The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Eldoret South

Mkombozi Secondary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms/Admn. Block
implementation status
Complete
total cost
Ksh 4,500,000
estimate
Ksh 6,000,000

Kesses Water Project

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction Of A Water Tank/Water Pipws
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 4,100,000
estimate
Ksh 5,100,000

Chuiyat Water Project

location
Chuiyat (in Eldoret South)
year first funded
2004
action
Construction Of A Water Tank
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 2,800,000
estimate
Ksh 3,000,000

Kingwal Water Project

location
Megun (in Eldoret South)
year first funded
2005
action
Construction Of Water Tank And Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 2,500,000

Kapkoigaa Secondary School

location
Kapkoi (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Washrooms/Dormitory
implementation status
Incomplete
total cost
Ksh 1,970,000
estimate
Ksh 1,750,000

Kapsaret Water Project

location
Kapsaret (in Eldoret South)
year first funded
2005
action
Water Pipes
output
Access To Clean Water
implementation status
Complete
total cost
Ksh 1,830,745
estimate
Ksh 2,340,000

Chepkoiyo Primary School

location
Kesses (in Eldoret South)
year first funded
2003
action
Construction of classrooms & Purchase Of Land
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,800,000
estimate
Ksh 600,000

Kapteldon-Tuiyo Water

location
Kapsaret (in Eldoret South)
year first funded
2007
action
Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 2,300,000

Koisagat Water Project

location
Chuiyat (in Eldoret South)
year first funded
2006
action
Cleaning Of Borehole And Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,700,000
estimate
Ksh 2,200,000

Simat Water Project

location
Simat (in Eldoret South)
year first funded
2005
action
Installation Of Pipes
output
Access To Clean Water
implementation status
Incomplete
total cost
Ksh 1,650,000
estimate
Ksh 2,300,000

Kaplamai Primary School

location
Tarakwa (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,650,000
estimate
Ksh 1,450,000

Tulwopngetuny Secondary School

location
Kesses (in Eldoret South)
year first funded
2006
action
Lockers And Chairs
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 1,400,000

Chepkoiyo Secondary School

location
Kesses (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,540,000
estimate
Ksh 1,850,000

Kelchin Secondary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 1,800,000

Koitebes Primary School

location
Kapkoi (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,480,000
estimate
Ksh 1,500,000

Koiluget Water Project

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Construction Of A Water Tank &Installation Of Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,650,000

Kipkenyo Secondary School

location
Pioneer (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Cheptiret Dispensary

location
Cheptiret (in Eldoret South)
year first funded
2008
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 1,350,000
estimate
Ksh 1,200,000

Koibasui Primary School

location
Ngeria (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,350,000
estimate
Ksh 900,000

Inder Primary School

location
Kapsaret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms/Admn. Block
implementation status
Incomplete
total cost
Ksh 1,300,000
estimate
Ksh 1,200,000

Seiyowater Project

location
Cheptiret (in Eldoret South)
year first funded
2005
action
Drilling Of A Borehole
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 1,950,000

Ecd Teldet Nursery School

location
Oleinguse (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,300,000
estimate
Ksh 1,600,000

Lengut Primary School

location
Kipchamo (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,280,000
estimate
Ksh 830,000

Kisor/Mutwot Electproject

location
Simat (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 2,500,000

Kapkoi Dispensary

location
Kapkoi (in Eldoret South)
year first funded
2004
action
Construction Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,650,000

Songoliet Secondary School

location
Megun (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,200,000
estimate
Ksh 800,000

Barekeiywo Primary School

location
Oleinguse (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Kapserton Primary School

location
Tulwet (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,180,000
estimate
Ksh 1,200,000

Kerita Kosyin Water Project

location
Kapkoi (in Eldoret South)
year first funded
2006
action
Water Pipes
output
Access To Clean Water
implementation status
Complete
total cost
Ksh 1,177,255
estimate
Ksh 1,650,000

