The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Mabirikani Water Project
- location
-
Kilifi Township
(in Bahari)
- year first funded
- 2007
- action
- Installation Of Water Pipelines
- output
- To Provide Fresh Water To The Community.
- implementation status
- Back Filling Of The Excavated Soil.
- total cost
- Ksh 6,672,672
- estimate
- Ksh 6,672,672
Soyo Soyo Water Project
- location
-
Roka
(in Bahari)
- year first funded
- 2006
- action
- Connecting Pipeline
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Phase I Completed 100%, Phase 2 Piping Stage.
- total cost
- Ksh 6,511,887
- estimate
- Ksh 6,511,887
Arabuko-Sokoke Forest
- location
-
Roka
(in Bahari)
- year first funded
- 2005
- action
- Installation Of Electric Fence
- output
- To Reduce Human-Wildlife Conflict
- implementation status
- Complete 80%
- total cost
- Ksh 6,500,000
- estimate
- Ksh 6,500,000
Ngerenya Mix Secondary School new
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Construction Of 8 Classrooms
- output
- To Prepare Students For Post-Sec Education
- implementation status
- 8 Completed 100%.
- total cost
- Ksh 6,100,000
- estimate
- Ksh 6,100,000
Roka Secondary School C/Rooms
- location
-
Roka
(in Bahari)
- year first funded
- 2004
- action
- Construction Of 7 Classrooms
- output
- To Prepare Students For Post-Sec Education
- implementation status
- 6 Completed 1 Roofing Stage.
- total cost
- Ksh 5,114,651
- estimate
- Ksh 5,114,651
Makio Social Hall
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Social Hall
- output
- To Provide Self Employment To The People Of Kikambala.
- implementation status
- Roofing Stage.
- total cost
- Ksh 4,300,000
- estimate
- Ksh 2,650,000
Zowerani Dispensary
- location
-
Tezo
(in Bahari)
- year first funded
- 2004
- action
- Construction Of Disp,Staff House,A Pit Latrine
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Staff House Walling Above Ring Beam. 60%
- total cost
- Ksh 3,850,000
- estimate
- Ksh 3,850,000
Junju Secondary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 3 New Classrooms Office And Store.
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- 2 Classrooms Complete, 1 Classroom, Office And Store Not Started.
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,700,000
Mtwapa Juakali Sheds
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2006
- action
- Construction Of Juakali Sheds
- output
- To Create More Jobs For The Youth.
- implementation status
- Slab Level
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Mtondia Bamako Centre/Toilet
- location
-
Tezo
(in Bahari)
- year first funded
- 2003
- action
- Construction Of A Health Centre/Toilet.
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Plumbing And Electrical Installation. 70%
- total cost
- Ksh 3,150,000
- estimate
- Ksh 3,150,000
Roka Secondary School
- location
-
Roka
(in Bahari)
- year first funded
- 2006
- action
- Construction Of Laboratory/ Equipment
- output
- To Encourage Students To Take Science Subjects.
- implementation status
- Building Is Complete./ Equipments Supplied 100%
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Ziani Dispensary
- location
-
Ziani
(in Bahari)
- year first funded
- 2004
- action
- Construction of Staff House And Toilets
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Painting And Internal Fittings 98%
- total cost
- Ksh 2,980,000
- estimate
- Ksh 2,980,000
Matsangoni Youth Polytechnic New
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Youth Polytechnic.
- output
- Provide Vocational Trainings To The Community.
- implementation status
- Painting Stage. 75%
- total cost
- Ksh 2,674,037
- estimate
- Ksh 1,474,037
Majaoni Secondary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- 4 Classrooms Completed
- total cost
- Ksh 2,625,154
- estimate
- Ksh 2,625,154
Takaungu Dispensary
- location
-
Mavueni/Takaungu
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Dispensary And Toilets
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,850,000
Police Staff Quarters Matsangoni New
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2003
- action
- Construction Of Police Staff Quarters/Pit Latrine
- output
- Increase Securiy At Matsangoni.
