The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Aldai

Oroba River Bridgechepswert Magoi

location
Chemase (in Aldai)
year first funded
2005
action
Construction Of A Bridge
output
To Connect And Repair A Swept Bridge
implementation status
Completed
total cost
Ksh 4,514,000
estimate
Ksh 4,514,000

Kapsengere Dispensary

location
Terik (in Aldai)
year first funded
2003
action
Construction Of Health Facility
output
Improve Health Care
implementation status
The Project Has Stalled Due To Land Dispute
total cost
Ksh 3,400,000
estimate
Ksh 5,000,000

Kaptumo Health Centre

location
Kaptumo (in Aldai)
year first funded
2003
action
Construction Of Female Ward To Completion
output
Improve Health Care
implementation status
General Ward Complete And In Use, Female Ward At Window Level
total cost
Ksh 2,800,000
estimate
Ksh 3,500,000

Kemeloi Health Centre

location
Mugen (in Aldai)
year first funded
2003
action
Construction Of Female/Male Ward
output
Improve Health Care
implementation status
Roofing Done, General Finshing Works Remaining
total cost
Ksh 2,700,000
estimate
Ksh 2,000,000

Kaptumek Health Centre

location
Maraba (in Aldai)
year first funded
2003
action
Expansion - Maternity Wing
output
Improve Health Care
implementation status
Roofing Done, General Finshing Works Remaining
total cost
Ksh 2,600,000
estimate
Ksh 2,800,000

Koyo Health Centre

location
Koyo (in Aldai)
year first funded
2003
action
Expansion - Maternity Wing
output
Improve Health Care
implementation status
Project Almost Complete, Save For Final Finishes(Ceiling And Fittings)
total cost
Ksh 2,600,000
estimate
Ksh 2,500,000

Cheptingwich Heath Centre

location
Kemeloi (in Aldai)
year first funded
2004
action
Completion Of Health Centre (Plastering And Painting)
output
Improve Health Care
implementation status
Completion Works OnGoing
total cost
Ksh 2,300,000
estimate
Ksh 2,000,000

Kapsengere Secondary School

location
Terik (in Aldai)
year first funded
2005
action
Dormitory
output
Improve Education Standard
implementation status
The Project Is At Foundation Level
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Aldai Girls Secondary School

location
Kaptumo (in Aldai)
year first funded
2004
action
Construction Of Dormitory
output
To Be Allocated Additional Funds
implementation status
The Construction Approaching First Floor Slab
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Kaptumo Boys Secondary School

location
Kaptumo (in Aldai)
year first funded
2004
action
Dining Hall
output
Improve Education Standard
implementation status
dining Hall And Kitchen At Lintel
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Ahebisaas Secondary School

location
Ndurio (in Aldai)
year first funded
2004
action
Dining Hall/ Dormitory
output
Improve Education Standard
implementation status
Dining Hall Roofed,Walling Yet To Be Done And A Semi Permanent Dormitory Build To Completion
total cost
Ksh 2,200,000
estimate
Ksh 4,400,000

Kapkolei Girls Secondary School

location
Kapkolei (in Aldai)
year first funded
2004
action
Dining Hall
output
MultiPurpose Hall
implementation status
Project At Roofing Stage
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Frair Girls Secondary School

location
Chebilat (in Aldai)
year first funded
2004
action
Twin Laboratory/Library
output
Improve Education Standard
implementation status
The Project Is At Lintel Level
total cost
Ksh 2,200,000
estimate
Ksh 6,000,000

Kimaren Secondary School

location
Kibwareng (in Aldai)
year first funded
2004
action
Dormitory
output
Improve Education Standard
implementation status
Roofing Done, Finishing Works Remaining
total cost
Ksh 2,200,000
estimate
Ksh 3,000,000

Aonjoge Boys

location
Bonjoge (in Aldai)
year first funded
2004
action
Dining Hall
output
To Provide Shelter During Meals
implementation status
Roofing Done, Finishing Works On Going
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Maraba Secondary School

location
Kibwareng (in Aldai)
year first funded
2004
action
Library
output
Improve Education Standard
implementation status
Library Project Complete
total cost
Ksh 2,200,000
estimate
Ksh 250,000

Chemase Health Centre

location
Chemase (in Aldai)
year first funded
2003
action
Expansion -Staff Houses
output
Improve Health Care
implementation status
At Finishing Level
total cost
Ksh 2,200,000
estimate
Ksh 2,000,000

