The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kiboit Water Dam
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2005
- action
- Excavation Of The Dam, Construction Of Cattle Troughs
- output
- Dam
- implementation status
- Not Yet Started
- total cost
- Ksh 2,813,984
- estimate
- Ksh 0
Siongiroi
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Building Of Food Stores
- output
- Food Stores
- implementation status
- not known
- total cost
- Ksh 2,059,000
- estimate
- Ksh 0
Constituency Construction
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Constituency Office
- output
- Constituency/ Cdf Office
- implementation status
- Not Yet Started
- total cost
- Ksh 2,040,000
- estimate
- Ksh 0
Sigor
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2007
- action
- Building Of Food Stores
- output
- Food Stores
- implementation status
- not known
- total cost
- Ksh 2,009,027
- estimate
- Ksh 0
Sigor Secondary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of Textbooks And School Bus
- output
- Textbooks And School Bus
- implementation status
- Textbooks & School Bus Purchased
- total cost
- Ksh 1,950,000
- estimate
- Ksh 0
Olbutyo Secondary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of School Bus,Text Books & Construction Of Staff Toilets
- output
- School Bus, Textbooks And Staff Toilets
- implementation status
- Textbooks Purchased, Staff Toilets Completed, Purchase Of School Bus Partnered With School Ongoing
- total cost
- Ksh 1,880,000
- estimate
- Ksh 0
Kamaget Secondary School
- location
-
Kamaget
(in Chepalungu)
- year first funded
- 2004
- action
- n/a
- output
- Textbooks,Lockers&Chairs And A Classroom
- implementation status
- Textbooks, Lockers &Chairs Purchased ,Classroom Ongoing
- total cost
- Ksh 1,850,000
- estimate
- Ksh 0
Kipkeikei Secondary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Purchase Of Textbooks Lockers/ Chairs/Construction Of Classroom
- output
- Textbooks,Lockers&Chairs And Classroom
- implementation status
- Textbooks ,Lockers &Chairs Purchased, Construction Of A Classroom Ongoing.
- total cost
- Ksh 1,850,000
- estimate
- Ksh 0
Sugurmega Secondary School
- location
-
Sugurmega
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of A Classroom & A Lab
- output
- A Classroom And Lab Equipments
- implementation status
- Ongoing
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Karap Naemi Bridge
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2005
- action
- Foot Bridge Construction
- output
- Fully Passable Foot Bridge
- implementation status
- Ongoing
- total cost
- Ksh 1,716,000
- estimate
- Ksh 0
Chepkosa Secondary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of Textbooks, Construction Of Kitchen, Boys Dormitory And Girls Dormitory
- output
- Textbooks, Kitchen ,Boys Dormitory And Girls Dormitory
- implementation status
- Textbooks Purchased, Kitchen Completed , Boys And Girls Dormitory Ongoing
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Makimeny Dispensary
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Dispensary Block
- output
- Dispensary Block
- implementation status
- Ongoing
- total cost
- Ksh 1,550,000
- estimate
- Ksh 0
Kimenderit Road
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kiriba Day Secondary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2004
- action
- Purchase Of Text Books & Lockers/Chairs /Construction Of Classroom & Lab Equip
- output
- Textbooks ,Lockers/Chairs, Lab Equipments, A Classroom
- implementation status
- Construction On Going ,Text Books, Lockers, Chairs & Lab Equip Purchased
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kapkesosio Secondary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Textbooks, Computers Lab, Construction Of Girls Dorm, Library/Store
- output
- Textbooks, Girls Dorm
- implementation status
- Books Purchased Construction Of Dorm & Completion Of Lab Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Chepwostuiyet Sec
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2003
- action
- Classroom And Lab Fittings And Fixing And Purchase Of Lab App.
- output
- Classroom And Lab Fittings
- implementation status
- Lab Fitting Purchased And Classroom Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kapoleseroi Sec
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of Generator,Text Books & Construction Of Dormitory
- output
- Generator, Textbooks, Dormitory
- implementation status
- Generator Purchased, Dormitory Ongoing
- total cost
- Ksh 1,460,000
- estimate
- Ksh 0
Mengwet Sec
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of Lab Equip And Construction Of Boys Dorm
- output
- Lab & Dormitory
- implementation status
- Lab. Equip, Text Books. Purchase Dormitory On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Chebunyo Secondary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Lab, Purchase Of Lab Equip,Text Books & Construction Of Library.
- output
- Lab, Text Books And Library
- implementation status
- Text Books, Lab Equip Purchased, Library Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kaboson Gsec
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2003
- action
- n/a
- output
- Admnistration Block
- implementation status
- Construction On Going ,Text Books, Lockers, Chairs & Lab Equip Purchased
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Lugumek Sec
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2003
- action
- Construction And Fixing Of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Makimeny Sec
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- n/a
- output
- Boys Dorm & Lab Equipments
- implementation status
- Boys Dorm Ongoing & Lab Equip Purchased
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Siongiroi Health Centre
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Maternity Wing & Staff Quarters
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kipsuter Sec
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Kitchen, Boys Dormitory & Purchase Of Text Books.
- output
- Kitchen, Dormitory & Text Books
- implementation status
- Boys Dorm Ongoing , Kitchen Completed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Mogor Secondary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of Generator And Text.Construction Of Library.
- output
- Generator, Text And Library
- implementation status
- Text And Generator Purchased, Library Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Sigor Water Extension
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2006
- action
- Extension Of Water Lines To The Community
- output
- Waterlines
- implementation status
- Not Yet Started
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Moi Gsiongiroi
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Science Lab, Purchase Of Lab Apparatus & Text Books
- output
- Lab & Lab Apparatus
- implementation status
- Lab Construction & Purchase Of Apparatus Completed
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Chebunyo Health Centre
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Maternity Wing
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Kapkesosio Dispensary
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Staff Quarter & Maternity Wing
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Tilangok Dispensary
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Dispensary Block
- output
- Dispensary Block
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Cheboyo Dispensary
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of Maternity Ward And Casualty Room
- output
- Maternity Ward
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Chepwostuiyet Water Projectda
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2006
- action
- Excavation Of The Dam, Construction Of Cattle Troughs And Fencing
- output
- A Fence And Water Reservoir
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Marangetit Water Dam
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2006
- action
- Dam Construction & Land Purchase Extension
- output
- Dam & Land
- implementation status
- Almost Complete
- total cost
- Ksh 1,120,000
- estimate
- Ksh 0
Kamongil Dispensary
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Water Preservation & Staff Quarters
- output
- Staff Houses And Water Tank
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kipsuter Dispensary
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Maternity Wing & Staff Quarters
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Lelaitich Sec
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 1 Complete, 1 Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kapkulumben Secondary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2005
- action
- Construction Of Classrooms Textbooks,Lockers&Chairs
- output
- Textbooks,Lockers&Chairs And A Classroom
- implementation status
- Textbooks, Lockers &Chairs Purchased ,Classroom Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Sugumerga Dispensary
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2005
- action
- Completion Of Maternity Ward. And Toilets
- output
- Maternity Ward And Staff Toilets
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Tumoi Secondary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of A New dining Hall
- output
- Dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 1,030,000
- estimate
- Ksh 0
Sigor Financial Services
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2005
- action
- Completion Of Office And Purchase Of Equipments
- output
- Completed Office To Offer Soft Loans To The Youths
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mismis Dam
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2006
- action
- Excavation Of The Dam, Construction Of Cattle Troughs
- output
- Dam
- implementation status
- Not Yet Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Women & Youth
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Youth Centre
- output
- A Youth Centre
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chelelach Dispensary
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Dispensary And Staff Houses
- output
- Dispensary Block And Staff Houses.
- implementation status
- Ongoing
- total cost
- Ksh 972,566
- estimate
- Ksh 0
Kaptebengwa Mismis Cattle Dip
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2006
- action
- Roofing, Fencing And Finishing Of The Dip
- output
- Completed Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 970,000
- estimate
- Ksh 0
Olbutyo Health Centre
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Maternity Wing & Purchase Of Lab Equipment
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Chebunyo - Kataret
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Grading & Gravelling
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 870,972
- estimate
- Ksh 0
Ndamichonik Cattle Dip
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2006
- action
- Construction Of A New Dip
- output
- A Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kamogiboi Water Dam
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2005
- action
- Desilting And Repair Of Dam
- output
- A Dam Serviced
- implementation status
- Completed
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Ndamichonik Dispensary
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Staff Quarters And Maternity Wing
- output
- Staff Quarters And Maternity Wing.
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Bingwa Dispensary
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2005
- action
- Completion Of Dispensary/Electrification
- output
- Dispensary Block With Lighting System
- implementation status
- Almost Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Tumoi Secondary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2005
- action
- Construction Of Classroom, Book Purchase, Lab Equipments Purchase
- output
- Classroom, Books & Lab Equipment
- implementation status
- Construction On Going Books Purchased, Lab Equipment Purchased
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kaboson Day Sec
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2005
- action
- n/a
- output
- Text Books, Lockers & Chairs And Classroom
- implementation status
- Textbooks, Lockers & Chairs Purchased Classroom On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Lugumek Dispensary
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Maternity Wing
- output
- It Reduces Mortality Rate
- implementation status
- Completed
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kamosiro - Kaboson Rural Access Road
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2008
- action
- Graveling & Road Repair
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 746,775
- estimate
- Ksh 0
Kataret Dispensary
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of Dispensary/Electrification
- output
- Dispensary Block With Lighting System
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kabisimba Community Dispensary
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of Health Facility
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Ngenenet Bridge Kopmus
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Building Of A New Bridge
- output
- A Bridge
- implementation status
- Ongoing
- total cost
- Ksh 670,000
- estimate
- Ksh 0
Tumoi Commdispensary
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Dispensary Block
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 660,000
- estimate
- Ksh 0
Kataret Siroriondo Cattle Dip
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Cattle Dip
- output
- Cattle Dip
- implementation status
- Purchased
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Chepwostuiyet Dispensary
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Dispensary /Maternity Wing / Staff Houses
- output
- Health Facility
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Mogor-Cheboyo Raod
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kelichek Cattle Dip
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2006
- action
- Construction Of A New Dip & Completion Of Water Trough
- output
- A Cattle Dip And Water Trough
- implementation status
- Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 0
Tumoi Secondary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of Teachers Houses.
- output
- Teachers? Houses.
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kapoleseroi Dispensary
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Dispensary
- output
- Dispensary Block
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Itembe Dispensary
- location
-
Itembe
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Dispensary
- output
- Dispensary Block
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Chebanyiny Secondary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kapkesosio - Tebeswet
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Spot Gravelling & Grading
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 562,000
- estimate
- Ksh 0
Chemaetany Secondary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of New Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 540,000
- estimate
- Ksh 0
Chemaetany Secondary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 540,000
- estimate
- Ksh 0
Tumoi Dispensary
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Staff Houses
- output
- Staff Houses
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Olbutyo Fsa
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2005
- action
- Completion Of Office And Purchase Of Equipments
- output
- Completed Office To Offer Soft Loans To The Youths
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chebaraa Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classes And Installation Of Electricity
- output
- A Classroom With Electricity
- implementation status
- Purchased
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lugumek Secondary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of A Classroom
- output
- A Classroom
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sigor Sub District Hosp
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2005
- action
- Construction Of Health Facility
- output
- It Reduces Mortality Rate
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Cheponjirai Primary School
- location
-
Kamaget
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classrooms Land Purchase
- output
- Land And Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chepkorgong Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Tumoi Secondary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2007
- action
- Dormitory Construction
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Borut Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2006
- action
- Purchase Of School Land And Construction Of Classroom
- output
- A School Land And Classroom
- implementation status
- Land Purchased, Classroom Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kibereisit Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Koimiret Secondary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of One Class
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Tumoi Sec, School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Dormitory
- output
- Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Tulon Ltdchebunyo -Chebaraa Roa
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Graveling & Road Repair
- output
- Road
- implementation status
- Incomplete
- total cost
- Ksh 420,000
- estimate
- Ksh 0
Kipsirat Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2005
- action
- Construction Of A Classroom And Purchase Of Water Tank
- output
- A Classroom And Water Tank
- implementation status
- Complete
- total cost
- Ksh 410,000
- estimate
- Ksh 0
Cheleget Primary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms & Purchase Of Land
- output
- Classroom & School Land
- implementation status
- 1 Complete
- total cost
- Ksh 405,000
- estimate
- Ksh 0
Chelelaibei Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of 2 Classroom
- output
- 2 Classrooms
- implementation status
- 1 Complete 1 Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Reberwet Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Purchased
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Sigor Boarding Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Almost Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kataret Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of 2 Classes
- output
- 2 Classes
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Yoywana Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of 2 Classes
- output
- 2 Classes
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Makimeny Dispensary
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Septic Tank And Soak Pit
- output
- Septic Tank And Soak Pit
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kapoleseroi Cattle
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2006
- action
- Completion Of The Dip And Construction Of A Dam
- output
- A Dip And A Dam
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Sachora - Sigor - Kaboson
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2008
- action
- Spot Patching & Light Grading
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kabisimba
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Cheptagum-Siwot Bridge
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kamotyo Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- 2 Classroom
- implementation status
- 1 Complete, 1 Ongoing
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Chepnyaliliet Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 1 Complete, I Ongoing
- total cost
- Ksh 390,000
- estimate
- Ksh 0
Kapkesosio Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 1 Class Complete, 1 Ongoing
- total cost
- Ksh 385,000
- estimate
- Ksh 0
Saunet Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 375,000
- estimate
- Ksh 0
Goitab Kalyet Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2003
- action
- New Class Construction
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 375,000
- estimate
- Ksh 0
Chemengwa Secondary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A New Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 375,000
- estimate
- Ksh 0
St. Patrick Cheptolelyoi Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2003
- action
- Cementing Of Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 365,000
- estimate
- Ksh 0
Kaptwolo Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Classroom
- implementation status
- 1 Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Tilangok Primary School
- location
-
Kamaget
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of 2 Classes
- output
- 2 Classes
- implementation status
- 1 Class Complete,1 Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kelichek Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kaboson Day Secondary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kaboson Girls Secondary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Bus
- output
- A Bus
- implementation status
- Purchased
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Olesoi Secondary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Tumoi Dispensary
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of Land/Building
- output
- Land
- implementation status
- Purchased
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Bingwa Secondary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of A New Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 340,000
- estimate
- Ksh 0
Kosia Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of A Classroom Initiated By Kessp
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 335,000
- estimate
- Ksh 0
Kamogiboi Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 325,000
- estimate
- Ksh 0
Lelechonik Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 325,000
- estimate
- Ksh 0
Kaplewa Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 325,000
- estimate
- Ksh 0
Chebois Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom And Land Purchase
- output
- Classroom And Land
- implementation status
- Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 0
Chebunyo Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Almost Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 0
Simbeiywet Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 1 Complete, 1 On Going
- total cost
- Ksh 320,000
- estimate
- Ksh 0
Kabolwo Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 310,000
- estimate
- Ksh 0
Chebanyiny Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- Class Rooms
- implementation status
- 1 Complete
- total cost
- Ksh 305,000
- estimate
- Ksh 0
Kapoleserio Rural Road
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kamogiboi Road
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kerundut Cattle Dip
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2006
- action
- Construction Of Dip
- output
- Reduces Livestock Diseases
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kimenderit Cattle Dip
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2006
- action
- Construction Of Dip
- output
- Reduces Livestock Diseases
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chebaraa Water Project
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2007
- action
- Extension Of Waterlines
- output
- Waterlines
- implementation status
- Land Purchased Water Trough Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Umoja Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Purchase Of Land And Construction Of Classroom
- output
- A School Land And Classroom
- implementation status
- Purchased And Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kipsaiyalel Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Purchase Of School Land And Construction Of Classroom
- output
- A School Land And Classroom
- implementation status
- Purchased
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Saramek Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2006
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Purchased
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiboson Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Purchase Of Building Materials For Ongoing Projects
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kipkuror Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Classroom Initiated By Kessp
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiproroget Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mengwet Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Electricity Installation And Classroom Construction
- output
- Classroom & Electricity
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapsayailel Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapsabul Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Six Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiptunoi
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of Land Land And Building
- output
- Land/ Building S
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Reberwet Cattle Dip
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A New Dip
- output
- A Cattle Dip
- implementation status
- On Going
- total cost
- Ksh 290,000
- estimate
- Ksh 0
Cheptagum Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2003
- action
- Purchase Of School Land And Construction Of Classroom
- output
- A School Land And Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Chemengwa Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of New Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Masindoni Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kerundut Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kaboson Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of Classroom Initiated By Kessp
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kamaget Primary School
- location
-
Kamaget
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kagawet Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kiriba Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Two Classes
- output
- Classes
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kabema Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of A Classroom Initiated By Kessp
