The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Gichugu

Youth Empowerment Centre

location
Baragwi (in Gichugu)
year first funded
2008
action
Construction of A Youth Centre
output
Empower The Youth
implementation status
New
total cost
Ksh 5,002,648
estimate
Ksh 0

Kutus Old Market

location
Kabare (in Gichugu)
year first funded
2003
action
Build 34 Stalls, Septic Tank, 2 Ablution Blocks, Painting
output
Provide Market For Produce
implementation status
Ongoing
total cost
Ksh 5,000,000
estimate
Ksh 10,000,000

Karuti/Kiambogo bridge

location
Karumandi (in Gichugu)
year first funded
2006
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete
total cost
Ksh 4,118,018
estimate
Ksh 2,148,608

Ngungu Primary School

location
Kabare (in Gichugu)
year first funded
2007
action
Roof Painting/Renovation For 3 Classes
output
Cater For Increasing Population
implementation status
Roof Painting And Renovation Of 2 Classes Complete
total cost
Ksh 3,850,000
estimate
Ksh 1,000,000

Muratiri bridge

location
Kirima (in Gichugu)
year first funded
2004
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 3,300,000
estimate
Ksh 6,333,390

Thiba Micro Hydro Power

location
Kirima/Karumandi (in Gichugu)
year first funded
2007
action
Procuring Step Up & Step Down Transformers
output
Increased Power Supply
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Giconjo Primary School

location
NjukiIni (in Gichugu)
year first funded
2005
action
Purchase Of Land & Construction Of 2 Classes
output
Improved Education Standards
implementation status
Purchase Of Land Complete.
total cost
Ksh 2,850,000
estimate
Ksh 3,803,350

Njuku/Mutige Farrow Water Project

location
Kirima (in Gichugu)
year first funded
2004
action
Construction Of Intake/ Piping
output
Water For Farming
implementation status
Intake Complete Piping Ongoing
total cost
Ksh 2,750,000
estimate
Ksh 716,100

Gacatha Secondary School

location
NjukiIni (in Gichugu)
year first funded
2004
action
Construction Of dining Hall
output
Improved Hygienic Standards
implementation status
Ongoing
total cost
Ksh 2,720,000
estimate
Ksh 2,320,000

Konyu bridge

location
Kabare/Kirima (in Gichugu)
year first funded
2003
action
Bridge Construction
output
Easy Accessibility
implementation status
Complete
total cost
Ksh 2,691,002
estimate
Ksh 15,771,428

Stelias Secondary School

location
Baragwi (in Gichugu)
year first funded
2004
action
Construction & Equipping Of Lab; 2 Classes; dining Hall
output
Improved Learning Standards
implementation status
Lab Complete & In Use. 2 Classes Ongoing
total cost
Ksh 2,544,936
estimate
Ksh 17,449,363

Kiamiciri Primary School

location
Kabare (in Gichugu)
year first funded
2004
action
Construction Of Toilets & Classes Renovation
output
Improved Hygienic/Learning Standards
implementation status
Toilets Complete Classes Ongoing
total cost
Ksh 2,450,000
estimate
Ksh 3,791,000

Kathunguri Primary School

location
Ngariama (in Gichugu)
year first funded
2005
action
Construction Of 7 Classes
output
Improved Education Standards
implementation status
6 Classes Complete & In Use. 1 New
total cost
Ksh 2,450,000
estimate
Ksh 2,050,000

Karumandi Secondary School

location
Karumandi (in Gichugu)
year first funded
2004
action
Piping/Dormitory Construction
output
Provision Of Water/Decongestion Of Other Dormitories
implementation status
Piping Complete & In Use Dorm Ongoing
total cost
Ksh 2,380,000
estimate
Ksh 3,680,000

Rwambiti Primary School

location
Baragwi (in Gichugu)
year first funded
2005
action
Construction Of 4 Classes/Toilets
output
Improved Hygienic/Learning Standards
implementation status
2 Classes & Toilets Complete.
total cost
Ksh 2,208,084
estimate
Ksh 803,800

Mutige Secondary School

location
Kirima (in Gichugu)
year first funded
2006
action
Construction Of Principals House & Admin. Block
output
Improved Hygienic/Learning Standards
implementation status
House Complete; Admin Block Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 2,655,936

Kiarundange Water Project

location
Karumandi (in Gichugu)
year first funded
2004
action
Storage Tank & Piping
output
Water For Domestic Use
implementation status
Complete & In Use
total cost
Ksh 2,128,870
estimate
Ksh 25,485,012

Stann Gituba Secondary School

location
Ngariama (in Gichugu)
year first funded
2005
action
Buying Energy Saving Jikos; Construction Of Dorms
output
Reduced Cooking Costs & Decongestion Of Dormitories
implementation status
Purchase Of Jikos Complete, Construction Is Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 1,300,000

