The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Bomachoge

Riokindo Greater Water Project

location
MachogeMasaba (in Bomachoge)
year first funded
2006
action
Water Pumping Scheme
output
Piped Water
implementation status
On Going
total cost
Ksh 6,340,000
estimate
Ksh 4,340,000

Nyakerato Water Project

location
Sengera (in Bomachoge)
year first funded
2003
action
Installation Of Horse Pipes
output
Piped Water
implementation status
On Going
total cost
Ksh 2,212,142
estimate
Ksh 1,212,142

Eberenge Dispensary

location
Magenche (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,774,761
estimate
Ksh 1,774,761

Egetuki Dispensary

location
MachogeChache (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,712,143
estimate
Ksh 1,712,143

Sengera Secondary School

location
Sengera (in Bomachoge)
year first funded
2004
action
Installation Of Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Magenche Dispensary

location
Magenche (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,324,761
estimate
Ksh 1,324,761

Mokomoni Secondary School

location
Magenche (in Bomachoge)
year first funded
2005
action
Construction Of Kitchen And Dining Hall
output
Kitchen And Dining Hall
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Kiango Self help dispensary

location
BoochiBorabu (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 1,212,143
estimate
Ksh 1,012,143

Nyamasege C. Dispensary

location
Sengera (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 1,062,142
estimate
Ksh 862,142

Kenyoro Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2003
action
Construction Of Storey Building
output
Classrooms
implementation status
On Going
total cost
Ksh 1,056,071
estimate
Ksh 1,056,071

Keragia Dispensary

location
Tendere (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,025,086
estimate
Ksh 825,086

Tongeri Dispensary

location
Majoge Masaba (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,006,071
estimate
Ksh 1,006,071

Keberesi-Obianda Area

location
Machoge Masaba (in Bomachoge)
year first funded
2007
action
Installation Of 200Kva Transformer
output
Power
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mokubo Secondary School Area

location
Magenche (in Bomachoge)
year first funded
2007
action
Installation Of 200Kva Transformer
output
Power
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nyabiore Market Area

location
Magenche (in Bomachoge)
year first funded
2007
action
Installation Of 200Kva Transformer
output
Power
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nyaisero Kimai Area

location
Sengera (in Bomachoge)
year first funded
2007
action
Installation Of 200Kva Transformer
output
Power
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Riokindo Greater Area

location
Machoge Masaba (in Bomachoge)
year first funded
2007
action
Installation Of 200Kva Transformer
output
Power
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Riokindo secondary school

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Purchase of School bus (co-fund)
output
Class room
implementation status
complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gucha Hospital

location
Tendere (in Bomachoge)
year first funded
2007
action
Construction Of X-Ray Room
output
X-Ray Room
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gakero Elck Secondary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Eberege Health Centre

location
Magenche (in Bomachoge)
year first funded
2007
action
Installation Of 200Kva Transformer
output
Power
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kerongorori Dispensary

location
MachogeMasaba (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 959,011
estimate
Ksh 759,011

Nyamiobo Polytechnic

location
MachogeChache (in Bomachoge)
year first funded
2004
action
Construction Of Workshop
output
Workshop
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Igorera Shdispensary

location
BoochiBorabu (in Bomachoge)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 762,143
estimate
Ksh 762,143

Nyagenke Secondary School

location
Majoge Chache (in Bomachoge)
year first funded
2004
action
Construction And Renovation Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 750,000
estimate
Ksh 750,000

Nyamecheo Water

location
Magenche (in Bomachoge)
year first funded
2003
action
Installation Of Water Pipes
output
Piped Water
implementation status
Stalled
total cost
Ksh 724,761
estimate
Ksh 724,761

Riauka Line Culvert

location
MachogeMasaba (in Bomachoge)
year first funded
2004
action
Construction Of Line Culvert
output
Line Culvert
implementation status
Complete
total cost
Ksh 724,000
estimate
Ksh 724,000

Riribe Primary School

location
MachogeMasaba (in Bomachoge)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 700,000