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Makimeny Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Cheboyo Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Ngwonet Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- One Classroom
- total cost
- Ksh 275,000
- estimate
- Ksh 0
Kamosiro Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 270,000
- estimate
- Ksh 0
Nyambugo Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2003
- action
- Completion Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 265,000
- estimate
- Ksh 0
Kiptage Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom And Land Purchase
- output
- A Land And Classroom
- implementation status
- One Class Complete, Land Purchase And One Class Ongoing
- total cost
- Ksh 265,000
- estimate
- Ksh 0
Chebunyo-Chebaraa Road
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 260,000
- estimate
- Ksh 0
Labotiet - Chebunyo
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Spot Gravelling & Grading
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 252,600
- estimate
- Ksh 0
Kesegut Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kamusanga Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Almost Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Oreiyet Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Almost Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Lelbarak Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land & Construction Of Classroom
- output
- A School Land
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Ndamichonik Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Nyatembe Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land And Construction Of A Classroom
- output
- Land And Classroom
- implementation status
- Purchased ,Classroom Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kaproron Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Classroom
- output
- A Classroom
- implementation status
- Almost Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tumoi Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of A Classroom Initiated By Kessp
- output
- A Classroom
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tebeswet Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of Classroom Initiated By Kessp
- output
- A Classroom
- implementation status
- Purchased
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Lelechonik Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of School Plot
- output
- A School Plot
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kipsimbol Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2005
- action
- Completion Of Classrooms
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kaptorokwo Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Chesorton Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Sogororbei Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Masasabei Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kesosio Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 1 Complete, 1 On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Chemisimgut Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kipsuter Secondary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mogor Secondary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Chebunyo Secondary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Masasabei Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Completion Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Cheptuiyet Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land And New Class
- output
- A School Land
- implementation status
- Purchased, Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 0
Cheptuonik Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 235,000
- estimate
- Ksh 0
Kiptunoi Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom And Land Purchase
- output
- Classrom
- implementation status
- Complete
- total cost
- Ksh 225,000
- estimate
- Ksh 0
Lugumek Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 210,000
- estimate
- Ksh 0
Kamorit Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroomland Purchase
- output
- Classroom And Land
- implementation status
- Complete
- total cost
- Ksh 205,000
- estimate
- Ksh 0
Kamusanga Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2003
- action
- Cementing Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 205,000
- estimate
- Ksh 0
Chenit Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Completion Of Classroom
- output
- Classroom
- implementation status
- 1 Class Complete, Other Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ngomwet Central Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kimaya Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapleu Pre-School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A New Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mathew Maritim Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kataret Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ainapmoi Pre School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of School Plot And Construction Of New Classroom
- output
- A School Plot And Classroom
- implementation status
- Purchased , Classroom Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chepkosa Primary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Floor Of Classrooms
- output
- Cemented Classrooms
- implementation status
- School Land Purchased 1 Class Complete, Other Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kaptorokwo Primary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamorit Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of 2 Acre School Land
- output
- A School Land
- implementation status
- Purchased
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kipsegon Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of 2 Classroom
- output
- 2 Classrooms
- implementation status
- 1 Complete 1Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chebugon B Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of School Land & Construction Of A Class
- output
- A School Land. A Classroom
- implementation status
- Land Purchased Classroom Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ngenenet Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapamban Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sugumerga Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Constrution Of Boys Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chepwostuiyet Secondary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of A Laboratory
- output
- A Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chepnyaliliet Sec
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapkulumben Secondary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of A Laboratory
- output
- A Labaratory
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamongil Secondary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapkesosio Sec
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Makimeny Secondary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mengwet Secondary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Siongiroi Girls Secondary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Siongiroi Health Centre
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Repair Of Ambulance
- output
- Serviced Ambulance
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapamban Cattle Dip
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A New Dip
- output
- A Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chemaetany Chepleliet Road
