The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursaries
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Award Bursary To Needy Students
- output
- Education To All
- implementation status
- Cheques Distributed
- total cost
- Ksh 22,456,427
- estimate
- Ksh 22,456,427
Reserve Fund
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Funds Set Aside For Any Emmergency Ocurrences Within The Constituency
- output
- To Fund Emmergency Within The Constituency
- implementation status
- Fy2007/08 Funds Spent As Per Table 3 Below
- total cost
- Ksh 12,506,514
- estimate
- Ksh 12,506,514
Bunyala Sports & Indusrial Park
- location
-
Khajula
(in Budalangi)
- year first funded
- 2007
- action
- Phase1 Construction Of Sports Complex
- output
- Landscapping &Construction Of Stadium
- implementation status
- Landscapping Completed ,Land Purchased From The Community
- total cost
- Ksh 10,000,000
- estimate
- Ksh 10,000,000
Makunda Mixed Secondary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2004
- action
- 1 New School Bus & Construction Of School dining Hall
- output
- School Bus & School dining Hall
- implementation status
- School Bus Purchased /dining Hall At Finishing Level
- total cost
- Ksh 5,933,508
- estimate
- Ksh 5,933,508
Stenedict Budalangi Secondary School
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2003
- action
- New Chairs,New Shelves/New Schoo L Bus &Repair/Paintingof Buildings
- output
- New Chairs,New Shelves/New Schoo L Bus & Good Buildings
- implementation status
- Fy 03/06 C Ompleted & In Use ,Fy 08/9 To Start When Funds Are Received
- total cost
- Ksh 5,155,000
- estimate
- Ksh 5,155,000
Busagwa Youth Polytecnic
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2007
- action
- Construction Of Workshop & 1 Office
- output
- Workshop & Office Suite
- implementation status
- Construction At Roofing Level
- total cost
- Ksh 5,100,000
- estimate
- Ksh 5,100,000
Osieko Dispensarysery
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Construction of 1 New Dispensary Block & 1 New Staff House
- output
- Dispensary Block & Staff House
- implementation status
- Completed & Not In Use
- total cost
- Ksh 4,666,768
- estimate
- Ksh 4,666,768
Mukhobola Health Centre
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2003
- action
- Construction of 1 New Mortury Block & Generator
- output
- Mortury Block & Selfstarter Generator
- implementation status
- Mortury Completed Not In Use, Need Curtain Wall On Going
- total cost
- Ksh 4,450,000
- estimate
- Ksh 3,450,000
Lunyofu Primary School
- location
-
Bunyala West
(in Budalangi)
- year first funded
- 2003
- action
- Construction Of 4 New Classrooms/Staffroom/3 Vip Latrine
- output
- New Classrooms/Staffroom/Vip Latrine
- implementation status
- Classrooms Completed & In Use ,Staffroom At Roofing Level
- total cost
- Ksh 3,923,833
- estimate
- Ksh 3,923,833
Khajula Dispensary
- location
-
Khajula
(in Budalangi)
- year first funded
- 2003
- action
- Construction of 1 New Dispensary Block & 1 Staff House
- output
- Dispensary Full With Doctors Residence
- implementation status
- Completed & Not In Use
- total cost
- Ksh 3,254,822
- estimate
- Ksh 3,254,822
Magombe Multipurpose
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2007
- action
- Expasion Of Rice Field From 534 To 1600 Acres
- output
- High Yield Of Rice In The Region & Food Security
- implementation status
- First Phase Completed & Good Harvest Achieved
- total cost
- Ksh 3,000,000
- estimate
- Ksh 2,000,000
Osieko Secondary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2006
- action
- Construction of 1 New Admin Block & 1 New Classroom
- output
- New Desks ,New Admin Block &New Classroom
- implementation status
- Desks In Use,Construction Work Going On
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Bunyala Wet Lands Transport Network
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2007
- action
- Openning Of Water Ways On Rivers Nzoia & Yala,Engine Boats,Canoes
- output
- Easy Transportation Between These Two Rivers
- implementation status
- 3 Engines Purchased ,2 Boats ,Canals Widdened
- total cost
- Ksh 2,332,395
- estimate
- Ksh 2,332,395
Budalangi Dispensary
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2003
- action
- Construction Of 3 Vip Latrines/1 Staff House & Maternity Ward Fy 2009/010 Funds Not Yet Released
- output
- Latrines/Staff House& Maternity
- implementation status
- Fy 03/6 Completed & In Use
- total cost
- Ksh 2,234,822
- estimate
- Ksh 2,234,822
Maduwa Primary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2005
- action
- Purchase Of Mobile Toilet,2New Classrooms
- output
- Mobile Toilet,New Classrooms
- implementation status
- Toilets & Classes In Use
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Bulwani Maternity
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2003
- action
- Construction Of 1 New Martenity Block
- output
- New Martenity Block
- implementation status
- Completed & In Use
- total cost
- Ksh 2,170,000
- estimate
- Ksh 2,170,000
Maduwaosieko Foot Bridge
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Viament Of Funds Done
- output
- Foot Bridge
- implementation status
- Funds Vied To Other Projects
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Osieko Primary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2003
- action
- Construction of 1 New Classroom & Reovation Of 3 Classrooms
- output
- New Look School
- implementation status
- Completed & Not In Use
- total cost
- Ksh 1,883,608
- estimate
- Ksh 1,883,608
Busagwa Primary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2005
