The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Koisamo/ Sigoro/Kiptuno Road
- location
-
Sigoro
(in Eldama Ravine)
- year first funded
- 2005
- action
- Spot Gravelling, Clearing And Drainage Along The Koisamo/Sigoro/Kiptuno Road
- output
- Gravelled And Passable Road To Facilitate Transport And Communication In The Area
- implementation status
- Complete And In Use
- total cost
- Ksh 6,000,000
- estimate
- Ksh 0
Kaplesir Water Project
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2006
- action
- Environmental Impact Assessment, Water Analysis, Construction Of Intake And Purchase Of Pipes For water distribution
- output
- Complete Intake And Water Reticulated Closer The Residents
- implementation status
- Ongoing
- total cost
- Ksh 5,400,000
- estimate
- Ksh 0
Mumberes Water Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2009
- action
- Construction Of Intake, Tank And Purchase Of Pipes For Reticulation Of Water
- output
- Tank, Piping Works Done
- implementation status
- New
- total cost
- Ksh 5,150,000
- estimate
- Ksh 0
Narosura-Emkwen Clean Water Project
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Intake, Three Tanks And Piping Of Water To The Distribution Tanks Closer To The Constituents
- output
- One Tank Constructed And Another Plastic Two Procured As Well As Pipes Bought And Pipeworks Done To The Tanks
- implementation status
- Phase One Complete And In Use
- total cost
- Ksh 5,000,000
- estimate
- Ksh 0
Kiptuno Community Water Project
- location
-
Kiptuno
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Intakem Tank And Piping Of Water Closer To The Residents
- output
- Complete Intake, Ready Water Tank And Piping Of Water
- implementation status
- Phase One Complete
- total cost
- Ksh 4,800,000
- estimate
- Ksh 0
Assururiet Water Project
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
- output
- Tanks And Pipes
- implementation status
- Ongoing
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Mumberes Girls Secondary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Classrooms And Dormitory
- output
- Complete Classrooms And Dormitory
- implementation status
- 5 Complete
- total cost
- Ksh 3,850,000
- estimate
- Ksh 0
Torongo Secondary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom, Dining Hall And Kitchen
- output
- Classroom And Dining Hall
- implementation status
- Two Classrooms Complete And Dining Hall Set To Start
- total cost
- Ksh 2,950,000
- estimate
- Ksh 0
Perkerra Water Project
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2007
- action
- Purchase Of Pipes And Construction Of Tank
- output
- Tank And Pipe Works Done
- implementation status
- Ongoing
- total cost
- Ksh 2,350,000
- estimate
- Ksh 0
Tulwomoi Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom And Supply Of Power To The School
- output
- Complete Classroom And Power Supplied
- implementation status
- Two Classrooms Ongoing And Power Suppply Under Way
- total cost
- Ksh 2,320,000
- estimate
- Ksh 0
Nyorki/Chemelil Water Project
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Tank
- output
- Ready Tank And Piped Water
- implementation status
- Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 0
Saos Secondary School
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Dining Hall And Computer Lab
- output
- Dining Hall And Computer Lab
- implementation status
- Ongoing
- total cost
- Ksh 1,990,000
- estimate
- Ksh 0
Kamelilo Borehole Chepsito/Kapko
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction
- output
- Pipes And Water Tanks
- implementation status
- Ongoing
- total cost
- Ksh 1,900,000
- estimate
- Ksh 0
Mochongoi Primary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Purchase Of Land And Construction Of Classrooms
- output
- 2 Acres Land/ 6 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,850,000
- estimate
- Ksh 0
Kiplombe Secondary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Classrooms And Administration Block
- output
- Complete Clasrooms And Administraion Block
- implementation status
- Three Complete Classrooms.Completion Of Administration Block Under Way
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Lelgel Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms And Supply Of Power To The School
- output
- Complete Classroom And Power Supplied
- implementation status
- Two Classrooms Being Completed And Power Supply In Process
- total cost
- Ksh 1,550,000
- estimate
- Ksh 0
Tabare Electricty Project
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2008
- action
- Supply Of Electricity To The Area
- output
- Increased Supply Of Power To The Residents
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Cheraik Primary School
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Four Classrooms And Staffroom
- output
- Classrooms
- implementation status
- All Classrooms Incomplete And Require Funds For Completetion In Addition To The Emergency Request To Repair Wall Blown By Wind. Project Has Evident Poor Workmanship
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Arama Secondary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Three Classrooms
- output
- Three Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,450,000
- estimate
- Ksh 0
Nerkwo Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Electrification To The Primary Chool And Renovations Of Classrooms
- output
- Anhanced Power Supply And Completely Renovated Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Mumberes Primary School Electricity Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2006
- action
- Electrification
- output
- Power Supply
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kabiyet Benonin Water Project
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Tank And Piping Of Water
- output
- Pipe Works And Tank
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Poror Secondary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of A New Dormitory
- output
- Complete Dormitory
- implementation status
- New
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Toniok Girls Secondary School
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2007
- action
- Renovation Of 2 Classrooms Blown By Wind, Construction Of Classroom And A New Dormitory
- output
- Classrooms And Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Benonin Secondary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of A Laboratory And Classroom
- output
- Complete Lab And Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,230,000
- estimate
- Ksh 0
Tinet Day Secondary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Eldama Ravine Girls Secondary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Teachers Houses
- output
- Complete Teachers Houses
