The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Bonchari

Constituency Office Construction

location
Bomorenda (in Bonchari)
year first funded
2003
action
Painting
output
Office Space
implementation status
On Going
total cost
Ksh 8,729,925
estimate
Ksh 11,500,000

Isamwera Secondary school

location
Bomariba (in Bonchari)
year first funded
2004
action
On Going
output
Tuition Block
implementation status
On Going
total cost
Ksh 6,600,000
estimate
Ksh 19,322,780

Bogitaa Secondary School

location
Riana (in Bonchari)
year first funded
2003
action
On Going
output
Tuition Block
implementation status
On Going
total cost
Ksh 5,550,000
estimate
Ksh 8,590,000

Kiabusura Secondary School

location
Bomorenda (in Bonchari)
year first funded
2003
action
On Going
output
Tuition Block -
implementation status
On Going
total cost
Ksh 4,800,000
estimate
Ksh 7,446,000

Nyamokenye Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
1St Floor Wall
output
Tuition Block
implementation status
On Going
total cost
Ksh 4,500,000
estimate
Ksh 9,500,000

Ekerubo Secondary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Roofing
output
Tuition Block
implementation status
On Going
total cost
Ksh 3,232,500
estimate
Ksh 5,809,000

Riotanchi Hc Ambulance

location
Bomorenda (in Bonchari)
year first funded
2007
action
n/a
output
Health Services
implementation status
Purchased
total cost
Ksh 2,858,000
estimate
Ksh 2,967,100

Botoro Secondary School

location
Bomorenda (in Bonchari)
year first funded
2003
action
Construction of Admin Block
output
Admin Block
implementation status
Complete
total cost
Ksh 2,850,000
estimate
Ksh 4,500,000

Igonga Secondary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of Dining Hall
output
Dining Hall
implementation status
Complete
total cost
Ksh 2,800,000
estimate
Ksh 2,800,000

Itibo Secondary School

location
Iyabe (in Bonchari)
year first funded
2007
action
n/a
output
Laboratory Block
implementation status
On-Going
total cost
Ksh 2,787,500
estimate
Ksh 3,487,437

Bonyaoro Girls Secondary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of Tuition Block
output
Tuition Block
implementation status
Complete
total cost
Ksh 2,550,000
estimate
Ksh 2,550,000

Ekerubo Dispensary

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of Health Block
output
Health Block
implementation status
Complete -
total cost
Ksh 2,450,000
estimate
Ksh 2,500,000

Bokeire Dispensary

location
Iyabe (in Bonchari)
year first funded
2004
action
Painting
output
Health Block
implementation status
Complete
total cost
Ksh 2,100,000
estimate
Ksh 2,394,841

Gesuguri Dispensary

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Painting
output
Health Block
implementation status
Complete -
total cost
Ksh 2,000,000
estimate
Ksh 2,200,000

Botoro Primary School

location
Bomorenda (in Bonchari)
year first funded
2003
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,200,000

Bogiakumu Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
On Going
output
Tuition Block
implementation status
On Going
total cost
Ksh 2,000,000
estimate
Ksh 2,600,000

Kisii South Instof Technology

location
Riana (in Bonchari)
year first funded
2004
action
On Going
output
Classes
implementation status
Complete
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Matongo Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
On Going
output
Tuition Block -
implementation status
On Going
total cost
Ksh 1,850,000
estimate
Ksh 3,646,000

Kiaruta Dispensary

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of Health Block
output
Health Block
implementation status
Complete -
total cost
Ksh 1,800,000
estimate
Ksh 1,875,000

Ekioga Ypoly

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Painting
output
Classes
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 1,800,000

Kioge Primary School

location
Iyabe (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 1,675,000
estimate
Ksh 1,975,000

Nyabimwa Secondary School

location
Bomariba (in Bonchari)
year first funded
2008
action
Planning
output
Tuition Block
implementation status
Ongoing
total cost
Ksh 1,557,500
estimate
Ksh 3,115,000

