The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Bomet

Longisa Comm Water

location
Kapkimolwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 12,500,000
estimate
Ksh 52,000,000

Sot Tech Institute

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 10,000,000
estimate
Ksh 10,000,000

Longisa Secondary school

location
Cheboin (in Bomet)
year first funded
2003
action
Land/Bus
output
-
implementation status
Completed
total cost
Ksh 4,300,000
estimate
Ksh 2,000,000

Kongotik Secondary School

location
Kembu (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 4,200,000
estimate
Ksh 2,000,000

Chesoen-Singorwet Road

location
Singorwet (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Pending
total cost
Ksh 4,000,000
estimate
Ksh 400,000

Raiya Pre School

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Land
output
-
implementation status
Completed
total cost
Ksh 3,000,000
estimate
Ksh 500,000

Silibwet Dispensary

location
Bomet Townshp (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 2,650,000
estimate
Ksh 3,000,000

Singorwet Comm Water Project

location
Singorwet (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 2,000,000
estimate
Ksh 5,000,000

Koibeyon Sec

location
Kapkimolwa (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
Completed
total cost
Ksh 1,825,000
estimate
Ksh 2,000,000

Kiplabotwa Sec

location
Kiplabotwa (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
70%Ongoing
total cost
Ksh 1,650,000
estimate
Ksh 2,000,000

Sergutiet Water Project

location
Sibaiyan (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 1,650,000
estimate
Ksh 1,000,000

Olbobo Sec

location
Kiplabotwa (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
80%Ongoing
total cost
Ksh 1,550,000
estimate
Ksh 2,000,000

Chesoen Secondary

location
Chesoen (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
20%Ongoin
total cost
Ksh 1,475,000
estimate
Ksh 2,000,000

Mengit Sec

location
Kiplabotwa (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 2,000,000

Kiptobit Sec

location
Kapkimolwa (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 1,400,000
estimate
Ksh 2,000,000

Chebonei Secondary School

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Complete
total cost
Ksh 1,375,000
estimate
Ksh 2,000,000

Kipreres Secondary school

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%On-Going
total cost
Ksh 1,350,000
estimate
Ksh 2,000,000

Njerian Secondary School

location
Merigi (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
Completed
total cost
Ksh 1,325,000
estimate
Ksh 2,000,000

Mogoma Secondary School

location
Kembu (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 1,325,000
estimate
Ksh 2,000,000

Kapsimotwa Secondary School

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 1,325,000
estimate
Ksh 2,000,000

Ndarawetta Secondary School

location
Ndarawetta (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
45%Ongoin
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

Mulot Secondary School

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%On-Going
total cost
Ksh 1,275,000
estimate
Ksh 2,000,000

Tegat Polytechnic

location
Tegat (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 1,250,000
estimate
Ksh 500,000

Chepkitwal Secondary School

location
Kembu (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 1,250,000
estimate
Ksh 2,000,000

Mulot Dispensary

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Land/Constr
output
-
implementation status
75%Ongoin
total cost
Ksh 1,200,000
estimate
Ksh 1,000,000

Kabusare Secondary School

location
Ndarawetta (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
45%Ongoin
total cost
Ksh 1,175,000
estimate
Ksh 2,000,000

Maaset Secondary School

location
Sibaiyan (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 1,175,000
estimate
Ksh 2,000,000

Mugango Secondary School

location
Mugango (in Bomet)
year first funded
2004
action
Water Tank
output
-
implementation status
50%Ongoin
total cost
Ksh 1,175,000
estimate
Ksh 2,000,000

Emkwen Youth Poly

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 1,150,000
estimate
Ksh 500,000

Chemaner Secondary School

location
Chemaner (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 1,150,000
estimate
Ksh 2,000,000

Chemaner Dispensary

location
Chemaner (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
10%Ongoin
total cost
Ksh 1,150,000
estimate
Ksh 500,000

Merigi Secondary School

location
Merigi (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 1,060,000
estimate
Ksh 2,000,000

