The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Butula

Orphan Rescue Centre – Benga

location
Marachi East (in Butula)
year first funded
2003
action
College Construction,computer&Furniture,Bull scheme
output
High enrollment of O-level students
implementation status
On going
total cost
Ksh 26,032,878
estimate
Ksh 27,000,000

Ogallo mkt,Tingolo&Bumala'B'-Electricity

location
Marachi East (in Butula)
year first funded
2008
action
Electricity extension
output
good standard of living
implementation status
on going
total cost
Ksh 6,500,000
estimate
Ksh 8,000,000

Constituency office const.

location
Elukhari (in Butula)
year first funded
2004
action
Construction of office const
output
Efficient service delivery
implementation status
On going
total cost
Ksh 6,181,217
estimate
Ksh 4,500,000

Bukhalalire water Pipeline

location
Marachi Central (in Butula)
year first funded
2007
action
Waterpipeline Construction
output
Enough water for irrigation
implementation status
on going
total cost
Ksh 4,940,000
estimate
Ksh 10,000,000

Namabasa – Sikura bridge constr.

location
Marachi East (in Butula)
year first funded
2004
action
Bridge construction
output
Ease transport
implementation status
On going
total cost
Ksh 3,042,000
estimate
Ksh 3,042,000

AP Line Burinda constr. Of AP houses

location
Bumala (in Butula)
year first funded
2004
action
AP houses Construction
output
A secure community
implementation status
On going
total cost
Ksh 2,850,000
estimate
Ksh 1,450,000

Bwaliro girls secondary School

location
Lugulu (in Butula)
year first funded
2003
action
Classrooms Construction
output
high enrolment of children
implementation status
complete
total cost
Ksh 2,600,000
estimate
Ksh 4,600,000

Bwaliro girls secondary School

location
Lugulu (in Butula)
year first funded
2007
action
Dorm. Const
output
high enrolment of children
implementation status
On going
total cost
Ksh 2,100,000
estimate
Ksh 2,000,000

Lugulu a.c secondary School(Dorm.)

location
Lugulu (in Butula)
year first funded
2007
action
Dorm. Const
output
high enrolment of children
implementation status
On going
total cost
Ksh 2,100,000
estimate
Ksh 1,500,000

Bulemia,Bukalama,Bulwani, Bumala, Masebula,Kamrembo, Bukhwaku, Ogina road

location
Lugulu, Bumal and Bujumba (in Butula)
year first funded
2008
action
Grading roads
output
Ease transport
implementation status
On -going
total cost
Ksh 2,070,000
estimate
Ksh 0

Orphan Rescue Centre – Benga

location
Marachi East (in Butula)
year first funded
2005
action
40Accres Land
output
55Accres land
implementation status
on going
total cost
Ksh 2,000,000
estimate
Ksh 3,500,000

Khunyangu sub.District hospital

location
Marachi Central (in Butula)
year first funded
2005
action
m/ward Construction
output
Quality healthcare services
implementation status
On going
total cost
Ksh 1,800,000
estimate
Ksh 350,000

Bumala ac. secondary School

location
Bumala (in Butula)
year first funded
2003
action
Construction of a library
output
conducive learning environment
implementation status
Complete
total cost
Ksh 1,750,000
estimate
Ksh 1,600,000

Bukuyudi-Siwololo,Ogayo Seth-Ams-Busire,Siunga-Masendebale-Akanyo-Esibina-Tingolo-Isongo-Eluche-Indangalasia

location
Elukhari,Bumala&Marachi East (in Butula)
year first funded
2007
action
Grading Rds
output
Ease transport
implementation status
on going
total cost
Ksh 1,750,000
estimate
Ksh 3,000,000

Tingolo mixed secondary Schooll. Const. Lab.

location
Marachi East (in Butula)
year first funded
2007
action
Lab. Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 1,706,089
estimate
Ksh 1,500,000

Butula D.O's Office

location
Elukhari (in Butula)
year first funded
2007
action
DO's Office
output
Efficient service delivery
implementation status
on going
total cost
Ksh 1,650,000
estimate
Ksh 0

Bumala Chief's Centre

location
Bumala (in Butula)
year first funded
2007
action
Chief's Office
output
Efficient service delivery
implementation status
On going
total cost
Ksh 1,600,000
estimate
Ksh 700,000

Buriya girls secondary School

location
Bujumba (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 1,550,000
estimate
Ksh 750,000

Bumutiru secondary School

location
Marachi Central (in Butula)
year first funded
2004
action
Construction of a D/hall
output
Meals provided in a condicive environment
implementation status
ongoing
total cost
Ksh 1,500,000
estimate
Ksh 850,000

