The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Emuhaya

Musila Bridge

location
South West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of A Bridge
output
-
implementation status
Complete
total cost
Ksh 6,000,000
estimate
Ksh 6,000,000

Ematsuli Bridge

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of A Bridge
output
-
implementation status
Complete
total cost
Ksh 6,000,000
estimate
Ksh 6,000,000

Musilongo Bridge

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Bridge Construction
output
-
implementation status
Complete
total cost
Ksh 5,887,233
estimate
Ksh 588,723,312

Ebukanga Ematse Bridge

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of A Bridge
output
-
implementation status
Complete
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Ebunangwe Water Project

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Laying Of Water Pipes
output
-
implementation status
Ongoing
total cost
Ksh 3,507,702
estimate
Ksh 350,770,196

Mundichiri-Epwopi Road

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Opening/Grading/Gravelling
output
-
implementation status
Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Elwakhi-Emanyinya Road

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Opening/Grading/Gravelling
output
-
implementation status
Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Ebulonga Rural Electrification

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Erection Of Electricity Poles
output
-
implementation status
Ongoing
total cost
Ksh 2,050,000
estimate
Ksh 2,050,000

Munasibi Bridge

location
West Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of Bridge
output
-
implementation status
New
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Esirabe-Chiefs office-Magada road

location
East Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Isanda Primary Schoolhol

location
Central Bunyore (in Emuhaya)
year first funded
2003
action
Construction Of 2 Classrooms
output
-
implementation status
On going
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Ebusyubi Health Centre

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Health Facility
output
-
implementation status
Complete
total cost
Ksh 1,650,000
estimate
Ksh 1,650,000

Emanyinya Secondary School

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Dh/Electricity
output
-
implementation status
On going
total cost
Ksh 1,569,449
estimate
Ksh 15,694,485

Emuhaya Health Center/Distrcit Hospital

location
Wekhomo Location (in Emuhaya)
year first funded
2003
action
Construction Of Health Facility
output
-
implementation status
Complete
total cost
Ksh 1,550,000
estimate
Ksh 1,550,000

Murraming

location
North East Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
West Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Luanda Dispensary

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Health
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Ipali Health Centre

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Health Facility
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
Wekhomo Location (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
On going
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Khwipanga-Emuhondo-Ematioli road

location
North Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
New
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
East Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Murraming

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Murraming
output
-
implementation status
On going
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Ebuyangu-Hobuyaya road

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Ibubi Girls High School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction of Of Dormitory & Toilets
output
-
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Ebukanga Health Centre

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Health Centre
output
-
implementation status
Ongoing
total cost
Ksh 1,426,482
estimate
Ksh 1,426,482

Emmaloba Primary School

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 1,350,000
estimate
Ksh 1,350,000

Elukhambi Primary School

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 4 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 1,350,000
estimate
Ksh 1,350,000

Emusire Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
On going
total cost
Ksh 1,350,000
estimate
Ksh 1,350,000

Ekamanji Health Centre

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Health Facility
output
-
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Ebbiba Primary School

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Ebwali Secondary School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of Dormitory
output
-
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Musitinyi Dispensary

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of A Maternity Wing
output
-
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Ebusakami Water Supply

location
South Bunyore (in Emuhaya)
year first funded
2007
action
Laying Of Water Pipes
output
-
implementation status
Cancelled
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Ebumbayi Primary School

location
South Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 4 Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Emakakha-Ebunangwe-Emanyonyi road

location
North East Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Esitsaba Dispensary

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Contruction Of Health Facility
output
-
implementation status
Ongoing
total cost
Ksh 1,181,482
estimate
Ksh 1,181,482

Okonda Footbridge

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Footbridge
output
-
implementation status
Complete
total cost
Ksh 1,157,674
estimate
Ksh 1,157,674

Nzalwa Youth Polytecnic

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Construction & Equipments
output
-
implementation status
Complete
total cost
Ksh 1,157,650
estimate
Ksh 115,765,033

Mulwakhi Primary School

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,150,000

Ebusiratsi Secondary School

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Construction Dining Hall & Kitchen
output
-
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Asiongo Primary School

location
South Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 4 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Ematete Youth Polytechnic