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Graveling & Road Repair
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Cheptagum Road
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamongil Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Cheborian Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 0
Nyakichiwa Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2003
- action
- Cementing Of Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 185,000
- estimate
- Ksh 0
Kimananga Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classes & Land Purchase
- output
- Classroom & Land
- implementation status
- Complete
- total cost
- Ksh 185,000
- estimate
- Ksh 0
Olesoi Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 0
Singoiywek Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Cementing Of Classrooms & Land Purchase
- output
- Cemented Classrooms
- implementation status
- On Going
- total cost
- Ksh 180,000
- estimate
- Ksh 0
Goitab Kalyet Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2003
- action
- Cementing Of Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Chelelach Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Kabisimba Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Cheptagum Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Kaplewa Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Lelechonik Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Chenit Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2003
- action
- Purchased Of Land
- output
- Land
- implementation status
- Purchased
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Singoiywek Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
St Joseph Kapsirich
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2003
- action
- Land Purchase
- output
- Land
- implementation status
- Purchased
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Kiplombe Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Roborwo Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 170,000
- estimate
- Ksh 0
Kapsabul Polytechnic
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of Workshop
- output
- A Workshop
- implementation status
- Ongoing
- total cost
- Ksh 162,270
- estimate
- Ksh 0
St. Marys Mismis Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 0
Lelaitich
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom And Land Purchase
- output
- Classroom & Land Purchase
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 0
Makimeny Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 0
Marangetiet Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 0
Ngenenet Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Siongiroi Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
St. Peters Koiyet Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Simbeiywet Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2007
- action
- Land Purchase
- output
- A School Land
- implementation status
- Purchased
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Cheponjirai Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kesosio Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kiplombe Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of Land
- output
- A Land
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kiptunoi Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Toilets
- implementation status
- 80% Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kelichek Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Cheptolelyoi Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Purchased
- total cost
- Ksh 150,000
- estimate
- Ksh 0
J Primary School mwokyot Kaptich Nursery
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Siwot Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Almost Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kimugul Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mulot Sec
- location
-
Mulot
(in Chepalungu)
- year first funded
- 2004
- action
- Emergency (Dorm Reconstruction
- output
- Emergency
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapkesosio Health Centre
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Lab Equipments(Microscope,Centrifuge,Refrigerator,Clucometer Machine)
- output
- Lab Equipments
- implementation status
- Purchased
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Oldaldal Cattle Dip
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A Dip
- output
- Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Cheptagum Water Springs
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2007
- action
- Conservation Of Water Springs
- output
- Conserved Water Springs
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chemagel Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of Boys Toilets
- output
- Toilets
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chemagel Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chepleliet Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kamundugi Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapsinendet Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Renovation Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Reberwet Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Atebwo Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Library
- output
- Library
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Bingwa Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chepwostuiyet Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapoleseroi Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chebunyo Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chebelion Primary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapkulumben Primary School
- location
-
Cheleget
(in Chepalungu)
- year first funded
- 2004
- action
- Cementing Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kaptarakwa Primary School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kimenderit Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Segemik Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapsasian Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Saramek Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2006
- action
- Construction Of Classroom And Land Purchase
- output
- Classroom & Land
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Cheboyo Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kipkelat Primary School
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Areiyet Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kipkeikei Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Installation Of Solar
- output
- Solar Power
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mwokyot Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chemaetany Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapsayailel Dam
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2006
- action
- Purchase Of Land For Dam Already Constructed And Water Trough
- output
- A Land For Dam And Trough
- implementation status
- Ongoing
- total cost
- Ksh 144,559
- estimate
- Ksh 0
Kipkeigei - Lugumek
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2008
- action
- Spot Gravelling & Grading
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 140,700
- estimate
- Ksh 0
Kimananga Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of Water Tank And Construction Of Girls Toilets
- output
- Water Tank And A Toilet
- implementation status
- Water Tank Purchased Toilet Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Chebukon