Chesunet Dispensary

location
Kesses (in Eldoret South)
year first funded
2005
action
Construction Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,350,000

Cheptiret Secondary School

location
Cheptiret (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Library
implementation status
Incomplete
total cost
Ksh 1,150,000
estimate
Ksh 1,400,000

Boror Primary School

location
Tarakwa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Matharu Dispensary

location
Timboroa (in Eldoret South)
year first funded
2003
action
Construction Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,250,000

Kosirai Secondary School

location
Megun (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,300,000

St. Josephs Secondary School

location
Kapsaret (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,350,000

Ngeria Secondary School

location
Ngeria (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
dining Hall
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Lingwai Secondary School

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Lelmokwo Primary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Chelabal Primary School

location
Ngeria (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,070,000
estimate
Ksh 1,220,000

Kapmuzee Primary School

location
Ngeria (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,000,000

Ketiplong Primary School

location
Kesses (in Eldoret South)
year first funded
2005
action
Construction/Purchase Of Land
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,030,000
estimate
Ksh 1,200,000

Chepkongi Primary School

location
Simat (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 1,010,000
estimate
Ksh 950,000

Kapchorwa Primary School

location
Oleinguse (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Simotwo Elect

location
Tarakwa (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Korir And Other S Elect

location
Tulwet (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 30,000

Patricians Electricity Project

location
Ngeria (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Yamumbi/ Lemook Water Project

location
Kapsaret (in Eldoret South)
year first funded
2006
action
Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,600,000

Lelmolok Water Project

location
Kesses (in Eldoret South)
year first funded
2005
action
Drilling Of A Borehole
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Cheptiret Water Project

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction Of A Water Tank
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Simat Secondary School

location
Simat (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Laboratory
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Racecourse Secondary School

location
Pioneer (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,150,000

David Koros Secondary School

location
Kesses (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms/Admn. Block
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,250,000

Bindura Secondary School

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,300,000

St. Marks Teldet Primary School

location
Oleinguse (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 900,000

Cheplaskei Secondary School

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Staff Houses
implementation status
Incomplete
total cost
Ksh 991,000
estimate
Ksh 1,000,000

Kabilat Primary School

location
Oleinguse (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 970,000
estimate
Ksh 850,000

Kapkagaron Primary School

location
Kapsaret (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 947,116
estimate
Ksh 1,000,000

Kaplelach Dispensary

location
Chuiyat (in Eldoret South)
year first funded
2003
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 940,000
estimate
Ksh 1,360,000

St. James Leberio Primary School

location
Kapsaret (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 910,000
estimate
Ksh 1,000,000

Chakaiya Secondary School

location
Timboroa (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 1,350,000

St. Josephs Primary School

location
Kapsaret (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 1,150,000

Mogobich Primary School

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 800,000

Konyit Primary School

location
Megun (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Kisor Health Centre

location
Simat (in Eldoret South)
year first funded
2003
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 950,000

Tulwet Dispensary

location
Tulwet (in Eldoret South)
year first funded
2006
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 920,000

Cengalo Secondary School

location
Oleinguse (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 900,000

Lemook Secondary School

location
Kapsaret (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 950,000

Koriomat Primary School

location
Tarakwa (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 870,000
estimate
Ksh 1,200,000

Ndungulu Primary School

location
Oleinguise (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 1,200,000

Lingwai Dispensary

location
Tarakwa (in Eldoret South)
year first funded
2004
action
Construction Of Opd
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,400,000

Ngeria Education Centre

location
Ngeria (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 2,500,000

Kapngetuny Lingwai Raod

location
Tarakwa (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Nairiri-Cheptabach Road

location
Cheptiret (in Eldoret South)
year first funded
2009
action
Heavy Grading
output
Road
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 1,300,000

Risis Elect

location
Tulwet (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 2,800,000

Kipranga Elect

location
Tulwet (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 2,800,000

Kesses Health Project

location
Kesses (in Eldoret South)
year first funded
2006
action
Construction Of Opd
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,300,000