Menet Secondary School

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 1,050,000
estimate
Ksh 2,000,000

Toronik-Kipreres Road

location
Kipreres (in Bomet)
year first funded
2004
action
Grading
output
-
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Siwot Secondary School

location
Kipreres (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%On-Going
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Kaporuso Secondary School

location
Kembu (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 975,000
estimate
Ksh 2,000,000

Singorwet Secondary School

location
Singorwet (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 975,000
estimate
Ksh 2,000,000

Aisaik Secondary School

location
Singorwet (in Bomet)
year first funded
2004
action
Water Tank
output
-
implementation status
Completed
total cost
Ksh 975,000
estimate
Ksh 2,000,000

Kiplelji Secondary School

location
Chesoen (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 975,000
estimate
Ksh 2,000,000

Kapkimolwa Sub/Location Office

location
Kapkimolwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
not known
total cost
Ksh 950,000
estimate
Ksh 800,000

Menet Dispensary

location
Kembu (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
45%Ongoin
total cost
Ksh 950,000
estimate
Ksh 500,000

Kitoben Secondary School

location
Mugango (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
20%Ongoin
total cost
Ksh 950,000
estimate
Ksh 2,000,000

Chesoen Chief Office

location
Chesoen (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
55%Ongoin
total cost
Ksh 950,000
estimate
Ksh 800,000

Cheboin Secondary School

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 900,000
estimate
Ksh 2,000,000

Kipyosit Secondary School

location
Tegat (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
Completed
total cost
Ksh 900,000
estimate
Ksh 2,000,000

Mogoiwet Bridge

location
Ndarawetta (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 880,000
estimate
Ksh 880,000

Kimargis Secondary School

location
Sibaiyan (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 875,000
estimate
Ksh 2,000,000

Bukacha Secondary School

location
Kiromwok (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Pending
total cost
Ksh 850,000
estimate
Ksh 20,000,000

Motigo Secondary School

location
Merigi (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
95%Ongoin
total cost
Ksh 850,000
estimate
Ksh 2,000,000

Nyongores Secondary School

location
Ndarawetta (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 850,000
estimate
Ksh 2,000,000

Segutiet Dispensary

location
Chesoen (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
70%Ongoin
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Ngainet Ass Chiefs Office

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Longisa Fcs

location
Cheboin (in Bomet)
year first funded
2003
action
Renovation
output
-
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Ndarawetta Dispensary

location
Ndarawetta (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
10%Ongoin
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Eworet Foot Bridge

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Merigi Dispensary

location
Merigi (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 775,000
estimate
Ksh 500,000

Kwenikab Ilet Secondary School

location
Ndarawetta (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 775,000
estimate
Ksh 2,000,000

Nyongores Road

location
Ndarawetta (in Bomet)
year first funded
2004
action
Gravelling
output
-
implementation status
Completed
total cost
Ksh 750,000
estimate
Ksh 750,000

Kiptobit Pri

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Land/Constr
output
-
implementation status
80%Ongoin
total cost
Ksh 750,000
estimate
Ksh 1,000,000

Kapkimolwa-Kiptulwa Road

location
Kapkimolwa (in Bomet)
year first funded
2006
action
Opening-Up
output
-
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 750,000

Stbenedicts Kapkimolwa Sec

location
Kapkimolwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Stalled
total cost
Ksh 700,000
estimate
Ksh 2,000,000

Kembu Dispensary

location
Kembu (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 700,000
estimate
Ksh 500,000

Sibaiyan Primary School

location
Sibaiyan (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
40%Ongoin
total cost
Ksh 674,300
estimate
Ksh 1,000,000

Kapcheluch Pri

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Olomotonyi Primary School

location
Singorwet (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 650,000
estimate
Ksh 500,000

Kiplokyi Girls Secondary School

location
Sibaiyan (in Bomet)
year first funded
2004
action
Well Drilling
output
-
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Kabungut Secondary School

location
Singorwet (in Bomet)
year first funded
2003
action
Generator
output
-
implementation status
Completed
total cost
Ksh 605,000
estimate
Ksh 180,000

