Wajir South

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (121)

There are 121 CDF projects in Wajir South. These are the most expensive:

  • Salalmaa Borehole (2004): Ksh 6,150,000 spent on Geosurvey,Drilling & Equipping Of Salalmaa Borehole. (more)
  • Abakore / Sabuli Drift (2006): Ksh 5,800,000 spent on Construction Of A Drift Btw Abakore / Sabuli Roads.. (more)
  • Khalif Mude Road (2009): Ksh 5,500,000 spent on Constructions Of A 40M Drift At Khalif Mude Road.. (more)
  • Habaswein Cdf Office (2007): Ksh 5,000,000 spent on Construction & Equipping Of Cdf Office. (more)
  • Diff Airstrip (2007): Ksh 5,000,000 spent on Fencing & Grading Of Airstrip. (more)
  • Drift At Kursin/ Sukela Road (2007): Ksh 4,500,000 spent on Construction Of A Drift At Kursin/ Sukela Road. (more)
  • Drift Between Habaswein & Dilmanyale (2006): Ksh 4,000,000 spent on Making Drift Between Habaswein/ Dilmanyale. (more)
  • Habaswein Secondary School (2007): Ksh 4,000,000 spent on Construction Of 2 Staff Houses & 2 Classrooms At Habaswein Boys Secondary. (more)
  • Dadaja Bulla Replacement Borehole (2004): Ksh 3,000,000 spent on Drilling A Replacement Borehole. (more)
  • Administration Block At Habaswein District Hospital (2007): Ksh 3,000,000 spent on Construction Of An Administration Block. (more)

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus