The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Riokindo Greater Water Project
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2006
- action
- Water Pumping Scheme
- output
- Piped Water
- implementation status
- On Going
- total cost
- Ksh 6,340,000
- estimate
- Ksh 4,340,000
Nyakerato Water Project
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2003
- action
- Installation Of Horse Pipes
- output
- Piped Water
- implementation status
- On Going
- total cost
- Ksh 2,212,142
- estimate
- Ksh 1,212,142
Eberenge Dispensary
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,774,761
- estimate
- Ksh 1,774,761
Egetuki Dispensary
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,712,143
- estimate
- Ksh 1,712,143
Sengera Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2004
- action
- Installation Of Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Magenche Dispensary
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,324,761
- estimate
- Ksh 1,324,761
Mokomoni Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Kitchen And Dining Hall
- output
- Kitchen And Dining Hall
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Kiango Self help dispensary
- location
-
BoochiBorabu
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 1,212,143
- estimate
- Ksh 1,012,143
Nyamasege C. Dispensary
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 1,062,142
- estimate
- Ksh 862,142
Kenyoro Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Storey Building
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,056,071
- estimate
- Ksh 1,056,071
Keragia Dispensary
- location
-
Tendere
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,025,086
- estimate
- Ksh 825,086
Tongeri Dispensary
- location
-
Majoge Masaba
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,006,071
- estimate
- Ksh 1,006,071
Keberesi-Obianda Area
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2007
- action
- Installation Of 200Kva Transformer
- output
- Power
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mokubo Secondary School Area
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Installation Of 200Kva Transformer
- output
- Power
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nyabiore Market Area
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Installation Of 200Kva Transformer
- output
- Power
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nyaisero Kimai Area
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2007
- action
- Installation Of 200Kva Transformer
- output
- Power
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Riokindo Greater Area
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2007
- action
- Installation Of 200Kva Transformer
- output
- Power
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Riokindo secondary school
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Purchase of School bus (co-fund)
- output
- Class room
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gucha Hospital
- location
-
Tendere
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of X-Ray Room
- output
- X-Ray Room
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gakero Elck Secondary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Eberege Health Centre
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Installation Of 200Kva Transformer
- output
- Power
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kerongorori Dispensary
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 959,011
- estimate
- Ksh 759,011
Nyamiobo Polytechnic
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Workshop
- output
- Workshop
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Igorera Shdispensary
- location
-
BoochiBorabu
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 762,143
- estimate
- Ksh 762,143
Nyagenke Secondary School
- location
-
Majoge Chache
(in Bomachoge)
- year first funded
- 2004
- action
- Construction And Renovation Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Nyamecheo Water
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2003
- action
- Installation Of Water Pipes
- output
- Piped Water
- implementation status
- Stalled
- total cost
- Ksh 724,761
- estimate
- Ksh 724,761
Riauka Line Culvert
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Line Culvert
- output
- Line Culvert
- implementation status
- Complete
- total cost
- Ksh 724,000
- estimate
- Ksh 724,000
Riribe Primary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mochorwa Dispensary
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Sengera Sda Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Library
- output
- Library
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Getenga Primary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Three Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Riokindo Water Project
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2003
- action
- Water Project
- output
- Piped Water
- implementation status
- Stalled
- total cost
- Ksh 656,071
- estimate
- Ksh 656,071
Rio-Iochoe Box Culvert
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Box Culvert
- output
- Box Culvert
- implementation status
- Complete
- total cost
- Ksh 636,780
- estimate
- Ksh 636,780
Kebabe Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 400,000
Gakero Sda Secondary School
- location
-
Majoge Chache
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Administration Block
- output
- Offices
- implementation status
- On Going
- total cost
- Ksh 562,143
- estimate
- Ksh 562,143
Mesabakwa Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Library
- output
- Library
- implementation status
- On Going
- total cost
- Ksh 511,067
- estimate
- Ksh 211,067
Nyamiobo Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Riokindo Boys Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
St. Peters Keberesi Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Metembe Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyakorere Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gekongo Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Maiga Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Riaima Primary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Three Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 463,943
- estimate
- Ksh 463,943
Magena Health Centre
- location
-
BoochiBorabu
(in Bomachoge)
- year first funded
- 2003
- action
- Construction Of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 462,142
- estimate
- Ksh 462,142
Nyamasebe Primary School
- location
-
Mchoge Chache
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Riombaba Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Three Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Egetonto Health Centre
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Finishing The Health Centre Building
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Nyangeti Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kemoreko Primary School
- location
-
Majoge Borabu
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Two Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 250,000
