The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Gwassi

Sindo,Ngeri,Keri,Kiriwo,Nyandiwa,Seremba,Laknyiero,Magunga,Wiga,Oland/Nyndenda

location
Kaksingri Central (in Gwassi)
year first funded
2007
action
n/a
output
-
implementation status
More funds needed
total cost
Ksh 9,215,050
estimate
Ksh 0

Obanga Health Centre

location
Gwassi North (in Gwassi)
year first funded
2003
action
Construction Of Wards And Staff Houses
output
Ward, Staff Hses & Treatment Block
implementation status
On Going
total cost
Ksh 4,057,500
estimate
Ksh 3,157,500

Seka Health Centre

location
Gwassi South (in Gwassi)
year first funded
2003
action
Construction Of Wards And Staff Houses
output
Ward, Staff Hses & Treatment Block
implementation status
In Use
total cost
Ksh 4,057,500
estimate
Ksh 3,157,500

Nyatoto Secondary School

location
Ruma (in Gwassi)
year first funded
2003
action
Roofing,Plastering, Fittings
output
Staff Houses & Admin Block,Laboratory
implementation status
On Going
total cost
Ksh 4,057,500
estimate
Ksh 2,307,500

God Bura Health Centre

location
Gwassi Central (in Gwassi)
year first funded
2003
action
Construction Of Wards And Staff Houses
output
Ward, Staff Hses & Treatment Block
implementation status
In Use
total cost
Ksh 3,957,500
estimate
Ksh 3,057,500

Kigoto Secondary School

location
Gwassi East (in Gwassi)
year first funded
2003
action
Construction Of Laboratory
output
Laboratory
implementation status
Ongoing
total cost
Ksh 3,926,000
estimate
Ksh 2,626,000

Nyamrisra Health Centre

location
Kaksingri West (in Gwassi)
year first funded
2003
action
Construction Of Wards And Staff Houses
output
Ward, Staff Hses & Treatment Block
implementation status
In Use
total cost
Ksh 3,886,000
estimate
Ksh 2,986,500

Obanga Secondary School

location
Gwassi North (in Gwassi)
year first funded
2003
action
Construction Of Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 3,826,000
estimate
Ksh 2,626,000

Nyandiwa Secondary School

location
Gwassi West (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses Admin.Block & Clssrooms
output
Staff Houses & Admin Block
implementation status
Ongoing
total cost
Ksh 3,526,000
estimate
Ksh 2,226,000

God Oloo Secondary School

location
Gwassi South (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses Admin.Block & Clssrooms, Construction Of Laboratory
output
Admin Block And Classroom
implementation status
Ongoing
total cost
Ksh 3,506,000
estimate
Ksh 2,406,000

Magunga Secondary School

location
Gwassi Central (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses,Admin Block & Classroom
output
Staff Houses & Admin Block
implementation status
On Going
total cost
Ksh 3,212,000
estimate
Ksh 2,594,000

Gingo Secondary School

location
Kaksingri Central (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses Admin.Block & Clssrooms
output
Staff Houses & Admin Block
implementation status
Ongoing
total cost
Ksh 3,057,500
estimate
Ksh 2,257,500

Kisegi Secondary School

location
Gwassi North (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses Admin.Block & Clssrooms
output
Staff Houses & Admin Block
implementation status
Ongoing
total cost
Ksh 3,057,500
estimate
Ksh 2,257,500

Onywera Secondary School

location
Kaksingri East (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses Admin.Block & Clssrooms
output
Staff Houses & Admin Block
implementation status
Ongoing
total cost
Ksh 3,057,500
estimate
Ksh 2,257,500

Nyadenda Secondary School

location
Kaksingri East (in Gwassi)
year first funded
2004
action
Roofing,Plastering, Fittings, Putting Slab.
output
Staff Houses & Admin Block
implementation status
Ongoing
total cost
Ksh 2,990,000
estimate
Ksh 2,165,000

Kiembe Health Centre

location
Gwassi West (in Gwassi)
year first funded
2005
action
Construction Of Wards And Staff Houses
output
Ward, Staff Hses & Treatment Block
implementation status
On Going
total cost
Ksh 2,905,000
estimate
Ksh 1,905,000

Msare Secondary School

location
Kaksingri West (in Gwassi)
year first funded
2004
action
Putting Up Staff Houses Admin.Block & Clssrooms
output
Staff Houses & Admin Block
implementation status
Ongoing
total cost
Ksh 2,815,000
estimate
Ksh 2,015,000

Nyagwethe Secondary School

location
Gwassi North (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses Admin.Block & Clssrooms
output
Staff Houses & Admin Block
implementation status
Complete
total cost
Ksh 2,706,500
estimate
Ksh 2,106,000

