The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Githunguri

Bursary

location
Githunguri (in Githunguri)
year first funded
2004
action
Awarding Bursary To Needy Students
output
-
implementation status
more funds needed to complete
total cost
Ksh 22,591,208
estimate
Ksh 0

Githunguri Health Centre

location
Githunguri (in Githunguri)
year first funded
2003
action
Construction Of Maternity Wing
output
A Maternity Wing
implementation status
Not Yet Started
total cost
Ksh 11,618,713
estimate
Ksh 5,500,000

Emergency

location
Githunguri (in Githunguri)
year first funded
2004
action
Funding Emergency Cases In The Constituency
output
-
implementation status
Project not completed
total cost
Ksh 10,222,729
estimate
Ksh 0

Office Expenditure

location
Githunguri (in Githunguri)
year first funded
2003
action
Running The Office
output
-
implementation status
Project not completed
total cost
Ksh 6,736,826
estimate
Ksh 0

Githunguri CDF

location
Githunguri (in Githunguri)
year first funded
2007
action
Construction of CDF office
output
Offices
implementation status
Complete
total cost
Ksh 5,250,000
estimate
Ksh 3,000,000

Mukuyu Secondary School

location
Githiga (in Githunguri)
year first funded
2004
action
Construction Of Dining Hall
output
A dining Hall
implementation status
Ongoing
total cost
Ksh 4,250,000
estimate
Ksh 3,200,000

Kiaibabu Health Centre

location
Ikinu (in Githunguri)
year first funded
2003
action
Completion Of Initiated Health Facility
output
A Health Centre
implementation status
Ongoing
total cost
Ksh 3,900,130
estimate
Ksh 4,000,000

Githiga Secondary School

location
Githiga (in Githunguri)
year first funded
2006
action
Completion Of Admn Block Destroyed By Fire
output
Admn Block
implementation status
Ongoing
total cost
Ksh 3,850,000
estimate
Ksh 870,000

Gikanga Kageche Secondary School

location
Githiga (in Githunguri)
year first funded
2004
action
Construction Of dining Hall
output
A dining Hall
implementation status
Ongoing
total cost
Ksh 3,850,000
estimate
Ksh 4,000,000

Ikinu-Rioki Wroject

location
Ikinu (in Githunguri)
year first funded
2004
action
Borehole Drilling & Piping
output
Clean Water To Community
implementation status
Ongoing
total cost
Ksh 3,650,000
estimate
Ksh 4,274,000

Ikinu Ap Post

location
Ikinu (in Githunguri)
year first funded
2006
action
Construction Of Ap Line
output
Complete Ap Houses
implementation status
Ongoing
total cost
Ksh 3,600,000
estimate
Ksh 5,000,000

Kiambururu Water Project

location
Komothai (in Githunguri)
year first funded
2004
action
Borehole Drilling & Piping
output
A Borehole
implementation status
Ongoing
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Komothai Polytechnic

location
Komothai (in Githunguri)
year first funded
2006
action
Completion Of Classrooms & Ablution Block
output
Complete Classrooms & Block
implementation status
Ongoing
total cost
Ksh 3,500,000
estimate
Ksh 6,000,000

Design & Monitoring

location
Githunguri (in Githunguri)
year first funded
2006
action
Monitoring The Projects
output
Good Implementation Of Projects
implementation status
Ongoing
total cost
Ksh 3,402,214
estimate
Ksh 1,230,000

Thuita Water Project

location
Komothai (in Githunguri)
year first funded
2004
action
Borehole Drilling, Pump House Construction & Piping
output
A Borehole & Clean Water To The Community
implementation status
Ongoing
total cost
Ksh 3,220,000
estimate
Ksh 5,000,000

Gitiha Secondary School

location
Githiga (in Githunguri)
year first funded
2005
action
Purchase Of Energy Saving Jikos & Water Pumps,Pipes
output
Jikos Pumps & Pipes
implementation status
Complete
total cost
Ksh 3,200,000
estimate
Ksh 1,500,000

Gitiha Health Centre

location
Githiga (in Githunguri)
year first funded
2003
action
Construction Of Mat Wing & Purchase Of Lab Equip.
output
Martenity Wing
implementation status
Ongoing
total cost
Ksh 3,052,000
estimate
Ksh 3,500,000

