The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Gem

Lihanda Community Health Centre

location
East Gem (in Gem)
year first funded
2006
action
Construction of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 4,594,450
estimate
Ksh 4,594,450

Gongo Community Health Centre

location
Central Gem (in Gem)
year first funded
2006
action
Construction of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 4,594,450
estimate
Ksh 4,594,450

Akala Odok Panyako Luanda Road

location
South Gem (in Gem)
year first funded
2005
action
Grading/Maint
output
Road
implementation status
Complete
total cost
Ksh 3,980,678
estimate
Ksh 4,000,000

Cdf Office

location
North East Gem (in Gem)
year first funded
2007
action
Construction of Offices
output
Offices
implementation status
On Going
total cost
Ksh 3,409,477
estimate
Ksh 46,425,346

Nyamnnia Mixed Secondary School

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 3,400,000
estimate
Ksh 5,005,003

Lundha Mixed Secondary School

location
North Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 2,500,000
estimate
Ksh 2,572,800

Ndori Wambusa Road

location
South Gem (in Gem)
year first funded
2008
action
Opening Roads
output
Road
implementation status
Complete
total cost
Ksh 2,394,899
estimate
Ksh 0

Gongo Warom Secondary School

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 2,200,000
estimate
Ksh 1,131,106

Akala Health Centre

location
South Gem (in Gem)
year first funded
2005
action
Construction of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 2,150,000
estimate
Ksh 2,150,000

Ndori Secondary School

location
South Gem (in Gem)
year first funded
2006
action
Construction of Office
output
Office
implementation status
On Going
total cost
Ksh 1,800,000
estimate
Ksh 1,477,828

Lihanda Secondary School

location
East Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,559,720

Akala Police Station

location
South Gem (in Gem)
year first funded
2007
action
Construction of Beef Up Security
output
Beef Up Security
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 2,946,440

Ramula Health Centre

location
East Gem (in Gem)
year first funded
2004
action
Construction of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Ndori Secondary School

location
South Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,952,008

Yala Community Market

location
Yala Township (in Gem)
year first funded
2008
action
n/a
output
Modern Market
implementation status
On Going
total cost
Ksh 1,650,000
estimate
Ksh 0

Gem District Hqs

location
Central Gem (in Gem)
year first funded
2005
action
Construction Of Police Post
output
Beef Up Security
implementation status
On Going
total cost
Ksh 1,641,309
estimate
Ksh 1,400,000

Dhene Secondary School

location
South Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 1,234,700

Akala Health Centre

location
South Gem (in Gem)
year first funded
2006
action
Construction of Childrens Ward
output
Childrens Ward
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,182,428

Masogo Health Centre

location
Central Gem (in Gem)
year first funded
2004
action
Construction of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,100,000

Ndiru Market

location
South Gem (in Gem)
year first funded
2008
action
Electrification
output
Electrification
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 1,670,000

Kagilo Secondary School

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,363,368

Mutumbu Girls Secondary School

location
North Gem (in Gem)
year first funded
2003
action
Construction of Lab
output
Lab
implementation status
Complete
total cost
Ksh 1,574,425
estimate
Ksh 1,650,000

Yala Sub District Hospital

location
Yala Township (in Gem)
year first funded
2008
action
Fitting
output
Coldroom
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 4,313,600

Nyagondo Secondary School

location
North East Gem (in Gem)
year first funded
2005
action
Construction of Admin Block
output
Admin Block
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 2,554,155

Nyawara Ap Lines

location
Central Gem (in Gem)
year first funded
2005
action
Construction Of Police Lines
output
Beef Up Security
implementation status
On Going
total cost
Ksh 1,450,000
estimate
Ksh 1,449,320

Ndere Mixed Secondary School

location
North Gem (in Gem)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 1,169,475

Kambare Dispensary

location
South Gem (in Gem)
year first funded
2006
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,586,580

Anyiko Mixed Secondary School

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Lab
output
Lab
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,410,270

