The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Bura
Bangale Water Project
- location
-
Bangale
(in Bura)
- year first funded
- 2008
- action
- Major Water Project For Bangale Division
- output
- Major Water Project For Bangale Division
- implementation status
- Consultations Ongoing With Other Departments And Stakeholders
- total cost
- Ksh 9,000,000
- estimate
- Ksh 4,000,000
Hirimani Secondary School
- location
-
Bura
(in Bura)
- year first funded
- 2004
- action
- Construction Of 1 Classrooms Renovation Of Dining Hall And 2 Classrooms And A Dormitory. The Allocation Of 2009/10 Was For Some Extra Works Done In The Dormitory.
- output
- Improve Access To Education And Academic Performance.
- implementation status
- The Construction Of Dormitory Is Complete And Ready For Occupancy. More Works Done To The Dormitory
- total cost
- Ksh 5,177,000
- estimate
- Ksh 0
Cdf Vehicle
- location
-
Bura
(in Bura)
- year first funded
- 2009
- action
- Purchase Of Vehicle To Be Used For Cdf Activites
- output
- Easier And Improved Project Monitoring And Evaluation And Other Cdf Activities
- implementation status
- Cdf Vehicle Procured And In Use In The Constituency
- total cost
- Ksh 5,000,000
- estimate
- Ksh 5,000,000
Bura Water Project
- location
-
Bura
(in Bura)
- year first funded
- 2009
- action
- Major Intrevention To Piped Water In Bura Town
- output
- Supply Of Clean Water For The Bura Town Residents
- implementation status
- Survey Work Ongoing And Consultations With The Technical Departments
- total cost
- Ksh 5,000,000
- estimate
- Ksh 0
Abaqiq Dam
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction of A Dam
- output
- Provide Clean Water For The Community.
- implementation status
- Complete
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,700,000
Bisikidera Dam
- location
-
Bura
(in Bura)
- year first funded
- 2006
- action
- Construction of A Dam
- output
- Provide Clean Water For The Community.
- implementation status
- Complete
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,700,000
Disilting Balaneka Dam
- location
-
Bangale
(in Bura)
- year first funded
- 2004
- action
- Dam Construction
- output
- Improve Access To Safe Drinking Water.
- implementation status
- Completed
- total cost
- Ksh 3,561,834
- estimate
- Ksh 0
Hirimani Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2004
- action
- Construction Of 6 Classrooms
- output
- Improve Access To Education And Academic Performance. 300 Students To Benefit Yearly
- implementation status
- Remaining Two Classrooms Of 07/08 Completed In Use.
- total cost
- Ksh 3,389,520
- estimate
- Ksh 0
Roka Primary School
- location
-
Mbalambala
(in Bura)
- year first funded
- 2008
- action
- Construction of A Dormitory For Roka Pri. Boarding
- output
- Construct A Dormitory For Roka Pri. Boarding
- implementation status
- Tendering And Award Of New 09/10 Block Of Dormotory Complete
- total cost
- Ksh 3,361,994
- estimate
- Ksh 1,861,994
Atata Primary School
- location
-
Mororo
(in Bura)
- year first funded
- 2003
- action
- Construction Of 7 Classrooms, 1 Single Toilet, 1 Double Toilet, Sign Board Erection, Purchase Of 100 Desks, Cupboard, Chairs And Table.
- output
- Improve Access To Education By Benefiting 400 Pupils Yearly
- implementation status
- Construction Of 6 Classrooms, 1 Single Toilet 1 Double Toilet, Sign Board Erection, Purchase Of 100 Desks, Cupboard, Chairs And Table Complete In Use.
- total cost
- Ksh 3,300,000
- estimate
- Ksh 3,300,000
Constituency/ Cdf Office
- location
-
Bura
(in Bura)
- year first funded
- 2008
- action
- Put Up A Modern Office Block With Modern Facilities
- output
- Put Up A Modern Office Block With Modern Facilities
- implementation status
- Consultations Ongoing With Other Departments And Stakeholders
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Matagala Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2003
- action
- 4 Classrooms And 2 More To Be Constructed In The 2009/10 Financial Yr
- output
- Improve Access To Education And Academic Performance And Infrastructure
- implementation status
- Previous Projects Complete And The 2009/10 2 Classrooms Tender Documents Under Preparation
- total cost
- Ksh 2,900,000
- estimate
- Ksh 1,700,000
Fahari Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2005
- action
- Construction Of 4 Class Two More Classrooms To Be Put Up In 2009/20
- output
- Improve Access To Education And Academic Performance.
- implementation status
- 4 Classrooms Complete. Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 1,600,000
Madogo Secondary School
- location
-
Madogo
(in Bura)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms And 2 Departmental Offices. 2 More Classes Tobe Constructed With 08/09 Funds.