Enego Health Centre

location
Ndurio (in Aldai)
year first funded
2004
action
Construction Nursing Block
output
Improve Health Care
implementation status
Roofing Done,Finishing Works Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Kapkolei Health Centre

location
Kapkolei (in Aldai)
year first funded
2004
action
Expansion Maternity Wing
output
Improve Health Care
implementation status
Roofing Done, Finishing Works Remaining
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Kibwareng Dispensary

location
Kibwareng (in Aldai)
year first funded
2004
action
Completion Of Staff Quarters (2 Units)
output
Improve Health Care
implementation status
Project Also Co Funded By Latf And Community
total cost
Ksh 2,200,000
estimate
Ksh 2,000,000

Kapsamoch Dispensary

location
Kapkures (in Aldai)
year first funded
2004
action
Completion Of Dispensary Block (Plastering And Painting)
output
Improve Health Care
implementation status
Roofing And Genral Finishing Done,Now Working On Sewarage And Water Systems
total cost
Ksh 2,200,000
estimate
Ksh 2,000,000

Bonjoge Health Centre

location
Bonjoge (in Aldai)
year first funded
2004
action
Construction Of Dispensary Block
output
Improve Health Care
implementation status
Completion Works Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 250,000

Chepkebuge Secondary School

location
Chebilat (in Aldai)
year first funded
2004
action
Classrooms And Laboratory
output
Improve Education Standard
implementation status
2 Class Rooms And Lab Build To Completion
total cost
Ksh 2,100,000
estimate
Ksh 2,200,000

Banja Secondary School

location
Kapkerer (in Aldai)
year first funded
2004
action
Laboratory Extention/Renovation & Dorm
output
Improve Education Standard
implementation status
Lab And Boys Dorm Build To Completion
total cost
Ksh 1,900,000
estimate
Ksh 1,500,000

Kipkegenda Dispensary

location
Koyo (in Aldai)
year first funded
2003
action
Construction Of Dispensary Block To Completion
output
Improve Health Care
implementation status
Roofing And Genral Finishing Done
total cost
Ksh 1,820,000
estimate
Ksh 1,900,000

Banja Water Project

location
Terik (in Aldai)
year first funded
2008
action
Drilling Of Borehole And Piping
output
Clean Water For Domestic Use
implementation status
New, Not Yet Started
total cost
Ksh 1,800,000
estimate
Ksh 0

Kemeloi Boys Secondary School

location
Mugen (in Aldai)
year first funded
2004
action
Dining Hall
output
To Provide Shelter During Meals
implementation status
The Project Is At Foundation Level
total cost
Ksh 1,700,000
estimate
Ksh 4,200,000

Chemase Secondary School

location
Chemase (in Aldai)
year first funded
2003
action
Laboratory
output
Improve Education Standard
implementation status
Roofing And General Finishes Done,
total cost
Ksh 1,700,000
estimate
Ksh 2,000,000

Kapkenduiywa Secondary School

location
Maraba (in Aldai)
year first funded
2005
action
Classrooms/Adm.Block
output
Improve Education Standard
implementation status
2 Classrooms Roofed, Admn. Block And 2 Classrooms At 4 Courses From Foundation
total cost
Ksh 1,700,000
estimate
Ksh 2,400,000

Chepkongony Secondary School

location
Kaptumo (in Aldai)
year first funded
2004
action
Laboratory
output
Improve Education Standard
implementation status
Phase One Of Twin Laboratory Roofed, Finishing Works In Progress
total cost
Ksh 1,700,000
estimate
Ksh 1,500,000

Keburo Secondary School

location
Kaptumo (in Aldai)
year first funded
2004
action
Classrooms/Admin Block
output
Improve Education Standard
implementation status
Two Classrooms And Admin Block Complete
total cost
Ksh 1,624,002
estimate
Ksh 1,800,000

Ndurio Secondary School

location
Ndurio (in Aldai)
year first funded
2003
action
Classrooms/Admn. Block
output
Improve Education Standard
implementation status
2 Classrooms Complete And Operational
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kesogon Secondary School

location
Ndurio (in Aldai)
year first funded
2003
action
Laboratory
output
Improve Education Standard
implementation status
The Project Is At Foundation Level
total cost
Ksh 1,500,000
estimate
Ksh 4,500,000

