It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Chepalungu

Kiboit Water Dam

location
Kongasis (in Chepalungu)
year first funded
2005
action
Excavation Of The Dam, Construction Of Cattle Troughs
output
Dam
implementation status
Not Yet Started
total cost
Ksh 2,813,984
estimate
Ksh 0

Siongiroi

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Building Of Food Stores
output
Food Stores
implementation status
not known
total cost
Ksh 2,059,000
estimate
Ksh 0

Constituency Construction

location
Sigor (in Chepalungu)
year first funded
2008
action
Construction Of Constituency Office
output
Constituency/ Cdf Office
implementation status
Not Yet Started
total cost
Ksh 2,040,000
estimate
Ksh 0

Sigor

location
Sigor (in Chepalungu)
year first funded
2007
action
Building Of Food Stores
output
Food Stores
implementation status
not known
total cost
Ksh 2,009,027
estimate
Ksh 0

Sigor Secondary School

location
Sigor (in Chepalungu)
year first funded
2003
action
Purchase Of Textbooks And School Bus
output
Textbooks And School Bus
implementation status
Textbooks & School Bus Purchased
total cost
Ksh 1,950,000
estimate
Ksh 0

Olbutyo Secondary School

location
Kongasis (in Chepalungu)
year first funded
2003
action
Purchase Of School Bus,Text Books & Construction Of Staff Toilets
output
School Bus, Textbooks And Staff Toilets
implementation status
Textbooks Purchased, Staff Toilets Completed, Purchase Of School Bus Partnered With School Ongoing
total cost
Ksh 1,880,000
estimate
Ksh 0

Kamaget Secondary School

location
Kamaget (in Chepalungu)
year first funded
2004
action
n/a
output
Textbooks,Lockers&Chairs And A Classroom
implementation status
Textbooks, Lockers &Chairs Purchased ,Classroom Ongoing
total cost
Ksh 1,850,000
estimate
Ksh 0

Kipkeikei Secondary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Purchase Of Textbooks Lockers/ Chairs/Construction Of Classroom
output
Textbooks,Lockers&Chairs And Classroom
implementation status
Textbooks ,Lockers &Chairs Purchased, Construction Of A Classroom Ongoing.
total cost
Ksh 1,850,000
estimate
Ksh 0

Sugurmega Secondary School

location
Sugurmega (in Chepalungu)
year first funded
2003
action
Construction Of A Classroom & A Lab
output
A Classroom And Lab Equipments
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 0

Karap Naemi Bridge

location
Kapkesosio (in Chepalungu)
year first funded
2005
action
Foot Bridge Construction
output
Fully Passable Foot Bridge
implementation status
Ongoing
total cost
Ksh 1,716,000
estimate
Ksh 0

Chepkosa Secondary School

location
Cheleget (in Chepalungu)
year first funded
2003
action
Purchase Of Textbooks, Construction Of Kitchen, Boys Dormitory And Girls Dormitory
output
Textbooks, Kitchen ,Boys Dormitory And Girls Dormitory
implementation status
Textbooks Purchased, Kitchen Completed , Boys And Girls Dormitory Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 0

Makimeny Dispensary

location
Makimeny (in Chepalungu)
year first funded
2004
action
Completion Of Dispensary Block
output
Dispensary Block
implementation status
Ongoing
total cost
Ksh 1,550,000
estimate
Ksh 0

Kimenderit Road

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 0

Kiriba Day Secondary School

location
Kongasis (in Chepalungu)
year first funded
2004
action
Purchase Of Text Books & Lockers/Chairs /Construction Of Classroom & Lab Equip
output
Textbooks ,Lockers/Chairs, Lab Equipments, A Classroom
implementation status
Construction On Going ,Text Books, Lockers, Chairs & Lab Equip Purchased
total cost
Ksh 1,500,000
estimate
Ksh 0

Kapkesosio Secondary School

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Textbooks, Computers Lab, Construction Of Girls Dorm, Library/Store
output
Textbooks, Girls Dorm
implementation status
Books Purchased Construction Of Dorm & Completion Of Lab Completed
total cost
Ksh 1,500,000
estimate
Ksh 0

Chepwostuiyet Sec

location
Bingwa (in Chepalungu)
year first funded
2003
action
Classroom And Lab Fittings And Fixing And Purchase Of Lab App.
output
Classroom And Lab Fittings
implementation status
Lab Fitting Purchased And Classroom Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Kapoleseroi Sec

location
Bingwa (in Chepalungu)
year first funded
2003
action
Purchase Of Generator,Text Books & Construction Of Dormitory
output
Generator, Textbooks, Dormitory
implementation status
Generator Purchased, Dormitory Ongoing
total cost
Ksh 1,460,000
estimate
Ksh 0

Mengwet Sec

location
Makimeny (in Chepalungu)
year first funded
2003
action
Purchase Of Lab Equip And Construction Of Boys Dorm
output
Lab & Dormitory
implementation status
Lab. Equip, Text Books. Purchase Dormitory On Going
total cost
Ksh 1,400,000
estimate
Ksh 0

Chebunyo Secondary School

location
Chebunyo (in Chepalungu)
year first funded
2003
action
Construction Of Lab, Purchase Of Lab Equip,Text Books & Construction Of Library.
output
Lab, Text Books And Library
implementation status
Text Books, Lab Equip Purchased, Library Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 0

Kaboson Gsec

location
Kaboson (in Chepalungu)
year first funded
2003
action
n/a
output
Admnistration Block
implementation status
Construction On Going ,Text Books, Lockers, Chairs & Lab Equip Purchased
total cost
Ksh 1,400,000
estimate
Ksh 0

Lugumek Sec

location
Lelaitich (in Chepalungu)
year first funded
2003
action
Construction And Fixing Of Lab
output
Lab
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 0

Makimeny Sec

location
Makimeny (in Chepalungu)
year first funded
2003
action
n/a
output
Boys Dorm & Lab Equipments
implementation status
Boys Dorm Ongoing & Lab Equip Purchased
total cost
Ksh 1,400,000
estimate
Ksh 0

Siongiroi Health Centre

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Maternity Wing & Staff Quarters
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 0

Kipsuter Sec

location
Siongiroi (in Chepalungu)
year first funded
2003
action
Construction Of Kitchen, Boys Dormitory & Purchase Of Text Books.
output
Kitchen, Dormitory & Text Books
implementation status
Boys Dorm Ongoing , Kitchen Completed
total cost
Ksh 1,400,000
estimate
Ksh 0