Langas Primary School

location
Pioneer (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 850,000

Nandi Gaa Primary School

location
Ngeria (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 790,000
estimate
Ksh 700,000

Kipkaren Road Primary School

location
Pioneer (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Admn. Block
implementation status
Complete
total cost
Ksh 790,000
estimate
Ksh 900,000

Chuchuniat Primary School

location
Cheptiret (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 780,000
estimate
Ksh 850,000

Kaplelach Barekeiwo Road

location
Chuiyat (in Eldoret South)
year first funded
2009
action
Grading And Spot Garavelling
output
Road
implementation status
Completed
total cost
Ksh 766,000
estimate
Ksh 1,240,000

Kipkororsyo Primary School

location
Timboroa (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 750,000
estimate
Ksh 900,000

Oleinguse Polytechnic

location
Oleinguse (in Eldoret South)
year first funded
2006
action
To Provide Equipments
output
Trained Personnel
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 850,000

Inder Tuiyo Road

location
Kapsaret (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Incomplete
total cost
Ksh 750,000
estimate
Ksh 1,350,000

Kapkoi Lelmokwo Road

location
Kesses (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Completed
total cost
Ksh 750,000
estimate
Ksh 1,250,000

Barekeiwo Dispensary

location
Oleinguse (in Eldoret South)
year first funded
2003
action
Construction Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 870,000

Seiyo Secondary School

location
Cheptiret (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 750,000
estimate
Ksh 1,250,000

Ngarafalls Secondary School

location
Ngeria (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Laboratory
implementation status
Incomplete
total cost
Ksh 750,000
estimate
Ksh 900,000

Davies Elect

location
Megun (in Eldoret South)
year first funded
2006
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Complete
total cost
Ksh 742,560
estimate
Ksh 2,750,000

Lessos-Chepkitiny Foot Path

location
Kapkoi (in Eldoret South)
year first funded
2009
action
Purchase Of Materials For Bridge
output
Road
implementation status
Completed
total cost
Ksh 732,000
estimate
Ksh 1,250,000

Kapteldet Water

location
Kapsaret (in Eldoret South)
year first funded
2007
action
Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 730,745
estimate
Ksh 1,100,000

Sigilai Primary School

location
Chuiyat (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms/Toilets
implementation status
Incomplete
total cost
Ksh 730,000
estimate
Ksh 1,300,000

Isaac Kosgei Secondary School

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 720,000
estimate
Ksh 1,220,000

Chepkogor Dispensary

location
Tulwet (in Eldoret South)
year first funded
2007
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Kerita Chepkitiny Road

location
Kapkoi (in Eldoret South)
year first funded
2009
action
Grading And Spot Gravelling
output
Road
implementation status
Completed
total cost
Ksh 700,000
estimate
Ksh 1,400,000

Tuiyo Nganiat Road

location
Kapsaret (in Eldoret South)
year first funded
2009
action
Construction Of A Bridge
output
Road
implementation status
Completed
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Kapkoi Ketiplong Raod

location
Kesses (in Eldoret South)
year first funded
2009
action
Grading And Spot Gravelling
output
Road
implementation status
Completed
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Oasis/ Complex Elect

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 2,700,000

Kipkenyo Health Centre

location
Pioneer (in Eldoret South)
year first funded
2006
action
Wiring Of The Health Centre
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 2,700,000

Simat Primary School

location
Simat (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Admn. Block
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Chebii Primary School

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 680,000
estimate
Ksh 660,000

Dam Project

location
Kesses (in Eldoret South)
year first funded
2004
action
Dam Construction
output
Access To Water
implementation status
Complete
total cost
Ksh 673,085
estimate
Ksh 700,000

Kermetio Primary School

location
Ngeria (in Eldoret South)
year first funded
2009
action
Construction/Purchase Of Land
output
Classrooms
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 950,000