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Tugumoi Koibatek Secondary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Adminstration Block And Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Uhuru Secondary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Complete Three Classrooms
- implementation status
- Three Classrooms Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Soibei Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Chemeswon Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Saos Primary School
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Tolmo Primary School
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Classroom And Administration Blcok
- output
- Complete Classroom And Administration Block
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Kaplelechwa Electricity Project
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2008
- action
- Supply Of Electricity To The Area
- output
- Increase Access To Power By The Constituents
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lalut Primary School
- location
-
Koisamo
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Three Classrooms
- output
- Complete Three Classrooms
- implementation status
- Three Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lelderit Regesoi Road
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2008
- action
- Completion Of Gravelling And Fixing Culverts
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kipkoriony Water Project
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Water Tank And Piping Of Water Closer To The Constituents
- output
- Pipes Purchased And Water Tank Constructed
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kiplongon Water Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of The Water Tank
- output
- Complete Water Tank
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Highlands Mixed Day Secondary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2008
- action
- Construction Of Three Classrooms
- output
- Three Classrooms
- implementation status
- One Clasroom Incomplete And Require Finishing, Windows, Doors And Plastering
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Bhakita Girls Secondary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Tiripkatoi Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Emergency Repair Of Toilets And Completion Of Classroom As Well As Construction Of A New Classroom
- output
- Functional Toilets And Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
St. Patrick Shimoni Primary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Latrines And Renovation Of Classrooms
- output
- Latrines Constucted And Classrooms Renovated
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Soymining Water Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Water Tank
- output
- Complete And Functional Water Tank
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Nyakio Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Three Classrooms
- output
- Complete Three Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kapngoech Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Three Complete Classrooms
- implementation status
- Three Complete
- total cost
- Ksh 847,000
- estimate
- Ksh 0
Mandina Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Complete And Functional Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 825,000
- estimate
- Ksh 0
Tendwet Electrity Mlango Mumbere
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2006
- action
- Electrification Of The Area
- output
- Increased Power Supply To The Residents
- implementation status
- Complete
- total cost
- Ksh 815,000
- estimate
- Ksh 0
Equator Water Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of A Water Tank To Distribute Water In The Area
- output
- Complete Water Tank
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Seguton Dispensary
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- Complete And Functional Dispensary
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kapcholoi Secondary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Four Classroom
- output
- Complete Four Classroom
- implementation status
- Two Complete Classrooms And Two Awaiting Completion
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kabor Primary School
- location
-
Kiptuno
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Complete Three Classroom
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Oinoptich Water Project
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2007
- action
- Piping Of Water Closer To The Constituents
- output
- Clean Water Supplied
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Nakurtakwei Road Project
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2004
- action
- Spot Gravelling And Maintenance Of The Road
- output
- Gravelled Road And Passable Road
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Moringwo Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Two Complete And Three At Foundation Level
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Aic Eldama Ravine Health Centre
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Complete Dispensary
- implementation status
- Ongoing Works At Lintel Level
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Nakurtakwei Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Complete Two Classroom
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kewangoi Primary School
- location
-
Koisamo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Two Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kapcholoi Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom And Administration Block
- output
- Complete Classrooms And Administration Block
- implementation status
- Two Complete. Administration Block Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Sinonin Secondary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2008
- action
- Construction Of New Classrooms
- output
- Two Classrooms Yet To Start
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Sigowet Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Complete Classrooms
- implementation status
- Two Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kipkoriony Primary School
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2004
- action
- Renovations Of The Cattle Dip
- output
- Complete Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kibias Community Dispensary
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Dispensary And Completion Of Tank And Fittings
- output
- Compeleted Dispensary Wing And Storage Tank
- implementation status
- Ongoing
- total cost
- Ksh 727,740
- estimate
- Ksh 0
Kiptuno Health Centre
- location
-
Kiptuno
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Dispensary Lab
- output
- Complete Dispensary Lab
- implementation status
- Complete
- total cost
- Ksh 710,000