Kakimirai Dispensary

location
Chemaner (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
W I P
total cost
Ksh 600,000
estimate
Ksh 500,000

Kitaima Dispensary

location
Sibaiyan (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 600,000
estimate
Ksh 500,000

Kipyosit Dispensary

location
Tegat (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 600,000
estimate
Ksh 500,000

Chepkurbet Primary School

location
Singorwet (in Bomet)
year first funded
2003
action
Land/Constr
output
-
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Singorwet Dispensary

location
Singorwet (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 600,000
estimate
Ksh 500,000

Kiromwok Secondary school

location
Kiromwok (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 600,000
estimate
Ksh 2,000,000

Aonet Water Project

location
Mugango (in Bomet)
year first funded
2008
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 3,000,000

Cheboin Dispensary

location
Cheboin (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 600,000
estimate
Ksh 500,000

Siwot Dispensary

location
Kipreres (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Pending
total cost
Ksh 600,000
estimate
Ksh 500,000

Korara Pri

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Teganda Water Project

location
Ndarawetta (in Bomet)
year first funded
2005
action
Pipes
output
-
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 2,000,000

Kiplokyi Boys

location
Sibaiyan (in Bomet)
year first funded
2007
action
Construction
output
-
implementation status
New
total cost
Ksh 575,000
estimate
Ksh 0

Bilelga Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Kitoben Health Centre

location
Mugango (in Bomet)
year first funded
2003
action
Beds/Constr
output
-
implementation status
Completed
total cost
Ksh 550,000
estimate
Ksh 500,000

Murwongoi Primary School

location
Kembu (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Masese-Kitoben Road

location
Mugango (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Koisomoi Primary School

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kiptulwa Pri

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Land/Const
output
-
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kapkimolwa Dispensary

location
Kapkimolwa (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 500,000
estimate
Ksh 500,000

Chepkesem Dip

location
Kapkimolwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Kalyet Pri

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Land/Constr
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chepnyaliliet-Chelemei Road

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Opening-Up
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiplabotwa Primary School

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
80%Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Cheboror Primary School

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chelemei Primary School

location
Kipreres (in Bomet)
year first funded
2004
action
Land/Constr
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Cheboror Dispensary

location
Kipreres (in Bomet)
year first funded
2004
action
Land/Constr
output
-
implementation status
Pending
total cost
Ksh 500,000
estimate
Ksh 500,000

Tenwek Secondary School

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Library
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 300,000

Korikab Ririk Bridge

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90% Ongoin
total cost
Ksh 500,000
estimate
Ksh 500,000

Ainob Set Water Spring

location
Bomet Townshp (in Bomet)
year first funded
2008
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 3,000,000

Nyabongo Primary School

location
Mugango (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kapsigowo Primary School

location
Singorwet (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Mogoiwet Secondary School

location
Ndarawetta (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Chepkositonik Tea Centre

location
Merigi (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 500,000
estimate
Ksh 50,000

Kamogoso Primary School

location
Chesoen (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kakimirai Secondary School

location
Chemaner (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Wip
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Bukunye Primary School

location
Chemaner (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Sigowet Primary School

location
Chemaner (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kibiwot Primary School

location
Chemaner (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kakimirai Bridge

location
Chemaner (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiromwok Dispensary

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 500,000
estimate
Ksh 500,000

Silibwet Community Library

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
10%Ongoin
total cost
Ksh 472,547
estimate
Ksh 750,000

Mononwet Primary School

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Wasega Primary school

location
Tegat (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Tenwek Primary School

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Sinendet Primary School

location
Mugango (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Mogindo Comm Water Project

location
Ndarawetta (in Bomet)
year first funded
2006
action
Water Tank
output
-
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 500,000

Kapkesiego Primary School

location
Kiromwok (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
70%Ongoin
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Siwot Primary School

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Emityot Primary School

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Sugutek Bridge

location
Merigi (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
Completed
total cost
Ksh 426,000
estimate
Ksh 376,000