Motemomwamu Primary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Two Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Nyabinyinyi Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Tunta Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Ntamocha Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 304,062
- estimate
- Ksh 104,062
Itembu Dispensary
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Dispensary Room
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Endereti Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mokubo Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nyaibate Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Randani Secondary School
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Senta Primary School
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kineni Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Matagaro Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Library
- output
- Library
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyabioto Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamboga Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Renovation Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyabiore Dispensary
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Dispensary Room
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyantogo Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Installation Of Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Genga Polytechnic
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Workshop
- output
- Workshop
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Riyabu ELCK secondary school
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ekerubo primary School
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kenyenya secondary school
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kerongorori secondary school
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kenyaro PAG
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Riokindo Mixed secondary school
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Riokindo primary School
- location
-
Machoge MASABA
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamacheo Boarding
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kineni secondary school
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Matagaro primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sengera Girls secondary school
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Magenche Chief's Office
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2005
- action
- Renovation Of Office
- output
- Office
- implementation status
- Complete
- total cost
- Ksh 292,970
- estimate
- Ksh 92,970
Nyamaonde Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 292,970
- estimate
- Ksh 292,970
Nyataro Secondary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 292,970
- estimate
- Ksh 292,970
Keera Line Culvert
- location
-
Majoge Borabu
(in Bomachoge)
- year first funded
- 2004
- action
- Repairing Of The Bridge/ Construction Of Line Culvert
- output
- Line Culvert
- implementation status
- Complete
- total cost
- Ksh 292,000
- estimate
- Ksh 292,000
Nyamoronga Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 257,005
- estimate
- Ksh 257,005
Moogi Dispensary
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Dispensary Room
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Itare primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kenyenya Secondary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2004
- action
- Purchase Of Lab Equipment
- output
- Equipment
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mosobeti Primary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyabiore Secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyakenyerere Primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyakoiba Secondary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Dormitory
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Rianchogu Primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Misesi Health Centre
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Sengera Chief's Office
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Renovation Of Chief'S Office
- output
- Chief'S Office
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyangeti Mixed secondary school
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Keore primary School
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mokomoni secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyakorere Secondary school
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyabinyinyi secondary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Itango primary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of a class room
- output
- Class room
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Magenche Chief Location
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2008
- action
- Contruction of office
- output
- Office
- implementation status
- ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Nyantogo Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Bombaba Special School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Buyonge Secondary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Egetuki Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gesabakwa Primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Itabago Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyarenda Primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mogambi Primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nyangeke Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Renovation Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyataro Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Magena Primary School
- location
-
BoochiBorabu
(in Bomachoge)
- year first funded
- 2006
- action
- Installation Of Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Buyonge Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gakero Deb Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Renovation Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyagesa Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamiobo Primary School
- location
-
MachogeChache
(in Bomachoge)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Eberege Primary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 92,970
- estimate
- Ksh 92,970
Nyamecheo Primary School
- location
-
Magenche
(in Bomachoge)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 92,970
- estimate
- Ksh 92,970
Masaba Chief's Office
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2005
- action
- Renovation Of Office
- output
- Office
- implementation status
- Complete
- total cost
- Ksh 92,970
- estimate
- Ksh 92,970
Nyamiobo Dok Primary School
- location
-
Sengera
(in Bomachoge)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 92,970
- estimate
- Ksh 92,970
Randani Primary School
- location
-
MachogeMasaba
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Keore Primary School
- location
-
Machoge Masaba
(in Bomachoge)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000