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,050,000

Musinaka Primary School

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,050,000

Ebbitsi Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 4 Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,050,000

Ebusiratsi Health Centre

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Contruction Of Health Facility
output
-
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,050,000

Staff Houses Muchio Police Post

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Police Houses
output
-
implementation status
Ongoing
total cost
Ksh 1,022,621
estimate
Ksh 1,022,621

Luanda-Ekwanda road

location
South Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
new
total cost
Ksh 1,001,428
estimate
Ksh 1,001,428

Wandeche/Itabalia Bridge

location
East Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of Bridge
output
-
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Eling`oma Dispensary

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of Dispensary
output
-
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ekwanda Primary School

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Construction Of 4 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Khusikuku Foot Bridge

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Foot Bridge
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ebusakami Secondary School

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of A Hall
output
-
implementation status
Ongoing
total cost
Ksh 997,700
estimate
Ksh 997,700

Emukunzi Youth Polytechnic

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Renovation & Purchase Of Tools/Wshop/Electr
output
-
implementation status
Ongoing
total cost
Ksh 975,350
estimate
Ksh 975,350

Ebubayi Secondary School

location
East Bunyore (in Emuhaya)
year first funded
2003
action
Construction & Equiping
output
-
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 950,000

Ematsuli Secondary School

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Renovation
output
-
implementation status
On going
total cost
Ksh 924,010
estimate
Ksh 924,010

Mungoye Primary School

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 4 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 921,482
estimate
Ksh 921,482

Essunza Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Renovation Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 919,449
estimate
Ksh 9,194,485

Esiarambatsi Health Centre

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Health Centre
output
-
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Wandeche Primary School

location
East Bunyore (in Emuhaya)
year first funded
2006
action
Renovations
output
-
implementation status
On going
total cost
Ksh 875,000
estimate
Ksh 875,000

Munungo(Esitsimi) Primary

location
South West Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 853,644
estimate
Ksh 8,536,441

Ebulonga Secondary School

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 825,000
estimate
Ksh 825,000

Ebusiloli Secondary School

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Library
output
-
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 800,000

AP Staff Houses

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Ap Staff Houses
output
-
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Emutsuru Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
To Complete 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 800,000

Emmatsi Secondary School

location
Wekhomo Location (in Emuhaya)
year first funded
2006
action
Construction Of 4 Classrooms
output
-
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Epanga Primary School

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Esibuye Tea Buying Centre

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Tea Buying Centre
output
-
implementation status
Ongoing
total cost
Ksh 786,482
estimate
Ksh 786,482

Emmukunzi Primary School

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 770,000
estimate
Ksh 770,000

Esirulo Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Emusenjeli Primary School

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 4 Classrooms
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Ematsuli Health Centre

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Health Facility
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Ilungu Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2006
action
Renovations
output
-
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 750,000

Ebwiranyi Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 4 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 750,000

Khwiliba Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of 4 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 750,000

Bunyore Girls High School

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Construction Of Laboratory
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Itumbu Primary School

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Construction Of 4 Classes/Elctricity
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Ebulako Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Emuhaya Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of 4 Classrooms
output
-
implementation status
Stalled
total cost
Ksh 700,000
estimate
Ksh 700,000

Esibila Primary School

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Renovation Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Ebukanga Secondary School

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Construction of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Esirabe Primary School

location
East Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of Multipurpose Hall
output
-
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Ebusiratsi COG Primary School

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Renovation
output
-
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 700,000

Ebusiratsi AP Staff Houses

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Ap Houses
output
-
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Ekwanda Secondary School

location
South Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Emmaloba Primary School

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 4 Classrooms
output
-
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Emmutsa Primary School

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Esabalu Rural Electrification

location
South Bunyore (in Emuhaya)
year first funded
2005
action
Erection Of Electricity Poles
output
-
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Esiandumba Primary & secondary School

location
South West Bunyore (in Emuhaya)
year first funded
2005
action
Electrification
output
-
implementation status
Complete
total cost
Ksh 674,088
estimate
Ksh 674,088

Ebubayi Primary Scool

location
East Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of Classrooms
output
-
implementation status
On going
total cost
Ksh 656,474
estimate
Ksh 656,474