Mogor Secondary School

location
Mogor (in Chepalungu)
year first funded
2003
action
Purchase Of Generator And Text.Construction Of Library.
output
Generator, Text And Library
implementation status
Text And Generator Purchased, Library Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 0

Sigor Water Extension

location
Sigor (in Chepalungu)
year first funded
2006
action
Extension Of Water Lines To The Community
output
Waterlines
implementation status
Not Yet Started
total cost
Ksh 1,350,000
estimate
Ksh 0

Moi Gsiongiroi

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Completion Of Science Lab, Purchase Of Lab Apparatus & Text Books
output
Lab & Lab Apparatus
implementation status
Lab Construction & Purchase Of Apparatus Completed
total cost
Ksh 1,300,000
estimate
Ksh 0

Chebunyo Health Centre

location
Chebunyo (in Chepalungu)
year first funded
2003
action
Construction Of Maternity Wing
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 1,250,000
estimate
Ksh 0

Kapkesosio Dispensary

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Staff Quarter & Maternity Wing
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 0

Tilangok Dispensary

location
Kaboson (in Chepalungu)
year first funded
2004
action
Completion Of Dispensary Block
output
Dispensary Block
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 0

Cheboyo Dispensary

location
Mogor (in Chepalungu)
year first funded
2003
action
Completion Of Maternity Ward And Casualty Room
output
Maternity Ward
implementation status
Ongoing
total cost
Ksh 1,150,000
estimate
Ksh 0

Chepwostuiyet Water Projectda

location
Bingwa (in Chepalungu)
year first funded
2006
action
Excavation Of The Dam, Construction Of Cattle Troughs And Fencing
output
A Fence And Water Reservoir
implementation status
Ongoing
total cost
Ksh 1,150,000
estimate
Ksh 0

Marangetit Water Dam

location
Sigor (in Chepalungu)
year first funded
2006
action
Dam Construction & Land Purchase Extension
output
Dam & Land
implementation status
Almost Complete
total cost
Ksh 1,120,000
estimate
Ksh 0

Kamongil Dispensary

location
Kaboson (in Chepalungu)
year first funded
2004
action
Construction Of Water Preservation & Staff Quarters
output
Staff Houses And Water Tank
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Kipsuter Dispensary

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Maternity Wing & Staff Quarters
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 0

Lelaitich Sec

location
Lelaitich (in Chepalungu)
year first funded
2005
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
1 Complete, 1 Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 0

Kapkulumben Secondary School

location
Cheleget (in Chepalungu)
year first funded
2005
action
Construction Of Classrooms Textbooks,Lockers&Chairs
output
Textbooks,Lockers&Chairs And A Classroom
implementation status
Textbooks, Lockers &Chairs Purchased ,Classroom Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 0

Sugumerga Dispensary

location
Sugumerga (in Chepalungu)
year first funded
2005
action
Completion Of Maternity Ward. And Toilets
output
Maternity Ward And Staff Toilets
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 0

Tumoi Secondary School

location
Kapkesosio (in Chepalungu)
year first funded
2009
action
Construction Of A New dining Hall
output
Dining Hall
implementation status
Ongoing
total cost
Ksh 1,030,000
estimate
Ksh 0

Sigor Financial Services

location
Sigor (in Chepalungu)
year first funded
2005
action
Completion Of Office And Purchase Of Equipments
output
Completed Office To Offer Soft Loans To The Youths
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 0

Mismis Dam

location
Sigor (in Chepalungu)
year first funded
2006
action
Excavation Of The Dam, Construction Of Cattle Troughs
output
Dam
implementation status
Not Yet Started
total cost
Ksh 1,000,000
estimate
Ksh 0

Women & Youth

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of Youth Centre
output
A Youth Centre
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Chelelach Dispensary

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Dispensary And Staff Houses
output
Dispensary Block And Staff Houses.
implementation status
Ongoing
total cost
Ksh 972,566
estimate
Ksh 0

Kaptebengwa Mismis Cattle Dip

location
Sigor (in Chepalungu)
year first funded
2006
action
Roofing, Fencing And Finishing Of The Dip
output
Completed Cattle Dip
implementation status
Complete
total cost
Ksh 970,000
estimate
Ksh 0

Olbutyo Health Centre

location
Kongasis (in Chepalungu)
year first funded
2004
action
Construction Of Maternity Wing & Purchase Of Lab Equipment
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 0

Chebunyo - Kataret

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Grading & Gravelling
output
Road
implementation status
Complete
total cost
Ksh 870,972
estimate
Ksh 0

Ndamichonik Cattle Dip

location
Makimeny (in Chepalungu)
year first funded
2006
action
Construction Of A New Dip
output
A Cattle Dip
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 0

Kamogiboi Water Dam

location
Chebunyo (in Chepalungu)
year first funded
2005
action
Desilting And Repair Of Dam
output
A Dam Serviced
implementation status
Completed
total cost
Ksh 850,000
estimate
Ksh 0

Ndamichonik Dispensary

location
Makimeny (in Chepalungu)
year first funded
2003
action
Construction Of Staff Quarters And Maternity Wing
output
Staff Quarters And Maternity Wing.
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 0

Bingwa Dispensary

location
Bingwa (in Chepalungu)
year first funded
2005
action
Completion Of Dispensary/Electrification
output
Dispensary Block With Lighting System
implementation status
Almost Complete
total cost
Ksh 850,000
estimate
Ksh 0

Tumoi Secondary School

location
Kapkesosio (in Chepalungu)
year first funded
2005
action
Construction Of Classroom, Book Purchase, Lab Equipments Purchase
output
Classroom, Books & Lab Equipment
implementation status
Construction On Going Books Purchased, Lab Equipment Purchased
total cost
Ksh 800,000
estimate
Ksh 0

Kaboson Day Sec

location
Kaboson (in Chepalungu)
year first funded
2005
action
n/a
output
Text Books, Lockers & Chairs And Classroom
implementation status
Textbooks, Lockers & Chairs Purchased Classroom On Going
total cost
Ksh 800,000
estimate
Ksh 0

Lugumek Dispensary

location
Lelaitich (in Chepalungu)
year first funded
2003
action
Construction Of Maternity Wing
output
It Reduces Mortality Rate
implementation status
Completed
total cost
Ksh 750,000
estimate
Ksh 0

Kamosiro - Kaboson Rural Access Road

location
Kaboson (in Chepalungu)
year first funded
2008
action
Graveling & Road Repair
output
Road
implementation status
Ongoing
total cost
Ksh 746,775
estimate
Ksh 0

