The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Bura

Bangale Water Project

location
Bangale (in Bura)
year first funded
2008
action
Major Water Project For Bangale Division
output
Major Water Project For Bangale Division
implementation status
Consultations Ongoing With Other Departments And Stakeholders
total cost
Ksh 9,000,000
estimate
Ksh 4,000,000

Hirimani Secondary School

location
Bura (in Bura)
year first funded
2004
action
Construction Of 1 Classrooms Renovation Of Dining Hall And 2 Classrooms And A Dormitory. The Allocation Of 2009/10 Was For Some Extra Works Done In The Dormitory.
output
Improve Access To Education And Academic Performance.
implementation status
The Construction Of Dormitory Is Complete And Ready For Occupancy. More Works Done To The Dormitory
total cost
Ksh 5,177,000
estimate
Ksh 0

Cdf Vehicle

location
Bura (in Bura)
year first funded
2009
action
Purchase Of Vehicle To Be Used For Cdf Activites
output
Easier And Improved Project Monitoring And Evaluation And Other Cdf Activities
implementation status
Cdf Vehicle Procured And In Use In The Constituency
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Bura Water Project

location
Bura (in Bura)
year first funded
2009
action
Major Intrevention To Piped Water In Bura Town
output
Supply Of Clean Water For The Bura Town Residents
implementation status
Survey Work Ongoing And Consultations With The Technical Departments
total cost
Ksh 5,000,000
estimate
Ksh 0

Abaqiq Dam

location
Madogo (in Bura)
year first funded
2006
action
Construction of A Dam
output
Provide Clean Water For The Community.
implementation status
Complete
total cost
Ksh 3,700,000
estimate
Ksh 3,700,000

Bisikidera Dam

location
Bura (in Bura)
year first funded
2006
action
Construction of A Dam
output
Provide Clean Water For The Community.
implementation status
Complete
total cost
Ksh 3,700,000
estimate
Ksh 3,700,000

Disilting Balaneka Dam

location
Bangale (in Bura)
year first funded
2004
action
Dam Construction
output
Improve Access To Safe Drinking Water.
implementation status
Completed
total cost
Ksh 3,561,834
estimate
Ksh 0

Hirimani Primary School

location
Bura (in Bura)
year first funded
2004
action
Construction Of 6 Classrooms
output
Improve Access To Education And Academic Performance. 300 Students To Benefit Yearly
implementation status
Remaining Two Classrooms Of 07/08 Completed In Use.
total cost
Ksh 3,389,520
estimate
Ksh 0

Roka Primary School

location
Mbalambala (in Bura)
year first funded
2008
action
Construction of A Dormitory For Roka Pri. Boarding
output
Construct A Dormitory For Roka Pri. Boarding
implementation status
Tendering And Award Of New 09/10 Block Of Dormotory Complete
total cost
Ksh 3,361,994
estimate
Ksh 1,861,994

Atata Primary School

location
Mororo (in Bura)
year first funded
2003
action
Construction Of 7 Classrooms, 1 Single Toilet, 1 Double Toilet, Sign Board Erection, Purchase Of 100 Desks, Cupboard, Chairs And Table.
output
Improve Access To Education By Benefiting 400 Pupils Yearly
implementation status
Construction Of 6 Classrooms, 1 Single Toilet 1 Double Toilet, Sign Board Erection, Purchase Of 100 Desks, Cupboard, Chairs And Table Complete In Use.
total cost
Ksh 3,300,000
estimate
Ksh 3,300,000

Constituency/ Cdf Office

location
Bura (in Bura)
year first funded
2008
action
Put Up A Modern Office Block With Modern Facilities
output
Put Up A Modern Office Block With Modern Facilities
implementation status
Consultations Ongoing With Other Departments And Stakeholders
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Matagala Primary School

location
Bura (in Bura)
year first funded
2003
action
4 Classrooms And 2 More To Be Constructed In The 2009/10 Financial Yr
output
Improve Access To Education And Academic Performance And Infrastructure
implementation status
Previous Projects Complete And The 2009/10 2 Classrooms Tender Documents Under Preparation
total cost
Ksh 2,900,000
estimate
Ksh 1,700,000