Plateau Polytechnic

location
Kipchamo (in Eldoret South)
year first funded
2007
action
To Provide Equipments
output
Trained Personnel
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 600,000

Baiyete Kapyemit Road

location
Kapkoi (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Completed
total cost
Ksh 650,000
estimate
Ksh 1,050,000

Tuiyobei Gaa Primary School

location
Tulwet (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 1,150,000

Seiyo Primary School

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Admn. Block
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 750,000

Biseria Cattle Dip

location
Tarakwa (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 630,000
estimate
Ksh 800,000

St. Marys Chebarus Primary School

location
Pioneer (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 626,000
estimate
Ksh 850,000

Wareng Secondary School

location
Pioneer (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,000

Koiluget Nursery School

location
Tarakwa (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 800,000

Silaga Nursery School

location
Timboroa (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 800,000

Deb Momoniat Primary School

location
Megun (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 700,000

Kaptumo Primary School

location
Kapkoi (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Toror Primary School

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 800,000

Murgor Primary School

location
Kesses (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Admn. Block
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 1,100,000

Oasis Primary School

location
Ngeria (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 900,000

Aic Tulwet Secondary School

location
Tulwet (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 800,000

Kaplamai Dispensary

location
Tarakwa (in Eldoret South)
year first funded
2009
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 1,100,000

Ollessos Cattle Dip

location
Cheptiret (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 700,000

Olesergech Cattle Dip

location
Kapsaret (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 750,000

Nandi Gaa Electproject

location
Ngeria (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Terige Electproject

location
Tulwet (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Kapngetuny Community Elect

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Connection To Various Projects
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Kisor/Kipkenyo Elect

location
Simat (in Eldoret South)
year first funded
2006
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Bishop Muge Elect

location
Timboroa (in Eldoret South)
year first funded
2006
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Cheplaskei Elect

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Kipsamo, Langas Ngeria Elect

location
Ngeria (in Eldoret South)
year first funded
2008
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Kerita-Chepkongony Road

location
Kapkoi (in Eldoret South)
year first funded
2009
action
Grading Spot Gravelling
output
Road
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 1,100,000

Kaptieny Kosirai Road

location
Ngeria (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Sachangwan Chakaiya Road

location
Timboroa (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 1,100,000

Kipkaren Cattle Dip

location
Pioneer (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 590,000
estimate
Ksh 800,000

Mogochoret Primary School

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 580,000
estimate
Ksh 700,000

Kerita Kosyin Primary School

location
Kapkoi (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Admn. Block
implementation status
Complete
total cost
Ksh 570,000
estimate
Ksh 1,000,000

Seet Cattle Dip

location
Ngeria (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 600,000

Kapsaret Kitale Ndogo Road

location
Kapsaret (in Eldoret South)
year first funded
2009
action
Grading
output
Road
implementation status
Incomplete
total cost
Ksh 550,000
estimate
Ksh 1,050,000

Kerita Primary School

location
Kapkoi (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Admn. Block
implementation status
Incomplete
total cost
Ksh 550,000
estimate
Ksh 800,000

Kaptumo Dispensary

location
Kapkoi (in Eldoret South)
year first funded
2004
action
Construction Of Doctors House
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 800,000

Kapleleach Cattle Dip

location
Chuiyat (in Eldoret South)
year first funded
2004
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 600,000

Kapkenduiywo Primary School

location
Kapsaret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 540,000
estimate
Ksh 780,000

Lorien Tarakwa Elect

location
Tarakwa (in Eldoret South)
year first funded
2008
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 533,000
estimate
Ksh 2,540,000

Sda Aturei Primary School

location
Kapsaret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 530,000
estimate
Ksh 1,000,000

Barnotik Primary School

location
Megun (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 530,000
estimate
Ksh 950,000

Legetet Primary School

location
Megun (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 530,000
estimate
Ksh 650,000