Mochorwa Dispensary

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Dispensary
output
Classrooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 700,000

Sengera Sda Secondary School

location
Magenche (in Bomachoge)
year first funded
2004
action
Construction Of Library
output
Library
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 700,000

Getenga Primary School

location
MachogeMasaba (in Bomachoge)
year first funded
2005
action
Construction Of Three Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 500,000

Riokindo Water Project

location
MachogeMasaba (in Bomachoge)
year first funded
2003
action
Water Project
output
Piped Water
implementation status
Stalled
total cost
Ksh 656,071
estimate
Ksh 656,071

Rio-Iochoe Box Culvert

location
Magenche (in Bomachoge)
year first funded
2004
action
Construction Of Box Culvert
output
Box Culvert
implementation status
Complete
total cost
Ksh 636,780
estimate
Ksh 636,780

Kebabe Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2004
action
Construction Of Laboratory
output
Laboratory
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 400,000

Gakero Sda Secondary School

location
Majoge Chache (in Bomachoge)
year first funded
2003
action
Construction Of Administration Block
output
Offices
implementation status
On Going
total cost
Ksh 562,143
estimate
Ksh 562,143

Mesabakwa Secondary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Library
output
Library
implementation status
On Going
total cost
Ksh 511,067
estimate
Ksh 211,067

Nyamiobo Secondary School

location
Sengera (in Bomachoge)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Riokindo Boys Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

St. Peters Keberesi Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2006
action
Construction Of Laboratory
output
Laboratory
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Metembe Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyakorere Secondary School

location
Magenche (in Bomachoge)
year first funded
2004
action
Construction Of Four Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Gekongo Secondary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 300,000

Maiga Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 200,000

Riaima Primary School

location
Magenche (in Bomachoge)
year first funded
2006
action
Construction Of Three Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 463,943
estimate
Ksh 463,943

Magena Health Centre

location
BoochiBorabu (in Bomachoge)
year first funded
2003
action
Construction Of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 462,142
estimate
Ksh 462,142

Nyamasebe Primary School

location
Mchoge Chache (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 450,000

Riombaba Primary School

location
MachogeChache (in Bomachoge)
year first funded
2004
action
Construction Of Three Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 450,000

Egetonto Health Centre

location
Sengera (in Bomachoge)
year first funded
2006
action
Finishing The Health Centre Building
output
Health Centre
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 150,000

Nyangeti Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 450,000

Kemoreko Primary School

location
Majoge Borabu (in Bomachoge)
year first funded
2006
action
Construction Of Two Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 250,000

Motemomwamu Primary School

location
MachogeMasaba (in Bomachoge)
year first funded
2006
action
Construction Of Two Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Nyabinyinyi Secondary School

location
Magenche (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Tunta Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Ntamocha Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 304,062
estimate
Ksh 104,062

Itembu Dispensary

location
Magenche (in Bomachoge)
year first funded
2007
action
Construction Of Dispensary Room
output
Dispensary
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Endereti Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2007
action
Construction Of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Mokubo Secondary School

location
Magenche (in Bomachoge)
year first funded
2007
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Nyaibate Secondary School

location
Magenche (in Bomachoge)
year first funded
2007
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Randani Secondary School

location
Machoge Masaba (in Bomachoge)
year first funded
2007
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Senta Primary School

location
Machoge Masaba (in Bomachoge)
year first funded
2007
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kineni Secondary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Matagaro Secondary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Library
output
Library
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyabioto Secondary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyamboga Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Renovation Of Classroom
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyabiore Dispensary

location
Magenche (in Bomachoge)
year first funded
2007
action
Construction Of Dispensary Room
output
Dispensary
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyantogo Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Installation Of Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Genga Polytechnic

location
MachogeChache (in Bomachoge)
year first funded
2005
action
Construction Of Workshop
output
Workshop
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Riyabu ELCK secondary school

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Ekerubo primary School

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kenyenya secondary school

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kerongorori secondary school

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kenyaro PAG

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Riokindo Mixed secondary school