- action
- Renovations Of Entire Classrooms In School
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 1,685,000
- estimate
- Ksh 1,685,000
Makunda Primary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2003
- action
- Construction of 3 New Classrooms
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 1,557,340
- estimate
- Ksh 1,557,340
LugarePrimary School
- location
-
Khajula
(in Budalangi)
- year first funded
- 2006
- action
- 1 New Classroom,Admin Block & Fenced School Compound With Lockable Gate
- output
- New Look School Fenced With Good Gate
- implementation status
- Completed & In Use Admin Block At Lintal
- total cost
- Ksh 1,500,000
- estimate
- Ksh 600,000
Maduwa Dispensary
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2003
- action
- Construction of 1 New Staff House
- output
- New Staff House
- implementation status
- Completed & Not In Use
- total cost
- Ksh 1,443,210
- estimate
- Ksh 1,443,210
Mubwayo Primary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2003
- action
- Construction of 1 New Classroom Esp To Take Up The Project
- output
- New Look School
- implementation status
- Fy 08/09 Funds Reallocated To Other Projects
- total cost
- Ksh 1,412,592
- estimate
- Ksh 1,412,592
Bulwani Primary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2006
- action
- Construction Of Staff Houses & Labour For 3 Classes
- output
- Provide Labour & Acomm. To Teachers
- implementation status
- Completed & In Use, Staff House At Roofing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Budala Primary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Construction Of 1 New Classroom & Renovation Classrooms
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 1,199,118
- estimate
- Ksh 1,199,118
Musoma Primary School
- location
-
Khajula
(in Budalangi)
- year first funded
- 2004
- action
- 1 New Classroom & Renovation Of 2 Classrooms
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 1,129,313
- estimate
- Ksh 1,129,313
Runyu Primary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Construction Of 1 New Classroom & Renovation Classrooms
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 600,000
Namalo Primary School
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2005
- action
- Renovation & Construction Of 1 New Classroom
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,050,000
Nambengele Police Patrol Base
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2006
- action
- Construction Of 1 New Block For Police Post
- output
- Police Post With Cells
- implementation status
- Construction At Lintal & On Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,050,000
Rukala Market
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Purchase Of Land To Contruct Market
- output
- Public Market
- implementation status
- Land Purchased From Community
- total cost
- Ksh 1,022,860
- estimate
- Ksh 1,022,860
Busagwa Dispensary
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2006
- action
- New Block Of Dispensary
- output
- Dispensary For The Community
- implementation status
- Stalled At Roofing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mabinju Secondary School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2009
- action
- Construction of Secondary School
- output
- New Secondary School
- implementation status
- Yet To Start
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bulagu Ecd
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2008
- action
- Construction of Two Classrooms
- output
- Good Classroom S
- implementation status
- Project At Walling
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nakhabuka Stadium
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2004
- action
- Viament Of Funds Done
- output
- Stadium
- implementation status
- Viament Done With The Authority From Nmb
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
St Anne Bunyala Girls Secondary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2004
- action
- Equip School Laboratory & Purchase Energy Saving Cookers
- output
- Fully Equipped Laboratory & Energy Saving Jiko
- implementation status
- Completed & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Igigo Primary School
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2004
- action
- Renovation Of 2 Classrooms & Completion Of 2 Classrooms& Completion Of 1 New
- output
- New Classroom,Good Renovated Classes
- implementation status
- Funds Not Allocated Fy 07/08 And 08/0
- total cost
- Ksh 915,804
- estimate
- Ksh 915,805
Budalangi Social Hall
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2006
- action
- Construction Of Social Hall At The Market Centre
- output
- Social Hall
- implementation status
- Stalled
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Mukhobola Primary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2004
- action
- Construction of 1 New Classroom &Renovation Of Other Classrooms
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 870,000
- estimate
- Ksh 870,000
Makunda Bubamba Road
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2006
- action
- Excavation Of Road
- output
- Good Weather Road
- implementation status
- Completed But Washed Away By Floods ((Cdfc Report)
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Ndekwe Foot Bridge
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2006
- action
- Construction Of 200M Foot Bridge
- output
- Foot Bridge
- implementation status
- Washed Away By Flood
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Budalangi Primary School
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2006