- output
- Improve Access To Education And Academic Performance.
- implementation status
- The Renovations Under Remarks Section Are Complete And Ready For Occupancy And The 2 Classrooms For 08/09 Are Complete And In Use
- total cost
- Ksh 2,700,000
- estimate
- Ksh 0
Wolesorea Primary School
- location
-
Hirimani
(in Bura)
- year first funded
- 2003
- action
- 4 Classrooms Construction, Signboard Erection And Renovations Of Classrooms And Toilets
- output
- Improve Academic Performance 300 Pupils To Benefit Yearly.
- implementation status
- Project For Renovation Of Classes Blown By Wind 08/09 Has Been Tendered
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,100,000
Hirimani Foot Bridge
- location
-
Hirimani
(in Bura)
- year first funded
- 2008
- action
- Construction of A Foot Bridge Across Hirimani Gulley
- output
- Construct A Foot Bridge Across Hirimani Gulley
- implementation status
- Projects Forwarded To The Relevant Departments For Designs And Documentation
- total cost
- Ksh 2,572,300
- estimate
- Ksh 1,000,000
Katumba Dam
- location
-
Bangale
(in Bura)
- year first funded
- 2008
- action
- Digging Of A Dam For The Katumba Community
- output
- Once Complete The Venture Will Ensure Steady Source Of Water Through The Dry Season
- implementation status
- Survey Work Ongoing And Consultations With The Technical Departments
- total cost
- Ksh 2,550,000
- estimate
- Ksh 0
Water Pumps For Shambas
- location
-
Madogo
(in Bura)
- year first funded
- 2005
- action
- Purchase Of Pump Machines For Bara Duri, Madogo Minor, Mororo Minor, Musule, Quarbona Farms
- output
- To Enhance Food Security For 600 Families
- implementation status
- 6 Pump Machines Purchased And Functioning
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Jajavo Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Improve Access To Education And Academic Performance. 100 Students To Benefit Yearly
- implementation status
- 4 Classrooms Complete And In Use - 1 More Classroom For 08/09 Has Been Constructed And Ready For Occupancy
- total cost
- Ksh 2,300,000
- estimate
- Ksh 1,700,000
Tula Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 4 Class Two More Classrooms Allocated In 07/0; One More Classroom For 2009/10
- output
- Improve Access To Education And Academic Performance.
- implementation status
- 2 Classrooms Complete And Pupils Using Them In The New School. Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 800,000
Madogo Rural Electrification
- location
-
Madogo
(in Bura)
- year first funded
- 2004
- action
- Internal Wiring And Installation Of Power To Madogo Dos Office, Madogo Social Hall, Madogo Dispensary, Madogo Primary And Madogo Secondary.
- output
- Improve Service Delivery, Academic Performance And Social Activities.
- implementation status
- Internal Wiring And Installation Of Power To Madogo Dos Office, Madogo Social Hall, Madogo Dispensary Completed.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Bura Irrigation Schooleme
- location
-
Bura
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Darime Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Improve Access To Education And Academic Performance.
- implementation status
- 2 Classrooms Completed And In Use For 06/07.Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 800,000
Mororo Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms, Signboard Erection And Desks Purchase. Some Funds Allocated For Renovation Of Existing 13 Classrooms
- output
- Improve Access To Education And Academic Performance. 300 Students To Benefit Yearly.
- implementation status
- The Intended Renovations Needs More Funding Which Is Expected In The 09/10 Allocations
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,500,000
Sabukia Primary School
- location
-
Hirimani
(in Bura)
- year first funded
- 2008
- action
- Two Class Extra One Classroom To Be Put Up In 2009/10 Financial Yr.
- output
- Two Classrooms
- implementation status
- Construction Of Two Classrooms Complete And In Use. Exxtra One Classroom Tendering Complete
- total cost
- Ksh 1,850,000
- estimate
- Ksh 1,200,000
Godia Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms In The 2009/10
- output
- 2 Classrooms To Be Constructed
- implementation status
- I Class Complete And The New 2 Classrooms Not Yet Constructed. Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 550,000
Huruma Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Improve Access To Education And Academic Performance. 400 Students To Benefit Yearly
- implementation status
- 4 Classrooms Complete.
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Mbalambala Chiefs Office
- location
-
Mbalambala
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- 1 Office Block To Be Constructed
- implementation status
- Complete And Already Occupied
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Buwa Chiefs Office
- location
-
Buwa
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- 1 Office Block To Be Constructed
- implementation status
- Complete And Already Occupied
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Bangale Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Improve Access To Education And Academic Performance.
- implementation status
- The 07/08 2 Classrooms Complete And In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Amani Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Improve Access To Education And Academic Performance. 350 Students To Benefit Yearly
- implementation status
- 4 Classrooms Complete And In Use.