Fahari Primary School

location
Bura (in Bura)
year first funded
2005
action
Construction Of 4 Class Two More Classrooms To Be Put Up In 2009/20
output
Improve Access To Education And Academic Performance.
implementation status
4 Classrooms Complete. Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 2,800,000
estimate
Ksh 1,600,000

Madogo Secondary School

location
Madogo (in Bura)
year first funded
2004
action
Construction Of 2 Classrooms And 2 Departmental Offices. 2 More Classes Tobe Constructed With 08/09 Funds.
output
Improve Access To Education And Academic Performance.
implementation status
The Renovations Under Remarks Section Are Complete And Ready For Occupancy And The 2 Classrooms For 08/09 Are Complete And In Use
total cost
Ksh 2,700,000
estimate
Ksh 0

Wolesorea Primary School

location
Hirimani (in Bura)
year first funded
2003
action
4 Classrooms Construction, Signboard Erection And Renovations Of Classrooms And Toilets
output
Improve Academic Performance 300 Pupils To Benefit Yearly.
implementation status
Project For Renovation Of Classes Blown By Wind 08/09 Has Been Tendered
total cost
Ksh 2,600,000
estimate
Ksh 2,100,000

Hirimani Foot Bridge

location
Hirimani (in Bura)
year first funded
2008
action
Construction of A Foot Bridge Across Hirimani Gulley
output
Construct A Foot Bridge Across Hirimani Gulley
implementation status
Projects Forwarded To The Relevant Departments For Designs And Documentation
total cost
Ksh 2,572,300
estimate
Ksh 1,000,000

Katumba Dam

location
Bangale (in Bura)
year first funded
2008
action
Digging Of A Dam For The Katumba Community
output
Once Complete The Venture Will Ensure Steady Source Of Water Through The Dry Season
implementation status
Survey Work Ongoing And Consultations With The Technical Departments
total cost
Ksh 2,550,000
estimate
Ksh 0

Water Pumps For Shambas

location
Madogo (in Bura)
year first funded
2005
action
Purchase Of Pump Machines For Bara Duri, Madogo Minor, Mororo Minor, Musule, Quarbona Farms
output
To Enhance Food Security For 600 Families
implementation status
6 Pump Machines Purchased And Functioning
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Jajavo Primary School

location
Bura (in Bura)
year first funded
2005
action
Construction Of 4 Classrooms
output
Improve Access To Education And Academic Performance. 100 Students To Benefit Yearly
implementation status
4 Classrooms Complete And In Use - 1 More Classroom For 08/09 Has Been Constructed And Ready For Occupancy
total cost
Ksh 2,300,000
estimate
Ksh 1,700,000

Tula Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 4 Class Two More Classrooms Allocated In 07/0; One More Classroom For 2009/10
output
Improve Access To Education And Academic Performance.
implementation status
2 Classrooms Complete And Pupils Using Them In The New School. Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 2,200,000
estimate
Ksh 800,000

Madogo Rural Electrification

location
Madogo (in Bura)
year first funded
2004
action
Internal Wiring And Installation Of Power To Madogo Dos Office, Madogo Social Hall, Madogo Dispensary, Madogo Primary And Madogo Secondary.
output
Improve Service Delivery, Academic Performance And Social Activities.
implementation status
Internal Wiring And Installation Of Power To Madogo Dos Office, Madogo Social Hall, Madogo Dispensary Completed.
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Bura Irrigation Schooleme

location
Bura (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Darime Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 2 Classrooms
output
Improve Access To Education And Academic Performance.
implementation status
2 Classrooms Completed And In Use For 06/07.Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 2,000,000
estimate
Ksh 800,000

Mororo Primary School

location
Madogo (in Bura)
year first funded
2003
action
Construction Of 4 Classrooms, Signboard Erection And Desks Purchase. Some Funds Allocated For Renovation Of Existing 13 Classrooms
output
Improve Access To Education And Academic Performance. 300 Students To Benefit Yearly.
implementation status
The Intended Renovations Needs More Funding Which Is Expected In The 09/10 Allocations
total cost
Ksh 2,000,000
estimate
Ksh 1,500,000