Buhuyi secondary School completion dorm

location
Marachi East (in Butula)
year first funded
2004
action
Dormitory Construction
output
high enrollment in boarding sector
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Bumala health centre const. maternity ward

location
Bumala (in Butula)
year first funded
2004
action
Dispensary Construction
output
Quality healthcare services
implementation status
On going
total cost
Ksh 1,400,000
estimate
Ksh 800,000

Ikonzo secondary School.4Classrooms

location
Bujumba (in Butula)
year first funded
2006
action
Classroom const
output
conducive learning environment
implementation status
complete
total cost
Ksh 1,400,000
estimate
Ksh 300,000

Buhuyi primary School

location
Marachi East (in Butula)
year first funded
2008
action
Classrooms renovation
output
conducive learning environment
implementation status
On going
total cost
Ksh 1,400,000
estimate
Ksh 1,600,000

Bukhakhala Primary School (Classroom,ECD classroom&Admin.Block)

location
Bumala (in Butula)
year first funded
2005
action
Classrooms Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 1,350,000
estimate
Ksh 1,200,000

Const. Ikonzo comm. Dispensary/Land purchase

location
Bujumba (in Butula)
year first funded
2003
action
Dispensary Construction
output
Quality healthcare services
implementation status
complete
total cost
Ksh 1,325,000
estimate
Ksh 725,000

Murumba AP Line

location
Marachi Central (in Butula)
year first funded
2008
action
AP houses Construction
output
A secure comm.
implementation status
On -going
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Maternity Block – Bumutiru dispensary

location
Marachi Central (in Butula)
year first funded
2005
action
m/ward Construction
output
Quality healthcare services
implementation status
complete
total cost
Ksh 1,250,000
estimate
Ksh 300,000

kingandole secondary School- Laboratory

location
marachi central (in Butula)
year first funded
2005
action
Lab. Construction
output
Improved performance in Science subjects
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,000,000

Masebula-Kamurembo Bridge

location
Bumala (in Butula)
year first funded
2005
action
Bridge construction
output
Ease transport
implementation status
complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Butula AP Line

location
Elukhari & Marachi East (in Butula)
year first funded
2009
action
Construction of Ap line.
output
Ap Residence
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Elukhari mixed Day secondary School

location
Elukhari (in Butula)
year first funded
2007
action
2 Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 1,200,000
estimate
Ksh 1,600,000

Butula/Esikarira Dispensary constr.

location
Elukhari (in Butula)
year first funded
2003
action
Dispensary Construction
output
Quality healthcare services
implementation status
Complete
total cost
Ksh 1,175,000
estimate
Ksh 975,000

Kalalani prim. Schooll. Const. classroom & Renovation

location
Marachi East (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 400,000

Masebula primary School const. 1 classroom/water

location
Bumala (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 1,100,000
estimate
Ksh 750,000

Bukhalalire secondary School

location
Marachi Central (in Butula)
year first funded
2006
action
Staff House.const
output
conducive learning environment
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Butula -Kanjala-Bukati&Sikarira (Extension of Piped Water)

location
Elukhari (in Butula)
year first funded
2007
action
Extension of piped water
output
provision of clean water
implementation status
ongoing
total cost
Ksh 1,065,076
estimate
Ksh 2,000,000

Busire-Bukhwaku-Nyamwanga-Buriya-Borokisumunango Access roads

location
Bujumba (in Butula)
year first funded
2007
action
Grading Rds
output
Ease transport
implementation status
complete
total cost
Ksh 1,060,000
estimate
Ksh 1,060,000

Lugulu Chief's Centre

location
Lugulu (in Butula)
year first funded
2006
action
Chief's Office ren.
output
Efficient service delivery
implementation status
On going
total cost
Ksh 1,050,000
estimate
Ksh 700,000

Tingolo chiefs office rehabilitation&AP Line

location
Marachi East (in Butula)
year first funded
2004
action
Chief's Office ren.
output
Efficient service delivery
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 850,000

Busiada girls secondary School

location
Marachi Central (in Butula)
year first funded
2004
action
Dormitory Construction
output
high enrollment in boarding sector
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 900,000

Bulwani Dispensary

location
Lugulu (in Butula)
year first funded
2008
action
Dispensary Construction
output
Quality healthcare services
implementation status
On going
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Bukhalalire Community dispensaryConstraction.

location
Marachi Central (in Butula)
year first funded
2004
action
Dispensary Construction
output
Quality healthcare services
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 750,000

