The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
    It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    
    
        
            
            Bujwang'A Secondary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Ofadmn,Lib,Lab,Class
- output
- Reduce Congestion
- implementation status
- Roofing Completed
- total cost
- Ksh 9,366,936
- estimate
- Ksh 3,560,000
 
    
        
            
            Funyula Law Courts
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of Court Block
- output
- Improve Service Delivery
- implementation status
- Stalled
- total cost
- Ksh 8,382,550
- estimate
- Ksh 7,200,000
 
    
        
            
            Busibi Secondary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Construction Of Admn,Lab,Lib,Class
- output
- Reduce Congestion
- implementation status
- Roofing Completed
- total cost
- Ksh 7,981,775
- estimate
- Ksh 3,560,000
 
    
        
            
            Hakati Secondary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Construction Of Admin,Lab Lib
- output
- Reduce Congestion
- implementation status
- Roofing Completed
- total cost
- Ksh 7,094,443
- estimate
- Ksh 3,560,000
 
    
        
            
            Bwangangi Primary School
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 10 Classes,Admin
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 6,760,000
- estimate
- Ksh 4,500,000
 
    
        
            
            Mugasa Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 10 Classes,Admin
- output
- Reduce Congestion
- implementation status
- Roofing Completed
- total cost
- Ksh 6,710,000
- estimate
- Ksh 4,500,000
 
    
        
            
            Namuduru Dispensary
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Construction Of Dispensary,Doctor'S House
- output
- Improve Health Standards
- implementation status
- Complete
- total cost
- Ksh 5,160,770
- estimate
- Ksh 4,000,000
 
    
        
            
            Bukiri Secondary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2007
- action
- Construction Of Admin,Lab Lib
- output
- Reduce Congestion
- implementation status
- Roofing Completed
- total cost
- Ksh 5,160,000
- estimate
- Ksh 6,500,000
 
    
        
            
            Busijo Secondary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2007
- action
- Construction Of Admn,Lib,Lab,Class
- output
- Reduce Congestion
- implementation status
- Roofing Completed
- total cost
- Ksh 5,160,000
- estimate
- Ksh 6,500,000
 
    
        
            
            Kabwodo Dispensary
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Dispensary,Doctor'S House,
- output
- Improve Health Standards
- implementation status
- Complete
- total cost
- Ksh 3,851,924
- estimate
- Ksh 4,000,000
 
    
        
            
            Wakhungu Dispensary
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Ot Dispensary,Doctor'S House
- output
- Improve Health Standards
- implementation status
- Complete
- total cost
- Ksh 3,282,240
- estimate
- Ksh 4,000,000
 
    
        
            
            Funyula Stadium
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2003
- action
- Perimetre Wall Construcion
- output
- Improve Socail Ammenities
- implementation status
- Stalled
- total cost
- Ksh 3,017,844
- estimate
- Ksh 2,000,000
 
    
        
            
            Sio Port District Hosp
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2007
- action
- Renovations Of Wards
- output
- Imrove Health Standards
- implementation status
- Not Started
- total cost
- Ksh 2,900,000
- estimate
- Ksh 5,000,000
 
    
        
            
            Nanderema Patrol Base
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2008
- action
- Construction Of A.P Houses
- output
- Improve Security
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 1,500,000
 
    
        
            
            Busijo/Bumbe Jetty
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2003
- action
- Construction
- output
- Jetty
- implementation status
- Stalled
- total cost
- Ksh 2,767,843
- estimate
- Ksh 1,000,000
 
    
        
            
            Mukonjo Dispensary
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2008
- action
- Construction Of Clinic
- output
- Provide Health Care
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 3,237,830
 
    
        
            
            Muramba Primary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of 4 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 2,508,547
- estimate
- Ksh 2,300,000
 
    
        
            
            Sigalame Secondary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2007
- action
- Renovation/Poshomill Purchased
- output
- Improve Quality  Standards
- implementation status
- Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
 
    
        
            
            Nabuganda Dispensary
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Dispensary,Doctor'S House,
- output
- Improve Health Standards
- implementation status
- Complete
- total cost
- Ksh 2,250,000
- estimate
- Ksh 4,000,000
 
    
        
            
            Nanderema Secondary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of Library
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 2,079,566
- estimate
- Ksh 2,100,000
 
    
        
            
            Busembe Special School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Dormitory Construction
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Jua Kali Sheds
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Construction/Co-Funded
- output
- Sheds
- implementation status
- Stalled
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Ageng'A Dispensary
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2003
- action
- Construction Of Laundry Unit
- output
- Improve  Standards
- implementation status
- Roofing Completed
- total cost
- Ksh 1,889,101
- estimate
- Ksh 2,100,000
 
    
        
            
            Budwong'I Water Project&Rehab Of Sio
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Construction
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 1,800,000
- estimate
- Ksh 800,000
 
    
        
            
            Ageng'A Maternity Wing
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Maternity Wing
- output
- Improve Mothercare
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Bunandi Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 4 Classes & Office
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 1,350,000
- estimate
- Ksh 600,000
 
    
        
            
            Wakhungu Secondary school
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Two Classes
- output
- Purchase Land & Construction Of Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,350,000
 
    
        
            
            Nanderema Girls Secondary school
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Construction Of 3 Classrooms
- output
- Improve Girl Child Education
- implementation status
- On Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,350,000
 
    
        
            
            Public Toilets
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Pit Latrines
- output
- Imrove Sanitation
- implementation status
- Stalled
- total cost
- Ksh 1,270,390
- estimate
- Ksh 1,800,000
 
    
        
            
            Buloma Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 3 Classes
- output
- Reduce Congestion
- implementation status
- Stalled
- total cost
- Ksh 1,100,000
- estimate
- Ksh 600,000
 