Ebulamba Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 654,600
estimate
Ksh 654,600

Esirulo AP Staff Houses

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Ap Staff Houses
output
-
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 650,000

Ebukhaya Secondary School

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Mwituha Secondary School

location
North East Bunyore (in Emuhaya)
year first funded
2008
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 650,000

Ekwanda Health Centre

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Erection Of Electricity Poles
output
-
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

AP Staff Houses

location
South West Bunyore (in Emuhaya)
year first funded
2005
action
Constrution Of Ap Houses/
output
-
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Esibila Secondary School

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms/Electricity
output
-
implementation status
Complete
total cost
Ksh 635,000
estimate
Ksh 635,000

Ebuyalu Secondary School

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Purchase Of Laboratory Equip/Electricity
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Ekamanji Primary School

location
West Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 5 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Ebulondi Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Construction of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Essong`olo Secondary School

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of A Laboratory
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Essongo`lo Primary School

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Toilets/Classes
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Esirembela Tea buying Centre

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of A Tea Buying Centre
output
-
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Kayila Primary School

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

AP Staff Houses

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of Office & Houses
output
-
implementation status
Ongoing
total cost
Ksh 585,000
estimate
Ksh 585,000

Hobunaka Secondary School

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Construction Of 2 Classes/Dh
output
-
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 550,000

Esalwa Secondary School

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Contruction Of A Comp. Lab
output
-
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Esiembero Primary School

location
East Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 550,000

Chief Offices

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of Chief Offices
output
-
implementation status
On going
total cost
Ksh 550,000
estimate
Ksh 550,000

Musitinyi Primary School

location
East Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 3 Classrooms
output
-
implementation status
On going
total cost
Ksh 550,000
estimate
Ksh 550,000

Ebusakami Primary School

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Roofing Of A Hall/Construction of Classes
output
-
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 550,000

Esiandumba Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Ebukoolo Primary School

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Construction Of 1 Classroom
output
-
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 550,000

Essaba Secondary School

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of A Library
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Khwipanga-Emanyinya-Etsava road

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Emusenjeli Tea Buying Centre

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Tea Buying Centre
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Ebukhaya Primary School

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Ebusiratsi AC Primary School

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Irumbi Primary School

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Emurembe Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kilingili PrimarySchool

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Library
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kilingili Secondary School

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
CoFunding Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Chief Camp

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of A Chief Camp
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Emalloba Primary School

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of A Classroom
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ekwanda-Emmaloba road

location
South Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Emululu Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Esibeye Secondary School

location
South West Bunyore (in Emuhaya)
year first funded
2005
action
Cnstruction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ebuhando Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Constuction Of Toilets/Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ebulako Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2006
action
Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Emukhuya Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kima Hospital

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of Ward
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Esibakal Primary School

location
West Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mumboha Secondary School

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ebusiralo-Epang'a-Esamwenyi road

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Opening/Grading/Gravelling
output
-
implementation status
new
total cost
Ksh 500,000
estimate
Ksh 500,000

AP Staff Houses Mulukhoro

location
West Bunyore (in Emuhaya)
year first funded
2006
action
Construction of Ap Staff Houses
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ebulkoolo Chiefs Centre

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Construction of Ap Staff Houses
output
-
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Emmabwi Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Esikhuyu Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Essumba Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Esibuye Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms/Electricity
output
-
implementation status
Complete
total cost
Ksh 475,000
estimate
Ksh 475,000

Mukhombe Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2007
action
Constrution Of 2 Ecd Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 456,474
estimate
Ksh 456,474

Emukhuya Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 450,000

Emusutswi Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Wemilabi Primary School

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Emwatsi Primary School

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Musila Bridge Approaches road

location
South West Bunyore (in Emuhaya)
year first funded
2008
action
Grading & Gravelling
output
-
implementation status
new
total cost
Ksh 400,000
estimate
Ksh 400,000

Esiandumba Secondary School

location
South West Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Ebussamba Secondary School

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Ebussamba Primary School

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mwituha Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2006
action
Renovations Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Mundichiri Primary School

location
North Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Emusenjeli Dispensary

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Renovation & Equiping
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Esirulo Tea Buying Centre