Lessos Chepkitiny Bridge

location
Cheptiret (in Eldoret South)
year first funded
2008
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 510,000
estimate
Ksh 1,500,000

Bindura/Kesses

location
Tulwet (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 504,005
estimate
Ksh 1,000,000

Luita Elect

location
Kesses (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Emgwen Chebolo Footpath

location
Kapkoi (in Eldoret South)
year first funded
2009
action
Putting Culverts
output
Road
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Megun Polytechnic

location
Megun (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Mugundoi Polytechnic

location
Cheptiret (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Ecd Resource Centre

location
Pioneer (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Matharu Elect

location
Timboroa (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Sigilai Electricity Project

location
Chuiyat (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Chesunet Bridge

location
Kesses (in Eldoret South)
year first funded
2005
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 500,000
estimate
Ksh 10,000,000

Nairirir Electproject

location
Ngeria (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Kamuzee Cattle Dip

location
Ngeria (in Eldoret South)
year first funded
2008
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 650,000

Ochemina Cattle Dip

location
Megun (in Eldoret South)
year first funded
2005
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 600,000

Cengalo Dispensary

location
Oleinguse (in Eldoret South)
year first funded
2006
action
Construction Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,150,000

Chuiyat Secondary School

location
Chuiyat (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,100,000

Chemina Secondary School

location
Megun (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 750,000

Hill Secondary School

location
Pioneer (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chepyakwai Secondary School

location
Ngeria (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 900,000

Mwiruti Secondary School

location
Simat (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Barekeiywo Secondary School

location
Oleinguse (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Chepchuina Secondary School

location
Pioneer (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Lelmolok Secondary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 850,000

Tarakwa Secondary School

location
Tarakwa (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,100,000

Mugundoi Primary School

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 700,000

Kaptinga Primary School

location
Simat (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 700,000

Chesunet Primary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 800,000

Kingwal Primary School

location
Ngeria (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 850,000

Saroiyot Bridge

location
Kipchamo (in Eldoret South)
year first funded
2008
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 490,000
estimate
Ksh 1,200,000

Ndungulu Secondary School

location
Oleinguse (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 980,000

Mimosa Cattle Dip

location
Ngeria (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 600,000

Kaptinga Cattle Dip

location
Simat (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 600,000

Saroiyot Cattle Dip

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Incomplete
total cost
Ksh 450,000
estimate
Ksh 600,000

Kapchepchai Cattle Dip

location
Cheptiret (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Incomplete
total cost
Ksh 450,000
estimate
Ksh 550,000

Seiyo Cattle Dip

location
Cheptiret (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 550,000

Ngarafalls Cattle Dip

location
Ngeria (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 500,000

Kipchamo Cattle Dip

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 500,000

Kipsamo Catttle Dip

location
Ngeria (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 550,000

Kapcheserut Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 500,000

Kipsamo Primary School

location
Ngeria (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Admn. Block
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 950,000

Lelmolok Primary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 450,000
estimate
Ksh 950,000

Tuiyobei Primary School

location
Simat (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 430,000
estimate
Ksh 930,000

Emkwen Elect

location
Kapkoi (in Eldoret South)
year first funded
2008
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 424,564
estimate
Ksh 2,450,000

Mutwot Secondary School

location
Simat (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 420,000
estimate
Ksh 920,000

Lelmolok Elect

location
Kesses (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 2,400,000

Gitwe Elect

location
Simat (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 2,400,000

St. Georges Primary School

location
Kapsaret (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 24,000,000

Momoniat Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2003
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 450,000

Kapngorom Cattle Dip

location
Cheptiret (in Eldoret South)
year first funded
2008
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 500,000

Koisagat Cattle Dip

location
Chuiyat (in Eldoret South)
year first funded
2005
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 450,000

Terige Cattle Dip

location
Tulwet (in Eldoret South)
year first funded
2005
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 450,000