- implementation status
- Complete And In-Use 100%
- total cost
- Ksh 2,389,000
- estimate
- Ksh 2,389,000
Mwarakaya Kizingo Water Tank Project
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2003
- action
- Construction of Water Tank, And Lying Of Pipes.
- output
- Provide Water Reservoir Sheds. During Dry Season
- implementation status
- Phase 1Completed 100%, Phase 2 Not Started.
- total cost
- Ksh 2,373,670
- estimate
- Ksh 2,373,670
Chasimba Secondary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 3 New Classrooms
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- 2 Classroom Completed, 1 Not Started
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Dzitsoni Secondary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2005
- action
- Construction of A Laboratory
- output
- Encourage Students To Do Science Subjects
- implementation status
- Completed 100%
- total cost
- Ksh 2,161,259
- estimate
- Ksh 2,161,259
St. Teresas Secondary School Lab
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A School Lab
- output
- Encourage Students To Do Science Subjects
- implementation status
- Lintel Level 60%
- total cost
- Ksh 2,150,000
- estimate
- Ksh 2,150,000
Paul Harris Secondary School
- location
-
Mwarakaya.
(in Bahari)
- year first funded
- 2008
- action
- Construction Of A New Lab.
- output
- To Expose Students To Science Subjects.
- implementation status
- Not Started
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Matandale Youth Polytechnic
- location
-
Mwarakaya.
(in Bahari)
- year first funded
- 2009
- action
- Construction Of A Youth Polytechnic.
- output
- Provide Vocational Trainings To The Community.
- implementation status
- Not Started
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Dindiri Secondary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 3 New Classrooms
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- 2 Classrooms Completed, 1 Not Started
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Bofa Primary School - Classrooms
- location
-
Tezo
(in Bahari)
- year first funded
- 2009
- action
- Construction Of 2 New Classrooms And Store.
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- Not Started.
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Vipingo Central Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2009
- action
- Construction Of 2 New Classrooms And Store.
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- Not Started
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Uyombo Secondary School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 3 New Classrooms
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- 2 Completed 100% 1 In Roofing Stage.
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Mavueni Dispensary
- location
-
Mavueni/Takaungu
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- To Provide Medical Services To The Area.
- implementation status
- Completed 100%
- total cost
- Ksh 2,025,000
- estimate
- Ksh 2,050,000
Kibarani Secondary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2007
- action
- Construction Sec School For The Deaf
- output
- Help Handicapped Students To Access Education
- implementation status
- Completed 100%
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Chonyi Dos Headquaters
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2003
- action
- Construction of DoS Office
- output
- To Provide Security In Chonyi Division
- implementation status
- Completed 100%
- total cost
- Ksh 1,975,125
- estimate
- Ksh 1,475,125
Majengo Kanamai Dispensary
- location
-
Mtepeni
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Dispensary.
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Not Started
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Chumani Dispensary
- location
-
Roka
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Dispensary.
- output
- Improve Heath Standards In Roka Location.
- implementation status
- Not Started
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Kizingo Dispensary
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2008
- action
- Construction Of A New Maternity Wing.
- output
- To Improve Health Conditions In Kizingo Area.
- implementation status
- Not Started
- total cost
- Ksh 1,725,400
- estimate
- Ksh 1,725,400
Karimboni Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2007
- action
- Construction Of 4 Classroom
- output
- To Acomodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Bundacho Secondary School
- location
-
Chasimba.
(in Bahari)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Not Started
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Pingilikani Youth Poly/ Toilet
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- To Provide Vocational Training In Bahari Constituency.
- implementation status
- Completed 100%
- total cost
- Ksh 1,574,037
- estimate
- Ksh 1,574,037
Shariani Secondary School
- location
-
Junju
(in Bahari)
- year first funded
- 2005
- action
- Installation Of 3 Phase Electricity Supply
- output
- To Provide Light To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 1,569,300
- estimate
- Ksh 1,569,300
Matsangoni Water Tank Booster
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2009
- action
- Connection Of Water Pipeline.