Strategic Planning & Capacity Building

location
Githunguri (in Githunguri)
year first funded
2005
action
Development Of Action Plan
output
Effective & Efficient Strategies
implementation status
Ongoing
total cost
Ksh 3,034,380
estimate
Ksh 700,000

Githima Secondary School

location
Kiratina (in Githunguri)
year first funded
2009
action
Construction of Dining Hall
output
Completed
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 0

Githiga Police Post

location
Githiga (in Githunguri)
year first funded
2008
action
Construction of the police post
output
Completed
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Ihiga-Gatitu-Ikinu Rioki Water project

location
Githiga (in Githunguri)
year first funded
2007
action
Project design piping and expansion
output
Clean & piped water
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 2,000,000

Mbari Ya Igi Dispensary

location
Komothai (in Githunguri)
year first funded
2006
action
Rehabilation Of Existing Building Into A Dispensary
output
A Dispensary
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 4,649,465

Githiga Locproject

location
Githiga (in Githunguri)
year first funded
2004
action
Technical Evaluation & Construction Of Intake Weir
output
Intake Weir
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 1,500,000

Komothai Boys Secondary School

location
Komothai (in Githunguri)
year first funded
2004
action
Roofing & Completion Of Dining Hall
output
dining Hall
implementation status
Complete
total cost
Ksh 2,950,000
estimate
Ksh 3,330,000

Matuguta Secondary School

location
Githiga (in Githunguri)
year first funded
2004
action
Construction Of 2 Classrooms,Store & 3Blocks Of Pitlatrines
output
Complete Classrooms & Toilets
implementation status
Ongoing
total cost
Ksh 2,700,000
estimate
Ksh 3,500,000

Kiairia High School

location
Githunguri (in Githunguri)
year first funded
2008
action
Construction of multi purpose hall
output
Completed
implementation status
Not started
total cost
Ksh 2,612,750
estimate
Ksh 1,612,750

Kiratina Admblock

location
Kiratina (in Githunguri)
year first funded
2004
action
Completion Of Chiefs Office
output
Chiefs Camp
implementation status
Ongoing
total cost
Ksh 2,600,000
estimate
Ksh 3,000,000

Kigumo Health Centre

location
Komothai (in Githunguri)
year first funded
2003
action
Purchase Of Generator & General Renovations
output
A Functional Generator
implementation status
Complete
total cost
Ksh 2,400,000
estimate
Ksh 3,000,000

Kiratina Water Project

location
Kiratina (in Githunguri)
year first funded
2004
action
Pump House Construction,Pvc Pipes And Tank
output
Piped Water To Community
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 1,050,000

Jiereini

location
Kiratina (in Githunguri)
year first funded
2006
action
Construction Of Dormitory
output
A Dormitory
implementation status
Ongoing
total cost
Ksh 2,159,002
estimate
Ksh 1,459,002

Githunguri Technical Secondary School

location
Githunguri (in Githunguri)
year first funded
2006
action
Construction Of Administration Block
output
Admnistratuin Block
implementation status
Ongoing
total cost
Ksh 2,100,000
estimate
Ksh 4,000,000

Lioki-Ikinu-Gitiha Road

location
Ikinu (in Githunguri)
year first funded
2005
action
Upgrading Of The Feeder Rd
output
Murramed Road
implementation status
Complete
total cost
Ksh 2,015,260
estimate
Ksh 4,360,015

St Josephs Secondary School

location
Githunguri (in Githunguri)
year first funded
2005
action
Extension Of Existing Dormitory
output
A Dormitory
implementation status
Ongoing
total cost
Ksh 2,010,000
estimate
Ksh 2,100,000

Gichogocho Water Project

location
Kiratina (in Githunguri)
year first funded
2006
action
Construction Of Pump House,Intake Chamber & Pipe Work
output
Clean Water To Community
implementation status
Not Yet Started
total cost
Ksh 2,000,000
estimate
Ksh 10,371,831