Kapteldet Dispensary

location
Kapsaret (in Eldoret South)
year first funded
2008
action
Construction Of Opd
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 800,000

Kapteldon Dispensary

location
Kapsaret (in Eldoret South)
year first funded
2006
action
Construction Of Opd
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 850,000

Kamuyu Secondary School

location
Tarakwa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 850,000

St. Catherine Secondary School

location
Kesses (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Labaratory
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 900,000

Arnesens Secondary School

location
Tarakwa (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
School Canteen
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 900,000

Boarderlands Primary School

location
Kapsaret (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classroom/Toilets
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 800,000

Chereber Primary School

location
Oleinguse (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 800,000

Masaba Primary School

location
Chuiyat (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 800,000

Belekenya Primary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 800,000

Assururiet Bridge

location
Kesses (in Eldoret South)
year first funded
2003
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 350,000
estimate
Ksh 950,000

Kapcheserut Dispensary

location
Kesses (in Eldoret South)
year first funded
2007
action
Construction Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 2,000,000

Sosiani Primary School

location
Pioneer (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 700,000

Cheboror Primary School

location
Oleinguse (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 450,000

Bindura Primary School

location
Tarakwa (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 700,000

Tulwet Primary School

location
Tulwet (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 840,000

Juma Buigut Nursery

location
Ngeria (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 300,000

Kipkaren Airport Primary School

location
Ngeria (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 330,000
estimate
Ksh 700,000

Keringet Primary School

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 310,000
estimate
Ksh 650,000

Chemenei Primary School

location
Kipchamo (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 700,000

Kesses Educational Office

location
Kesses (in Eldoret South)
year first funded
2005
action
Construction of Office
output
Office
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 800,000

Kesses Ap Staff Houses

location
Kesses (in Eldoret South)
year first funded
2007
action
Construction
output
Security
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Ruiyobei Elect

location
Cheptiret (in Eldoret South)
year first funded
2006
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 2,300,000

Simat Electproject

location
Simat (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 2,300,000

Inder/Kapteldon Water Project

location
Kapsaret (in Eldoret South)
year first funded
2005
action
Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 800,000

Chuiyat Dispensary

location
Chuiyat (in Eldoret South)
year first funded
2007
action
Construction Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 700,000

Rukuini Secondary School

location
Tarakwa (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 600,000

Chirchir Secondary School

location
Timboroa (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 800,000

Davies Secondary School

location
Megun (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 800,000

Tuiyo Secondary School

location
Kapsaret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 650,000

Kesses Secondary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 700,000

Tilol Primary School

location
Timboroa (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 750,000

Kimuri Primary School

location
Ngeria (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 700,000

Kiptegaa Primary School

location
Timboroa (in Eldoret South)
year first funded
2003
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 600,000

Seiyo Nursery School

location
Cheptiret (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Tinet Nursery

location
Tulwet (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Chebarus Nursery School

location
Pioneer (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Subukia Kahuho Nursery School

location
Timboroa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 400,000

Kipkaren Foot Bridge

location
Pioneer (in Eldoret South)
year first funded
2007
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 250,000
estimate
Ksh 300,000

Chepkongony Foot Bridge

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 250,000
estimate
Ksh 300,000

Simat Maruriat Ai

location
Simat (in Eldoret South)
year first funded
2009
action
Provision Of A.I Services
output
Improved Cattle Breeds
implementation status
Incomplete
total cost
Ksh 250,000
estimate
Ksh 350,000

Nganiat Cattle Dip

location
Kapsaret (in Eldoret South)
year first funded
2007
action
Rehabilitation Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 350,000

Assururiet Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 400,000

Chepkitiny Cattle Dip

location
Kapkoi (in Eldoret South)
year first funded
2004
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 450,000

Chagaiya Dispensary

location
Timboroa (in Eldoret South)
year first funded
2006
action
Completion Of Opd
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 600,000