Bujumba secondary School constr. Lab

location
Bujumba (in Butula)
year first funded
2004
action
Science Lab. Construction
output
Improved performance in Science subjects
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Butula girls secondary School

location
Elukhari (in Butula)
year first funded
2007
action
Dorm. Const
output
high enrolment of children
implementation status
On going
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Butula youth polytechnic

location
Elukhari (in Butula)
year first funded
2004
action
Classrooms renovation
output
conducive learning environment
implementation status
On going
total cost
Ksh 930,000
estimate
Ksh 480,000

Butunyi mixed primary School

location
marachi Central (in Butula)
year first funded
2006
action
Classroom rennovation
output
conducive learning environment
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Construction of Musibiriri Dispensary

location
Marachi East (in Butula)
year first funded
2004
action
Dispensary Construction
output
Quality healthcare services
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 400,000

Bukhuma secondary School

location
Lugulu (in Butula)
year first funded
2007
action
Classroom
output
conducive learning environment
implementation status
complete
total cost
Ksh 900,000
estimate
Ksh 350,000

Butula D.O's Office

location
Elukhari (in Butula)
year first funded
2008
action
Office renovation
output
Efficient service delivery
implementation status
complete
total cost
Ksh 850,000
estimate
Ksh 0

Dadira primary School

location
Bujumba (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 850,000
estimate
Ksh 250,000

Bujumba comm. dispensary Maternity Unit

location
Bujumba (in Butula)
year first funded
2004
action
Dispensary Construction
output
Quality healthcare services
implementation status
On going
total cost
Ksh 850,000
estimate
Ksh 500,000

Masendebale dispensary

location
Marachi East (in Butula)
year first funded
2006
action
Dispensary Construction
output
Construction of staff house
implementation status
On -going
total cost
Ksh 850,000
estimate
Ksh 150,000

Lugulu AP Line

location
Lugulu (in Butula)
year first funded
2009
action
AP houses Construction
output
A secure community
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Bulemia AP Line

location
Lugulu (in Butula)
year first funded
2009
action
AP houses Construction
output
A secure community
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 1,200,000

St.Augustine Butunyi boarding priamry School-Dormitory Co-funded&Reabilitation of Dorm

location
Marachi Central (in Butula)
year first funded
2006
action
Dormitory Construction
output
Ease congestion
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 1,200,000

Tingolo mixed secondary Schooll. Const. 2 classroom

location
Marachi East (in Butula)
year first funded
2003
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 750,000
estimate
Ksh 750,000

Namwitsula primary School const. 2 classroom

location
Bujumba (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 400,000

Bukhalalire secondary School

location
Marachi Central (in Butula)
year first funded
2007
action
Dorm. Const
output
high enrolment of children
implementation status
On going
total cost
Ksh 750,000
estimate
Ksh 1,200,000

Butula girls secondary School

location
Elukhari (in Butula)
year first funded
2003
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 3,000,000

Bumala 'B' secondary School

location
Marachi East (in Butula)
year first funded
2007
action
Classrooms renovation
output
conducive learning environment
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 800,000

Butunyi Girls secondary School

location
marachi central (in Butula)
year first funded
2008
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 0

Bukhalalire secondary School

location
Marachi Central (in Butula)
year first funded
2005
action
Dormitory Construction
output
Ease congestion
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 600,000

Bulemia/Namsala Health Centre

location
Lugulu (in Butula)
year first funded
2009
action
Dispensary Construction
output
Quality healthcare services
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Bwaliro dispensary construction of lab &Electricity

location
Lugulu (in Butula)
year first funded
2004
action
Dispensary Construction
output
Quality healthcare services
implementation status
Complete
total cost
Ksh 685,000
estimate
Ksh 525,000

Emalomba - Sirangala, Mauko - Bumala 'B', Tingolo access Roads.

location
Marachi East (in Butula)
year first funded
2006
action
Grading of access roads
output
Ease transport
implementation status
complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Elukhari Chief's Centre

location
Elukhari (in Butula)
year first funded
2009
action
Chief's Office
output
Efficient service delivery
implementation status
On going
total cost
Ksh 650,000
estimate
Ksh 1,200,000

Emagombe pimary School

location
Marachi central (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 650,000
estimate
Ksh 300,000

Butunyi youth polytechnic

location
Marachi Central (in Butula)
year first funded
2004
action
Classroom rennovation
output
conducive learning environment
implementation status
Complete
total cost
Ksh 635,000
estimate
Ksh 300,000

Bujumba/ Burinda water project (Pump)

location
Bujumba (in Butula)
year first funded
2004
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 625,000
estimate
Ksh 625,000