Kibongwa Dispensary

location
Chemase (in Aldai)
year first funded
2004
action
Completion Of Dispensary Block (Plastering And Painting)
output
Improve Health Care
implementation status
Roofing Done, Completion Works Remaining
total cost
Ksh 1,423,016
estimate
Ksh 1,000,000

Deb Samitui Secondary School

location
Chebilat (in Aldai)
year first funded
2004
action
Classrooms/Adm.Block
output
Improve Education Standard
implementation status
3 Classrooms Complete,Completion Works On Admn.Block In Progrss
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Serem Dispensary

location
Kemeloi (in Aldai)
year first funded
2004
action
Completion Of Dispensary Block (Plastering And Painting)
output
Improve Health Care
implementation status
Roofing Done,Completion Works Remaining
total cost
Ksh 1,400,000
estimate
Ksh 1,200,000

Kipchemwon Secondary School

location
Terik (in Aldai)
year first funded
2005
action
Building 4 Class Rooms And Admn. Block
output
Improved Access To Education
implementation status
Purchased Land And Bought Building Materials
total cost
Ksh 1,400,000
estimate
Ksh 2,600,000

Ssamitui Secondary School

location
Kibwareng (in Aldai)
year first funded
2004
action
Classrooms/Adm.Block
output
Improve Education Standard
implementation status
4 Classrooms And Admn. Block Complete,Save For Minor Finishes
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Kemeloi Girls Secondary School

location
Mugen (in Aldai)
year first funded
2004
action
Laboratory Construction
output
Improve Education Standard
implementation status
Roofing And General Finishing Done, Plumbing Works On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Koitabut Secondary School

location
Chebara (in Aldai)
year first funded
2004
action
Laboratory /Adm.Block
output
Improve Education Standard
implementation status
Admin. Block (Primary) Build To Completion And Lab Equiped
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Kabwareng Secondary School

location
Maraba (in Aldai)
year first funded
2004
action
Classrooms/ Admin Block
output
Improve Education Standard
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

A Kapkeben Girls Secondary School

location
Bonjoge (in Aldai)
year first funded
2004
action
Dormitory/Classrooms
output
Accomodation Of More Students
implementation status
Dormitory Complete And In Use, 1 Classroom Under Construction
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Soi Water Project

location
Kapkerer (in Aldai)
year first funded
2008
action
Construction Of Water Tank (Reservoir) And Piping
output
Clean Water For Domestic Use
implementation status
First Phase Complete,A Section Of The Community Now Taking Water.
total cost
Ksh 1,280,395
estimate
Ksh 2,500,000

Kapkemich Dispensary

location
Mugen (in Aldai)
year first funded
2004
action
Expansion
output
Improve Health Care
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,000,000

Kaptumek Secondary School

location
Maraba (in Aldai)
year first funded
2003
action
Laboratory
output
Improve Education Standard
implementation status
Roofing Done, Completion Works In Progress
total cost
Ksh 1,200,000
estimate
Ksh 150,000

Koyo Secondary School

location
Koyo (in Aldai)
year first funded
2003
action
Expansion -Staff Houses
output
Improve Education Standard
implementation status
2 Staff Units Complete
total cost
Ksh 1,200,000
estimate
Ksh 150,000

Serem Secondary School

location
Mugen (in Aldai)
year first funded
2004
action
Laboratory Construction
output
Improve Education Standard
implementation status
Structure Complete And Functional
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Chebara Secondary School

location
Chebara (in Aldai)
year first funded
2004
action
Laboratory
output
Improve Education Standard
implementation status
Lab Build To Completion And Equipment Purchased
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Koibarak Secondary School

location
Chebara (in Aldai)
year first funded
2004
action
Renovation Of Laboratory /Adm.Block
output
Improve Education Standard
implementation status
Renovation Of Laboratory Complete, 1 Classroom Built To Completion
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Holy Rosary Girls Secondary School

location
Chepkumia (in Aldai)
year first funded
2004
action
3 Classroom construction
output
Improve Education Standard
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Chekuny Secondary School

location
Bonjoge (in Aldai)
year first funded
2004
action
4 Classrooms And Admin.Block.
output
A New Secondary School
implementation status
Roofing Done For 3 Class Rooms And Admn. Block, Completion Works Remaining
total cost
Ksh 1,200,000
estimate
Ksh 2,400,000

Chepkumia Secondary School

location
Chepkumia (in Aldai)
year first funded
2004
action
Construction Of Library And Completion Of Admin Block
output
Improve Education Standard
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,600,000

