There are 207 CDF projects in Ugenya.
            These are the most expensive:
        
        
        
            - 
                Tingare Secondary School (2009):
                Ksh 10,000,000
                spent on Construction Of A Dining Hall And Kitchen.
                (more)
            
 
        
            - 
                Ambira Health Centre (2008):
                Ksh 6,200,000
                spent on Construction 1 Male And 1 Female Ward.
                (more)
            
 
        
            - 
                Umina Mixed Secondary School (2003):
                Ksh 3,070,000
                spent on Construction of admin block & Verandah; wall/floor Plastering; Fitting Of Windows/Doors; Paintings; Electrification; Ceiling.
                (more)
            
 
        
            - 
                Bar Achuth Dispensary (2005):
                Ksh 2,772,303
                spent on Construction Of Maternity Unit, Male And Female Wards;Walling;Plastering;Roofing;Painting;Fitting.
                (more)
            
 
        
            - 
                Ukwala Health Centre (2009):
                Ksh 2,681,544
                spent on Construction Of 2 Staff Houses.
                (more)
            
 
        
            - 
                Sikalame Dispensary (2007):
                Ksh 2,551,850
                spent on Electification;Painting;General Repair;Two Roomd.
                (more)
            
 
        
            - 
                Tingare Dispensary (2006):
                Ksh 2,140,298
                spent on Slabbing(Flooring);Gables Building;Plastering;Fitting Of Doors,Windows;Painting;Starting Phace 2 Of The Project .
                (more)
            
 
        
            - 
                Simenya Dispensary (2006):
                Ksh 2,100,000
                spent on Construction Of Opd.Foundation;Plastering Of Walls&Floor;Fittings Off Windows,Doors;Painsdtings;Electrification.
                (more)
            
 
        
            - 
                Uhuyi Dispensary (2008):
                Ksh 1,800,000
                spent on Construction Of Out Patient Department.
                (more)
            
 
        
            - 
                Bar Anyanga Primary School (2006):
                Ksh 1,700,000
                spent on Paintings Of Classrooms; wall Plastering; Fittings Of Shutters; Facerboards ;Construction Of Admin Block.
                (more)