The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Gaccuriri Wang'Uru Bridge
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- New Bridge
- output
- Passable Road
- implementation status
- Ongoing 1,245,379 Is Not Yet Released
- total cost
- Ksh 4,500,000
- estimate
- Ksh 7,000,000
Karaba Community Land
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Land
- output
- Incr Security
- implementation status
- Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Makima Market Water Pro
- location
-
Makima
(in Gachoka)
- year first funded
- 2003
- action
- Piped Water Supply
- output
- Impr Water Availability
- implementation status
- 500,000 Not Released Complete But Not Operational
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
Mukango Piped Water
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2008
- action
- Piping Water
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 1,765,000
- estimate
- Ksh 2,000,000
Malikini Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2007
- action
- Lab Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Mariari Girls SSchool
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2003
- action
- Bus Purchase
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,000,000
Kiamuringa Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2006
- action
- 4 Classes Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,800,000
Makima Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Lab Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Karaba S School Borehole
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- Bore Hole Sinking
- output
- Impr Water Availability
- implementation status
- Complete 650,000 Relocated To Various
- total cost
- Ksh 1,450,000
- estimate
- Ksh 800,000
Makutano Acres Land
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Land Purchase
- output
- Better Living
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Kiambere Gasavari Issaco Road
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2005
- action
- Rock Removal
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Kiametho Nyuari Kamwimbi Road
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
St. Lukes School For Deaf
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2003
- action
- 8 Staff Houses
- output
- Student Security
- implementation status
- 3 Complete
- total cost
- Ksh 1,220,000
- estimate
- Ksh 4,000,000
Mavuria Water Project
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- Piped Water Supply
- output
- Impr Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Nganduri Kamunyange Road
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete 200,000 Relocated To Various Proj.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
Mbita Dispensary
- location
-
Mbita
(in Gachoka)
- year first funded
- 2007
- action
- 2 Staff House Construction
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 1,072,400
- estimate
- Ksh 500,000
Mbonzuki Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Lab Construction & Equipping
- output
- Impr. Learning
- implementation status
- Incomplete (From Lintel Level )
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,500,000
Gategi Health Centre
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2009
- action
- Ward Construction
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ngeca Mashamba Road
- location
-
Makima
(in Gachoka)
- year first funded
- 2006
- action
- Road Opening
- output
- Passable Rd
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Ngegari Makima Bridge
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Drift Construction
- output
- Passable Road
- implementation status
- Not Yet
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,700,000
Gategi Mrkt Borehole
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2006
- action
- Bore Hole Sinking
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Makutano Community Borehole
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Piping Water
- output
- Impr Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Malikini Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2009
- action
- Dormitory Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mbondoni Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2005
- action
- Bus, Generator
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,800,000
Iriamurai Boarding Pr School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2005
- action
- D/Hall Construction
- output
- Better Facility
- implementation status
- Incomplete(Floor,Painting,Window Pane)
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Karura Riacina Kindaruma Road
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete 300,000 Relocated To Various Proj.
- total cost
- Ksh 950,000
- estimate
- Ksh 1,500,000
Makutano Police Borehole
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Electrification
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 936,000
- estimate
- Ksh 936,000
Machang'A Secondary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Admin. Block Constr
- output
- Inc Efficiency
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kanthenge Kangeta Road
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Kathiga Ka Nyonga Road
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete 170,000 Relocated To Various Proj.
- total cost
- Ksh 870,000
- estimate
- Ksh 1,200,000
Kathuri Gachara Machang'A
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete 350,000 Relocated To Various Proj.
- total cost
- Ksh 850,000
- estimate
- Ksh 500,000
Mutuobare Secondary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2006
- action
- 2 Class construction
- output
- Impr Learning
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 700,000
Mavuria Water Project
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2007
- action
- Piped Water Supply
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Karaba Police Post
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- Police Lines Construction
- output
- Incr Security
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kiambere Secondary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2003
- action
- Borehole construction
- output
- Avail Water & Imp Learning
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Karuku Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- 6 Class Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Minoori Water Project
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Tank Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Rianjeru Primary School Adm Block
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Admin Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 770,000
- estimate
- Ksh 800,000
Iria Itune Secondary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2006
- action
- 2 Class Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kanyonga Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2006
- action
- 2 Class Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ngambari Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- 2 Class construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mutuobare Chiefs Office
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2003
- action
- Office Construction
- output
- Better Service
- implementation status
- Ongoing 150,000 Relocated To Various Proj.
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Makima D.O. Office
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Office Construction
- output
- Incr Security
- implementation status
- Not Yet
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Gachoka Police Post
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Station Office Construction
- output
- Incr Security
- implementation status
- Incomplete(Plastering &Windows)
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Makima Acres Land
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Land Purchase
- output
- Better Living
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Machang'A Rugogwe Kiritiri
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Rianguu Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2009
- action
- 2 Classrooms Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Iria - Itune Secondary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Laboratory Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 685,000
- estimate
- Ksh 685,000
Mboce Dam
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete 200,000 Relocated To Various
- total cost
- Ksh 650,000
- estimate
- Ksh 600,000
Kionywe Dam
- location
-
Makima
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete 150,000 Relocated To Various
- total cost
- Ksh 650,000
- estimate
- Ksh 750,000
Mashamba Irrigation Project
- location
-
Makima
(in Gachoka)
- year first funded
- 2007
- action
- Irrigation
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mbonzuki Earth Dam
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 630,000
- estimate
- Ksh 630,000
Makawani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- 2 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 614,000
- estimate
- Ksh 614,000
Ntharawe Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Stf House Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Gategi Girls Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2005
- action
- Staff House Construction
- output
- Impr Learning
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Mavuria Chiefs Office
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- Adm. Police House Construction
- output
- Better Services
- implementation status
- Not Yet
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Rwika Adm Ap Lines
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Ap Lines Construction
- output
- Incr Security
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ganthura Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2007
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various Proj.
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Unyuani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2006
- action
- 2 Classrooms Construction
- output
- Impr Learning
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kiritiri, Gatumbiri, Rugogwe, Thiba Bridge To Machanga Road
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 585,000
- estimate
- Ksh 585,000
Kamunyange Dispensary
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Dispensary Construction
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 584,348
- estimate
- Ksh 650,000
Aic Gachuriri Primary School
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Incomplete (Floor,Plastering,Windows,Doors
- total cost
- Ksh 570,000
- estimate
- Ksh 300,000
Guma Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
Mulukusi Dispensary
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Dispensary Construction (Phase 1)
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Gasavari Thura Road
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2006
- action
- Road Opening
- output
- Passable Rd
- implementation status
- Complete 300,000 Relocated To Various Proj.
- total cost
- Ksh 540,000
- estimate
- Ksh 800,000
Nyangwa Piped Water Project
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- Piping Water
- output
- Impr Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 535,000
- estimate
- Ksh 535,000
Karaba Health Centre
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Mortuary Construction (Phase 1)
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kanyariri Primary School
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Admin Block Completion
- output
- Impr. Learning
- implementation status
- Incomplete(From Lintel)
- total cost
- Ksh 500,000
- estimate
- Ksh 250,000
Karaba Secondary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Classrooms Renovation
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Karuki Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiambere Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2008
- action
- Kitchen Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiritiri Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- 2 Classes Constr
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mariari Sda Primary School School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- 2 Classes Constr
- output
- Impr. Learning
- implementation status
- 1 Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Marimari Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- Admin Block Completion
- output
- Impr. Learning
- implementation status
- Incomplete(From Lintel)
- total cost
- Ksh 500,000
- estimate
- Ksh 250,000
Ngenge Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2006
- action
- Staff House Constr
- output
- Impr Learning
- implementation status
- Incomplete (Grills, Doors & Plastering
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Karura Dispensary
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- Stf House Construction
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Kirathe Dispensary
- location
-
Kithunthiri
(in Gachoka)
- year first funded
- 2004
- action
- Stf House Construction
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kathuri Gachara Road Rehabilitation
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Wango Kilia Malikini Road
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Rock Rem / Rd Repairs
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Karaba Ds Office
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Office Construction
- output
- Incr Security
- implementation status
- Not Yet
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ciandiga Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2006
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various Proj.
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Kaareri/Kiriiri Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete 250,000 Relocated To Various
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Minoori Piped Water Project
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2009
- action
- Piping Water
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kamweli Dispensary
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Staff House Construction
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 476,000
- estimate
- Ksh 500,000
Kariari Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 455,000
- estimate
- Ksh 275,000
Kaganjo Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
Rianjeru Area Road
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2006
- action
- Road Repairs
- output
- Passable Roads
- implementation status
- Complete 250,000 Relocated To Various Proj.
