The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Bomet
Longisa Comm Water
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 12,500,000
- estimate
- Ksh 52,000,000
Sot Tech Institute
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 10,000,000
- estimate
- Ksh 10,000,000
Longisa Secondary school
- location
-
Cheboin
(in Bomet)
- year first funded
- 2003
- action
- Land/Bus
- output
- -
- implementation status
- Completed
- total cost
- Ksh 4,300,000
- estimate
- Ksh 2,000,000
Kongotik Secondary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 4,200,000
- estimate
- Ksh 2,000,000
Chesoen-Singorwet Road
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Pending
- total cost
- Ksh 4,000,000
- estimate
- Ksh 400,000
Raiya Pre School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 500,000
Silibwet Dispensary
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 2,650,000
- estimate
- Ksh 3,000,000
Singorwet Comm Water Project
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
Koibeyon Sec
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 1,825,000
- estimate
- Ksh 2,000,000
Kiplabotwa Sec
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 70%Ongoing
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,000,000
Sergutiet Water Project
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,000,000
Olbobo Sec
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 80%Ongoing
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,000,000
Chesoen Secondary
- location
-
Chesoen
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 20%Ongoin
- total cost
- Ksh 1,475,000
- estimate
- Ksh 2,000,000
Mengit Sec
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
Kiptobit Sec
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
Chebonei Secondary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,375,000
- estimate
- Ksh 2,000,000
Kipreres Secondary school
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 2,000,000
Njerian Secondary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 1,325,000
- estimate
- Ksh 2,000,000
Mogoma Secondary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 1,325,000
- estimate
- Ksh 2,000,000
Kapsimotwa Secondary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 1,325,000
- estimate
- Ksh 2,000,000
Ndarawetta Secondary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 45%Ongoin
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,000,000
Mulot Secondary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%On-Going
- total cost
- Ksh 1,275,000
- estimate
- Ksh 2,000,000
Tegat Polytechnic
- location
-
Tegat
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 1,250,000
- estimate
- Ksh 500,000
Chepkitwal Secondary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,000,000
Mulot Dispensary
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Land/Constr
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Kabusare Secondary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 45%Ongoin
- total cost
- Ksh 1,175,000
- estimate
- Ksh 2,000,000
Maaset Secondary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 1,175,000
- estimate
- Ksh 2,000,000
Mugango Secondary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Water Tank
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 1,175,000
- estimate
- Ksh 2,000,000
Emkwen Youth Poly
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 1,150,000
- estimate
- Ksh 500,000
Chemaner Secondary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 1,150,000
- estimate
- Ksh 2,000,000
Chemaner Dispensary
- location
-
Chemaner
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 10%Ongoin
- total cost
- Ksh 1,150,000
- estimate
- Ksh 500,000
Merigi Secondary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 1,060,000
- estimate
- Ksh 2,000,000
Menet Secondary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 2,000,000
Toronik-Kipreres Road
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Siwot Secondary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Kaporuso Secondary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 975,000
- estimate
- Ksh 2,000,000
Singorwet Secondary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 975,000
- estimate
- Ksh 2,000,000
Aisaik Secondary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2004
- action
- Water Tank
- output
- -
- implementation status
- Completed
- total cost
- Ksh 975,000
- estimate
- Ksh 2,000,000
Kiplelji Secondary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 975,000
- estimate
- Ksh 2,000,000
Kapkimolwa Sub/Location Office
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- not known
- total cost
- Ksh 950,000
- estimate
- Ksh 800,000
Menet Dispensary
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 45%Ongoin
- total cost
- Ksh 950,000
- estimate
- Ksh 500,000
Kitoben Secondary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 20%Ongoin
- total cost
- Ksh 950,000
- estimate
- Ksh 2,000,000
Chesoen Chief Office
- location
-
Chesoen
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 55%Ongoin
- total cost
- Ksh 950,000
- estimate
- Ksh 800,000
Cheboin Secondary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
Kipyosit Secondary School
- location
-
Tegat
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
Mogoiwet Bridge
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 880,000
- estimate
- Ksh 880,000
Kimargis Secondary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 875,000
- estimate
- Ksh 2,000,000
Bukacha Secondary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 850,000
- estimate
- Ksh 20,000,000
Motigo Secondary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 95%Ongoin
- total cost
- Ksh 850,000
- estimate
- Ksh 2,000,000
Nyongores Secondary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 850,000
- estimate
- Ksh 2,000,000
Segutiet Dispensary
- location
-
Chesoen
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 70%Ongoin
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Ngainet Ass Chiefs Office
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Longisa Fcs
- location
-
Cheboin
(in Bomet)
- year first funded
- 2003
- action
- Renovation
- output
- -
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Ndarawetta Dispensary
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 10%Ongoin
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Eworet Foot Bridge
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Merigi Dispensary
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 775,000
- estimate
- Ksh 500,000
Kwenikab Ilet Secondary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 775,000
- estimate
- Ksh 2,000,000
Nyongores Road
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Gravelling
- output
- -
- implementation status
- Completed
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kiptobit Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Land/Constr
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
Kapkimolwa-Kiptulwa Road
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2006
- action
- Opening-Up
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Stbenedicts Kapkimolwa Sec
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Stalled
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
Kembu Dispensary
- location
-
Kembu
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Sibaiyan Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 40%Ongoin
- total cost
- Ksh 674,300
- estimate
- Ksh 1,000,000
Kapcheluch Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Olomotonyi Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Kiplokyi Girls Secondary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2004
- action
- Well Drilling
- output
- -
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Kabungut Secondary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2003
- action
- Generator
- output
- -
- implementation status
- Completed
- total cost
- Ksh 605,000
- estimate
- Ksh 180,000
Kakimirai Dispensary
- location
-
Chemaner
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- W I P
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Kitaima Dispensary
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Kipyosit Dispensary
- location
-
Tegat
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Chepkurbet Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2003
- action
- Land/Constr
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Singorwet Dispensary
- location
-
Singorwet
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Kiromwok Secondary school
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Aonet Water Project
- location
-
Mugango
(in Bomet)
- year first funded
- 2008