Gesero Secondary School

location
Iyabe (in Bonchari)
year first funded
2003
action
On Going
output
Laboratory Block
implementation status
On Going
total cost
Ksh 1,550,000
estimate
Ksh 2,169,639

Nyamagundo Dispensary

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of Health Block
output
Health Block
implementation status
Complete
total cost
Ksh 1,550,000
estimate
Ksh 2,000,000

Nyabimwa Secondary School

location
Bomariba (in Bonchari)
year first funded
2004
action
On Going
output
Laboratory
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 1,700,000

Itierio Secondary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
On Going
output
Dormitory
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 1,600,000

Mosando Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Ground Floor Slab
output
Classes
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 7,284,060

Oroche Dispensary

location
Bogiakumu (in Bonchari)
year first funded
2003
action
Construction of Health Block
output
Health Block
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Omwari Secondary School

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Riotanchi Health Centre

location
Bomorenda (in Bonchari)
year first funded
2005
action
Comlete
output
Maternity Block
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Iruma Mixed Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 1,350,000
estimate
Ksh 1,350,000

Nyamagiri Dispensary

location
Riana (in Bonchari)
year first funded
2006
action
Fittings
output
Health Block
implementation status
On Going
total cost
Ksh 1,250,000
estimate
Ksh 2,292,000

Riana Health Centre

location
Riana (in Bonchari)
year first funded
2005
action
Comlete
output
Maternity Block
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Entanke Dispensary

location
Bomariba (in Bonchari)
year first funded
2005
action
Painting
output
Health Block
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 2,300,000

Nyangoge Secondary School

location
Bomorenda (in Bonchari)
year first funded
2003
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,650,000

Iyabe Health Centre

location
Iyabe (in Bonchari)
year first funded
2006
action
Foundation Stage.
output
Health Block
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 28,402,797

Suneka Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
1St Floor Wall
output
Dormitory
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 17,171,500

Nyasagati Primary School

location
Iyabe (in Bonchari)
year first funded
2008
action
Planning
output
4Classes
implementation status
Ongoing
total cost
Ksh 935,000
estimate
Ksh 2,215,000

Riamonting'A Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Nyabieyo Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Plaster
output
Classes
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Ngeri Youth Polytechnic

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 675,000
estimate
Ksh 775,000

Igonga Village Poly

location
Bomariba (in Bonchari)
year first funded
2006
action
On Going
output
Classes
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 14,678,475

Nyangena Primary School

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyamare primary school

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Kirwanda Village Polytechnic

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 580,000
estimate
Ksh 580,000

Nyasagati Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 570,000
estimate
Ksh 620,000

Ekerore Police Post

location
Bogiakumu (in Bonchari)
year first funded
2007
action
n/a
output
Office Space
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 1,784,043

Chisaro Primary School

location
Riana (in Bonchari)
year first funded
2008
action
Planning
output
4Classes
implementation status
Ongoing
total cost
Ksh 507,500
estimate
Ksh 1,015,000

Botoro Primary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Genga Secondary School

location
Riana (in Bonchari)
year first funded
2008
action
Planning
output
2 Classes
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 10,000,000

Omwari Primary School

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 550,000

Mugori Primary School

location
Riana (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 600,000

Nyabieyo Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Ekerubo Primary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Mwata Primary School

location
Riana (in Bonchari)
year first funded
2003
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 445,000
estimate
Ksh 520,000

Bitare Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 382,500
estimate
Ksh 532,500

Ekerore Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 375,000
estimate
Ksh 475,000

Chisaro Primary School

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 370,000
estimate
Ksh 520,000

Kisii South Instof Technology

location
Iyabe (in Bonchari)
year first funded
2007
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Nyangiti Primary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 500,000

Sigisi Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 450,000

Nyamaya Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 400,000

Bogiakumu Primary School

location
Bogiakumu (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,410
estimate
Ksh 320,410