Ngiriambu Secondary School

location
NjukiIni (in Gichugu)
year first funded
2006
action
Piping
output
Provision Of Water
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 1,500,000

Gatunguru Secondary School

location
Kabare (in Gichugu)
year first funded
2004
action
Lab & dining Hall Construction
output
Improved Hygienic/Learning Standards
implementation status
Lab Construction Complete.
total cost
Ksh 2,000,000
estimate
Ksh 1,400,000

Kiathi Primary School

location
Baragwi (in Gichugu)
year first funded
2006
action
Renovation/Construction Of 2 Classes/ Toilets
output
Catering For Increased Population
implementation status
Ongoing
total cost
Ksh 1,969,095
estimate
Ksh 1,153,350

Kiamwathi Secondary School

location
Baragwi (in Gichugu)
year first funded
2004
action
Construction Of Hall
output
Improved Learning Standards
implementation status
Ongoing
total cost
Ksh 1,960,000
estimate
Ksh 1,960,000

Rukenya Secondary School

location
Kabare (in Gichugu)
year first funded
2004
action
Construction Of Lab, 2 Classes & Toilets
output
Improved Hygienic/Learning Standards
implementation status
Lab & Toilets Construction Complete.
total cost
Ksh 1,930,000
estimate
Ksh 1,730,000

Kanjangiri bridge

location
Kirima (in Gichugu)
year first funded
2004
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 1,856,131
estimate
Ksh 21,632,376

Kathiari bridge

location
Karumandi (in Gichugu)
year first funded
2005
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 1,847,583
estimate
Ksh 18,478,526

Kiamutugu Ap Post

location
Ngariama (in Gichugu)
year first funded
2006
action
Construction Of Ap Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 1,830,200
estimate
Ksh 95,877,578

Kiamutugu Sec

location
Ngariama (in Gichugu)
year first funded
2006
action
Construction Of Dormitory
output
Cater For Increasing Population
implementation status
Ongoing
total cost
Ksh 1,810,063
estimate
Ksh 1,594,140

Mugumo Secondary School

location
Kirima (in Gichugu)
year first funded
2006
action
Construction Of Library
output
Improved Learning Standards
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 4,657,924

Kiandai Secondary School

location
Baragwi (in Gichugu)
year first funded
2005
action
Construction Of 3 Classes/ Admin. Block
output
Improved Learning Standards
implementation status
2 Classes Complete & In Use, 1 Ongoing
total cost
Ksh 1,750,000
estimate
Ksh 1,027,635

Kiamiciri Secondary School

location
Kabare (in Gichugu)
year first funded
2005
action
Construction Of Laboratory
output
Improved Learning Standards
implementation status
On Going
total cost
Ksh 1,740,123
estimate
Ksh 174,012,285

Kiamugumo Secondary School

location
Ngariama (in Gichugu)
year first funded
2005
action
Construction -Staff Houses,Toilets/Septic Tank
output
Catering For Teachers
implementation status
Ongoing
total cost
Ksh 1,723,235
estimate
Ksh 22,942,093

Kiandai Primary School

location
Baragwi (in Gichugu)
year first funded
2006
action
Construction/Renovation Of Classes/ Toilets
output
Improved Hygienic/Learning Standards
implementation status
Ongoing
total cost
Ksh 1,720,571
estimate
Ksh 15,205,714

Kanjuu Secondary School

location
NjukiIni (in Gichugu)
year first funded
2004
action
Construction Of 3 Classes
output
Cater For Increasing Population
implementation status
Complete
total cost
Ksh 1,650,000
estimate
Ksh 1,450,000

Maganjo bridge

location
Karumandi (in Gichugu)
year first funded
2003
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 1,638,289
estimate
Ksh 7,885,714

St Arys Polytechnic

location
Ngariama (in Gichugu)
year first funded
2005
action
Construction Of Classes & Admin. Block
output
Improved Enrolment
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 34,631,878

Kianguenyi Secondary School

location
Kirima (in Gichugu)
year first funded
2004
action
Construction Of Sanitation Block
output
Improved Learning Standards
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 1,590,000

Gatugura Dispensary

location
Kirima (in Gichugu)
year first funded
2006
action
Construction Of 1 Staff House
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 1,534,560
estimate
Ksh 1,282,655

Ngungu Secondary School

location
Kabare (in Gichugu)
year first funded
2004
action
Construction Of Lab
output
Improved Learning Standards
implementation status
Ongoing
total cost
Ksh 1,513,658
estimate
Ksh 121,365,805