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 3,000,000
Cheboin Dispensary
- location
-
Cheboin
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Siwot Dispensary
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Korara Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Teganda Water Project
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2005
- action
- Pipes
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Kiplokyi Boys
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2007
- action
- Construction
- output
- -
- implementation status
- New
- total cost
- Ksh 575,000
- estimate
- Ksh 0
Bilelga Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Kitoben Health Centre
- location
-
Mugango
(in Bomet)
- year first funded
- 2003
- action
- Beds/Constr
- output
- -
- implementation status
- Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 500,000
Murwongoi Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Masese-Kitoben Road
- location
-
Mugango
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Koisomoi Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kiptulwa Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Land/Const
- output
- -
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kapkimolwa Dispensary
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chepkesem Dip
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kalyet Pri
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Land/Constr
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Chepnyaliliet-Chelemei Road
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Opening-Up
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiplabotwa Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 80%Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Cheboror Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Chelemei Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Land/Constr
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Cheboror Dispensary
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Land/Constr
- output
- -
- implementation status
- Pending
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tenwek Secondary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Library
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Korikab Ririk Bridge
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90% Ongoin
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ainob Set Water Spring
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2008
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
Nyabongo Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kapsigowo Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Mogoiwet Secondary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Chepkositonik Tea Centre
- location
-
Merigi
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 500,000
- estimate
- Ksh 50,000
Kamogoso Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kakimirai Secondary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Wip
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Bukunye Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Sigowet Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kibiwot Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kakimirai Bridge
- location
-
Chemaner
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiromwok Dispensary
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Silibwet Community Library
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 10%Ongoin
- total cost
- Ksh 472,547
- estimate
- Ksh 750,000
Mononwet Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Wasega Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Tenwek Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Sinendet Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Mogindo Comm Water Project
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Water Tank
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Kapkesiego Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 70%Ongoin
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Siwot Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Emityot Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Sugutek Bridge
- location
-
Merigi
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 426,000
- estimate
- Ksh 376,000
Lalakin Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 425,000
- estimate
- Ksh 1,000,000
Sonoiya Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 425,000
- estimate
- Ksh 1,000,000
Kapkimolwa Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 425,000
- estimate
- Ksh 1,000,000
Mataima Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 420,000
- estimate
- Ksh 1,000,000
Kimargis Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Sibaiyan Dispensary
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 40%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Kiptenden Dispensary
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Chesoen Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Ngomwet Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Taabet Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kipkoligo Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kaplelach Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Tomoiyot Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Saoset Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Tengecha Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapsimbiri Dispensary
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 70%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Masese Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Suswondo Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Mugango Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Mugango Dispensary
- location
-
Mugango
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Singorwet Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 95%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kaptilolwo Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Mount Sugutek Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kibochi Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Moburo Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Tiroto Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kitaima Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Mulot Girls School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2007
- action
- Construction
- output
- -
- implementation status
- 90%On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Ndubai Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 60%Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Siwot Polytechnic
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Mariango Waterjt
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Legimbo Secondary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 45%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Kugunoi Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Masare Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Samituk Pre School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Tegat Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kipkurion Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Tegat Water Proj
- location
-
Tegat
(in Bomet)
- year first funded
- 2007
- action
- Well Drilling
- output
- -
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lebekwet Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kaporuso Water Project
- location
-
Kembu
(in Bomet)
- year first funded
- 2003
- action
- Electricity
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapsimotwa Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapnariet Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kiptobit Pre School
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Kiplabotwa Dispensary
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Land/Constr
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Mengit Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 80%Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Nderiat Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Simotwet Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kamogoso Secondary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2007
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 375,000
- estimate
- Ksh 2,000,000
Ndabibi Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Olokyin-Toronk Road
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 300,000
Koita Dam
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Semoi Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Kirswo Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Sugutek Cattle Dip
- location
-
Merigi