- output
- To Provide Fresh Water To The Community.
- implementation status
- Not Started.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Lubondo Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 New Classrooms
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- Completed 100%
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kolewa Mapawa Water Project
- location
-
Junju
(in Bahari)
- year first funded
- 2007
- action
- Water Pipeline To Connect Villages.
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Pipes Are Already Laid .
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Barani Nursery New
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Nursery School
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Roofing Level 40%
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Roka Chiefs Office
- location
-
Roka
(in Bahari)
- year first funded
- 2006
- action
- Construction Of ChiefS Office/Toilet.
- output
- To Increase Security At Roka Area.
- implementation status
- Toilet 100% Complete. Chiefs Office At Plastering Stage. 60%
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Kizingitini Nursery School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Nursery Sch.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Walling Stage 40%
- total cost
- Ksh 1,375,000
- estimate
- Ksh 1,375,000
Kitumbo Nursery/Toilet
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Constructio Nursery Sch/Toilet
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- External Plastering 70% Toilet Complete And In Use
- total cost
- Ksh 1,325,000
- estimate
- Ksh 1,325,000
Katana Ngala Secondary School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- To Prepare Students For Post-Sec Education
- implementation status
- Walling Above Ring Beam.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Chengoni Primary School
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Chumani/Roka Mjini/Roka Maweni/Foleni Road
- location
-
Roka
(in Bahari)
- year first funded
- 2009
- action
- Road Grading.
- output
- Improve Road Network In The Area.
- implementation status
- Not Started
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Paul Haris Secondary School
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2005
- action
- Construction of 4 Classroom
- output
- To Prepare Students For Post-Sec Education
- implementation status
- Completed 100%
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Silala Nursery
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Nursery
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- External Plastering Stage.
- total cost
- Ksh 1,170,000
- estimate
- Ksh 1,170,000
Kwa Nguma Water Pipeline
- location
-
Takaungu
(in Bahari)
- year first funded
- 2007
- action
- Pipeline To Connect Villages.
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 1,152,295
- estimate
- Ksh 1,152,295
Kikambala Dos H/Q
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Completion Of DoS Office/Installation Of Electricity.
- output
- To Increase Security Services At Kikambala Area.
- implementation status
- Completed 100%
- total cost
- Ksh 1,119,900
- estimate
- Ksh 1,119,990
Bomani Water Well
- location
-
Junju
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 1,105,000
- estimate
- Ksh 1,105,000
Mtondia Chiefs Office/Toilet
- location
-
Tezo
(in Bahari)
- year first funded
- 2006
- action
- Construction Of ChiefS Office/Toilet
- output
- To Increase Security In Mtondia Area.
- implementation status
- Plastering Stage.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Ngombeni Primary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Painting Stage 80%
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Mtomondoni Primary School Emer
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2006
- action
- Renov Of School. Construction A Pit Latrine
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Kadzinuni Bridge
- location
-
Takaungu/Mavueni.
(in Bahari)
- year first funded
- 2009
- action
- Rehabilitation Of A Broken Bridge.
- output
- To Connect Two Villages.
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Msumarini Secondary School ol
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2007
- action
- Purchase Of Lab Equip, And Furniture.
- output
- To Encourage Students To Take Science Subjects.
- implementation status
- Tendering Stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mbogolo Water Tank
- location
-
Mavueni
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Water Tank
- output
- Provide Water Reservoir During Dry Season
- implementation status
- Completed 100%
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mtsanganyiko Nursery School/Toilet
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Construction of Nursery School/Toilet.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Roofing 80%. Tendering Stage For Toilets.
