The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursary
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Awarding Bursary To Needy Students
- output
- -
- implementation status
- more funds needed to complete
- total cost
- Ksh 22,591,208
- estimate
- Ksh 0
Githunguri Health Centre
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2003
- action
- Construction Of Maternity Wing
- output
- A Maternity Wing
- implementation status
- Not Yet Started
- total cost
- Ksh 11,618,713
- estimate
- Ksh 5,500,000
Emergency
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Funding Emergency Cases In The Constituency
- output
- -
- implementation status
- Project not completed
- total cost
- Ksh 10,222,729
- estimate
- Ksh 0
Office Expenditure
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2003
- action
- Running The Office
- output
- -
- implementation status
- Project not completed
- total cost
- Ksh 6,736,826
- estimate
- Ksh 0
Githunguri CDF
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2007
- action
- Construction of CDF office
- output
- Offices
- implementation status
- Complete
- total cost
- Ksh 5,250,000
- estimate
- Ksh 3,000,000
Mukuyu Secondary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Construction Of Dining Hall
- output
- A dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 4,250,000
- estimate
- Ksh 3,200,000
Kiaibabu Health Centre
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2003
- action
- Completion Of Initiated Health Facility
- output
- A Health Centre
- implementation status
- Ongoing
- total cost
- Ksh 3,900,130
- estimate
- Ksh 4,000,000
Githiga Secondary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2006
- action
- Completion Of Admn Block Destroyed By Fire
- output
- Admn Block
- implementation status
- Ongoing
- total cost
- Ksh 3,850,000
- estimate
- Ksh 870,000
Gikanga Kageche Secondary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Construction Of dining Hall
- output
- A dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 3,850,000
- estimate
- Ksh 4,000,000
Ikinu-Rioki Wroject
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2004
- action
- Borehole Drilling & Piping
- output
- Clean Water To Community
- implementation status
- Ongoing
- total cost
- Ksh 3,650,000
- estimate
- Ksh 4,274,000
Ikinu Ap Post
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2006
- action
- Construction Of Ap Line
- output
- Complete Ap Houses
- implementation status
- Ongoing
- total cost
- Ksh 3,600,000
- estimate
- Ksh 5,000,000
Kiambururu Water Project
- location
-
Komothai
(in Githunguri)
- year first funded
- 2004
- action
- Borehole Drilling & Piping
- output
- A Borehole
- implementation status
- Ongoing
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Komothai Polytechnic
- location
-
Komothai
(in Githunguri)
- year first funded
- 2006
- action
- Completion Of Classrooms & Ablution Block
- output
- Complete Classrooms & Block
- implementation status
- Ongoing
- total cost
- Ksh 3,500,000
- estimate
- Ksh 6,000,000
Design & Monitoring
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Monitoring The Projects
- output
- Good Implementation Of Projects
- implementation status
- Ongoing
- total cost
- Ksh 3,402,214
- estimate
- Ksh 1,230,000
Thuita Water Project
- location
-
Komothai
(in Githunguri)
- year first funded
- 2004
- action
- Borehole Drilling, Pump House Construction & Piping
- output
- A Borehole & Clean Water To The Community
- implementation status
- Ongoing
- total cost
- Ksh 3,220,000
- estimate
- Ksh 5,000,000
Gitiha Secondary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Energy Saving Jikos & Water Pumps,Pipes
- output
- Jikos Pumps & Pipes
- implementation status
- Complete
- total cost
- Ksh 3,200,000
- estimate
- Ksh 1,500,000
Gitiha Health Centre
- location
-
Githiga
(in Githunguri)
- year first funded
- 2003
- action
- Construction Of Mat Wing & Purchase Of Lab Equip.