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Konoramadha Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 2 More Classrooms For 07/08 Yr.
- output
- Improve Access To Education And Academic Performance. 60 Students To Benefit Yearly
- implementation status
- 2 Classrooms Complete And In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Adele Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Improve Access To Education And Academic Performance. 80 Students To Benefit Yearly
- implementation status
- 2 Classrooms Complete. 1More Classroom And Toilet Block Completed And Ready For Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Wolesorea Chiefs Office
- location
-
Hirimani
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- 1 Office Block To Be Constructed
- implementation status
- Complete And Already Occupied
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Tune Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2007
- action
- One Classroom To Be Put Up In 2009/10
- output
- 2 Classrooms Constructed In 07/08 Improved Infrastructure
- implementation status
- The Classrooms Complete And In Use.Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 900,000
Nanighi Primary School
- location
-
Nanighi
(in Bura)
- year first funded
- 2007
- action
- Purchase Of Mattresses For The Boarding Wing.
- output
- Improved Infrastructure In The Institution And Bedding Facilities
- implementation status
- Construction Of The Block Of Two Toilets Is Complete And In Use. The Tendering For The Purchase Of Beddings For The Boarding Wing In Progress
- total cost
- Ksh 1,500,000
- estimate
- Ksh 500,000
Chewele Chiefs Office
- location
-
Chewele
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- 1 Office Blockand A Toilet To Be Constructed
- implementation status
- Complete And Already Occupied
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Mbalambala Boat
- location
-
Mbalambala
(in Bura)
- year first funded
- 2008
- action
- Purchase A Motor Boat For Crossing River Tana For Mbalambala Primary School
- output
- Purchase A Motor Boat For Crossing River Tana For Mbalambala Primary School
- implementation status
- Quotations Floated
- total cost
- Ksh 1,500,000
- estimate
- Ksh 250,000
Korati Dispensary
- location
-
(in Bura)
- year first funded
- 2009
- action
- Carry Out Thorough Renovations To The Facility
- output
- Improved Provision Of Health Care Services And Proximity
- implementation status
- Tender Documents Preparation Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Ruko Primary School
- location
-
Buwa
(in Bura)
- year first funded
- 2005
- action
- Construction Of 3 Class
- output
- Improve Access To Education And Academic Performance. 160 Students To Benefit Yearly
- implementation status
- not known
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Boka Dispensary
- location
-
Boka
(in Bura)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- Improve Access To Quality Healthcare For Kamargur People
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Shika Adabu Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2008
- action
- Two Classrooms
- output
- Two Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Tumaini Polytechnic Vehicle
- location
-
Bura
(in Bura)
- year first funded
- 2008
- action
- Purchase Of A Driving Vehicle For The Polytechnic
- output
- Purchase Of A Driving Vehicle For The Polytechnic
- implementation status
- Consultation On The Way Foreward Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Charidende Dispensary
- location
-
Charidende
(in Bura)
- year first funded
- 2003
- action
- Dispensary And Toilet Constructed
- output
- Improve Health And Sanitation Of Charidende Community
- implementation status
- Completed And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,110,000
Constituency Strategic Plan
- location
-
Bura
(in Bura)
- year first funded
- 2008
- action
- Develop A 5 Yr Strategic Plan For The Constituency
- output
- Develop A 5 Yr Strategic Plan For The Constituency
- implementation status
- Consultations Ongoing With Other Departments And Stakeholders
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Wolestokocha Primary School
- location
-
Hirimani
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- 2 Class Rooms To Be Constructed
- implementation status
- Ksh 1000,000 Reallocated To Hosingo Primary School For Construction Of Two Classrooms And A Block Of Toilets
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Sombo Dispensary
- location
-
Sala
(in Bura)
- year first funded
- 2005
- action
- Renovation Of Dispensary.Construction Of A House For Nurse.
- output
- Improve Quality Of Health Care And Working Conditions Of Staff.
- implementation status
- Dispensary Renovated.And Nurses House Constructed?
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Madogo Dispensary
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Maternity Wing To Be Constructed
- implementation status
- ?Consultations With Stakeholders Ongoing As To What Could Be Put Up With Available Funds
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Korati Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Improve Access To Education And Academic Performance. 60 Students To Benefit Yearly
- implementation status
- The 2 Classrooms For 07/08 Allocation Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Bangale Posho Mill
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- 20 Hp Machine To Be Bought
- implementation status
- Machine Installed And Being Used By The Community
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Hosingo Primary School
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms And A Toilet Block
- output
- Improve Access To Education And Academic Performance. 130 Students To Benefit Yearly
- implementation status
- 2 Classrooms Complete . 2 More Classrooms And A Toilet Block From The Wolestokotcha Project Satisfactorily Complete And Ready For Use.
