It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kadesh Water Project
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2003
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- On-Going
- total cost
- Ksh 3,200,000
- estimate
- Ksh 5,000,000
Githongo Sub Distrcit Hospital
- location
-
Marathi
(in Central Imenti)
- year first funded
- 2004
- action
- Maternity Ward Construction
- output
- Ward Constructed
- implementation status
- OnGoing
- total cost
- Ksh 2,800,000
- estimate
- Ksh 3,500,000
Kiamiogo Water Project
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2003
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- On-Going
- total cost
- Ksh 2,700,000
- estimate
- Ksh 3,000,000
Kanja Water Project
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 2,400,000
- estimate
- Ksh 3,000,000
Thingithu Kauthene W/P
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 2,400,000
- estimate
- Ksh 3,000,000
MuuroOMaugu Bridges
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Culverts Bridges
- output
- Bridge Completed
- implementation status
- Complete
- total cost
- Ksh 2,240,191
- estimate
- Ksh 2,300,000
Tabata Bridge
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Bridge Completed
- implementation status
- Complete
- total cost
- Ksh 1,672,930
- estimate
- Ksh 1,800,000
Gaitu/KarieneGatimbi/Katherii Road
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2004
- action
- Grading & Murraming.
- output
- Road Graded With Murram
- implementation status
- Complete
- total cost
- Ksh 1,667,209
- estimate
- Ksh 1,700,000
Mbwinjeru Day Secondary School
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Laboratory
- output
- Lab Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,400,000
Gathiranga Kathita Bridge
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Bridge Fully Completed
- implementation status
- Complete
- total cost
- Ksh 1,621,700
- estimate
- Ksh 1,700,000
Ntumburi Mutethia Water Project Ngarenar
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Ngarinaro Kiantuntu Water Project
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Mujwa Hydro Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2009
- action
- Construction Of A Micro Hydro Project
- output
- Hydro Project Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,000,000
Ntumburi Day Sec
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Science Room
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
Gakando Girls Secondary School
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Dining Hall
- output
- Dining Hall Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,375,175
- estimate
- Ksh 2,000,000
Mashaka Social Hall
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Social Hall
- output
- Social Hall Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,340,419
- estimate
- Ksh 1,500,000
Mukuune Day Secondary School
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Science Room
- output
- Science Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,800,000
Abothuguchi Boys Secondary School
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 3 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,400,000
Mck Ntumburi Boarding Primary School
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- On-Going
- total cost
- Ksh 1,125,000
- estimate
- Ksh 2,250,000
Kariene Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,800,000
Mboroga Dispensary
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Rooms Constructed
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Ntugi Day Secondary School
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,500,000
Mwanganthia Secondary School
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 3 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 975,000
- estimate
- Ksh 1,600,000
Kariene Day Secondary School
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 3 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 950,000
- estimate
- Ksh 1,600,000
Kiruagu Dispensary
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2004
- action
- Completion Of Out-Patient Rooms
- output
- 2 Rooms Constructed
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
Nchogene /Nkandone W/P
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 900,000
- estimate
- Ksh 1,800,000
Mujwa Gitie Water Project
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 900,000
- estimate
- Ksh 2,200,000
Gachuru Day Secondary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,400,000
Ruibi Day Secondary School
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,500,000
Murangi Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Mucheene Secondary School
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Science Room
- output
- Science Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Gathiranga Day Secondary School
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kimuri Water Project
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Muthangene Day Sec
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
Kianthumbi Day School
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 2,500,000
Kagoji Dispensary
- location
-
Kithirune West
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of OutPatient Rooms
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,600,000
Kaguma Day Secondary School
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
Kithirune Day Secondary School
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,450,000
Nyweri Day Secondary School
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,400,000
Mariene Day Secondary School
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,540,000
Mugambone Day Secondary School
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 1,100,000
Ruiga Boys Secondary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Ruiga Girls Secondary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,800,000
Mujwa /Gathigau W/Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2007
- action
- Storage Tank Construction
- output
- Storage Tank Installed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 4,500,000
Muuti Water Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 560,000
Kaongo Girls Secondary School
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,720,000
Kiagu Kauthene Police Station
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2005
- action
- Residential House & Off. Construction
- output
- Admin Block Constructed
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,400,000
Mukeremi Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Central Abothuguchi Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,250,000
Nkuene Kathai Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,550,000
Kaongo Health Centre
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2005
- action
- Construction of Staff Houses
- output
- Staff House Constructed
- implementation status
- OnGoing
- total cost
- Ksh 700,000
- estimate
- Ksh 2,900,000
Kiija Mutethia Water Project
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 650,000
- estimate
- Ksh 1,200,000
Gatimbi Health Centre
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Waiting Bay
- output
- Waiting Bay Constructed
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Gatuatine Day Secondary School
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ndiiru Dispensary
- location
-
Makandune
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of OutPatient Rooms
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,900,000
Kiamuri Day Secondary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,800,000
Murinya Day Secondary School
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,100,000
Mburugiti Day Secondary School
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Gathiranga Dispensary
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of OutPatient Rooms
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Kinjo South Water Project
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Kinjo North Water Project
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Kinjo Girls Secondary School
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Complex Hall
- output
- Hall Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Kinjo Day Secondary School
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,350,000
Tabata Day Secondary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Gaokene Day Secondary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- 2 Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Muthaga Water Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 550,000
- estimate
- Ksh 1,240,000
KathueneMunyariKiagu Road
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2005
- action
- Grading & Murraming.
