The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Eldama Ravine

Koisamo/ Sigoro/Kiptuno Road

location
Sigoro (in Eldama Ravine)
year first funded
2005
action
Spot Gravelling, Clearing And Drainage Along The Koisamo/Sigoro/Kiptuno Road
output
Gravelled And Passable Road To Facilitate Transport And Communication In The Area
implementation status
Complete And In Use
total cost
Ksh 6,000,000
estimate
Ksh 0

Kaplesir Water Project

location
Kiplombe (in Eldama Ravine)
year first funded
2006
action
Environmental Impact Assessment, Water Analysis, Construction Of Intake And Purchase Of Pipes For water distribution
output
Complete Intake And Water Reticulated Closer The Residents
implementation status
Ongoing
total cost
Ksh 5,400,000
estimate
Ksh 0

Mumberes Water Project

location
Mumberes (in Eldama Ravine)
year first funded
2009
action
Construction Of Intake, Tank And Purchase Of Pipes For Reticulation Of Water
output
Tank, Piping Works Done
implementation status
New
total cost
Ksh 5,150,000
estimate
Ksh 0

Narosura-Emkwen Clean Water Project

location
Perkerra (in Eldama Ravine)
year first funded
2003
action
Construction Of Intake, Three Tanks And Piping Of Water To The Distribution Tanks Closer To The Constituents
output
One Tank Constructed And Another Plastic Two Procured As Well As Pipes Bought And Pipeworks Done To The Tanks
implementation status
Phase One Complete And In Use
total cost
Ksh 5,000,000
estimate
Ksh 0

Kiptuno Community Water Project

location
Kiptuno (in Eldama Ravine)
year first funded
2004
action
Construction Of Intakem Tank And Piping Of Water Closer To The Residents
output
Complete Intake, Ready Water Tank And Piping Of Water
implementation status
Phase One Complete
total cost
Ksh 4,800,000
estimate
Ksh 0

Assururiet Water Project

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
output
Tanks And Pipes
implementation status
Ongoing
total cost
Ksh 4,000,000
estimate
Ksh 0

Mumberes Girls Secondary School

location
Mumberes (in Eldama Ravine)
year first funded
2003
action
Construction Of Classrooms And Dormitory
output
Complete Classrooms And Dormitory
implementation status
5 Complete
total cost
Ksh 3,850,000
estimate
Ksh 0

Torongo Secondary School

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom, Dining Hall And Kitchen
output
Classroom And Dining Hall
implementation status
Two Classrooms Complete And Dining Hall Set To Start
total cost
Ksh 2,950,000
estimate
Ksh 0

Perkerra Water Project

location
Perkerra (in Eldama Ravine)
year first funded
2007
action
Purchase Of Pipes And Construction Of Tank
output
Tank And Pipe Works Done
implementation status
Ongoing
total cost
Ksh 2,350,000
estimate
Ksh 0

Tulwomoi Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom And Supply Of Power To The School
output
Complete Classroom And Power Supplied
implementation status
Two Classrooms Ongoing And Power Suppply Under Way
total cost
Ksh 2,320,000
estimate
Ksh 0

Nyorki/Chemelil Water Project

location
Kiplombe (in Eldama Ravine)
year first funded
2005
action
Construction Of Tank
output
Ready Tank And Piped Water
implementation status
Complete
total cost
Ksh 2,200,000
estimate
Ksh 0

Saos Secondary School

location
Saos/Kibias (in Eldama Ravine)
year first funded
2006
action
Construction Of Dining Hall And Computer Lab
output
Dining Hall And Computer Lab
implementation status
Ongoing
total cost
Ksh 1,990,000
estimate
Ksh 0

Kamelilo Borehole Chepsito/Kapko

location
Eldama Ravine (in Eldama Ravine)
year first funded
2004
action
Construction
output
Pipes And Water Tanks
implementation status
Ongoing
total cost
Ksh 1,900,000
estimate
Ksh 0

Mochongoi Primary School

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Purchase Of Land And Construction Of Classrooms
output
2 Acres Land/ 6 Classrooms
implementation status
Ongoing
total cost
Ksh 1,850,000
estimate
Ksh 0

Kiplombe Secondary School

location
Kiplombe (in Eldama Ravine)
year first funded
2003
action
Construction Of Classrooms And Administration Block
output
Complete Clasrooms And Administraion Block
implementation status
Three Complete Classrooms.Completion Of Administration Block Under Way
total cost
Ksh 1,700,000
estimate
Ksh 0

Lelgel Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms And Supply Of Power To The School
output
Complete Classroom And Power Supplied
implementation status
Two Classrooms Being Completed And Power Supply In Process
total cost
Ksh 1,550,000
estimate
Ksh 0

Tabare Electricty Project

location
Kabiyet (in Eldama Ravine)
year first funded
2008
action
Supply Of Electricity To The Area
output
Increased Supply Of Power To The Residents
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 0

