The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Changamwe

Kajembe Secondary School

location
Mikindani (in Changamwe)
year first funded
2003
action
Construction Of 2 Labs, Class Rooms, Toilets, Offices, An Ark, Perimeter Wall & Purchase Of Furniture,
output
Better Education Facilities.
implementation status
Complete And In Use
total cost
Ksh 20,700,000
estimate
Ksh 35,000,000

Bursary Fund

location
Changamwe (in Changamwe)
year first funded
2006
action
Assistance To Needy Students In The Constituency
output
-
implementation status
Ongoing
total cost
Ksh 16,263,116
estimate
Ksh 0

Supply Of Floodlights In The Constituency

location
Changamwe (in Changamwe)
year first funded
2006
action
Put 3 Poles Of Floodlights
output
Lit Dark Areas
implementation status
Complete And In Use
total cost
Ksh 8,700,000
estimate
Ksh 0

Kajembe Secondary School

location
Mikindani (in Changamwe)
year first funded
2007
action
Construction Of Multipurpose Hall
output
Better Educational Facilities
implementation status
Top Slab
total cost
Ksh 8,700,000
estimate
Ksh 5,000,000

Assistance To Tudor, Khamisi, Baptist, Changamwe, St Charles Lwanga & Miritini Secondary School s

location
Tudor (in Changamwe)
year first funded
2005
action
1 Classroom Construction For Each School
output
Better Education Facilities
implementation status
Complete And In Use
total cost
Ksh 6,000,000
estimate
Ksh 6,000,000

Proposed Construction Of Mrkt At Chaani

location
Kipevu (in Changamwe)
year first funded
2006
action
Construction Of A Market
output
Availability Of Clean Market Facilities
implementation status
Ongoing
total cost
Ksh 5,000,000
estimate
Ksh 420,000,000

Electricity

location
Changamwe (in Changamwe)
year first funded
2009
action
Supply Of Electricity Poles At Kwa Shee, Ganahola, Mwakidemu, Airport,Jomvu Kuu, Jomvu Misheni, Mtaa Wa Swahili, Chamunyu Road, Magongo Market, Chaani Market, Changamwe Market, Miritini Health Centre, Bokole Health Centre And Jitengeni
output
Lit Dark Areas
implementation status
Tendering
total cost
Ksh 4,650,000
estimate
Ksh 6,000,000

Tudor Social Hall

location
Tudor (in Changamwe)
year first funded
2009
action
Construction Of A Social Hall
output
A Gathering Place For Social Cultural Activities
implementation status
Tendering
total cost
Ksh 4,050,000
estimate
Ksh 6,000,000

Construction Of Mwidani Social Hall

location
Portreitz (in Changamwe)
year first funded
2007
action
Hall Construction
output
A Gathering Place For Social Cultural Activities
implementation status
Complete
total cost
Ksh 4,000,000
estimate
Ksh 4,500,000

Construction Of A Social Hall At National Housing

location
Changamwe (in Changamwe)
year first funded
2008
action
Hall Construction
output
A Gathering Place For Social Cultural Activities
implementation status
Tendering
total cost
Ksh 4,000,000
estimate
Ksh 6,000,000

Market At Changamwe

location
Changamwe (in Changamwe)
year first funded
2005
action
Construction Of A Public Market Grill Gates Construction
output
Availability/ Of Clean Market Facilities.
implementation status
Complete And Not In Use
total cost
Ksh 3,772,639
estimate
Ksh 3,272,639

St. Marys Bangladesh

location
Mikindani (in Changamwe)
year first funded
2007
action
Construction Of Classrooms
output
Better Educational Facilities
implementation status
Ongoing
total cost
Ksh 3,500,000
estimate
Ksh 3,000,000

Streets Light Supply In The Constituency

location
Changamwe (in Changamwe)
year first funded
2007
action
Fixing Electric Poles
output
Power Supply
implementation status
Complete And In Use
total cost
Ksh 3,200,000
estimate
Ksh 3,500,000

Bokole Health Centre

location
Bokole (in Changamwe)
year first funded
2004
action
Construction Of A Health Centre
output
Improved Health Facilities
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 4,200,000

Miritini Health Centre

location
Miritini (in Changamwe)
year first funded
2004
action
Construction Of A Health Centre.
output
Improved Health Facilities
implementation status
On-Going
total cost
Ksh 3,000,000
estimate
Ksh 4,200,000

Potreitz Medical Training College

location
Portreitz (in Changamwe)
year first funded
2008
action
Construction Of 2 Special Classrooms
output
Increase Intake Especially For The Qualified Residents Of Changamwe Constituency
implementation status
Classrooms' Contruction In Progress
total cost
Ksh 3,000,000
estimate
Ksh 3,500,000

Mombasa Polytechnic Generator

location
Tudor (in Changamwe)
year first funded
2005
action
Purchase Of A Generator
output
Longer Learning Hrs For Students
implementation status
Complete And In Use
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Recurrent Expenses

location
Changamwe (in Changamwe)
year first funded
2008
action
Maintenance Of Office Equipment
output
Better Working Condition For The Office
implementation status
Ongoing
total cost
Ksh 2,507,128
estimate
Ksh 0

Storm Water Drains At Wayani

location
Portreitz Wayani (in Changamwe)
year first funded
2006
action
Construction Of Drainage Systems
output
To Prevent Floods
implementation status
Complete And In Use
total cost
Ksh 2,500,000
estimate
Ksh 4,000,000

Stlwanga Secondary School s Bus

location
Changamwe (in Changamwe)
year first funded
2008
action
To Purchase School Bus
output
Assists Teachers & Students During Educational Tours
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Kajembe Secondary School s Bus

location
Mikindani (in Changamwe)
year first funded
2008
action
To Purchase School Bus
output
Assists Teachers & Students During Educational Tours
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Miritini Secondary School s Bus

location
Miritini (in Changamwe)
year first funded
2008
action
To Purchase School Bus
output
Assists Teachers & Students During Educational Tours
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Changamwe Secondary School

location
Changamwe (in Changamwe)
year first funded
2008
action
To Purchase School Bus
output
Assists Teachers & Students During Educational Tours
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 5,000,000

Equipments For Miritini Health Centre

location
Miritini (in Changamwe)
year first funded
2007
action
Equipping Health Facilities And Digging Placenta Pit And Incinerator
output
Better Health Facilities
implementation status
10Metre By 7.5 Metres? Septic Tank Dug, Ceiling, Power Fixation And Water Metre In Progress Soak Pit Dug, Equipped With Furniture
total cost
Ksh 2,188,602
estimate
Ksh 2,000,000

Equipments For Miritini Health Centre

location
Miritini (in Changamwe)
year first funded
2007
action
Equipping Health Facilities And Digging Placenta Pit And Incinerator
output
Better Health Facilities
implementation status
10Metre By 7.5 Metres? Septic Tank Dug, Ceiling, Power Fixation And Water Metre In Progress Soak Pit Dug, Equipped With Furniture
total cost
Ksh 2,188,602
estimate
Ksh 2,000,000

School's Fence At Amani Primary School

location
Mikindani (in Changamwe)
year first funded
2007
action
Fencing The School With Perimeter Wall
output
Conducive Learning Environment
implementation status
Ongoing 150 Meters By 2.1 Meters Wall Constructed
total cost
Ksh 2,000,000
estimate
Ksh 1,000,000

Kajembe Secondary School

location
Mikindani (in Changamwe)
year first funded
2005
action
Purchase Of Furniture
output
Creation Of A Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Road Barriers

location
Mikindani (in Changamwe)
year first funded
2009
action
Construction Of Four Barriers To Protect Heavy Commercial Vehicles From Destroying The Town Plan
output
Maintain The Roads
implementation status
Tendering
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Mreroni School

location
Miritini (in Changamwe)
year first funded
2008
action
2 Classrooms Construction
output
Better Educational Facilities
implementation status
Tendering
total cost
Ksh 2,000,000
estimate
Ksh 1,000,000

Streets Lights Supply Bangladesh

location
Mikindani (in Changamwe)
year first funded
2008
action
n/a
output
Lit Dark Areas
implementation status
Tendering
total cost
Ksh 1,814,031
estimate
Ksh 1,200,000

Sports Activities

location
Changamwe (in Changamwe)
year first funded
2008
action
Purchase Of Balls And Other Sports Facilities, Repairing Sports Facilities And Sports Trucks
output
Better Working Environment & Sports Facilities For The Constituency Sports Teams
implementation status
Ongoing
total cost
Ksh 1,728,291
estimate
Ksh 0