Etureti Primary School

location
Iyabe (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Nyangiti Primary School

location
Bomorenda (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Mugori Primary School

location
Riana (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Riamaoncha Primary School

location
Bogiakumu (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Bomariba Primary School

location
Bomariba (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Botoro Primary School

location
Bomorenda (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Oriangi Primary School

location
Bomariba (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Rianyapara Primary School

location
Bogiakumu (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 320,270
estimate
Ksh 320,270

Itibo Nyang'Iti Road

location
Iyabe (in Bonchari)
year first funded
2005
action
n/a
output
Communication
implementation status
Complete
total cost
Ksh 320,000
estimate
Ksh 320,000

Oriangi Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 320,000
estimate
Ksh 320,000

Gesebe C Factory

location
Bomariba (in Bonchari)
year first funded
2005
action
Coffee Processing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Nyamagundo Coffee Factory

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Coffee Processing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Gesonso C Factory

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Coffee Processing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Gesuguri C Factory

location
Bomorenda (in Bonchari)
year first funded
2005
action
Coffee Processing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Kebacha C Factory

location
Iyabe (in Bonchari)
year first funded
2005
action
Coffee Processing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Iyabe Coffee Factory

location
Iyabe (in Bonchari)
year first funded
2005
action
Fencing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Riana Coffee Factory

location
Riana (in Bonchari)
year first funded
2005
action
Coffee Processing
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Itibo Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kiabusura Primary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 32,500

Kiabusura Primary School

location
Bomorenda (in Bonchari)
year first funded
2007
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Rianyabaro Primary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 450,000

Nyakungu Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 380,000

Miranga Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Bomariba Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 325,000

Riamagige Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Sanitary
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Kirwanda Primary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Ccomplete
total cost
Ksh 300,000
estimate
Ksh 390,000

Itibo Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 282,500
estimate
Ksh 282,500

Kirwanda Youth Poly

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 280,000
estimate
Ksh 280,000

Etureti Primary School

location
Iyabe (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 274,707
estimate
Ksh 274,707

Ebate Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 260,000
estimate
Ksh 360,000

Genga Primary School

location
Riana (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 350,000

Nyamiobo Primary School

location
Riana (in Bonchari)
year first funded
2006
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 300,000

Ekerubo Primary School

location
Bomorenda (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 500,000

Nyamaya Primary School

location
Iyabe (in Bonchari)
year first funded
2008
action
Planning
output
2 Classes
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Rianyapara Primary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 390,000

Mosando Primary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 340,000

WelcomeOmosege

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Communication
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 240,000

Suneka Primary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 330,000

Mwamisoko Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 230,000

Entanke Village Poly

location
Bomariba (in Bonchari)
year first funded
2006
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 225,000
estimate
Ksh 325,000

Riamaoncha Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 220,000
estimate
Ksh 220,000

Nyamokenye Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Fence
implementation status
Complete
total cost
Ksh 215,000
estimate
Ksh 100,000

Gesuguri Coffee Factory

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Fence
output
-
implementation status
Complete
total cost
Ksh 215,000
estimate
Ksh 100,000

Nyamokenye Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Fence
output
-
implementation status
Complete
total cost
Ksh 215,000
estimate
Ksh 100,000

Nyotoima Primary School

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 212,500
estimate
Ksh 262,500

Nyamerako Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 202,500
estimate
Ksh 252,500

Nyangoge Secondary School

location
Bomorenda (in Bonchari)
year first funded
2008
action
Planning
output
Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Igonga Primary School

location
Bomariba (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Nyotoima Primary School

location
Riana (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Miranga Primary School

location
Bomariba (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Kirwanda Primary School

location
Bogiakumu (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Marindi Primary School

location
Riana (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Kioge Primary School

location
Iyabe (in Bonchari)
year first funded
2008
action
Planning
output
2Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Ekerubo Primary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Classes
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 150,000

Botoro Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Itierio Primary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Sanitary
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Riana - Mugori Road

location
Riana (in Bonchari)
year first funded
2006
action
n/a
output
Communication
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Suneka Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ritoke Riagori Road