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Construction Of Tea Banda
output
-
implementation status
Ongoing
total cost
Ksh 385,196
estimate
Ksh 385,196

Ematsuli Primary School

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Toilets
output
-
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Emmunwa Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2006
action
Renovations
output
-
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Chritoco Resource Centre

location
East Bunyore (in Emuhaya)
year first funded
2005
action
Equipments For Disables
output
-
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

District Commissioners Office

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Renovation Of Offices
output
-
implementation status
Complete
total cost
Ksh 315,000
estimate
Ksh 315,000

Ebusiralo Youth Polytechnic

location
West Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Workshop
output
-
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 250,000

Ebukanga Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Emmanyinya Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Emmanyinya AP Camp

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Ap Staff Houses
output
-
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Esirulo AP Camp

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Ap Staff Houses
output
-
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Mwitukho Primary School

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Renovation
output
-
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Emuhondo Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Ochwore Water Projects

location
South Bunyore (in Emuhaya)
year first funded
2005
action
To Dig Boreholes
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Esibeye Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Classrooms
output
-
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Ebusikhale Rural Electrification

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Erection Of Electricity
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Embali Police Patrol base

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Construction of Patrol Base
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Muchula Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of Toilets
output
-
implementation status
Complete
total cost
Ksh 284,508
estimate
Ksh 284,508

Esamwenyi/Kima Ebuhando Road

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Grading & Gravelling
output
-
implementation status
Complete
total cost
Ksh 273,328
estimate
Ksh 273,328

Esamwenyi/Ematioli Road

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 273,328
estimate
Ksh 273,328

Esalwa Primary School

location
West Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebusiralo Primary School

location
West Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Maseno Mission Hospital

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Renovation Of Wards
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Hobunaka Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebwali Primary School

location
Wekhomo Location (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebusyubi Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebukuya School for the Deaf

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebukuya Primary School

location
South West Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Ekwanda(Equitorial) Springs

location
South Bunyore (in Emuhaya)
year first funded
2008
action
Protection Of Springs
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Ikumu Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebusiratsi Special School

location
North Bunyore (in Emuhaya)
year first funded
2005
action
Construction Of 2 Classrooms
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Ebukhuliti Primary School

location
North Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Essaba AP Camp

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Ap Staff Houses
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Essaba Primary School

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Esiamarwi ECD

location
North Bunyore (in Emuhaya)
year first funded
2008
action
Construction Of 2 Classrooms
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Protection of Springs

location
Central Bunyore (in Emuhaya)
year first funded
2006
action
Springs Protection
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Ebuhando Hills Reafforestation

location
Wekhomo Location (in Emuhaya)
year first funded
2009
action
Planting Of Trees
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Protection of Springs

location
West Bunyore (in Emuhaya)
year first funded
2006
action
Springs Protection
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Ebusiekwe Hills Reafforestation

location
West Bunyore (in Emuhaya)
year first funded
2009
action
Planting Of Trees
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Mumboha Primary School

location
West Bunyore (in Emuhaya)
year first funded
2007
action
Elctrification
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Protection of Springs

location
Wekhomo Location (in Emuhaya)
year first funded
2006
action
Springs Protection
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Esirumba Footbridge

location
Central Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Bridge
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Protection of Springs

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
Springs Protection
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Okondo Footbridge

location
South West Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Bridge
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Muluanda Cattle Dip

location
South West Bunyore (in Emuhaya)
year first funded
2009
action
Rehabilitation Of Cattle Dip
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Protection of Springs

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Springs Protection
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Ekwanda AP Administration Police

location
South Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of Ap Houses
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ekwanda Rural Electrification

location
South Bunyore (in Emuhaya)
year first funded
2005
action
Erection Of Electricity
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Manyasi Footbridge

location
South Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Bridge
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Emakakha Cattle Dip

location
North East Bunyore (in Emuhaya)
year first funded
2009
action
Rehabilitation Of Cattle Dip
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Protection of Springs

location
North Bunyore (in Emuhaya)
year first funded
2006
action
Protection Of Springs
output
-
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Eluhobe Primary School

location
North Bunyore (in Emuhaya)
year first funded
2007
action
Construction Of 2 Classrooms
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Owakhatonde Footbridge

location
North Bunyore (in Emuhaya)
year first funded
2009
action
Construction Of Bridge
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Protection of Springs

location
East Bunyore (in Emuhaya)
year first funded
2006
action
Springs Protection
output
-
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Emuhaya Tea Buying Centre

