The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Constituency Office Construction
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2003
- action
- Painting
- output
- Office Space
- implementation status
- On Going
- total cost
- Ksh 8,729,925
- estimate
- Ksh 11,500,000
Isamwera Secondary school
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- On Going
- output
- Tuition Block
- implementation status
- On Going
- total cost
- Ksh 6,600,000
- estimate
- Ksh 19,322,780
Bogitaa Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2003
- action
- On Going
- output
- Tuition Block
- implementation status
- On Going
- total cost
- Ksh 5,550,000
- estimate
- Ksh 8,590,000
Kiabusura Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2003
- action
- On Going
- output
- Tuition Block -
- implementation status
- On Going
- total cost
- Ksh 4,800,000
- estimate
- Ksh 7,446,000
Nyamokenye Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- 1St Floor Wall
- output
- Tuition Block
- implementation status
- On Going
- total cost
- Ksh 4,500,000
- estimate
- Ksh 9,500,000
Ekerubo Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Roofing
- output
- Tuition Block
- implementation status
- On Going
- total cost
- Ksh 3,232,500
- estimate
- Ksh 5,809,000
Riotanchi Hc Ambulance
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Health Services
- implementation status
- Purchased
- total cost
- Ksh 2,858,000
- estimate
- Ksh 2,967,100
Botoro Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2003
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- Complete
- total cost
- Ksh 2,850,000
- estimate
- Ksh 4,500,000
Igonga Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Itibo Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Laboratory Block
- implementation status
- On-Going
- total cost
- Ksh 2,787,500
- estimate
- Ksh 3,487,437
Bonyaoro Girls Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of Tuition Block
- output
- Tuition Block
- implementation status
- Complete
- total cost
- Ksh 2,550,000
- estimate
- Ksh 2,550,000
Ekerubo Dispensary
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of Health Block
- output
- Health Block
- implementation status
- Complete -
- total cost
- Ksh 2,450,000
- estimate
- Ksh 2,500,000
Bokeire Dispensary
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Painting
- output
- Health Block
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,394,841
Gesuguri Dispensary
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Painting
- output
- Health Block
- implementation status
- Complete -
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,200,000
Botoro Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2003
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,200,000
Bogiakumu Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- On Going
- output
- Tuition Block
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,600,000
Kisii South Instof Technology
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- On Going
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Matongo Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- On Going
- output
- Tuition Block -
- implementation status
- On Going
- total cost
- Ksh 1,850,000
- estimate
- Ksh 3,646,000
Kiaruta Dispensary
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of Health Block
- output
- Health Block
- implementation status
- Complete -
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,875,000
Ekioga Ypoly
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Painting
- output
- Classes
- implementation status
- On Going
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,800,000
Kioge Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 1,675,000
- estimate
- Ksh 1,975,000
Nyabimwa Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- Tuition Block
- implementation status
- Ongoing
- total cost
- Ksh 1,557,500
- estimate
- Ksh 3,115,000
Gesero Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2003
- action
- On Going
- output
- Laboratory Block
- implementation status
- On Going
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,169,639
Nyamagundo Dispensary
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of Health Block
- output
- Health Block
- implementation status
- Complete
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,000,000
Nyabimwa Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- On Going
- output
- Laboratory
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,700,000
Itierio Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- On Going
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,600,000
Mosando Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Ground Floor Slab
- output
- Classes
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 7,284,060
Oroche Dispensary
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2003
- action
- Construction of Health Block
- output
- Health Block
- implementation status
- Complete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Omwari Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Riotanchi Health Centre
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Comlete
- output
- Maternity Block
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Iruma Mixed Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,350,000
Nyamagiri Dispensary
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- Fittings
- output
- Health Block
- implementation status
- On Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,292,000
Riana Health Centre
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Comlete
- output
- Maternity Block
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Entanke Dispensary
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- Painting
- output
- Health Block
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 2,300,000
Nyangoge Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2003
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,650,000
Iyabe Health Centre
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Foundation Stage.