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Galanema Cattle Dip
- location
-
Chasimba
(in Bahari)
- year first funded
- 2005
- action
- Construction of A Cattle Dip
- output
- To Protect Livestock From Ticks
- implementation status
- Completed 100%
- total cost
- Ksh 925,000
- estimate
- Ksh 925,000
Kilifi Primary School
- location
-
Kilifin T/Ship
(in Bahari)
- year first funded
- 2006
- action
- Renovations Of Kilifi Pry. School
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 919,240
- estimate
- Ksh 919,240
Mtepeni North Water Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2004
- action
- Digging And Construction Of Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 915,064
- estimate
- Ksh 915,064
Bungu Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Roofing Stage 70%
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Mkongani Chiefs Office New/Toilet
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2006
- action
- Construction Of ChiefS Office/Toilet
- output
- To Facilitate Security In Mkongani Sub-Location.
- implementation status
- Completed 100%
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Mtomondoni Primary School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2009
- action
- Construction Of School Desks.
- output
- To Easen Students From Sitting Down.
- implementation status
- Not Started
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Vipingo Health Centre
- location
-
Junju
(in Bahari)
- year first funded
- 2004
- action
- Rehabilitation Of Vipingo Health Centre
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Taratibu Water Well
- location
-
Junju
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 859,012
- estimate
- Ksh 8,590,119
Matsangoni Chiefs Office
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2005
- action
- Construction of chief's Office
- output
- To Facilitate Security In Matsangoni Sub-Location.
- implementation status
- Completed 100%
- total cost
- Ksh 840,000
- estimate
- Ksh 840,000
Junju Chiefs Office/Toilet
- location
-
Junju
(in Bahari)
- year first funded
- 2006
- action
- Construction Of ChiefS Office/Toilet
- output
- To Improve Security At Junju Area.
- implementation status
- Complete And In- Use. 100%
- total cost
- Ksh 804,000
- estimate
- Ksh 804,000
Mtwapa Dispensary Water Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Complete Await Purchase Of Water Tank 90%
- total cost
- Ksh 803,631
- estimate
- Ksh 80,363,112
Lutsangani Secondary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2004
- action
- Construction Of Modern Kitchen
- output
- Promote Hostel Facilities In The School.
- implementation status
- Completed 100%
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Katana Ngala Secondary School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2004
- action
- Renovation Of 4 Classrooms
- output
- Replacing Old Leaking Roof.
- implementation status
- Completed 100%
- total cost
- Ksh 795,000
- estimate
- Ksh 795,000
Mitulani Nursery School
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2008
- action
- Construction Of A New Nursery School.
- output
- To Promote Early Childhood Education.
- implementation status
- Not Started
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Mkomani Nursery New/Toilet
- location
-
Takaungu
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Nursery School/Toilet
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Mwembetsungu Nursery New/Toilet
- location
-
Junju
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Nursery School/Toilet
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kaole Nursery School
- location
-
Ziani
(in Bahari)
- year first funded
- 2005
- action
- Construction of Nursery School/Toilet.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kijipwa Nursery Schooltoilet
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Nursery Sch/ Toilet.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Madevu Nursery New/Toilet
- location
-
Mavueni/ Mkongani
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Nursery School/Toilet
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Mbomboni Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2007
- action
- Construction Of One Class
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Chodari Water Well
- location
-
Junju
(in Bahari)
- year first funded
- 2004
- action
- Installation Of Pipeline And Erection Of Water Kiosk
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 722,596
- estimate
- Ksh 722,596
Madeteni Primary School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2009
- action
- Construction Of One Class
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Not Started
- total cost
- Ksh 720,000
- estimate
- Ksh 720,000
Mkwajuni Youth Poly
- location
-
Mavueni/
(in Bahari)
- year first funded
- 2006
- action
- Installation Of Electricity To The Polytechnic
- output
- To Provide Vocational Training In Bahari Constituency.
- implementation status
- Completed 100%
- total cost
- Ksh 707,520
- estimate
- Ksh 707,520
Animo Police Post
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2006
- action
- Construction Of Police Posts
- output
- Increase Security At Animo Area.
- implementation status
- Complete And Awaiting Police Posting 90%
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Baharini Primary School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 New Classrooms
- output
- To Accommodate More Students As A Result Of Free Primary Education.