Apuoyo Mix Secondary School

location
West Gem (in Gem)
year first funded
2004
action
Construction of Office & Lib
output
Office & Lib
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,513,492

Malunga Secondary School

location
North West Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,353,485

Luri Primary School

location
Central Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,470,560

Lidha Dispensary

location
South West Gem (in Gem)
year first funded
2004
action
Construction of Staff Houses
output
Staff Houses
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,300,000

Rera Polytechnic

location
South Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,300,000

Mindhine Polytechnic

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,340,000
estimate
Ksh 1,417,137

Ojwaya Primary School

location
South Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,320,000
estimate
Ksh 953,050

Malele Mixed Secondary School

location
South West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,100,000

Orombe River Primary School

location
West Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 1,218,318

Bapollo Ohanga Mixed Secondary School

location
North Gem (in Gem)
year first funded
2007
action
Construction of Lab
output
Lab
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 2,565,885

Kaudha Secondary School

location
South West Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 2,824,000

Odendo Primary School

location
South West Gem (in Gem)
year first funded
2003
action
Construction of Admin Block
output
Admin Block
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 2,500,000

Got Regea Kisenda Road

location
North Gem (in Gem)
year first funded
2008
action
Opening Roads
output
Road
implementation status
Complete
total cost
Ksh 1,268,950
estimate
Ksh 0

Sirembe Police Post

location
North West Gem (in Gem)
year first funded
2006
action
Construction Of Police Lines
output
Beef Up Security
implementation status
Complete
total cost
Ksh 1,263,190
estimate
Ksh 1,079,909

Karariwest - Siriwo Road

location
Central Gem (in Gem)
year first funded
2008
action
Opening Roads
output
Road
implementation status
Complete
total cost
Ksh 1,262,000
estimate
Ksh 1,262,000

Odok Rera Primary School

location
South Gem (in Gem)
year first funded
2003
action
Construction/Fencing
output
Classrooms
implementation status
Complete
total cost
Ksh 1,220,000
estimate
Ksh 820,000

Tatro Primary School

location
Yala Township (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 2,104,400

Ramula Police Post

location
East Gem (in Gem)
year first funded
2005
action
Construction Of Police Lines
output
Police Post
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 400,000

Kambare Secondary School

location
South Gem (in Gem)
year first funded
2005
action
Electrification
output
Electrification
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 756,000

Nyawara Girls Secondary School

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 4,390,242

Argwings Kodhek Secondary School

location
North Gem (in Gem)
year first funded
2006
action
Construction of Twin Labs
output
Twin Labs
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,844,100

St. Mary School Yala

location
Yala Township (in Gem)
year first funded
2007
action
Construction of Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 3,534,810

Rachare Primary School

location
South West Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,150,000

Ligoma Primary School

location
North Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 2,974,328

Ojola Secondary School

location
South West Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 998,440

Ujimbe Primary School

location
North West Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 2,490,590

Musembe Primary School

location
North Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 3,012,045

Mindhine Primary School

location
Yala Township (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Kudho Primary School

location
South Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 900,000

Karuwa Primary School

location
North East Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,134,270

Got Regea Police Post

location
North Gem (in Gem)
year first funded
2004
action
Rehabilitation Of Resource Centre
output
Beef Up Security
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 850,000

Apuoyo Water Project

location
West Gem (in Gem)
year first funded
2007
action
Drilling
output
Provision Of Clean Water
implementation status
On Going
total cost
Ksh 1,025,750
estimate
Ksh 1,500,000

Jina Secondary School

location
Yala Township (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,052,600

Wagai Community Health Centre

location
North East Gem (in Gem)
year first funded
2006
action
Construction of Staff Houses
output
Staff Houses
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 800,000

St Pauls Eyala

location
Yala Township (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Kisendo Polytechinic

location
North Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Uyonga Primary School

location
Central Gem (in Gem)
year first funded
2004
action
Renovation of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Rabuor Primary School

location
East Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,076,840

Ojwach Primary School

location
South Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Asayi Primary School

location
North West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 850,000

Nyalunya Secondary School

location
South Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,474,152

Ndegwe Secondary School

location
North West Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 694,490

Dienya Secondary School

location
West Gem (in Gem)
year first funded
2006
action
Construction of Lab
output
Lab
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,672,500

Nango Gonda Primary School

location
Central Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 978,000
estimate
Ksh 6,030,960

Ahono Primary School

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 850,000

Kojuok Primary School

location
Central Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 944,000
estimate
Ksh 1,770,095

Uthanya Primary School

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,088,754

Ober Primary School

location
West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 739,540

Mundoware Primary School

location
North Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 3,250,300

Mulare Primary School

location
North Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 4,884,050

Maungo Primary School

location
East Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,061,032

Kotoo Primary School

location
West Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 700,000

Komuok Primary School

location
North East Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 687,980

Jm Rembe Primary School

location
Yala Township (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 2,923,934

Bar Komeno Primary School

location
North West Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Wagwer Mixed Secondary School

location
North West Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Got Regea Health Centre

location
North Gem (in Gem)
year first funded
2007
action
Construction of Health Centre
output
Health Centre
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,095,652

Kanyilaji E

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 300,000

Sirembe Dispensary

location
North West Gem (in Gem)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 850,000

Siriwo Primary School

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 1,133,630

Nyabeda Secondary School

location
North Gem (in Gem)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Apuoyo Primary School

location
West Gem (in Gem)
year first funded
2006
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 676,200

Got-Kokwiri Primary School

location
North Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 1,022,556

Kagilo Primary School

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 1,803,170

Rachare Primary School

location
South West Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
3 On Going
total cost
Ksh 800,000
estimate
Ksh 792,656

Yala Township Primary School

location
Yala Township (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 938,067

Asayi Community Health Centre

location
North West Gem (in Gem)
year first funded
2007
action
Construction of Health Centre
output
Health Centre
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 3,250,129

Uranga Secondary School

location
East Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 1,409,369

Rawalo Nursery School

location
Central Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 736,787
estimate
Ksh 350,000

Masogo Water Project

location
Central Gem (in Gem)
year first funded
2006
action
Drilling
output
Provision Of Clean Water
implementation status
On Going
total cost
Ksh 725,600
estimate
Ksh 801,000

Unami Ecd

location
North West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 463,000

Yala Dairy

location
Yala Township (in Gem)
year first funded
2004
action
n/a
output
Store
implementation status
Stalled
total cost
Ksh 700,000
estimate
Ksh 700,000

Mindhine Polytechnic

location
Yala Township (in Gem)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 1,400,000

Bar Turo Primary School

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Migosi Primary School

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 1,216,960

Ojola Primary School

location
South West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 750,000

Ndori Secondary School

location
South Gem (in Gem)
year first funded
2006
action
Electrification
output
School Lighting
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 987,320

Ulumbi Mixed Secondary School

location
Yala Township (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,073,754

Wagwer Mixed Secondary School

location
North West Gem (in Gem)
year first funded
2006
action
Construction of Lab
output
Lab
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,300,000

Dienya Primary School

location
West Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 500,000

Abuche Primary School

location
South Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 675,000
estimate
Ksh 0

Gogo Primary School

location
North Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 1,421,000

St. Bernadete Aluor

location
South Gem (in Gem)
year first funded
2007
action
Purchases
output
Bus
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 3,464,250

Masogo Orphanage

location
Central Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Got Regea Primary School

location
North Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 1,200,000

Bar Sauri Primary School

location
Yala Township (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 1,558,950

Bar Katado Primary School

location
West Gem (in Gem)
year first funded
2006
action
Renovation
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 854,066

Sirembe Mixed Secondary School

location
North West Gem (in Gem)
year first funded
2005
action
Construction of Staff Houses
output
Staff Houses
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 534,735