- estimate
- Ksh 0
Mwachon Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- Two Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kibias Primary School
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Construction Of Classroom
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Chemususu Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Two Classroom
- output
- Complete Classrooms
- implementation status
- Two Complete Classroom
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kiplongon Cattle Dip
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Fencing And Cementing Of Waln Paths For The Dip
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Toniok Primary School
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Cheraik Water Project
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Tank And Purchase Of New Pipes For Reticulation Of Water
- output
- Tank And Piping Works Done
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Tolmo Secondary School
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Two Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kirima Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms And Completion Of Others
- output
- Functional And Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 680,000
- estimate
- Ksh 0
Torongo Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom And Six Door Toilet
- output
- Classroom And Six Door Toilet
- implementation status
- Ongoing
- total cost
- Ksh 670,000
- estimate
- Ksh 0
Koibatek Primary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Two Classrooms And Pit Latrine (Emergency Funds)
- output
- Two Complete Classrooms And Pit Latrine
- implementation status
- One Complete Classroom And One Yet To Commence. Pit Latrine Completed And Functional.
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kokorwonin Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Complete Classrooms
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kaprorwa Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Complete Classrooms
- implementation status
- One Complete
- total cost
- Ksh 630,000
- estimate
- Ksh 0
Kamelilo Primary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2003
- action
- Renovation Of Classrooms And Emergency Funding For Construction Of Pit Latrines
- output
- Complete Classrooms And Pit Latrines
- implementation status
- Complete And In Use
- total cost
- Ksh 622,900
- estimate
- Ksh 0
Milimani Ecd
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 0
Torongo Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of The Dip
- output
- Fuctional Dispensary
- implementation status
- Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 0
Tugumoi Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Complete And Functional Classroom
- implementation status
- Four Classrooms Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Sogeon Dairy Farmers Dip
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2009
- action
- Construction Of New Foundation, Roofing And Path For The Dip
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
St Joseph Primary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of New Classrooms
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Simotwet Health Centre
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of The Dispensary
- output
- Functional Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mwangaza Electricity Project
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Electrification In Tugomoi Area
- output
- Enhanced Power Supply
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Sogeon Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of The Cattle Dip
- output
- Functional Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Tinet Health Centre
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of The Health Center
- output
- Functional Health Center
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Baringo Secondary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2005
- action
- Top Up Towards The Purchase Of A School Bus
- output
- Operational School Bus Procured
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kamelilo Day Secondary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2004
- action
- Completion Of Classroom
- output
- Roofing Completed
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Muserechi Water Project
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Tank And Piping Of Water
- output
- Complete Tank And Pipes Purchased
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Poror Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of A New Classroom
- output
- Functional Classroom
- implementation status
- Ongoing, Finishing Works
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kapsigot Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Majimazuri Forest Primary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of A New Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Tambarass Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Tebeswet Water Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Water Tank
- output
- Complete Water Tank
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Torongo Health Centre
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Purchase Of A Water Tank And Completion Of The Dispensary
- output
- Water Tank Procured And Completion Works Done
- implementation status
- Complete
- total cost
- Ksh 520,000
- estimate
- Ksh 0
Nerkwo Water Project
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of The Intake And Piping Of Water To The Distribution Tank Closer To The Residents
- output
- Complete Tank And Piping Of Water
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kabiyet Dispensary
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Complete Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kaplelechwa Water Tank
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of A Water Tank
- output
- Complete Water Tank
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sogonin Primary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Purchase Of Land Ad Construction Of Classrooms
- implementation status
- 4 Acres Of Land Purchased And Classroom Constructed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kipkuyang Primary School
- location
-
Koisamo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- One Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kaptim Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Complete Classroom
- implementation status
- One Complete, Painting Of Roofs Of 8 Classrooms Done
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Metipso Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- One Complete The Other At Lintel Level
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sigowet Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kibias -Tolmo Road