Sabukia Primary School

location
Hirimani (in Bura)
year first funded
2008
action
Two Class Extra One Classroom To Be Put Up In 2009/10 Financial Yr.
output
Two Classrooms
implementation status
Construction Of Two Classrooms Complete And In Use. Exxtra One Classroom Tendering Complete
total cost
Ksh 1,850,000
estimate
Ksh 1,200,000

Godia Primary School

location
Bura (in Bura)
year first funded
2008
action
Construction Of 2 Classrooms In The 2009/10
output
2 Classrooms To Be Constructed
implementation status
I Class Complete And The New 2 Classrooms Not Yet Constructed. Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 1,750,000
estimate
Ksh 550,000

Huruma Primary School

location
Bura (in Bura)
year first funded
2005
action
Construction Of 4 Classrooms
output
Improve Access To Education And Academic Performance. 400 Students To Benefit Yearly
implementation status
4 Classrooms Complete.
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Mbalambala Chiefs Office

location
Mbalambala (in Bura)
year first funded
2007
action
n/a
output
1 Office Block To Be Constructed
implementation status
Complete And Already Occupied
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Buwa Chiefs Office

location
Buwa (in Bura)
year first funded
2007
action
n/a
output
1 Office Block To Be Constructed
implementation status
Complete And Already Occupied
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Bangale Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 2 Classrooms
output
Improve Access To Education And Academic Performance.
implementation status
The 07/08 2 Classrooms Complete And In Use
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Amani Primary School

location
Bura (in Bura)
year first funded
2005
action
Construction Of 4 Classrooms
output
Improve Access To Education And Academic Performance. 350 Students To Benefit Yearly
implementation status
4 Classrooms Complete And In Use.
total cost
Ksh 1,650,000
estimate
Ksh 1,650,000

Konoramadha Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 2 More Classrooms For 07/08 Yr.
output
Improve Access To Education And Academic Performance. 60 Students To Benefit Yearly
implementation status
2 Classrooms Complete And In Use
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Adele Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 2 Classrooms
output
Improve Access To Education And Academic Performance. 80 Students To Benefit Yearly
implementation status
2 Classrooms Complete. 1More Classroom And Toilet Block Completed And Ready For Use
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Wolesorea Chiefs Office

location
Hirimani (in Bura)
year first funded
2007
action
n/a
output
1 Office Block To Be Constructed
implementation status
Complete And Already Occupied
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Tune Primary School

location
Bura (in Bura)
year first funded
2007
action
One Classroom To Be Put Up In 2009/10
output
2 Classrooms Constructed In 07/08 Improved Infrastructure
implementation status
The Classrooms Complete And In Use.Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 1,500,000
estimate
Ksh 900,000

Nanighi Primary School

location
Nanighi (in Bura)
year first funded
2007
action
Purchase Of Mattresses For The Boarding Wing.
output
Improved Infrastructure In The Institution And Bedding Facilities
implementation status
Construction Of The Block Of Two Toilets Is Complete And In Use. The Tendering For The Purchase Of Beddings For The Boarding Wing In Progress
total cost
Ksh 1,500,000
estimate
Ksh 500,000

Chewele Chiefs Office

location
Chewele (in Bura)
year first funded
2007
action
n/a
output
1 Office Blockand A Toilet To Be Constructed
implementation status
Complete And Already Occupied
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Mbalambala Boat

location
Mbalambala (in Bura)
year first funded
2008
action
Purchase A Motor Boat For Crossing River Tana For Mbalambala Primary School
output
Purchase A Motor Boat For Crossing River Tana For Mbalambala Primary School
implementation status
Quotations Floated
total cost
Ksh 1,500,000
estimate
Ksh 250,000

Korati Dispensary

location
(in Bura)
year first funded
2009
action
Carry Out Thorough Renovations To The Facility
output
Improved Provision Of Health Care Services And Proximity
implementation status
Tender Documents Preparation Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 0

Ruko Primary School

location
Buwa (in Bura)
year first funded
2005
action
Construction Of 3 Class
output
Improve Access To Education And Academic Performance. 160 Students To Benefit Yearly
implementation status
not known
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Boka Dispensary

location
Boka (in Bura)
year first funded
2004
action
Construction Of A Dispensary
output
Improve Access To Quality Healthcare For Kamargur People
implementation status
Complete And In Use
total cost
Ksh 1,300,000
estimate
Ksh 0