Nyangulu Mixed Secondary School

location
East Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 900,000

Miro Primary School

location
North Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 1,363,408

Nyabeda Secondary School

location
North Gem (in Gem)
year first funded
2007
action
Construction of Lab
output
Lab
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 1,300,000

Ndere Orphanage

location
North Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 815,659

Mutumbu Primary School

location
North Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 821,400

Nyapiedho Primary School

location
North West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyawara Primary School

location
Central Gem (in Gem)
year first funded
2007
action
Construction of Admin Block
output
Admin Block
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 500,270

Opal Primary School

location
North West Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 3,493,350

Sirandu Primary School

location
North Gem (in Gem)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 1,290,370

Ulamba Primary School

location
North East Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 568,210

Uranga Primary School

location
East Gem (in Gem)
year first funded
2003
action
Renovation of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,422,300

Wangoji Primary School

location
West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 663,386

Ndori Ecd

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Uriri Resource Centre

location
North East Gem (in Gem)
year first funded
2006
action
Construction of Resource Ctr.
output
Resource Ctr.
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 695,297

Gogo Dispensary

location
North Gem (in Gem)
year first funded
2008
action
Construction of Health Centre
output
Health Centre
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 0

St. Elizabeth Onding Dispensary

location
East Gem (in Gem)
year first funded
2007
action
Construction of Health Centre
output
Health Centre
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 2,790,970

Uriri Dispensary

location
North East Gem (in Gem)
year first funded
2005
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 835,721

Sinaga Police Post

location
Yala Township (in Gem)
year first funded
2005
action
Construction Of Police Lines
output
Beef Up Security
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 500,500

Malanga Primary School

location
North Gem (in Gem)
year first funded
2007
action
Construction of Office
output
Office
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 665,085

Kaudha Primary School

location
South West Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 401,836

Asayi Community Health Centre

location
North West Gem (in Gem)
year first funded
2006
action
Construction of Staff Houses
output
Staff Houses
implementation status
On Going
total cost
Ksh 585,108
estimate
Ksh 800,000

Owuodho Market

location
South Gem (in Gem)
year first funded
2006
action
Drilling
output
Provision Of Clean Water
implementation status
On Going
total cost
Ksh 525,600
estimate
Ksh 736,000

Anyiko Mixed Secondary School

location
Yala Township (in Gem)
year first funded
2007
action
Construction & Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 513,466
estimate
Ksh 581,733

Nyagondo Mkt Water Project

location
North East Gem (in Gem)
year first funded
2006
action
Rehabilitation Of Wells
output
Provision Of Clean Water
implementation status
On Going
total cost
Ksh 505,600
estimate
Ksh 1,382,000

Kambare Water Project

location
South Gem (in Gem)
year first funded
2006
action
Drilling
output
Provision Of Clean Water
implementation status
Complete
total cost
Ksh 505,600
estimate
Ksh 872,000

Ndiru Bridge

location
South Gem (in Gem)
year first funded
2007
action
Construction of bridge
output
-
implementation status
Complete
total cost
Ksh 505,100
estimate
Ksh 505,100

Lana Siga Road

location
North Gem (in Gem)
year first funded
2004
action
n/a
output
Road
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Rera Health Centre

location
South Gem (in Gem)
year first funded
2008
action
Construction of Staff Houses
output
Staff Houses
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Ndiru Dispensary

location
South Gem (in Gem)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Uhonya Ecd

location
North West Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 590,962

Sinyolo Ecd

location
East Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 1,239,613

Malanga Child Devcentre

location
North Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 648,490

Kotiang Ecd

location
West Gem (in Gem)
year first funded
2008
action
Construction of Classroom
output
Classroom
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Kathomo Orphanage

location
West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 100,000

Akala Anchorsite

location
South Gem (in Gem)
year first funded
2007
action
Renovation/ Purchase Of Computers
output
Hall & Computers
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 768,770