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Renovation Of The Buying Centre
output
-
implementation status
Complete
total cost
Ksh 195,000
estimate
Ksh 195,000

Esibembe Primary School

location
South Bunyore (in Emuhaya)
year first funded
2007
action
Renovation Of 3 Classrooms
output
-
implementation status
new
total cost
Ksh 156,482
estimate
Ksh 156,482

Musichichibulu Cattle dip

location
East Bunyore (in Emuhaya)
year first funded
2008
action
Rehabilitation Of Cattle Dip
output
-
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Mundika Footbridge

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Construction Of Footbridge
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Emusire Catlle dip

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Rehabilitation Of Cattle Dip
output
-
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Anyole Youth Group

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Facilitation
output
-
implementation status
Complete
total cost
Ksh 147,700
estimate
Ksh 147,700

Ebusiralo/Epang`a Road

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Mwibuno/Waluko Road

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Stalled
total cost
Ksh 140,000
estimate
Ksh 140,000

Ekwanda/Ochuore Road

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Emuhondo/Ilungu Road

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Mundichiri /Mwitukho Road

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Essong`olo/Esirabe Road

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Duka Moja Mwitsikhi Road

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Rabuori/Essaba Road

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 133,328
estimate
Ksh 133,328

Elukal/Ebwiranyi Road

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 133,328
estimate
Ksh 133,328

Ebusiralo/Esina Mutu Road

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 133,328
estimate
Ksh 133,328

Emusutwi/Emurembe Road

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 133,328
estimate
Ksh 133,328

Emuhaya/Esiamayayi Road

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 133,328
estimate
Ksh 133,328

Hobuya - Emanyinyi Road

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 133,328
estimate
Ksh 133,328

West Bunyore Tea Growers SHG

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Establishment Of Tree Nurseries
output
-
implementation status
Ongoing
total cost
Ksh 125,000
estimate
Ksh 125,000

Luanda Ward Comm.Dev.Group

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Facilitation
output
-
implementation status
Complete
total cost
Ksh 125,000
estimate
Ksh 125,000

Wemilabi Youth Vocational Centre

location
North Bunyore (in Emuhaya)
year first funded
2003
action
Establishment Of Tea Nurseries
output
-
implementation status
Complete
total cost
Ksh 125,000
estimate
Ksh 125,000

Jiendeleze SHG

location
East Bunyore (in Emuhaya)
year first funded
2003
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 125,000
estimate
Ksh 125,000

Essumba Welfare Group

location
Central Bunyore (in Emuhaya)
year first funded
2003
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 110,000

Ebubayi Tea Buying Centre

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 110,000

Maseno- Eboirangi/Emosoli Road

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ekwanda - Emwaloba Road

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ebusoli-Emakakha Road

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Opening Up & Reshaping
output
-
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Esibuye Primary School

location
North East Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of Toilets
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ebukhuliti - Ematsuli Road

location
North Bunyore (in Emuhaya)
year first funded
2003
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Esalwa - Nzawa Road

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Munjina - Ebwali Road

location
Wekhomo Location (in Emuhaya)
year first funded
2003
action
Opening Up & Reshaping
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Esiandumba Secondary School

location
South West Bunyore (in Emuhaya)
year first funded
2006
action
Construction Of Toilets
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Hillside Ebulako Youth Group

location
Wekhomo Location (in Emuhaya)
year first funded
2008
action
Fish Farming
output
-
implementation status
Ongoing
total cost
Ksh 90,000
estimate
Ksh 90,000

Ebusiralo Godown Fish Farmers group

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Fish Farming
output
-
implementation status
Ongoing
total cost
Ksh 90,000
estimate
Ksh 90,000

Esikhuyu Munjiti Self Help Group

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Fish Farming
output
-
implementation status
Ongoing
total cost
Ksh 90,000
estimate
Ksh 90,000