- output
- Road Graded With Murram
- implementation status
- Stopped
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
Mukiria Youth Polytechnic
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Rehabilitation Of Classroom
- output
- Room Rehabilitated
- implementation status
- OnGoing
- total cost
- Ksh 517,556
- estimate
- Ksh 600,000
Kimbo Disaster Protection
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2008
- action
- Tree Planting
- output
- Trees Planted
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Meru Central District Hq's
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2007
- action
- Physical Planning Costs
- output
- Physical Plan Completed
- implementation status
- OnGoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kirima Gitauga Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 500,000
- estimate
- Ksh 960,000
Kionyo Kithigachio Water Project
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Meru Central University Katheri
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2007
- action
- Rehabilitation Of Classroom
- output
- 2 Classrooms Completed
- implementation status
- OnGoing
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Mbwinjeru Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 500,000
- estimate
- Ksh 750,000
Ntugu Water Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,300,000
Igane Weru Community W/P
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 450,000
- estimate
- Ksh 800,000
Gatuara Water Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Kathita /Mpuri Water Project
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kirukuru Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Gathiranga Social Hall
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2005
- action
- Hall Construction
- output
- Hall Constructed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Kaki Water Project
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Katheri Secondary School
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of School Biogas
- output
- Biogas Facility Onstalled
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Keeru Secondary School
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Computer Room
- output
- Room Constructed
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Karimunga Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2008
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kirigara Girls Secondary School
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Science Room
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Igane Dispensary
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of OutPatient Rooms
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,200,000
Karaene Day Secondary School
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,100,000
St. Lukes Hospital
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of A Ward
- output
- Ward Constructed
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Gataratare Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 380,000
- estimate
- Ksh 400,000
Nkiriiri Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 363,000
- estimate
- Ksh 860,000
Kienine Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 350,000
- estimate
- Ksh 600,000
Muriinya Social Hall
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Social Hall
- output
- Social Hall Constructed
- implementation status
- OnGoing
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Mariene Primary School
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Mwitethia Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Kibarine Women Water Association
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 550,000
Mpuri Mworoga Water Project
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Kibirichia Police Post
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2005
- action
- Residential House &Office Construction
- output
- Admin Block Constructed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Katheri C
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Admin. Offices
- output
- Admin Block Constructed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Mujwa Police Post
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2005
- action
- Residential House &Office Construction
- output
- Admin Block Constructed
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kariene Do's Headquater
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Admin. Offices
- output
- Admin Block Constructed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Gaitu/Kaguma Police Post
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2005
- action
- Residential House &Office Construction
- output
- Admin Block Constructed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,400,000
Gaikundia Mpindi W/Project
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 8,500,000
Gikuru Mugwankuru W/Project
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Nkunjumo Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 480,000
Kiamuri Polytechnic
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Marurui Millenium Polytechnic
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Gakando Vocational Training Centre
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,100,000
Kibirichia Girls Secondary School
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,500,000
Kibirichia Health Centre
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Male Ward.
- output
- Ward Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kibirichia Boys Secondary School
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,200,000
Richeme Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Murati Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Ruibi Polytechnic
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kimbo Day Secondary School
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kaimenyi Water Project
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Sanaka Water Project
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kithamburu Day Secondary School
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Completed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,200,000
Mwanika Dispensary
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of OutPatient Rooms
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 650,000
Nduruma Dispensary
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Outpatient Rooms
- output
- Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,800,000
Mbwinjeru Dispensary
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Outpatient Rooms
- output
- Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 750,000
Mutethia Kirungurune Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Water Connection Rehabilitated
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Gitene Primary School
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Mugambone Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Gatimbi Do's Office Road
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2004
- action
- Grading & Murraming.
