Voi

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (205)

There are 205 CDF projects in Voi. These are the most expensive:

  • Marungu Secondary School (2003): Ksh 6,700,000 spent on Construction Of 4 Classrooms, Admin Block And Toilets. (more)
  • Irima Water Project (2006): Ksh 6,500,000 spent on Construction Of Pipeline From Mzima Mains. (more)
  • Ndovu Dispensary (2005): Ksh 6,500,000 spent on Construction Of Health Facility. (more)
  • Mbogholinyi Water Project (2005): Ksh 5,200,000 spent on Construction Of Silt Tank And Pipe Laying. (more)
  • Talio Chini Borehole (2009): Ksh 4,500,000 spent on Drilling Of Borehole And Distribution. (more)
  • Buguta West Borehole (2008): Ksh 4,400,000 spent on Drilling Of Borehole And Distribution. (more)
  • David Kayanda Secondary School (2004): Ksh 4,354,000 spent on Construction Of Admin Block. (more)
  • Mwakitawa Secondary School (2004): Ksh 4,300,000 spent on Construction Of Milti Purpose Hall. (more)
  • Coast Institute Of Technology (2004): Ksh 4,250,000 spent on Construction And Completion Of Admin Block. (more)
  • Ikanga/Kirutai Water Project (2008): Ksh 3,930,000 spent on Drilling Of Borehole And Distribution. (more)