Cheraik Primary School

location
Saos/Kibias (in Eldama Ravine)
year first funded
2004
action
Construction Of Four Classrooms And Staffroom
output
Classrooms
implementation status
All Classrooms Incomplete And Require Funds For Completetion In Addition To The Emergency Request To Repair Wall Blown By Wind. Project Has Evident Poor Workmanship
total cost
Ksh 1,500,000
estimate
Ksh 0

Arama Secondary School

location
Lembus Central (in Eldama Ravine)
year first funded
2006
action
Construction Of Three Classrooms
output
Three Complete Classrooms
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 0

Nerkwo Primary School

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Electrification To The Primary Chool And Renovations Of Classrooms
output
Anhanced Power Supply And Completely Renovated Classrooms
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 0

Mumberes Primary School Electricity Project

location
Mumberes (in Eldama Ravine)
year first funded
2006
action
Electrification
output
Power Supply
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 0

Kabiyet Benonin Water Project

location
Kabiyet (in Eldama Ravine)
year first funded
2005
action
Construction Of Tank And Piping Of Water
output
Pipe Works And Tank
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 0

Poror Secondary School

location
Lembus Central (in Eldama Ravine)
year first funded
2007
action
Construction Of A New Dormitory
output
Complete Dormitory
implementation status
New
total cost
Ksh 1,300,000
estimate
Ksh 0

Toniok Girls Secondary School

location
Perkerra (in Eldama Ravine)
year first funded
2007
action
Renovation Of 2 Classrooms Blown By Wind, Construction Of Classroom And A New Dormitory
output
Classrooms And Dormitory
implementation status
Ongoing
total cost
Ksh 1,250,000
estimate
Ksh 0

Benonin Secondary School

location
Kabiyet (in Eldama Ravine)
year first funded
2006
action
Construction Of A Laboratory And Classroom
output
Complete Lab And Classroom
implementation status
Ongoing
total cost
Ksh 1,230,000
estimate
Ksh 0

Tinet Day Secondary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2006
action
Construction Of Classrooms
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 0

Eldama Ravine Girls Secondary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2004
action
Construction Of Teachers Houses
output
Complete Teachers Houses
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 0

Tugumoi Koibatek Secondary School

location
Torongo (in Eldama Ravine)
year first funded
2006
action
Construction Of Classroom
output
Adminstration Block And Two Classrooms
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 0

Uhuru Secondary School

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Complete Three Classrooms
implementation status
Three Classrooms Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Soibei Primary School

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 0

Chemeswon Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2006
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 0

Saos Primary School

location
Saos/Kibias (in Eldama Ravine)
year first funded
2005
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 0

Tolmo Primary School

location
Saos/Kibias (in Eldama Ravine)
year first funded
2003
action
Construction Of Classroom And Administration Blcok
output
Complete Classroom And Administration Block
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 0

Kaplelechwa Electricity Project

location
Kabiyet (in Eldama Ravine)
year first funded
2008
action
Supply Of Electricity To The Area
output
Increase Access To Power By The Constituents
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 0

Lalut Primary School

location
Koisamo (in Eldama Ravine)
year first funded
2003
action
Construction Of Three Classrooms
output
Complete Three Classrooms
implementation status
Three Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Lelderit Regesoi Road

location
Lembus Central (in Eldama Ravine)
year first funded
2008
action
Completion Of Gravelling And Fixing Culverts
output
-
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 0

Kipkoriony Water Project

location
Perkerra (in Eldama Ravine)
year first funded
2006
action
Construction Of Water Tank And Piping Of Water Closer To The Constituents
output
Pipes Purchased And Water Tank Constructed
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 0

Kiplongon Water Project

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of The Water Tank
output
Complete Water Tank
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Highlands Mixed Day Secondary School

location
Mumberes (in Eldama Ravine)
year first funded
2008
action
Construction Of Three Classrooms
output
Three Classrooms
implementation status
One Clasroom Incomplete And Require Finishing, Windows, Doors And Plastering
total cost
Ksh 900,000
estimate
Ksh 0

Bhakita Girls Secondary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2005
action
Construction Of Classrooms
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 0

Tiripkatoi Primary School

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Emergency Repair Of Toilets And Completion Of Classroom As Well As Construction Of A New Classroom
output
Functional Toilets And Complete Classroom
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 0

St. Patrick Shimoni Primary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2003
action
Construction Of Latrines And Renovation Of Classrooms
output
Latrines Constucted And Classrooms Renovated
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 0

Soymining Water Project

location
Mumberes (in Eldama Ravine)
year first funded
2003
action
Construction Of Water Tank
output
Complete And Functional Water Tank
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 0

Nyakio Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2005
action
Construction Of Three Classrooms
output
Complete Three Classrooms
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 0

Kapngoech Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2003
action
Construction Of Classroom
output
Three Complete Classrooms
implementation status
Three Complete
total cost
Ksh 847,000
estimate
Ksh 0

Mandina Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Complete And Functional Classroom
implementation status
Complete And In Use
total cost
Ksh 825,000
estimate
Ksh 0

