There are 121 CDF projects in Wajir South.
These are the most expensive:
-
Salalmaa Borehole (2004):
Ksh 6,150,000
spent on Geosurvey,Drilling & Equipping Of Salalmaa Borehole.
(more)
-
Abakore / Sabuli Drift (2006):
Ksh 5,800,000
spent on Construction Of A Drift Btw Abakore / Sabuli Roads..
(more)
-
Khalif Mude Road (2009):
Ksh 5,500,000
spent on Constructions Of A 40M Drift At Khalif Mude Road..
(more)
-
Habaswein Cdf Office (2007):
Ksh 5,000,000
spent on Construction & Equipping Of Cdf Office.
(more)
-
Diff Airstrip (2007):
Ksh 5,000,000
spent on Fencing & Grading Of Airstrip.
(more)
-
Drift At Kursin/ Sukela Road (2007):
Ksh 4,500,000
spent on Construction Of A Drift At Kursin/ Sukela Road.
(more)
-
Drift Between Habaswein & Dilmanyale (2006):
Ksh 4,000,000
spent on Making Drift Between Habaswein/ Dilmanyale.
(more)
-
Habaswein Secondary School (2007):
Ksh 4,000,000
spent on Construction Of 2 Staff Houses & 2 Classrooms At Habaswein Boys Secondary.
(more)
-
Dadaja Bulla Replacement Borehole (2004):
Ksh 3,000,000
spent on Drilling A Replacement Borehole.
(more)
-
Administration Block At Habaswein District Hospital (2007):
Ksh 3,000,000
spent on Construction Of An Administration Block.
(more)