Mung'ambwa primary Schooll constr. Classroom

location
Lugulu (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 250,000

Busiada girl’s secondary Schooll. Provision of water

location
Marachi Central (in Butula)
year first funded
2004
action
Borehole drilling
output
provision of clean water
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Bumutiru ac. Primary School

location
Marachi Central (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 250,000

kingandole Secondry School-Emergency

location
Marachi Central (in Butula)
year first funded
2006
action
Classroom rennovation
output
conducive learning environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Bukhwaku primary School

location
Bujumba (in Butula)
year first funded
2004
action
2 Classroom const
output
conducive learning environment
implementation status
complete
total cost
Ksh 600,000
estimate
Ksh 350,000

Butula boys School

location
Elukhari (in Butula)
year first funded
2009
action
renovation of Classrooms
output
conducive learning environment
implementation status
ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Butula boys high School

location
Elukhari (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Bwaliro primary School

location
Lugulu (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 300,000

Obok, Mukhusayo, Bukhalala Primary Scl, Bugaji shallow well.

location
Bumala (in Butula)
year first funded
2006
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 575,408
estimate
Ksh 575,408

Kingandole secondary School – Adm. Block

location
Marachi Central (in Butula)
year first funded
2003
action
Admin. Block Construction
output
Better admin. Services
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Rehab. of Bumala ‘ B’ dispensary

location
Marachi East (in Butula)
year first funded
2005
action
Dispensary Const
output
Quality healthcare services
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Bukati primary School

location
Elukhari (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 400,000

Tingolo A.P Line

location
Marachi East (in Butula)
year first funded
2007
action
Staff House.renovationconst
output
good accomodation for AP officers
implementation status
on going
total cost
Ksh 550,000
estimate
Ksh 0

Buriya primary School

location
Bujumba (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 400,000

Masebula primary School const. 1 classroom/water

location
Bumala (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kingandole primary Schooll - classroom

location
Marachi Central (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Bukhalalire primary School

location
Marachi Central (in Butula)
year first funded
2005
action
Dormitory Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 100,000

Nyalwanda primary Schooll const. 1 classroom

location
Marachi Central (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 250,000

Enakaywa primary School

location
Lugulu (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 250,000

Bulemia ECD constr. ECD classroom

location
Lugulu (in Butula)
year first funded
2004
action
ECD Classroom Construction
output
high enrolment of children
implementation status
complete
total cost
Ksh 500,000
estimate
Ksh 200,000

Buhuyi secondary School -Laboratory

location
Marachi East (in Butula)
year first funded
2004
action
Lab. Construction
output
Improved performance in Science subjects
implementation status
stalled
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Masendebale prim. School const. 2 classroom

location
Marachi East (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Namwitsula primary School const. 1 classroom

location
Bujumba (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 500,000
estimate
Ksh 350,000

Mafubu Dispensary

location
Marachi East (in Butula)
year first funded
2009
action
Dispensary Construction
output
Construction of Dispensary
implementation status
On -going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Butula Roads Mgt. Committee

location
Elukhari (in Butula)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

DEO's Office

location
Elukhari (in Butula)
year first funded
2009
action
Office renovation
output
provision of quality service
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Buriya Primary Scl., Namwitsula, Ikonzo, Sirihay shallow well.

location
Bujumba (in Butula)
year first funded
2006
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 444,626
estimate
Ksh 444,626

Kingandole secondary School – Adm. Block(emergency)

location
Marachi Central (in Butula)
year first funded
2004
action
Admin. Block Construction
output
Better admin. Services
implementation status
Complete
total cost
Ksh 425,000
estimate
Ksh 425,000

Bwaliro primary School

location
Lugulu (in Butula)
year first funded
2008
action
renovation of Classrooms
output
conducive learning environment
implementation status
complete
total cost
Ksh 400,000
estimate
Ksh 0

St. Catherine special Schooll. Classrooms- Renovation

location
Elukhari (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Constituency Office Fencing

location
Elukhari (in Butula)
year first funded
2008
action
Fencing-pipedwire
output
office security
implementation status
on going
total cost
Ksh 400,000
estimate
Ksh 600,000

Muruka/Buhuyi station - Fencing

location
Elukhari & Marachi East (in Butula)
year first funded
2008
action
Fencing
output
Security
implementation status
on-going
total cost
Ksh 400,000
estimate
Ksh 600,000

Bumala 'A' Village Borehole

location
Bumala (in Butula)
year first funded
2004
action
Borehole drilling
output
provision of clean water
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 500,000

Busire water project constr. 2 shallow wells

location
Bumala (in Butula)
year first funded
2004
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Sirikhaya secondary School.

location
Bujumba (in Butula)
year first funded
2007
action
Lab.Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 250,000

Bujumba secondary School- Computer Lab

location
Bujumba (in Butula)
year first funded
2007
action
Computer Lab. Construction
output
Provision of computer lessons
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 300,000

Bumala 'B' primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom rennovation
output
conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 250,000

Elukhari primary School

location
Elukhari (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 250,000

Butula boys primary School

location
Elukhari (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

mung'ambwa ECD Classroom

location
Lugulu (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 200,000

Bulwani primary School

location
Lugulu (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Busiada girls secondary School

location
Marachi central (in Butula)
year first funded
2006
action
Staff House.const
output
conducive learning environment
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 300,000

Madola primary Schooll – classroom ECD

location
lugulu (in Butula)
year first funded
2004
action
Classroom Construction
output
high enrolment of children
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Bukhuma secondary School

location
Lugulu (in Butula)
year first funded
2009
action
Admin. Block Construction/co-funded with PTA
output
-
implementation status
complete
total cost
Ksh 400,000
estimate
Ksh 0

Constituency office - Land Purchase

location
ELUKHARI (in Butula)
year first funded
2005
action
Purchase of land
output
Constituency office construction.
implementation status
complete
total cost
Ksh 370,000
estimate
Ksh 370,000

Sigulu Shimalabandu,Bumala B. primarySchoolisongo pr.&Chengo mkt.

location
Marachi East (in Butula)
year first funded
2006
action
Rehbiltation
output
Provosion of clean Water
implementation status
Complete
total cost
Ksh 367,457
estimate
Ksh 367,457

Bumutiru R.C. primary School

location
Marachi Central (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Khunyangu primarySchool.

location
Marachi Central (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 350,000
estimate
Ksh 300,000

Siunga Primary School

location
Marachi East (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Busibi ECD Centre

location
Marachi East (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 350,000
estimate
Ksh 250,000

Makwara primary School(Classrooom)

location
Marachi East (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Busibula primary School

location
Bujumba (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Bumala a.c. primary School

location
Bumala (in Butula)
year first funded
2007
action
1 Classroom const
output
conducive learning environment
implementation status
On going
total cost
Ksh 350,000
estimate
Ksh 350,000

Masebula secondary School

location
Bumala (in Butula)
year first funded
2009
action
Construction of Classroom
output
conducive learning environment
implementation status
complete
total cost
Ksh 350,000
estimate
Ksh 0

Neela -Sikoma Bridge constr. Bridge

location
Marachi Central (in Butula)
year first funded
2004
action
Bridge construction
output
Ease transport
implementation status
On going
total cost
Ksh 350,000
estimate
Ksh 350,000

Lugulu secondary Schooll - electricity

location
Elugulu (in Butula)
year first funded
2004
action
Installation of elec.
output
conducive learning environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Sikura primary School -Emergency

location
Marachi Central (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 400,000

Lugulu ac. secondary School renovation of library/electricity

location
Lugulu (in Butula)
year first funded
2004
action
Library rennovation
output
conducive learning environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kingandole primary Schooll - classroom

location
Marachi Central (in Butula)
year first funded
2007
action
Classroom cnst.
output
conducive learning environment
implementation status
complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Bukanga,Elukhari secondaryScool,Igula Shallowc Wells

location
Bujumba&Elukhari (in Butula)
year first funded
2006
action
Rehbiltation
output
Provosion of clean Water
implementation status
Complete
total cost
Ksh 333,885
estimate
Ksh 333,885

Esikarira primary School

location
Elukhari (in Butula)
year first funded
2004
action
Classroom rennovation
output
conducive learning environment
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Butula girls secondary School

location
Elukhari (in Butula)
year first funded
2006
action
Lab.Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 800,000

Kanjala prim. Schooll ECD classroom

location
Elukhari (in Butula)
year first funded
2004
action
2 Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Sikoma secondarySchool

location
marachi central (in Butula)
year first funded
2009
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 400,000

Nyalwanda primary Schooll const. 1 classroom

location
marachi Central (in Butula)
year first funded
2009
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 450,000

Neela primary School construction classroom

location
Marachi Central (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 250,000

Bumutiru Secondary School

location
Marachi Central (in Butula)
year first funded
2006
action
Lab. Construction
output
Improved performance in Science subjects
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Isongo chiefs office constr. Of chiefs office

location
Marachi East (in Butula)
year first funded
2004
action
Chief's Office ren.
output
Efficient service delivery
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 100,000

Butula girl’s primary

location
elukhari (in Butula)
year first funded
2009
action
ECD Classroom Construction
output
conducive learning environment
implementation status
ongoing
total cost
Ksh 300,000
estimate
Ksh 400,000

Busiada Primary School

location
Marachi Central (in Butula)
year first funded
2009
action
Classroom
output
conducive learning environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Bumutiru primary School

location
Marachi Central (in Butula)
year first funded
2009
action
Classroom
output
conducive learning environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Siribo Secondary School

location
Marachi East (in Butula)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Mung'abo primary School

location
Marachi East (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Nella,Emadwella&Obiero makokha Shallow Wells.

location
Lugulu (in Butula)
year first funded
2006
action
Rehbiltation
output
Provision of clean water
implementation status
Complete
total cost
Ksh 261,047
estimate
Ksh 261,047

Buhuyi primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 250,000
estimate
Ksh 300,000

Butunyi mixed primary School

location
marachi central (in Butula)
year first funded
2004
action
C/rom const
output
conducive learning environment
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Saka primary School constr. Of classroom

location
Marachi Central (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Esikoma primary School

location
Marachi Central (in Butula)
year first funded
2006
action
Classroom Construction
output
Increased income opportunities
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Musoma primary School

location
Marachi Central (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Bukhuma primary School

location
Lugulu (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 250,000
estimate
Ksh 250,000

Esibembe primary Schooloo;

location
Lugulu (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Kanjala prim. Schooll renovation

location
Elukhari (in Butula)
year first funded
2009
action
renovation of Classrooms
output
conducive learning environment
implementation status
ongoing
total cost
Ksh 250,000
estimate
Ksh 800,000

Butula boys School

location
Elukhari (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 150,000

Musibiriri primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mauko primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mung'abo primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 300,000

Buduma Primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 300,000

Ikonzo primary School constr. 1 classroom

location
Bujumba (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 250,000
estimate
Ksh 250,000

Bujumba primary School constr. Of classroom

location
Bujumba (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Nyamwanga primary School constr./renovation classroom

location
Bujumba (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Burinda primary School

location
Bujumba (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Busire primary School

location
Bumala (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 300,000

Muruka&Buhuyi dispensary /post(Purchaseof Land)

location
Elukhari&Marachi East. (in Butula)
year first funded
2007
action
Pchase land
output
Efficient service delivery
implementation status
On going
total cost
Ksh 250,000
estimate
Ksh 2,500,000

Enakaywa market(Mushroom) shade

location
Lugulu (in Butula)
year first funded
2006
action
Market shade cons
output
Increased income opportunities
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Butula girl’s primary

location
Elukhari (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Butula girl’s primary

location
Elukhari (in Butula)
year first funded
2007
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Constituency Office - water supply

location
Elukhari (in Butula)
year first funded
2005
action
Installation of water
output
provision of clean water
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 230,000

Busibula primary School

location
Bujumba (in Butula)
year first funded
2008
action
Shallow well Construction
output
Provision of clean water
implementation status
Complete
total cost
Ksh 216,500
estimate
Ksh 216,500

Bujumba-Burinda water project

location
Bujumba (in Butula)
year first funded
2008
action
Purchase of water pump
output
Provision of clean water
implementation status
complete
total cost
Ksh 210,000
estimate
Ksh 0

Bukati market(Mushroom) shade

location
Elukhari (in Butula)
year first funded
2006
action
Market shade cons
output
Increased income opportunities
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 250,000

Saka market(Mushroom) shade

location
Marachi Central (in Butula)
year first funded
2006
action
Market shade cons
output
Increased income opportunities
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 250,000

Butula Market(Mushroom) shade

location
Elukhari (in Butula)
year first funded
2006
action
Market shade cons
output
Increased income opportunities
implementation status
complete
total cost
Ksh 200,000
estimate
Ksh 250,000

Tingolo primary School

location
Marachi East (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

Bumala primary School

location
Bumala (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 250,000

Bukhakhala water shallow wells

location
Bumala (in Butula)
year first funded
2004
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

St. Catherine special Schooll. (Latrines)

location
Elukhari (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 200,000
estimate
Ksh 0

Namwitsula /Ikonzo market(Mushroom) shade

location
bujumba (in Butula)
year first funded
2006
action
Market shade cons
output
Increased income opportunities
implementation status
complete
total cost
Ksh 200,000
estimate
Ksh 250,000