Kataret Dispensary

location
Chebunyo (in Chepalungu)
year first funded
2003
action
Completion Of Dispensary/Electrification
output
Dispensary Block With Lighting System
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Kabisimba Community Dispensary

location
Siongiroi (in Chepalungu)
year first funded
2003
action
Completion Of Health Facility
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 0

Ngenenet Bridge Kopmus

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Building Of A New Bridge
output
A Bridge
implementation status
Ongoing
total cost
Ksh 670,000
estimate
Ksh 0

Tumoi Commdispensary

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Of Dispensary Block
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 660,000
estimate
Ksh 0

Kataret Siroriondo Cattle Dip

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction Of Cattle Dip
output
Cattle Dip
implementation status
Purchased
total cost
Ksh 650,000
estimate
Ksh 0

Chepwostuiyet Dispensary

location
Bingwa (in Chepalungu)
year first funded
2004
action
Completion Of Dispensary /Maternity Wing / Staff Houses
output
Health Facility
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 0

Mogor-Cheboyo Raod

location
Mogor (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 650,000
estimate
Ksh 0

Kelichek Cattle Dip

location
Mogor (in Chepalungu)
year first funded
2006
action
Construction Of A New Dip & Completion Of Water Trough
output
A Cattle Dip And Water Trough
implementation status
Complete
total cost
Ksh 620,000
estimate
Ksh 0

Tumoi Secondary School

location
Kapkesosio (in Chepalungu)
year first funded
2007
action
Construction Of Teachers Houses.
output
Teachers? Houses.
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kapoleseroi Dispensary

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Completion Of Dispensary
output
Dispensary Block
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Itembe Dispensary

location
Itembe (in Chepalungu)
year first funded
2004
action
Completion Of Dispensary
output
Dispensary Block
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Chebanyiny Secondary School

location
Kongasis (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Kapkesosio - Tebeswet

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Spot Gravelling & Grading
output
Road
implementation status
Complete
total cost
Ksh 562,000
estimate
Ksh 0

Chemaetany Secondary School

location
Siongiroi (in Chepalungu)
year first funded
2009
action
Construction Of New Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 540,000
estimate
Ksh 0

Chemaetany Secondary School

location
Siongiroi (in Chepalungu)
year first funded
2009
action
Construction Of Classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 540,000
estimate
Ksh 0

Tumoi Dispensary

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of Staff Houses
output
Staff Houses
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Olbutyo Fsa

location
Kongasis (in Chepalungu)
year first funded
2005
action
Completion Of Office And Purchase Of Equipments
output
Completed Office To Offer Soft Loans To The Youths
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Chebaraa Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classes And Installation Of Electricity
output
A Classroom With Electricity
implementation status
Purchased
total cost
Ksh 500,000
estimate
Ksh 0

Lugumek Secondary School

location
Lelaitich (in Chepalungu)
year first funded
2007
action
Completion Of A Classroom
output
A Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Sigor Sub District Hosp

location
Sigor (in Chepalungu)
year first funded
2005
action
Construction Of Health Facility
output
It Reduces Mortality Rate
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Cheponjirai Primary School

location
Kamaget (in Chepalungu)
year first funded
2004
action
Construction Of Classrooms Land Purchase
output
Land And Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Chepkorgong Primary School

location
Kongasis (in Chepalungu)
year first funded
2003
action
Construction Of Classes
output
A Classroom
implementation status
Ongoing
total cost
Ksh 495,000
estimate
Ksh 0

Tumoi Secondary School

location
Kapkesosio (in Chepalungu)
year first funded
2007
action
Dormitory Construction
output
Dormitory
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 0

Borut Primary School

location
Chebunyo (in Chepalungu)
year first funded
2006
action
Purchase Of School Land And Construction Of Classroom
output
A School Land And Classroom
implementation status
Land Purchased, Classroom Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Kibereisit Primary School

location
Makimeny (in Chepalungu)
year first funded
2008
action
Purchase Of School Land
output
A School Land
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Koimiret Secondary School

location
Makimeny (in Chepalungu)
year first funded
2008
action
Construction Of One Class
output
A Classroom
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Tumoi Sec, School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of Dormitory
output
Dormitory
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Tulon Ltdchebunyo -Chebaraa Roa

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Graveling & Road Repair
output
Road
implementation status
Incomplete
total cost
Ksh 420,000
estimate
Ksh 0

Kipsirat Primary School

location
Mogor (in Chepalungu)
year first funded
2005
action
Construction Of A Classroom And Purchase Of Water Tank
output
A Classroom And Water Tank
implementation status
Complete
total cost
Ksh 410,000
estimate
Ksh 0

Cheleget Primary School

location
Cheleget (in Chepalungu)
year first funded
2003
action
Construction Of 2 Classrooms & Purchase Of Land
output
Classroom & School Land
implementation status
1 Complete
total cost
Ksh 405,000
estimate
Ksh 0

Chelelaibei Primary School

location
Kaboson (in Chepalungu)
year first funded
2004
action
Construction Of 2 Classroom
output
2 Classrooms
implementation status
1 Complete 1 Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Reberwet Primary School

location
Bingwa (in Chepalungu)
year first funded
2007
action
Purchase Of School Land
output
A School Land
implementation status
Purchased
total cost
Ksh 400,000
estimate
Ksh 0

Sigor Boarding Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classes
output
A Classroom
implementation status
Almost Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kataret Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of 2 Classes
output
2 Classes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Yoywana Primary School

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Construction Of 2 Classes
output
2 Classes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Makimeny Dispensary

location
Makimeny (in Chepalungu)
year first funded
2008
action
Construction Of Septic Tank And Soak Pit
output
Septic Tank And Soak Pit
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kapoleseroi Cattle

location
Siongiroi (in Chepalungu)
year first funded
2006
action
Completion Of The Dip And Construction Of A Dam
output
A Dip And A Dam
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 0

Sachora - Sigor - Kaboson

location
Sigor (in Chepalungu)
year first funded
2008
action
Spot Patching & Light Grading
output
Road
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kabisimba

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 400,000
estimate
Ksh 0

Cheptagum-Siwot Bridge

location
Sugumerga (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 400,000
estimate
Ksh 0

Kamotyo Primary School

location
Kaboson (in Chepalungu)
year first funded
2003
action
Construction Of 2 Classrooms
output
2 Classroom
implementation status
1 Complete, 1 Ongoing
total cost
Ksh 395,000
estimate
Ksh 0