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Hosingo Sub Chiefs Office
- location
-
Hirimani
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Sub Chief'S Office To Be Constructed
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mororo Primary School
- location
-
Mororo
(in Bura)
- year first funded
- 2008
- action
- Renovation Of Classrooms
- output
- Renovation Of Classrooms
- implementation status
- More Funds Needed For The Project
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Magura Primary School
- location
-
Bura
(in Bura)
- year first funded
- 2009
- action
- Put 2 Blocks Of Toilets For The Institution
- output
- Improved Health Hygiene And Sanitation
- implementation status
- Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Gale Nursery
- location
-
Bangale
(in Bura)
- year first funded
- 2009
- action
- One Classroom To Be Constructed
- output
- Classroom To Improve The Education Of Of Little Children
- implementation status
- Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Dukanotu Nursery
- location
-
Nanighi
(in Bura)
- year first funded
- 2008
- action
- Construction of On Classroom For Nursery Class
- output
- Construct On Classroom For Nursery Class
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Wadesa Nursery
- location
-
Madogo
(in Bura)
- year first funded
- 2008
- action
- Construction of On Classroom For Nursery Class
- output
- Construct On Classroom For Nursery Class
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Bula Rig Nursery
- location
-
Bura
(in Bura)
- year first funded
- 2008
- action
- Construction of On Classroom For Nursery Class
- output
- Construct On Classroom For Nursery Class
- implementation status
- Construction Of The Nursery Class Complete And In Use.
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Katumba Nursery
- location
-
Bangale
(in Bura)
- year first funded
- 2008
- action
- Construction of On Classroom For Nursery Class
- output
- Construct On Classroom For Nursery Class
- implementation status
- Funds To Be Reallocated To A Borehole At The Same Place
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Lagbandana Nursery
- location
-
Madogo
(in Bura)
- year first funded
- 2008
- action
- Construction of On Classroom For Nursery Class
- output
- Construct On Classroom For Nursery Class
- implementation status
- Complete And In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Chewele Primary School
- location
-
Chewele
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Renovation Of Classes
- implementation status
- ?The Construction Of Classroom Is Complete And In Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 50,000
Al Mukarama Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mobile Community
- location
-
Bura
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Safina Community
- location
-
Bura
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Bura South Community
- location
-
Bura
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Jua Kali Sheds
- location
-
Bura
(in Bura)
- year first funded
- 2006
- action
- Built Sheds For Jua Kali Artisans
- output
- Create A Conducive Working Environment For Jua Kali Artisans.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Abawata Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Purchase Of Water Pump
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Tawakal Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Purchase Of Water Pump Machine
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Buwa Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Purchase Of Water Pump Machine
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Amalgan Farm
- location
-
Bura
(in Bura)
- year first funded
- 2004
- action
- Purchase Of Water Pump Machine
- output
- Enhance Food Security For 80 Families
- implementation status
- Water Pump Machine Bought But Submerged In Water Due To The Floods.
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Chewele Farm
- location
-
Chewele
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Kuruso Farm Water
- location
-
Madogo
(in Bura)
- year first funded
- 2003
- action
- Purchase Of Water Pump Machine
- output
- Enhance Food Security For 80 Families
- implementation status
- Water Pump Machine Bought And Functioning
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Gubatu Farm Water
- location
-
Madogo
(in Bura)
- year first funded
- 2003
- action
- Purchase Of Water Pump Machine
- output
- Enhance Food Security For 100 Families
- implementation status
- Water Pump Machine Bought And Functioning
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Tana Umoja Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kuruso Anti Aids Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Konoramadha Cdc Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Water Pump Machine To Be Bought
- implementation status
- not known
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Bangale Primary School Solar Installation
- location
-
Bangale
(in Bura)
- year first funded
- 2003
- action
- Installation Of A Solar System
- output
- Improve Academic Performance
- implementation status
- Solar Installed And Functioning
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bura Health Centre
- location
-
Bura
(in Bura)
- year first funded
- 2003
- action
- Installation Of Solar Power At Bura Health Centre
- output
- Assist In Treating Emergency Cases Thus Improving Healthcare
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Al Mukarama Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Farm Improvement
- implementation status
- not known
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Mororo Cdc
- location
-
Mororo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Musule Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Qarboma Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Madogo Minor Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Mororo Minor Farm
- location
-
Mororo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Gubato Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Kurrso Farm
- location
-
Madogo
(in Bura)
- year first funded
- 2006
- action
- Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
- output
- Enhance Food Security
- implementation status
- Complete And Farmers Carrying Out Regular Farm Improvement Activities
- total cost
- Ksh 155,556
- estimate
- Ksh 1,555,555
Tana Tawakal
- location
-
Madogo
(in Bura)
- year first funded
- 2007
- action
- n/a
- output
- Farm Improvement
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000