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Riokindo primary School

location
Machoge MASABA (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyamacheo Boarding

location
Magenche (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kineni secondary school

location
Sengera (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Matagaro primary School

location
Sengera (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Sengera Girls secondary school

location
Sengera (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Magenche Chief's Office

location
Magenche (in Bomachoge)
year first funded
2005
action
Renovation Of Office
output
Office
implementation status
Complete
total cost
Ksh 292,970
estimate
Ksh 92,970

Nyamaonde Primary School

location
MachogeChache (in Bomachoge)
year first funded
2005
action
Renovation Of Classroom
output
Classrooms
implementation status
On Going
total cost
Ksh 292,970
estimate
Ksh 292,970

Nyataro Secondary School

location
MachogeChache (in Bomachoge)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 292,970
estimate
Ksh 292,970

Keera Line Culvert

location
Majoge Borabu (in Bomachoge)
year first funded
2004
action
Repairing Of The Bridge/ Construction Of Line Culvert
output
Line Culvert
implementation status
Complete
total cost
Ksh 292,000
estimate
Ksh 292,000

Nyamoronga Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 257,005
estimate
Ksh 257,005

Moogi Dispensary

location
Sengera (in Bomachoge)
year first funded
2007
action
Construction Of Dispensary Room
output
Dispensary
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Itare primary School

location
Sengera (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Kenyenya Secondary School

location
MachogeMasaba (in Bomachoge)
year first funded
2004
action
Purchase Of Lab Equipment
output
Equipment
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Mosobeti Primary School

location
Magenche (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyabiore Secondary School

location
Magenche (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyakenyerere Primary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyakoiba Secondary School

location
Sengera (in Bomachoge)
year first funded
2004
action
Construction Of Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Rianchogu Primary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Misesi Health Centre

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Health Centre
output
Health Centre
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Sengera Chief's Office

location
Sengera (in Bomachoge)
year first funded
2006
action
Renovation Of Chief'S Office
output
Chief'S Office
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyangeti Mixed secondary school

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Keore primary School

location
Machoge Masaba (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Mokomoni secondary School

location
Magenche (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyakorere Secondary school

location
Magenche (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyabinyinyi secondary School

location
Magenche (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Itango primary School

location
Magenche (in Bomachoge)
year first funded
2008
action
Contruction of a class room
output
Class room
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Magenche Chief Location

location
Magenche (in Bomachoge)
year first funded
2008
action
Contruction of office
output
Office
implementation status
ongoing
total cost
Ksh 200,000
estimate
Ksh 350,000

Nyantogo Primary School

location
MachogeChache (in Bomachoge)
year first funded
2007
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Bombaba Special School

location
MachogeChache (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Buyonge Secondary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Egetuki Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Gesabakwa Primary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Itabago Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyarenda Primary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Mogambi Primary School

location
Sengera (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyangeke Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Renovation Of Classroom
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyataro Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Magena Primary School

location
BoochiBorabu (in Bomachoge)
year first funded
2006
action
Installation Of Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Buyonge Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Gakero Deb Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Renovation Of Classroom
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyagesa Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamiobo Primary School

location
MachogeChache (in Bomachoge)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Eberege Primary School

location
Magenche (in Bomachoge)
year first funded
2005
action
Renovation Of Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 92,970
estimate
Ksh 92,970

Nyamecheo Primary School

location
Magenche (in Bomachoge)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 92,970
estimate
Ksh 92,970

Masaba Chief's Office

location
MachogeMasaba (in Bomachoge)
year first funded
2005
action
Renovation Of Office
output
Office
implementation status
Complete
total cost
Ksh 92,970
estimate
Ksh 92,970

Nyamiobo Dok Primary School

location
Sengera (in Bomachoge)
year first funded
2005
action
Renovation Of Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 92,970
estimate
Ksh 92,970

Randani Primary School

location
MachogeMasaba (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 80,000
estimate
Ksh 80,000

Keore Primary School

location
Machoge Masaba (in Bomachoge)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 70,000
estimate
Ksh 70,000