The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Tangulbei high School
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2006
- action
- Construction of a high school
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 8,000,000
- estimate
- Ksh 10,000,000
Nginyany Girls Secondary School
- location
-
Kositei
(in Baringo East)
- year first funded
- 2008
- action
- Construction of a new girls school
- output
- provision of learning facility
- implementation status
- ongoing
- total cost
- Ksh 6,000,000
- estimate
- Ksh 3,000,000
Churo health centre
- location
-
churo
(in Baringo East)
- year first funded
- 2007
- action
- Building of health facility
- output
- improved health care
- implementation status
- On going
- total cost
- Ksh 5,950,000
- estimate
- Ksh 3,500,000
Chemolingot secondary School
- location
-
Kositei
(in Baringo East)
- year first funded
- 2004
- action
- Build new Classrooms
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 5,232,000
- estimate
- Ksh 4,000,000
Kolloa health centre
- location
-
Koloa
(in Baringo East)
- year first funded
- 2006
- action
- Construction of Health Centre
- output
- Gather for the health use
- implementation status
- Complete
- total cost
- Ksh 4,500,000
- estimate
- Ksh 3,000,000
Nginyang primary School
- location
-
Loyamorok
(in Baringo East)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- provision of learning facility
- implementation status
- ongoing
- total cost
- Ksh 4,000,000
- estimate
- Ksh 2,000,000
CDF office
- location
-
Kositei
(in Baringo East)
- year first funded
- 2004
- action
- Build CDF Office
- output
- A Fully operational office
- implementation status
- complete
- total cost
- Ksh 3,730,627
- estimate
- Ksh 4,000,000
Ngoron health centre
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Health Centre
- output
- provision for health facility
- implementation status
- On going
- total cost
- Ksh 3,400,000
- estimate
- Ksh 2,000,000
Chemolingot District Hospital
- location
-
Kositei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Theater &wards
- output
- Serve their respective operation
- implementation status
- 99% Complete
- total cost
- Ksh 2,900,000
- estimate
- Ksh 3,500,000
Tangulbei dispensary
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2005
- action
- Construction of health facility
- output
- Provide health facility
- implementation status
- Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,200,000
Cheptunoyo primary School
- location
-
Silale
(in Baringo East)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Accommodate students
- implementation status
- Complete
- total cost
- Ksh 2,450,000
- estimate
- Ksh 0
Kapunyany borehole
- location
-
Tirioko
(in Baringo East)
- year first funded
- 2006
- action
- Construction of bore-hole
- output
- Harvest water for D.use.
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 1,000,000
Kaptuya primary School
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2003
- action
- Construction of four Classrooms
- output
- Accomodat more stdents
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 600,000
District H.Quarters Govt Offices
- location
-
Kositei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of offices
- output
- Accommodate Departmental offices
- implementation status
- 99%Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,233,991
Pkurlul Dam
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2006
- action
- Construction of water Dam
- output
- provision of water
- implementation status
- Complete
- total cost
- Ksh 1,946,000
- estimate
- Ksh 1,000,000
Plesian primary School
- location
-
Churo
(in Baringo East)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- provision of learning facility
- implementation status
- ongoing
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,000,000
Kachilitwa primary School
- location
-
Churo
(in Baringo East)
- year first funded
- 2005
- action
- Built one Classroom
- output
- Accommodate one class
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 950,000
Tepelekwo primarySchool
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- provision of learning facility
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 500,000
Chepkalacha Dispensary
- location
-
Korossi
(in Baringo East)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Providing health facility
- implementation status
- On going
- total cost
- Ksh 1,700,000
- estimate
- Ksh 800,000
Chesakam primary School
- location
-
Ribkwo
(in Baringo East)
- year first funded
- 2003
- action
- Construction of new Classrooms
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,350,000
Nangarua primary School
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2004
- action
- Building of Classrooms
- output
- provision of learning facility
- implementation status
- On going
- total cost
- Ksh 1,550,000
- estimate
- Ksh 70,000
Churo water supply
- location
-
Churo
(in Baringo East)
- year first funded
- 2004
- action
- Buy water pipes
- output
- Take water to respctive places
- implementation status
- complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 800,000
Toplen dam
- location
-
Silale
(in Baringo East)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Patipat dam
- location
-
Akoret
(in Baringo East)
- year first funded
- 2005
- action
- Construction of water Dam
- output
- provision of water
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,000,000
Koloruk dam
- location
-
Ribkwo
(in Baringo East)
- year first funded
- 2005
- action
- Construction of a dam
- output
- Need more funding
- implementation status
- Incomplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,000,000
Ayan Water Dam
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2008
- action
- Dam Construction
- output
- To collect rain water
- implementation status
- 99% Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,000,000
Chesirimion primary School
- location
-
Loyamorok
(in Baringo East)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Accommodate students
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,350,000
Loiwat Primary School
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2004
- action
- Construction of a Classroom
- output
- Provide learning facility
- implementation status
- ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 250,000
Churo girls secondary School
- location
-
Churo
(in Baringo East)
- year first funded
- 2004
- action
- installing electricity-Wiring
- output
- provide lighting system
- implementation status
- complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Ponpon dam
- location
-
Korossi
(in Baringo East)
- year first funded
- 2004
- action
- desilting
- output
- provision of water
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Ptikii primary School
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Learning facility
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Dapelkei Water Project
- location
-
Silale
(in Baringo East)
- year first funded
- 2008
- action
- costruction of water Tank & Piping
- output
- Provide water
- implementation status
- 99% Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Chepkirial water pan
- location
-
Tirioko
(in Baringo East)
- year first funded
- 2004
- action
- Construction of water pan
- output
- Conserve rain water
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kongar water pan
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2004
- action
- Consturuction of a dam
- output
- Harvest rain water for D.use.