Ngatipkoi

location
Chepkumia (in Aldai)
year first funded
2004
action
Construction
output
Improve Health Care
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 2,800,000

Kibisem Dispensary

location
Chemase (in Aldai)
year first funded
2004
action
Construction
output
Improve Health Care
implementation status
Construction At Window Level
total cost
Ksh 1,100,000
estimate
Ksh 1,800,000

Mosombor Dispensary

location
Kaptumo (in Aldai)
year first funded
2004
action
Construction Of Nursingblock
output
Improve Health Care
implementation status
Construction At Lintel Level
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Kapkures Secondary School

location
Kapkures (in Aldai)
year first funded
2004
action
Laboratory Construction
output
Improve Education Standard
implementation status
Roofing Has Been Done,Finishing Works Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Kapsagawat Dispensary

location
Chebilat (in Aldai)
year first funded
2004
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
Construction At Lintel Level
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Chemase Water Project

location
Chemase (in Aldai)
year first funded
2009
action
Construction Of Tank & Piping
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 0

Kamobon Water Project

location
Kaboi (in Aldai)
year first funded
2009
action
Construction Of Water Tank & Piping
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 0

Kereri Dispensary

location
Bonjoge (in Aldai)
year first funded
2004
action
Completion Of Dispensary Block (Plastering And Painting)
output
Improve Health Care
implementation status
Finishing Works Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,900,000

Kimyoasis Secondary School

location
Chepkumia (in Aldai)
year first funded
2005
action
4 Classrooms And Admin.Block.
output
Improve Education Standard
implementation status
2 Classrooms And Admn. Block Roofed
total cost
Ksh 900,000
estimate
Ksh 1,800,000

Kaboi Dispensary

location
Kaboi (in Aldai)
year first funded
2008
action
Completion Of Maternity Wing
output
Improve Health Care
implementation status
Finishing Works Done,Save For Septic Tank And Ceiling
total cost
Ksh 900,000
estimate
Ksh 0

Kapsoiyo Dispensary

location
Koyo (in Aldai)
year first funded
2004
action
Construction Of Dispensary Block
output
Improve Health Care
implementation status
Construction At Window Level
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Mugen Dispensary

location
Mugen (in Aldai)
year first funded
2004
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
The Project Is At Lintel
total cost
Ksh 900,000
estimate
Ksh 1,900,000

Bishop Makarius Secondary School

location
Kapkures (in Aldai)
year first funded
2005
action
Laboratory Construction
output
Improve Education Standard
implementation status
Roofing Done,Finishing Remaining
total cost
Ksh 900,000
estimate
Ksh 1,500,000

Kaborowo Primary School

location
Kaptumo (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improve Education Standard
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 800,000
estimate
Ksh 500,000

KeburoToretmoiLegoi Road

location
Kapsaos (in Aldai)
year first funded
2008
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
Approximatetly 5Kms Of Road Formed And Now In A Better State
total cost
Ksh 800,000
estimate
Ksh 1,500,000

Chebirir Primary School

location
Chemase (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 800,000
estimate
Ksh 500,000

Kipsebwo Polythenic

location
Kaptumo (in Aldai)
year first funded
2004
action
ExpansionDormitory
output
To Accomondate More Students
implementation status
Project At Foundation Level
total cost
Ksh 720,259
estimate
Ksh 1,000,000

Korongoi Dispensary

location
Kapkerer (in Aldai)
year first funded
2004
action
Construction Of Dispensary Block
output
Improve Health Care
implementation status
The Project Is At Roofing Stage
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kabwareng Dispensary

location
Chepkumia (in Aldai)
year first funded
2005
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Kipsigak Dispensary

location
Kapkerer (in Aldai)
year first funded
2003
action
Completion Of Dispensary Block (Plastering And Painting)
output
Improve Health Care Provision
implementation status
The Project Is Complete
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Boi Dispensary

location
Kibwareng (in Aldai)
year first funded
2004
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
Roofing Done,Finishing Works Remaining
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kongoro Dispensary

location
Maraba (in Aldai)
year first funded
2004
action
Completion Of Dispensary Block (Plastering And Painting)
output
Improve Health Care
implementation status
The Block Is Complete And Operational,
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Chemobo Dispensary

location
Kapkures (in Aldai)
year first funded
2004
action
Construction Of Dispensary Block
output
Improve Health Care
implementation status
The Project At The Foundation Slab
total cost
Ksh 700,000
estimate
Ksh 1,900,000