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 50,000
Irwaga Primary school
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Toronik Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 90%On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Motoimet Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Kabusare Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Emityot Secondary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 325,000
- estimate
- Ksh 2,000,000
Kakimirai Cenral Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 325,000
- estimate
- Ksh 1,000,000
Tagaruto Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 325,000
- estimate
- Ksh 1,000,000
Cheptuiyet Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Saparet Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Belgut Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Menet Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kabungut Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Olongoswet Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Norera Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Koita Pri
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Mulot Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 70%Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 10,000,000
Kibisoronik Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Longisa Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Cheboin Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Tegat-Kipyosit Road
- location
-
Tegat
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kaporuso Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kembu Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2005
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chepkitwal Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kongotik Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Murany Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapsoiyo Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Bomet Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Raiya Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chepngaina Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Tumoiyot Central
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Silibwet Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapsimbiri Secondary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 20,000,000
Kapsimbiri Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Not Used
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapsimotwa Dispensary
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 5,000,000
Chuiyat Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Salaik Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kitoben Primary School
- location
-
Mugango
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Balek Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kabarturus Dam
- location
-
Singorwet
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tirgaga Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapkigorwet Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Mogindo Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kwenikab Ilet Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Mondoiwet Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Teganda Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Nyongores Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Bondet-Tagaruto Road
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyongores Dispensary
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Cheswerta Library
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 70%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Chepkongongy Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Merigi Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Matarmat Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Magenji Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Land
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 10,000,000
Kecheiyat Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- W.I.P
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chepkolon Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chebsian Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Njerian Dispensary
- location
-
Merigi
(in Bomet)
- year first funded
- 2008
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Sergutiet Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Segutiet Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 45%Ongoin
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Morit Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kakimirai Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Wip
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chambori Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kiromwok Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Irwaga Dispensary
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Emityot-Longisa Road
- location
-
Cheboin
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Legimbo Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Koibeyon Pri
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 280,000
- estimate
- Ksh 1,000,000
Ngainet-Mogoiwet Road
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Pending
- total cost
- Ksh 266,670
- estimate
- Ksh 266,670
Kaptetgot Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kipreres Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Siwot Dam
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Kaptororgo Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 80%Ongoin
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Silibwet-Kapsimotwa Road
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Manyatta Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kapmusa-Siwot Road
- location
-
Kipreres
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kugunoi Water Spring
- location
-
Cheboin
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 50,000
Bukunye Cattle Dip
- location
-
Chemaner
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 50,000
Cheboingong Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 240,000
- estimate
- Ksh 1,000,000
Kamobiriri Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2007
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 225,000
- estimate
- Ksh 1,000,000
Sogoet Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 225,000
- estimate
- Ksh 1,000,000
Kipyosit Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 220,000
- estimate
- Ksh 1,000,000
Bomet Health Centre
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kipsirichoik Dam
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Boreiywek Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Mogoma Primary School
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Mogitui Primary school
- location
-
Tegat
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Emityot Dev Co-Op
- location
-
Cheboin
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Samituk Dam
- location
-
Cheboin
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Cheboin Dam
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Legimgo Dam
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Chebirir Primary School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kures Dam
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Pending Pj
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Olbobo Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 50%Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Nyaururu Primary School
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kiplabotwa Dam
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kiplegok Dam
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Itibo Comm Dam
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Chepkesem Dam
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Belgut Dispensary
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kiptogoch Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 10%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Bukacha Primary School
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- 75%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Chemaner Primary School
- location
-
Chemaner
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 85%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kiplelji Primary School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Maaset Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kiplokyi Primary School
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Motigo Primary School
- location
-
Merigi
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 65%Ongoin
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Merigi Co-Op Socie
- location
-
Merigi
(in Bomet)