Nyapera Dam desisting/rehabilitation

location
Marachi East (in Butula)
year first funded
2004
action
Dam Rehabilitation
output
Enough water for irrigation
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Masebula Primary School- Borehole

location
Bumala (in Butula)
year first funded
2004
action
Borehole drilling
output
provision of clean water
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

Tingolo Market(Mushroom) shade

location
Marachi East (in Butula)
year first funded
2006
action
Market shade cons
output
Increased income opportunities
implementation status
complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Butula D.Os pavilion constr./rehabilitation

location
Elukhari (in Butula)
year first funded
2004
action
DO's pavillion ren
output
Efficient service delivery
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Bumwaya Dam

location
Marachi Central (in Butula)
year first funded
2006
action
Dam Rehabilitation
output
Enough water for irrigation
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Bukhakhala primary School water point shallow wells

location
Bumala (in Butula)
year first funded
2005
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Bumala ‘B’ Dam rehabilitation

location
Marachi East (in Butula)
year first funded
2004
action
Dam Rehabilitation
output
Enough water for irrigation
implementation status
Complete
total cost
Ksh 197,175
estimate
Ksh 197,175

Ogwaro,Lwanya , Zakayo & Namwitsula water spring

location
Bujumba (in Butula)
year first funded
2009
action
Protection of water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 300,000

Bumala 'B' secondary School

location
Marachi East (in Butula)
year first funded
2007
action
Purchase of Lockers&chairs
output
4o Chairs&Lockers
implementation status
complete
total cost
Ksh 162,400
estimate
Ksh 162,400

Bwaliro girls secondary School

location
Lugulu (in Butula)
year first funded
2007
action
Purchase of Lockers&chairs
output
4o Chairs&Lockers
implementation status
Complete
total cost
Ksh 162,400
estimate
Ksh 162,400

Burinda A.P Line

location
Bujumba (in Butula)
year first funded
2008
action
AP houses Construction
output
Efficient service delivery
implementation status
complete
total cost
Ksh 160,000
estimate
Ksh 0

Uriya – Nyamwanga bridge construction

location
Bujumba (in Butula)
year first funded
2004
action
Bridge construction
output
Ease transport
implementation status
complete
total cost
Ksh 160,000
estimate
Ksh 160,000

Tingolo primary School(3 Classrooms-Roof

location
Marachi East (in Butula)
year first funded
2007
action
Classrooms renovation
output
conducive learning environment
implementation status
on going
total cost
Ksh 150,000
estimate
Ksh 0

Siribo primary School

location
Marachi East (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
On going
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyapera ECD constr. ECD class

location
Marachi East (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Nango primary School const. classroom

location
Bujumba (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Simuli primary School(Latrines)

location
Marachi Central (in Butula)
year first funded
2005
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 150,000
estimate
Ksh 0

Bukhalalire secondary School

location
Marachi Central (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 600,000

Lugulu ac. Primary Schooll classroom(emergency)

location
Lugulu (in Butula)
year first funded
2004
action
Classroom Construction
output
conducive learning environment
implementation status
complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Bwaliro girls secondary School

location
Lugulu (in Butula)
year first funded
2007
action
Kitchen const
output
Provide quality food
implementation status
on going
total cost
Ksh 150,000
estimate
Ksh 0

Musibiriri primary School .Toilets

location
Marachi East (in Butula)
year first funded
2007
action
Construction Toilets
output
conducive learning environment
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Mungab primary School

location
Marachi East (in Butula)
year first funded
2009
action
Latrines const
output
a hyginic institution
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Buduma A. C primary School

location
Marachi East (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Namwitsula primarySchool

location
Bujumba (in Butula)
year first funded
2009
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 150,000
estimate
Ksh 0

Buriya girls secondary School

location
Bujumba (in Butula)
year first funded
2009
action
Classroom
output
conducive learning environment
implementation status
complete
total cost
Ksh 150,000
estimate
Ksh 0

Bukati spring protection of springs

location
Elukhari (in Butula)
year first funded
2004
action
Protect water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 142,000
estimate
Ksh 142,000

Kanjala spring project protection of water spring

location
Elukhari (in Butula)
year first funded
2004
action
Protect water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 142,000
estimate
Ksh 142,000

Mailis ,Nyera & Nundu Water Springs

location
Marachi East (in Butula)
year first funded
2009
action
Protection of water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 50,000

Omondi , Kanjala & Okaya water springs

location
Elukhari (in Butula)
year first funded
2009
action
Protect water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 135,000
estimate
Ksh 90,000

Agola,Magombe & Mukhwaya Water Springs

location
Marachi Central (in Butula)
year first funded
2009
action
Protection of water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 135,000
estimate
Ksh 200,000

