The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Gem
Lihanda Community Health Centre
- location
-
East Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 4,594,450
- estimate
- Ksh 4,594,450
Gongo Community Health Centre
- location
-
Central Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 4,594,450
- estimate
- Ksh 4,594,450
Akala Odok Panyako Luanda Road
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Grading/Maint
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 3,980,678
- estimate
- Ksh 4,000,000
Cdf Office
- location
-
North East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Offices
- output
- Offices
- implementation status
- On Going
- total cost
- Ksh 3,409,477
- estimate
- Ksh 46,425,346
Nyamnnia Mixed Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 3,400,000
- estimate
- Ksh 5,005,003
Lundha Mixed Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,572,800
Ndori Wambusa Road
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Opening Roads
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,394,899
- estimate
- Ksh 0
Gongo Warom Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,131,106
Akala Health Centre
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 2,150,000
- estimate
- Ksh 2,150,000
Ndori Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Office
- output
- Office
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,477,828
Lihanda Secondary School
- location
-
East Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,559,720
Akala Police Station
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Beef Up Security
- output
- Beef Up Security
- implementation status
- On Going
- total cost
- Ksh 1,700,000
- estimate
- Ksh 2,946,440
Ramula Health Centre
- location
-
East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Ndori Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,952,008
Yala Community Market
- location
-
Yala Township
(in Gem)
- year first funded
- 2008
- action
- n/a
- output
- Modern Market
- implementation status
- On Going
- total cost
- Ksh 1,650,000
- estimate
- Ksh 0
Gem District Hqs
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction Of Police Post
- output
- Beef Up Security
- implementation status
- On Going
- total cost
- Ksh 1,641,309
- estimate
- Ksh 1,400,000
Dhene Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,234,700
Akala Health Centre
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Childrens Ward
- output
- Childrens Ward
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,182,428
Masogo Health Centre
- location
-
Central Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,100,000
Ndiru Market
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Electrification
- output
- Electrification
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,670,000
Kagilo Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,363,368
Mutumbu Girls Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Lab
- output
- Lab
- implementation status
- Complete
- total cost
- Ksh 1,574,425
- estimate
- Ksh 1,650,000
Yala Sub District Hospital
- location
-
Yala Township
(in Gem)
- year first funded
- 2008
- action
- Fitting
- output
- Coldroom
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 4,313,600
Nyagondo Secondary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,554,155
Nyawara Ap Lines
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction Of Police Lines
- output
- Beef Up Security
- implementation status
- On Going
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,449,320
Ndere Mixed Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,169,475
Kambare Dispensary
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,586,580
Anyiko Mixed Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Lab
- output
- Lab
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,410,270
Apuoyo Mix Secondary School
- location
-
West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Office & Lib
- output
- Office & Lib
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,513,492
Malunga Secondary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,353,485
Luri Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,470,560
Lidha Dispensary
- location
-
South West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,300,000
Rera Polytechnic
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,300,000
Mindhine Polytechnic
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,340,000
- estimate
- Ksh 1,417,137
Ojwaya Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,320,000
- estimate
- Ksh 953,050
Malele Mixed Secondary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,100,000
Orombe River Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,218,318
Bapollo Ohanga Mixed Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,565,885
Kaudha Secondary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,824,000
Odendo Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,500,000
Got Regea Kisenda Road
- location
-
North Gem
(in Gem)
- year first funded
- 2008
- action
- Opening Roads
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,268,950
- estimate
- Ksh 0
Sirembe Police Post
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction Of Police Lines
- output
- Beef Up Security
- implementation status
- Complete
- total cost
- Ksh 1,263,190
- estimate
- Ksh 1,079,909
Karariwest - Siriwo Road
- location
-
Central Gem
(in Gem)
- year first funded
- 2008
- action
- Opening Roads
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,262,000
- estimate
- Ksh 1,262,000
Odok Rera Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2003
- action
- Construction/Fencing
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,220,000
- estimate
- Ksh 820,000
Tatro Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,104,400
Ramula Police Post
- location
-
East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction Of Police Lines
- output
- Police Post
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 400,000
Kambare Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Electrification
- output
- Electrification
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 756,000
Nyawara Girls Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 4,390,242
Argwings Kodhek Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Twin Labs
- output
- Twin Labs
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,844,100
St. Mary School Yala
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 3,534,810
Rachare Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Ligoma Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 2,974,328
Ojola Secondary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 998,440
Ujimbe Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,490,590