- implementation status
- Lintel Level
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ngombeni Chiefs Office
- location
-
Ziani
(in Bahari)
- year first funded
- 2007
- action
- Construction Of Chiefs Office.
- output
- To Improve Security At Ziani Area.
- implementation status
- Completed 100%
- total cost
- Ksh 660,000
- estimate
- Ksh 660,000
Zowerani Assistant Chiefs Office
- location
-
Ngerenya
(in Bahari)
- year first funded
- 2007
- action
- Construction Of Ass. Chiefs Office
- output
- To Increase Security At Zowerani Area.
- implementation status
- Complete And In-Use 100%
- total cost
- Ksh 660,000
- estimate
- Ksh 660,000
Bembo Nursery School
- location
-
Ziani
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Nursery School.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Lintel Level 45%
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Majengo Water Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2006
- action
- Digging And Construction Of Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Pump Installation 90%
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mikingirini Nursery School
- location
-
Tezo
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Nursery Sch.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mzambarauni Water Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Construction Of Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Nyongoro Nursery School
- location
-
Roka
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Nursery School
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Sidzeni Nursery Schoolnew
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2006
- action
- Construction Of Nursery School.
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Complete And In Use. 90%
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Kararacha Primary School
- location
-
Roka
(in Bahari)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Substructure Slab-Level.
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mtwapa Dispensary
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2004
- action
- Buying Dispensary Equipment And Fencing
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Vuma Primary School
- location
-
Takaungu
(in Bahari)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Karimboni Nursery School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Nursery School
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Barani Nursery New
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2009
- action
- Construction Of School Desks.
- output
- To Easen Students From Sitting Down.
- implementation status
- Not Started
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mtwapa Chiefs Office
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2007
- action
- Construction Of ChiefS Office.
- output
- To Improve Security At Mtwapa Area.
- implementation status
- Complete And In-Use 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Uyombo Nursery School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2007
- action
- Construction Of Nursery School
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Basi Primary School
- location
-
Kilifi T/Ship
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 4 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Madeteni Nursery School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Nursery School
- output
- To Promote Early Childhood Educ. In The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Bahari Girls Secondary School
- location
-
Mavueni/Takaungu
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Lab.
- output
- Encourage Students To Do Science Subjects
- implementation status
- Completed 100%
- total cost
- Ksh 575,101
- estimate
- Ksh 575,101
Kidzibu Electricity Contri
- location
-
Chasimba
(in Bahari)
- year first funded
- 2005
- action
- Installation Of Electric Transformer
- output
- To Provide Light To Kidzibu Area.
- implementation status
- Completed 100%
- total cost
- Ksh 575,000
- estimate
- Ksh 575,000
Mrima Wa Kuku Primary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Renovation Of 3 Classrooms
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 564,300
- estimate
- Ksh 564,300
Mkongo Bamako/Toilet
- location
-
Roka
(in Bahari)
- year first funded
- 2004
- action
- Completion Of Mkongo Health Centre/Toilet
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Completed 00%. Await Purchase Of Lab Equipments.
- total cost
- Ksh 549,999
- estimate
- Ksh 450,000
Mtepeni Health Centre
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Construction Of Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Excavation And Internal Walling 60%
- total cost
- Ksh 533,190
- estimate
- Ksh 533,190
Ngerenya Mix Secondary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Modern Toilet
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mtomondoni Primary School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2009
- action
- Construction Of A Kitchen
- output
- To Introduce Lunch Programme To The School
- implementation status
- Tendering Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mtomondoni Primary School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Erection School Fence
- output
- To Avoid Intruders To The School
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mtepeni Primary School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2005
- action
- Renovation Of The School
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mitangoni Primary School
- location
-
Takaungu/ Mavueni
(in Bahari)
- year first funded
- 2009
- action
- Renovation Of 2 Classrooms
- output
- Replacing The Old Roof With A New One.