- total cost
- Ksh 450,000
- estimate
- Ksh 750,000
Itabua B Rwika Market Road
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Repairs
- output
- Passable Rd
- implementation status
- N/A Relocated To Various Proj.
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Makutano Borehole Improvement
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Improve Borehole
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Wachoro Dispensary
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Maternity Extension
- output
- Impr Health Care
- implementation status
- Not Yet
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Ndithiri Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 430,000
- estimate
- Ksh 250,000
Kiriiri - Kavairi Drift
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Drift Construction
- output
- Passable Road
- implementation status
- Not Yet
- total cost
- Ksh 406,000
- estimate
- Ksh 406,000
Maviani Earth Dam
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Yoder Karwigi Market
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Transformer Purchase
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Wango Silanga Earth Dam
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Gacavari Secondary Class Const
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2007
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Iriamurai Poly
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2006
- action
- Workshop Construction
- output
- Impr Learning
- implementation status
- Incomplete(Done Upto Lintel)
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kikumini Secondary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mbonzuki Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2005
- action
- Class construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
St. Clare Girls' Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2009
- action
- Administration Block
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kabuguri Dispensary
- location
-
Gichiche
(in Gachoka)
- year first funded
- 2005
- action
- Lab Compl
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Nganduri Dispensary
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- Lab. Equipments Purchase
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karia Nyangwa Road
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Road Opening
- output
- Better Communications
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Ndundani Drift
- location
-
Makima
(in Gachoka)
- year first funded
- 2007
- action
- Drift Construction
- output
- Passable Rd
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karaba Dos Camp
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Aplines Constuction
- output
- Incr Security
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
Irugama Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kakindu Dam
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kamenju Earth Dam
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kandara Dam
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Iria Itune Gathenge Road Rehabilitation
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 392,000
- estimate
- Ksh 392,000
Kakawa Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Renovation Of 4 Classrooms &Office
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 390,000
- estimate
- Ksh 390,000
Gitaraka Police Post
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Staff House Completion (From Lintel) & Office Construction
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 384,000
- estimate
- Ksh 384,000
Kanyonga Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Laboratory Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
St Mary's Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Bus Engine Purchase
- output
- Improve Travelling
- implementation status
- Complete
- total cost
- Ksh 365,000
- estimate
- Ksh 365,000
Kangungi Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2009
- action
- Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kanyonga Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kiamukuyu Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2009
- action
- Staffroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kirima Mixed Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2007
- action
- Class Const
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kitololoni Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Makima Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2007
- action
- Class Const
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Makima Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Land Purchase (10 Acres @ 35,000 Per Acre)
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Aic Ndune Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Manyatti Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mashamba Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mashamba Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Muthiru Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mutindwa Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2009
- action
- Admin Block Phase Ii
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mutuobare Secondary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Njeru Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Staffroom Construction-Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Nyambori Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Land & Iron Sheets
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Nyangwa Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- 1 Nursery Class Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 300,000
Unyuani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Yoder Karwigi Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2004
- action
- Lab Comp
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Makima Dispensary
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Staff House Construction-Completion
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kabondori Nyangwa Road
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Mbondoni Police Patrol Base
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Office Construction
- output
- Incr Security
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Riakanau Chiefs Office
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2003
- action
- Office Construction
- output
- Better Service
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gakegari Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Iikithathi Earth
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Karuriri Earth Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kiangungi Earth Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet Started
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Makima Dam
- location
-
Makima
(in Gachoka)
- year first funded
- 2006
- action
- Water Improvement
- output
- Water Improvement
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 600,000
Ndia Mundu Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Makutano Secondary school
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- N/A (Relocated To Various Proj.)