Environmental Activities

location
Changamwe (in Changamwe)
year first funded
2008
action
Sensitization Workshop On Maintaining Good Environment
output
-
implementation status
Cleaning Sewarage System At Bokole And Changamwe Estate ,Planting Trees At Mikindani Primary, Jomvu Kuu Primary
total cost
Ksh 1,728,291
estimate
Ksh 0

Lab Equipments For Kajembe Secondary School

location
Mikindani (in Changamwe)
year first funded
2005
action
Equipping Of School Lab With Furniture & Other Experimental Materials
output
Conducive Environment For The Students When Doing Their Practical Sessions
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Marycliff Primary School

location
Tudor (in Changamwe)
year first funded
2006
action
SchoolS Renovation
output
Better Educational Facilities.
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Building A Centre For Women Development

location
Changamwe (in Changamwe)
year first funded
2004
action
Construction Of A Centre For Women
output
Meeting Place For Women
implementation status
Complete And In Use
total cost
Ksh 1,239,497
estimate
Ksh 1,500,000

Tudor Social Hall Rehabilitation

location
Tudor (in Changamwe)
year first funded
2006
action
Renovation Of The Hall & Toilets
output
Better Social Facilities
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Kajembe Secondary School

location
Mikindani (in Changamwe)
year first funded
2004
action
Provision Of School'S Furniture & Computers
output
Better Learning Facilities
implementation status
Complete And In Use
total cost
Ksh 1,026,667
estimate
Ksh 0

Generator For Potreitz Hospital

location
Portreitz (in Changamwe)
year first funded
2009
action
Power Back For Kepi Store
output
Better Facility For The Hospital
implementation status
Tendering
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Akamba Handcraft

location
Changamwe (in Changamwe)
year first funded
2004
action
Renovation Of Akamba Handcraft Centres
output
Better Working Facility To Community
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Ziwani School For The Deaf

location
Mikindani (in Changamwe)
year first funded
2005
action
Construction Of One Classroom
output
Better Education Facilities
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Staugustine Primary School Roof Renovation

location
Tudor (in Changamwe)
year first funded
2005
action
RoofingS Renovation
output
Better Education Facilities
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,051,627

Girls Hostel At Mikindani Teachers Training College

location
Mikindani (in Changamwe)
year first funded
2005
action
Construction Of Girls Hostel
output
Better Educational Facilities
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mikindani Primary School

location
Mikindani (in Changamwe)
year first funded
2006
action
Construction Of One Classroom
output
Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 100,000,000

Miritini Primary School

location
Miritini (in Changamwe)
year first funded
2006
action
Construction Of One Classroom
output
Better Learning Facilities
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ziwani School For The Deaf

location
Tudor (in Changamwe)
year first funded
2006
action
Construction Of One Classroom
output
Better Educational Fcilities?
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 110,000,000

Mikanjuni Maternity

location
Jomvu Kuu (in Changamwe)
year first funded
2008
action
Construction Of Examination, Antenatal & ChildrenS Welfare Room, Placenta Pit, Incinerator, Kitchen/Laundry,Drying Lines & Pit Latrines
output
Better Health Facilities
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 15,000,000

Tudor Primary School

location
Tudor (in Changamwe)
year first funded
2007
action
Changed From Classroom Construction To School Renovation
output
Better Educational Facilities
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mwijabu Primary School

location
Portreitz (in Changamwe)
year first funded
2007
action
Construction Of 1 Classroom
output
Better Educational Facilities
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Changamwe Adventist School

location
Changamwe (in Changamwe)
year first funded
2007
action
Construction Of 1 Classroom
output
Better Educational Facilities
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ward Construction At Portreitz District Hospital

location
Portreitz (in Changamwe)
year first funded
2007
action
Ward Construction
output
Better Health Facilities
implementation status
Complete But Not In Use Awaits Power Back Up
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Changamwe Secondary School

location
Changamwe (in Changamwe)
year first funded
2009
action
Classroom Construction
output
Better Educational Facilities
implementation status
Tendering
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Chiefs Office At Mikindani

location
Mikindani (in Changamwe)
year first funded
2009
action
Constructing A Chief'S Oofice
output
Better Services To The Community And Good Working Environment For The Administartion
implementation status
Tendering
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Furniture Supply At Kwashee Social Hall

location
Mikindani (in Changamwe)
year first funded
2007
action
Equipping The Hall With Furniture
output
A Conducive Social Place
implementation status
Complete & In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Social Hall At Kwashee

location
Mikindani (in Changamwe)
year first funded
2008
action
Hall Construction
output
Gathering For Cultural Activities / Meetings For The Community
implementation status
Complete And In Use
total cost
Ksh 530,345
estimate
Ksh 5,000,000