Lalakin Primary school

location
Tegat (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 425,000
estimate
Ksh 1,000,000

Sonoiya Primary school

location
Tegat (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 425,000
estimate
Ksh 1,000,000

Kapkimolwa Pri

location
Kapkimolwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 425,000
estimate
Ksh 1,000,000

Mataima Primary school

location
Tegat (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 420,000
estimate
Ksh 1,000,000

Kimargis Primary School

location
Sibaiyan (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Sibaiyan Dispensary

location
Sibaiyan (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
40%Ongoin
total cost
Ksh 400,000
estimate
Ksh 500,000

Kiptenden Dispensary

location
Sibaiyan (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 400,000
estimate
Ksh 500,000

Chesoen Primary School

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Ngomwet Primary School

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Taabet Primary School

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kipkoligo Primary School

location
Chemaner (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kaplelach Primary School

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Tomoiyot Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Saoset Primary School

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Tengecha Primary School

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kapsimbiri Dispensary

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
70%Ongoin
total cost
Ksh 400,000
estimate
Ksh 500,000

Masese Primary School

location
Mugango (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Suswondo Primary School

location
Mugango (in Bomet)
year first funded
2004
action
Land
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Mugango Primary School

location
Mugango (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Mugango Dispensary

location
Mugango (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 400,000
estimate
Ksh 500,000

Singorwet Primary School

location
Singorwet (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
95%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kaptilolwo Primary School

location
Ndarawetta (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 500,000

Mount Sugutek Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kibochi Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Moburo Primary School

location
Merigi (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Tiroto Primary School

location
Merigi (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kitaima Primary School

location
Sibaiyan (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Mulot Girls School

location
Kipreres (in Bomet)
year first funded
2007
action
Construction
output
-
implementation status
90%On-Going
total cost
Ksh 400,000
estimate
Ksh 2,000,000

Ndubai Primary School

location
Kipreres (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
60%Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Siwot Polytechnic

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 400,000
estimate
Ksh 500,000

Mariango Waterjt

location
Kipreres (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Legimbo Secondary School

location
Cheboin (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
45%Ongoin
total cost
Ksh 400,000
estimate
Ksh 2,000,000

Kugunoi Primary School

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Masare Primary School

location
Cheboin (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Samituk Pre School

location
Cheboin (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 400,000
estimate
Ksh 500,000

Tegat Primary school

location
Tegat (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kipkurion Primary school

location
Tegat (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Tegat Water Proj

location
Tegat (in Bomet)
year first funded
2007
action
Well Drilling
output
-
implementation status
Stalled
total cost
Ksh 400,000
estimate
Ksh 400,000

Lebekwet Primary School

location
Kembu (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kaporuso Water Project

location
Kembu (in Bomet)
year first funded
2003
action
Electricity
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kapsimotwa Primary School

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kapnariet Primary School

location
Ndarawetta (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kiptobit Pre School

location
Kapkimolwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 500,000

Kiplabotwa Dispensary

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Land/Constr
output
-
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 500,000

Mengit Primary School

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
80%Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Nderiat Primary School

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 500,000

Simotwet Primary School

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kamogoso Secondary School

location
Chesoen (in Bomet)
year first funded
2007
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 375,000
estimate
Ksh 2,000,000

Ndabibi Primary School

location
Kipreres (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Olokyin-Toronk Road

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 300,000

Koita Dam

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 500,000

Semoi Primary School

location
Mugango (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Kirswo Primary School

location
Mugango (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Sugutek Cattle Dip

location
Merigi (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 50,000

Irwaga Primary school

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Toronik Primary School

location
Kipreres (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
90%On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Motoimet Primary School

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Kabusare Primary School

location
Ndarawetta (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Emityot Secondary School

location
Cheboin (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 325,000
estimate
Ksh 2,000,000

Kakimirai Cenral Pri

location
Kapkimolwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 325,000
estimate
Ksh 1,000,000