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mutuobare Location Village Polytechnic
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2008
- action
- 10 Acres Land Purchase
- output
- Better Living
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gataka Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2007
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gataka Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gikuru Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ack Kaseve Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2007
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mbonzuki Secondary School Electrification
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Electrification
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 340,000
- estimate
- Ksh 340,000
Musingini Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 340,000
- estimate
- Ksh 340,000
Kirima Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- Laboratory Gas And Drainage System Installation
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 335,000
- estimate
- Ksh 335,000
Gachoka Sport Clubs
- location
-
Kianjiru, Mbeti )
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Sports Facilities
- output
- Better Living
- implementation status
- Not Yet
- total cost
- Ksh 334,986
- estimate
- Ksh 334,986
Kaseveni Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Class/Desks
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
Kiruriri Primary School Class Const
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2007
- action
- Class Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 325,000
- estimate
- Ksh 325,000
Mutindwa Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2007
- action
- Admin Block
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 325,000
- estimate
- Ksh 325,000
Karaba Secondary school
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Mbondoni Chiefs Office
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Office Construction
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Mwea Chiefs Office
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Office Construction
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Makima Chief's Camp
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Office Construction
- output
- Incr Security
- implementation status
- Not Yet
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Mutindwa Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2005
- action
- Class construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 310,000
- estimate
- Ksh 310,000
Riaciina Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2005
- action
- Class Construction
- output
- Impr Learning
- implementation status
- Incomplete
- total cost
- Ksh 310,000
- estimate
- Ksh 310,000
Upper Wakalya Dam
- location
-
Karaba
(in Gachoka)
- year first funded
- 2006
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete 100,000 Relocated To Various
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Kamutuanjiru Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2007
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ack Malikini Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- 6 Class Renovation
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ack Ngangari Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2008
- action
- Admin. Block (Phase 1)
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ack Ngangari Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2009
- action
- Administration Block Phase 11
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ack Ngomola Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- 3 Classes Renovation & Purchase Of Desks
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Aic Kathiani Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- 6 Class Renovation
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Aic Wango Secondary
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gitaraka Secondary School shool
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Dormitory Renovation (Roofing Including Timber Work)
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Jnyaga
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2009
- action
- Administration Block Phase 11
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Jnyaga Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2008
- action
- Administration Block Construction
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Kamunyange Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamutuanjiru Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2009
- action
- Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamweli Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamwimbi Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- 2 Classes Constr
- output
- Impr. Learning
- implementation status
- 1Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamwimbi Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kangungi Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Karaba Consolata Primary School Sc
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiamuringa Boarding Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2005
- action
- Dorm Constr
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Machanga Secondary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Machang'A Secondary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2009
- action
- Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Makawani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Class Constructin
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mathigameru Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mburutani Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Class construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Munyori Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwea Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nganduri Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Contruction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngiori Integrated Secondary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ntharawe Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyangwa Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rugogwe Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2009
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rwika Tech Institute
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Computers Purchase
- output
- Better Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
St. Training Centre
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2007
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- N/A (Relocated To Various Proj.)
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Urua Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wango Mixed Secondary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Yoder Karwigi Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
Kabuguri Dispensary
- location
-
Gichiche
(in Gachoka)
- year first funded
- 2009
- action
- Ward Construction
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Mbonzuki Disopensary
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Laboratory Construction(Phase 1)
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gacabari Thura Road Rehabilitation
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gategi Kilia Mwiyendei Road
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Repairs
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mabati Juu Mutindwa Road
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2006
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Wango Drift
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2006
- action
- Drift Constr
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Kiambere Administration Police
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2008
- action
- Police Block Construction(Phase 1)
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kianjiru Chief's Office
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Office Construction
- output
- Better Service
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ntharawe A/Chief Office
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- Office Construction
- output
- Incr Security
- implementation status
- Incomplet(Plastering, Door, Painting, Doors& Windows
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gwakarigu Dam
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2006
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various Proj.
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Kamunyagia Dam
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Kamutungi Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2006
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Kiuguri Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2006
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Mburutani Dam
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Started 200,000 Relocated To Various Proj.
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Malikini Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 280,000
Riakanau Dispensary
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2003
- action
- Lab Eq Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 279,560
- estimate
- Ksh 300,000
Boreholes Repairs
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various Proj.
