The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Emergency And Disaster
- location
-
Bumula
(in Bumula)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 12,837,833
- estimate
- Ksh 0
Construction Of Cdf Offices
- location
-
Bumula
(in Bumula)
- year first funded
- 2008
- action
- Offices Construction
- output
- Offices
- implementation status
- Complete
- total cost
- Ksh 9,000,000
- estimate
- Ksh 0
Administrative Costs
- location
-
Bumula
(in Bumula)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- ECD class needs plastering to protect against wear
- total cost
- Ksh 7,391,370
- estimate
- Ksh 0
Construction Of Chiefs Offices
- location
-
Bumula
(in Bumula)
- year first funded
- 2007
- action
- Offices Construction
- output
- Offices
- implementation status
- Ongoing
- total cost
- Ksh 4,500,000
- estimate
- Ksh 0
Kimaeti Secondary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2004
- action
- Purchase Of School Bus
- output
- School Bus
- implementation status
- Ongoing
- total cost
- Ksh 2,700,000
- estimate
- Ksh 5,000,000
Napara Secondary School
- location
-
Napara
(in Bumula)
- year first funded
- 2003
- action
- Construction Of 2 Laboratories
- output
- Laboratories
- implementation status
- Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 16,000,000
Kabula Dispensary
- location
-
Kabula
(in Bumula)
- year first funded
- 2003
- action
- Construction Of 2 Ward And Purchof An Amblnce
- output
- Ambulance And Wards
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 12,000,000
Kimaeti Dispensary
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2003
- action
- Construction Of 2 Ward, Maternity Wing And 4 Latrines
- output
- Ward Maternity, And Latrines
- implementation status
- Ongoing
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,000,000
St. Peters Siboti Secondary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 2,300,000
- estimate
- Ksh 1,000,000
Siboti Dispensary
- location
-
Siboti
(in Bumula)
- year first funded
- 2003
- action
- Staff House And Female Wards
- output
- Staff And Wards
- implementation status
- Ongoing
- total cost
- Ksh 2,200,000
- estimate
- Ksh 12,000,000
Miluki Dispensary
- location
-
Mukwa
(in Bumula)
- year first funded
- 2004
- action
- Construction Of Health Center
- output
- Health Center
- implementation status
- Needs Plaster & Floor
- total cost
- Ksh 2,200,000
- estimate
- Ksh 3,000,000
Cattle Dips
- location
-
Bumula
(in Bumula)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 2,100,100
- estimate
- Ksh 0
Transformer At Watoya Market
- location
-
Kabula
(in Bumula)
- year first funded
- 2004
- action
- Purchase Of A Transformer
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 1,974,402
- estimate
- Ksh 2,000,000
Chiliba Secondary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2004
- action
- Purchase Of Lab Equipment And Construction Of dining Hall
- output
- dining Hall And Lab Equipment
- implementation status
- Ongoing
- total cost
- Ksh 1,950,000
- estimate
- Ksh 2,000,000
Monitoring & Evaluation
- location
-
Bumula
(in Bumula)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- ECD class was not painted satisfactorily & floor cracked.
- total cost
- Ksh 1,909,465
- estimate
- Ksh 0
Namusasi Ack Secondary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms And Admin Office
- output
- Classrooms And Admin Office
- implementation status
- Ongoing
- total cost
- Ksh 1,850,000
- estimate
- Ksh 15,000,000
Mungore Ack Girls Secondary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2004
- action
- Construction Of A Science Lab
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 1,700,000
- estimate
- Ksh 15,000,000
Nandika S Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2008
- action
- Opening & Grading Of The Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,621,000
- estimate
- Ksh 2,000,000
Mwiruti Secondary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,600,000
- estimate
- Ksh 12,000,000
Khasoko Secondary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2003
- action
- Drilling Of A Bore Hole And Construction Of Twin Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 15,000,000
Nakhwana Secondary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2005
- action
- Purchase Of Land & Construction Of 4 Classrooms & An Office
- output
- Classrooms, Land & Office
- implementation status
- Ongoing
- total cost
- Ksh 1,550,000
- estimate
- Ksh 25,000,000
Siboti RPrimary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of Administration Block
- output
- Administration Block
- implementation status
- Ongoing
- total cost
- Ksh 1,520,000
- estimate
- Ksh 5,000,000
Strategic Plan
- location
-
Bumula
(in Bumula)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,504,578
- estimate
- Ksh 18,000,000
Kabula Youth Polytechnic
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Workshop
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 15,000,000
St. Teresas Kabula Secondary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2004
- action
- Dormitory Construction
- output
- Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 15,000,000
St. Miluki Secondary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2004
- action
- Construction Of Lab & Equip
- output
- Lab
- implementation status
- Lab Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 15,000,000
St. Patricks Netima Secondary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,000,000
Bumula Health Centre
- location
-
Bumula
(in Bumula)
- year first funded
- 2004
- action
- Drilling Of A Borehole And Purchase Of A Solar Panel
- output
- Solar Panel
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 12,000,000
Mateka Secondary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2004
- action
- Purchase Of Lab Equipment
- output
- Equipments
- implementation status
- Complete
- total cost
- Ksh 1,399,968
- estimate
- Ksh 15,000,000
Machwele Youth Polytechnic
- location
-
Siboti
(in Bumula)
- year first funded
- 2005
- action
- Renovation And Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,340,000
- estimate
- Ksh 15,000,000
Netima Secondary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of Dormitory
- output
- Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 15,000,000
Bumula Secondary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2004
- action
- Construction Of A dining Hall
- output
- dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 16,000,000
Sirende S Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2006
- action
- Purchase Of Land