Musembe Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 3,012,045
Mindhine Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Kudho Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 900,000
Karuwa Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,134,270
Got Regea Police Post
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- Rehabilitation Of Resource Centre
- output
- Beef Up Security
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 850,000
Apuoyo Water Project
- location
-
West Gem
(in Gem)
- year first funded
- 2007
- action
- Drilling
- output
- Provision Of Clean Water
- implementation status
- On Going
- total cost
- Ksh 1,025,750
- estimate
- Ksh 1,500,000
Jina Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,052,600
Wagai Community Health Centre
- location
-
North East Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
St Pauls Eyala
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Kisendo Polytechinic
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Uyonga Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2004
- action
- Renovation of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Rabuor Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,076,840
Ojwach Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Asayi Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 850,000
Nyalunya Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,474,152
Ndegwe Secondary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 694,490
Dienya Secondary School
- location
-
West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,672,500
Nango Gonda Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 978,000
- estimate
- Ksh 6,030,960
Ahono Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 850,000
Kojuok Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 944,000
- estimate
- Ksh 1,770,095
Uthanya Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,088,754
Ober Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 739,540
Mundoware Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 3,250,300
Mulare Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 4,884,050
Maungo Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,061,032
Kotoo Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 700,000
Komuok Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 687,980
Jm Rembe Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 2,923,934
Bar Komeno Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Wagwer Mixed Secondary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Got Regea Health Centre
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,095,652
Kanyilaji E
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 300,000
Sirembe Dispensary
- location
-
North West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Siriwo Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,133,630
Nyabeda Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Apuoyo Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2006
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 676,200
Got-Kokwiri Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,022,556
Kagilo Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 1,803,170
Rachare Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- 3 On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 792,656
Yala Township Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 938,067
Asayi Community Health Centre
- location
-
North West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 3,250,129
Uranga Secondary School
- location
-
East Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 1,409,369
Rawalo Nursery School
- location
-
Central Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 736,787
- estimate
- Ksh 350,000
Masogo Water Project
- location
-
Central Gem
(in Gem)
- year first funded
- 2006
- action
- Drilling
- output
- Provision Of Clean Water
- implementation status
- On Going
- total cost
- Ksh 725,600
- estimate
- Ksh 801,000
Unami Ecd
- location
-
North West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 463,000
Yala Dairy
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- n/a
- output
- Store
- implementation status
- Stalled
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mindhine Polytechnic
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 1,400,000
Bar Turo Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Migosi Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,216,960
Ojola Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 750,000
Ndori Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Electrification
- output
- School Lighting
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 987,320
Ulumbi Mixed Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,073,754
Wagwer Mixed Secondary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,300,000
Dienya Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Abuche Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 675,000
- estimate
- Ksh 0
Gogo Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 1,421,000
St. Bernadete Aluor
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Purchases
- output
- Bus
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 3,464,250
Masogo Orphanage
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Got Regea Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Bar Sauri Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,558,950
Bar Katado Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2006
- action
- Renovation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 854,066
Sirembe Mixed Secondary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 534,735
Nyangulu Mixed Secondary School
- location
-
East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Miro Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,363,408
Nyabeda Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,300,000
Ndere Orphanage
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 815,659
Mutumbu Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 821,400
Nyapiedho Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nyawara Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 500,270
Opal Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 3,493,350
Sirandu Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,290,370
Ulamba Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 568,210
Uranga Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2003
- action
- Renovation of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,422,300
Wangoji Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 663,386
Ndori Ecd
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Uriri Resource Centre
- location
-
North East Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Resource Ctr.
- output
- Resource Ctr.