Tagaruto Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 325,000
estimate
Ksh 1,000,000

Cheptuiyet Primary School

location
Singorwet (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Saparet Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Land
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Belgut Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Menet Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kabungut Primary School

location
Singorwet (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Olongoswet Pri

location
Kapkimolwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Norera Pri

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Koita Pri

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Land
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Mulot Primary School

location
Kiplabotwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
70%Ongoing
total cost
Ksh 300,000
estimate
Ksh 10,000,000

Kibisoronik Primary School

location
Kipreres (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Longisa Primary School

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Cheboin Primary School

location
Cheboin (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Tegat-Kipyosit Road

location
Tegat (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Kaporuso Primary School

location
Kembu (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kembu Primary School

location
Kembu (in Bomet)
year first funded
2005
action
Land
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chepkitwal Primary School

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kongotik Primary School

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Murany Primary School

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kapsoiyo Primary School

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Bomet Primary School

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Raiya Primary School

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chepngaina Primary School

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Tumoiyot Central

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Silibwet Primary School

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kapsimbiri Secondary School

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 20,000,000

Kapsimbiri Primary School

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Not Used
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kapsimotwa Dispensary

location
Bomet Townshp (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 300,000
estimate
Ksh 5,000,000

Chuiyat Primary School

location
Mugango (in Bomet)
year first funded
2004
action
Land
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Salaik Primary School

location
Mugango (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kitoben Primary School

location
Mugango (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Balek Primary School

location
Singorwet (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kabarturus Dam

location
Singorwet (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 300,000
estimate
Ksh 300,000

Tirgaga Primary School

location
Singorwet (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kapkigorwet Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Mogindo Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kwenikab Ilet Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Mondoiwet Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Teganda Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Nyongores Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Bondet-Tagaruto Road

location
Ndarawetta (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyongores Dispensary

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 300,000
estimate
Ksh 500,000

Cheswerta Library

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
70%Ongoin
total cost
Ksh 300,000
estimate
Ksh 500,000

Chepkongongy Primary School

location
Merigi (in Bomet)
year first funded
2004
action
Land
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Merigi Primary School

location
Merigi (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Matarmat Primary School

location
Merigi (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Magenji Primary School

location
Merigi (in Bomet)
year first funded
2004
action
Land
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 10,000,000

Kecheiyat Primary School

location
Merigi (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
W.I.P
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chepkolon Primary School

location
Merigi (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chebsian Primary School

location
Merigi (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Njerian Dispensary

location
Merigi (in Bomet)
year first funded
2008
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 500,000

Sergutiet Primary School

location
Sibaiyan (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Segutiet Primary School

location
Chesoen (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
45%Ongoin
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Morit Primary School

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kakimirai Primary School

location
Chemaner (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Wip
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chambori Primary School

location
Chemaner (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kiromwok Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Irwaga Dispensary

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 500,000

Emityot-Longisa Road

location
Cheboin (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Legimbo Primary School

location
Cheboin (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Koibeyon Pri

location
Kapkimolwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 280,000
estimate
Ksh 1,000,000

Ngainet-Mogoiwet Road

location
Ndarawetta (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Pending
total cost
Ksh 266,670
estimate
Ksh 266,670

Kaptetgot Primary School

location
Sibaiyan (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Kipreres Primary School

location
Kipreres (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%On-Going
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Siwot Dam

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Pending
total cost
Ksh 250,000
estimate
Ksh 500,000

Kaptororgo Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
80%Ongoin
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Silibwet-Kapsimotwa Road

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 250,000
estimate
Ksh 250,000

Manyatta Primary School

location
Bomet Townshp (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Kapmusa-Siwot Road

location
Kipreres (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 250,000
estimate
Ksh 250,000

Kugunoi Water Spring

location
Cheboin (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 50,000

Bukunye Cattle Dip

location
Chemaner (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 250,000
estimate
Ksh 50,000

Cheboingong Primary School

location
Bomet Townshp (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
Completed
total cost
Ksh 240,000
estimate
Ksh 1,000,000