Staffroom S Construction At Miritini Primary School

location
Miritini (in Changamwe)
year first funded
2007
action
Construction Of A Staffroom
output
Better Educational Facilities
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Boreholes At Tudor Estate

location
Tudor (in Changamwe)
year first funded
2004
action
Boreholes Construction
output
Availability Of Clean Water
implementation status
Complete And One In Use.
total cost
Ksh 500,000
estimate
Ksh 550,000

Buying Plot For Bokole Health Centre

location
Bokole (in Changamwe)
year first funded
2004
action
Purchase Of Lamd For Health Centre
output
Health Centre For The Community
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Boreholes In Tudor Location

location
Tudor (in Changamwe)
year first funded
2003
action
Drilling Borehole
output
Provision Of Clean Drinking Water
implementation status
Re-Tendering
total cost
Ksh 500,000
estimate
Ksh 500,000

Electricity Supply At Chamunyu

location
Miritini (in Changamwe)
year first funded
2007
action
Fixing Electric Poles
output
Power Supply
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 700,000

Construction Of Public Toilets At Tudor Estate

location
Tudor (in Changamwe)
year first funded
2007
action
Toilets Construction
output
Better Health Facilities
implementation status
To Start Soon
total cost
Ksh 450,000
estimate
Ksh 500,000

Construction Of A Well At Kwashee

location
Mikindani (in Changamwe)
year first funded
2008
action
Drilling Of A Well
output
Availability Of Water
implementation status
Tendering
total cost
Ksh 400,000
estimate
Ksh 500,000

Gorofani Estate

location
Tudor (in Changamwe)
year first funded
2009
action
Digging And Constructing A Well
output
Availability Of Water
implementation status
Tendering
total cost
Ksh 400,000
estimate
Ksh 400,000

Miritini Health Centre

location
Miritini (in Changamwe)
year first funded
2009
action
Digging And Constructing A Well
output
Availability Of Water
implementation status
Tendering
total cost
Ksh 400,000
estimate
Ksh 400,000

Drilling Of A Well At Chaani Primary School

location
Kipevu (in Changamwe)
year first funded
2008
action
Drilling Of A Well
output
Availability Of Water
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 500,000

Construction Of A Well At Tudor Health Centre

location
Tudor (in Changamwe)
year first funded
2008
action
Drilling Of A Well
output
Availability Of Water
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 450,000

Construction Of Public Toilets At Changamwe Estate

location
Changamwe (in Changamwe)
year first funded
2007
action
Toilets Construction
output
Better Health Facilities
implementation status
Tendering Process
total cost
Ksh 400,000
estimate
Ksh 400,000

Assistance To Community Schools Mreroni, Miliman

location
Miritini (in Changamwe)
year first funded
2003
action
Rehabilitation Of Community School
output
Better Learning Environment
implementation status
Complete And In Use
total cost
Ksh 320,000
estimate
Ksh 40,000,000

Well At Kiziwi

location
Tudor (in Changamwe)
year first funded
2005
action
Construction Of A Well
output
Provision Of Clean Water To The Community
implementation status
Complete And In Use
total cost
Ksh 300,483
estimate
Ksh 350,000

Renovation Of Chiefs Office In Tudor

location
Tudor (in Changamwe)
year first funded
2005
action
Renovation Of Chiefs Office
output
Better Service/Improved Security
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Renovation Of Disability Awareness Development & Reliefs Building

location
Portreitz (in Changamwe)
year first funded
2008
action
Renovation Of The Building
output
-
implementation status
Tendering
total cost
Ksh 300,000
estimate
Ksh 350,000

Wells Construction At Spaki Primary School

location
Tudor (in Changamwe)
year first funded
2007
action
Drilling Of A Well
output
Availability Of Clean Water
implementation status
6 Classrooms Renovated
total cost
Ksh 300,000
estimate
Ksh 350,000