Wang Bith Primary School

location
South West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Sirembe Primary School

location
North West Gem (in Gem)
year first funded
2006
action
Construction of Admin Block
output
Admin Block
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 375,350

Nyasidhi Primary School

location
North East Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ndere Boys Boarding Primary School

location
North Gem (in Gem)
year first funded
2007
action
Painting & Electrification
output
Dormitory
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 320,910

Muadi Primary School

location
North Gem (in Gem)
year first funded
2005
action
Roofing 1 classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 820,926

Mingao Primary School

location
Central Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 2,652,080

Jina Primary School

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Aluor School For The Blind

location
South Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 2,025,945

Yala Mixed Sec

location
Yala Township (in Gem)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Ulumbi Mixed Secondary School

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Sceptic Tank
output
Sceptic Tank
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 1,639,648

Sinaga Girls Secondary School

location
Yala Township (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 200,000

Ramula Mixed Secondary School

location
East Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Dienya Secondary School

location
West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Yala Police Station

location
Yala Township (in Gem)
year first funded
2009
action
Rehabilitation
output
Police Station
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Malanga Chiefs Camp

location
North Gem (in Gem)
year first funded
2009
action
Construction of Ap Line
output
Ap Line
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Olengo Nyangueso Road

location
Central Gem (in Gem)
year first funded
2008
action
Opening Roads
output
Road
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Sinaga Omindo Road

location
Yala Township (in Gem)
year first funded
2004
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Wagwer Gogo Road

location
North West Gem (in Gem)
year first funded
2004
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kanyuto Primary School

location
East Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 445,000
estimate
Ksh 660,000

Mabinju Ecd

location
South Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 493,720

Dc Office

location
Central Gem (in Gem)
year first funded
2008
action
Furniture/Equipment
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kambare Ap Line

location
South Gem (in Gem)
year first funded
2005
action
Construction of Ap Line
output
Ap Line
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 350,000

Sirembe Ndegwe Road

location
North West Gem (in Gem)
year first funded
2004
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

St Paul's Child Devcentre

location
Central Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 1,035,352

Rawa Ecd

location
Yala Township (in Gem)
year first funded
2007
action
Construction of Classrooms
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 794,246

Ochiago Ecd

location
South Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 596,950

Nyaolo Ecd

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Ndiru Ecd

location
South Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 493,720

Wagai Primary School

location
North East Gem (in Gem)
year first funded
2008
action
Construction of Office
output
Office
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 421,050

Uranga Primary School

location
East Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 800,000

Ramula Primary School

location
East Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 2,672,985

Oseno Primary School

location
South West Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 1,600,000

Onyinyore Primary School

location
South Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 1,117,480

Omindo Primary School

location
East Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 900,000

Olengo Primary School

location
Central Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 774,204

Nyapiedho Primary School

location
North West Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Lihanda Primary School

location
East Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 2,300,760

Kambare Primary School

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 760,000

Bar Kawandu

location
North West Gem (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 1,363,284

Nyasidhi Secondary School

location
North East Gem (in Gem)
year first funded
2009
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 0

Maliera Secondary School

location
North Gem (in Gem)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Malele Mixed Secondary School

location
South West Gem (in Gem)
year first funded
2009
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 0

Dienya Chief's Camp

location
West Gem (in Gem)
year first funded
2006
action
Construction of Office
output
Office
implementation status
Complete
total cost
Ksh 375,022
estimate
Ksh 200,000

Ogero Dispensary

location
South Gem (in Gem)
year first funded
2008
action
Electrification
output
-
implementation status
not known
total cost
Ksh 375,000
estimate
Ksh 0

Bar Turo Primary School

location
Yala Township (in Gem)
year first funded
2003
action
Construction of Office
output
Office
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 450,810

Horace Ongili Mixed Secondary School

location
North East Gem (in Gem)
year first funded
2004
action
Construction of Staff Houses
output
Staff Houses
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 929,235

Bar Kalare

location
East Gem (in Gem)
year first funded
2007
action
Roofing 2 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 403,200