Thuita Secondary School

location
Komothai (in Githunguri)
year first funded
2009
action
Construction of science lab
output
Completed
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Lioki Secondary School

location
Ikinu (in Githunguri)
year first funded
2008
action
Construction of 2 classes and 1 laboratory
output
Completed
implementation status
Not started
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Gathiruini Secondary School

location
Kiratina (in Githunguri)
year first funded
2008
action
Construction of dormitory
output
Complete
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Gathanje Secondary School

location
Githunguri (in Githunguri)
year first funded
2005
action
Construction Of Admn Block
output
Admn Block
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 3,000,000

Karia Health Centre

location
Ikinu (in Githunguri)
year first funded
2004
action
Extension & Renovation Of health centerentre
output
A Health Centre
implementation status
Ongoing
total cost
Ksh 1,850,000
estimate
Ksh 2,000,000

Kiberethi Police Post

location
Komothai (in Githunguri)
year first funded
2006
action
Construction Of Police Post
output
A Police Post
implementation status
Ongoing
total cost
Ksh 1,582,737
estimate
Ksh 2,500,000

Youth Empowerment and resource center

location
Githunguri (in Githunguri)
year first funded
2008
action
Construction of the centre
output
Not started
implementation status
Not started
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kigumo secondary School

location
Kiratina (in Githunguri)
year first funded
2007
action
Construction od admin block
output
Admin block
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Gathugu Secondary School

location
Kiratina (in Githunguri)
year first funded
2008
action
Complete 2 science labs
output
Functional
implementation status
Ongoing
total cost
Ksh 1,484,875
estimate
Ksh 2,500,000

Ngeteti Dispensary

location
Githunguri (in Githunguri)
year first funded
2003
action
Renovation Of Existing Building
output
A Dispensary
implementation status
Ongoing
total cost
Ksh 1,427,000
estimate
Ksh 2,000,000

Gathanje Police Post

location
Githunguri (in Githunguri)
year first funded
2006
action
Construction Admn Block
output
Admn Block
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 5,698,500

Gathangari Dispensary

location
Githiga (in Githunguri)
year first funded
2005
action
Rehabilation Of Existing Building Into A Dispensary
output
A Dispensary
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 2,552,000

William Ngiru

location
Ikinu (in Githunguri)
year first funded
2007
action
Completion of school multi purpose hall
output
Hall
implementation status
Complete
total cost
Ksh 1,348,959
estimate
Ksh 767,864

Kirigu Water Project

location
Kiratina (in Githunguri)
year first funded
2004
action
Sinking Of Borehole
output
A Functional Borehole
implementation status
Ongoing
total cost
Ksh 1,332,737
estimate
Ksh 1,560,000

Ngewa Health Centre

location
Ngewa (in Githunguri)
year first funded
2003
action
Purchase Of Lab & Maternity Equipments
output
Working Equipments
implementation status
Complete
total cost
Ksh 1,280,012
estimate
Ksh 2,000,000

Kamondo Secondary School

location
Ikinu (in Githunguri)
year first funded
2008
action
Construction of Lab and buy equipments
output
Functional lab
implementation status
Ongoing
total cost
Ksh 1,150,000
estimate
Ksh 1,150,000

Ngemwa police post

location
Ikinu (in Githunguri)
year first funded
2007
action
Completion of the police post
output
A police post
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Ciiko Primary School

location
Githunguri (in Githunguri)
year first funded
2005
action
Purchase Of Lockers,Printer & Completion Of Classroooms
output
Lockers Printers & Classrooms Ongoing
implementation status
Ongoing
total cost
Ksh 1,036,310
estimate
Ksh 1,000,000

Karia Water project

location
Ikinu (in Githunguri)
year first funded
2009
action
Pump,Storage tank
output
Clean h20
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Lioki AP Lines

location
Ikinu (in Githunguri)
year first funded
2009
action
Construction of AP lines
output
Complete
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 0

Githunguri Loc Water Project

location
Githunguri (in Githunguri)
year first funded
2004
action
Purchase Of Pvc Pipes,Renovation Of Water Tanks
output
Provision Of Water
implementation status
Ongoing
total cost
Ksh 870,000
estimate
Ksh 1,500,000

Githunguri LocSchool Projects

location
Githunguri (in Githunguri)
year first funded
2004
action
Electrical Installation & Wiring Of Classrooms
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 860,000
estimate
Ksh 2,000,000