- implementation status
- Tendering Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Matsangoni Water Tank
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2007
- action
- Construction of A Water Tank
- output
- Provide Water Storage Facility During Dry Season.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Majajani Road Improvement
- location
-
Mavueni
(in Bahari)
- year first funded
- 2006
- action
- Road Improvement
- output
- Easy Accessibility To The Area.
- implementation status
- Complete And In-Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tezo Block Water Tank
- location
-
Tezo
(in Bahari)
- year first funded
- 2007
- action
- Construction of A Water Tank
- output
- Provide Water Reservoir During Dry Season
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chije Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2006
- action
- Renovation Of 3 Classrooms
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Bundacho Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Bandara- Salama Chiefs Office
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- To Improve Security At Banda Ra Salama Area.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Chumani Road Project
- location
-
Roka
(in Bahari)
- year first funded
- 2003
- action
- Grading Murram
- output
- Making Easy Accessibility Of Agric Produce To The Market.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Makata Primary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2007
- action
- Renovation Of 2 Classrooms
- output
- Replacing The Old Roof And Walling With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kaa Chako Water Tank Project
- location
-
Chasimba
(in Bahari)
- year first funded
- 2003
- action
- Construction of Storage Water Tank
- output
- Provide Water Reservoir During Dry Season
- implementation status
- Completed 100%
- total cost
- Ksh 482,570
- estimate
- Ksh 482,570
Mtomondoni Water Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2004
- action
- Digging And Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 451,325
- estimate
- Ksh 451,325
Baharini Primary School
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 100 Desks.
- output
- To Reduce The Number Of Students Sitting On The Floor.
- implementation status
- Tendering Stage
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Chasimba Secondary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2009
- action
- Construction Of New Toilets
- output
- To Improve Sanitation In The School
- implementation status
- Not Started
- total cost
- Ksh 440,000
- estimate
- Ksh 440,000
Mawamba Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 437,980
- estimate
- Ksh 437,980
Kireme Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2007
- action
- Rehabilitation Of 3 Class
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 428,805
- estimate
- Ksh 428,805
Kolongoni Water Well
- location
-
Chasimba
(in Bahari)
- year first funded
- 2004
- action
- Constructing Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Excavation Stage 20%
- total cost
- Ksh 427,920
- estimate
- Ksh 427,920
Chikonde Water Well
- location
-
Chasimba
(in Bahari)
- year first funded
- 2004
- action
- Constructing W/ Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Walling Level 40%
- total cost
- Ksh 418,201
- estimate
- Ksh 418,201
Madzi Meruhe Water Well
- location
-
Chasimba
(in Bahari)
- year first funded
- 2004
- action
- Constructing Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Finishing Level 80%
- total cost
- Ksh 407,101
- estimate
- Ksh 407,101
Godi Water Well
- location
-
Chasimba
(in Bahari)
- year first funded
- 2004
- action
- Constructing Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Plastering Stage 70%
- total cost
- Ksh 402,451
- estimate
- Ksh 402,451
Mtondia Bamako Dispensary
- location
-
Tezo
(in Bahari)
- year first funded
- 2009
- action
- Purchase Of Lab Equipments.
- output
- To Improve Health Facilities Within The Tezo Area.
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mbomboni Borehole
- location
-
Chasimba
(in Bahari)
- year first funded
- 2008
- action
- Construction Of A Borehole.
- output
- To Provide Clean Water To The Community.
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Bofa Primary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2009
- action
- Construction Of New Toilets
- output
- To Improve Sanitation In The School
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mikingirini Primary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Class Room Completion
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 352,940
- estimate
- Ksh 352,940
Bokini Water Well
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2006
- action
- Water Accessibility
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Exaction, Internal Walling 40%
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Chasimba Chiefs Office
- location
-
Chasimba
(in Bahari)
- year first funded
- 2009
- action
- Renovations Of Chiefs Office.
- output
- To Improve Security At Ziani Area.