Ugaji, Isongo, & Koyugu water springs

location
Bumala (in Butula)
year first funded
2009
action
Shallow well Construction
output
provision of clean water
implementation status
Complete
total cost
Ksh 135,000
estimate
Ksh 0

Igula Primary School

location
Marachi Central (in Butula)
year first funded
2008
action
Drop electricity
output
good standard of living
implementation status
complete
total cost
Ksh 125,000
estimate
Ksh 0

Sirikhaya secondary School.

location
Bujumba (in Butula)
year first funded
2008
action
Drop electricity
output
good standard of living
implementation status
complete
total cost
Ksh 125,000
estimate
Ksh 0

Lugulu A.C. Primary ECD

location
Lugulu (in Butula)
year first funded
2005
action
ECD Classroom Construction
output
high enrolment of children
implementation status
Complete
total cost
Ksh 125,000
estimate
Ksh 125,000

Enakaywa Primary School

location
Lugulu (in Butula)
year first funded
2006
action
Construction of a latrine
output
a hyginic institution
implementation status
Complete
total cost
Ksh 124,550
estimate
Ksh 124,550

Bumala B.secondary School

location
Marachi East (in Butula)
year first funded
2007
action
Construction Toilets
output
conducive learning environment
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 120,000

Esibina primary School(Latrines)

location
Marachi East (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 0

Bukhakhala primarySchool(Latrines)

location
Bumala (in Butula)
year first funded
2008
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 120,000
estimate
Ksh 0

Busibura Primary School

location
Bujumba (in Butula)
year first funded
2009
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 120,000
estimate
Ksh 0

Bukhalalire Dispensary

location
Marachi Central (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 120,000
estimate
Ksh 0

Bwaliro primary School

location
Lugulu (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 120,000
estimate
Ksh 0

Mungambwa primary School(Latrines)

location
Lugulu (in Butula)
year first funded
2007
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 120,000
estimate
Ksh 0

Bukhuma secondary School

location
Lugulu (in Butula)
year first funded
2008
action
Latrines const
output
a hyginic institution
implementation status
complete
total cost
Ksh 120,000
estimate
Ksh 0

Esibembe primary School

location
Lugulu (in Butula)
year first funded
2004
action
ECD Classroom Construction
output
high enrolment of children
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 250,000

Indenga cattle dip rehabilitation – dip

location
Lugulu (in Butula)
year first funded
2004
action
Cattle dip rennovation
output
improved livestock production
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Simuli primary School

location
Marachi Central (in Butula)
year first funded
2006
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 300,000

Elukhari secondary School

location
Elukhari (in Butula)
year first funded
2008
action
Construction of latrines
output
a hyginic institution
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Bumala Police patrol base(Installation of Electricity)

location
Bumala (in Butula)
year first funded
2008
action
Electricity extension
output
Efficient service delivery
implementation status
complete
total cost
Ksh 90,000
estimate
Ksh 0

K'opondo & kamwere Water Spring

location
Bumala (in Butula)
year first funded
2009
action
Protect water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 90,000

Madianyi ,Bumakhudu ,Naminyere Wangaya&Kodongo water spring

location
Lugulu (in Butula)
year first funded
2009
action
Protect water spring
output
provision of clean water
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 90,000

kingandole secondarySchool –Lightening Arrestors

location
Marachi Central (in Butula)
year first funded
2007
action
Inst. Lghtng arrestors
output
Reduced cases of lightening
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Siunga Primary School

location
Marachi Central (in Butula)
year first funded
2005
action
Classroom Construction
output
conducive learning environment
implementation status
Complete
total cost
Ksh 64,000
estimate
Ksh 64,000

Sikarira Dispensary

location
Elukhari (in Butula)
year first funded
2009
action
Drop electricity
output
provision of quality service
implementation status
complete
total cost
Ksh 50,000
estimate
Ksh 0

Bumala police patrol base supply of water(water tank)

location
Bumala (in Butula)
year first funded
2004
action
Purchase of w/tank
output
provision of clean and enough water
implementation status
Complete
total cost
Ksh 40,000
estimate
Ksh 40,000

DC's Office

location
Elukhari (in Butula)
year first funded
2009
action
Fencing
output
Good office security
implementation status
complete
total cost
Ksh 20,000
estimate
Ksh 0

Bwaliro dispensary of provision of water pump

location
Lugulu (in Butula)
year first funded
2004
action
Purchase of water pump
output
provision of clean water
implementation status
Complete
total cost
Ksh 15,000
estimate
Ksh 15,000