Kamobiriri Primary School

location
Sibaiyan (in Bomet)
year first funded
2007
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 225,000
estimate
Ksh 1,000,000

Sogoet Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 225,000
estimate
Ksh 1,000,000

Kipyosit Primary school

location
Tegat (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 220,000
estimate
Ksh 1,000,000

Bomet Health Centre

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Kipsirichoik Dam

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 200,000
estimate
Ksh 500,000

Boreiywek Primary School

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Mogoma Primary School

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Mogitui Primary school

location
Tegat (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Emityot Dev Co-Op

location
Cheboin (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Samituk Dam

location
Cheboin (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Cheboin Dam

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Legimgo Dam

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Chebirir Primary School

location
Kipreres (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Kures Dam

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Pending Pj
total cost
Ksh 200,000
estimate
Ksh 500,000

Olbobo Primary School

location
Kiplabotwa (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
50%Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Nyaururu Primary School

location
Kiplabotwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiplabotwa Dam

location
Kiplabotwa (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Kiplegok Dam

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Itibo Comm Dam

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Chepkesem Dam

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 500,000

Belgut Dispensary

location
Kiromwok (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 200,000
estimate
Ksh 500,000

Kiptogoch Primary School

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
10%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Bukacha Primary School

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
75%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Chemaner Primary School

location
Chemaner (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
85%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiplelji Primary School

location
Chesoen (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Maaset Primary School

location
Sibaiyan (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiplokyi Primary School

location
Sibaiyan (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Motigo Primary School

location
Merigi (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
65%Ongoin
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Merigi Co-Op Socie

location
Merigi (in Bomet)
year first funded
2005
action
Land
output
-
implementation status
Pending
total cost
Ksh 200,000
estimate
Ksh 200,000

Kwenikab Ilet Dispensary

location
Ndarawetta (in Bomet)
year first funded
2007
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Kapcheluch Water Project

location
Ndarawetta (in Bomet)
year first funded
2003
action
Water Tank
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 200,000

Mogoiwet Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Sonokwek Primary School

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Aisaik Primary School

location
Singorwet (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Chepkirip Primary School

location
Cheboin (in Bomet)
year first funded
2009
action
New
output
-
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 0

Kapsimbiri Tea Buying Centre

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 50,000

Kapsoiyo Water Project

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 300,000

Chematich Water Project

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 3,000,000

Kipkebe Water Project

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 3,000,000

Cheptembe Water Dam

location
Bomet Townshp (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 150,000
estimate
Ksh 3,000,000

Chemororoch Dam

location
Merigi (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 150,000
estimate
Ksh 500,000

Balek Secondary School

location
Singorwet (in Bomet)
year first funded
2009
action
Construction
output
-
implementation status
New
total cost
Ksh 125,000
estimate
Ksh 2,000,000

Sigowet Secondary

location
Chemaner (in Bomet)
year first funded
2009
action
Construction
output
-
implementation status
New
total cost
Ksh 125,000
estimate
Ksh 2,000,000

Aeos Office

location
Bomet Townshp (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 100,000

Chematich Primary School

location
Bomet Townshp (in Bomet)
year first funded
2009
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 1,000,000

Chemamul Primary School

location
Bomet Townshp (in Bomet)
year first funded
2009
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 1,000,000

Merigi-Chepkolon-Njerian Road

location
Merigi (in Bomet)
year first funded
2006
action
Grading
output
-
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 500,000

Kiplokyi Cattle Dip

location
Sibaiyan (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 50,000

Kapkoros Health Centre

location
Sibaiyan (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
60%Ongoin
total cost
Ksh 100,000
estimate
Ksh 500,000

Kiplelji Dispensary

location
Chesoen (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
50%Ongoin
total cost
Ksh 100,000
estimate
Ksh 500,000

Chesoen Dispensary

location
Chesoen (in Bomet)
year first funded
2003
action
Construction
output
-
implementation status
90%Ongoin
total cost
Ksh 100,000
estimate
Ksh 500,000