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 695,297
Gogo Dispensary
- location
-
North Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
St. Elizabeth Onding Dispensary
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 2,790,970
Uriri Dispensary
- location
-
North East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 835,721
Sinaga Police Post
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction Of Police Lines
- output
- Beef Up Security
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 500,500
Malanga Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Office
- output
- Office
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 665,085
Kaudha Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 401,836
Asayi Community Health Centre
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- On Going
- total cost
- Ksh 585,108
- estimate
- Ksh 800,000
Owuodho Market
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Drilling
- output
- Provision Of Clean Water
- implementation status
- On Going
- total cost
- Ksh 525,600
- estimate
- Ksh 736,000
Anyiko Mixed Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction & Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 513,466
- estimate
- Ksh 581,733
Nyagondo Mkt Water Project
- location
-
North East Gem
(in Gem)
- year first funded
- 2006
- action
- Rehabilitation Of Wells
- output
- Provision Of Clean Water
- implementation status
- On Going
- total cost
- Ksh 505,600
- estimate
- Ksh 1,382,000
Kambare Water Project
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Drilling
- output
- Provision Of Clean Water
- implementation status
- Complete
- total cost
- Ksh 505,600
- estimate
- Ksh 872,000
Ndiru Bridge
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of bridge
- output
- -
- implementation status
- Complete
- total cost
- Ksh 505,100
- estimate
- Ksh 505,100
Lana Siga Road
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- n/a
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Rera Health Centre
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ndiru Dispensary
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Uhonya Ecd
- location
-
North West Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 590,962
Sinyolo Ecd
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,239,613
Malanga Child Devcentre
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 648,490
Kotiang Ecd
- location
-
West Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kathomo Orphanage
- location
-
West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Akala Anchorsite
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Renovation/ Purchase Of Computers
- output
- Hall & Computers
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 768,770
Wang Bith Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sirembe Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 375,350
Nyasidhi Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ndere Boys Boarding Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Painting & Electrification
- output
- Dormitory
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 320,910
Muadi Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Roofing 1 classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 820,926
Mingao Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 2,652,080
Jina Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Aluor School For The Blind
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 2,025,945
Yala Mixed Sec
- location
-
Yala Township
(in Gem)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ulumbi Mixed Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Sceptic Tank
- output
- Sceptic Tank
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 1,639,648
Sinaga Girls Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Ramula Mixed Secondary School
- location
-
East Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Dienya Secondary School
- location
-
West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Yala Police Station
- location
-
Yala Township
(in Gem)
- year first funded
- 2009
- action
- Rehabilitation
- output
- Police Station
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Malanga Chiefs Camp
- location
-
North Gem
(in Gem)
- year first funded
- 2009
- action
- Construction of Ap Line
- output
- Ap Line
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Olengo Nyangueso Road
- location
-
Central Gem
(in Gem)
- year first funded
- 2008
- action
- Opening Roads
- output
- Road
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sinaga Omindo Road
- location
-
Yala Township
(in Gem)
- year first funded
- 2004
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Wagwer Gogo Road
- location
-
North West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kanyuto Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 445,000
- estimate
- Ksh 660,000
Mabinju Ecd
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 493,720
Dc Office
- location
-
Central Gem
(in Gem)
- year first funded
- 2008
- action
- Furniture/Equipment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kambare Ap Line
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Ap Line
- output
- Ap Line
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 350,000
Sirembe Ndegwe Road
- location
-
North West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
St Paul's Child Devcentre
- location
-
Central Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,035,352
Rawa Ecd
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- -
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 794,246
Ochiago Ecd
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 596,950
Nyaolo Ecd
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ndiru Ecd
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- -
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 493,720
Wagai Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Office
- output
- Office
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 421,050
Uranga Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Ramula Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 2,672,985
Oseno Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,600,000
Onyinyore Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,117,480
Omindo Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Olengo Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 774,204
Nyapiedho Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Lihanda Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 2,300,760
Kambare Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 760,000
Bar Kawandu
- location
-
North West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,363,284
Nyasidhi Secondary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2009
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Maliera Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Malele Mixed Secondary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2009
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Dienya Chief's Camp
- location
-
West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Office
- output
- Office
- implementation status
- Complete
- total cost
- Ksh 375,022
- estimate
- Ksh 200,000
Ogero Dispensary
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Electrification
- output
- -
- implementation status
- not known
- total cost
- Ksh 375,000
- estimate
- Ksh 0
Bar Turo Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2003
- action
- Construction of Office
- output
- Office
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 450,810
Horace Ongili Mixed Secondary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 929,235
Bar Kalare
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Roofing 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 403,200
Siala Ecd
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ulumbi Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Onding Primary School
- location
-
East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 589,155
Ndere Boys Boarding Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Emergency
- output
- Beds
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Muhanda Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 2,073,940
Sirembe Mixed Secondary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2009
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sawangongo Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Abolution Block