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Mbondoni Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Generator Repair
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 264,000
- estimate
- Ksh 264,000
Kiambere Tac Hall
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- Hall Renovation
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Kirathe Dispensary
- location
-
Kithunthiri
(in Gachoka)
- year first funded
- 2009
- action
- Public /Staff Toilet Construction&Fencing
- output
- Impr Health Care
- implementation status
- Not Yet
- total cost
- Ksh 252,510
- estimate
- Ksh 252,510
Kiritiri Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Ndoma Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Mutuobare Mrkt Water Project
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2006
- action
- Tank Construction
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Makima Dam
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Machanga Primary School Adm Block Compl
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2007
- action
- Admin Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kilia B Nursary
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2007
- action
- Class Const
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kiamukuyu Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Class Constr
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kathuri Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kamurugu Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2005
- action
- Class Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Ikomenie Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Gwakarigu Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Incomplete(Painting &Plastering
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Gatumbiri Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Gatuanyaga Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kiamakumi Piped Water Project
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2009
- action
- Piping Water
- output
- Impr Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kanyariri Piped Magaru Water
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2008
- action
- Piping Water
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Gatarathi Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Gachoka Stream Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Karaba Police Post
- location
-
Karaba
(in Gachoka)
- year first funded
- 2009
- action
- Office Construction
- output
- Incr Security
- implementation status
- Not Yet
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Ngomola Road
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2009
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Not Yet
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mutuobare Riacina Road
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2005
- action
- Drift Construction
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Makima Njeru Masinga Road
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Road Repair
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Mbondoni Dispensary
- location
-
Makima
(in Gachoka)
- year first funded
- 2007
- action
- Expansion
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kabuguri Dispensary
- location
-
Gichiche
(in Gachoka)
- year first funded
- 2007
- action
- Lab Equip Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 200,000
Unguni Primary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2006
- action
- Class Construction
- output
- Impr Learning
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Rugogwe Primary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Omega Juniour Acadamy
- location
-
Makima
(in Gachoka)
- year first funded
- 2007
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- N/A (Relocated To Various Proj.)
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Ngiori Special School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2006
- action
- Class Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Nganduri Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Maviani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- Class Constr
- output
- Impr Learning
- implementation status
- Incomplete (In Use) (Floor &Plastering
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mathiga Meru Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Class Constr
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Minoori Piped Water Project
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2008
- action
- Piping Water
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 243,000
- estimate
- Ksh 243,000
Karaba Makutano Road
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Repairs
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Gatirangugu Sand Dam
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 235,000
- estimate
- Ksh 235,000
Kariguri Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- Admin Block Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Mutuobare Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Furniture
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Gatete Karura Road Rehabilitation
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Stephen Kisilu Sec
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Tank Repair
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 216,000
- estimate
- Ksh 216,000
Kariari Ciamatu Road Drift
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Drift Constr
- output
- Passable Road
- implementation status
- Not Yet
- total cost
- Ksh 215,000
- estimate
- Ksh 215,000
Gachoka S/Loc Asst Chief's Office
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2005
- action
- Office Construction
- output
- Better Service
- implementation status
- Complete
- total cost
- Ksh 210,000
- estimate
- Ksh 250,000
Yungo Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Ccm Koma Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Desks& Water Gutters Purchase
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gategi Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Kitchen Renovation & Latrine Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ikomenie Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2009
- action
- Class Completion
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Karura Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2008
- action
- Purchase Of Desks
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kaweru Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Class Completion
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mutuobare Secondary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2008
- action
- Purchase Of Land
- output
- Better Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngangari Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2004
- action
- Class Completion
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngiori Intergrated Secondary School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2009
- action
- 1 Classroom Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. Clare Girls Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2005
- action
- Lab Eq Purchase
- output
- Improved Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Stephen Kisilu Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- 5 Classrooms Renovation
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Wachoro Secondary Cmputer Rm Const
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Computer Rm Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gacabari Dispensary
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2009
- action
- Staff House Repair
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gitaraka Dispensary