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2008
- action
- Clearing, Spot Gravelling And Drainage Along The Road
- output
- Passable Road And Better Drainage
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kibias Water Project
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of The Water Tank
- output
- Complete And Functional Water Tank
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kapketen -Kirobon Road
- location
-
Solian
(in Eldama Ravine)
- year first funded
- 2008
- action
- Clearing, Spot Gravelling And Drainage Along The Road
- output
- Complete And Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Bikwen Prmary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom From Foundation And Renovation Of Five Classrooms, Office And Staffroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Bondeni Ecd
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2008
- action
- Construction Of An Ecd Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 482,176
- estimate
- Ksh 0
Tugumoi Dispensary
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of The Dispensary
- output
- Complete And Functional Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Sinonin Dispensary
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Functional Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Tamket Ecd/Primary School
- location
-
Kiptuno
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of New Classroom
- output
- One Complete Classroom
- implementation status
- New
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Orinie Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Complete Two Classroom
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Sinendet Primary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Complete Classroom
- implementation status
- One Completed And Th Other Yet To Commenceas Funds Not Yet Disbursed
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kapsoit Hill Teas Community Road Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2009
- action
- Spot Gravelling, Drainage And Fixing Of Culverts
- output
- Passable Road And Better Drainage
- implementation status
- New
- total cost
- Ksh 436,015
- estimate
- Ksh 0
Timboroa Health Centre
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of The Maternity Wing
- output
- Complete Maternity Wing
- implementation status
- Complete
- total cost
- Ksh 425,000
- estimate
- Ksh 0
Tinet Primary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 0
Torongo Water Tank
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of A Water Tank
- output
- Complete And Functional Tank
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mumberes Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- 2 Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Maji Mazuri Boys Secondary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of A New Dormitory
- output
- Complete And Functional Dormitory
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Morkisis Cattle Dip
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2007
- action
- Repair, Construction Of Path And Fencing Of The Dip
- output
- Complete Dip In Use
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kiplombe Dispensaryesary
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of The Dispensary
- output
- Complete Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Eldama Ravine Boarding Primary School
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Dining Hall And Kitchen
- output
- Dining Hall And Kitchen
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kisarget Water Project
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2009
- action
- Purchase Of New Pipes And Construction Of Intake
- output
- Ready Intake And Pipes For Reticulation
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Tolmo Water Project
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Complete Tank And Pipes Purchased
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kemelone-Tenges Road
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2009
- action
- Spot Gravelling, Bush Clearing And Drainage Along The 7Km Road
- output
- Passable Road And Better Drainage
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Siloi Ecd
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2007
- action
- Completion Of Classrooms And Renovation Works
- output
- One Classroom
- implementation status
- Ongoing
- total cost
- Ksh 390,000
- estimate
- Ksh 0
Muserechi Cattle Dip
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2008
- action
- Completion Of Fencing, Path And Roofing
- output
- Complete Dip
- implementation status
- Ongoing
- total cost
- Ksh 360,000
- estimate
- Ksh 0
Kibarasoi Ecd
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Two Permanent Classrooms
- output
- Two Complete Classroom
- implementation status
- Ongoing And Project At Lintel Level
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Tabare Cattle Dip
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of A Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kaburwo Elecricity Project
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2006
- action
- Supply Of Electrification To The Area
- output
- Increased Power Supply
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Igure Primary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of A New Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Soymining Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom And Power Connection
- output
- Complete Classroom And Power Supplied
- implementation status
- Complete
- total cost
- Ksh 335,000
- estimate
- Ksh 0
Shauri Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2004
- action
- Purchase Of Pipes To Reticulate The Water And Digging Of Trenches
- output
- Pipes Bought And Laid
- implementation status
- Complete
- total cost
- Ksh 319,830
- estimate
- Ksh 0
Langas Community Development Group
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2005
- action
- Repair Of The Water Engine
- output
- Functional Engine
- implementation status
- Repaired And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapdening Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
- output
- Pipes Procured And Piping Done
- implementation status
- Phase One Completed. The Other Phase Merged With Perkerra Water Project
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sagat Dispensary
- location
-
Kabimoi
(in Eldama Ravine)
- year first funded
- 2009
- action
- Purchase Of Lab Equipment
- output
- Supplied Lab Equipment For The Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kabiyet Cattle Dip
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2005
- action
- Rehabilitation Of Of Path, Water Tank And Fencing
- output