Mugen Polythenic

location
Mugen (in Aldai)
year first funded
2004
action
Expansion
output
Improve Technical Skills
implementation status
On Going
total cost
Ksh 675,000
estimate
Ksh 1,000,000

Koibem Polythenic

location
Chepkumia (in Aldai)
year first funded
2005
action
Construction
output
Improve Technical Skills
implementation status
New
total cost
Ksh 675,000
estimate
Ksh 1,000,000

Iribo Polythenic

location
Terik (in Aldai)
year first funded
2005
action
Construction
output
Improve Technical Skills
implementation status
Not Started
total cost
Ksh 675,000
estimate
Ksh 1,000,000

Bonjoge Polythenic

location
Bonjoge (in Aldai)
year first funded
2005
action
Construction Of Two Blocks/ Classrooms
output
Improve Technical Skills
implementation status
New At Foundation Level
total cost
Ksh 675,000
estimate
Ksh 3,000,000

Kapsigilai Polythenic

location
Chemase (in Aldai)
year first funded
2005
action
Construction
output
Improve Technical Skills
implementation status
New
total cost
Ksh 675,000
estimate
Ksh 1,000,000

Tuiyobei Vented Drift Bridge

location
Kapsaos (in Aldai)
year first funded
2009
action
Construction Of Drift Bridge
output
To Improve Accessibility
implementation status
New
total cost
Ksh 650,000
estimate
Ksh 0

Asurur Vented Drift Bridge

location
Ndurio (in Aldai)
year first funded
2009
action
Construction Of Drift Bridge
output
To Improve Accessibility
implementation status
New
total cost
Ksh 650,000
estimate
Ksh 0

Kesogon Dispensary

location
Ndurio (in Aldai)
year first funded
2004
action
Construction Nursing Block
output
Improve Health Care
implementation status
Construction At Lintel LevelProject Also Co Funded By Latf And Community
total cost
Ksh 641,000
estimate
Ksh 1,000,000

Chebilat Health Centre

location
Chebilat (in Aldai)
year first funded
2004
action
Expansion
output
Improve Health Care
implementation status
Nursing Block Complete CoFunded By Cdf And Lasdap/Latf
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Chepkongony Dispensary

location
Kaptumo (in Aldai)
year first funded
2004
action
Expansion Two Staff Houses
output
Improve Health Care
implementation status
Two Units Roofed,1 Unit Almost Complete
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Mugundoi Water Project

location
Kaboi (in Aldai)
year first funded
2009
action
Purchase Of Electricity Water Pump
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 0

Chepkumia Health Centre

location
Chepkumia (in Aldai)
year first funded
2006
action
Construction Of Staff Houses And Maternity Wing
output
Improve Health Care
implementation status
On - Going
total cost
Ksh 600,000
estimate
Ksh 1,400,000

MugenKapkemich Road

location
Mugen (in Aldai)
year first funded
2008
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
Approximatetly 4Kms Of Road Formed And Now In Use
total cost
Ksh 600,000
estimate
Ksh 2,500,000

Chepukundi Dispensary

location
Mugen (in Aldai)
year first funded
2004
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
Construction At Foundation Level
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Kapkeruge Chemong Road

location
Kemeloi (in Aldai)
year first funded
2009
action
Road Formation
output
To Improve Accessibility
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Chepkurgung Gambogi Soi Road

location
Terik (in Aldai)
year first funded
2009
action
Road Formation
output
To Improve Accessibility
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Chepswerta Kapkuong Road

location
Chemase (in Aldai)
year first funded
2009
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

ChebilatChepkebugeKimaren Road

location
Chebilat (in Aldai)
year first funded
2008
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
Approximatetly 5Kms Of Road Graded
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Kamotony Primary School

location
Ndurio (in Aldai)
year first funded
2007
action
Rehabilitation
output
Improve Education Standard
implementation status
Two Classrooms Renovated And Are In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Kapsengere Primary School

location
Terik (in Aldai)
year first funded
2007
action
Renovations Of 6 Classrooms And Adminstration Block
output
Improve Learning Environment
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Chepkurngung Primary School

location
Terik (in Aldai)
year first funded
2007
action
Construction Of 2 Classrooms
output
Improve Learning Environment
implementation status
2 Class Rooms Roofed, Finishing Works Remaining
total cost
Ksh 500,000
estimate
Ksh 500,000