Chepnyaliliet Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction 2 Classrooms
output
2 Classrooms
implementation status
1 Complete, I Ongoing
total cost
Ksh 390,000
estimate
Ksh 0

Kapkesosio Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2004
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
1 Class Complete, 1 Ongoing
total cost
Ksh 385,000
estimate
Ksh 0

Saunet Primary School

location
Makimeny (in Chepalungu)
year first funded
2003
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 375,000
estimate
Ksh 0

Goitab Kalyet Primary School

location
Sigor (in Chepalungu)
year first funded
2003
action
New Class Construction
output
Classroom
implementation status
Complete
total cost
Ksh 375,000
estimate
Ksh 0

Chemengwa Secondary School

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Construction Of A New Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 375,000
estimate
Ksh 0

St. Patrick Cheptolelyoi Primary School

location
Sigor (in Chepalungu)
year first funded
2003
action
Cementing Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 365,000
estimate
Ksh 0

Kaptwolo Primary School

location
Bingwa (in Chepalungu)
year first funded
2004
action
Construction Of 2 Classrooms
output
Classroom
implementation status
1 Complete
total cost
Ksh 350,000
estimate
Ksh 0

Tilangok Primary School

location
Kamaget (in Chepalungu)
year first funded
2004
action
Construction Of 2 Classes
output
2 Classes
implementation status
1 Class Complete,1 Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Kelichek Primary School

location
Mogor (in Chepalungu)
year first funded
2004
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Kaboson Day Secondary School

location
Kaboson (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Kaboson Girls Secondary School

location
Kaboson (in Chepalungu)
year first funded
2007
action
Purchase Of School Bus
output
A Bus
implementation status
Purchased
total cost
Ksh 350,000
estimate
Ksh 0

Olesoi Secondary School

location
Sugumerga (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Tumoi Dispensary

location
Kapkesosio (in Chepalungu)
year first funded
2007
action
Purchase Of Land/Building
output
Land
implementation status
Purchased
total cost
Ksh 350,000
estimate
Ksh 0

Bingwa Secondary School

location
Bingwa (in Chepalungu)
year first funded
2009
action
Construction Of A New Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 340,000
estimate
Ksh 0

Kosia Primary School

location
Lelaitich (in Chepalungu)
year first funded
2003
action
Completion Of A Classroom Initiated By Kessp
output
A Classroom
implementation status
Ongoing
total cost
Ksh 335,000
estimate
Ksh 0

Kamogiboi Primary School

location
Chebunyo (in Chepalungu)
year first funded
2003
action
Construction Of Classes
output
A Classroom
implementation status
Ongoing
total cost
Ksh 325,000
estimate
Ksh 0

Lelechonik Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Of Classes
output
A Classroom
implementation status
Complete
total cost
Ksh 325,000
estimate
Ksh 0

Kaplewa Primary School

location
Sugumerga (in Chepalungu)
year first funded
2003
action
Construction Of Classes
output
A Classroom
implementation status
Ongoing
total cost
Ksh 325,000
estimate
Ksh 0

Chebois Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2004
action
Construction Of Classroom And Land Purchase
output
Classroom And Land
implementation status
Complete
total cost
Ksh 320,000
estimate
Ksh 0

Chebunyo Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Completion Of Classrooms
output
Classrooms
implementation status
Almost Complete
total cost
Ksh 320,000
estimate
Ksh 0

Simbeiywet Primary School

location
Bingwa (in Chepalungu)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
1 Complete, 1 On Going
total cost
Ksh 320,000
estimate
Ksh 0

Kabolwo Primary School

location
Lelaitich (in Chepalungu)
year first funded
2004
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 310,000
estimate
Ksh 0

Chebanyiny Primary School

location
Kongasis (in Chepalungu)
year first funded
2003
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
1 Complete
total cost
Ksh 305,000
estimate
Ksh 0

Kapoleserio Rural Road

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 0

Kamogiboi Road

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 0

Kerundut Cattle Dip

location
Sugumerga (in Chepalungu)
year first funded
2006
action
Construction Of Dip
output
Reduces Livestock Diseases
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 0

Kimenderit Cattle Dip

location
Kapkesosio (in Chepalungu)
year first funded
2006
action
Construction Of Dip
output
Reduces Livestock Diseases
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 0

Chebaraa Water Project

location
Sigor (in Chepalungu)
year first funded
2007
action
Extension Of Waterlines
output
Waterlines
implementation status
Land Purchased Water Trough Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Umoja Primary School

location
Bingwa (in Chepalungu)
year first funded
2004
action
Purchase Of Land And Construction Of Classroom
output
A School Land And Classroom
implementation status
Purchased And Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kipsaiyalel Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Purchase Of School Land And Construction Of Classroom
output
A School Land And Classroom
implementation status
Purchased
total cost
Ksh 300,000
estimate
Ksh 0

Saramek Primary School

location
Makimeny (in Chepalungu)
year first funded
2006
action
Purchase Of School Land
output
A School Land
implementation status
Purchased
total cost
Ksh 300,000
estimate
Ksh 0

Kiboson Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Purchase Of Building Materials For Ongoing Projects
output
A Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Kipkuror Primary School

location
Kongasis (in Chepalungu)
year first funded
2004
action
Completion Of Classroom Initiated By Kessp
output
Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Kiproroget Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction Of Classes
output
A Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Mengwet Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Electricity Installation And Classroom Construction
output
Classroom & Electricity
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kapsayailel Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kapsabul Primary School

location
Lelaitich (in Chepalungu)
year first funded
2004
action
Cementing Of Six Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kiptunoi

location
Makimeny (in Chepalungu)
year first funded
2007
action
Purchase Of Land Land And Building
output
Land/ Building S
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Reberwet Cattle Dip

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of A New Dip
output
A Cattle Dip
implementation status
On Going
total cost
Ksh 290,000
estimate
Ksh 0

Cheptagum Primary School

location
Sugumerga (in Chepalungu)
year first funded
2003
action
Purchase Of School Land And Construction Of Classroom
output
A School Land And Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Chemengwa Primary School

location
Lelaitich (in Chepalungu)
year first funded
2003
action
Construction Of New Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 275,000
estimate
Ksh 0

Masindoni Primary School

location
Makimeny (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 275,000
estimate
Ksh 0

