There are 207 CDF projects in Ugenya.
These are the most expensive:
-
Tingare Secondary School (2009):
Ksh 10,000,000
spent on Construction Of A Dining Hall And Kitchen.
(more)
-
Ambira Health Centre (2008):
Ksh 6,200,000
spent on Construction 1 Male And 1 Female Ward.
(more)
-
Umina Mixed Secondary School (2003):
Ksh 3,070,000
spent on Construction of admin block & Verandah; wall/floor Plastering; Fitting Of Windows/Doors; Paintings; Electrification; Ceiling.
(more)
-
Bar Achuth Dispensary (2005):
Ksh 2,772,303
spent on Construction Of Maternity Unit, Male And Female Wards;Walling;Plastering;Roofing;Painting;Fitting.
(more)
-
Ukwala Health Centre (2009):
Ksh 2,681,544
spent on Construction Of 2 Staff Houses.
(more)
-
Sikalame Dispensary (2007):
Ksh 2,551,850
spent on Electification;Painting;General Repair;Two Roomd.
(more)
-
Tingare Dispensary (2006):
Ksh 2,140,298
spent on Slabbing(Flooring);Gables Building;Plastering;Fitting Of Doors,Windows;Painting;Starting Phace 2 Of The Project .
(more)
-
Simenya Dispensary (2006):
Ksh 2,100,000
spent on Construction Of Opd.Foundation;Plastering Of Walls&Floor;Fittings Off Windows,Doors;Painsdtings;Electrification.
(more)
-
Uhuyi Dispensary (2008):
Ksh 1,800,000
spent on Construction Of Out Patient Department.
(more)
-
Bar Anyanga Primary School (2006):
Ksh 1,700,000
spent on Paintings Of Classrooms; wall Plastering; Fittings Of Shutters; Facerboards ;Construction Of Admin Block.
(more)