- Functional Dip And Tank
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sosion Water Project
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2007
- action
- Purchase Of Pipes For Distribution Of Water
- output
- Increased Supply Of Water To The Residents
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapkitet Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2007
- action
- Supply Of Electricity To The School
- output
- Access To Power For The School
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiplombe Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Classsroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Koisamo Secondary School
- location
-
Koisamo
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- One Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Arama Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Functional Classroom
- implementation status
- One Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chemeswon Water Project
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
- output
- Ready Intake And Pipes
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Timboroa Secondary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of A New Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Maji Mazuri Rc Primary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of An Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Equator Health Centre
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of The Dispensary
- output
- Complete Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Equator Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of A New Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Haraka Ecd
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiplongon Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of A New Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mumberes Electricity Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Electrification Of The Area
- output
- Enhance Power Supply To Public Institutions And The Residents
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chepsito Road Construction
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2004
- action
- Bridge Construction To Connect The Area
- output
- Complete Bridge
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sigoro Dispensary
- location
-
Sigoro
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of The Dispensary
- output
- Complete And Functional Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Tugumoi Secondary School
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Emkwen Cattle Dip
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2006
- action
- Completion Of Path And Fencing Of The Dip
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 290,000
- estimate
- Ksh 0
Bikwen Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Purchase Of Land And Rehabilitation Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 272,000
- estimate
- Ksh 0
Kapchebokel Ecd
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Three Semipermanent Classrooms And Toilet
- output
- Three Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Cheptililik Ecd
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2008
- action
- Purchase Of Land Towards Construction Of The Ecd
- output
- Land Purchased And An New Ecd Commenced
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kapsoit Primary School
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2008
- action
- Construction Of Two Classrooms
- output
- -
- implementation status
- Finishings yet to be done
- total cost
- Ksh 250,000
- estimate
- Ksh 0
St. Primary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Two Classrooms
- output
- Two Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Githioro Primary School
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2009
- action
- Construction Of New Classroom
- output
- One Classroom
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tarigo Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of A New Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
St Mary's Boito Secondary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Seguton Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kamura Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Complete And Functional Classroom
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Sinonin Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2008
- action
- Completion Of Primary
- output
- Functional Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kiptuno Primary School
- location
-
Kiptuno
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Benonin Primary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2009
- action
- New Foundation And Walls For A Classroom
- output
- One Classroom
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kanjulul Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tiripkatoi Water Project
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2008
- action
- Purchase Of Pipes For Distribution Of Water
- output
- Pipes Procured And Piping Done
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kaburwo Cattle Dip
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2004
- action
- Repair Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 235,000
- estimate
- Ksh 0
Shabab Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2005
- action
- Piping Of Water Closer To The Constituents
- output
- Pipes Laid And Water Reticulated
- implementation status
- Complete And In Use
- total cost
- Ksh 232,285
- estimate
- Ksh 0
Toniok Borehole Project
- location
-
Perkera
(in Eldama Ravine)
- year first funded
- 2005
- action
- Purchase Of Pipes For Reticulation Of Water
- output
- Pipes Procured
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 0
Toniok Borehole
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2004
- action
- Repair Of The Borehole And Pump
- output
- Functional Water Pump
- implementation status
- Complete
- total cost
- Ksh 220,000
- estimate
- Ksh 0
Nakurtakwei Dispensary
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of The Dispensary
- output
- Functional Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 220,000
- estimate
- Ksh 0
Boito Primary School
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Two Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kaptembwa Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2007
- action
- Purchase Of Pipes For Distribution Of Water
- output
- Pipes Procured And Piping Done
- implementation status
- Phase One Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kcc Community Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Intake And Piping Of Water Closer To The Residents Of The Area
- output
- Pipes Bought And Piping Done
- implementation status
- Phase One Completed.