Kerundut Primary School

location
Sugumerga (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Kaboson Primary School

location
Kaboson (in Chepalungu)
year first funded
2003
action
Completion Of Classroom Initiated By Kessp
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Kamaget Primary School

location
Kamaget (in Chepalungu)
year first funded
2003
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Kagawet Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Kiriba Primary School

location
Kongasis (in Chepalungu)
year first funded
2003
action
Construction Of Two Classes
output
Classes
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Kabema Primary School

location
Makimeny (in Chepalungu)
year first funded
2003
action
Completion Of A Classroom Initiated By Kessp
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Makimeny Primary School

location
Makimeny (in Chepalungu)
year first funded
2003
action
Completion Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Cheboyo Primary School

location
Mogor (in Chepalungu)
year first funded
2003
action
Completion Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 275,000
estimate
Ksh 0

Ngwonet Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classes
output
A Classroom
implementation status
One Classroom
total cost
Ksh 275,000
estimate
Ksh 0

Kamosiro Primary School

location
Kaboson (in Chepalungu)
year first funded
2004
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 270,000
estimate
Ksh 0

Nyambugo Primary School

location
Sugumerga (in Chepalungu)
year first funded
2003
action
Completion Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 265,000
estimate
Ksh 0

Kiptage Primary School

location
Bingwa (in Chepalungu)
year first funded
2003
action
Construction Of Classroom And Land Purchase
output
A Land And Classroom
implementation status
One Class Complete, Land Purchase And One Class Ongoing
total cost
Ksh 265,000
estimate
Ksh 0

Chebunyo-Chebaraa Road

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 260,000
estimate
Ksh 0

Labotiet - Chebunyo

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Spot Gravelling & Grading
output
Road
implementation status
Complete
total cost
Ksh 252,600
estimate
Ksh 0

Kesegut Primary School

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Completion Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kamusanga Primary School

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Almost Complete
total cost
Ksh 250,000
estimate
Ksh 0

Oreiyet Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of A Classroom
output
A Classroom
implementation status
Almost Complete
total cost
Ksh 250,000
estimate
Ksh 0

Lelbarak Primary School

location
Mogor (in Chepalungu)
year first funded
2007
action
Purchase Of School Land & Construction Of Classroom
output
A School Land
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Ndamichonik Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Nyatembe Primary School

location
Kongasis (in Chepalungu)
year first funded
2007
action
Purchase Of School Land And Construction Of A Classroom
output
Land And Classroom
implementation status
Purchased ,Classroom Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kaproron Primary School

location
Kongasis (in Chepalungu)
year first funded
2004
action
Completion Of Classroom
output
A Classroom
implementation status
Almost Complete
total cost
Ksh 250,000
estimate
Ksh 0

Tumoi Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2004
action
Completion Of A Classroom Initiated By Kessp
output
A Classroom
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 0

Tebeswet Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2004
action
Completion Of Classroom Initiated By Kessp
output
A Classroom
implementation status
Purchased
total cost
Ksh 250,000
estimate
Ksh 0

Lelechonik Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Purchase Of School Plot
output
A School Plot
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kipsimbol Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2005
action
Completion Of Classrooms
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kaptorokwo Primary School

location
Kaboson (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Chesorton Primary School

location
Kaboson (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Sogororbei Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Masasabei Primary School

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kesosio Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
1 Complete, 1 On Going
total cost
Ksh 250,000
estimate
Ksh 0

Chemisimgut Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kipsuter Secondary School

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Mogor Secondary School

location
Mogor (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Chebunyo Secondary School

location
Chebunyo (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Masasabei Primary School

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Completion Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Cheptuiyet Primary School

location
Sugumerga (in Chepalungu)
year first funded
2007
action
Purchase Of School Land And New Class
output
A School Land
implementation status
Purchased, Complete
total cost
Ksh 240,000
estimate
Ksh 0

Cheptuonik Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 235,000
estimate
Ksh 0

Kiptunoi Primary School

location
Makimeny (in Chepalungu)
year first funded
2003
action
Construction Of Classroom And Land Purchase
output
Classrom
implementation status
Complete
total cost
Ksh 225,000
estimate
Ksh 0

Lugumek Primary School

location
Lelaitich (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 210,000
estimate
Ksh 0

Kamorit Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Of Classroomland Purchase
output
Classroom And Land
implementation status
Complete
total cost
Ksh 205,000
estimate
Ksh 0

Kamusanga Primary School

location
Chebunyo (in Chepalungu)
year first funded
2003
action
Cementing Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 205,000
estimate
Ksh 0

Chenit Primary School

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Completion Of Classroom
output
Classroom
implementation status
1 Class Complete, Other Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Ngomwet Central Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kimaya Primary School

location
Kongasis (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kapleu Pre-School

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Construction Of A New Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Mathew Maritim Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Cementing Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kataret Primary School

location
Mogor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Ainapmoi Pre School

location
Sigor (in Chepalungu)
year first funded
2008
action
Purchase Of School Plot And Construction Of New Classroom
output
A School Plot And Classroom
implementation status
Purchased , Classroom Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Chepkosa Primary School

location
Cheleget (in Chepalungu)
year first funded
2004
action
Cementing Floor Of Classrooms
output
Cemented Classrooms
implementation status
School Land Purchased 1 Class Complete, Other Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kaptorokwo Primary School

location
Cheleget (in Chepalungu)
year first funded
2007
action
Purchase Of School Land
output
A School Land
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kamorit Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Purchase Of 2 Acre School Land
output
A School Land
implementation status
Purchased
total cost
Ksh 200,000
estimate
Ksh 0

Kipsegon Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of 2 Classroom
output
2 Classrooms
implementation status
1 Complete 1Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Chebugon B Primary School

location
Mogor (in Chepalungu)
year first funded
2008
action
Purchase Of School Land & Construction Of A Class
output
A School Land. A Classroom
implementation status
Land Purchased Classroom Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Ngenenet Primary School

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kapamban Primary School

location
Siongiroi (in Chepalungu)
year first funded
2009
action
Construction Of Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Sugumerga Primary School

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Constrution Of Boys Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Chepwostuiyet Secondary School

location
Bingwa (in Chepalungu)
year first funded
2007
action
Completion Of A Laboratory
output
A Laboratory
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Chepnyaliliet Sec

location
Chebunyo (in Chepalungu)
year first funded
2009
action
Construction Of A Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kapkulumben Secondary School

location
Cheleget (in Chepalungu)
year first funded
2009
action
Construction Of A Laboratory
output
A Labaratory
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kamongil Secondary School

location
Kaboson (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Kapkesosio Sec

location
Kapkesosio (in Chepalungu)
year first funded
2007
action
Construction Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Makimeny Secondary School

location
Makimeny (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Mengwet Secondary School

location
Makimeny (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Siongiroi Girls Secondary School

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Siongiroi Health Centre

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Repair Of Ambulance
output
Serviced Ambulance
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kapamban Cattle Dip