Siala Ecd

location
South Gem (in Gem)
year first funded
2008
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Ulumbi Primary School

location
Yala Township (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Onding Primary School

location
East Gem (in Gem)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 589,155

Ndere Boys Boarding Primary School

location
North Gem (in Gem)
year first funded
2007
action
Emergency
output
Beds
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Muhanda Primary School

location
Yala Township (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 2,073,940

Sirembe Mixed Secondary School

location
North West Gem (in Gem)
year first funded
2009
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Sawangongo Secondary School

location
Central Gem (in Gem)
year first funded
2008
action
Rehabilitation
output
Abolution Block
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 635,165

Sawangongo Secondary School

location
Central Gem (in Gem)
year first funded
2005
action
Roofing
output
Dormitory
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 491,000

Lundha Mixed Secondary School

location
North Gem (in Gem)
year first funded
2009
action
Construction of Lab
output
Lab
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Aluor Secondary School

location
South Gem (in Gem)
year first funded
2008
action
Re-Construction
output
Library
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 815,841

Abaki Road

location
West Gem (in Gem)
year first funded
2008
action
Opening Roads
output
Road
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kabwana - Odok Road

location
South Gem (in Gem)
year first funded
2004
action
Opening/Bridge
output
Road
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Dienya Health Centre

location
North East Gem (in Gem)
year first funded
2007
action
Electrification
output
Electrification
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 406,626

Usuha Ecd

location
North Gem (in Gem)
year first funded
2008
action
n/a
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 714,252

Kagilo Secondary School

location
Central Gem (in Gem)
year first funded
2007
action
Construction of Lab
output
Lab
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 1,681,835

Sawangongo Secondary School

location
Central Gem (in Gem)
year first funded
2009
action
Renovation
output
Dormitory
implementation status
On Going
total cost
Ksh 281,600
estimate
Ksh 0

Uriri Primary School

location
North East Gem (in Gem)
year first funded
2008
action
Construction/Renovation
output
Toilets/Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 150,000

West Gem A Lines

location
West Gem (in Gem)
year first funded
2004
action
Construction of Ap line
output
Ap Line
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mindhine Primary School

location
Yala Township (in Gem)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 280,000

Ogero Dispensary

location
South Gem (in Gem)
year first funded
2003
action
Construction of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Nyabeda Primary School

location
North Gem (in Gem)
year first funded
2007
action
Roofing 2 classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 235,000
estimate
Ksh 235,000

Sirembe Ujimbe Road

location
North West Gem (in Gem)
year first funded
2004
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 231,250
estimate
Ksh 231,250

Wambusa Primary School

location
South Gem (in Gem)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 230,000
estimate
Ksh 230,000

Sagam Primary School

location
Yala Township (in Gem)
year first funded
2006
action
Construction of Electrification
output
Electrification
implementation status
Complete
total cost
Ksh 229,175
estimate
Ksh 351,690

Sagam Primary School

location
Yala Township (in Gem)
year first funded
2007
action
Construction of 1 Classroom
output
1 Classroom
implementation status
On Going
total cost
Ksh 220,825
estimate
Ksh 960,845

Mutumbu

location
North Gem (in Gem)
year first funded
2005
action
Electrification
output
Electrification
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kotoo Primary School

location
West Gem (in Gem)
year first funded
2009
action
n/a
output
-
implementation status
60% of work complete
total cost
Ksh 200,000
estimate
Ksh 0

Bapollo Ohanga Mixed Secondary School

location
North Gem (in Gem)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Lihanda Secondary School

location
East Gem (in Gem)
year first funded
2007
action
Impl. Of Educ Stds
output
Desks
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Aluor Mixed Primary School

location
South Gem (in Gem)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 858,944

Anyiko Primary School

location
Yala Township (in Gem)
year first funded
2009
action
Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Bar Kalare

location
East Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 1,103,500

Dhene Primary School

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 1,049,198

Kanyadet Primary School

location
South West Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 243,000

Kojuok Primary School

location
Central Gem (in Gem)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 250,000