Tendwet Electrity Mlango Mumbere

location
Mumberes (in Eldama Ravine)
year first funded
2006
action
Electrification Of The Area
output
Increased Power Supply To The Residents
implementation status
Complete
total cost
Ksh 815,000
estimate
Ksh 0

Equator Water Project

location
Mumberes (in Eldama Ravine)
year first funded
2007
action
Construction Of A Water Tank To Distribute Water In The Area
output
Complete Water Tank
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Seguton Dispensary

location
Lembus Mosop (in Eldama Ravine)
year first funded
2004
action
Construction Of A Dispensary
output
Complete And Functional Dispensary
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kapcholoi Secondary School

location
Lembus Central (in Eldama Ravine)
year first funded
2007
action
Construction Of Four Classroom
output
Complete Four Classroom
implementation status
Two Complete Classrooms And Two Awaiting Completion
total cost
Ksh 800,000
estimate
Ksh 0

Kabor Primary School

location
Kiptuno (in Eldama Ravine)
year first funded
2005
action
Construction Of Classrooms
output
Complete Three Classroom
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Oinoptich Water Project

location
Kiplombe (in Eldama Ravine)
year first funded
2007
action
Piping Of Water Closer To The Constituents
output
Clean Water Supplied
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Nakurtakwei Road Project

location
Kiplombe (in Eldama Ravine)
year first funded
2004
action
Spot Gravelling And Maintenance Of The Road
output
Gravelled Road And Passable Road
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Moringwo Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Two Complete And Three At Foundation Level
total cost
Ksh 750,000
estimate
Ksh 0

Aic Eldama Ravine Health Centre

location
Eldama Ravine (in Eldama Ravine)
year first funded
2004
action
Construction Of Dispensary
output
Complete Dispensary
implementation status
Ongoing Works At Lintel Level
total cost
Ksh 750,000
estimate
Ksh 0

Nakurtakwei Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2005
action
Construction Of Classrooms
output
Complete Two Classroom
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 0

Kewangoi Primary School

location
Koisamo (in Eldama Ravine)
year first funded
2004
action
Construction Of Two Classrooms
output
Two Complete Classroom
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 0

Kapcholoi Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom And Administration Block
output
Complete Classrooms And Administration Block
implementation status
Two Complete. Administration Block Ongoing
total cost
Ksh 750,000
estimate
Ksh 0

Sinonin Secondary School

location
Lembus Central (in Eldama Ravine)
year first funded
2008
action
Construction Of New Classrooms
output
Two Classrooms Yet To Start
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 0

Sigowet Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Complete Classrooms
implementation status
Two Complete
total cost
Ksh 750,000
estimate
Ksh 0

Kipkoriony Primary School

location
Perkerra (in Eldama Ravine)
year first funded
2004
action
Renovations Of The Cattle Dip
output
Complete Classrooms
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Kibias Community Dispensary

location
Saos/Kibias (in Eldama Ravine)
year first funded
2003
action
Construction Of Dispensary And Completion Of Tank And Fittings
output
Compeleted Dispensary Wing And Storage Tank
implementation status
Ongoing
total cost
Ksh 727,740
estimate
Ksh 0

Kiptuno Health Centre

location
Kiptuno (in Eldama Ravine)
year first funded
2004
action
Construction Of Dispensary Lab
output
Complete Dispensary Lab
implementation status
Complete
total cost
Ksh 710,000
estimate
Ksh 0

Mwachon Primary School

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Construction Of Two Classrooms
output
Two Complete Classrooms
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Kibias Primary School

location
Saos/Kibias (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Construction Of Classroom
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Chemususu Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2003
action
Construction Of Two Classroom
output
Complete Classrooms
implementation status
Two Complete Classroom
total cost
Ksh 700,000
estimate
Ksh 0

Kiplongon Cattle Dip

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of Fencing And Cementing Of Waln Paths For The Dip
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Toniok Primary School

location
Perkerra (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Cheraik Water Project

location
Saos/Kibias (in Eldama Ravine)
year first funded
2004
action
Construction Of Tank And Purchase Of New Pipes For Reticulation Of Water
output
Tank And Piping Works Done
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Tolmo Secondary School

location
Saos/Kibias (in Eldama Ravine)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Kirima Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms And Completion Of Others
output
Functional And Complete Classrooms
implementation status
Ongoing
total cost
Ksh 680,000
estimate
Ksh 0

Torongo Primary School

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom And Six Door Toilet
output
Classroom And Six Door Toilet
implementation status
Ongoing
total cost
Ksh 670,000
estimate
Ksh 0

Koibatek Primary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2004
action
Construction Of Two Classrooms And Pit Latrine (Emergency Funds)
output
Two Complete Classrooms And Pit Latrine
implementation status
One Complete Classroom And One Yet To Commence. Pit Latrine Completed And Functional.
total cost
Ksh 650,000
estimate
Ksh 0

Kokorwonin Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2003
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 0

Kaprorwa Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
One Complete
total cost
Ksh 630,000
estimate
Ksh 0