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lower Hill Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Pipeline To Distribute Water Closer To The Residents
- output
- Piping Of Water
- implementation status
- Complete And Fuctional
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sotwet Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2007
- action
- Construction Of Intake And Purchase Of Pipes For Reticulation Of Water
- output
- Pipes Bought And Clean Water Supplied
- implementation status
- 90% Of Work Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tilatil Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2007
- action
- Purchase Of Pipes For Distribution Of Water
- output
- Supply Of Clean Drinking Water To The Residents
- implementation status
- Complete And Functional
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kaplelechwa Ecd
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of An Ecd Classroom
- output
- Complete Ecd Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Luita Ecd
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2007
- action
- Purchase Of Land For The Construction Of An Ecd
- output
- Functional Ecd School
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapkitet Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2006
- action
- Emergency Funding For The Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lemonera Cattle Dip
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2007
- action
- Renovations Of Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Muserechi Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Arama Health Centre
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Maternity Wing
- output
- Complete And Functional Maternity Wing
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamasaba Primary School
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Construction Upto Lintel Level
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapsigot Water Project
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Water Tank
- output
- Complete And Functional Tank
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Igure Dispensary
- location
-
Maji Mazuri
(in Eldama Ravine)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Complete Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Jonathan Moi Primary School
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Simotwet Primary School
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2005
- action
- Construction Of Classroom And Clearance Of Title Fee For The School Land 17 Hectares
- output
- Land Procured And Classrooms Constructed
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Toniok Community Water Project
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2006
- action
- Purchase Of Pipes Towards Reticulation Of Water Closer To The Residents
- output
- Specified Pipes Procured And Laid
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ipopor Water Project
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of A Water Tank
- output
- Complete And Functional Tank
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Seguton Cattle Dip
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2004
- action
- Renovations Of Cracks, Path And Fence
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Kabiyet Primary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Pit Latrines
- output
- Complete Pit Latrine For Pupils In The Area
- implementation status
- Complete
- total cost
- Ksh 165,000
- estimate
- Ksh 0
Kimikwet Water Project
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2007
- action
- Digging Of Trenches And Laying Of Pipings To Distribute Water Closer To The Populace
- output
- Pipes Bought And Laid
- implementation status
- Phase One Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 0
Tiripkatoi Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2009
- action
- Renovation Of Fence And Repair Works
- output
- Functional Dip
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Sogeon Water Project
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of A Water Tank
- output
- Complete Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapchurum Water Project
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2006
- action
- Purchase Of Pipes To Reticulate The Water
- output
- Clean Water Supplied
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Tambarass Road
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2009
- action
- Spot Gravelling
- output
- Improved And Passable Road
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapseret Water Project
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2006
- action
- Completion Of Water Tank
- output
- Complete Tank
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Shauri Yako Cattle Dip Ex G
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2006
- action
- Rehabiltation Of Walls And Fence For The Dip
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Testai Teskatree Nursery
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Establishment Of A Tree Nursery
- output
- Tree Nursery With Various Tree Seedlings-Indigenous And Exotic
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kokorwonin Water Project
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2004
- action
- Completion Of Water Tank And Purchase Of Pipes
- output
- Complete Tank And Pipes
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kapcholoi Water Tank
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2006
- action
- Construction Of Water Tank
- output
- Complete Water Tank
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kaplelingor Women Water Project
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction Of Water Tank
- output
- Complete Tank
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kaptiegan Cattle Dip
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2009
- action
- Renovation Of Walls, Roof And Path
- output
- Complete And Functional Dip