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Water Protection
- implementation status
- Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Chemaetany Cattle Dip
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of Land For The Construction Of Cattle Dip
- output
- A Cattle Dip Land
- implementation status
- Purchased
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Oldaldal Bridge
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2005
- action
- Foot Bridge Construction
- output
- Fully Passable Foot Bridge
- implementation status
- 50% Complete
- total cost
- Ksh 112,000
- estimate
- Ksh 0
Olbutyo Health Centre
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Completion Of Kitchen
- output
- Kitchen
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kapsabul Primary School
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiptunoi Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of Boys Toilets
- output
- Toilets
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Koitobek Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Atebwo Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2008
- action
- Permanent Teachers Pit Latrine
- output
- Pit Latrine
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chemagel Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Toilets
- output
- School Toilets
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Cheponjirai Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Roborwo Primary School
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chepkeswaet Nursery School
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Land
- output
- A School Land
- implementation status
- Purchased
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chebirir Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Completion Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chebois Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Girls Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Cheptuonik Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Toilets(Boys, Girls And Staff)
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Koitobek Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kapsio Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kimenderit Primary School
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2008
- action
- Cementing Of Classrooms
- output
- Cemented Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kimaya Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Boys Toilets
- output
- Toilets
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Segemik Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Cementing Of Two Classes
- output
- A Class
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
St. Josephs Kapsirich Primary School
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Land
- output
- A School Plot
- implementation status
- Purchased
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Makimeny Tolilet Nursery
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Land
- output
- Plot
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mengwet Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Purchased
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Terta Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A Classroom
- output
- A Classroom
- implementation status
- Almost Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chelelach Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Boys Permanent Latrine
- output
- Permanent Latrine
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chepleliet Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Boys Pit Latrine
- output
- Pit Latrine
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kapsinendet Central Primary School
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of Boys Pit Latrine
- output
- Pit Latrine
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Cheptuiyet Pre-School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2008
- action
- Construction Of A New Classroom
- output
- A Classroom
- implementation status
- Classroom Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Masindoni Secondary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of School Land
- output
- A School Land
- implementation status
- Purchased
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Olbutyo Health Centre
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of Health Centre
- output
- Health Centre Block
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Lelaitich Dispensary
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of Dispensary
- output
- Dispensary Block
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nyatembe
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Water Protection
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kimindilil Water Project
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2007
- action
- Water Extension
- output
- Water Pipes
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Koimiret Cattle Dip
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Building Of Water Tank And Dip Repair
- output
- A Water Tank
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chebelyon Primary School
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Bulding Materials And Plastic Water Tank
- output
- Building Material And Water Tank
- implementation status
- 80% Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 0
Atebwo Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of New Classroom
- output
- Clsssroom
- implementation status
- Ongoing
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Olbutyo Cattle Dip
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Repair Of Drying Path And Foot Path
- output
- Foot Path
- implementation status
- Need More Funds For Completion
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kimaya Dispensary
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2007
- action
- Purchase Of Land
- output
- Dispensary Plot
- implementation status
- Purchased
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kiptenden Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2008
- action
- Completion Of Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Sosur Spring
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Water Protection
- implementation status
- Not Yet Started
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Chebanyiny Road
- location
-
Kongasis
(in Chepalungu)
- year first funded
- 2008
- action
- Gravelling And Spot Patching
- output
- Road
- implementation status
- Not Started
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Chepkirib Water Spring
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2006
- action
- Construction On The Spring Site.
- output
- Protect Spring Water From Contamination
- implementation status
- Not Started
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Cheptagum Dispensary
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2007
- action
- Completion Of Dispensary
- output
- Dispensary Block
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Lelechonik
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2006
- action
- Construction On The Spring Site.
- output
- Spring
- implementation status
- Not Started
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Tabargoi Water Project
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2006
- action
- Construction On The Spring Site.