- implementation status
- Not Started
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Dindiri Makata Water Well
- location
-
Ziani
(in Bahari)
- year first funded
- 2004
- action
- Digging Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Complete 90%
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mkunguni Roka Water Well
- location
-
Roka
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Complete 100% Now In Use.
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Roka Water Well
- location
-
Roka
(in Bahari)
- year first funded
- 2007
- action
- Digging Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Not Started
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Takaungu A Camp Electrification
- location
-
Takaungu
(in Bahari)
- year first funded
- 2007
- action
- Electrification In A.PS Camp.
- output
- To Provide Light To The A.P?S Camp.
- implementation status
- Not Started. Funds Re-Allocated To Complete Takaungu Dispensary.
- total cost
- Ksh 346,000
- estimate
- Ksh 346,000
Takaungu/Kilifi Creek Boat Engine
- location
-
Mavueni Takaungu
(in Bahari)
- year first funded
- 2004
- action
- Buying Of A Water Boat/Engine.
- output
- To Ferry People Across The Creek
- implementation status
- Engine Not Yet Bought.
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
Mwambani Water Well
- location
-
Tezo
(in Bahari)
- year first funded
- 2004
- action
- Digging And Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 323,660
- estimate
- Ksh 323,660
Uyombo/Watamu /Creek
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2004
- action
- Buying Of A Water Boat / Engine.
- output
- To Ferry People Across The Creek
- implementation status
- Boat Engines In-Use 100%
- total cost
- Ksh 310,000
- estimate
- Ksh 310,000
Lubondo Pri Emergency C/Room
- location
-
Chasimba
(in Bahari)
- year first funded
- 2006
- action
- Construction of One Classroom
- output
- To Accommodate Students As Result Of Free Pri Educ.
- implementation status
- Completed 100%
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kibokoni Water Project
- location
-
Tezo
(in Bahari)
- year first funded
- 2003
- action
- Construction Of Water Well.
- output
- To Provide Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Junju Secondary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Tendering Stage.
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Dindiri Secondary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Tendering Stage.
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bodoi Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bundacho W/ Project
- location
-
Chasimba
(in Bahari)
- year first funded
- 2004
- action
- Connecting Water To The People
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Uyombo Girls Secondary School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Pingilikani Primary School
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2008
- action
- Acquisition Of Land
- output
- To Have Enough Land For School Development.
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lubondo Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 2 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mtondia Water Well
- location
-
Tezo
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 283,370
- estimate
- Ksh 283,370
Maweni Water Well
- location
-
Mtwapa
(in Bahari)
- year first funded
- 2004
- action
- Construction Of Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 283,370
- estimate
- Ksh 283,370
Mawamba Water Well Emergency
- location
-
Junju
(in Bahari)
- year first funded
- 2005
- action
- Digging And Construction Of A Water Well
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Excavation Stage 35%
- total cost
- Ksh 280,000
- estimate
- Ksh 280,000
Junju Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Completion Of 1 Classroom
- output
- To Avoid Congestion In One Classroom
- implementation status
- Completed 100%
- total cost
- Ksh 265,000
- estimate
- Ksh 265,000
Bora Upanga Water Well
- location
-
Roka
(in Bahari)
- year first funded
- 2004
- action
- Construction Water Well
- output
- Community To Have Fresh Drinking Water.
- implementation status
- Completed 100%
- total cost
- Ksh 255,270
- estimate
- Ksh 255,270
Dzitsoni Secondary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2005
- action
- Construction of Pit Latrine
- output
- Improve Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 255,000
- estimate
- Ksh 255,000
Bembo Nursery School
- location
-
Ziani
(in Bahari)
- year first funded
- 2009
- action
- Construction Of New Toilets
- output
- To Improve Sanitation In The School
- implementation status
- Not Started
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Uyombo Nursery School
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2009
- action
- Construction Of New Toilets
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Silala Nursery School Toilets
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2009
- action
- Construction Of New Toilets
- output
- To Improve Sanitation In The School
- implementation status
- Not Started
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Matandale Youth Polytechnic
- location
-
Mwarakaya.