- output
- Martenity Wing
- implementation status
- Ongoing
- total cost
- Ksh 3,052,000
- estimate
- Ksh 3,500,000
Strategic Planning & Capacity Building
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Development Of Action Plan
- output
- Effective & Efficient Strategies
- implementation status
- Ongoing
- total cost
- Ksh 3,034,380
- estimate
- Ksh 700,000
Githima Secondary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2009
- action
- Construction of Dining Hall
- output
- Completed
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 0
Githiga Police Post
- location
-
Githiga
(in Githunguri)
- year first funded
- 2008
- action
- Construction of the police post
- output
- Completed
- implementation status
- Ongoing
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Ihiga-Gatitu-Ikinu Rioki Water project
- location
-
Githiga
(in Githunguri)
- year first funded
- 2007
- action
- Project design piping and expansion
- output
- Clean & piped water
- implementation status
- Ongoing
- total cost
- Ksh 3,000,000
- estimate
- Ksh 2,000,000
Mbari Ya Igi Dispensary
- location
-
Komothai
(in Githunguri)
- year first funded
- 2006
- action
- Rehabilation Of Existing Building Into A Dispensary
- output
- A Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 3,000,000
- estimate
- Ksh 4,649,465
Githiga Locproject
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Technical Evaluation & Construction Of Intake Weir
- output
- Intake Weir
- implementation status
- Ongoing
- total cost
- Ksh 3,000,000
- estimate
- Ksh 1,500,000
Komothai Boys Secondary School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2004
- action
- Roofing & Completion Of Dining Hall
- output
- dining Hall
- implementation status
- Complete
- total cost
- Ksh 2,950,000
- estimate
- Ksh 3,330,000
Matuguta Secondary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms,Store & 3Blocks Of Pitlatrines
- output
- Complete Classrooms & Toilets
- implementation status
- Ongoing
- total cost
- Ksh 2,700,000
- estimate
- Ksh 3,500,000
Kiairia High School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2008
- action
- Construction of multi purpose hall
- output
- Completed
- implementation status
- Not started
- total cost
- Ksh 2,612,750
- estimate
- Ksh 1,612,750
Kiratina Admblock
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2004
- action
- Completion Of Chiefs Office
- output
- Chiefs Camp
- implementation status
- Ongoing
- total cost
- Ksh 2,600,000
- estimate
- Ksh 3,000,000
Kigumo Health Centre
- location
-
Komothai
(in Githunguri)
- year first funded
- 2003
- action
- Purchase Of Generator & General Renovations
- output
- A Functional Generator
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 3,000,000
Kiratina Water Project
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2004
- action
- Pump House Construction,Pvc Pipes And Tank
- output
- Piped Water To Community
- implementation status
- Ongoing
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,050,000
Jiereini
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2006
- action
- Construction Of Dormitory
- output
- A Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 2,159,002
- estimate
- Ksh 1,459,002
Githunguri Technical Secondary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Construction Of Administration Block
- output
- Admnistratuin Block
- implementation status
- Ongoing
- total cost
- Ksh 2,100,000
- estimate
- Ksh 4,000,000
Lioki-Ikinu-Gitiha Road
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2005
- action
- Upgrading Of The Feeder Rd
- output
- Murramed Road
- implementation status
- Complete
- total cost
- Ksh 2,015,260
- estimate
- Ksh 4,360,015
St Josephs Secondary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Extension Of Existing Dormitory
- output
- A Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 2,010,000
- estimate
- Ksh 2,100,000
Gichogocho Water Project
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2006
- action
- Construction Of Pump House,Intake Chamber & Pipe Work
- output
- Clean Water To Community
- implementation status
- Not Yet Started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 10,371,831
Thuita Secondary School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2009
- action
- Construction of science lab
- output
- Completed
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Lioki Secondary School
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2008
- action
- Construction of 2 classes and 1 laboratory
- output
- Completed
- implementation status
- Not started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Gathiruini Secondary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2008
- action
- Construction of dormitory
- output
- Complete
- implementation status
- Ongoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Gathanje Secondary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of Admn Block
- output
- Admn Block
- implementation status
- Ongoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 3,000,000
Karia Health Centre
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2004
- action
- Extension & Renovation Of health centerentre
- output
- A Health Centre
- implementation status
- Ongoing
- total cost
- Ksh 1,850,000
- estimate
- Ksh 2,000,000
Kiberethi Police Post
- location
-
Komothai
(in Githunguri)
- year first funded
- 2006
- action
- Construction Of Police Post
- output
- A Police Post
- implementation status
- Ongoing
- total cost
- Ksh 1,582,737
- estimate
- Ksh 2,500,000
Youth Empowerment and resource center
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2008
- action
- Construction of the centre
- output
- Not started
- implementation status
- Not started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kigumo secondary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2007
- action
- Construction od admin block
- output
- Admin block
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Gathugu Secondary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2008
- action
- Complete 2 science labs
- output
- Functional
- implementation status
- Ongoing
- total cost
- Ksh 1,484,875
- estimate
- Ksh 2,500,000
Ngeteti Dispensary
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2003
- action