    
        
            
            Mundaya Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Construction Of 4 Classes
- output
- Reduce Congestion
- implementation status
- Incomplete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
 
    
        
            
            Nyakwaka Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 11 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 300,000
 
    
        
            
            Nerobia Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 3 Classes
- output
- Reduce Congestion
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Rumbiye Dispensary
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of Staff House
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 973,086
- estimate
- Ksh 1,300,000
 
    
        
            
            Odiado Primary School
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 4 Classes
- output
- Reduce Congestion
- implementation status
- Incomplete
- total cost
- Ksh 950,000
- estimate
- Ksh 300,000
 
    
        
            
            Nambale Rc Secondary school
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Construction Of 2 Classrooms
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
 
    
        
            
            Ganga/Matinga Dam
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2008
- action
- Rehabilitation
- output
- Provide Clean Water
- implementation status
- On-Going
- total cost
- Ksh 890,221
- estimate
- Ksh 0
 
    
        
            
            Ganjala Secondary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Power Supply
- output
- Improve Lighting
- implementation status
- Incomplete
- total cost
- Ksh 837,672
- estimate
- Ksh 850,000
 
    
        
            
            Namunyweda Primary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 4 C Rooms
- output
- Improve  Standards
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Sigalame Primary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 3 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Nabutuki Primary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 3 C Rooms
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Buduta Primary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Two Classes
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
 
    
        
            
            Bumulimba Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Two Classes
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
 
    
        
            
            Nandereka Primary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Two Classes
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
 
    
        
            
            Sibinga Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Renovation Of 3 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 250,000
 
    
        
            
            Nambuku Patrol Base
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2008
- action
- Construction Of A.P Houses
- output
- Improve Security
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Namasali Youth Polytechnic
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2009
- action
- One Workshop
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
 
    
        
            
            Ganjala Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Renovation Of C Rooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
 
    
        
            
            Bumayenga Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Two Classes
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Mundaya Borehole
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Drilling
- output
- Provide Clean Water
- implementation status
- Stalled/No Water
- total cost
- Ksh 526,000
- estimate
- Ksh 800,000
 
    
        
            
            Madivira Spring
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of Water Point
- output
- Provide Clean Water
- implementation status
- On-Going
- total cost
- Ksh 519,202
- estimate
- Ksh 1,000,000
 
    
        
            
            Ejinja Community Water
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Power Supply
- output
- Provide Clean Water
- implementation status
- Incomplete
- total cost
- Ksh 514,300
- estimate
- Ksh 600,000
 
    
        
            
            Mukonjo Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2003
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Buradi Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2009
- action
- One Class
- output
- Impove Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Namboboto Boys Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Renovation Of Classes
- output
- Improve Learning
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Hakati Primary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2009
- action
- Administration Block
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Namasali Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 11 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Buburi Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of C Room & Office
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Munyanja Primary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 2 Classes
- output
- Improve  Standards
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Mudoma Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of Admin,Ecd,2 Toillets
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 488,159
- estimate
- Ksh 500,000
 
    
        
            
            Siongo Spring
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Construction Of Water House
- output
- Provide Clean Water
- implementation status
- Stalled
- total cost
- Ksh 437,560
- estimate
- Ksh 871,000
 
    
        
            
            Bumarere/Namuduru/ Namasango/Namasali
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Water Supply
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 405,000
- estimate
- Ksh 500,000
 
    
        
            
            Bisibi Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 5 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Bukeko Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Library
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Nanderema Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Staff Room
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Bukiri Primary School
            
            
                - location
- 
                        Ageng'A
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 1 C Room
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Nyakhobi Secondary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2003
- action
- Biogas Project
- output
- Improve Lighting
- implementation status
- Complete
- total cost
- Ksh 385,560
- estimate
- Ksh 250,000
 
    
        
            
            Busembe Primary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Dorm,1 Class
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
 
    
        
            
            Nyakhobi Secondary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2004
- action
- Electrical Wiring
- output
- Electricity Supply
- implementation status
- Incomplete
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
 
    
        
            
            Sifuyo Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 2 C Rooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Malanga Primary School
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 4 Classes,An Office
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kabwodo Primary School
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Constructon Of Ecd Class
- output
- Reduce Congestion
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Rumbiye Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Ecd Class
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Busulere Primary School
            
            
                - location
- 
                        Nambuku
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Completion Of 2 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Onana Metres
            
            
                - location
- 
                        Odiado/ Nangosya
                        (in Funyula)
                    
- year first funded
- 2003
- action
- Installing Metres
- output
- Imrove Water Supply
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Wakhungu Primary School
            
            
                - location
- 
                        Odiado
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 2 Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Bujwang'A Primary School
            
            
                - location
- 
                        Nanguba
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Renovation Of Classes
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Moody Awori Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of 4 Pit Latrines/ Fence
- output
- Improve Sanitation
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Nambale Rc Primary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Repair & Paint Of 4 Crooms
- output
- Improve  Standards
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Namuduru Primary School
            
            
                - location
- 
                        Bwiri
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Staff Room
- output
- Improve  Standards
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Nyakhobi Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Renovation Of 2 Ecd Classes
- output
- Reduce Congestion
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Sibale Primary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2006
- action
- Construction Of Ecd Class
- output
- Reduce Congestion
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Namboboto Borehole Geo-Survey Fe
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- year first funded
- 2005
- action
- Drilling
- output
- Water
- implementation status
- On-Going
- total cost
- Ksh 170,400
- estimate
- Ksh 500,000
 
    
        
            
            Namboboto Secondary School
            
            
                - location
- 
                        Namboboto
                        (in Funyula)
                    
- action
- Installation
- output
- Wiring
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 300,000