The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Bumula

Emergency And Disaster

location
Bumula (in Bumula)
year first funded
2004
action
n/a
output
-
implementation status
not known
total cost
Ksh 12,837,833
estimate
Ksh 0

Construction Of Cdf Offices

location
Bumula (in Bumula)
year first funded
2008
action
Offices Construction
output
Offices
implementation status
Complete
total cost
Ksh 9,000,000
estimate
Ksh 0

Administrative Costs

location
Bumula (in Bumula)
year first funded
2003
action
n/a
output
-
implementation status
ECD class needs plastering to protect against wear
total cost
Ksh 7,391,370
estimate
Ksh 0

Construction Of Chiefs Offices

location
Bumula (in Bumula)
year first funded
2007
action
Offices Construction
output
Offices
implementation status
Ongoing
total cost
Ksh 4,500,000
estimate
Ksh 0

Kimaeti Secondary School

location
Kimaeti (in Bumula)
year first funded
2004
action
Purchase Of School Bus
output
School Bus
implementation status
Ongoing
total cost
Ksh 2,700,000
estimate
Ksh 5,000,000

Napara Secondary School

location
Napara (in Bumula)
year first funded
2003
action
Construction Of 2 Laboratories
output
Laboratories
implementation status
Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 16,000,000

Kabula Dispensary

location
Kabula (in Bumula)
year first funded
2003
action
Construction Of 2 Ward And Purchof An Amblnce
output
Ambulance And Wards
implementation status
Complete
total cost
Ksh 2,400,000
estimate
Ksh 12,000,000

Kimaeti Dispensary

location
Kimaeti (in Bumula)
year first funded
2003
action
Construction Of 2 Ward, Maternity Wing And 4 Latrines
output
Ward Maternity, And Latrines
implementation status
Ongoing
total cost
Ksh 2,300,000
estimate
Ksh 2,000,000

St. Peters Siboti Secondary School

location
Siboti (in Bumula)
year first funded
2004
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 2,300,000
estimate
Ksh 1,000,000

Siboti Dispensary

location
Siboti (in Bumula)
year first funded
2003
action
Staff House And Female Wards
output
Staff And Wards
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 12,000,000

Miluki Dispensary

location
Mukwa (in Bumula)
year first funded
2004
action
Construction Of Health Center
output
Health Center
implementation status
Needs Plaster & Floor
total cost
Ksh 2,200,000
estimate
Ksh 3,000,000

Cattle Dips

location
Bumula (in Bumula)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 2,100,100
estimate
Ksh 0

Transformer At Watoya Market

location
Kabula (in Bumula)
year first funded
2004
action
Purchase Of A Transformer
output
Electricity
implementation status
Complete
total cost
Ksh 1,974,402
estimate
Ksh 2,000,000

Chiliba Secondary School

location
Mabusi (in Bumula)
year first funded
2004
action
Purchase Of Lab Equipment And Construction Of dining Hall
output
dining Hall And Lab Equipment
implementation status
Ongoing
total cost
Ksh 1,950,000
estimate
Ksh 2,000,000

Monitoring & Evaluation

location
Bumula (in Bumula)
year first funded
2008
action
n/a
output
-
implementation status
ECD class was not painted satisfactorily & floor cracked.
total cost
Ksh 1,909,465
estimate
Ksh 0

Namusasi Ack Secondary School

location
Khasoko (in Bumula)
year first funded
2005
action
Construction Of 4 Classrooms And Admin Office
output
Classrooms And Admin Office
implementation status
Ongoing
total cost
Ksh 1,850,000
estimate
Ksh 15,000,000

Mungore Ack Girls Secondary School

location
Khasoko (in Bumula)
year first funded
2004
action
Construction Of A Science Lab
output
Laboratory
implementation status
Ongoing
total cost
Ksh 1,700,000
estimate
Ksh 15,000,000

Nandika S Primary School

location
Kimaeti (in Bumula)
year first funded
2008
action
Opening & Grading Of The Road
output
Road
implementation status
Complete
total cost
Ksh 1,621,000
estimate
Ksh 2,000,000

Mwiruti Secondary School

location
Kabula (in Bumula)
year first funded
2004
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 12,000,000

Khasoko Secondary School

location
Khasoko (in Bumula)
year first funded
2003
action
Drilling Of A Bore Hole And Construction Of Twin Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 15,000,000

Nakhwana Secondary School

location
Kimaeti (in Bumula)
year first funded
2005
action
Purchase Of Land & Construction Of 4 Classrooms & An Office
output
Classrooms, Land & Office
implementation status
Ongoing
total cost
Ksh 1,550,000
estimate
Ksh 25,000,000

Siboti RPrimary School

location
Siboti (in Bumula)
year first funded
2005
action
Construction Of Administration Block
output
Administration Block
implementation status
Ongoing
total cost
Ksh 1,520,000
estimate
Ksh 5,000,000