- action
- Construction Of New Classroom/Fencing Of School Compound
- output
- New Classroom/Fenced School
- implementation status
- Completed & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Iyanga Ecd School
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Construction Of 1 New Classroom
- output
- New Classroom
- implementation status
- Completed & In Use
- total cost
- Ksh 603,000
- estimate
- Ksh 603,000
Bunyala Outgrowers Rice Schooleme
- location
-
Bunyala East and Cental
(in Budalangi)
- year first funded
- 2004
- action
- Expansion Of Rice Scheme
- output
- Free Flowing Water For Irrigation
- implementation status
- Completed & In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mabinju Fish Banda
- location
-
Khajula
(in Budalangi)
- year first funded
- 2008
- action
- Construction of 1 New Fish Banda For Fishermen
- output
- 1 New Fish Banda
- implementation status
- Not Funded
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mundika B Primary School
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2004
- action
- Construction of 1 New Classroom &Renovation Of Other Classrooms
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 531,780
- estimate
- Ksh 531,780
Rugunga Resource Centre
- location
-
Khajula
(in Budalangi)
- year first funded
- 2004
- action
- Labour For The Construction Of The Block
- output
- 1 New Block
- implementation status
- Completed & Canal Is In Proper Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Khajula/Ndekwe Canal
- location
-
Khajula
(in Budalangi)
- year first funded
- 2004
- action
- Openning Of Water Ways & Canal
- output
- Free Flowing Water Through Canal
- implementation status
- Completed & Canal Is In Proper Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Munani Ecd School
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2004
- action
- 1 New Classroom &6 Vip Latrines
- output
- New Look School
- implementation status
- Completed & In Use
- total cost
- Ksh 451,000
- estimate
- Ksh 451,000
Amatch Community Water Project
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2006
- action
- Rehabilitation Of Pipes & Extension Of Waterlines
- output
- Running Pipped Water For The Community
- implementation status
- Completed & Not In Use
- total cost
- Ksh 340,000
- estimate
- Ksh 340,000
Runyu Nandehe Foot Bridge
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2004
- action
- Construction Of 200M Foot Bridge
- output
- Foot Bridge
- implementation status
- Completed & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bunyala District Youth Empentre
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2007
- action
- Purchase Of 3 Acres Of Land
- output
- Construction Of Proposed Youth Emp.Centre
- implementation status
- Land Not Purchased
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Muhula Water Pan
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2006
- action
- Pipped Tap Water
- output
- Clean Water For The Communtiy
- implementation status
- Viament Done Nmc/Cdf/Budalangi2007/40
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Sirandolo Community Water Project
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2006
- action
- Pipped Tap Water
- output
- Clean Water For The Communtiy
- implementation status
- Viament Done Nmc/Cdf/Budalangi2007/40
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Muyiakalo Busia Water Supply
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2006
- action
- Pipped Tap Water
- output
- Clean Water For The Communtiy
- implementation status
- Viament Done Nmc/Cdf/Budalangi2007/40
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Matumbo Water Pan
- location
-
Bunyala East
(in Budalangi)
- year first funded
- 2009
- action
- Renovation Of Community Bore Hole
- output
- Good Clean Water
- implementation status
- Fy 2009/010 Yet To Be Received
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Rukala Borehole
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2005
- action
- Digging & Construction Of 1 Shallow Well
- output
- Supply Of Clean Well Water
- implementation status
- Completed & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Runyu Borehole
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2005
- action
- Digging & Construction Of 1 Shallow Well
- output
- Supply Of Clean Well Water
- implementation status
- Completed & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Siginga Water Melon
- location
-
Bunyala West
(in Budalangi)
- year first funded
- 2005
- action
- Cultivation Of Water Melon By The Community
- output
- Continous Cultivation Of The Crop
- implementation status
- Reallocation Done Cdfboard/Budalangi/Vol.Ii/72
- total cost
- Ksh 136,000
- estimate
- Ksh 68,000
Osieko Community Water Project
- location
-
Bunyala South
(in Budalangi)
- year first funded
- 2005
- action
- Digging & Construction Of 1 Shallow Well
- output
- Clean Borehole Water
- implementation status
- Completed & Not In Use
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Siduhumi/Mukhobola /Makunda Water Well
- location
-
Bunyala Cental
(in Budalangi)
- year first funded
- 2006
- action
- Rehabilitation Of Pipes & Extension Of Waterlines
- output
- Running Pipped Water For The Community
- implementation status
- Completed & Not In Use
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Lunyofu Stadium
- location
-
Bunyala West
(in Budalangi)
- action
- Stadium For Games And Cultural Activities
- output
- Community Stadium&Cultural Centre
- implementation status
- Viament Done To Lunyofu Primary School
- total cost
- Ksh 0
- estimate
- Ksh 1,000,000