Rukenya Primary School

location
Kabare (in Gichugu)
year first funded
2006
action
Construction Of Classes/Roof Painting
output
Enhanced Outlook/Increased Population
implementation status
Roof Painting Complete
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Muri-Njuki Water Project

location
NjukiIni (in Gichugu)
year first funded
2005
action
Intake And Piping
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 9,911,298

Ngumara Water Project

location
Karumandi (in Gichugu)
year first funded
2005
action
Piping
output
Water For Domestic Use
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 8,000,000

Mukia Water Project

location
Karumandi (in Gichugu)
year first funded
2005
action
Piping
output
Water For Domestic Use
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 74,582,544

Mumako Water Project

location
Ngariama (in Gichugu)
year first funded
2006
action
Piping
output
Water For Farming
implementation status
Intake Complete Piping Ongoing
total cost
Ksh 1,496,400
estimate
Ksh 3,358,200

Gaciongo Secondary School

location
NjukiIni (in Gichugu)
year first funded
2004
action
Construction Of Classes & Equipping Lab
output
Cater For Increasing Population
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 550,950

Riakithiga Dispensary

location
Kabare (in Gichugu)
year first funded
2004
action
Construction/Electricity Installation/ Plumbing
output
Provision Of Health Services
implementation status
Construction Complete; Electricity
total cost
Ksh 1,448,799
estimate
Ksh 998,150

Mucagara Secondary School

location
Karumandi (in Gichugu)
year first funded
2004
action
Construction Of 2 Classes & Electricity Installation
output
To Cater For Rising Enrollment
implementation status
Construction Complete & Electricity Ongoing
total cost
Ksh 1,406,290
estimate
Ksh 900,000

Mwanianjau Secondary School

location
Ngariama (in Gichugu)
year first funded
2005
action
Construction Of Classes
output
Cater For Increasing Population
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Karucho Secondary School

location
NjukiIni (in Gichugu)
year first funded
2004
action
Construction Of 4 Classes
output
To Cater For Improved Enrollment
implementation status
2 Classes Complete & In Use.
total cost
Ksh 1,400,000
estimate
Ksh 1,050,000

Gatugura/Kirima Ap Line

location
Kirima (in Gichugu)
year first funded
2005
action
Construction Of Staff Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 1,370,000
estimate
Ksh 1,370,000

Mukindu Water Project

location
Baragwi (in Gichugu)
year first funded
2005
action
Construction Of Intake/Piping
output
Water For Farming
implementation status
Intake Complete Piping Ongoing
total cost
Ksh 1,320,000
estimate
Ksh 2,969,390

Ngekenyi Ap Line

location
Kabare (in Gichugu)
year first funded
2007
action
Construction Of 5 Ap Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 850,000

Kiburia Secondary School

location
Baragwi (in Gichugu)
year first funded
2006
action
Construction Of Classes
output
Catering For Improved Enrollment
implementation status
1 Class Complete & In Use
total cost
Ksh 1,300,000
estimate
Ksh 503,705

Kikange Water Project

location
Kirima (in Gichugu)
year first funded
2006
action
Construction Of Intake/ Piping
output
Water For Farming
implementation status
Intake Complete Piping Ongoing
total cost
Ksh 1,271,610
estimate
Ksh 4,941,940

Raimu Primary School

location
Baragwi (in Gichugu)
year first funded
2005
action
Construction Of Classes/Toilets
output
Improved Hygienic/Learning Standards
implementation status
Toilets Complete
total cost
Ksh 1,251,571
estimate
Ksh 225,735

Thumaita East Secondary School

location
Karumandi (in Gichugu)
year first funded
2004
action
Construction Of 3 Classes
output
Improved Learning Standards
implementation status
1 Class Complete & In Use.
total cost
Ksh 1,250,000
estimate
Ksh 1,250,000

Riakaruria Water Project

location
Kirima (in Gichugu)
year first funded
2006
action
Construction Of Intake/ Piping
output
Water For Farming
implementation status
Intake Complete Piping Ongoing
total cost
Ksh 1,221,600
estimate
Ksh 4,989,600

Kabare Girls Secondary School

location
Kabare (in Gichugu)
year first funded
2006
action
Dormitories Renovation & Fencing
output
Improved Learning Standards/Enhanced Outlook
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 68,881,672

Kariru Road

location
Karumandi (in Gichugu)
year first funded
2007
action
Re-Shaping & Murraming
output
Improved Accessibility
implementation status
Ongoing
total cost
Ksh 1,185,700
estimate
Ksh 1,195,700

Githure Secondary School

location
Ngariama (in Gichugu)
year first funded
2004
action
Construction Of Admn Block
output
Effective Administration
implementation status
Ongoing
total cost
Ksh 1,130,419
estimate
Ksh 1,130,419

Stlouis Nyagithuci Secondary School

location
Kirima (in Gichugu)
year first funded
2005
action
Construction Of Classes
output
Improved Hygienic/Learning Standards
implementation status
1 Class Complete & In Use
total cost
Ksh 1,130,000
estimate
Ksh 770,000

Kabare Boys Primary School

location
Kabare (in Gichugu)
year first funded
2005
action
Electricity Installation Water Tank/Painting 17 Classes
output
Power/Water Supply
implementation status
Power Connection Complete.
total cost
Ksh 1,110,000
estimate
Ksh 771,450

Kiambatha Secondary School

location
Ngariama (in Gichugu)
year first funded
2004
action
Construction Of 2 Classes
output
Cater For Increasing Population
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Rwambiti Secondary School

location
Baragwi (in Gichugu)
year first funded
2004
action
Construction Of Kitchen/Equiping dining Hall
output
Improved Learning Standards
implementation status
In Use Though Finishing Is Not Done
total cost
Ksh 1,100,000
estimate
Ksh 600,000

Kabare Girls Boarding Primary School

location
Kabare (in Gichugu)
year first funded
2006
action
Purchase Of Generator/Dormitory Renovation
output
Power Supply/Enhanced Outlook
implementation status
Dormitory Renovation Complete
total cost
Ksh 1,095,140
estimate
Ksh 1,065,400

Kiandumu Water Project

location
Ngariama (in Gichugu)
year first funded
2007
action
Piping
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 1,071,460
estimate
Ksh 3,344,554

Nyanjara bridge

location
Ngariama (in Gichugu)
year first funded
2004
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 1,065,147
estimate
Ksh 1,065,147

Karumandi Health Centre

location
Karumandi (in Gichugu)
year first funded
2006
action
Construction Of Vct Centre/ Purchase Of Refrigerator
output
Provision Of Vct Services
implementation status
Complete & In Use/ Purchase Of Refrigerator New
total cost
Ksh 1,014,000
estimate
Ksh 411,465

Kimunye Ap post

location
Kirima (in Gichugu)
year first funded
2006
action
Construction Of Police Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 1,000,750
estimate
Ksh 7,126,758

Kianyaga Secondary School

location
Baragwi (in Gichugu)
year first funded
2006
action
Renovation
output
Enhanced Outlook
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 3,882,820

Kerugoya District Hospital

location
District Project (in Gichugu)
year first funded
2005
action
Renovation
output
Improved Health Services
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gichugu Dairy

location
Kutus (in Gichugu)
year first funded
2004
action
Factory Renovation
output
Improved Milk Production
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Giakigera Water Project

location
Karumandi (in Gichugu)
year first funded
2007
action
Piping
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,568,200

Kianyambo Secondary School

location
NjukiIni (in Gichugu)
year first funded
2005
action
Lab Construction
output
Improved Learning Standards
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Ngariama Secondary School

location
Ngariama (in Gichugu)
year first funded
2005
action
Construction Of 3 Classes
output
Cater For Increasing Population
implementation status
2 Classrooms Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Kavote Secondary School

location
Karumandi (in Gichugu)
year first funded
2004
action
Construction Of Lab & dining Hall
output
Improved Learning Standards
implementation status
Lab Ongoing. Dining Hall Yet To Start
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kamutithi Bridge

location
Kabare (in Gichugu)
year first funded
2007
action
Bridge Construction
output
Improved Accessibility
implementation status
Ongoing
total cost
Ksh 964,234
estimate
Ksh 300,000

Kariki/Kieria Water Project

location
Karumandi (in Gichugu)
year first funded
2007
action
Intake Construction/Piping
output
Water For Domestic Use
implementation status
Intake Complete/Piping Ongoing
total cost
Ksh 956,000
estimate
Ksh 4,993,244

Gatu Women Success

location
Baragwi (in Gichugu)
year first funded
2004
action
Renovation Of Intake & Piping
output
Water For Farming/Domestic Use
implementation status
Ongoing
total cost
Ksh 950,571
estimate
Ksh 757,062

Gakindu bridge

location
Ngariama (in Gichugu)
year first funded
2003
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 938,571
estimate
Ksh 7,885,714

Kaguma Water Project

location
Kabare (in Gichugu)
year first funded
2005
action
Construction Of Intake
output
Water For Farming/Domestic Use
implementation status
Complete & In Use
total cost
Ksh 900,000
estimate
Ksh 438,660

Ngiriambu Primary School

location
NjukiIni (in Gichugu)
year first funded
2005
action
Construction Of Toilets & 2 Classes/ Renovation Of 13 Classes
output
Improved Hygienic/Growing Population
implementation status
Toilets Complete & In Use. Classes Ongoing
total cost
Ksh 900,000
estimate
Ksh 200,000