Githun.CDF office projects

location
Githunguri (in Githunguri)
year first funded
2009
action
Tents,Chairs P/A generato
output
Purchase of equipments
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kahunira Secondary School

location
Githunguri (in Githunguri)
year first funded
2009
action
Construction of 2 Classrooms
output
Completed
implementation status
not known
total cost
Ksh 800,000
estimate
Ksh 0

Minja Nyakabugi

location
Githunguri (in Githunguri)
year first funded
2009
action
Intake pipes and water pump
output
Clean h20
implementation status
ongoing
total cost
Ksh 800,000
estimate
Ksh 0

Gathanje Secondary School

location
Githunguri (in Githunguri)
year first funded
2008
action
Construction of 2 Classrooms
output
Completed
implementation status
ongoing
total cost
Ksh 800,000
estimate
Ksh 800,000

Kagwana-Maicomo Road

location
Githunguri (in Githunguri)
year first funded
2006
action
Murraming Of Rd
output
Murramed Road
implementation status
Not Yet Started
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Kigumo Water

location
Kiratina (in Githunguri)
year first funded
2007
action
Borehole cleanking tank repair and piping
output
Clean & piped water
implementation status
Ongoing
total cost
Ksh 760,000
estimate
Ksh 760,000

Gathiruini Secondary School

location
Kiratina (in Githunguri)
year first funded
2006
action
Renovation
output
Complete Classrooms
implementation status
Not Yet Started
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Kagwanja Road

location
Komothai (in Githunguri)
year first funded
2005
action
Upgrading Of The Road
output
Upgraded Road
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Dallas Road

location
Komothai (in Githunguri)
year first funded
2005
action
Upgrading Of The Road
output
Upgraded Road
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Magomano-Kiaria River Culvert Crossing

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Feeder Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 644,000
estimate
Ksh 250,000

Githunguri Youth Athletics & sports

location
Githunguri (in Githunguri)
year first funded
2008
action
Athletics
output
Strong & competitive teams
implementation status
Ongoing
total cost
Ksh 638,000
estimate
Ksh 638,000

Ihiga Primary School

location
Githiga (in Githunguri)
year first funded
2004
action
Construction Of Classrooms & Pitlatrines
output
Classrooms & Pit Latrines
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Ngemwa Gatitu Rd

location
Ikinu (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Kigumo Polytechnic

location
Kiratina (in Githunguri)
year first funded
2006
action
Purchase Of Computer,Renovation Of Classrooms & Construction Of School Gate
output
Functioning Computer Good Classrooms & School Gate
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 3,000,000

Kindiga Primary School

location
Githunguri (in Githunguri)
year first funded
2006
action
Completion Of Classrooms
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Ngochi-Kahunira Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 592,000
estimate
Ksh 350,000

Waingere Water project

location
Githiga (in Githunguri)
year first funded
2009
action
Pipe network
output
Clean h20
implementation status
complete
total cost
Ksh 535,000
estimate
Ksh 0

Nyakiri kwa Ngugi Queen

location
Githunguri (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Mbari Ya Igi Kiratina Road

location
Komothai (in Githunguri)
year first funded
2005
action
Upgrading Of The Road
output
Upgraded Road
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 750,000

Komothai Girls Secondary School

location
Komothai (in Githunguri)
year first funded
2004
action
Purchase Of Textbooks & Computer
output
Text Books & Computers
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 700,000

Gathugu Secondary School

location
Kiratina (in Githunguri)
year first funded
2004
action
Purchase Of Lab Equip.
output
School Laboratory
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 800,000

Karia-Maigotho Road

location
Ikinu (in Githunguri)
year first funded
2006
action
Murramming Of Road
output
Murramed Road
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Gitombo Kirigu

location
Kiratina (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Mibauini-Magoto Road

location
Ikinu (in Githunguri)
year first funded
2006
action
Murramming Of Road
output
Murramed Road
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Gathanje-Ikuria Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 460,000
estimate
Ksh 1,200,000

Kiberethi Kwa Mari rd

location
Komothai (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Thuthuriki Kiairaya

location
Githunguri (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
complete
total cost
Ksh 400,000
estimate
Ksh 0