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Communication
implementation status
Complete
total cost
Ksh 199,400
estimate
Ksh 199,400

Igonga Primary School

location
Bomariba (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 190,000
estimate
Ksh 290,000

Matongo Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 190,000
estimate
Ksh 270,000

Kebute Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 187,500
estimate
Ksh 337,500

Rioigara Bridge

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 80,000

Mogumo Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Classes
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 280,000

Kenyorora Primary School

location
Bomariba (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 275,000

Riamagige Primary School

location
Bomariba (in Bonchari)
year first funded
2005
action
Sanitary
output
-
implementation status
Complete
total cost
Ksh 170,000
estimate
Ksh 170,000

Isamwera Primary School

location
Bomariba (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 165,000
estimate
Ksh 265,000

Bogitaa Primary School

location
Riana (in Bonchari)
year first funded
2005
action
n/a
output
Classes
implementation status
Complete
total cost
Ksh 162,500
estimate
Ksh 212,500

Bogiakumu Primary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 155,000
estimate
Ksh 180,000

Nyamokenye Primary School

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 200,000

Marindi Primary School

location
Riana (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 320,000

Gesero Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 190,000

Nyamagiri Bridge

location
Iyabe (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 100,000

Bokeire Dispensary

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Fencing
output
-
implementation status
Complete
total cost
Ksh 126,000
estimate
Ksh 126,000

Nyabimwa Primary School

location
Bomariba (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 125,000
estimate
Ksh 225,000

Gesuguri Bridge

location
Iyabe (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 120,000

Itibo Secondary School

location
Iyabe (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 120,000

Omwari Secondary School

location
Riana (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 120,000

Ekioga Ypoly

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 120,000

Omoko Waters Spring

location
Bomariba (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Rianyabayo Water Spring

location
Bomorenda (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Rianyamongo Water

location
Riana (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Riongeri Ragira

location
Riana (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Riamicheo Water Spring

location
Riana (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Riarianga Water Sprig

location
Bomariba (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Riamatieka Water Spring

location
Bomariba (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Rianyabaro Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Bonyaoro Girls Water

location
Bomorenda (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Riondara Water Spring

location
Bomorenda (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Riasigara Water Spring

location
Bomorenda (in Bonchari)
year first funded
2007
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 113,500
estimate
Ksh 113,500

Mugoga Primary School

location
Riana (in Bonchari)
year first funded
2005
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 112,500
estimate
Ksh 162,500

Nyangoge Primary School

location
Bomorenda (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 220,000

Omwari Secondary School

location
Riana (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyangoge Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Riamontinga Primary School

location
Iyabe (in Bonchari)
year first funded
2004
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamagundo Bridge

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyangundo Bridge

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Riagwaro Bridge

location
Bomorenda (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamokenye Secondary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mosando Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Omwari Primary School

location
Riana (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Iruma Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyabimwa Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Classes
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Riotanchi Health Centre

location
Bomorenda (in Bonchari)
year first funded
2006
action
Staff Housing
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Oroche Dispensary

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Furniture
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamagundo Dispensary

location
Bomariba (in Bonchari)
year first funded
2006
action
Sanitary
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Bitare Primary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Security
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyabioto Dispensary

location
Bomorenda (in Bonchari)
year first funded
2006
action
Security
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamokenye Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 100,000

Botoro Secondary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Iruma Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ekerubo Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyabimwa Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Igonga Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mosando Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Matongo Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Bogiakumu Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Isamwera Primary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Sanitary
output
-
implementation status
Complete
total cost
Ksh 99,150
estimate
Ksh 99,150

Itierio Secondary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 98,185
estimate
Ksh 98,185

Suneka Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2007
action
n/a
output
-
implementation status
On Going
total cost
Ksh 86,000
estimate
Ksh 86,000

Rioroo Bridge

location
Riana (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Nyakungu Primary School

location
Bogiakumu (in Bonchari)
year first funded
2007
action
n/a
output
Conservancy Tank
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 540,000