Kapkerer Secondary School

location
Kapkerer (in Aldai)
year first funded
2009
action
Lab Completion
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Kapkenduiywa Schoolfor The Deaf

location
Maraba (in Aldai)
year first funded
2005
action
2 Classrooms And An Office
output
Improve Learning Environment
implementation status
1 Classroom And Office Build To Completion
total cost
Ksh 500,000
estimate
Ksh 900,000

Kiptulus Secondary School

location
Kaboi (in Aldai)
year first funded
2008
action
Completion Of Two Classrooms (Plastering, Painting, Doors And Windows)
output
Improve Education Standard
implementation status
3 Classrooms Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 0

Kamarich Water Project

location
Kaboi (in Aldai)
year first funded
2008
action
Purchase And Laying Of Distribution Pipes
output
Clean Water For Domestic Use
implementation status
Intake Works And Laying Of Pipes Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,200,000

Kabisocho Water Project

location
Ndurio (in Aldai)
year first funded
2009
action
Spring Protection & Piping
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Bonjoge Police Post

location
Bonjoge (in Aldai)
year first funded
2008
action
n/a
output
-
implementation status
Ongoing.
total cost
Ksh 500,000
estimate
Ksh 0

Siksik Dispensary

location
Kaboi (in Aldai)
year first funded
2009
action
Construction Of New Nursing Block
output
-
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Ressio Forest Dispensary

location
Chebilat (in Aldai)
year first funded
2008
action
Construction Of Mch Wing
output
Improve Health Care
implementation status
Roofing Done, Finishing Works Ongoing
total cost
Ksh 500,000
estimate
Ksh 800,000

Chemursoi Dispensary

location
Chemase (in Aldai)
year first funded
2004
action
Expansion Observation Ward/Room
output
Improve Health Care
implementation status
The Project Is Complete But Not Yet Operational
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chepkurngung Dispensary

location
Terik (in Aldai)
year first funded
2004
action
Construction Of Dispensary Block
output
Improve Health Care
implementation status
The Project At The Slab Level
total cost
Ksh 500,000
estimate
Ksh 1,200,000

Kapkolei Water Project

location
Kapkolei (in Aldai)
year first funded
2008
action
Purchase Of Water Pump
output
Clean Water For Domestic Use
implementation status
Water Pump Purchased And Installed
total cost
Ksh 500,000
estimate
Ksh 500,000

Mogoiywo Primary School

location
Maraba (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Chepturer Cattle Dip

location
Kapkolei (in Aldai)
year first funded
2009
action
Construction To Completion Of The Dip
output
To Improve Livestock Production
implementation status
Complete and in use.
total cost
Ksh 400,000
estimate
Ksh 0

Kisarich Dispensary

location
Maraba (in Aldai)
year first funded
2004
action
Expansion Maternity Wing
output
Improve Health Care
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Chepkober Dispensary

location
Maraba (in Aldai)
year first funded
2004
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
Roofing Done,Completion Works Remaining
total cost
Ksh 400,000
estimate
Ksh 1,000,000

KapsamochSiginwai Road

location
Mugen (in Aldai)
year first funded
2009
action
Bush Clearing And Road Formation
output
To Improve Accessibility
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Pemja Primary School

location
Maraba (in Aldai)
year first funded
2009
action
Construction To Completion Of 2 Class
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Serem Primary School

location
Mugen (in Aldai)
year first funded
2009
action
Construction Of 1 Classroom To Completion .
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Chemursoi Primary School

location
Chemase (in Aldai)
year first funded
2009
action
Construction To Completion Of 2 Class
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Kapkemich Primary School

location
Kapkures (in Aldai)
year first funded
2009
action
Completion Of 4 Classrooms/Finishing
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Kimolwo Primary School

location
Kapkolei (in Aldai)
year first funded
2009
action
Construction Of One Classroom And Renovation.
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Chemong Primary School

location
Kemeloi (in Aldai)
year first funded
2009
action
Construction Of One Classroom And Renovation.
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Morongoit Primary School

location
Chebilat (in Aldai)
year first funded
2009
action
Lab Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Gambogi Muslim Primary School

location
Kapkerer (in Aldai)
year first funded
2009
action
Completion Of 2 Class Rooms
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Mamman Primary School

location
Maraba (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Kapchemosin Primary School

location
Kaboi (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Chepsioch Primary School

location
Maraba (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Koimet Primary School

location
Ndurio (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Iboe Primary School

location
Kapkures (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Chebui Primary School

location
Ndurio (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Kapkitany Primary School

location
Kemeloi (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Saos Primary School

location
Bonjoge (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Kiroro Primary School

location
Chemase (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Chepswerta Primary School

location
Chemase (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Nderio Primary School

location
Kapkures (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Kimerek Primary School

location
Mugen (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion
output
Improved Infrustructure
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Magoi Primary School

location
Chemase (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

n/a

location
Chebilat (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Done To Competion
total cost
Ksh 400,000
estimate
Ksh 500,000