Gikumbo Primary School

location
Karumandi (in Gichugu)
year first funded
2005
action
Construction Of 2 Classes/Toilets
output
Improved Hygienic Standards
implementation status
Toilets Complete & In Use. Construction Of 2 Classes Ongoing
total cost
Ksh 872,880
estimate
Ksh 2,100,000

Nguru Gituru bridge

location
Baragwi (in Gichugu)
year first funded
2005
action
Bridge Construction
output
Improved Accessibility
implementation status
Phase 1 Complete
total cost
Ksh 830,000
estimate
Ksh 500,000

Karoki bridge

location
Baragwi (in Gichugu)
year first funded
2003
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 818,571
estimate
Ksh 7,885,714

Kiaumbui Secondary School

location
NjukiIni (in Gichugu)
year first funded
2004
action
Construction Of 2 Classes
output
Improved Hygienic/Learning Standards
implementation status
Ongoing
total cost
Ksh 806,000
estimate
Ksh 806,000

Guama Primary School

location
Karumandi (in Gichugu)
year first funded
2005
action
Construction Of Toilets/ Renovation Of 6 Classes
output
Improved Hygienic Standards
implementation status
Toilets Construction Complete & In Use. Class Ongoing.
total cost
Ksh 800,000
estimate
Ksh 800,000

Mbiri Ap post

location
NjukiIni (in Gichugu)
year first funded
2005
action
Construction Of Ap Houses
output
Housing Staff
implementation status
5 Staff Houses Complete
total cost
Ksh 800,000
estimate
Ksh 9,562,729

Kutus Old Town Security Team

location
Kabare (in Gichugu)
year first funded
2009
action
Construction Of Staff Houses & Report Office
output
Housing Staff
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 0

Nyagithuci Primary School

location
Kirima (in Gichugu)
year first funded
2006
action
Painting / Renovation Of 16 Classes
output
Enhanced Outlook
implementation status
Painting Ongoing
total cost
Ksh 800,000
estimate
Ksh 300,000

Kaboro bridge

location
NjukiIni (in Gichugu)
year first funded
2003
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 788,571
estimate
Ksh 7,885,714

Njuki-Muroko bridge

location
Baragwi (in Gichugu)
year first funded
2005
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 788,000
estimate
Ksh 788,000

Rukenya Community Water Project

location
Kabare (in Gichugu)
year first funded
2006
action
Piping
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 4,329,071

Kariko bridge

location
NjukiIni (in Gichugu)
year first funded
2006
action
Bridge Construction
output
Improved Accessibility
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 520,000

Kimweas Polytechnic

location
NjukiIni (in Gichugu)
year first funded
2005
action
Construction Of Classes
output
Improved Enrolment
implementation status
1 Class Complete; 1 Class New
total cost
Ksh 746,270
estimate
Ksh 746,270

Kangema

location
Ngariama (in Gichugu)
year first funded
2006
action
Construction
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 741,150
estimate
Ksh 430,000

Karura Bridge

location
Baragwi (in Gichugu)
year first funded
2007
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 716,000
estimate
Ksh 732,000

Kagongo Women Water Project

location
Baragwi (in Gichugu)
year first funded
2007
action
Intake Construction
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 4,600,000

Thumaita East Primary School

location
Karumandi (in Gichugu)
year first funded
2007
action
Construction Of Latrines
output
Improved Hygienic Standards
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 670,000

Kaboyo Kwa Felix bridge

location
Baragwi (in Gichugu)
year first funded
2007
action
Bridge Construction
output
Improved Accessibility
implementation status
Ongoing
total cost
Ksh 648,000
estimate
Ksh 660,000

Kabari Assistant Chiefs Office

location
Ngariama (in Gichugu)
year first funded
2006
action
Construction Of Ass. Chief'S Office/ Boardroom
output
To House Ass. Chief?S Office
implementation status
Office Complete/Boardroom Ongoing
total cost
Ksh 641,001
estimate
Ksh 1,330,000

Karuti/Kiambogo Roads

location
Karumandi (in Gichugu)
year first funded
2009
action
Back Filling Of Bridge
output
Improved Accessibility
implementation status
New
total cost
Ksh 634,026
estimate
Ksh 0

Kariru Secondary School

location
Karumandi (in Gichugu)
year first funded
2006
action
Construction Of 1 Class
output
Improved Learning Standards
implementation status
Complete
total cost
Ksh 612,876
estimate
Ksh 61,287,613

Thuyia Primary School

location
Karumandi (in Gichugu)
year first funded
2008
action
Renovation Of Classes
output
Enhanced Outlook
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Teachers Assessors Centre Hall

location
Ngariama (in Gichugu)
year first funded
2007
action
Construction
output
Construct A Hall
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Kabari Ap Post

location
Ngariama (in Gichugu)
year first funded
2007
action
Construction Of 3 Ap Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 580,000