Baraka Pre School

location
Chesoen (in Bomet)
year first funded
2009
action
Construction
output
-
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 1,000,000

Kaptimtui Pre School

location
Kipreres (in Bomet)
year first funded
2009
action
New
output
-
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 1,000,000

Bomet Hostel For Health Centre

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Equipments
output
-
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 100,000

Kipreres Dip

location
Kipreres (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 50,000

Uswet Spring

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Protection
output
-
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 100,000

Motiret Dam

location
Kipreres (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 500,000

Berekeiwet Pre School

location
Tegat (in Bomet)
year first funded
2009
action
New
output
-
implementation status
40%On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Ainopchorwet Spring

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Protection
output
-
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 100,000

Tiritab Muito Spring

location
Cheboin (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 80,000
estimate
Ksh 80,000

Maarat Water Spring

location
Tegat (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 80,000
estimate
Ksh 80,000

Kiptenden Cattle Dip

location
Sibaiyan (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kitaima Tea Buying Centre

location
Sibaiyan (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Boito Cattle Dip

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Ngomwet Cattle Dip

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Taabet Cattle Dip

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Morit Cattle Dip

location
Chesoen (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Taabet Water Spring

location
Chesoen (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Chesoen Tea centre

location
Chesoen (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Njerian Spring

location
Chemaner (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Kimogoro Cattle Dip

location
Chemaner (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Maroba Tea Buying Centre

location
Chemaner (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Chepkostionik Cattle Dip

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Eworet Cattle Dip

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Kiromwok Cattle Dip

location
Kiromwok (in Bomet)
year first funded
2005
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Motoimet Tea Centre

location
Kiromwok (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 50,000
estimate
Ksh 100,000

Sinonin Dip

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Simwaga Dip

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Itibo Dip

location
Kapkimolwa (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Tuiyobei Cattle Dip

location
Sibaiyan (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kaminjeiwet Cattle Dip

location
Singorwet (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Salaik Tea Buying Centre

location
Mugango (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Kitoben Cattle Dip

location
Mugango (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Mugango Cattle Dip

location
Mugango (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Kapsebet Cattle Dip

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Sugutanda Cattle Dip

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Tenwek Cattle Dip

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Chepngaina Cattle Dip

location
Bomet Townshp (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Arorwet Cattle Dip

location
Bomet Townshp (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Lemeiywet Water Spring

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 50,000
estimate
Ksh 50,000

Chepkitwal Tea Buying Centre

location
Kembu (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Kembu Cattle Dip

location
Kembu (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Kosior Cattle Dip

location
Kembu (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Kipsirichoik Cattle Dip

location
Kembu (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Kongotik Cattle Dip

location
Kembu (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Tegat Tea Buying

location
Tegat (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
Pending
total cost
Ksh 50,000
estimate
Ksh 100,000

Sonogut Water Spring

location
Tegat (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Tegat Cattle Dip

location
Tegat (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Cheboin Cattle Dip

location
Cheboin (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Mataringe Cattle Dip

location
Cheboin (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Emityot Cattle Dip

location
Cheboin (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Chebirir Water Spring

location
Kipreres (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Ndubai Dip

location
Kipreres (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Motiret Dip

location
Kipreres (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Siwot Dip

location
Kipreres (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Olokyin Dip

location
Kiplabotwa (in Bomet)
year first funded
2005
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Kapliyo Dip

location
Kiplabotwa (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Balek Tea Buying Center

location
Singorwet (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Ndarawetta Cattle Dip

location
Ndarawetta (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Ngainet Cattle Dip

location
Ndarawetta (in Bomet)
year first funded
2004
action
Construction
output
-
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 50,000

Mogindo Tea Buying Centre

location
Ndarawetta (in Bomet)
year first funded
2006
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Motigo Dispensary

location
Merigi (in Bomet)
year first funded
2004
action
Acaricides
output
-
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Njerian Primary School

location
Merigi (in Bomet)
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 0
estimate
Ksh 1,000,000