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of A New Dip
output
A Cattle Dip
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Chemaetany Chepleliet Road

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Graveling & Road Repair
output
Road
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Cheptagum Road

location
Sugumerga (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 0

Kamongil Primary School

location
Kaboson (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 195,000
estimate
Ksh 0

Cheborian Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 190,000
estimate
Ksh 0

Nyakichiwa Primary School

location
Lelaitich (in Chepalungu)
year first funded
2003
action
Cementing Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 185,000
estimate
Ksh 0

Kimananga Primary School

location
Bingwa (in Chepalungu)
year first funded
2003
action
Construction Of Classes & Land Purchase
output
Classroom & Land
implementation status
Complete
total cost
Ksh 185,000
estimate
Ksh 0

Olesoi Primary School

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Cementing Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 0

Singoiywek Primary School

location
Kongasis (in Chepalungu)
year first funded
2008
action
Cementing Of Classrooms & Land Purchase
output
Cemented Classrooms
implementation status
On Going
total cost
Ksh 180,000
estimate
Ksh 0

Goitab Kalyet Primary School

location
Sigor (in Chepalungu)
year first funded
2003
action
Cementing Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Chelelach Primary School

location
Siongiroi (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Kabisimba Primary School

location
Siongiroi (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Cheptagum Primary School

location
Sugumerga (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Kaplewa Primary School

location
Sugumerga (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Lelechonik Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Chenit Primary School

location
Chebunyo (in Chepalungu)
year first funded
2003
action
Purchased Of Land
output
Land
implementation status
Purchased
total cost
Ksh 175,000
estimate
Ksh 0

Singoiywek Primary School

location
Kongasis (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

St Joseph Kapsirich

location
Kongasis (in Chepalungu)
year first funded
2003
action
Land Purchase
output
Land
implementation status
Purchased
total cost
Ksh 175,000
estimate
Ksh 0

Kiplombe Primary School

location
Makimeny (in Chepalungu)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 0

Roborwo Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 170,000
estimate
Ksh 0

Kapsabul Polytechnic

location
Lelaitich (in Chepalungu)
year first funded
2007
action
Completion Of Workshop
output
A Workshop
implementation status
Ongoing
total cost
Ksh 162,270
estimate
Ksh 0

St. Marys Mismis Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 0

Lelaitich

location
Lelaitich (in Chepalungu)
year first funded
2004
action
Construction Of Classroom And Land Purchase
output
Classroom & Land Purchase
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 0

Makimeny Primary School

location
Makimeny (in Chepalungu)
year first funded
2004
action
Cementing Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 0

Marangetiet Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 0

Ngenenet Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Siongiroi Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

St. Peters Koiyet Primary School

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Simbeiywet Primary School

location
Bingwa (in Chepalungu)
year first funded
2007
action
Land Purchase
output
A School Land
implementation status
Purchased
total cost
Ksh 150,000
estimate
Ksh 0

Cheponjirai Primary School

location
Chebunyo (in Chepalungu)
year first funded
2007
action
Purchase Of School Land
output
A School Land
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 0

Kesosio Primary School

location
Makimeny (in Chepalungu)
year first funded
2008
action
Construction Of Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kiplombe Primary School

location
Makimeny (in Chepalungu)
year first funded
2007
action
Purchase Of Land
output
A Land
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kiptunoi Primary School

location
Makimeny (in Chepalungu)
year first funded
2007
action
Construction Of Toilets
output
Toilets
implementation status
80% Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kelichek Primary School

location
Mogor (in Chepalungu)
year first funded
2007
action
Purchase Of School Land
output
A School Land
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Cheptolelyoi Primary School

location
Sigor (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Purchased
total cost
Ksh 150,000
estimate
Ksh 0

J Primary School mwokyot Kaptich Nursery

location
Sigor (in Chepalungu)
year first funded
2007
action
Construction Of Classroom
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Siwot Primary School

location
Sigor (in Chepalungu)
year first funded
2007
action
Construction Of A Classroom
output
A Classroom
implementation status
Almost Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kimugul Primary School

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Purchase Of School Land
output
A School Land
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Mulot Sec

location
Mulot (in Chepalungu)
year first funded
2004
action
Emergency (Dorm Reconstruction
output
Emergency
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Kapkesosio Health Centre

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Purchase Of Lab Equipments(Microscope,Centrifuge,Refrigerator,Clucometer Machine)
output
Lab Equipments
implementation status
Purchased
total cost
Ksh 150,000
estimate
Ksh 0

Oldaldal Cattle Dip

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of A Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Cheptagum Water Springs

location
Sugumerga (in Chepalungu)
year first funded
2007
action
Conservation Of Water Springs
output
Conserved Water Springs
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 0

Chemagel Primary School

location
Siongiroi (in Chepalungu)
year first funded
2009
action
Construction Of Boys Toilets
output
Toilets
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Chemagel Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Chepleliet Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kamundugi Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kapsinendet Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Renovation Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Reberwet Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Atebwo Primary School

location
Bingwa (in Chepalungu)
year first funded
2004
action
Construction Of Library
output
Library
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Bingwa Primary School

location
Bingwa (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Chepwostuiyet Primary School

location
Bingwa (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kapoleseroi Primary School

location
Bingwa (in Chepalungu)
year first funded
2004
action
Cementing Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Chebunyo Primary School

location
Chebunyo (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Chebelion Primary School

location
Cheleget (in Chepalungu)
year first funded
2004
action
Cementing Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kapkulumben Primary School

location
Cheleget (in Chepalungu)
year first funded
2004
action
Cementing Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kaptarakwa Primary School

location
Kaboson (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Kimenderit Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Segemik Primary School

location
Kongasis (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kapsasian Primary School

location
Lelaitich (in Chepalungu)
year first funded
2007
action
Completion Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Saramek Primary School

location
Makimeny (in Chepalungu)
year first funded
2006
action
Construction Of Classroom And Land Purchase
output
Classroom & Land
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Cheboyo Primary School

location
Mogor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kipkelat Primary School

location
Mogor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Areiyet Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kipkeikei Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Installation Of Solar
output
Solar Power
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Mwokyot Primary School

location
Sigor (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Chemaetany Primary School

location
Siongiroi (in Chepalungu)
year first funded
2004
action
Construction Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kapsayailel Dam

location
Siongiroi (in Chepalungu)
year first funded
2006
action
Purchase Of Land For Dam Already Constructed And Water Trough
output
A Land For Dam And Trough
implementation status
Ongoing
total cost
Ksh 144,559
estimate
Ksh 0