Kamelilo Primary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2003
action
Renovation Of Classrooms And Emergency Funding For Construction Of Pit Latrines
output
Complete Classrooms And Pit Latrines
implementation status
Complete And In Use
total cost
Ksh 622,900
estimate
Ksh 0

Milimani Ecd

location
Eldama Ravine (in Eldama Ravine)
year first funded
2005
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
Ongoing
total cost
Ksh 620,000
estimate
Ksh 0

Torongo Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2006
action
Construction Of The Dip
output
Fuctional Dispensary
implementation status
Complete
total cost
Ksh 620,000
estimate
Ksh 0

Tugumoi Primary School

location
Torongo (in Eldama Ravine)
year first funded
2003
action
Construction Of Classroom
output
Complete And Functional Classroom
implementation status
Four Classrooms Complete
total cost
Ksh 600,000
estimate
Ksh 0

Sogeon Dairy Farmers Dip

location
Lembus Central (in Eldama Ravine)
year first funded
2009
action
Construction Of New Foundation, Roofing And Path For The Dip
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

St Joseph Primary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2004
action
Construction Of New Classrooms
output
Complete Classroom
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Simotwet Health Centre

location
Perkerra (in Eldama Ravine)
year first funded
2004
action
Construction Of The Dispensary
output
Functional Dispensary
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Mwangaza Electricity Project

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Electrification In Tugomoi Area
output
Enhanced Power Supply
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Sogeon Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2007
action
Construction Of The Cattle Dip
output
Functional Cattle Dip
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Tinet Health Centre

location
Torongo (in Eldama Ravine)
year first funded
2003
action
Construction Of The Health Center
output
Functional Health Center
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Baringo Secondary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2005
action
Top Up Towards The Purchase Of A School Bus
output
Operational School Bus Procured
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kamelilo Day Secondary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2004
action
Completion Of Classroom
output
Roofing Completed
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Muserechi Water Project

location
Kiplombe (in Eldama Ravine)
year first funded
2004
action
Construction Of Tank And Piping Of Water
output
Complete Tank And Pipes Purchased
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Poror Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2007
action
Construction Of A New Classroom
output
Functional Classroom
implementation status
Ongoing, Finishing Works
total cost
Ksh 550,000
estimate
Ksh 0

Kapsigot Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 0

Majimazuri Forest Primary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2007
action
Construction Of A New Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 0

Tambarass Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Construction Of A Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 0

Tebeswet Water Project

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of Water Tank
output
Complete Water Tank
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 0

Torongo Health Centre

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Purchase Of A Water Tank And Completion Of The Dispensary
output
Water Tank Procured And Completion Works Done
implementation status
Complete
total cost
Ksh 520,000
estimate
Ksh 0

Nerkwo Water Project

location
Torongo (in Eldama Ravine)
year first funded
2007
action
Construction Of The Intake And Piping Of Water To The Distribution Tank Closer To The Residents
output
Complete Tank And Piping Of Water
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Kabiyet Dispensary

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Construction Of Dispensary
output
Complete Dispensary
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Kaplelechwa Water Tank

location
Kabiyet (in Eldama Ravine)
year first funded
2006
action
Construction Of A Water Tank
output
Complete Water Tank
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Sogonin Primary School

location
Kabiyet (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom
output
Purchase Of Land Ad Construction Of Classrooms
implementation status
4 Acres Of Land Purchased And Classroom Constructed
total cost
Ksh 500,000
estimate
Ksh 0

Kipkuyang Primary School

location
Koisamo (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom
output
One Complete Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kaptim Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Complete Classroom
implementation status
One Complete, Painting Of Roofs Of 8 Classrooms Done
total cost
Ksh 500,000
estimate
Ksh 0

Metipso Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Complete Classroom
implementation status
One Complete The Other At Lintel Level
total cost
Ksh 500,000
estimate
Ksh 0

Sigowet Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2005
action
Construction Of A Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kibias -Tolmo Road

location
Saos/Kibias (in Eldama Ravine)
year first funded
2008
action
Clearing, Spot Gravelling And Drainage Along The Road
output
Passable Road And Better Drainage
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kibias Water Project

location
Saos/Kibias (in Eldama Ravine)
year first funded
2007
action
Construction Of The Water Tank
output
Complete And Functional Water Tank
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kapketen -Kirobon Road

location
Solian (in Eldama Ravine)
year first funded
2008
action
Clearing, Spot Gravelling And Drainage Along The Road
output
Complete And Passable Road
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Bikwen Prmary School

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom From Foundation And Renovation Of Five Classrooms, Office And Staffroom
output
Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Bondeni Ecd

location
Eldama Ravine (in Eldama Ravine)
year first funded
2008
action
Construction Of An Ecd Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 482,176
estimate
Ksh 0

Tugumoi Dispensary

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Construction Of The Dispensary
output
Complete And Functional Dispensary
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Sinonin Dispensary