Strategic Plan

location
Bumula (in Bumula)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,504,578
estimate
Ksh 18,000,000

Kabula Youth Polytechnic

location
Kabula (in Bumula)
year first funded
2005
action
Workshop
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 15,000,000

St. Teresas Kabula Secondary School

location
Kabula (in Bumula)
year first funded
2004
action
Dormitory Construction
output
Dormitory
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 15,000,000

St. Miluki Secondary School

location
Mukwa (in Bumula)
year first funded
2004
action
Construction Of Lab & Equip
output
Lab
implementation status
Lab Complete
total cost
Ksh 1,400,000
estimate
Ksh 15,000,000

St. Patricks Netima Secondary School

location
Siboti (in Bumula)
year first funded
2004
action
Construction Of 3 Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,000,000

Bumula Health Centre

location
Bumula (in Bumula)
year first funded
2004
action
Drilling Of A Borehole And Purchase Of A Solar Panel
output
Solar Panel
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 12,000,000

Mateka Secondary School

location
S. Bukusu (in Bumula)
year first funded
2004
action
Purchase Of Lab Equipment
output
Equipments
implementation status
Complete
total cost
Ksh 1,399,968
estimate
Ksh 15,000,000

Machwele Youth Polytechnic

location
Siboti (in Bumula)
year first funded
2005
action
Renovation And Construction Of Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,340,000
estimate
Ksh 15,000,000

Netima Secondary School

location
Siboti (in Bumula)
year first funded
2005
action
Construction Of Dormitory
output
Dormitory
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 15,000,000

Bumula Secondary School

location
Bumula (in Bumula)
year first funded
2004
action
Construction Of A dining Hall
output
dining Hall
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 16,000,000

Sirende S Primary School

location
Siboti (in Bumula)
year first funded
2006
action
Purchase Of Land
output
Land
implementation status
Ongoing
total cost
Ksh 1,250,000
estimate
Ksh 25,000,000

Bitobo Youth Polytechnic

location
Napara (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,000,000

Kimatuni R Primary School

location
S. Bukusu (in Bumula)
year first funded
2006
action
Renovation Of 4 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,170,000
estimate
Ksh 8,000,000

Masuno R Primary School

location
Mabusi (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 1,170,000
estimate
Ksh 12,000,000

Kimatuni S Primary School

location
Mabusi (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 1,170,000
estimate
Ksh 12,000,000

Myanga Secondary School

location
Kimaeti (in Bumula)
year first funded
2004
action
Construction Of Lab
output
Laboratory
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 15,000,000

Namatotoa R Primary School

location
Khasoko (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,070,000
estimate
Ksh 8,000,000

Mungore Ack Primary School

location
Khasoko (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,070,000
estimate
Ksh 12,000,000

Bisuche AckPrimary School

location
Mukwa (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
2 Completed
total cost
Ksh 1,020,000
estimate
Ksh 12,000,000

Napara R Primary School

location
Napara (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms, Staffroom And 3 Offices
output
Classrooms And Staffroom
implementation status
Ongoing
total cost
Ksh 1,020,000
estimate
Ksh 12,000,000

Nasyanda Bahai Primary School

location
Khasoko (in Bumula)
year first funded
2005
action
Construction Of Twin Classroom And A Staffroom
output
Classrooms And Staffroom
implementation status
Ongoing
total cost
Ksh 1,020,000
estimate
Ksh 1,000,000

Namusasi A Primary School

location
Khasoko (in Bumula)
year first funded
2005
action
Construction Of 5 Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 1,020,000
estimate
Ksh 2,000,000

Namanze R Primary School

location
Khasoko (in Bumula)
year first funded
2005
action
Construction Of Twin Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 1,020,000
estimate
Ksh 15,000,000

Mungore Girls Secondary School

location
Khasoko (in Bumula)
year first funded
2007
action
Purchase Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 35,000,000

Tulumba Primary School

location
S. Bukusu (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 8,000,000

Sihilila RPrimary School

location
Napara (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 1,000,000

Nakalila R Primary School

location
Napara (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 1,000,000

Nangata R Primary School

location
Siboti (in Bumula)
year first funded
2004
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 1,000,000

Lubunda R Primary School

location
Khasoko (in Bumula)
year first funded
2005
action
Construction Of 4 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 12,000,000

Bumula Fym Primary School

location
Bumula (in Bumula)
year first funded
2005
action
Construction Of Admin Block
output
Admin Office
implementation status
Complete
total cost
Ksh 920,000
estimate
Ksh 5,000,000

Wesimikha Primary School

location
Bumula (in Bumula)
year first funded
2005
action
Construction Of 5 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 2,000,000

Manani Sa Primary School

location
Mukwa (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Painting And Flooring
total cost
Ksh 920,000
estimate
Ksh 12,000,000