Muungano Mushroom Group

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Stalled
total cost
Ksh 83,751
estimate
Ksh 837,505

Matendo Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Complete
total cost
Ksh 83,750
estimate
Ksh 83,750

Ebubayi Basketry SHG

location
East Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Complete
total cost
Ksh 83,750
estimate
Ksh 83,750

Ebunangwe Teachers women Group

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Complete
total cost
Ksh 83,750
estimate
Ksh 83,750

Olumbuku Farmers SHG

location
North Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Complete
total cost
Ksh 83,750
estimate
Ksh 83,750

Abango`nje Self Help Group

location
South West Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Stalled
total cost
Ksh 83,750
estimate
Ksh 83,750

Riverside Mushroom Project

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Stalled
total cost
Ksh 83,750
estimate
Ksh 83,750

Emmaloba SHG

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Mushroom Farming
output
-
implementation status
Complete
total cost
Ksh 83,750
estimate
Ksh 83,750

Utulivu Women Group

location
South West Bunyore (in Emuhaya)
year first funded
2008
action
Poultry Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Sikujua Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2008
action
Dairy Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Anyole Aged Senior citizens

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Poultry Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Itumbu Tumaini

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Poultry Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Nzisi Agro-business Youth Group

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Bee Keeping
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Abamwalikhwa Women Group

location
South Bunyore (in Emuhaya)
year first funded
2008
action
Poultry Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

The Mighty Sporting Tiger

location
North East Bunyore (in Emuhaya)
year first funded
2008
action
Poultry Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Mundoli Youth Group

location
North Bunyore (in Emuhaya)
year first funded
2008
action
Bee Keeping
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Jifunze Women Group

location
East Bunyore (in Emuhaya)
year first funded
2008
action
Goats Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Eluchieo Youth Group

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Poultry Farming
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Busanga Self Help Group

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Bee Keeping
output
-
implementation status
Ongoing
total cost
Ksh 80,000
estimate
Ksh 80,000

Ammayoka Self Help Group

location
West Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 65,000
estimate
Ksh 65,000

Bunyore Richfield Youth Group

location
East Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 65,000
estimate
Ksh 65,000

Mwitukho Primary School

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Construction Of Toilets
output
-
implementation status
Complete
total cost
Ksh 64,493
estimate
Ksh 64,493

Kima Tujisaidie Youth Group

location
Wekhomo Location (in Emuhaya)
year first funded
2003
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Murandekha Women Group

location
East Bunyore (in Emuhaya)
year first funded
2003
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Noth Bunyore Handicapped Jua Kali SHG

location
North Bunyore (in Emuhaya)
year first funded
2003
action
Tailoring
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Namiru Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Namema SHG

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Luanda Youth Dev.Group

location
South West Bunyore (in Emuhaya)
year first funded
2003
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Ushindi Farmers Group

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 62,500
estimate
Ksh 62,500

Emutsuru Women Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Tea Nurseries
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Viazi Self Help Group

location
South West Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

Andeka men Fighting HIV/AIDS SHG

location
Wekhomo Location (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

Emuhaya Tea Buying Centre

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Establishment Of Tea Nurseries
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Tujifunze Women Group

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tea Nurseries
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Esiabwali Youth Group

location
North Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

Wemilabi Youth Vocational Centre

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tea Nurseries
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Mulunyenya Support Group

location
North East Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

North East Impact Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tea Nurseries
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Lords Kingdom farmers Field School

location
South Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

Amani Self Help Group

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

Ebukobelo Youth Group

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Essaba Multi Youth Group

location
Central Bunyore (in Emuhaya)
year first funded
2008
action
Horticulture Farming
output
-
implementation status
Ongoing
total cost
Ksh 60,000
estimate
Ksh 60,000

Tupendane Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Khombayo Self Help Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 53,000
estimate
Ksh 53,000

Emukasa Self Help Group

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Mumboha Secondary School

location
West Bunyore (in Emuhaya)
year first funded
2005
action
Electrification
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Asumbwe Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 46,875
estimate
Ksh 46,875

Musanda Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 46,875
estimate
Ksh 46,875

Wichungi Youth Group

location
East Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Esikhaye Women Group

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Emululu Women Group

location
South West Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Agape Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Huruma Support Group