Gesero Bridge

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Isamwera Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Mogumo Primary School

location
Riana (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Nyang'Iti Primary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Sanitary/Classroom
output
-
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Bogiakumu Primary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Classes
output
-
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Oriangi Primary School

location
Riana (in Bonchari)
year first funded
2005
action
Sanitary
output
-
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Iruma Primary School

location
Bogiakumu (in Bonchari)
year first funded
2005
action
Stalled
output
Classes
implementation status
Stalled
total cost
Ksh 60,000
estimate
Ksh 160,000

Nyamage Bridge

location
Riana (in Bonchari)
year first funded
2004
action
n/a
output
Transport
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Nyabimwa Secondary School

location
Bomariba (in Bonchari)
year first funded
2007
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 56,200
estimate
Ksh 56,200

Omwari Secondary School

location
Riana (in Bonchari)
year first funded
2007
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 56,200
estimate
Ksh 56,200

Botoro Secondary School

location
Bomorenda (in Bonchari)
year first funded
2007
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 56,200
estimate
Ksh 56,200

Nyamira Water Project

location
Bomorenda (in Bonchari)
year first funded
2004
action
n/a
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Kiamoiro Tea

location
Bomorenda (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Nwari Tea

location
Riana (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 27,000

Bombure V Y Group

location
Bomorenda (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Bomwancha E S H G

location
Bomorenda (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Igonga S H G

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Obwari S H G

location
Bomorenda (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Bomakombi Tea Nursery

location
Iyabe (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Riokengo E S H G

location
Bomariba (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Iyabe Health Centre

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kiabusura Primary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Classrooms
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Gesero Primary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Classes
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Mwamisoko Primary School

location
Bogiakumu (in Bonchari)
year first funded
2007
action
Construction of classes
output
Classes
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 100,000

Riana Health Centre

location
Riana (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Itierio Primary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Gesero Primary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Gese Ro Sec

location
Iyabe (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Riana Chiefs Camp

location
Riana (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Nyamokenye Primary School School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Kiaruta Dis

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Iruma Primary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Itibo Pr

location
Iyabe (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Oroche Dispensary

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Iruma Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 48,181
estimate
Ksh 48,181

Riotanchi Health Centre

location
Bomorenda (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 34,980
estimate
Ksh 34,980

Ekioga Ypoly

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Electricity Supply
output
-
implementation status
Complete
total cost
Ksh 34,980
estimate
Ksh 34,980

Chache Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Rigoko Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riamachiboni Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riamaaka Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riamoracha Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riasisa Water Spring

location
Bomariba (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riamanchogu Water Spring

location
Bomariba (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Risonga Water Spring

location
Bomariba (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riabea Water Spring

location
Bomariba (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riametembe Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Nyamiobo Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riogwoka Water Spring

location
Bomariba (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Nyankoba Water Spring

location
Bomariba (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Nyameri Water Spring

location
Riana (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Embiru Water Spring

location
Riana (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riakinaro Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Nyakomogendi Water Spring

location
Iyabe (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Rianyamechaba Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Nyagonyi Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Etureti Water Spring

location
Iyabe (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Mwabokoro Water Spring

location
Riana (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Nyotoima Water Spring

location
Riana (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Rianyabaro Water Spring

location
Iyabe (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Buoga Water Spring

location
Iyabe (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riatimi Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Suguta Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riamogaka Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Itogotera Water Spring

location
Bomorenda (in Bonchari)
year first funded
2005
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 34,285
estimate
Ksh 34,285