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Dispensary
output
Functional Dispensary
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Tamket Ecd/Primary School

location
Kiptuno (in Eldama Ravine)
year first funded
2007
action
Construction Of New Classroom
output
One Complete Classroom
implementation status
New
total cost
Ksh 450,000
estimate
Ksh 0

Orinie Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2005
action
Construction Of Classrooms
output
Complete Two Classroom
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 0

Sinendet Primary School

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Complete Classroom
implementation status
One Completed And Th Other Yet To Commenceas Funds Not Yet Disbursed
total cost
Ksh 450,000
estimate
Ksh 0

Kapsoit Hill Teas Community Road Project

location
Mumberes (in Eldama Ravine)
year first funded
2009
action
Spot Gravelling, Drainage And Fixing Of Culverts
output
Passable Road And Better Drainage
implementation status
New
total cost
Ksh 436,015
estimate
Ksh 0

Timboroa Health Centre

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of The Maternity Wing
output
Complete Maternity Wing
implementation status
Complete
total cost
Ksh 425,000
estimate
Ksh 0

Tinet Primary School

location
Torongo (in Eldama Ravine)
year first funded
2007
action
Construction Of Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 0

Torongo Water Tank

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Construction Of A Water Tank
output
Complete And Functional Tank
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Mumberes Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Complete Classroom
implementation status
2 Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Maji Mazuri Boys Secondary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2004
action
Construction Of A New Dormitory
output
Complete And Functional Dormitory
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Morkisis Cattle Dip

location
Kiplombe (in Eldama Ravine)
year first funded
2007
action
Repair, Construction Of Path And Fencing Of The Dip
output
Complete Dip In Use
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Kiplombe Dispensaryesary

location
Kiplombe (in Eldama Ravine)
year first funded
2004
action
Construction Of The Dispensary
output
Complete Dispensary
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Eldama Ravine Boarding Primary School

location
Eldama Ravine (in Eldama Ravine)
year first funded
2005
action
Construction Of Dining Hall And Kitchen
output
Dining Hall And Kitchen
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kisarget Water Project

location
Perkerra (in Eldama Ravine)
year first funded
2009
action
Purchase Of New Pipes And Construction Of Intake
output
Ready Intake And Pipes For Reticulation
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Tolmo Water Project

location
Saos/Kibias (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Complete Tank And Pipes Purchased
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Kemelone-Tenges Road

location
Saos/Kibias (in Eldama Ravine)
year first funded
2009
action
Spot Gravelling, Bush Clearing And Drainage Along The 7Km Road
output
Passable Road And Better Drainage
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 0

Siloi Ecd

location
Lembus Central (in Eldama Ravine)
year first funded
2007
action
Completion Of Classrooms And Renovation Works
output
One Classroom
implementation status
Ongoing
total cost
Ksh 390,000
estimate
Ksh 0

Muserechi Cattle Dip

location
Lembus Mosop (in Eldama Ravine)
year first funded
2008
action
Completion Of Fencing, Path And Roofing
output
Complete Dip
implementation status
Ongoing
total cost
Ksh 360,000
estimate
Ksh 0

Kibarasoi Ecd

location
Torongo (in Eldama Ravine)
year first funded
2006
action
Construction Of Two Permanent Classrooms
output
Two Complete Classroom
implementation status
Ongoing And Project At Lintel Level
total cost
Ksh 350,000
estimate
Ksh 0

Tabare Cattle Dip

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Construction Of A Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Kaburwo Elecricity Project

location
Perkerra (in Eldama Ravine)
year first funded
2006
action
Supply Of Electrification To The Area
output
Increased Power Supply
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Igure Primary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2006
action
Construction Of A New Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Soymining Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom And Power Connection
output
Complete Classroom And Power Supplied
implementation status
Complete
total cost
Ksh 335,000
estimate
Ksh 0

Shauri Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2004
action
Purchase Of Pipes To Reticulate The Water And Digging Of Trenches
output
Pipes Bought And Laid
implementation status
Complete
total cost
Ksh 319,830
estimate
Ksh 0

Langas Community Development Group

location
Lembus Central (in Eldama Ravine)
year first funded
2005
action
Repair Of The Water Engine
output
Functional Engine
implementation status
Repaired And In Use
total cost
Ksh 300,000
estimate
Ksh 0

Kapdening Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2005
action
Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
output
Pipes Procured And Piping Done
implementation status
Phase One Completed. The Other Phase Merged With Perkerra Water Project
total cost
Ksh 300,000
estimate
Ksh 0

Sagat Dispensary

location
Kabimoi (in Eldama Ravine)
year first funded
2009
action
Purchase Of Lab Equipment
output
Supplied Lab Equipment For The Dispensary
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Kabiyet Cattle Dip

location
Kabiyet (in Eldama Ravine)
year first funded
2005
action
Rehabilitation Of Of Path, Water Tank And Fencing
output
Functional Dip And Tank
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Sosion Water Project

location
Kabiyet (in Eldama Ravine)
year first funded
2007
action
Purchase Of Pipes For Distribution Of Water
output
Increased Supply Of Water To The Residents
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kapkitet Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2007
action
Supply Of Electricity To The School
output
Access To Power For The School
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kiplombe Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2007
action
Construction Of Classsroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Koisamo Secondary School

location
Koisamo (in Eldama Ravine)
year first funded
2006
action
Construction Of One Classroom
output
One Complete Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Arama Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2007
action
Construction Of Classroom
output
Functional Classroom
implementation status
One Complete
total cost
Ksh 300,000
estimate
Ksh 0