Shika Adabu Primary School

location
Bura (in Bura)
year first funded
2008
action
Two Classrooms
output
Two Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Tumaini Polytechnic Vehicle

location
Bura (in Bura)
year first funded
2008
action
Purchase Of A Driving Vehicle For The Polytechnic
output
Purchase Of A Driving Vehicle For The Polytechnic
implementation status
Consultation On The Way Foreward Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Charidende Dispensary

location
Charidende (in Bura)
year first funded
2003
action
Dispensary And Toilet Constructed
output
Improve Health And Sanitation Of Charidende Community
implementation status
Completed And In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,110,000

Constituency Strategic Plan

location
Bura (in Bura)
year first funded
2008
action
Develop A 5 Yr Strategic Plan For The Constituency
output
Develop A 5 Yr Strategic Plan For The Constituency
implementation status
Consultations Ongoing With Other Departments And Stakeholders
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Wolestokocha Primary School

location
Hirimani (in Bura)
year first funded
2007
action
n/a
output
2 Class Rooms To Be Constructed
implementation status
Ksh 1000,000 Reallocated To Hosingo Primary School For Construction Of Two Classrooms And A Block Of Toilets
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Sombo Dispensary

location
Sala (in Bura)
year first funded
2005
action
Renovation Of Dispensary.Construction Of A House For Nurse.
output
Improve Quality Of Health Care And Working Conditions Of Staff.
implementation status
Dispensary Renovated.And Nurses House Constructed?
total cost
Ksh 950,000
estimate
Ksh 950,000

Madogo Dispensary

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
Maternity Wing To Be Constructed
implementation status
?Consultations With Stakeholders Ongoing As To What Could Be Put Up With Available Funds
total cost
Ksh 900,000
estimate
Ksh 900,000

Korati Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 2 Classrooms
output
Improve Access To Education And Academic Performance. 60 Students To Benefit Yearly
implementation status
The 2 Classrooms For 07/08 Allocation Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Bangale Posho Mill

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
20 Hp Machine To Be Bought
implementation status
Machine Installed And Being Used By The Community
total cost
Ksh 800,000
estimate
Ksh 800,000

Hosingo Primary School

location
Madogo (in Bura)
year first funded
2006
action
Construction Of 4 Classrooms And A Toilet Block
output
Improve Access To Education And Academic Performance. 130 Students To Benefit Yearly
implementation status
2 Classrooms Complete . 2 More Classrooms And A Toilet Block From The Wolestokotcha Project Satisfactorily Complete And Ready For Use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Hosingo Sub Chiefs Office

location
Hirimani (in Bura)
year first funded
2007
action
n/a
output
Sub Chief'S Office To Be Constructed
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 700,000

Mororo Primary School

location
Mororo (in Bura)
year first funded
2008
action
Renovation Of Classrooms
output
Renovation Of Classrooms
implementation status
More Funds Needed For The Project
total cost
Ksh 600,000
estimate
Ksh 600,000

Magura Primary School

location
Bura (in Bura)
year first funded
2009
action
Put 2 Blocks Of Toilets For The Institution
output
Improved Health Hygiene And Sanitation
implementation status
Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 600,000
estimate
Ksh 0

Gale Nursery

location
Bangale (in Bura)
year first funded
2009
action
One Classroom To Be Constructed
output
Classroom To Improve The Education Of Of Little Children
implementation status
Tendering And Award Of New 09/10 Block Of Class(Es) Is Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Dukanotu Nursery

location
Nanighi (in Bura)
year first funded
2008
action
Construction of On Classroom For Nursery Class
output
Construct On Classroom For Nursery Class
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Wadesa Nursery

location
Madogo (in Bura)
year first funded
2008
action
Construction of On Classroom For Nursery Class
output
Construct On Classroom For Nursery Class
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Bula Rig Nursery

location
Bura (in Bura)
year first funded
2008
action
Construction of On Classroom For Nursery Class
output
Construct On Classroom For Nursery Class
implementation status
Construction Of The Nursery Class Complete And In Use.
total cost
Ksh 550,000
estimate
Ksh 550,000