- implementation status
- New
- total cost
- Ksh 146,000
- estimate
- Ksh 0
Narosura Health Centre Ft
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2003
- action
- Renovation Of The Health Center
- output
- Complete And Functional Health Facility
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kapsamuti Water Project
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2004
- action
- Purchase Of Pipes For Distribution Of Water
- output
- Pipes Procured And Piping Done
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mumberes Bridge
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2008
- action
- Spot Gravelling And Maintenance Of The Bridge/Road
- output
- Road Gravelled
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mumberes Cattle Dip
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2007
- action
- Renovations Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Tambarass Cattle Dip
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Finishings yet to be done
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Poror Ecd
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2006
- action
- Rehabilitation Of Classroom
- output
- Functional Classroom
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Soibei Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2005
- action
- Land Purchase Towards Construction Of The Dip
- output
- Dip Land Purchased And Necessary Documentation Processed
- implementation status
- 0.21Ha.Of Land Bought
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Benonin Women Electricity
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Extension Of Electrification In The Area
- output
- Enhanced Power Supply
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kabiyet Primary School
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2004
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Two Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Sosion Road
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2009
- action
- Gravelling Of 100 Meters Of Road
- output
- Better And Passable Road Network
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kanjulul-Morkisis-Posto Road
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2009
- action
- Filling Of Potholes And Drainage Works
- output
- Passable Road And Better Drainage
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kanjulul Primary School
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2006
- action
- Emergency Funding For Completion Of Classroom
- output
- Complete Classroom
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mandina Borehole
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2006
- action
- Repair Of The Borehole
- output
- Functional Borehole To Provide Clean Water To Residents
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muserechi Dispensary
- location
-
Kiplombe
(in Eldama Ravine)
- year first funded
- 2006
- action
- Purchase Of Land For The Construction Of The Dispensary
- output
- Land Purchased
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chemususu Dispensary
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Renovation Of The Dispensary
- output
- Fuctional Dispensary
- implementation status
- Complete Dispensary
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Lembus Central Cultural Centre
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2008
- action
- Functional Cultural Centre
- output
- Cultural Artefacts Procured
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Soymining Dip
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Repair Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kibias Cattle Dip
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2005
- action
- Rehabilitation Of The Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Saos Cattle Dip
- location
-
Saos/Kibias
(in Eldama Ravine)
- year first funded
- 2006
- action
- Rehabilitation Of The Dip
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mwachon Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2006
- action
- Rehabilitation Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Tugumoi Cattle Dip
- location
-
Torongo
(in Eldama Ravine)
- year first funded
- 2004
- action
- Repair Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mochongoi Attle Dip
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2005
- action
- Repair Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Benonin Cattle Dip
- location
-
Kabiyet
(in Eldama Ravine)
- year first funded
- 2005
- action
- Rehabilitation Of The Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kiptuno Cattle Dip
- location
-
Kiptuno
(in Eldama Ravine)
- year first funded
- 2009
- action
- Repair Of Fence For The Dip
- output
- Functional Dip
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kamelilo Cattle Dip
- location
-
Eldama Ravine
(in Eldama Ravine)
- year first funded
- 2006
- action
- Renovations Of The Dip
- output
- Complete And Functional Dip
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gilgil Cattle Dip
- location
-
Perkerra
(in Eldama Ravine)
- year first funded
- 2006
- action
- Repair Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Togeito Water Project
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Construction
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Tinet Cattle Dip
- location
-
Lembus Mosop
(in Eldama Ravine)
- year first funded
- 2006
- action
- Repair Of The Dip
- output
- Functional Dip
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Lelgel Cattle Dip
- location
-
Mumberes
(in Eldama Ravine)
- year first funded
- 2005
- action
- Repair Of The Cattle Dip
- output
- Functional Dip
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kapngoech Dispensary
- location
-
Lembus Central
(in Eldama Ravine)
- year first funded
- 2004
- action
- Emergency Funding For The Construction Of Pit Latrine
- output
- Pit Latrine
- implementation status
- Complete And In Use
- total cost
- Ksh 20,000
- estimate
- Ksh 0