- Renovation Of Existing Building
- output
- A Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,427,000
- estimate
- Ksh 2,000,000
Gathanje Police Post
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Construction Admn Block
- output
- Admn Block
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 5,698,500
Gathangari Dispensary
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Rehabilation Of Existing Building Into A Dispensary
- output
- A Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,552,000
William Ngiru
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2007
- action
- Completion of school multi purpose hall
- output
- Hall
- implementation status
- Complete
- total cost
- Ksh 1,348,959
- estimate
- Ksh 767,864
Kirigu Water Project
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2004
- action
- Sinking Of Borehole
- output
- A Functional Borehole
- implementation status
- Ongoing
- total cost
- Ksh 1,332,737
- estimate
- Ksh 1,560,000
Ngewa Health Centre
- location
-
Ngewa
(in Githunguri)
- year first funded
- 2003
- action
- Purchase Of Lab & Maternity Equipments
- output
- Working Equipments
- implementation status
- Complete
- total cost
- Ksh 1,280,012
- estimate
- Ksh 2,000,000
Kamondo Secondary School
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2008
- action
- Construction of Lab and buy equipments
- output
- Functional lab
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Ngemwa police post
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2007
- action
- Completion of the police post
- output
- A police post
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Ciiko Primary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Lockers,Printer & Completion Of Classroooms
- output
- Lockers Printers & Classrooms Ongoing
- implementation status
- Ongoing
- total cost
- Ksh 1,036,310
- estimate
- Ksh 1,000,000
Karia Water project
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2009
- action
- Pump,Storage tank
- output
- Clean h20
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lioki AP Lines
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2009
- action
- Construction of AP lines
- output
- Complete
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Githunguri Loc Water Project
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Pvc Pipes,Renovation Of Water Tanks
- output
- Provision Of Water
- implementation status
- Ongoing
- total cost
- Ksh 870,000
- estimate
- Ksh 1,500,000
Githunguri LocSchool Projects
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Electrical Installation & Wiring Of Classrooms
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 860,000
- estimate
- Ksh 2,000,000
Githun.CDF office projects
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2009
- action
- Tents,Chairs P/A generato
- output
- Purchase of equipments
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kahunira Secondary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- Completed
- implementation status
- not known
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Minja Nyakabugi
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2009
- action
- Intake pipes and water pump
- output
- Clean h20
- implementation status
- ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Gathanje Secondary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- Completed
- implementation status
- ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kagwana-Maicomo Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Not Yet Started
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kigumo Water
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2007
- action
- Borehole cleanking tank repair and piping
- output
- Clean & piped water
- implementation status
- Ongoing
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Gathiruini Secondary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2006
- action
- Renovation
- output
- Complete Classrooms
- implementation status
- Not Yet Started
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Kagwanja Road
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Upgrading Of The Road
- output
- Upgraded Road
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
Dallas Road
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Upgrading Of The Road
- output
- Upgraded Road
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Magomano-Kiaria River Culvert Crossing
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Feeder Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 644,000
- estimate
- Ksh 250,000
Githunguri Youth Athletics & sports
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2008
- action
- Athletics
- output
- Strong & competitive teams
- implementation status
- Ongoing
- total cost
- Ksh 638,000
- estimate
- Ksh 638,000
Ihiga Primary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Construction Of Classrooms & Pitlatrines
- output
- Classrooms & Pit Latrines
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Ngemwa Gatitu Rd
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kigumo Polytechnic
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2006
- action
- Purchase Of Computer,Renovation Of Classrooms & Construction Of School Gate
- output
- Functioning Computer Good Classrooms & School Gate
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 3,000,000
Kindiga Primary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Ngochi-Kahunira Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 592,000
- estimate
- Ksh 350,000
Waingere Water project
- location
-
Githiga
(in Githunguri)
- year first funded
- 2009
- action
- Pipe network
- output
- Clean h20
- implementation status
- complete
- total cost
- Ksh 535,000
- estimate
- Ksh 0
Nyakiri kwa Ngugi Queen
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mbari Ya Igi Kiratina Road
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Upgrading Of The Road
- output
- Upgraded Road
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 750,000
Komothai Girls Secondary School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Textbooks & Computer
- output
- Text Books & Computers
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Gathugu Secondary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Lab Equip.