Kipkeigei - Lugumek

location
Sigor (in Chepalungu)
year first funded
2008
action
Spot Gravelling & Grading
output
Road
implementation status
Ongoing
total cost
Ksh 140,700
estimate
Ksh 0

Kimananga Primary School

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Purchase Of Water Tank And Construction Of Girls Toilets
output
Water Tank And A Toilet
implementation status
Water Tank Purchased Toilet Ongoing
total cost
Ksh 140,000
estimate
Ksh 0

Chebukon

location
Chebunyo (in Chepalungu)
year first funded
2005
action
Laying Pipes
output
Water Protection
implementation status
Ongoing
total cost
Ksh 140,000
estimate
Ksh 0

Chemaetany Cattle Dip

location
Siongiroi (in Chepalungu)
year first funded
2007
action
Purchase Of Land For The Construction Of Cattle Dip
output
A Cattle Dip Land
implementation status
Purchased
total cost
Ksh 140,000
estimate
Ksh 0

Oldaldal Bridge

location
Kapkesosio (in Chepalungu)
year first funded
2005
action
Foot Bridge Construction
output
Fully Passable Foot Bridge
implementation status
50% Complete
total cost
Ksh 112,000
estimate
Ksh 0

Olbutyo Health Centre

location
Kongasis (in Chepalungu)
year first funded
2008
action
Completion Of Kitchen
output
Kitchen
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kapsabul Primary School

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Construction Of Classes
output
A Classroom
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kiptunoi Primary School

location
Makimeny (in Chepalungu)
year first funded
2009
action
Construction Of Boys Toilets
output
Toilets
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Koitobek Primary School

location
Sugumerga (in Chepalungu)
year first funded
2009
action
Construction Of A Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Atebwo Primary School

location
Bingwa (in Chepalungu)
year first funded
2008
action
Permanent Teachers Pit Latrine
output
Pit Latrine
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Chemagel Primary School

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Construction Of Toilets
output
School Toilets
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Cheponjirai Primary School

location
Chebunyo (in Chepalungu)
year first funded
2009
action
Construction Of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 0

Roborwo Primary School

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Construction Of Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Chepkeswaet Nursery School

location
Kaboson (in Chepalungu)
year first funded
2008
action
Purchase Of Land
output
A School Land
implementation status
Purchased
total cost
Ksh 100,000
estimate
Ksh 0

Chebirir Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Completion Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chebois Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of Girls Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Cheptuonik Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of Toilets(Boys, Girls And Staff)
output
Toilets
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Koitobek Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2009
action
Construction Of A Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kapsio Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Construction Of A Classroom
output
A Classroom
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kimenderit Primary School

location
Kapkesosio (in Chepalungu)
year first funded
2008
action
Cementing Of Classrooms
output
Cemented Classroom
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kimaya Primary School

location
Kongasis (in Chepalungu)
year first funded
2008
action
Construction Of Boys Toilets
output
Toilets
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Segemik Primary School

location
Kongasis (in Chepalungu)
year first funded
2008
action
Cementing Of Two Classes
output
A Class
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

St. Josephs Kapsirich Primary School

location
Kongasis (in Chepalungu)
year first funded
2008
action
Purchase Of Land
output
A School Plot
implementation status
Purchased
total cost
Ksh 100,000
estimate
Ksh 0

Makimeny Tolilet Nursery

location
Makimeny (in Chepalungu)
year first funded
2008
action
Purchase Of Land
output
Plot
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Mengwet Primary School

location
Makimeny (in Chepalungu)
year first funded
2008
action
Electricity Installation
output
Electricity
implementation status
Purchased
total cost
Ksh 100,000
estimate
Ksh 0

Terta Primary School

location
Sigor (in Chepalungu)
year first funded
2008
action
Construction Of A Classroom
output
A Classroom
implementation status
Almost Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chelelach Primary School

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of Boys Permanent Latrine
output
Permanent Latrine
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 0

Chepleliet Primary School

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of Boys Pit Latrine
output
Pit Latrine
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kapsinendet Central Primary School

location
Siongiroi (in Chepalungu)
year first funded
2008
action
Construction Of Boys Pit Latrine
output
Pit Latrine
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Cheptuiyet Pre-School

location
Sugumerga (in Chepalungu)
year first funded
2008
action
Construction Of A New Classroom
output
A Classroom
implementation status
Classroom Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Masindoni Secondary School

location
Makimeny (in Chepalungu)
year first funded
2008
action
Purchase Of School Land
output
A School Land
implementation status
Purchased
total cost
Ksh 100,000
estimate
Ksh 0

Olbutyo Health Centre

location
Kongasis (in Chepalungu)
year first funded
2007
action
Completion Of Health Centre
output
Health Centre Block
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Lelaitich Dispensary

location
Lelaitich (in Chepalungu)
year first funded
2007
action
Completion Of Dispensary
output
Dispensary Block
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Nyatembe

location
Kongasis (in Chepalungu)
year first funded
2005
action
Laying Pipes
output
Water Protection
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kimindilil Water Project

location
Kongasis (in Chepalungu)
year first funded
2007
action
Water Extension
output
Water Pipes
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Koimiret Cattle Dip

location
Makimeny (in Chepalungu)
year first funded
2008
action
Building Of Water Tank And Dip Repair
output
A Water Tank
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Chebelyon Primary School

location
Sigor (in Chepalungu)
year first funded
2008
action
Purchase Of Bulding Materials And Plastic Water Tank
output
Building Material And Water Tank
implementation status
80% Complete
total cost
Ksh 90,000
estimate
Ksh 0

Atebwo Primary School

location
Bingwa (in Chepalungu)
year first funded
2009
action
Construction Of New Classroom
output
Clsssroom
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 0

Olbutyo Cattle Dip

location
Kongasis (in Chepalungu)
year first funded
2008
action
Repair Of Drying Path And Foot Path
output
Foot Path
implementation status
Need More Funds For Completion
total cost
Ksh 80,000
estimate
Ksh 0

Kimaya Dispensary

location
Kongasis (in Chepalungu)
year first funded
2007
action
Purchase Of Land
output
Dispensary Plot
implementation status
Purchased
total cost
Ksh 80,000
estimate
Ksh 0

Kiptenden Primary School

location
Bingwa (in Chepalungu)
year first funded
2008
action
Completion Of Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 0

Sosur Spring

location
Sugumerga (in Chepalungu)
year first funded
2005
action
Laying Pipes
output
Water Protection
implementation status
Not Yet Started
total cost
Ksh 70,000
estimate
Ksh 0