Ihiga Kamiti Rd

location
Githiga (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Kahunira-Ngeteti Road

location
Githunguri (in Githunguri)
year first funded
2006
action
Murraming Of Rd
output
Murramed Road
implementation status
Not Yet Started
total cost
Ksh 400,000
estimate
Ksh 650,000

Kiaibabu Sublocs

location
Ikinu (in Githunguri)
year first funded
2006
action
Murramming Of Road
output
Murramed Road
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 1,500,000

Kigumo Health centre

location
Kiratina (in Githunguri)
year first funded
2008
action
Construction of incenerator and placenta pit
output
Functional
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Githunguri Township Primary School

location
Githunguri (in Githunguri)
year first funded
2003
action
Cdf Contribution Towards Construction Of Dormitories
output
A Dormitory
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 1,450,000

Kiawairia Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Electrical Wiring And Roof Painting
output
-
implementation status
Wiring Done
total cost
Ksh 300,000
estimate
Ksh 400,000

Riamute Primary School

location
Githunguri (in Githunguri)
year first funded
2006
action
Completion Of 3 Classrooms
output
Complete Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Akagugu Primary School

location
Githunguri (in Githunguri)
year first funded
2005
action
Purchase Of Textbooks
output
Text Books & Repaired Walls
implementation status
Complete
total cost
Ksh 270,000
estimate
Ksh 150,000

Kamondo Primary School

location
Ikinu (in Githunguri)
year first funded
2005
action
Construction Of Collapsed Pit Latrines
output
Pit Latrines
implementation status
Complete
total cost
Ksh 263,096
estimate
Ksh 250,000

Komothai Chiefs Camp

location
Komothai (in Githunguri)
year first funded
2005
action
Replace Leaking Roof & Repairs
output
Good Roof
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 350,000

Kiambururu Dispensary

location
Komothai (in Githunguri)
year first funded
2006
action
Renovation
output
A Dispensary
implementation status
Not Yet Started
total cost
Ksh 250,000
estimate
Ksh 2,000,000

Kiairia Secondary School

location
Githunguri (in Githunguri)
year first funded
2005
action
Purchase Of Computer And Equipments
output
Computer & Equipments
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 450,000

Ikinu Educentre

location
Ikinu (in Githunguri)
year first funded
2006
action
Purchase Of Textbooks & Lab Eqip.
output
Text Books & Equipments
implementation status
Complete
total cost
Ksh 232,737
estimate
Ksh 250,000

Kanyore Primary School

location
Githiga (in Githunguri)
year first funded
2004
action
Purchase Of Lockers
output
Lockers
implementation status
Complete
total cost
Ksh 232,220
estimate
Ksh 250,000

Gatitu Primary School School

location
Githiga (in Githunguri)
year first funded
2005
action
Purchase Of School Land
output
Sch Owned Land
implementation status
Purchased
total cost
Ksh 200,000
estimate
Ksh 400,000

Ngemwa Primary School

location
Ikinu (in Githunguri)
year first funded
2005
action
Construction Of Collapsed Pit Latrines
output
Pit Latrines
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 379,000

Kibichoi Thuita bridge

location
Komothai (in Githunguri)
year first funded
2009
action
Muraming of feeder roads
output
Passable roads
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Ayub Kinyua-Kanaro Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Feeder Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 193,000
estimate
Ksh 300,000

Jamaica-Gitau Mbiri Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 192,000
estimate
Ksh 300,000

Independent-Kiairia Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Feeder Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 192,000
estimate
Ksh 300,000

Magomono-Giachumi Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 186,000
estimate
Ksh 1,000,000

Chiefs Office, Githiga

location
Githiga (in Githunguri)
year first funded
2006
action
Electrical & Water Installation
output
Electricity & Water
implementation status
Ongoing
total cost
Ksh 182,737
estimate
Ksh 300,000

Kiangima-Gathigi Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Feeder Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 175,000
estimate
Ksh 300,000

Kiawairera Eduentre

location
Githunguri (in Githunguri)
year first funded
2006
action
Renovation Of Classes
output
Habitable Classrooms
implementation status
Not Yet Started
total cost
Ksh 132,737
estimate
Ksh 500,000

Gathanje-Matuguta Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 130,000
estimate
Ksh 300,000