Chemeswon Water Project

location
Lembus Mosop (in Eldama Ravine)
year first funded
2005
action
Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
output
Ready Intake And Pipes
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Timboroa Secondary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2005
action
Construction Of A New Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Maji Mazuri Rc Primary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2007
action
Construction Of An Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Equator Health Centre

location
Mumberes (in Eldama Ravine)
year first funded
2003
action
Construction Of The Dispensary
output
Complete Dispensary
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 0

Equator Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Construction Of A New Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Haraka Ecd

location
Mumberes (in Eldama Ravine)
year first funded
2006
action
Construction Of A Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Kiplongon Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2004
action
Construction Of A New Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Mumberes Electricity Project

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Electrification Of The Area
output
Enhance Power Supply To Public Institutions And The Residents
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Chepsito Road Construction

location
Perkerra (in Eldama Ravine)
year first funded
2004
action
Bridge Construction To Connect The Area
output
Complete Bridge
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Sigoro Dispensary

location
Sigoro (in Eldama Ravine)
year first funded
2004
action
Construction Of The Dispensary
output
Complete And Functional Dispensary
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Tugumoi Secondary School

location
Torongo (in Eldama Ravine)
year first funded
2006
action
Construction Of Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Emkwen Cattle Dip

location
Mumberes (in Eldama Ravine)
year first funded
2006
action
Completion Of Path And Fencing Of The Dip
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 290,000
estimate
Ksh 0

Bikwen Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Purchase Of Land And Rehabilitation Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 272,000
estimate
Ksh 0

Kapchebokel Ecd

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Construction Of Three Semipermanent Classrooms And Toilet
output
Three Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Cheptililik Ecd

location
Saos/Kibias (in Eldama Ravine)
year first funded
2008
action
Purchase Of Land Towards Construction Of The Ecd
output
Land Purchased And An New Ecd Commenced
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Kapsoit Primary School

location
Mumberes (in Eldama Ravine)
year first funded
2008
action
Construction Of Two Classrooms
output
-
implementation status
Finishings yet to be done
total cost
Ksh 250,000
estimate
Ksh 0

St. Primary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2006
action
Construction Of Two Classrooms
output
Two Complete Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Githioro Primary School

location
Maji Mazuri (in Eldama Ravine)
year first funded
2009
action
Construction Of New Classroom
output
One Classroom
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Tarigo Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2006
action
Construction Of A New Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

St Mary's Boito Secondary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2005
action
Construction
output
Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Seguton Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2006
action
Construction Of A Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kamura Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2006
action
Construction Of Classroom
output
Complete And Functional Classroom
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 0

Sinonin Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2008
action
Completion Of Primary
output
Functional Dispensary
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kiptuno Primary School

location
Kiptuno (in Eldama Ravine)
year first funded
2006
action
Construction Of Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Benonin Primary School

location
Kabiyet (in Eldama Ravine)
year first funded
2009
action
New Foundation And Walls For A Classroom
output
One Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kanjulul Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Tiripkatoi Water Project

location
Torongo (in Eldama Ravine)
year first funded
2008
action
Purchase Of Pipes For Distribution Of Water
output
Pipes Procured And Piping Done
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Kaburwo Cattle Dip

location
Perkerra (in Eldama Ravine)
year first funded
2004
action
Repair Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 235,000
estimate
Ksh 0

Shabab Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2005
action
Piping Of Water Closer To The Constituents
output
Pipes Laid And Water Reticulated
implementation status
Complete And In Use
total cost
Ksh 232,285
estimate
Ksh 0

Toniok Borehole Project

location
Perkera (in Eldama Ravine)
year first funded
2005
action
Purchase Of Pipes For Reticulation Of Water
output
Pipes Procured
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 0

Toniok Borehole

location
Perkerra (in Eldama Ravine)
year first funded
2004
action
Repair Of The Borehole And Pump
output
Functional Water Pump
implementation status
Complete
total cost
Ksh 220,000
estimate
Ksh 0

Nakurtakwei Dispensary

location
Kiplombe (in Eldama Ravine)
year first funded
2004
action
Construction Of The Dispensary
output
Functional Dispensary
implementation status
Ongoing
total cost
Ksh 220,000
estimate
Ksh 0

Boito Primary School

location
Lembus Mosop (in Eldama Ravine)
year first funded
2004
action
Construction Of Classrooms
output
Two Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kaptembwa Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2007
action
Purchase Of Pipes For Distribution Of Water
output
Pipes Procured And Piping Done
implementation status
Phase One Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kcc Community Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2006
action
Construction Of Intake And Piping Of Water Closer To The Residents Of The Area
output
Pipes Bought And Piping Done
implementation status
Phase One Completed.
total cost
Ksh 200,000
estimate
Ksh 0