Chebanyiny Road

location
Kongasis (in Chepalungu)
year first funded
2008
action
Gravelling And Spot Patching
output
Road
implementation status
Not Started
total cost
Ksh 70,000
estimate
Ksh 0

Chepkirib Water Spring

location
Sigor (in Chepalungu)
year first funded
2006
action
Construction On The Spring Site.
output
Protect Spring Water From Contamination
implementation status
Not Started
total cost
Ksh 70,000
estimate
Ksh 0

Cheptagum Dispensary

location
Sugumerga (in Chepalungu)
year first funded
2007
action
Completion Of Dispensary
output
Dispensary Block
implementation status
Ongoing
total cost
Ksh 70,000
estimate
Ksh 0

Lelechonik

location
Kapkesosio (in Chepalungu)
year first funded
2006
action
Construction On The Spring Site.
output
Spring
implementation status
Not Started
total cost
Ksh 70,000
estimate
Ksh 0

Tabargoi Water Project

location
Sigor (in Chepalungu)
year first funded
2006
action
Construction On The Spring Site.
output
Protect Spring Water From Contamination
implementation status
Not Started
total cost
Ksh 70,000
estimate
Ksh 0

Sigor Cattle Dip

location
Sigor (in Chepalungu)
year first funded
2005
action
Renovation Of Dip
output
Reduces Livestock Diseases
implementation status
On Going
total cost
Ksh 60,000
estimate
Ksh 0

Cheptuyonik Primary School

location
Sugumerga (in Chepalungu)
year first funded
2006
action
Purchase Of Desk And Chairs
output
Desks And Chairs
implementation status
Purchased
total cost
Ksh 60,000
estimate
Ksh 0

Kapkulumben Dispensary

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Purchase Of Land
output
Land
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 0

Nyambugo Childrens Clinic Shed

location
Sugumerga (in Chepalungu)
year first funded
2007
action
Construction Of New Mobile Clinic Shed
output
Mobile Clinic
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 0

Chimisimgut

location
Chebunyo (in Chepalungu)
year first funded
2005
action
Laying Pipes
output
Water Protection
implementation status
On Going
total cost
Ksh 60,000
estimate
Ksh 0

Liitik

location
Sugurmerga (in Chepalungu)
year first funded
2005
action
Laying Pipes
output
Water Protection
implementation status
Completed
total cost
Ksh 60,000
estimate
Ksh 0

Kipsegon Cattle Dip

location
Kapkesosio (in Chepalungu)
year first funded
2005
action
Construction Of Dip
output
Reduces Livestock Diseases
implementation status
On Going
total cost
Ksh 60,000
estimate
Ksh 0

Kapleu PreSchool

location
Lelaitich (in Chepalungu)
year first funded
2006
action
Land Purchase
output
Land
implementation status
Purchased
total cost
Ksh 50,000
estimate
Ksh 0

Ndamichonik Primary School

location
Makimeny (in Chepalungu)
year first funded
2008
action
Purchase Of School Plot
output
A School Plot
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kamusanga Community Dispensary

location
Siongiroi (in Chepalungu)
year first funded
2009
action
Purchase Of Building Materials
output
Building Materials
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Kosia Heath Centre

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Purchase Of 0.5 Acre Plot
output
A Plot
implementation status
Purchased
total cost
Ksh 50,000
estimate
Ksh 0

Nyambugo Dam

location
Sugumerga (in Chepalungu)
year first funded
2009
action
Fencing Of The Dam
output
Dam
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Lelaitich Cattle Dip

location
Lelaitich (in Chepalungu)
year first funded
2006
action
Renovation Of Dip
output
Reduces Livestock Diseases
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 0

Nyambugo

location
Sugumerga (in Chepalungu)
year first funded
2006
action
Construction Of Dip
output
Reduces Livestock Diseases
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 0

Kibosek Cattle Dip

location
Kaboson (in Chepalungu)
year first funded
2008
action
Dip Repairs
output
A Renovated Dip
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Lugumek Cattle Dip

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Purchase Of Pipes And A Generator
output
Pipes Extension And A Generator
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Mogor Cattle Dip

location
Mogor (in Chepalungu)
year first funded
2008
action
Repair And Fencing
output
Fence And Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Lelechonik Water Springs

location
Kapkesosio (in Chepalungu)
year first funded
2007
action
Conservation Of Water Springs
output
Conserved Water Springs
implementation status
Not Started
total cost
Ksh 50,000
estimate
Ksh 0

Chepwostuiyet Primary School

location
Bingwa (in Chepalungu)
year first funded
2009
action
Construction Of Girls Toilets
output
Toilets
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Highland Primary School

location
Bingwa (in Chepalungu)
year first funded
2008
action
Purchase Of Land
output
Land
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Chepnyaliet Water Dam

location
Chebunyo (in Chepalungu)
year first funded
2009
action
Fencing Of The Dam
output
Fence
implementation status
Ongoing
total cost
Ksh 40,000
estimate
Ksh 0

Kelichek Cattle Dip

location
Mogor (in Chepalungu)
year first funded
2007
action
Acaricides
output
Replenished Cattle Dips
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 0

Kataret Chemisimgut Cattle Dip

location
Chebunyo (in Chepalungu)
year first funded
2008
action
Purchase Of Dip Materials
output
Materials
implementation status
Completed
total cost
Ksh 30,000
estimate
Ksh 0

Kipsegon Acaricides

location
Kapkesosio (in Chepalungu)
year first funded
2007
action
Replenishing Of Cattle Dips
output
Replenished Cattle Dips
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 0

Nyambugo Cattle Dip

location
Sugumerga (in Chepalungu)
year first funded
2008
action
Replanishing With Acariccide
output
Accaricide
implementation status
Complete
total cost
Ksh 15,000
estimate
Ksh 0

Oinoptibiik Cattle Dip

location
Lelaitich (in Chepalungu)
year first funded
2008
action
Repair And Maintenance
output
Refurbished Dip
implementation status
Complete
total cost
Ksh 15,000
estimate
Ksh 0

Cheptagum Siwot Bridge

location
Sugumerga (in Chepalungu)
year first funded
2004
action
Foot Bridge Construction
output
Fully Passable Foot Bridge
implementation status
Complete
total cost
Ksh 5,000
estimate
Ksh 0

Kapsinendet Central Primary School

location
Siongiroi (in Chepalungu)
action
Construction Of Boys Pit Latrine
output
Pit Latrine
implementation status
Ongoing
total cost
Ksh 0
estimate
Ksh 0