Githunguri Disabled Self Help Group

location
Githunguri (in Githunguri)
year first funded
2005
action
Extension Of Workshop.
output
Extended Workshop
implementation status
Ongoing
total cost
Ksh 130,000
estimate
Ksh 150,000

Githima Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Completion Of Administration Block
output
Admn Block
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 165,000

Njunu Primary School

location
Komothai (in Githunguri)
year first funded
2005
action
Construction Of 2 Classrooms
output
Complete Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 200,000

Kiambururu Primary School

location
Komothai (in Githunguri)
year first funded
2005
action
Purchase Of Metal Lockers & Painting
output
Metal Lockers
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Komothai Primary School School

location
Komothai (in Githunguri)
year first funded
2005
action
Purchase Of Text Books & Comp Accessories
output
Text Books & Functioning Computers
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Gathugu Primary School

location
Komothai (in Githunguri)
year first funded
2005
action
Construction Of School Gate
output
A Gate
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 250,000

Kibichoi Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Wiring Of Classes
output
Power Connected Classes
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Gitombo Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Construction Of Pit Latrines
output
Pit Latrines
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Githioro Primary School School

location
Kiratina (in Githunguri)
year first funded
2005
action
Sinking Of Borehole & Water Pump
output
Clean Water For The School
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 250,000

Kiawaiguru Primary School School

location
Komothai (in Githunguri)
year first funded
2005
action
Purchase Of Desks & Repairs Of School Gate
output
Desks & Repaired Gate
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Kihuririo Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Gathangari Primary School

location
Githiga (in Githunguri)
year first funded
2004
action
Purchase Of Desks,Chairs & Tables
output
Desks Chairs & Tables
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Mathanja Primary School

location
Githiga (in Githunguri)
year first funded
2004
action
Purchase Of Lockers & Chairs
output
Lockers & Chairs
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 300,000

Matuguta Primary School School

location
Githiga (in Githunguri)
year first funded
2005
action
Wiring Installation
output
Complete Wiring
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 250,000

Njenga Primary School School

location
Githiga (in Githunguri)
year first funded
2005
action
Purchase Of Lockers & Chairs
output
Lockers & Chairs
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 250,000

Gatina Primary School School

location
Githiga (in Githunguri)
year first funded
2005
action
Tank & Piping From Man Made Borehole
output
Piped Water To Pupils
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 200,000

Kagema Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Purchase Of Desks,Chairs & Tables
output
Desks Chairs & Tables
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Kigaki Education Centre

location
Kiratina (in Githunguri)
year first funded
2005
action
Purchase Of Lab Equipments
output
Lab Equiments
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Kigumo Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Desks& Roof Painting
output
Desks & Painted Roof
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 120,000

Gathiruini Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Construction Of Pit Latrines
output
Pit Latrines
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 130,000

Githiga Primary School

location
Githiga (in Githunguri)
year first funded
2004
action
Purchase Of Chairs & Tables
output
Tables & Chairs
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Gataka Primary School

location
Githiga (in Githunguri)
year first funded
2004
action
Purchase Of Office Furniture & Construction Of School Gate
output
Furniture & Gate
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Nginduri Primary School

location
Kiratina (in Githunguri)
year first funded
2005
action
Renovation & Construction Of Toilets
output
Toilets
implementation status
Complete
total cost
Ksh 85,000
estimate
Ksh 100,000

Thuita Primary School School

location
Komothai (in Githunguri)
year first funded
2005
action
Construction Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 85,000
estimate
Ksh 150,000

Hope Educentre

location
Githiga (in Githunguri)
year first funded
2005
action
Purchase Of Lab Equipments
output
Equipment
implementation status
Complete
total cost
Ksh 70,389
estimate
Ksh 200,000

Nyaga Primary School

location
Ngewa (in Githunguri)
year first funded
2006
action
Roof Painting
output
Painted Roof
implementation status
Ongoing
total cost
Ksh 69,775
estimate
Ksh 87,000

Kibuga Road

location
Githunguri (in Githunguri)
year first funded
2004
action
Murraming Of Rd
output
Murramed Road
implementation status
Ongoing
total cost
Ksh 42,000
estimate
Ksh 150,000