Gendo Dam

location
Gwassi South (in Gwassi)
year first funded
2009
action
Construction Of A Dam
output
Dam
implementation status
On Going
total cost
Ksh 2,600,000
estimate
Ksh 0

Pundo Dam

location
Gwassi Central (in Gwassi)
year first funded
2009
action
Construction Of A Dam
output
Dam
implementation status
On Going
total cost
Ksh 2,200,000
estimate
Ksh 0

Osiri Commhole

location
Gwassi North (in Gwassi)
year first funded
2009
action
Construction Of Bore Hole
output
Bore Hole
implementation status
More funds needed
total cost
Ksh 2,200,000
estimate
Ksh 0

St Gabriel Girls Secondary School

location
Gwassi West (in Gwassi)
year first funded
2003
action
Putting Up Staff Houses,Admin Block & Classroom
output
Staff Houses & Admin Block
implementation status
On Going
total cost
Ksh 2,079,000
estimate
Ksh 1,679,000

Wiga Secondary School

location
Gwassi East (in Gwassi)
year first funded
2005
action
Putting Up Staff Houses,Admin Block & Classroom,Laboratory Construction
output
Staff Houses & Admin Block,Laboratory
implementation status
On Going
total cost
Ksh 1,900,000
estimate
Ksh 700,000

Sokoni Dam

location
Gwassi South (in Gwassi)
year first funded
2008
action
Construction Of A Dam
output
Dam
implementation status
Complete
total cost
Ksh 1,750,000
estimate
Ksh 1,750,000

Kaliengo Dam

location
Gwassi South (in Gwassi)
year first funded
2008
action
Construction Of A Dam
output
Dam
implementation status
Re Allocation
total cost
Ksh 1,750,000
estimate
Ksh 1,750,000

Nyatambe Secondary School

location
Gwassi South (in Gwassi)
year first funded
2005
action
Construction Of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 700,000

Moi Girls Sindo

location
Kaksingri West (in Gwassi)
year first funded
2003
action
Elecricity Wiring
output
Electricity
implementation status
already in use
total cost
Ksh 1,658,000
estimate
Ksh 1,358,000

Ooma---Kithereka Road Opening

location
Gwassi Central (in Gwassi)
year first funded
2008
action
Opening Of The Road
output
Road
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Kasinga Primary School

location
Kaksingri East (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 1,000,000

Ramula Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 1,000,000

Kogoma--Ramula--Kibura

location
Gwassi West (in Gwassi)
year first funded
2008
action
Opening Of The Road
output
Road
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Nys----Nyalkendo Road Opening

location
Ruma Kaksingri East (in Gwassi)
year first funded
2008
action
Opening Of The Road
output
Road
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Kigwa ---Kumbatha Road Opening

location
Gwassi East (in Gwassi)
year first funded
2008
action
Opening Of The Road
output
Road
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Nyadenda ----Kasinga Road Opening

location
Ruma (in Gwassi)
year first funded
2008
action
Opening Of The Road
output
Road
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Suba District Hospital Newest Wards

location
Kaksingri Central (in Gwassi)
year first funded
2003
action
Construction Of Newest Wards
output
Newest Wards
implementation status
Complete
total cost
Ksh 1,567,500
estimate
Ksh 1,192,500

Nyagot Adundo Dam

location
Gwassi South (in Gwassi)
year first funded
2008
action
Construction Of A Dam
output
Dam
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Resource Centre

location
Ruma (in Gwassi)
year first funded
2008
action
Construction Of Resource Centre
output
Resource Centre
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Bishop Mugendi Sec

location
Kaksingri West (in Gwassi)
year first funded
2003
action
Fence
output
Fence
implementation status
Complete
total cost
Ksh 1,484,000
estimate
Ksh 1,084,000

Magunga Health Centre Renovation And Water Tank

location
Gwassi Central (in Gwassi)
year first funded
2003
action
Renovation Of H.Centre & Water Tank
output
H.Cemtre & Water Tank
implementation status
Complete
total cost
Ksh 1,456,050
estimate
Ksh 1,106,050

Matunga Primary School

location
Ruma (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 600,000

Malongo Dispensary

location
Gwassi North (in Gwassi)
year first funded
2008
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 800,000

Nyalkembo Dispensary

location
Gwassi East (in Gwassi)
year first funded
2008
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 800,000

God Bura Secondary School

location
Gwassi Central (in Gwassi)
year first funded
2004
action
Construction Of Dining Hall
output
Dining Hall
implementation status
On Going
total cost
Ksh 1,290,000
estimate
Ksh 890,000