Lower Hill Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2007
action
Construction Of Pipeline To Distribute Water Closer To The Residents
output
Piping Of Water
implementation status
Complete And Fuctional
total cost
Ksh 200,000
estimate
Ksh 0

Sotwet Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2007
action
Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
output
Pipes Bought And Clean Water Supplied
implementation status
90% Of Work Completed
total cost
Ksh 200,000
estimate
Ksh 0

Tilatil Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2007
action
Purchase Of Pipes For Distribution Of Water
output
Supply Of Clean Drinking Water To The Residents
implementation status
Complete And Functional
total cost
Ksh 200,000
estimate
Ksh 0

Kaplelechwa Ecd

location
Kabiyet (in Eldama Ravine)
year first funded
2006
action
Construction Of An Ecd Classroom
output
Complete Ecd Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Luita Ecd

location
Kabiyet (in Eldama Ravine)
year first funded
2007
action
Purchase Of Land For The Construction Of An Ecd
output
Functional Ecd School
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Kapkitet Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2006
action
Emergency Funding For The Construction Of A Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Lemonera Cattle Dip

location
Kiplombe (in Eldama Ravine)
year first funded
2007
action
Renovations Of Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Muserechi Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Arama Health Centre

location
Lembus Central (in Eldama Ravine)
year first funded
2006
action
Construction Of Maternity Wing
output
Complete And Functional Maternity Wing
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kamasaba Primary School

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Classroom
output
Classroom
implementation status
Construction Upto Lintel Level
total cost
Ksh 200,000
estimate
Ksh 0

Kapsigot Water Project

location
Lembus Mosop (in Eldama Ravine)
year first funded
2005
action
Construction Of Water Tank
output
Complete And Functional Tank
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Igure Dispensary

location
Maji Mazuri (in Eldama Ravine)
year first funded
2003
action
Construction Of Dispensary
output
Complete Dispensary
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Jonathan Moi Primary School

location
Perkerra (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Simotwet Primary School

location
Perkerra (in Eldama Ravine)
year first funded
2005
action
Construction Of Classroom And Clearance Of Title Fee For The School Land 17 Hectares
output
Land Procured And Classrooms Constructed
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Toniok Community Water Project

location
Perkerra (in Eldama Ravine)
year first funded
2006
action
Purchase Of Pipes Towards Reticulation Of Water Closer To The Residents
output
Specified Pipes Procured And Laid
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Ipopor Water Project

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Construction Of A Water Tank
output
Complete And Functional Tank
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Seguton Cattle Dip

location
Lembus Mosop (in Eldama Ravine)
year first funded
2004
action
Renovations Of Cracks, Path And Fence
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 195,000
estimate
Ksh 0

Kabiyet Primary School

location
Kabiyet (in Eldama Ravine)
year first funded
2006
action
Construction Of Pit Latrines
output
Complete Pit Latrine For Pupils In The Area
implementation status
Complete
total cost
Ksh 165,000
estimate
Ksh 0

Kimikwet Water Project

location
Eldama Ravine (in Eldama Ravine)
year first funded
2007
action
Digging Of Trenches And Laying Of Pipings To Distribute Water Closer To The Populace
output
Pipes Bought And Laid
implementation status
Phase One Complete
total cost
Ksh 160,000
estimate
Ksh 0

Tiripkatoi Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2009
action
Renovation Of Fence And Repair Works
output
Functional Dip
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 0

Sogeon Water Project

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of A Water Tank
output
Complete Tank
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 0

Kapchurum Water Project

location
Mumberes (in Eldama Ravine)
year first funded
2006
action
Purchase Of Pipes To Reticulate The Water
output
Clean Water Supplied
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Tambarass Road

location
Mumberes (in Eldama Ravine)
year first funded
2009
action
Spot Gravelling
output
Improved And Passable Road
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 0

Kapseret Water Project

location
Lembus Central (in Eldama Ravine)
year first funded
2006
action
Completion Of Water Tank
output
Complete Tank
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Shauri Yako Cattle Dip Ex G

location
Eldama Ravine (in Eldama Ravine)
year first funded
2006
action
Rehabiltation Of Walls And Fence For The Dip
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Testai Teskatree Nursery

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Establishment Of A Tree Nursery
output
Tree Nursery With Various Tree Seedlings-Indigenous And Exotic
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kokorwonin Water Project

location
Kiplombe (in Eldama Ravine)
year first funded
2004
action
Completion Of Water Tank And Purchase Of Pipes
output
Complete Tank And Pipes
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Kapcholoi Water Tank

location
Lembus Central (in Eldama Ravine)
year first funded
2006
action
Construction Of Water Tank
output
Complete Water Tank
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kaplelingor Women Water Project