- output
- Land
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 25,000,000
Bitobo Youth Polytechnic
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Kimatuni R Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2006
- action
- Renovation Of 4 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,170,000
- estimate
- Ksh 8,000,000
Masuno R Primary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,170,000
- estimate
- Ksh 12,000,000
Kimatuni S Primary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,170,000
- estimate
- Ksh 12,000,000
Myanga Secondary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of Lab
- output
- Laboratory
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 15,000,000
Namatotoa R Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,070,000
- estimate
- Ksh 8,000,000
Mungore Ack Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,070,000
- estimate
- Ksh 12,000,000
Bisuche AckPrimary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- 2 Completed
- total cost
- Ksh 1,020,000
- estimate
- Ksh 12,000,000
Napara R Primary School
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms, Staffroom And 3 Offices
- output
- Classrooms And Staffroom
- implementation status
- Ongoing
- total cost
- Ksh 1,020,000
- estimate
- Ksh 12,000,000
Nasyanda Bahai Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Construction Of Twin Classroom And A Staffroom
- output
- Classrooms And Staffroom
- implementation status
- Ongoing
- total cost
- Ksh 1,020,000
- estimate
- Ksh 1,000,000
Namusasi A Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 5 Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,020,000
- estimate
- Ksh 2,000,000
Namanze R Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Construction Of Twin Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,020,000
- estimate
- Ksh 15,000,000
Mungore Girls Secondary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2007
- action
- Purchase Of Water Tanks
- output
- Water Tanks
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 35,000,000
Tulumba Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 8,000,000
Sihilila RPrimary School
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 1,000,000
Nakalila R Primary School
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 1,000,000
Nangata R Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 1,000,000
Lubunda R Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 4 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 12,000,000
Bumula Fym Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of Admin Block
- output
- Admin Office
- implementation status
- Complete
- total cost
- Ksh 920,000
- estimate
- Ksh 5,000,000
Wesimikha Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 5 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 2,000,000
Manani Sa Primary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Painting And Flooring
- total cost
- Ksh 920,000
- estimate
- Ksh 12,000,000
Naburereya R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 12,000,000
Nangata Bridge
- location
-
Siboti
(in Bumula)
- year first funded
- 2006
- action
- Construction Of A Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 913,790
- estimate
- Ksh 1,000,000
Khelela Youth Polytechnic
- location
-
Mabusi
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms And 1 Office
- output
- Classroom And Office
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Mungore Youth Polytechnic
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Renovation Of Hostel
- output
- Hostel
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 6,000,000
Tabuti/Sudi Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooma
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 851,392
- estimate
- Ksh 12,000,000
St. Marys Kimatuni Secondary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 12,000,000
Khasoko A Primary School
- location
-
Khasoko
(in Bumula)
- year first funded
- 2004
- action
- Construction Of A Dormitory
- output
- Dormitory
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 15,000,000
Mukhuma R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Wamumali R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Kabula Community Water Project
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Drilling Of A Borehole
- output
- Borehole
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 8,000,000
Mayanja R Primary School
- location
-
Kibuke
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Stnabuyeywe Primary School
- location
-
Kibuke
(in Bumula)
- year first funded
- 2007
- action
- Construction Of 1 Classroom & Purchase Of Land
- output
- Land & Classroom
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 1,000,000
Ststephene Buloosi Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Muanda R Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Kibachenje Cog Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Mukwa R Primary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Mikokwe A Primary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom And 1 Office
- output
- Classroom And Office
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 12,000,000
Syekumulo R Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 1,000,000
Lunao Fym Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 5 Classrooms And 1 Office
- output
- Classroom And Office
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 25,000,000
Bosio R Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 1,000,000
Bitobo R Primary School
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 7,000,000
Masielo R Primary School
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom & 3 Offices
- output
- Classrooms And Offices
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 1,000,000
Kitabisi R Primary School
- location
-
Napara
(in Bumula)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 5,000,000
Khasolo R Primary School
- location
-
Napara
(in Bumula)
- year first funded
- 2003
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Needs Veranda
- total cost
- Ksh 820,000
- estimate
- Ksh 1,000,000
Kimwanga R Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 6 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 2,000,000
Syombe A Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms And 1 Office
- output
- Classrooms And Office
- implementation status
- Ongoing
- total cost
- Ksh 820,000
- estimate
- Ksh 1,000,000
St. Peters Musikoma Secondary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 8,000,000
Khasoko Youth Polytechnic