- year first funded
- 2005
- action
- Land
- output
- -
- implementation status
- Pending
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kwenikab Ilet Dispensary
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2007
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kapcheluch Water Project
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2003
- action
- Water Tank
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mogoiwet Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Sonokwek Primary School
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Aisaik Primary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Chepkirip Primary School
- location
-
Cheboin
(in Bomet)
- year first funded
- 2009
- action
- New
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapsimbiri Tea Buying Centre
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 50,000
Kapsoiyo Water Project
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Chematich Water Project
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 3,000,000
Kipkebe Water Project
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 3,000,000
Cheptembe Water Dam
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 150,000
- estimate
- Ksh 3,000,000
Chemororoch Dam
- location
-
Merigi
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Balek Secondary School
- location
-
Singorwet
(in Bomet)
- year first funded
- 2009
- action
- Construction
- output
- -
- implementation status
- New
- total cost
- Ksh 125,000
- estimate
- Ksh 2,000,000
Sigowet Secondary
- location
-
Chemaner
(in Bomet)
- year first funded
- 2009
- action
- Construction
- output
- -
- implementation status
- New
- total cost
- Ksh 125,000
- estimate
- Ksh 2,000,000
Aeos Office
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Chematich Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2009
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Chemamul Primary School
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2009
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Merigi-Chepkolon-Njerian Road
- location
-
Merigi
(in Bomet)
- year first funded
- 2006
- action
- Grading
- output
- -
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kiplokyi Cattle Dip
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 50,000
Kapkoros Health Centre
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 60%Ongoin
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kiplelji Dispensary
- location
-
Chesoen
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- 50%Ongoin
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Chesoen Dispensary
- location
-
Chesoen
(in Bomet)
- year first funded
- 2003
- action
- Construction
- output
- -
- implementation status
- 90%Ongoin
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Baraka Pre School
- location
-
Chesoen
(in Bomet)
- year first funded
- 2009
- action
- Construction
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Kaptimtui Pre School
- location
-
Kipreres
(in Bomet)
- year first funded
- 2009
- action
- New
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Bomet Hostel For Health Centre
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Equipments
- output
- -
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kipreres Dip
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 50,000
Uswet Spring
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Protection
- output
- -
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Motiret Dam
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Berekeiwet Pre School
- location
-
Tegat
(in Bomet)
- year first funded
- 2009
- action
- New
- output
- -
- implementation status
- 40%On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ainopchorwet Spring
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Protection
- output
- -
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tiritab Muito Spring
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Maarat Water Spring
- location
-
Tegat
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kiptenden Cattle Dip
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kitaima Tea Buying Centre
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Boito Cattle Dip
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ngomwet Cattle Dip
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Taabet Cattle Dip
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Morit Cattle Dip
- location
-
Chesoen
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Taabet Water Spring
- location
-
Chesoen
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Chesoen Tea centre
- location
-
Chesoen
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Njerian Spring
- location
-
Chemaner
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kimogoro Cattle Dip
- location
-
Chemaner
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Maroba Tea Buying Centre
- location
-
Chemaner
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Chepkostionik Cattle Dip
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Eworet Cattle Dip
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kiromwok Cattle Dip
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2005
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Motoimet Tea Centre
- location
-
Kiromwok
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Sinonin Dip
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Simwaga Dip
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Itibo Dip
- location
-
Kapkimolwa
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Tuiyobei Cattle Dip
- location
-
Sibaiyan
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kaminjeiwet Cattle Dip
- location
-
Singorwet
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Salaik Tea Buying Centre
- location
-
Mugango
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Kitoben Cattle Dip
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mugango Cattle Dip
- location
-
Mugango
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kapsebet Cattle Dip
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Sugutanda Cattle Dip
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Tenwek Cattle Dip
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Chepngaina Cattle Dip
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Arorwet Cattle Dip
- location
-
Bomet Townshp
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Lemeiywet Water Spring
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Chepkitwal Tea Buying Centre
- location
-
Kembu
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Kembu Cattle Dip
- location
-
Kembu
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kosior Cattle Dip
- location
-
Kembu
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kipsirichoik Cattle Dip
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kongotik Cattle Dip
- location
-
Kembu
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Tegat Tea Buying
- location
-
Tegat
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Pending
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Sonogut Water Spring
- location
-
Tegat
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Tegat Cattle Dip
- location
-
Tegat
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Cheboin Cattle Dip
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mataringe Cattle Dip
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Emityot Cattle Dip
- location
-
Cheboin
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Chebirir Water Spring
- location
-
Kipreres
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ndubai Dip
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Motiret Dip
- location
-
Kipreres
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Siwot Dip
- location
-
Kipreres
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Olokyin Dip
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2005
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kapliyo Dip
- location
-
Kiplabotwa
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Balek Tea Buying Center
- location
-
Singorwet
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ndarawetta Cattle Dip
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ngainet Cattle Dip
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mogindo Tea Buying Centre
- location
-
Ndarawetta
(in Bomet)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Motigo Dispensary
- location
-
Merigi
(in Bomet)
- year first funded
- 2004
- action
- Acaricides
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Njerian Primary School
- location
-
Merigi
(in Bomet)
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 0
- estimate
- Ksh 1,000,000