Wells Construction At Mreroni Primary School

location
Miritini (in Changamwe)
year first funded
2007
action
Drilling Of A Well
output
Availability Of Clean Water
implementation status
Well Drilling On The Process
total cost
Ksh 300,000
estimate
Ksh 350,000

Wells Construction At Umoja Primary School

location
Kipevu (in Changamwe)
year first funded
2007
action
Drilling Of A Well
output
Availability Of Clean Water
implementation status
Complete But No Water
total cost
Ksh 300,000
estimate
Ksh 350,000

Wells Construction At Charles Luanga Primary School

location
Changamwe (in Changamwe)
year first funded
2007
action
Drilling Of A Well
output
Availability Of Clean Water
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 350,000

School Desks For Kipevu

location
Kipevu (in Changamwe)
year first funded
2006
action
Purchase Of Desks
output
Better Educational Facilities.
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

School Desks For Magongo Primary School

location
Changamwe (in Changamwe)
year first funded
2006
action
Purchase Of Desks
output
Better Educational Facilities.
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Msikiti Noor St Light

location
Changamwe (in Changamwe)
year first funded
2005
action
n/a
output
Lit Dark Streets
implementation status
Tendering
total cost
Ksh 300,000
estimate
Ksh 50,000,000

Water Project

location
Portreitz Wayani (in Changamwe)
year first funded
2006
action
Extension Of Pipes
output
Availability Of Clean Water
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 30,000,000

Borehole At Kipevu Primary School

location
Kipevu (in Changamwe)
year first funded
2005
action
Borehole Drilling
output
Provision Of Clean Drinking Water
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Borehole In Miritinimwamla

location
Miritini (in Changamwe)
year first funded
2003
action
Drilling Borehole
output
Provision Of Clean Drinking Water
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 300,000

Chaani Primary School

location
Kipevu (in Changamwe)
year first funded
2009
action
Supply Of School'S Desks
output
Beeter Educational Facilities
implementation status
Tendering
total cost
Ksh 250,000
estimate
Ksh 300,000

Stary's Primary School

location
Mikindani (in Changamwe)
year first funded
2009
action
Supply Of Chairs And Tables
output
Better Educational Facilities
implementation status
Tendering
total cost
Ksh 250,000
estimate
Ksh 300,000

Water Project In Portreitz

location
Portreitz (in Changamwe)
year first funded
2003
action
Laying Of Pipes To Get Fresh Water
output
Provision Of Clean Drinking Water
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 500,000

Borehole In Changamwe

location
Changamwe (in Changamwe)
year first funded
2003
action
Drilling Borehole
output
Provision Of Clean Drinking Water
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 300,000

Boreholes Completion At Mikadini Primary School

location
Kipevu (in Changamwe)
year first funded
2007
action
Borehole Drilling Construction
output
Availability Of Clean Water
implementation status
Complete But No Water
total cost
Ksh 200,000
estimate
Ksh 250,000

Toilets Renovation At Changamwe Estate Market

location
Changamwe (in Changamwe)
year first funded
2008
action
Toilets Renovation
output
Better Health Facilities
implementation status
Tendering
total cost
Ksh 200,000
estimate
Ksh 250,000

Tudor Day Secondary School

location
Tudor (in Changamwe)
year first funded
2009
action
Assistance To The School To Enable Them Re- Posses Their School Bus
output
Assists Teachers & Students During Educational Tours
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Khamis Secondary School

location
Tudor (in Changamwe)
year first funded
2009
action
Assistance To The School To Enable Them Re- Posses Their School Bus
output
A School Bus For Educational Tours
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 800,000

Ganahola Water Project

location
Mikindani (in Changamwe)
year first funded
2005
action
Pipes Laying
output
Availability Of Clean Water
implementation status
Tendering
total cost
Ksh 150,000
estimate
Ksh 20,000,000

Burhaniya Primary School

location
Tudor (in Changamwe)
year first funded
2009
action
Installation Of Grill Doors And Windows
output
A Secured Computer Classroom
implementation status
Tendering
total cost
Ksh 100,000
estimate
Ksh 100,000

Equipment For Blind People In Changamwe

location
Changamwe (in Changamwe)
year first funded
2005
action
n/a
output
To Assist Blind People
implementation status
Complete And In Use
total cost
Ksh 84,348
estimate
Ksh 100,000