- location
-
Khasoko
(in Bumula)
- year first funded
- 2005
- action
- Power Installation
- output
- Power
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kimaeti R Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 770,000
- estimate
- Ksh 12,000,000
Stelizabeth Lunao Secondary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 5,000,000
Lumboka R Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 4 Classroom And Admin Office
- output
- Classroom Admin Block
- implementation status
- Ongoing
- total cost
- Ksh 720,000
- estimate
- Ksh 16,000,000
Tulukuyi R Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Musakasa R Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 1,000,000
Netima R Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 1,000,000
Nasimbo S Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 1,000,000
Nandika S Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of Admin Block
- output
- Admin Office
- implementation status
- Painting Leval
- total cost
- Ksh 620,000
- estimate
- Ksh 5,000,000
Tabala R Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Lelekwe R Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 1,000,000
Mwiyenga A Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2005
- action
- Purchase Of Land And Construction Of 5 Classrooms
- output
- Classrooms And Land
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 2,000,000
Nakhwana R Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Bunambobi R Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Lunao R Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 2 Classroom And Renovation Of 1 Classroom And Office
- output
- Classroom And Office
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 1,000,000
Sikinga Fym Primary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Khayo Mmk Primary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Khelela A Primary School
- location
-
Mabusi
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 1 Classrooms And 1 Office Center
- output
- Classroom And Office
- implementation status
- Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Biliso R Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Lwanja Primary School
- location
-
Kibuke
(in Bumula)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 8,000,000
Remwa R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Talitia R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Syoya R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Malinda RPrimary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Mwiruti R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
Kabula R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2006
- action
- Construction Of Library
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 6,000,000
Wamunyiri R Primary School
- location
-
Kabula
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 12,000,000
St. Muanda Secondary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 12,000,000
Mateka R Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2006
- action
- Renovation Of 4 Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 520,000
- estimate
- Ksh 8,000,000
Siloba Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 5,000,000
Kitingia Primary School
- location
-
(in Bumula)
- year first funded
- 2009
- action
- Construction Of 3 Classroom
- output
- Classrooms, Land & Office
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kabubero R Primary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Beam Leval
- total cost
- Ksh 500,000
- estimate
- Ksh 12,000,000
Kisawayi S Primary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 12,000,000
Burangasi R Primary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 8,000,000
Miluki R Primary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2005
- action
- Renovation Of 3 Classroom
- output
- Classrooms
- implementation status
- 2 Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 12,000,000
Wekelekha Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 5,000,000
Machwele Deb Primary School
- location
-
Kibuke
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom & Admin Office
- output
- Classroom And Admin Office
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 1,000,000
Bukirimo Primary School
- location
-
Kimaeti
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 8,000,000
Khasoko Special School Disabled
- location
-
Khasoko
(in Bumula)
- year first funded
- 2006
- action
- Construction Of A Dormitory
- output
- Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 15,000,000
Mukuyuni Primary School
- location
-
Bumula
(in Bumula)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 5,000,000
Constrcution Of Cdf Offices
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 8,000,000
Mwomo Deb Primary School
- location
-
Kibuke
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 420,000
- estimate
- Ksh 8,000,000
Namanje Fym Primary School
- location
-
Mukwa
(in Bumula)
- year first funded
- 2008
- action
- Construtcion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 320,000
- estimate
- Ksh 12,000,000
Lumboka Memorial Secondary School
- location
-
S. Bukusu
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 12,000,000
Namasanda Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Samoya Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Musikoma Youth Polytechnic
- location
-
Musikoma
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 1 Classroom & Purchase Of Lab Equipments
- output
- Classrooms & Lab Equipments
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Samoya Secondary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2004
- action
- Purchase Of Lab Equipment
- output
- Laboratory
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Siloba Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Namamuka Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Frwalstra Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Siritanyi RPrimary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Sio Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2004
- action
- Purchase Of Land
- output
- Land
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Bungoma Muslim Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 1 Classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Musikoma Primary School
- location
-
Musikoma
(in Bumula)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Sango Primary School
- location
-
Siboti
(in Bumula)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 120,000
- estimate
- Ksh 5,000,000