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Stf House Completion
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kamunyange Dispensary
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2008
- action
- Staff House Construction(Phase 1)
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiambere Kathingari Road
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2005
- action
- Road Opening
- output
- Passable Road
- implementation status
- Complete From Relocation
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Machanga Kabuguri Road
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2003
- action
- Repairs
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Maviani Karaba Secondary School Maviani Mrkt Kwa Musili Road
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ndithiri Road
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- Road Opening
- output
- Passable Road
- implementation status
- N/A Relocated To Kiambere Gathingari Rd
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ntharawe Kirimu
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Not Yet
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Riakanau Gategi Road
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Repairs
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Assistant Chief Riakanau Office
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2009
- action
- Office Construction
- output
- Incr Security
- implementation status
- Not Yet
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Ciakithini Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Katulye Dam
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kiambere Secondary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Tank Purchase
- output
- Avail Water & Imp Learning
- implementation status
- Not Yet
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiamicuki Earth Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2007
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kirimiuru Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2005
- action
- Dam Repair
- output
- Impr Water Availability
- implementation status
- Complete 100,000 Relocated To Various
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
Mukomwe Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Ngambari Dam
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Ngune Water Project
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Tank Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Nguru Piped Water Project
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2009
- action
- Piping Water
- output
- Impr Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ruiria Dam
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2004
- action
- Completion
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Wakalia Kathayoni Gitaraka Girls Road
- location
-
Karaba
(in Gachoka)
- year first funded
- 2008
- action
- Road Repairs
- output
- Passable Road
- implementation status
- Ongoing
- total cost
- Ksh 192,000
- estimate
- Ksh 192,000
Ngenge Secondary School
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Dormitory Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Kionywe Sand Dam
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Mbondoni Dispensary
- location
-
Makima
(in Gachoka)
- year first funded
- 2008
- action
- Laboratory Construction (Phase 1)
- output
- Impr Health Care
- implementation status
- Ongoing
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Rwika Dispensary
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Lab Eq Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Wachoro Dispensary
- location
-
Karaba
(in Gachoka)
- year first funded
- 2003
- action
- Lab Eq Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Ndune Borehole
- location
-
Makima
(in Gachoka)
- year first funded
- 2009
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Not Yet
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Kirima Mixed Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2004
- action
- Lab Equip Purchase
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Machang'A Dispensary
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2003
- action
- Lab Eq Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Mbita Dispensary
- location
-
Mbita
(in Gachoka)
- year first funded
- 2003
- action
- Lab Eq Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 250,000
Mbondoni Secondary School
- location
-
Makima
(in Gachoka)
- year first funded
- 2004
- action
- Lab Equipment
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Kiangungi Piped Water
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2008
- action
- Piping Water
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Kiambere Health Centre
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2008
- action
- Construction Of Drug House(Phase 1)
- output
- Impr Health Care
- implementation status
- Not Yet
- total cost
- Ksh 165,000
- estimate
- Ksh 165,000
Kaninwanthiga Community
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2009
- action
- Transformer Purchase
- output
- Better Living
- implementation status
- Not Yet
- total cost
- Ksh 158,000
- estimate
- Ksh 0
Deos Offices
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2003
- action
- Computer Purchase
- output
- Inc Efficiency
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kakindu Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2008
- action
- Latrines Construction-Completion
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kariguri Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Admin. Block Completion
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Munyori Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2006
- action
- Class construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ngiori Primary School special Uni
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2007
- action
- Kitchen Construction
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Rwika Technical Institute
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2008
- action
- Sewerage System
- output
- Better Services
- implementation status
- Not Yet
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ciandiga Dam
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2007
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kanyariri B Water Project
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Pipeline Rehabilitation
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 450,000
Machang'A Agroforest Project
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2006
- action
- Tree Nursery
- output
- Improved Environment
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kilia Farmers Youth Self Help Group
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2003
- action
- Road Impr $Horticultural
- output
- Better Living
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ack Riakanau Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Latrine Construction
- output
- Impr. Learning
- implementation status
- 0Ngoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Deb Muraru Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Jjm Nyaga Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2004
- action
- Desk &Class Repair
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kariari Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2008
- action
- Purchase Of Furniture
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 147,000
- estimate
- Ksh 147,000
Mutugu Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Wiring
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 142,400
- estimate
- Ksh 142,400
Kiambere Secondary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- Lab Eq.