Riamogaka Water Spring

location
Iyabe (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamanyanya Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Suguta Ii Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamarita Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riaokanga Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riokerio Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riarameki Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamanyara Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riakeragori Water Spring

location
Iyabe (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamakwara Water Spring

location
Bomorenda (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riosoro Cheni Water Spring

location
Bomorenda (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riosiemo Water Spring

location
Bomorenda (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamartin Water Spring

location
Bomorenda (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Echoro Water Spring

location
Bomariba (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riong'Ang'A Water Spring

location
Bomariba (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamachogu Water Spring

location
Bomariba (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Eyaka Water Spring

location
Bomariba (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riambaka Warer Spring

location
Riana (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamwango Water Spring

location
Riana (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riongoncho Water Spring

location
Bomariba (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riomosa Water Spring

location
Bomariba (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Nyamagoma Water Spring

location
Riana (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Rianyakebako Water Spring

location
Riana (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riamichoe Water Spring

location
Iyabe (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Riontiri Water Spring

location
Iyabe (in Bonchari)
year first funded
2006
action
n/a
output
Clean Water
implementation status
Completed
total cost
Ksh 32,143
estimate
Ksh 32,143

Itierio Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 31,000
estimate
Ksh 31,000

Riomari Water Spring

location
Iyabe (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riakiyondi Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riaricha Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyangena Water Spring

location
Bomorenda (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riososi Water Spring

location
Bomorenda (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Itibo Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riaroche Water Spring

location
Iyabe (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Misisita Water Spring

location
Iyabe (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Rianocha Water Spring

location
Riana (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riamasame Water Spring

location
Riana (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Egetugi Water Spring

location
Riana (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Rioroo Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyabioto Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyaora Water Spring

location
Iyabe (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riabutoto Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Botoro Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Rianyakwara Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riandeu Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Mosenia Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyaigoma Water Spring

location
Bomorenda (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riamasune Water Spring

location
Bomorenda (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Bonyaoro Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyabimwa Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Iruma Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Matongo Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Isamwera Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Igonga Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyantira Waterspring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Omwaro Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riamwasi Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Bonyangoncho Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riana Tree Nursery

location
Riana (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
not known
total cost
Ksh 30,000
estimate
Ksh 30,000

Riamonting'A Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Gesero Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Ekerubo Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Mosando Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyangoge Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Kerina Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyamokenye Secondary School

location
Riana (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Bogitaa Secondary School

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Bogiakumu Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Kiabusura Secondary School

location
Bomorenda (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Itierio Secondary School

location
Iyabe (in Bonchari)
year first funded
2006
action
Water
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riomari Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Water
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Rianyanganyi Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Water
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Riamoyuru Water Spring

location
Bomorenda (in Bonchari)
year first funded
2006
action
Water
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Kiomwobo Water Spring

location
Bogiakumu (in Bonchari)
year first funded
2006
action
Water
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Suneka Secondary School

location
Bomariba (in Bonchari)
year first funded
2006
action
Textbooks Supply
output
Textbooks Supply
implementation status
Complete
total cost
Ksh 29,405
estimate
Ksh 29,405

Bogisanga S H G

location
Bomariba (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Mwangoge Es H G

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 2,700

Kirwanda Elck W

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 2,700

Riambosero Tnursery

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Ngeri Tree nursery

location
Riana (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Bokecha S H G

location
Riana (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Nyangena Umoja Shg

location
Riana (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Nyamagoma Tn Shg

location
Bomariba (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Nyamwobo S H G

location
Bomariba (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Riaguto S H G

location
Bomariba (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Bonyaoro Tnursery

location
Bogiakumu (in Bonchari)
year first funded
2004
action
Tea Seedlings
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Metembe Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Nyasagati Primary School

location
Iyabe (in Bonchari)
year first funded
2005
action
Classes
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Riagesuya Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Nyanturago Water Spring

location
Bomariba (in Bonchari)
year first funded
2004
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Riagogi Bridge

location
Riana (in Bonchari)
year first funded
2005
action
n/a
output
Transport
implementation status
Completed
total cost
Ksh 15,000
estimate
Ksh 15,000

Kiabusura Secondary School

location
Bomorenda (in Bonchari)
year first funded
2005
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 11,185
estimate
Ksh 111,185

Nyamesobeti Water Spring

location
Bomorenda (in Bonchari)
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 30,000

Saisi Water Spring

location
Bomorenda (in Bonchari)
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 30,000

Nyaora Water Spring

location
Bogiakumu (in Bonchari)
action
n/a
output
Clean Water
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 30,000