Chesegem Dispensary

location
Kipchamo (in Eldoret South)
year first funded
2004
action
Completion Of Opd
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 600,000

Kapkoi Primary School

location
Kapkoi (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Toilets
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 800,000

Tarakwa Primary School

location
Tarakwa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 600,000

Kapranga Primary School

location
Tarakwa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 650,000

Racecourse Primary School

location
Pioneer (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 750,000

Gitwe Primary School

location
Simat (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 680,000

Chemina Primary School

location
Megun (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 600,000

Matharu Primary School

location
Timboroa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 750,000

St. Catherine Kahuho Primary School

location
Timboroa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 500,000

Chemare Primary School

location
Timboroa (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 250,000
estimate
Ksh 780,000

St. Georges Special Primary School

location
Kapsaret (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
School Fence
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

Lainguse Primary School

location
Oleinguse (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 450,000

Tulwet Kosyin Nursery

location
Tulwet (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 400,000

Kipkenyo Cattle Dip

location
Pioneer (in Eldoret South)
year first funded
2008
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 340,000

Assururriet Primary School

location
Kesses (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 232,117
estimate
Ksh 550,000

Cheplaskei Primary School

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 230,000
estimate
Ksh 650,000

Cheboror Cattle Dip

location
Oleinguse (in Eldoret South)
year first funded
2009
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Incomplete
total cost
Ksh 230,000
estimate
Ksh 450,000

Kabongo Primary School

location
Ngeria (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 230,000
estimate
Ksh 830,000

Tuiyo Primary School

location
Kapsaret (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 230,000
estimate
Ksh 600,000

Songoliet Primary School

location
Megun (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 230,000
estimate
Ksh 750,000

Chuiyat Primary School

location
Chuiyat (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 230,000
estimate
Ksh 650,000

Ngara Falls Primary School

location
Ngeria (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 800,000

Rehema Primary School

location
Kipchamo (in Eldoret South)
year first funded
2006
action
Construction
output
Classrooms
implementation status
Incomplete
total cost
Ksh 230,000
estimate
Ksh 730,000

Chemenei Lenguse Foot Bridge

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 200,000
estimate
Ksh 330,000

Kipkenyo/Huruma

location
Pioneer (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 200,000
estimate
Ksh 600,000

Chuiyat/Lingwai

location
Chuiyat (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 200,000
estimate
Ksh 700,000

Kaples

location
Kesses (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 200,000
estimate
Ksh 800,000

Lelmokwo Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2004
action
Renovation Oa Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 450,000

Racecourse Water

location
Pioneer (in Eldoret South)
year first funded
2007
action
Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 750,000

Chesegem Primary School

location
Kipchamo (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 700,000

Chepyakwai Primary School

location
Ngeria (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 650,000

Saroiyot Primary School

location
Kipchamo (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 800,000

Kiambaa Primary School

location
Ngeria (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 700,000

Koiwarusen Primary School

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 450,000

Sambul Primary School

location
Tarakwa (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 750,000

Tulwopngetuny Primary School

location
Kesses (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 750,000

Kileges Primary School

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 800,000

Kibabet Primary School

location
Megun (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 600,000

Cheptiret Primary School

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Admn. Block
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Ruman Primary School

location
Kesses (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 750,000

Muchorwe Primary School

location
Timboroa (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Admn. Block
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

St. Michael Kipchamo Primary School

location
Kipchamo (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 600,000

Kosirai Primary School

location
Megun (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 500,000

Kamuyu Primary School

location
Tarakwa (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 650,000

Kabongwa Primary School

location
Megun (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 650,000

Lemook Primary School

location
Kapsaret (in Eldoret South)
year first funded
2004
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 800,000

Mutwot Nursery

location
Simat (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 300,000

Chepkatet Water Project

location
Kapsaret (in Eldoret South)
year first funded
2009
action
Water Pipes
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 170,000
estimate
Ksh 680,000