Kibongwa Primary School

location
Chemase (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Kapsamoch Primary School

location
Mugen (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
Requires Additional Funds For Completion
total cost
Ksh 400,000
estimate
Ksh 500,000

Chepkurgung Primary School

location
Terik (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works Remaining
total cost
Ksh 400,000
estimate
Ksh 500,000

Kamagap Primary School

location
Maraba (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Class Rooms And 2 Offices Constructed To Near Completion
total cost
Ksh 400,000
estimate
Ksh 500,000

Kipsartuk Primary School

location
Maraba (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Tendwet Primary School

location
Kaboi (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works Remaining
total cost
Ksh 400,000
estimate
Ksh 500,000

Mugen Primary School

location
Mugen (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Aryok Primary School

location
Kapkolei (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Done To Competion
total cost
Ksh 400,000
estimate
Ksh 500,000

Siginwai Primary School

location
Mugen (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Kapkitony Primary School

location
Kaptumo (in Aldai)
year first funded
2008
action
Construction Of 2 Classrooms To Completion
output
Improved Learning Environment
implementation status
2 Classrooms Roofed, Finishing Works Remaining
total cost
Ksh 400,000
estimate
Ksh 500,000

Kapsoo Girls Secondary School

location
Kaboi (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

OroboKaptilol Road

location
Ndurio (in Aldai)
year first funded
2008
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
Approximatetly 2Kms Of Road Formed And Now In A Better State
total cost
Ksh 381,005
estimate
Ksh 1,200,000

Koyo Water Project

location
Koyo (in Aldai)
year first funded
2009
action
Purchase & Laying Of Pipes
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 350,000
estimate
Ksh 0

Serem Kapsamoch Bridge

location
Mugen (in Aldai)
year first funded
2004
action
Construction Of A Bridge
output
To Connect Serem And Kapsamoch Location.
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 350,000

Chepkongony Water Project

location
Kaptumo (in Aldai)
year first funded
2009
action
Construction Of Intake And Piping From Source
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 310,000
estimate
Ksh 0

Chepketemon Water Project

location
Chebilat (in Aldai)
year first funded
2009
action
Construction Of Reservoir Tank
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 310,000
estimate
Ksh 0

Sarma Dispensary

location
Ndurio (in Aldai)
year first funded
2004
action
Expansion
output
Improve Health Care
implementation status
Construction Complete
total cost
Ksh 304,741
estimate
Ksh 1,000,000

Chebirir Water Project

location
Maraba (in Aldai)
year first funded
2009
action
Construction Of Water Tank
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kaptile Water Project

location
Ndurio (in Aldai)
year first funded
2009
action
Spring Protection & Piping
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kapkemich Water Project

location
Kapkures (in Aldai)
year first funded
2009
action
Construction Of Water Tank & Piping
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kapinderem Water Project

location
Kibwareng (in Aldai)
year first funded
2009
action
Construction Of Water Tank
output
Clean Water For Domestic Use
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Serem Water Project

location
Mugen (in Aldai)
year first funded
2009
action
Spring Protection & Piping
output
Clean Water For Domestic Use
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Chepkiwis Dispensary

location
Maraba (in Aldai)
year first funded
2004
action
Construction
output
Improve Health Care
implementation status
New Purchased Land Worth Ksh 130,000(Approx. 1Acre)
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Koibem Dispensary

location
Chepkumia (in Aldai)
year first funded
2004
action
Construction Of Nursing Block
output
Improve Health Care
implementation status
Block Has Been Roofed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

KoyoKibukwoChepkongony Road

location
Koyo (in Aldai)
year first funded
2009
action
Bush Clearing And Road Formation
output
To Improve Accessibility
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

KoitabutKereri Road

location
Bonjoge (in Aldai)
year first funded
2009
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Mugen Roads

location
Mugen (in Aldai)
year first funded
2006
action
Repair
output
Improve Roads
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 500,000