Naburereya R Primary School

location
Kabula (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 920,000
estimate
Ksh 12,000,000

Nangata Bridge

location
Siboti (in Bumula)
year first funded
2006
action
Construction Of A Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 913,790
estimate
Ksh 1,000,000

Khelela Youth Polytechnic

location
Mabusi (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms And 1 Office
output
Classroom And Office
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Mungore Youth Polytechnic

location
Khasoko (in Bumula)
year first funded
2005
action
Renovation Of Hostel
output
Hostel
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 6,000,000

Tabuti/Sudi Primary School

location
S. Bukusu (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooma
output
Classrooms
implementation status
Ongoing
total cost
Ksh 851,392
estimate
Ksh 12,000,000

St. Marys Kimatuni Secondary School

location
S. Bukusu (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 12,000,000

Khasoko A Primary School

location
Khasoko (in Bumula)
year first funded
2004
action
Construction Of A Dormitory
output
Dormitory
implementation status
Complete
total cost
Ksh 820,000
estimate
Ksh 15,000,000

Mukhuma R Primary School

location
Kabula (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Wamumali R Primary School

location
Kabula (in Bumula)
year first funded
2004
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Kabula Community Water Project

location
Kabula (in Bumula)
year first funded
2005
action
Drilling Of A Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 820,000
estimate
Ksh 8,000,000

Mayanja R Primary School

location
Kibuke (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Stnabuyeywe Primary School

location
Kibuke (in Bumula)
year first funded
2007
action
Construction Of 1 Classroom & Purchase Of Land
output
Land & Classroom
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 1,000,000

Ststephene Buloosi Primary School

location
S. Bukusu (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Muanda R Primary School

location
S. Bukusu (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Kibachenje Cog Primary School

location
S. Bukusu (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Mukwa R Primary School

location
Mukwa (in Bumula)
year first funded
2004
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Mikokwe A Primary School

location
Mabusi (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom And 1 Office
output
Classroom And Office
implementation status
Complete
total cost
Ksh 820,000
estimate
Ksh 12,000,000

Syekumulo R Primary School

location
Bumula (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 1,000,000

Lunao Fym Primary School

location
Bumula (in Bumula)
year first funded
2004
action
Construction Of 5 Classrooms And 1 Office
output
Classroom And Office
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 25,000,000

Bosio R Primary School

location
Siboti (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 820,000
estimate
Ksh 1,000,000

Bitobo R Primary School

location
Napara (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 7,000,000

Masielo R Primary School

location
Napara (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom & 3 Offices
output
Classrooms And Offices
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 1,000,000

Kitabisi R Primary School

location
Napara (in Bumula)
year first funded
2005
action
n/a
output
-
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 5,000,000

Khasolo R Primary School

location
Napara (in Bumula)
year first funded
2003
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Needs Veranda
total cost
Ksh 820,000
estimate
Ksh 1,000,000

Kimwanga R Primary School

location
Kimaeti (in Bumula)
year first funded
2005
action
Construction Of 6 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 2,000,000

Syombe A Primary School

location
Kimaeti (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms And 1 Office
output
Classrooms And Office
implementation status
Ongoing
total cost
Ksh 820,000
estimate
Ksh 1,000,000

St. Peters Musikoma Secondary School

location
Musikoma (in Bumula)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 8,000,000

Khasoko Youth Polytechnic

location
Khasoko (in Bumula)
year first funded
2005
action
Power Installation
output
Power
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Kimaeti R Primary School

location
Kimaeti (in Bumula)
year first funded
2004
action
Construction Of 4 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 770,000
estimate
Ksh 12,000,000

Stelizabeth Lunao Secondary School

location
Bumula (in Bumula)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 5,000,000

Lumboka R Primary School

location
S. Bukusu (in Bumula)
year first funded
2006
action
Construction Of 4 Classroom And Admin Office
output
Classroom Admin Block
implementation status
Ongoing
total cost
Ksh 720,000
estimate
Ksh 16,000,000

Tulukuyi R Primary School

location
Kimaeti (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Musakasa R Primary School

location
Siboti (in Bumula)
year first funded
2004
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 1,000,000

Netima R Primary School

location
Siboti (in Bumula)
year first funded
2006
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 1,000,000

Nasimbo S Primary School

location
Siboti (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 1,000,000

Nandika S Primary School

location
Siboti (in Bumula)
year first funded
2005
action
Construction Of Admin Block
output
Admin Office
implementation status
Painting Leval
total cost
Ksh 620,000
estimate
Ksh 5,000,000

Tabala R Primary School

location
Kimaeti (in Bumula)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Lelekwe R Primary School

location
Kimaeti (in Bumula)
year first funded
2006
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 1,000,000