Katumba Nursery

location
Bangale (in Bura)
year first funded
2008
action
Construction of On Classroom For Nursery Class
output
Construct On Classroom For Nursery Class
implementation status
Funds To Be Reallocated To A Borehole At The Same Place
total cost
Ksh 550,000
estimate
Ksh 550,000

Lagbandana Nursery

location
Madogo (in Bura)
year first funded
2008
action
Construction of On Classroom For Nursery Class
output
Construct On Classroom For Nursery Class
implementation status
Complete And In Use
total cost
Ksh 550,000
estimate
Ksh 550,000

Chewele Primary School

location
Chewele (in Bura)
year first funded
2007
action
n/a
output
Renovation Of Classes
implementation status
?The Construction Of Classroom Is Complete And In Use.
total cost
Ksh 500,000
estimate
Ksh 50,000

Al Mukarama Farm

location
Madogo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 400,000
estimate
Ksh 400,000

Mobile Community

location
Bura (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 400,000

Safina Community

location
Bura (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 400,000

Bura South Community

location
Bura (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 400,000

Jua Kali Sheds

location
Bura (in Bura)
year first funded
2006
action
Built Sheds For Jua Kali Artisans
output
Create A Conducive Working Environment For Jua Kali Artisans.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Abawata Farm

location
Madogo (in Bura)
year first funded
2006
action
Purchase Of Water Pump
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 400,000
estimate
Ksh 400,000

Tawakal Farm

location
Madogo (in Bura)
year first funded
2006
action
Purchase Of Water Pump Machine
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 400,000
estimate
Ksh 400,000

Buwa Farm

location
Madogo (in Bura)
year first funded
2006
action
Purchase Of Water Pump Machine
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 400,000
estimate
Ksh 400,000

Amalgan Farm

location
Bura (in Bura)
year first funded
2004
action
Purchase Of Water Pump Machine
output
Enhance Food Security For 80 Families
implementation status
Water Pump Machine Bought But Submerged In Water Due To The Floods.
total cost
Ksh 400,000
estimate
Ksh 400,000

Chewele Farm

location
Chewele (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 380,000
estimate
Ksh 380,000

Kuruso Farm Water

location
Madogo (in Bura)
year first funded
2003
action
Purchase Of Water Pump Machine
output
Enhance Food Security For 80 Families
implementation status
Water Pump Machine Bought And Functioning
total cost
Ksh 360,000
estimate
Ksh 360,000

Gubatu Farm Water

location
Madogo (in Bura)
year first funded
2003
action
Purchase Of Water Pump Machine
output
Enhance Food Security For 100 Families
implementation status
Water Pump Machine Bought And Functioning
total cost
Ksh 360,000
estimate
Ksh 360,000

Tana Umoja Farm

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 350,000

Kuruso Anti Aids Farm

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 350,000

Konoramadha Cdc Farm

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
Water Pump Machine To Be Bought
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 350,000

Bangale Primary School Solar Installation

location
Bangale (in Bura)
year first funded
2003
action
Installation Of A Solar System
output
Improve Academic Performance
implementation status
Solar Installed And Functioning
total cost
Ksh 300,000
estimate
Ksh 300,000

Bura Health Centre

location
Bura (in Bura)
year first funded
2003
action
Installation Of Solar Power At Bura Health Centre
output
Assist In Treating Emergency Cases Thus Improving Healthcare
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Al Mukarama Farm

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
Farm Improvement
implementation status
not known
total cost
Ksh 220,000
estimate
Ksh 220,000

Mororo Cdc

location
Mororo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Musule Farm

location
Madogo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Qarboma Farm

location
Madogo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Madogo Minor Farm

location
Madogo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Mororo Minor Farm

location
Mororo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Gubato Farm

location
Madogo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Kurrso Farm

location
Madogo (in Bura)
year first funded
2006
action
Farm Improvement Activities In The Farms Like Harrowing And Bush Clearing
output
Enhance Food Security
implementation status
Complete And Farmers Carrying Out Regular Farm Improvement Activities
total cost
Ksh 155,556
estimate
Ksh 1,555,555

Tana Tawakal

location
Madogo (in Bura)
year first funded
2007
action
n/a
output
Farm Improvement
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 150,000