Kerita Secondary School

location
Kapkoi (in Eldoret South)
year first funded
2008
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 170,000
estimate
Ksh 450,000

Assururiet Water Project

location
Kesses (in Eldoret South)
year first funded
2009
action
Construction Of A Water Tank
output
Access To Clean Water
implementation status
Ongoing
total cost
Ksh 170,000
estimate
Ksh 480,000

Kaplelach Elect

location
Tulwet (in Eldoret South)
year first funded
2005
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Ongoing
total cost
Ksh 160,000
estimate
Ksh 2,160,000

Yamumbi Cattle Dip

location
Simat (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 250,000

Barekeiwo Cattle Dip

location
Oleinguse (in Eldoret South)
year first funded
2006
action
Rehabilitation Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 250,000

Baiyete Cattle Dip

location
Tarakwa (in Eldoret South)
year first funded
2009
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Incomplete
total cost
Ksh 150,000
estimate
Ksh 250,000

Lengut Cattle Dip

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 250,000

Kerita /Kosyin Cattle Dip

location
Kapkoi (in Eldoret South)
year first funded
2007
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 250,000

Nganiat/Tuiyo

location
Kapsaret (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 150,000
estimate
Ksh 950,000

Chemina/Songoliet

location
Megun (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Bridge
output
Easy Accessibility
implementation status
Done
total cost
Ksh 150,000
estimate
Ksh 550,000

Ngeria South Dispensary

location
Megun (in Eldoret South)
year first funded
2004
action
Completion Of Opd
output
Closer Medical Services
implementation status
Incomplete
total cost
Ksh 150,000
estimate
Ksh 450,000

Kapserton Elect

location
Tulwet (in Eldoret South)
year first funded
2008
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Incomplete
total cost
Ksh 149,876
estimate
Ksh 2,150,000

Lorian Cattle Dip

location
Tarakwa (in Eldoret South)
year first funded
2009
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 250,000

Kondoo North Cattle Dip

location
Tarakwa (in Eldoret South)
year first funded
2006
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 250,000

Aic Tulwet Nursery

location
Tulwet (in Eldoret South)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 250,000

Chepkitiny Nursery School

location
Kapkoi (in Eldoret South)
year first funded
2006
action
Construction of classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 300,000

Chepkigen Secondary School

location
Kipchamo (in Eldoret South)
year first funded
2009
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 350,000

Sambul Cattel Dip

location
Tulwet (in Eldoret South)
year first funded
2005
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Chepkigen Health Centre

location
Kipchamo (in Eldoret South)
year first funded
2007
action
Installation Of A Transformer
output
Electrification/Lighting
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 2,100,000

Rukuini Cattle Dip

location
Tarakwa (in Eldoret South)
year first funded
2007
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 200,000

Kapkagaron Cattle Dip

location
Kapsaret (in Eldoret South)
year first funded
2009
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Tuiyo Cattle Dip

location
Kapsaret (in Eldoret South)
year first funded
2008
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Mugundoi Cattle Dip

location
Ngeria (in Eldoret South)
year first funded
2008
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Megun Cattle Dip

location
Megun (in Eldoret South)
year first funded
2008
action
Renovation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 250,000

Koisagat Primary School

location
Chuiyat (in Eldoret South)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 75,000
estimate
Ksh 600,000

Chebarus Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Cheboiywo Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Ketiplong Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Kesses Cattle Dip

location
Kesses (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Tulwet Cattle Dip

location
Tulwet (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Cheptiret East Cattle Dip

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Chepyakwai Cattle Dip

location
Ngeria (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Chesegem Cattle Dip

location
Kipchamo (in Eldoret South)
year first funded
2008
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Kosyin Cattle Dip

location
Kapkoi (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Cheptiret West Cattle Dip

location
Cheptiret (in Eldoret South)
year first funded
2004
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 150,000

Chemenei-Lainguse Cattle Dip

location
Oleinguse (in Eldoret South)
action
Rehabilitation Of A Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 450,000