Mutaga Water Project

location
Ngariama (in Gichugu)
year first funded
2005
action
Piping
output
Water For Farming/Domestic Use
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 2,942,880

Gituba Wendo Furrow Water Project

location
Ngariama (in Gichugu)
year first funded
2007
action
Intake Construction
output
Water For Farming
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 915,394

George Gatuki bridge

location
Baragwi (in Gichugu)
year first funded
2006
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 608,000

Kiamugumo Primary School

location
Ngariama (in Gichugu)
year first funded
2007
action
Renovation Of Classes, Office & Toilets
output
Hygiene Standards & Enhanced Outlook
implementation status
Toilets Complete & In Use;
total cost
Ksh 600,000
estimate
Ksh 400,000

Karumandi South Primary School

location
Karumandi (in Gichugu)
year first funded
2007
action
Construction Of 12 Toilets;4 Urinals
output
Improved Sanitary Conditions
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Miruri Water Project

location
Kabare (in Gichugu)
year first funded
2005
action
Construction Of Intake
output
Provision Of Water For Farming/Domestic Use
implementation status
Ongoing
total cost
Ksh 590,000
estimate
Ksh 590,937

Kimunye Primary School

location
Kirima (in Gichugu)
year first funded
2007
action
Electricity Installation
output
Power Supply
implementation status
Power Connection Ongoing
total cost
Ksh 580,447
estimate
Ksh 200,000

Kiamwathi Primary School

location
Baragwi (in Gichugu)
year first funded
2007
action
Roof Painting/ Renovation Of Classes
output
Enhanced Outlook
implementation status
Ongoing
total cost
Ksh 571,417
estimate
Ksh 140,000

Kiburia Primary School

location
Baragwi (in Gichugu)
year first funded
2006
action
Construction Of Toilets/ Cementing 8 Classes
output
Improved Hygienic Standards
implementation status
Toilets Complete & In Use
total cost
Ksh 570,000
estimate
Ksh 100,000

Kiritini/Mikarara Water Project

location
Kabare (in Gichugu)
year first funded
2006
action
Construction Of Intake
output
Water For Farming/Domestic Use
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 572,010

Kianyaga Gakutha Drainage

location
Baragwi (in Gichugu)
year first funded
2005
action
Construction Of Drainage
output
Proper Drainage Of Water
implementation status
Ongoing
total cost
Ksh 510,000
estimate
Ksh 450,000

Joshua Mbai Dispensary

location
Ngariama (in Gichugu)
year first funded
2004
action
Construction
output
Provision Of Health Services
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kandiu Water Project

location
NjukiIni (in Gichugu)
year first funded
2009
action
Construction Of Intake
output
Water For Domestic Use
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Kamigua Polytechnic

location
Kabare (in Gichugu)
year first funded
2005
action
Renovation
output
Enhanced Outlook
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 800,220

Kathata bridge

location
Kabare (in Gichugu)
year first funded
2005
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 555,200

Kwa Maringa bridge

location
Kirima (in Gichugu)
year first funded
2005
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 243,800

Kanjuu Primary School

location
NjukiIni (in Gichugu)
year first funded
2007
action
Roof Painting/ Renovation Of Class
output
Enhanced Outlook
implementation status
Roof Painting Complete.
total cost
Ksh 500,000
estimate
Ksh 200,000

Muthigi-Ini Ap Post

location
NjukiIni (in Gichugu)
year first funded
2008
action
Construction Of 5 Ap Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Karucho Primary School

location
NjukiIni (in Gichugu)
year first funded
2006
action
Construction Of Toilets & Renovation Of 19 Classes
output
Improved Hygienic Standards/Cater For Growing Population
implementation status
Toilets N Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Karia Ap post

location
Ngariama (in Gichugu)
year first funded
2006
action
Construction Of Ap Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 489,050
estimate
Ksh 700,000

Gaciongo Primary School

location
NjukiIni (in Gichugu)
year first funded
2006
action
Painting /Toilets Construction
output
Improved Hygienic
implementation status
Painting Complete
total cost
Ksh 486,389
estimate
Ksh 3,363,885

Kithiururi Water Furrow

location
Baragwi (in Gichugu)
year first funded
2007
action
Piping
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 480,000
estimate
Ksh 1,876,050

Ndunguri Project

location
Kabare (in Gichugu)
year first funded
2007
action
Electrification
output
Electricity Provision
implementation status
Ongoing
total cost
Ksh 470,000
estimate
Ksh 470,000

Kibaro Primary School

location
Karumandi (in Gichugu)
year first funded
2008
action
Renovation Of 4 Classes & Office
output
Enhanced Outlook
implementation status
3 Classes & Office Complete.
total cost
Ksh 465,584
estimate
Ksh 400,000