- output
- School Laboratory
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Karia-Maigotho Road
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2006
- action
- Murramming Of Road
- output
- Murramed Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Gitombo Kirigu
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mibauini-Magoto Road
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2006
- action
- Murramming Of Road
- output
- Murramed Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Gathanje-Ikuria Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 460,000
- estimate
- Ksh 1,200,000
Kiberethi Kwa Mari rd
- location
-
Komothai
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Thuthuriki Kiairaya
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ihiga Kamiti Rd
- location
-
Githiga
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kahunira-Ngeteti Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Not Yet Started
- total cost
- Ksh 400,000
- estimate
- Ksh 650,000
Kiaibabu Sublocs
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2006
- action
- Murramming Of Road
- output
- Murramed Road
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 1,500,000
Kigumo Health centre
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2008
- action
- Construction of incenerator and placenta pit
- output
- Functional
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Githunguri Township Primary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2003
- action
- Cdf Contribution Towards Construction Of Dormitories
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 1,450,000
Kiawairia Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Electrical Wiring And Roof Painting
- output
- -
- implementation status
- Wiring Done
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Riamute Primary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Completion Of 3 Classrooms
- output
- Complete Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Akagugu Primary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Textbooks
- output
- Text Books & Repaired Walls
- implementation status
- Complete
- total cost
- Ksh 270,000
- estimate
- Ksh 150,000
Kamondo Primary School
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of Collapsed Pit Latrines
- output
- Pit Latrines
- implementation status
- Complete
- total cost
- Ksh 263,096
- estimate
- Ksh 250,000
Komothai Chiefs Camp
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Replace Leaking Roof & Repairs
- output
- Good Roof
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Kiambururu Dispensary
- location
-
Komothai
(in Githunguri)
- year first funded
- 2006
- action
- Renovation
- output
- A Dispensary
- implementation status
- Not Yet Started
- total cost
- Ksh 250,000
- estimate
- Ksh 2,000,000
Kiairia Secondary School
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Computer And Equipments
- output
- Computer & Equipments
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 450,000
Ikinu Educentre
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2006
- action
- Purchase Of Textbooks & Lab Eqip.
- output
- Text Books & Equipments
- implementation status
- Complete
- total cost
- Ksh 232,737
- estimate
- Ksh 250,000
Kanyore Primary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Lockers
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 232,220
- estimate
- Ksh 250,000
Gatitu Primary School School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of School Land
- output
- Sch Owned Land
- implementation status
- Purchased
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Ngemwa Primary School
- location
-
Ikinu
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of Collapsed Pit Latrines
- output
- Pit Latrines
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 379,000
Kibichoi Thuita bridge
- location
-
Komothai
(in Githunguri)
- year first funded
- 2009
- action
- Muraming of feeder roads
- output
- Passable roads
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ayub Kinyua-Kanaro Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Feeder Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 193,000
- estimate
- Ksh 300,000
Jamaica-Gitau Mbiri Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 192,000
- estimate
- Ksh 300,000
Independent-Kiairia Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Feeder Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 192,000
- estimate
- Ksh 300,000
Magomono-Giachumi Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 186,000
- estimate
- Ksh 1,000,000
Chiefs Office, Githiga
- location
-
Githiga
(in Githunguri)
- year first funded
- 2006
- action
- Electrical & Water Installation
- output
- Electricity & Water
- implementation status
- Ongoing
- total cost
- Ksh 182,737
- estimate
- Ksh 300,000
Kiangima-Gathigi Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Feeder Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 175,000
- estimate
- Ksh 300,000
Kiawairera Eduentre
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2006
- action
- Renovation Of Classes
- output
- Habitable Classrooms
- implementation status
- Not Yet Started
- total cost
- Ksh 132,737
- estimate
- Ksh 500,000
Gathanje-Matuguta Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 130,000
- estimate
- Ksh 300,000
Githunguri Disabled Self Help Group
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2005
- action
- Extension Of Workshop.