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 635,165
Sawangongo Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2005
- action
- Roofing
- output
- Dormitory
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 491,000
Lundha Mixed Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2009
- action
- Construction of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Aluor Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2008
- action
- Re-Construction
- output
- Library
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 815,841
Abaki Road
- location
-
West Gem
(in Gem)
- year first funded
- 2008
- action
- Opening Roads
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kabwana - Odok Road
- location
-
South Gem
(in Gem)
- year first funded
- 2004
- action
- Opening/Bridge
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Dienya Health Centre
- location
-
North East Gem
(in Gem)
- year first funded
- 2007
- action
- Electrification
- output
- Electrification
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 406,626
Usuha Ecd
- location
-
North Gem
(in Gem)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 714,252
Kagilo Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Lab
- output
- Lab
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,681,835
Sawangongo Secondary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2009
- action
- Renovation
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 281,600
- estimate
- Ksh 0
Uriri Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2008
- action
- Construction/Renovation
- output
- Toilets/Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 150,000
West Gem A Lines
- location
-
West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Ap line
- output
- Ap Line
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mindhine Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 280,000
Ogero Dispensary
- location
-
South Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Nyabeda Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Roofing 2 classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 235,000
- estimate
- Ksh 235,000
Sirembe Ujimbe Road
- location
-
North West Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 231,250
- estimate
- Ksh 231,250
Wambusa Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Sagam Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2006
- action
- Construction of Electrification
- output
- Electrification
- implementation status
- Complete
- total cost
- Ksh 229,175
- estimate
- Ksh 351,690
Sagam Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- On Going
- total cost
- Ksh 220,825
- estimate
- Ksh 960,845
Mutumbu
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Electrification
- output
- Electrification
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kotoo Primary School
- location
-
West Gem
(in Gem)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- 60% of work complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Bapollo Ohanga Mixed Secondary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lihanda Secondary School
- location
-
East Gem
(in Gem)
- year first funded
- 2007
- action
- Impl. Of Educ Stds
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Aluor Mixed Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 858,944
Anyiko Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2009
- action
- Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Bar Kalare
- location
-
East Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,103,500
Dhene Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,049,198
Kanyadet Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 243,000
Kojuok Primary School
- location
-
Central Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
Malele Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Malunga Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 800,946
Ndegwe Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 278,660
Ndiru Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 603,690
Nyalunya Primary School
- location
-
South Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 2,761,550
Oseno Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Renovation of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Sirodha Ecd
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 310,000
Uriri Dispensary
- location
-
North East Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Ward
- output
- Ward
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 729,721
Gongo Rescentre
- location
-
Central Gem
(in Gem)
- year first funded
- 2008
- action
- n/a
- output
- Beef Up Security
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 396,124
Wagai Do's Office
- location
-
North East Gem
(in Gem)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Do House
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 157,625
Komuok Resourse Centre
- location
-
North East Gem
(in Gem)
- year first funded
- 2004
- action
- Construction of Resource Centre
- output
- Resource Centre
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 100,000
Aluor Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2005
- action
- Electrification
- output
- Electrification
- implementation status
- Complete
- total cost
- Ksh 143,100
- estimate
- Ksh 143,100
Sinaga Girls Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2008
- action
- Roofing
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 116,000
- estimate
- Ksh 295,000
Lundha Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Yala Do S Office
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Renovation
- output
- Administration
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 431,450
Jina Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Construction of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 177,000
Aluor Secondary School
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 914,900
Horace Ongili Mixed Secondary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2008
- action
- Construction of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
District Veterinary Office
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Supply Of Equipment
- output
- Spraying Pumps
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 180,000
Kaudha Primary School
- location
-
South West Gem
(in Gem)
- year first funded
- 2005
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Water Resource Mgt Authority
- location
-
North Gem
(in Gem)
- year first funded
- 2007
- action
- Permits
- output
- Six Boreholes In Six School
- implementation status
- Complete
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Nyasidhi Primary School
- location
-
North East Gem
(in Gem)
- year first funded
- 2005
- action
- Electrification
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Anyiko Mixed Secondary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2007
- action
- Purchases
- output
- Lab Equipments
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 60,329
Jm Rembe Primary School
- location
-
Yala Township
(in Gem)
- year first funded
- 2008
- action
- Purchases
- output
- Books/Desks
- implementation status
- On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Wagai Do's Office
- location
-
North East Gem
(in Gem)
- year first funded
- 2006
- action
- Electrification
- output
- Electrification
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 332,725
Sirodha Primary School
- location
-
North West Gem
(in Gem)
- year first funded
- 2007
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Got Regea Primary School
- location
-
North Gem
(in Gem)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Amani Orphanage
- location
-
Yala Township
(in Gem)
- year first funded
- 2005
- action
- Construction of Water Tank
- output
- Water Tank
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ginga Valley Assistant Chief
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Beef Up Security
- output
- Beef Up Security
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kambare Ap Line
- location
-
South Gem
(in Gem)
- year first funded
- 2007
- action
- Construction of Toilets
- output
- Toilets
- implementation status
- On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Malunga East Chiefs Camp
- location
-
North West Gem
(in Gem)
- year first funded
- 2006
- action
- Construction of Office
- output
- Office
- implementation status
- Complete
- total cost
- Ksh 49,350
- estimate
- Ksh 244,260