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Katikit primary School
- location
-
kositei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kapunyany primary School
- location
-
Tirioko
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Kadingding dam
- location
-
Loyamorok
(in Baringo East)
- year first funded
- 2005
- action
- Build three clssroom
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chepngatip dam- kokwototo
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2003
- action
- Construction of water Dam
- output
- Conserve rain water
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chepanda Water Dam
- location
-
Kositei
(in Baringo East)
- year first funded
- 2008
- action
- Construction of a dam
- output
- Collect rain water
- implementation status
- ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chemolingot Ap houses
- location
-
Kositei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of AP Houses
- output
- Accomodation
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Natan primary School
- location
-
Silale
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Provide learning facility
- implementation status
- ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Apakiso primary School
- location
-
Ribkwo
(in Baringo East)
- year first funded
- 2007
- action
- Construction of four Classrooms
- output
- Accommodate pupils
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kositei primary School
- location
-
Kositei
(in Baringo East)
- year first funded
- 2006
- action
- Construction of four Classrooms
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Loiwat Despensary
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2008
- action
- expansion of the facility
- output
- Provide health facility
- implementation status
- ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Chesawach Dispensary
- location
-
Akoret
(in Baringo East)
- year first funded
- 2008
- action
- Construction of a new Dispensary
- output
- Provide health facility
- implementation status
- ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Adomeyon pre School
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- more pupils accomodated
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 1,000,000
Kapenguria pre School
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2005
- action
- Contruct two Classrooms
- output
- Accomodat more stdents
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 500,000
Chepkirial primary School
- location
-
Tirioko
(in Baringo East)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- Providing learning facility
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 500,000
Nalukumongin Primary School
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Provide learning facility
- implementation status
- ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Nakoko primary School
- location
-
Silale
(in Baringo East)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Komolion primary School
- location
-
Korossi
(in Baringo East)
- year first funded
- 2004
- action
- Constructin of three Classrooms
- output
- Accomodat more stdents
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Chiefs office police houses-Tangulbei
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2006
- action
- Build chiefs offices
- output
- Accommodate chiefs.
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Sosion pre School
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2004
- action
- Construction of a Classroom
- output
- Learning facility
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kasilangwa primary School
- location
-
Churo
(in Baringo East)
- year first funded
- 2004
- action
- Construction of two Classrooms
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Churo primary School
- location
-
Churo
(in Baringo East)
- year first funded
- 2003
- action
- Build Classrooms
- output
- Accommodate more students
- implementation status
- complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kokwototo primary School
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2004
- action
- Construction of a Classroom
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 580,000
- estimate
- Ksh 500,000
Loyeya primary School
- location
-
Korossi
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Kokwototo water supply
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2005
- action
- Construction of a water pan
- output
- provision of water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Chemolingot Stadium
- location
-
Kositei
(in Baringo East)
- year first funded
- 2008
- action
- Ground leveling
- output
- leveled stadium
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 3,500,000
Chemolingot Hospital Theatre
- location
-
Kositei
(in Baringo East)
- year first funded
- 2007
- action
- Completion of theatre
- output
- Complete Theatre
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Adich water pan
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2004
- action
- Construction of water pan
- output
- Conserve rain water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kapunyany Pre School
- location
-
Tirioko
(in Baringo East)
- year first funded
- 2008
- action
- Construction a new nursary Sch.
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Cherumbo Primary School
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2008
- action
- Building of a new Classroom
- output
- Accommodate students
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Chepkalacha Water Supply
- location
-
Korossi
(in Baringo East)
- year first funded
- 2008
- action
- purchase & instalation of pipes
- output
- Provide water
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Churo DO office
- location
-
Churo
(in Baringo East)
- year first funded
- 2006
- action
- Build D.Os office
- output
- Office operation.