- output
- Health Block
- implementation status
- Stalled
- total cost
- Ksh 1,000,000
- estimate
- Ksh 28,402,797
Suneka Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- 1St Floor Wall
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 17,171,500
Nyasagati Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 4Classes
- implementation status
- Ongoing
- total cost
- Ksh 935,000
- estimate
- Ksh 2,215,000
Riamonting'A Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Nyabieyo Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Plaster
- output
- Classes
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Ngeri Youth Polytechnic
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 675,000
- estimate
- Ksh 775,000
Igonga Village Poly
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- On Going
- output
- Classes
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 14,678,475
Nyangena Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nyamare primary school
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kirwanda Village Polytechnic
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 580,000
- estimate
- Ksh 580,000
Nyasagati Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 570,000
- estimate
- Ksh 620,000
Ekerore Police Post
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Office Space
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 1,784,043
Chisaro Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 4Classes
- implementation status
- Ongoing
- total cost
- Ksh 507,500
- estimate
- Ksh 1,015,000
Botoro Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Genga Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2 Classes
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 10,000,000
Omwari Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 550,000
Mugori Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
Nyabieyo Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Ekerubo Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Mwata Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2003
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 445,000
- estimate
- Ksh 520,000
Bitare Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 382,500
- estimate
- Ksh 532,500
Ekerore Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 375,000
- estimate
- Ksh 475,000
Chisaro Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 370,000
- estimate
- Ksh 520,000
Kisii South Instof Technology
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2007
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Nyangiti Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Sigisi Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Nyamaya Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
Bogiakumu Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,410
- estimate
- Ksh 320,410
Etureti Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Nyangiti Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Mugori Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Riamaoncha Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Bomariba Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Botoro Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Oriangi Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Rianyapara Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 320,270
- estimate
- Ksh 320,270
Itibo Nyang'Iti Road
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Communication
- implementation status
- Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Oriangi Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Gesebe C Factory
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- Coffee Processing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Nyamagundo Coffee Factory
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Coffee Processing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Gesonso C Factory
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Coffee Processing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Gesuguri C Factory
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Coffee Processing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Kebacha C Factory
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- Coffee Processing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Iyabe Coffee Factory
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- Fencing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Riana Coffee Factory
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Coffee Processing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Itibo Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiabusura Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 32,500
Kiabusura Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rianyabaro Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Nyakungu Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 380,000
Miranga Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Bomariba Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 325,000
Riamagige Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Sanitary
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Kirwanda Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Ccomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 390,000
Itibo Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 282,500
- estimate
- Ksh 282,500
Kirwanda Youth Poly
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 280,000
Etureti Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 274,707
- estimate
- Ksh 274,707
Ebate Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 360,000
Genga Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Nyamiobo Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Ekerubo Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Nyamaya Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2 Classes
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Rianyapara Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 390,000
Mosando Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 340,000
WelcomeOmosege
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Communication
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Suneka Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 330,000
Mwamisoko Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Entanke Village Poly
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 225,000
- estimate
- Ksh 325,000
Riamaoncha Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Nyamokenye Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Fence
- implementation status
- Complete
- total cost
- Ksh 215,000
- estimate
- Ksh 100,000
Gesuguri Coffee Factory
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Fence
- output
- -
- implementation status
- Complete
- total cost
- Ksh 215,000
- estimate
- Ksh 100,000
Nyamokenye Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Fence
- output
- -
- implementation status
- Complete
- total cost
- Ksh 215,000
- estimate
- Ksh 100,000
Nyotoima Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 212,500
- estimate
- Ksh 262,500
Nyamerako Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 202,500
- estimate
- Ksh 252,500
Nyangoge Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Igonga Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Nyotoima Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Miranga Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Kirwanda Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Marindi Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Kioge Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2008
- action
- Planning
- output
- 2Classes
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Ekerubo Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Classes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 150,000
Botoro Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Itierio Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Sanitary
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Riana - Mugori Road
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Communication
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Suneka Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ritoke Riagori Road
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Communication
- implementation status
- Complete
- total cost
- Ksh 199,400
- estimate
- Ksh 199,400
Igonga Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 290,000
Matongo Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 270,000
Kebute Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 187,500
- estimate
- Ksh 337,500
Rioigara Bridge
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 80,000
Mogumo Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 280,000