(in Bahari)
- year first funded
- 2009
- action
- Construction Of A Toilet
- output
- Improving Sanitation To The Polytechnic.
- implementation status
- Not Started
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Mtepeni Dispensary
- location
-
Mtepeni
(in Bahari)
- year first funded
- 2004
- action
- Renovation Of Mtepeni dispensary
- output
- Replacing The Old Roof With A New One.
- implementation status
- Completed 100%
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Roka Maweni Dispensary Emergency
- location
-
Roka
(in Bahari)
- year first funded
- 2005
- action
- Buying Of Dispensary Equipment
- output
- To Improve Health Facilities Within The Constituency
- implementation status
- Completed 100%
- total cost
- Ksh 199,000
- estimate
- Ksh 199,000
St. Martins Primary School Emergency
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2005
- action
- Building Materials For Roofing
- output
- Replacing Old Leaking Roofs.
- implementation status
- Completed 100%
- total cost
- Ksh 158,415
- estimate
- Ksh 158,415
Soyosoyo Primary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Com Contr Towards Construction Of Classroom
- output
- To Reduce Congestion Of Students In One Classroom.
- implementation status
- Completed 100%
- total cost
- Ksh 152,820
- estimate
- Ksh 152,820
Mdzongoloni W/ Pipeline Proj
- location
-
Tezo
(in Bahari)
- year first funded
- 2003
- action
- Connecting Pipe Line
- output
- To Provide Clean And Fresh Water To The Community.
- implementation status
- Completed 100%
- total cost
- Ksh 152,000
- estimate
- Ksh 152,000
Shariani Primary School
- location
-
Takaungu/Mavueni
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Not Started
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Chodari Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Junju Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kapecha Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kireme Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mitulani Nursery School
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Not Started
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Vipingo Primary School
- location
-
Junju
(in Bahari)
- year first funded
- 2008
- action
- Construction Of 1 Pit Latrines
- output
- To Improve Sanitation In The School
- implementation status
- Completed 100%
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Chengoni Primary School
- location
-
Mwarakaya
(in Bahari)
- year first funded
- 2008
- action
- Acquisition Of Land
- output
- To Have Enough Land For School Development.
- implementation status
- Not Started
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Gorofani Water Tank
- location
-
Junju
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Water Tank.
- output
- Provide Water Reservoir During Dry Season
- implementation status
- Completed 100%
- total cost
- Ksh 128,378
- estimate
- Ksh 128,378
Basi Primary School
- location
-
Tezo
(in Bahari)
- year first funded
- 2005
- action
- Construction Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Matsangoni Chiefs Office Emergency
- location
-
Matsangoni
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Toilet
- output
- Improving Sanitation To The Chief?S Office..
- implementation status
- Excavation Stage
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Majaoni Primary School
- location
-
Mavueni
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Toilet
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tezo Primary School Emergency
- location
-
Tezo
(in Bahari)
- year first funded
- 2006
- action
- Construction Of A Toilet
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Chumani Chiefs Office
- location
-
Roka
(in Bahari)
- year first funded
- 2007
- action
- Construction Of A Pit Latrine.
- output
- Improving Sanitation To The Chief?S Office.
- implementation status
- Completed 100%
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mwakuhenga Primary School
- location
-
Takaungu
(in Bahari)
- year first funded
- 2005
- action
- Construction Of A Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Complete 100%
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Bungu Primary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2004
- action
- Construction of Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mkwajuni Primary School
- location
-
Takaungu
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Dzitsoni Primary School
- location
-
Chasimba
(in Bahari)
- year first funded
- 2004
- action
- Construction of Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Chumani Primary School
- location
-
Roka
(in Bahari)
- year first funded
- 2004
- action
- Construction Of A Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Pingilikani Primary School
- location
-
Ziani
(in Bahari)
- year first funded
- 2004
- action
- Construction of Pit Latrine
- output
- Improving Sanitation To The School.
- implementation status
- Completed 100%
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000