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction Of Water Tank
output
Complete Tank
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kaptiegan Cattle Dip

location
Saos/Kibias (in Eldama Ravine)
year first funded
2009
action
Renovation Of Walls, Roof And Path
output
Complete And Functional Dip
implementation status
New
total cost
Ksh 146,000
estimate
Ksh 0

Narosura Health Centre Ft

location
Perkerra (in Eldama Ravine)
year first funded
2003
action
Renovation Of The Health Center
output
Complete And Functional Health Facility
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kapsamuti Water Project

location
Lembus Mosop (in Eldama Ravine)
year first funded
2004
action
Purchase Of Pipes For Distribution Of Water
output
Pipes Procured And Piping Done
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Mumberes Bridge

location
Mumberes (in Eldama Ravine)
year first funded
2008
action
Spot Gravelling And Maintenance Of The Bridge/Road
output
Road Gravelled
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Mumberes Cattle Dip

location
Mumberes (in Eldama Ravine)
year first funded
2007
action
Renovations Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Tambarass Cattle Dip

location
Mumberes (in Eldama Ravine)
year first funded
2007
action
n/a
output
-
implementation status
Finishings yet to be done
total cost
Ksh 100,000
estimate
Ksh 0

Poror Ecd

location
Lembus Central (in Eldama Ravine)
year first funded
2006
action
Rehabilitation Of Classroom
output
Functional Classroom
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Soibei Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2005
action
Land Purchase Towards Construction Of The Dip
output
Dip Land Purchased And Necessary Documentation Processed
implementation status
0.21Ha.Of Land Bought
total cost
Ksh 100,000
estimate
Ksh 0

Benonin Women Electricity

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Extension Of Electrification In The Area
output
Enhanced Power Supply
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kabiyet Primary School

location
Kabiyet (in Eldama Ravine)
year first funded
2004
action
Completion Of Classrooms
output
Classrooms
implementation status
Two Completed
total cost
Ksh 100,000
estimate
Ksh 0

Sosion Road

location
Kabiyet (in Eldama Ravine)
year first funded
2009
action
Gravelling Of 100 Meters Of Road
output
Better And Passable Road Network
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 0

Kanjulul-Morkisis-Posto Road

location
Kiplombe (in Eldama Ravine)
year first funded
2009
action
Filling Of Potholes And Drainage Works
output
Passable Road And Better Drainage
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kanjulul Primary School

location
Kiplombe (in Eldama Ravine)
year first funded
2006
action
Emergency Funding For Completion Of Classroom
output
Complete Classroom
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Mandina Borehole

location
Kiplombe (in Eldama Ravine)
year first funded
2006
action
Repair Of The Borehole
output
Functional Borehole To Provide Clean Water To Residents
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Muserechi Dispensary

location
Kiplombe (in Eldama Ravine)
year first funded
2006
action
Purchase Of Land For The Construction Of The Dispensary
output
Land Purchased
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Chemususu Dispensary

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Renovation Of The Dispensary
output
Fuctional Dispensary
implementation status
Complete Dispensary
total cost
Ksh 100,000
estimate
Ksh 0

Lembus Central Cultural Centre

location
Lembus Central (in Eldama Ravine)
year first funded
2008
action
Functional Cultural Centre
output
Cultural Artefacts Procured
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Soymining Dip

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Repair Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kibias Cattle Dip

location
Saos/Kibias (in Eldama Ravine)
year first funded
2005
action
Rehabilitation Of The Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Saos Cattle Dip

location
Saos/Kibias (in Eldama Ravine)
year first funded
2006
action
Rehabilitation Of The Dip
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Mwachon Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2006
action
Rehabilitation Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Tugumoi Cattle Dip

location
Torongo (in Eldama Ravine)
year first funded
2004
action
Repair Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Mochongoi Attle Dip

location
Kabiyet (in Eldama Ravine)
year first funded
2005
action
Repair Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Benonin Cattle Dip

location
Kabiyet (in Eldama Ravine)
year first funded
2005
action
Rehabilitation Of The Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kiptuno Cattle Dip

location
Kiptuno (in Eldama Ravine)
year first funded
2009
action
Repair Of Fence For The Dip
output
Functional Dip
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 0

Kamelilo Cattle Dip

location
Eldama Ravine (in Eldama Ravine)
year first funded
2006
action
Renovations Of The Dip
output
Complete And Functional Dip
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 0

Gilgil Cattle Dip

location
Perkerra (in Eldama Ravine)
year first funded
2006
action
Repair Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Togeito Water Project

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Construction
output
Tank
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Tinet Cattle Dip

location
Lembus Mosop (in Eldama Ravine)
year first funded
2006
action
Repair Of The Dip
output
Functional Dip
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Lelgel Cattle Dip

location
Mumberes (in Eldama Ravine)
year first funded
2005
action
Repair Of The Cattle Dip
output
Functional Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kapngoech Dispensary

location
Lembus Central (in Eldama Ravine)
year first funded
2004
action
Emergency Funding For The Construction Of Pit Latrine
output
Pit Latrine
implementation status
Complete And In Use
total cost
Ksh 20,000
estimate
Ksh 0