St. Thomas Mburi Primary School

location
NjukiIni (in Gichugu)
year first funded
2009
action
Construction Of Class
output
Catering For Increased Population
implementation status
New
total cost
Ksh 456,326
estimate
Ksh 0

Mururi Ap post

location
NjukiIni (in Gichugu)
year first funded
2005
action
Construction Of Ap Houses
output
Housing Staff
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 25,167,555

Kianyambo Primary School

location
NjukiIni (in Gichugu)
year first funded
2008
action
Toilets Construction
output
Improved Hygienic Standards
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 150,000

Gaciongo Dispensary

location
NjukiIni (in Gichugu)
year first funded
2005
action
Construction & Electrification
output
Provision Of Health Services
implementation status
Construction Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Raimu Rural

location
Baragwi (in Gichugu)
year first funded
2004
action
Electrification
output
Electricity Provision
implementation status
Complete
total cost
Ksh 430,262
estimate
Ksh 430,262

Gacatha Primary School

location
NjukiIni (in Gichugu)
year first funded
2005
action
Renovation
output
Improved Hygienic/ Learning Standards
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 62,173,826

Wangatia Water Project

location
Kabare (in Gichugu)
year first funded
2005
action
Construction Of Intake
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 457,080

Gatunguru Primary School

location
Kabare (in Gichugu)
year first funded
2005
action
Construction Of Toilets/Roof Painting
output
Enhanced Outlook/Sanitary Standards
implementation status
Toilets Complete.
total cost
Ksh 400,000
estimate
Ksh 627,080

Gatugura Primary School

location
Kirima (in Gichugu)
year first funded
2005
action
Construction Of Toilets/ Roof Painting Of 21 Classes
output
Improved Hygienic/Outlook
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Kianguenyi Primary School

location
Kirima (in Gichugu)
year first funded
2005
action
Construction Of Toilets/ Roofpainting Of 16 Classes & Admin. Block
output
Improved Hygienic/Out Look
implementation status
Toilets Complete Classes Ongoing
total cost
Ksh 400,000
estimate
Ksh 642,080

Gatugura Mixed Secondary School

location
Kirima (in Gichugu)
year first funded
2008
action
Classroom Construction
output
To Cater For Rising Enrollment
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Kiangombe Dispensary

location
Kirima (in Gichugu)
year first funded
2006
action
Construction
output
Provision Of Health Services
implementation status
Complete
total cost
Ksh 382,190
estimate
Ksh 405,972

Githage Primary School

location
Baragwi (in Gichugu)
year first funded
2007
action
Roof Painting/ Renovating 16 Classes
output
Enhanced Outlook
implementation status
Ongoing
total cost
Ksh 350,646
estimate
Ksh 200,000

Nyamindi Water Project

location
NjukiIni (in Gichugu)
year first funded
2008
action
Piping
output
Water For Farming
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 1,036,000

Ngariama Primary School

location
Ngariama (in Gichugu)
year first funded
2005
action
Construction Of Toilets & Class Painting
output
Improved Hygienic/Outlook
implementation status
Toilets Construction Complete
total cost
Ksh 339,580
estimate
Ksh 339,580

Kianjiru Primary School

location
Baragwi (in Gichugu)
year first funded
2006
action
Construction Of Toilets
output
Improved Hygienic Standards
implementation status
Toilets Complete
total cost
Ksh 320,000
estimate
Ksh 315,000

Kanjarara Water Project

location
Kabare (in Gichugu)
year first funded
2005
action
Construction Of Intake
output
Water For Farming/Domestic Use
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 289,124

Dos BoaRoad Room

location
Baragwi (in Gichugu)
year first funded
2004
action
Construction Of Boardroom
output
To Be For Meetings
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kariru Primary School

location
Karumandi (in Gichugu)
year first funded
2008
action
Renovation Of 5 Classes; Admin. Block
output
Enhanced Outlook
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Mogani Water Furrow Water Project

location
Ngariama (in Gichugu)
year first funded
2007
action
Piping
output
Water For Farming
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 415,350

Ngiroche/Kiritini Water Project

location
Kabare (in Gichugu)
year first funded
2004
action
Construction Of Intake
output
Water For Farming/Domestic Use
implementation status
Ongoing
total cost
Ksh 297,262
estimate
Ksh 527,080

Roba bridge

location
Kirima (in Gichugu)
year first funded
2006
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete
total cost
Ksh 276,100
estimate
Ksh 289,300

Upper Njuki Muro bridgeko

location
Baragwi (in Gichugu)
year first funded
2005
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 274,000
estimate
Ksh 274,000

Konyu Factory

location
Kirima (in Gichugu)
year first funded
2004
action
Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 250,000