- output
- Road Graded With Murram
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ruiga Dispensary
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of OutPatient Rooms
- output
- 1 Room Contructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Katheju Primary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Contructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Abomuntu Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Kibari Primary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
St. Dispensary
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Outpatient Rooms
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 8,000,000
Thamba /Ngombe Mariara Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Nkando Boys Secondary School
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Gitauga Dispensary
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of OutPatient Rooms
- output
- 1 Room Contructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,600,000
Kirigara Day School
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Science Room
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Kirigara Dispensary
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of OutPatient Rooms
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Gatune Polytechnic
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kiandatu Kitheo W/Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Mutethia Gituri Water Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kinoru Kathuathua W/Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Karingene Day Secondary School
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
Kieni Primary School
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Kiija Health Centre
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2005
- action
- Construction Of OutPatient Rooms
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Gitie Polytechnic
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2007
- action
- Rehabilitation Of Classroom
- output
- 4 Classes Rehabilitated
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Ciontare Water Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Karaene Water Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 650,000
Giatune Day Secondary School
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 850,000
Ngonga Primary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Gikuru Primary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Nkuene Holy Family Day Secondary School
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- On-Going
- total cost
- Ksh 174,825
- estimate
- Ksh 400,000
Mpindi Primary School
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 151,500
- estimate
- Ksh 900,000
Thigi Adult Education Comlrentre
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Gate
- output
- Gate Constructed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ciontere Water Project
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Water Connection Rehabilitated
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ntharagwene Water Project
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2007
- action
- Intake Construction
- output
- Water Intake Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Kijijone Primary School
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Kamenya Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Kathathene Primary School
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Giatune Kirwiro W/Project
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Kathathene Primary School
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 800,000
Koorone Murungurune Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2007
- action
- Storage Tank Construction
- output
- Storage Tank Installed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 750,000
Giatune Primary School
- location
-
Nduruma
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Kiamuri Primary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 700,000
Gachuru Primary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Kathwene Primary School
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Kongoacheke Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Mukondo Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Mwitethia Gaitune Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Central Mariene Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 750,000
Mirigu Mwichwiri Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kainyu Water Project
- location
-
Mariene
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 900,000
Gakiama Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Kathunguri Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Kigongo Youth Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 700,000
Mukika Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,200,000
Ntimene Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Rwamuti Water Project
- location
-
Gatimbi
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 560,000
Green Valley Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 960,000
Kiamukui Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 8,000,000
Ntugune Water Project
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Water Connection Rehabilitated
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kienywa Water Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2006
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Tangaru Water Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 650,000
Mukuune Water Project
- location
-
Mwangathia
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 750,000
Gitie/Muguna Water Project
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Mathithio Ja Kiao Home
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of Dormitory
- output
- Dormitory Constructed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Mukuune Water Project
- location
-
Kiija
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Ntumburi Dispensary
- location
-
Ntumburi
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of OutPatient Rooms
- output
- Classrooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
Kambabu Water Project
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2004
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- Stopped
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kamarai /Kamuranpa Water Project
- location
-
Kiamiogo
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Mwiguni Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kiriko Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2005
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kimbo Dispensary
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2007
- action
- Construction Of OutPatient Rooms
- output
- Rooms Constructed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Muuru Water Project
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Mikurwene Water Project
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Mwereru Water Project
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Kijijone Maji Water Project
- location
-
Katheri West
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kathita Munyi Water Project
- location
-
Katheri Central
(in Central Imenti)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Piping Rehabilitated
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kinjo Dispensary
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2007
- action
- Completion Of OutPatient Rooms
- output
- 1 Room Constructed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,800,000
Kinjo A Line
- location
-
Katheri East
(in Central Imenti)
- year first funded
- 2007
- action
- Residential House &Office Construction
- output
- Admin Block Constructed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 2,300,000
Gitega Water Project
- location
-
Kithirune East
(in Central Imenti)
- year first funded
- 2007
- action
- Buying Pipes
- output
- Pipes Procured And Installed
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kiagu Youth Sports Club
- location
-
Kiagu
(in Central Imenti)
- year first funded
- 2008
- action
- Sports Tournamnet
- output
- Tournament Held
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kariene Youth Sports Club
- location
-
Kariene
(in Central Imenti)
- year first funded
- 2008
- action
- Sports Tournament
- output
- Tournament Held
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kimbo Youth Sports Club
- location
-
Kibirichia
(in Central Imenti)
- year first funded
- 2008
- action
- Sports Tournamnet
- output
- Tournament Held
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Ntugi Sports Club
- location
-
Ntugi
(in Central Imenti)
- year first funded
- 2008
- action
- Sports Tournamnet
- output
- Tournament Held
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000