- output
- Protect Spring Water From Contamination
- implementation status
- Not Started
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Sigor Cattle Dip
- location
-
Sigor
(in Chepalungu)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Reduces Livestock Diseases
- implementation status
- On Going
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Cheptuyonik Primary School
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2006
- action
- Purchase Of Desk And Chairs
- output
- Desks And Chairs
- implementation status
- Purchased
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kapkulumben Dispensary
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Land
- output
- Land
- implementation status
- Ongoing
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Nyambugo Childrens Clinic Shed
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2007
- action
- Construction Of New Mobile Clinic Shed
- output
- Mobile Clinic
- implementation status
- Ongoing
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Chimisimgut
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Water Protection
- implementation status
- On Going
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Liitik
- location
-
Sugurmerga
(in Chepalungu)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Water Protection
- implementation status
- Completed
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kipsegon Cattle Dip
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2005
- action
- Construction Of Dip
- output
- Reduces Livestock Diseases
- implementation status
- On Going
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kapleu PreSchool
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2006
- action
- Land Purchase
- output
- Land
- implementation status
- Purchased
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Ndamichonik Primary School
- location
-
Makimeny
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of School Plot
- output
- A School Plot
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kamusanga Community Dispensary
- location
-
Siongiroi
(in Chepalungu)
- year first funded
- 2009
- action
- Purchase Of Building Materials
- output
- Building Materials
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kosia Heath Centre
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of 0.5 Acre Plot
- output
- A Plot
- implementation status
- Purchased
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nyambugo Dam
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2009
- action
- Fencing Of The Dam
- output
- Dam
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Lelaitich Cattle Dip
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2006
- action
- Renovation Of Dip
- output
- Reduces Livestock Diseases
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nyambugo
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2006
- action
- Construction Of Dip
- output
- Reduces Livestock Diseases
- implementation status
- On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kibosek Cattle Dip
- location
-
Kaboson
(in Chepalungu)
- year first funded
- 2008
- action
- Dip Repairs
- output
- A Renovated Dip
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Lugumek Cattle Dip
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Pipes And A Generator
- output
- Pipes Extension And A Generator
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mogor Cattle Dip
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2008
- action
- Repair And Fencing
- output
- Fence And Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Lelechonik Water Springs
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2007
- action
- Conservation Of Water Springs
- output
- Conserved Water Springs
- implementation status
- Not Started
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Chepwostuiyet Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2009
- action
- Construction Of Girls Toilets
- output
- Toilets
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Highland Primary School
- location
-
Bingwa
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Land
- output
- Land
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Chepnyaliet Water Dam
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2009
- action
- Fencing Of The Dam
- output
- Fence
- implementation status
- Ongoing
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Kelichek Cattle Dip
- location
-
Mogor
(in Chepalungu)
- year first funded
- 2007
- action
- Acaricides
- output
- Replenished Cattle Dips
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 0
Kataret Chemisimgut Cattle Dip
- location
-
Chebunyo
(in Chepalungu)
- year first funded
- 2008
- action
- Purchase Of Dip Materials
- output
- Materials
- implementation status
- Completed
- total cost
- Ksh 30,000
- estimate
- Ksh 0
Kipsegon Acaricides
- location
-
Kapkesosio
(in Chepalungu)
- year first funded
- 2007
- action
- Replenishing Of Cattle Dips
- output
- Replenished Cattle Dips
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 0
Nyambugo Cattle Dip
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2008
- action
- Replanishing With Acariccide
- output
- Accaricide
- implementation status
- Complete
- total cost
- Ksh 15,000
- estimate
- Ksh 0
Oinoptibiik Cattle Dip
- location
-
Lelaitich
(in Chepalungu)
- year first funded
- 2008
- action
- Repair And Maintenance
- output
- Refurbished Dip
- implementation status
- Complete
- total cost
- Ksh 15,000
- estimate
- Ksh 0
Cheptagum Siwot Bridge
- location
-
Sugumerga
(in Chepalungu)
- year first funded
- 2004
- action
- Foot Bridge Construction
- output
- Fully Passable Foot Bridge
- implementation status
- Complete
- total cost
- Ksh 5,000
- estimate
- Ksh 0
Kapsinendet Central Primary School
- location
-
Siongiroi
(in Chepalungu)
- action
- Construction Of Boys Pit Latrine
- output
- Pit Latrine
- implementation status
- Ongoing
- total cost
- Ksh 0
- estimate
- Ksh 0