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 135,000
- estimate
- Ksh 135,000
Gachoka Cacc Office
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Computer Purchase
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Kiamuthigani Piped Water
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2008
- action
- Piping Water
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 110,000
- estimate
- Ksh 110,000
Nthingini Agro Project
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2006
- action
- Tree Nursery
- output
- Improved Environment
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gataka Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2003
- action
- School Furniture
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gwakarigu Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2009
- action
- Latrine Construction
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kamaunju Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Iron Sheets
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiamuringa Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2004
- action
- Labeq
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Marimari Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Furniture
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngenge Primary School
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Class Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ntharawe Primary School
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2008
- action
- Purchase Of Desks
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyangwa Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2003
- action
- Sch Furniture
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gategi Health Centre
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Purchase Of Plastic Water Tank
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kianjiru WaRoad Bridge
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2003
- action
- Repairs
- output
- Passable Road
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Karaba Chiefs Office
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Office Renovation
- output
- Better Service
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kilia Chiefs Office
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2008
- action
- Office Completion
- output
- Better Services
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gitakari Well
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Well Improvement
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various Proj.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Iriamurai Borehole
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2008
- action
- Improvement Of The Pumping System Machine
- output
- Better Living
- implementation status
- Not Yet
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kaninwanthiga Dam
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2004
- action
- Dam Repair
- output
- Impr Water Availability
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kawanga Dam
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Dam Construction
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Kinyaga Well
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2006
- action
- Well Improvement
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mashamba Borehole
- location
-
Makima
(in Gachoka)
- year first funded
- 2005
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mbita Chiefs Office Wiring
- location
-
Mbeti.S
(in Gachoka)
- year first funded
- 2008
- action
- Wiring
- output
- Better Living
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngiori Primary School special Uni
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2003
- action
- Food Purchase
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 82,000
- estimate
- Ksh 200,000
Mariari Girls SSchool
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- Lab Renovation
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kiambere Assistant Chiefs
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2008
- action
- Office Renovation
- output
- Better Services
- implementation status
- Not Yet
- total cost
- Ksh 53,000
- estimate
- Ksh 53,000
Mutuaguoko Well Protection
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2007
- action
- Improvement
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Koma Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Malikini Secondary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2005
- action
- Lab Eq
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Nyangwa Primary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Desks
- output
- Impr. Learning
- implementation status
- Not Yet
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Rugakori Primary School Class Roofing
- location
-
Mbeti S
(in Gachoka)
- year first funded
- 2007
- action
- Roofing
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Unyuani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Wakalya Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Class Completion
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Karaba Dispensary
- location
-
Karaba
(in Gachoka)
- year first funded
- 2006
- action
- Lab Renovation
- output
- Impr Health Care
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gachabari Borehole
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2005
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- Repaired
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gwakarigu Borehole
- location
-
Makima
(in Gachoka)
- year first funded
- 2007
- action
- Borehole Const
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kiambere Main Borehole
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2004
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mutuaguoko Well
- location
-
Kiambere
(in Gachoka)
- year first funded
- 2006
- action
- Well Improvement
- output
- Impr Water Availability
- implementation status
- N/A Relocated To Various
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Rwanga Agro Project
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2006
- action
- Tree Nursery
- output
- Improved Environment
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gataka Secondary School
- location
-
Kianjiru
(in Gachoka)
- year first funded
- 2009
- action
- Purchase Of Desks
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gitaraka Primary School shool
- location
-
Karaba
(in Gachoka)
- year first funded
- 2005
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ikomenie Primary School
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2007
- action
- Desks Purchase
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Iramurai Girls S School
- location
-
Mavuria
(in Gachoka)
- year first funded
- 2006
- action
- Lab Comp
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
J N Mwonge Primary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2006
- action
- Class Completion
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kangungi Secondary School
- location
-
Mbeti S.
(in Gachoka)
- year first funded
- 2009
- action
- Classroom Completion
- output
- Impr. Learning
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Karaba Tac Hall Furniture
- location
-
Karaba
(in Gachoka)
- year first funded
- 2007
- action
- Purhase Of Furniture
- output
- Impr. Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kathiani Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kirathe Dispensary
- location
-
Kithunthiri
(in Gachoka)
- year first funded
- 2009
- action
- Water Tank Purchase
- output
- Impr Health Care
- implementation status
- Not Yet
- total cost
- Ksh 47,490
- estimate
- Ksh 47,490
Makawani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Karura Borehole
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Mutindwa Borehole
- location
-
Mutuobare
(in Gachoka)
- year first funded
- 2004
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Unyuani Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- N/A (Relocated To Various Proj.)
- total cost
- Ksh 30,002
- estimate
- Ksh 30,000
Wakalya Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks/ Class Construction
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kikumini Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kwanzivo Kitava Boreholes
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Borehole Repair
- output
- Impr Water Availability
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Iria Itune Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kakindu Primary School
- location
-
Riakanau
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Karaba Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Karuku Primary School
- location
-
Karaba
(in Gachoka)
- year first funded
- 2004
- action
- Desks
- output
- Impr Learning
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000