Mwiyenga A Primary School

location
Kimaeti (in Bumula)
year first funded
2005
action
Purchase Of Land And Construction Of 5 Classrooms
output
Classrooms And Land
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 2,000,000

Nakhwana R Primary School

location
Kimaeti (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Bunambobi R Primary School

location
Bumula (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Lunao R Primary School

location
Bumula (in Bumula)
year first funded
2006
action
Construction Of 2 Classroom And Renovation Of 1 Classroom And Office
output
Classroom And Office
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 1,000,000

Sikinga Fym Primary School

location
Mabusi (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Khayo Mmk Primary School

location
Mabusi (in Bumula)
year first funded
2006
action
Construction Of 2 Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Khelela A Primary School

location
Mabusi (in Bumula)
year first funded
2004
action
Construction Of 1 Classrooms And 1 Office Center
output
Classroom And Office
implementation status
Complete
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Biliso R Primary School

location
S. Bukusu (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Lwanja Primary School

location
Kibuke (in Bumula)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 620,000
estimate
Ksh 8,000,000

Remwa R Primary School

location
Kabula (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Talitia R Primary School

location
Kabula (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Syoya R Primary School

location
Kabula (in Bumula)
year first funded
2006
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Malinda RPrimary School

location
Kabula (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Mwiruti R Primary School

location
Kabula (in Bumula)
year first funded
2006
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

Kabula R Primary School

location
Kabula (in Bumula)
year first funded
2006
action
Construction Of Library
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 6,000,000

Wamunyiri R Primary School

location
Kabula (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 12,000,000

St. Muanda Secondary School

location
S. Bukusu (in Bumula)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 12,000,000

Mateka R Primary School

location
S. Bukusu (in Bumula)
year first funded
2006
action
Renovation Of 4 Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 520,000
estimate
Ksh 8,000,000

Siloba Primary School

location
Musikoma (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Kitingia Primary School

location
(in Bumula)
year first funded
2009
action
Construction Of 3 Classroom
output
Classrooms, Land & Office
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Kabubero R Primary School

location
Mukwa (in Bumula)
year first funded
2005
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Beam Leval
total cost
Ksh 500,000
estimate
Ksh 12,000,000

Kisawayi S Primary School

location
Mukwa (in Bumula)
year first funded
2004
action
Construction Of 3 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 12,000,000

Burangasi R Primary School

location
S. Bukusu (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 8,000,000

Miluki R Primary School

location
Mukwa (in Bumula)
year first funded
2005
action
Renovation Of 3 Classroom
output
Classrooms
implementation status
2 Completed
total cost
Ksh 500,000
estimate
Ksh 12,000,000

Wekelekha Primary School

location
Musikoma (in Bumula)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Machwele Deb Primary School

location
Kibuke (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom & Admin Office
output
Classroom And Admin Office
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 1,000,000

Bukirimo Primary School

location
Kimaeti (in Bumula)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 8,000,000

Khasoko Special School Disabled

location
Khasoko (in Bumula)
year first funded
2006
action
Construction Of A Dormitory
output
Dormitory
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 15,000,000

Mukuyuni Primary School

location
Bumula (in Bumula)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 5,000,000

Constrcution Of Cdf Offices

location
S. Bukusu (in Bumula)
year first funded
2005
action
Construction Of 2 Classroom
output
-
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 8,000,000

Mwomo Deb Primary School

location
Kibuke (in Bumula)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 420,000
estimate
Ksh 8,000,000

Namanje Fym Primary School

location
Mukwa (in Bumula)
year first funded
2008
action
Construtcion Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 320,000
estimate
Ksh 12,000,000

Lumboka Memorial Secondary School

location
S. Bukusu (in Bumula)
year first funded
2004
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 12,000,000

Namasanda Primary School

location
Musikoma (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Samoya Primary School

location
Musikoma (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Musikoma Youth Polytechnic

location
Musikoma (in Bumula)
year first funded
2005
action
Construction Of 1 Classroom & Purchase Of Lab Equipments
output
Classrooms & Lab Equipments
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Samoya Secondary School

location
Musikoma (in Bumula)
year first funded
2004
action
Purchase Of Lab Equipment
output
Laboratory
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Siloba Primary School

location
Musikoma (in Bumula)
year first funded
2005
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Namamuka Primary School

location
Musikoma (in Bumula)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Frwalstra Primary School

location
Musikoma (in Bumula)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Siritanyi RPrimary School

location
Musikoma (in Bumula)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Sio Primary School

location
Musikoma (in Bumula)
year first funded
2004
action
Purchase Of Land
output
Land
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Bungoma Muslim Primary School

location
Musikoma (in Bumula)
year first funded
2006
action
Construction Of 1 Classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Musikoma Primary School

location
Musikoma (in Bumula)
year first funded
2006
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Sango Primary School

location
Siboti (in Bumula)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 120,000
estimate
Ksh 5,000,000