Kaptumo Roads

location
Kaptumo (in Aldai)
year first funded
2006
action
Repair
output
Improve Roads
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 50,000

Kapkures Roads

location
Kapkures (in Aldai)
year first funded
2006
action
Rehabilitation
output
Improve Roads
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 500,000

Samoget Primary School

location
Maraba (in Aldai)
year first funded
2009
action
Construction To Completion Of 2 Class
output
Improved Infrustructure
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kimaren Primary School

location
Kibwareng (in Aldai)
year first funded
2009
action
Roofing Of 2 Classrooms
output
Improved Infrustructure
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kapko Primary School

location
Terik (in Aldai)
year first funded
2009
action
Completion Of Two Classroom At Roofing Stage
output
Improved Infrustructure
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kiprot Gorik Primary School

location
Ndurio (in Aldai)
year first funded
2009
action
Completion / Roofing Of 2 Class
output
Improved Infrustructure
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Chepkakwen Primary School

location
Kapkures (in Aldai)
year first funded
2009
action
Construction Of 2 Classrooms To Completion.
output
Improved Infrustructure
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Kibwareng Secondary School

location
Kibwareng (in Aldai)
year first funded
2004
action
n/a
output
-
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Kapkerer Roads

location
Kapkerer (in Aldai)
year first funded
2006
action
Rehabilitation
output
Improve Roads
implementation status
Not Started
total cost
Ksh 250,000
estimate
Ksh 500,000

Kipkuti Primary School

location
Kapkolei (in Aldai)
year first funded
2009
action
Completion Plastering And Fitting Of Windows
output
Improved Infrustructure
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Serem Cattle Dip

location
Mugen (in Aldai)
year first funded
2009
action
Rehabilitation Of An Old Dip
output
To Improve Livestock Production
implementation status
Complete and in use.
total cost
Ksh 250,000
estimate
Ksh 0

Kiptaruswo Primary School

location
Chebilat (in Aldai)
year first funded
2009
action
Completing Windows And Plastering
output
Improved Infrustructure
implementation status
New
total cost
Ksh 224,000
estimate
Ksh 0

Kapkeben Dispensary

location
Bonjoge (in Aldai)
year first funded
2003
action
Renovation Of Nursing Block
output
Improve Health Care
implementation status
Renovations Done, Dispensary Is Operational
total cost
Ksh 200,000
estimate
Ksh 600,000

Pemja Road

location
Maraba (in Aldai)
year first funded
2009
action
Bush Clearing And Grading
output
To Improve Accessibility
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Chemobo Primary School

location
Kapkures (in Aldai)
year first funded
2009
action
Finishing Of Floors
output
Improved Infrustructure
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Mogomben Primary School

location
Kibwareng (in Aldai)
year first funded
2009
action
Construction To Completion Of 2 Class
output
Improved Infrustructure
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Maraba Roads

location
Maraba (in Aldai)
year first funded
2006
action
Rehabilitation
output
Improve Roads
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 500,000

Morongoit Orthodox Dispensary

location
Chebilat (in Aldai)
year first funded
2004
action
Completion Works And Maternity Wing
output
Improve Health Care
implementation status
Plastering,Labour And Windows Done By Cdf
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kibongwa Cattle Dip

location
Chemase (in Aldai)
year first funded
2009
action
Completion Of The Dip
output
To Improve Livestock Production
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Koyo Roads

location
Koyo (in Aldai)
year first funded
2006
action
Repair
output
Improve Roads
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 50,000

Ndurio Roads

location
Ndurio (in Aldai)
year first funded
2006
action
Repair
output
Improve Roads
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 500,000

Chemogong Primary School

location
Kapkerer (in Aldai)
year first funded
2009
action
Construction To Completion Of 2 Class
output
Improved Infrustructure
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 0

Kiptaruswo Cattle Dip

location
Chebilat (in Aldai)
year first funded
2009
action
Completion Of The Dip
output
To Improve Livestock Production
implementation status
Complete and in use.
total cost
Ksh 140,000
estimate
Ksh 0

Ratinwo Cattle Dip

location
Maraba (in Aldai)
year first funded
2009
action
Rehabilitation Of An Old Dip
output
To Improve Livestock Production
implementation status
Complete and in use.
total cost
Ksh 124,501
estimate
Ksh 0

Kapkirukkabokw Cattle Dip

location
Kaboi (in Aldai)
year first funded
2009
action
Rehabilitation Of An Old Dip
output
To Improve Livestock Production
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0