Kenyorora Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 275,000
Riamagige Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- Sanitary
- output
- -
- implementation status
- Complete
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Isamwera Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 165,000
- estimate
- Ksh 265,000
Bogitaa Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 162,500
- estimate
- Ksh 212,500
Bogiakumu Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 155,000
- estimate
- Ksh 180,000
Nyamokenye Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Marindi Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 320,000
Gesero Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 190,000
Nyamagiri Bridge
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 100,000
Bokeire Dispensary
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Fencing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 126,000
- estimate
- Ksh 126,000
Nyabimwa Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 125,000
- estimate
- Ksh 225,000
Gesuguri Bridge
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Itibo Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Omwari Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Ekioga Ypoly
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Omoko Waters Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Rianyabayo Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Rianyamongo Water
- location
-
Riana
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Riongeri Ragira
- location
-
Riana
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Riamicheo Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Riarianga Water Sprig
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Riamatieka Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Rianyabaro Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Bonyaoro Girls Water
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Riondara Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Riasigara Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 113,500
- estimate
- Ksh 113,500
Mugoga Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 112,500
- estimate
- Ksh 162,500
Nyangoge Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 220,000
Omwari Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyangoge Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Riamontinga Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamagundo Bridge
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyangundo Bridge
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Riagwaro Bridge
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamokenye Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mosando Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Omwari Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Iruma Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyabimwa Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Classes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Riotanchi Health Centre
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Staff Housing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Oroche Dispensary
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Furniture
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamagundo Dispensary
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Sanitary
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bitare Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Security
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyabioto Dispensary
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Security
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamokenye Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Botoro Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Iruma Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ekerubo Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyabimwa Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Igonga Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mosando Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Matongo Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bogiakumu Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Isamwera Primary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Sanitary
- output
- -
- implementation status
- Complete
- total cost
- Ksh 99,150
- estimate
- Ksh 99,150
Itierio Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 98,185
- estimate
- Ksh 98,185
Suneka Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 86,000
- estimate
- Ksh 86,000
Rioroo Bridge
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Nyakungu Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- n/a
- output
- Conservancy Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 540,000
Gesero Bridge
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Isamwera Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mogumo Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Nyang'Iti Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Sanitary/Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Bogiakumu Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Classes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Oriangi Primary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- Sanitary
- output
- -
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Iruma Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- Stalled
- output
- Classes
- implementation status
- Stalled
- total cost
- Ksh 60,000
- estimate
- Ksh 160,000
Nyamage Bridge
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Transport
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 60,000
Nyabimwa Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2007
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 56,200
- estimate
- Ksh 56,200
Omwari Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2007
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 56,200
- estimate
- Ksh 56,200
Botoro Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2007
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 56,200
- estimate
- Ksh 56,200
Nyamira Water Project
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Kiamoiro Tea
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Nwari Tea
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 27,000
Bombure V Y Group
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Bomwancha E S H G
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Igonga S H G
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Obwari S H G
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Bomakombi Tea Nursery
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Riokengo E S H G
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 54,000
- estimate
- Ksh 54,000
Iyabe Health Centre
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kiabusura Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gesero Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Classes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mwamisoko Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2007
- action
- Construction of classes
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Riana Health Centre
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Itierio Primary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Gesero Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Gese Ro Sec
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Riana Chiefs Camp
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Nyamokenye Primary School School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Kiaruta Dis
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Iruma Primary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Itibo Pr
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Oroche Dispensary
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Iruma Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 48,181
- estimate
- Ksh 48,181
Riotanchi Health Centre
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 34,980
- estimate
- Ksh 34,980
Ekioga Ypoly
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Electricity Supply
- output
- -
- implementation status
- Complete
- total cost
- Ksh 34,980
- estimate
- Ksh 34,980