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Ebulondi Abaskhwa Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Twendelee Women Group

location
North Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,038
estimate
Ksh 440,375

Mwibeye Vitendo SHG

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Care & Support For Orphans
output
-
implementation status
Complete
total cost
Ksh 44,037
estimate
Ksh 44,037

Eburalek CBO

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 43,750
estimate
Ksh 43,750

Mungobe Self Help Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 40,750
estimate
Ksh 40,750

Esamwenyi Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 34,375
estimate
Ksh 34,375

Mumbita Wajane Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 34,375
estimate
Ksh 34,375

Ushirika Upendo Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Esibuye Urafiki Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farmign
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Magada Umoja Youth Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Abakhala Self Help Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Mukhalakhala Women Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Akhungu Self Help Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Ushauri Support Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Shida Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,250
estimate
Ksh 31,250

Matendo Self Help Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 31,000
estimate
Ksh 31,000

Nywele Self Help Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Esikhuyu Tujisaidie Youth Group

location
Central Bunyore (in Emuhaya)
year first funded
2005
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Ukweli Youth Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Ebukhuliti East VHC Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Ematsuli/Ebukhuka Focal Area Farmers

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Esiambaka Self Help Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

All Saints Esabu CD Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Juhudi Women Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Omulembe Women Group

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Establishment Of Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Mara Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 29,500
estimate
Ksh 29,500

Sikujua Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 29,000
estimate
Ksh 29,000

Amani Women Group

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 29,000
estimate
Ksh 29,000

Matunda Self Help Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Passion Fruits Farming
output
-
implementation status
Complete
total cost
Ksh 27,500
estimate
Ksh 27,500

Bwoto Self Help Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 27,500
estimate
Ksh 27,500

Rehema Women Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 27,000
estimate
Ksh 27,000

Mulembe Youth Group

location
Wekhomo Location (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 25,000
estimate
Ksh 25,000

Esinamutu Widows Women Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 23,438
estimate
Ksh 234,375

Depo Dairy Women Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 23,438
estimate
Ksh 234,375

Ebussamba Passion Self Help Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 23,437
estimate
Ksh 23,437

Olwebo Women Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Dairy Farming
output
-
implementation status
Complete
total cost
Ksh 23,000
estimate
Ksh 23,000

Ufinyanzi Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Shujaa Self Help Group

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Okutima Mwitsekhe

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Luanda Friends Self Help Group

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Tumaini Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Mwoso Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Fadaah Self Help Group

location
North East Bunyore (in Emuhaya)
year first funded
2004
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Masaa Women Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Marasmus Women Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Essokoro Women Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Bahambani Women Group

location
North Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Bunyore Joinery Self Help Group

location
West Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 21,875
estimate
Ksh 21,875

Esiarambatsi AP Camp

location
North East Bunyore (in Emuhaya)
year first funded
2008
action
Purchase Of Water Tank
output
-
implementation status
Complete
total cost
Ksh 20,449
estimate
Ksh 204,485

Echando SHG

location
West Bunyore (in Emuhaya)
year first funded
2003
action
Establishment Of Tree Nurseries
output
-
implementation status
Ongoing
total cost
Ksh 20,000
estimate
Ksh 20,000

Ebusundi Youth Group

location
Wekhomo Location (in Emuhaya)
year first funded
2003
action
Establishment Of Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

TBA/CBD Women

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Pamba Jikoni Self Help Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Emukusa Young Farmers Group

location
South West Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Sinjila Omulekhwa Women Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Sifa Women Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Mulimani Self Help Group

location
South Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Ebutuli Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Balala Youth Group

location
South Bunyore (in Emuhaya)
year first funded
2003
action
Establishment Of A Tree Nursery
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Emuhaya Group of Disabled

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Purchase Of Tailoring Materials
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Emanyonyi Women Group

location
North East Bunyore (in Emuhaya)
year first funded
2003
action
Establishment Of Tree Nurseries
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Obukhonyanyi Women Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Poultry Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Ebitsiengwe Self Help Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Bunyore Rich Field Youth Group

location
East Bunyore (in Emuhaya)
year first funded
2004
action
Horticulture Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Emmabwi Mwangaza Women Group

location
Central Bunyore (in Emuhaya)
year first funded
2004
action
Agriculture Farming
output
-
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000