- output
- Extended Workshop
- implementation status
- Ongoing
- total cost
- Ksh 130,000
- estimate
- Ksh 150,000
Githima Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Completion Of Administration Block
- output
- Admn Block
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 165,000
Njunu Primary School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kiambururu Primary School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Metal Lockers & Painting
- output
- Metal Lockers
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Komothai Primary School School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Text Books & Comp Accessories
- output
- Text Books & Functioning Computers
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Gathugu Primary School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of School Gate
- output
- A Gate
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Kibichoi Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Wiring Of Classes
- output
- Power Connected Classes
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Gitombo Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of Pit Latrines
- output
- Pit Latrines
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Githioro Primary School School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Sinking Of Borehole & Water Pump
- output
- Clean Water For The School
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Kiawaiguru Primary School School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Desks & Repairs Of School Gate
- output
- Desks & Repaired Gate
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kihuririo Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Gathangari Primary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Desks,Chairs & Tables
- output
- Desks Chairs & Tables
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Mathanja Primary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Lockers & Chairs
- output
- Lockers & Chairs
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Matuguta Primary School School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Wiring Installation
- output
- Complete Wiring
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Njenga Primary School School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Lockers & Chairs
- output
- Lockers & Chairs
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Gatina Primary School School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Tank & Piping From Man Made Borehole
- output
- Piped Water To Pupils
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kagema Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Desks,Chairs & Tables
- output
- Desks Chairs & Tables
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Kigaki Education Centre
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Lab Equipments
- output
- Lab Equiments
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Kigumo Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Desks& Roof Painting
- output
- Desks & Painted Roof
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 120,000
Gathiruini Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of Pit Latrines
- output
- Pit Latrines
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 130,000
Githiga Primary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Chairs & Tables
- output
- Tables & Chairs
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Gataka Primary School
- location
-
Githiga
(in Githunguri)
- year first funded
- 2004
- action
- Purchase Of Office Furniture & Construction Of School Gate
- output
- Furniture & Gate
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Nginduri Primary School
- location
-
Kiratina
(in Githunguri)
- year first funded
- 2005
- action
- Renovation & Construction Of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 85,000
- estimate
- Ksh 100,000
Thuita Primary School School
- location
-
Komothai
(in Githunguri)
- year first funded
- 2005
- action
- Construction Of Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 85,000
- estimate
- Ksh 150,000
Hope Educentre
- location
-
Githiga
(in Githunguri)
- year first funded
- 2005
- action
- Purchase Of Lab Equipments
- output
- Equipment
- implementation status
- Complete
- total cost
- Ksh 70,389
- estimate
- Ksh 200,000
Nyaga Primary School
- location
-
Ngewa
(in Githunguri)
- year first funded
- 2006
- action
- Roof Painting
- output
- Painted Roof
- implementation status
- Ongoing
- total cost
- Ksh 69,775
- estimate
- Ksh 87,000
Kibuga Road
- location
-
Githunguri
(in Githunguri)
- year first funded
- 2004
- action
- Murraming Of Rd
- output
- Murramed Road
- implementation status
- Ongoing
- total cost
- Ksh 42,000
- estimate
- Ksh 150,000