Chache Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Rigoko Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riamachiboni Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riamaaka Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riamoracha Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riasisa Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riamanchogu Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Risonga Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riabea Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riametembe Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Nyamiobo Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riogwoka Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Nyankoba Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Nyameri Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Embiru Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riakinaro Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Nyakomogendi Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Rianyamechaba Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Nyagonyi Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Etureti Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Mwabokoro Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Nyotoima Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Rianyabaro Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Buoga Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riatimi Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Suguta Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riamogaka Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Itogotera Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 34,285
- estimate
- Ksh 34,285
Riamogaka Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamanyanya Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Suguta Ii Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamarita Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riaokanga Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riokerio Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riarameki Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamanyara Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riakeragori Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamakwara Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riosoro Cheni Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riosiemo Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamartin Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Echoro Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riong'Ang'A Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamachogu Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Eyaka Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riambaka Warer Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamwango Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riongoncho Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riomosa Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Nyamagoma Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Rianyakebako Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riamichoe Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Riontiri Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- n/a
- output
- Clean Water
- implementation status
- Completed
- total cost
- Ksh 32,143
- estimate
- Ksh 32,143
Itierio Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 31,000
- estimate
- Ksh 31,000
Riomari Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riakiyondi Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riaricha Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyangena Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riososi Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Itibo Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riaroche Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Misisita Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Rianocha Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riamasame Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Egetugi Water Spring
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Rioroo Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyabioto Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyaora Water Spring
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riabutoto Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Botoro Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Rianyakwara Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riandeu Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Mosenia Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyaigoma Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riamasune Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Bonyaoro Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyabimwa Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Iruma Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Matongo Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Isamwera Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Igonga Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyantira Waterspring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Omwaro Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riamwasi Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Bonyangoncho Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riana Tree Nursery
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- not known
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riamonting'A Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Gesero Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Ekerubo Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Mosando Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyangoge Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kerina Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyamokenye Secondary School
- location
-
Riana
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Bogitaa Secondary School
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Bogiakumu Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kiabusura Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Itierio Secondary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2006
- action
- Water
- output
- -
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riomari Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Water
- output
- -
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Rianyanganyi Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Water
- output
- -
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Riamoyuru Water Spring
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2006
- action
- Water
- output
- -
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kiomwobo Water Spring
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2006
- action
- Water
- output
- -
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Suneka Secondary School
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2006
- action
- Textbooks Supply
- output
- Textbooks Supply
- implementation status
- Complete
- total cost
- Ksh 29,405
- estimate
- Ksh 29,405
Bogisanga S H G
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Mwangoge Es H G
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 2,700
Kirwanda Elck W
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 2,700
Riambosero Tnursery
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Ngeri Tree nursery
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Bokecha S H G
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Nyangena Umoja Shg
- location
-
Riana
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Nyamagoma Tn Shg
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Nyamwobo S H G
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Riaguto S H G
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Bonyaoro Tnursery
- location
-
Bogiakumu
(in Bonchari)
- year first funded
- 2004
- action
- Tea Seedlings
- output
- -
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 27,000
Metembe Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Nyasagati Primary School
- location
-
Iyabe
(in Bonchari)
- year first funded
- 2005
- action
- Classes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Riagesuya Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Nyanturago Water Spring
- location
-
Bomariba
(in Bonchari)
- year first funded
- 2004
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Riagogi Bridge
- location
-
Riana
(in Bonchari)
- year first funded
- 2005
- action
- n/a
- output
- Transport
- implementation status
- Completed
- total cost
- Ksh 15,000
- estimate
- Ksh 15,000
Kiabusura Secondary School
- location
-
Bomorenda
(in Bonchari)
- year first funded
- 2005
- action
- Lab Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 11,185
- estimate
- Ksh 111,185
Nyamesobeti Water Spring
- location
-
Bomorenda
(in Bonchari)
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 30,000
Saisi Water Spring
- location
-
Bomorenda
(in Bonchari)
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 30,000
Nyaora Water Spring
- location
-
Bogiakumu
(in Bonchari)
- action
- n/a
- output
- Clean Water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 30,000