Visit To Bahari

location
Bahari (in Gichugu)
year first funded
2005
action
Constituency Visits
output
Empower Cdfc
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Kathoge Police Post

location
NjukiIni (in Gichugu)
year first funded
2009
action
Construction Of Staff Houses
output
Housing Staff
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Bishop Gitari Boarding Primary School

location
NjukiIni (in Gichugu)
year first funded
2009
action
Painting 10 Classes, dining Hall & Dormitory
output
Enhanced Outlook
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Nyaru Water Project

location
Ngariama (in Gichugu)
year first funded
2005
action
Intake & Piping
output
Provision Of Water For Farming/Domestic Use
implementation status
Intake Complete
total cost
Ksh 250,000
estimate
Ksh 27,569,685

Kianduro Water Project

location
NjukiIni (in Gichugu)
year first funded
2007
action
Intake Construction
output
Water For Farming
implementation status
Ongoing
total cost
Ksh 201,300
estimate
Ksh 201,300

Githure Primary School

location
Ngariama (in Gichugu)
year first funded
2009
action
Construction Of Toilets
output
Improved Hygienic Standards
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Kiambatha Primary School

location
Ngariama (in Gichugu)
year first funded
2009
action
Painting Of Classes
output
Enhanced Outlook
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Kiaumbui Primary School

location
NjukiIni (in Gichugu)
year first funded
2007
action
Roof Painting
output
Enhanced Outlook
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mugumo Primary School

location
Kirima (in Gichugu)
year first funded
2007
action
Latrines Construction
output
Improved Hygienic Standards
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Kavote Primary School

location
Karumandi (in Gichugu)
year first funded
2006
action
Construction Of Toilets
output
Improved Hygienic Standards
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 150,000

Karani bridge

location
Kirima (in Gichugu)
year first funded
2006
action
Bridge Construction
output
Improved Accessibility
implementation status
Complete & In Use
total cost
Ksh 165,000
estimate
Ksh 160,000

Gituba Primary School

location
Ngariama (in Gichugu)
year first funded
2009
action
Construction Of Toilets
output
Improved Hygienic Standards
implementation status
New
total cost
Ksh 150,361
estimate
Ksh 0

Nyanja Primary School

location
Karumandi (in Gichugu)
year first funded
2005
action
Construction Of Toilets
output
Improved Hygienic Standards
implementation status
Toilets Complete & In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kimunye

location
Kirima (in Gichugu)
year first funded
2006
action
Renovation
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 136,000
estimate
Ksh 50,000

Kiandumo

location
Ngariama (in Gichugu)
year first funded
2006
action
Renovation
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 110,635
estimate
Ksh 110,635

Kiritini

location
Kabare (in Gichugu)
year first funded
2006
action
Renovation
output
-
implementation status
Not Started
total cost
Ksh 100,000
estimate
Ksh 100,000

Mucagara Primary School

location
Karumandi (in Gichugu)
year first funded
2006
action
Construction Of Toilets
output
Improved Hygienic Standards
implementation status
Toilets Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Mwanianjau Primary School

location
Ngariama (in Gichugu)
year first funded
2006
action
Construction Of Toilets
output
Improved Hygienic Standards/Cater For Growing Population
implementation status
Toilets Construction Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Dos Toilets

location
Baragwi (in Gichugu)
year first funded
2004
action
Construction Of Toilet
output
Improved Sanitary Conditions
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiamutugu

location
Ngariama (in Gichugu)
year first funded
2006
action
Renovation/Fencing
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 80,586
estimate
Ksh 80,586

Kathunguri

location
Ngariama (in Gichugu)
year first funded
2006
action
Renovation
output
Improved Livestock
implementation status
Stalled
total cost
Ksh 70,000
estimate
Ksh 70,350

Kiangothe Village Well

location
Kabare (in Gichugu)
year first funded
2007
action
Intake Construction
output
Water For Domestic Use
implementation status
Ongoing
total cost
Ksh 51,300
estimate
Ksh 51,636

Gatunguru

location
Kabare (in Gichugu)
year first funded
2007
action
Renovation
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 50,000

Kiandai

location
Baragwi (in Gichugu)
year first funded
2006
action
Renovation
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 50,000

Rwambiti

location
Baragwi (in Gichugu)
year first funded
2006
action
Renovation
output
Improved Livestock
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 49,450

Kiamwathi

location
Baragwi (in Gichugu)
year first funded
2006
action
Renovation
output
Improved Livestock
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 70,000

Thirikwa Assistant Chiefs Office

location
Ngariama (in Gichugu)
year first funded
2009
action
Renovation Of 2 Offices
output
Enhanced Outlook
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 0

Kiamutugu Health Centre

location
Ngariama (in Gichugu)
year first funded
2008
action
Purchase Of Incubator
output
Improved Health Services
implementation status
-
total cost
Ksh 50,000
estimate
Ksh 0