- implementation status
- Complete
- total cost
- Ksh 447,470
- estimate
- Ksh 447,470
Lomuge pre School
- location
-
Korossi
(in Baringo East)
- year first funded
- 2006
- action
- Built one Classroom
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
East p. comm. Resource centre
- location
-
Kositei
(in Baringo East)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Marram Primary School
- location
-
Churo
(in Baringo East)
- year first funded
- 2008
- action
- Expansion of Classrooms
- output
- expansion of the classrooms Expanded learning facility
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Lowiat primary School
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2009
- action
- Construction of two Classrooms
- output
- Accommodate more students
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Kaptuya water project
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2006
- action
- Construction of bore-hole
- output
- water provision
- implementation status
- ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,100,000
Kerelon Primary School
- location
-
Loiwat
(in Baringo East)
- year first funded
- 2008
- action
- Construction of a new Classroom
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Korossi Chiefs Office
- location
-
Korossi
(in Baringo East)
- year first funded
- 2008
- action
- Construction of Chiefs office
- output
- accommodate chiifs office
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kositei Water project
- location
-
Kositei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of a water pan
- output
- provide water
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
chesirimion Dispensary
- location
-
Loyamorok
(in Baringo East)
- year first funded
- 2009
- action
- Renovation of Dispensary
- output
- Improved Health Facility
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Churo admin & police houses
- location
-
Churo
(in Baringo East)
- year first funded
- 2005
- action
- Build police houses
- output
- Accommodate police
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Seronu Pre School
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of a Classroom
- output
- Learning facility
- implementation status
- Complete
- total cost
- Ksh 269,995
- estimate
- Ksh 800,000
churo chiefs Office
- location
-
Churo
(in Baringo East)
- year first funded
- 2009
- action
- Construction of Chiefs office
- output
- Accomodation
- implementation status
- Not Yet
- total cost
- Ksh 267,306
- estimate
- Ksh 267,306
Ngoron Chiefs Office
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2008
- action
- Construction of the office
- output
- accommodate Chifs office
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Amaya Chiefs Office
- location
-
Amaiya
(in Baringo East)
- year first funded
- 2008
- action
- Construction of Chiefs office
- output
- Accommodate Chiefs office
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Churo Cultural Centre
- location
-
Churo
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Cultural Centre
- output
- Cultural activities
- implementation status
- ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Chesawach Primary School
- location
-
Akoret
(in Baringo East)
- year first funded
- 2008
- action
- Building of a new Classroom
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Dira Primary School
- location
-
Ngoron
(in Baringo East)
- year first funded
- 2008
- action
- Construction of anew Classroom
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Serono Primary School
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2008
- action
- Building of a Classroom
- output
- provision of learning facility
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Chemsik Primary School
- location
-
Kositei
(in Baringo East)
- year first funded
- 2008
- action
- Construction of anew Classroom
- output
- Accommodate pupils
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Sowo hand pump
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2006
- action
- Purchase of hand Pump
- output
- provision of water
- implementation status
- On going
- total cost
- Ksh 150,000
- estimate
- Ksh 50,000
Chepluch Primary School
- location
-
Korossi
(in Baringo East)
- year first funded
- 2008
- action
- Construction of a new Classroom
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mukutani Dispensary
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2008
- action
- Building of an office for the facility
- output
- office accomodation
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Lolgos Primary School
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2008
- action
- Building of a new Classroom
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Lolgos Acces Road
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2008
- action
- Opening up a new road
- output
- Improve accessability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Korossi primary School desks
- location
-
Korossi
(in Baringo East)
- year first funded
- 2006
- action
- Purchase schools desks
- output
- Gather for pupils seating
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kaptuya pre School
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2006
- action
- Comlplete Classroom
- output
- Accommodat more students
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kaptuya police houses
- location
-
Kaptuya
(in Baringo East)
- year first funded
- 2007
- action
- Construction of police houses
- output
- Accommodate police officers
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kalabata Primary School
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2008
- action
- building of 1 Classroom
- output
- Provide learning facility
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Natan water pump
- location
-
Silale
(in Baringo East)
- year first funded
- 2006
- action
- Purchase of water pump
- output
- Provision of water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tangulbei chiefs office
- location
-
Tangulbei
(in Baringo East)
- year first funded
- 2007
- action
- Construction of Chiefs office
- output
- Accommodate Chiefs office
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kachilitwa Water Project
- location
-
Churo
(in Baringo East)
- year first funded
- 2008
- action
- Purchase of hand Pump
- output
- provide water
- implementation status
- Complete
- total cost
- Ksh 71,000
- estimate
- Ksh 71,000