Malele Primary School

location
South West Gem (in Gem)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Malunga Primary School

location
North West Gem (in Gem)
year first funded
2005
action
Construction of Admin Block
output
Admin Block
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 800,946

Ndegwe Primary School

location
North West Gem (in Gem)
year first funded
2007
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 278,660

Ndiru Primary School

location
South Gem (in Gem)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 603,690

Nyalunya Primary School

location
South Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 2,761,550

Oseno Primary School

location
South West Gem (in Gem)
year first funded
2005
action
Renovation of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Sirodha Ecd

location
North West Gem (in Gem)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 310,000

Uriri Dispensary

location
North East Gem (in Gem)
year first funded
2007
action
Construction of Ward
output
Ward
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 729,721

Gongo Rescentre

location
Central Gem (in Gem)
year first funded
2008
action
n/a
output
Beef Up Security
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 396,124

Wagai Do's Office

location
North East Gem (in Gem)
year first funded
2007
action
Rehabilitation
output
Do House
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 157,625

Komuok Resourse Centre

location
North East Gem (in Gem)
year first funded
2004
action
Construction of Resource Centre
output
Resource Centre
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 100,000

Aluor Secondary School

location
South Gem (in Gem)
year first funded
2005
action
Electrification
output
Electrification
implementation status
Complete
total cost
Ksh 143,100
estimate
Ksh 143,100

Sinaga Girls Secondary School

location
Yala Township (in Gem)
year first funded
2008
action
Roofing
output
Dormitory
implementation status
On Going
total cost
Ksh 116,000
estimate
Ksh 295,000

Lundha Primary School

location
North Gem (in Gem)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Yala Do S Office

location
Yala Township (in Gem)
year first funded
2007
action
Renovation
output
Administration
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 431,450

Jina Primary School

location
Yala Township (in Gem)
year first funded
2007
action
Construction of Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 177,000

Aluor Secondary School

location
South Gem (in Gem)
year first funded
2007
action
Construction of Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 914,900

Horace Ongili Mixed Secondary School

location
North East Gem (in Gem)
year first funded
2008
action
Construction of Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 600,000

District Veterinary Office

location
South Gem (in Gem)
year first funded
2007
action
Supply Of Equipment
output
Spraying Pumps
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 180,000

Kaudha Primary School

location
South West Gem (in Gem)
year first funded
2005
action
Construction of classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 90,000

Water Resource Mgt Authority

location
North Gem (in Gem)
year first funded
2007
action
Permits
output
Six Boreholes In Six School
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 75,000

Nyasidhi Primary School

location
North East Gem (in Gem)
year first funded
2005
action
Electrification
output
Classrooms
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Anyiko Mixed Secondary School

location
Yala Township (in Gem)
year first funded
2007
action
Purchases
output
Lab Equipments
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,329

Jm Rembe Primary School

location
Yala Township (in Gem)
year first funded
2008
action
Purchases
output
Books/Desks
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Wagai Do's Office

location
North East Gem (in Gem)
year first funded
2006
action
Electrification
output
Electrification
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 332,725

Sirodha Primary School

location
North West Gem (in Gem)
year first funded
2007
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Got Regea Primary School

location
North Gem (in Gem)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Amani Orphanage

location
Yala Township (in Gem)
year first funded
2005
action
Construction of Water Tank
output
Water Tank
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Ginga Valley Assistant Chief

location
North West Gem (in Gem)
year first funded
2006
action
Construction of Beef Up Security
output
Beef Up Security
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kambare Ap Line

location
South Gem (in Gem)
year first funded
2007
action
Construction of Toilets
output
Toilets
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Malunga East Chiefs Camp

location
North West Gem (in Gem)
year first funded
2006
action
Construction of Office
output
Office
implementation status
Complete
total cost
Ksh 49,350
estimate
Ksh 244,260