Kitawa Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Yongo Primary School

location
Ruma (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 800,000

Nyatoto Health Centre

location
Ruma (in Gwassi)
year first funded
2006
action
Construction Of Wards And Staff Houses
output
Ward, Staff Hses & Treatment Block
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Kirambo Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction Of 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Nyawacha Primary School

location
Gwassi East (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Mumisa Primary School

location
Gwassi Central (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Ligongo Primary School

location
Gwassi South (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Tonga Boys Secondary School

location
Gwassi West (in Gwassi)
year first funded
2003
action
Construction Of Laboratory
output
Laboratory
implementation status
New
total cost
Ksh 984,000
estimate
Ksh 584,000

Kichare Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction 1 Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 500,000

Nyadenda H Centr Renovation And Roof Catchment Water Tank

location
Kaksingri East (in Gwassi)
year first funded
2004
action
Renovation Of H.Centre & Water Tank
output
H.Cemtre & Water Tank
implementation status
Complete
total cost
Ksh 825,000
estimate
Ksh 475,000

Kibura Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Mukende Dispensary

location
Gwassi East (in Gwassi)
year first funded
2008
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Kigwa Dispensary Newest Water Supply System

location
Gwassi East (in Gwassi)
year first funded
2004
action
Fencing Water Supply
output
Fence And Water
implementation status
Complete
total cost
Ksh 625,000
estimate
Ksh 375,000

Kisiambi Primary School

location
Kaksingri West (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Kijebi Dispensary

location
Gwassi West (in Gwassi)
year first funded
2008
action
n/a
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyakiya Primary School

location
Ruma Ward (in Gwassi)
year first funded
2009
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kisaku Primary School

location
Kaksingri East (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiwa Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyasoti Primary School

location
Gwassi Central (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kithereka Primary School

location
Gwassi Central (in Gwassi)
year first funded
2009
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kimange Primary School

location
Gwassi West (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyamadede Dispensary

location
Gwassi East (in Gwassi)
year first funded
2009
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Mukuyu Dispensary

location
Gwassi South (in Gwassi)
year first funded
2009
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kisaku Dips Solar Power Supply And Water Tank

location
Gwassi North (in Gwassi)
year first funded
2004
action
Installing Solar Power Supply &Water Tank
output
Solar Power & Water Tank
implementation status
Complete
total cost
Ksh 475,000
estimate
Ksh 375,000

Manyala Primary School

location
Kaksingri East (in Gwassi)
year first funded
2008
action
Construction Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Miria Primary School

location
Gwassi East (in Gwassi)
year first funded
2009
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 0

Lwanda Health Centre Renatchment Water Tank

location
Gwassi South (in Gwassi)
year first funded
2004
action
Renovation Of H.Centre & Water Tank
output
H.Cemtre & Water Tank
implementation status
Complete
total cost
Ksh 375,000
estimate
Ksh 379,000

Nyandiwa Dispensary Renovation

location
Gwassi West (in Gwassi)
year first funded
2004
action
Renovation of The Dispens & Water Tank
output
-
implementation status
Complete
total cost
Ksh 345,000
estimate
Ksh 345,000

Kitawa Dips Renovation And Water Tank

location
Gwassi North (in Gwassi)
year first funded
2004
action
Renovation of The Dispens & Water Tank
output
Dispensary And Water Tank
implementation status
On Going
total cost
Ksh 345,000
estimate
Ksh 245,000

Osiri Primary School

location
Gwassi North (in Gwassi)
year first funded
2009
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Mwirendia Primary School

location
Kaksingri West (in Gwassi)
year first funded
2009
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Ngeri Primary School

location
Kaksingri West (in Gwassi)
year first funded
2009
action
Construction 1 Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Kiwa Dispensary Newest Water Supply System

location
Gwassi West (in Gwassi)
year first funded
2004
action
Putting Up Anewest Water Supply
output
Water
implementation status
New
total cost
Ksh 285,000
estimate
Ksh 235,000

Sindo Ploy Renovation

location
Kaksingri Central (in Gwassi)
year first funded
2007
action
n/a
output
-
implementation status
renovation is complete
total cost
Ksh 252,540
estimate
Ksh 0

Rukongo Ploy Renovation

location
Kaksingri East (in Gwassi)
year first funded
2007
action
n/a
output
-
implementation status
already in use
total cost
Ksh 184,060
estimate
Ksh 0

Italian/Kenya Scouts

location
Gwassi West (in Gwassi)
year first funded
2007
action
Extension Work And Baseline Survey Report
output
-
implementation status
Stalled
total cost
Ksh 162,785
estimate
Ksh 0

Sindo Women Resource Centre Renovation

location
Kaksingri West (in Gwassi)
year first funded
2007
action
n/a
output
-
implementation status
More funds needed
total cost
Ksh 152,740
estimate
Ksh 0

Nyagwethe Poly Extension

location
Gwassi North (in Gwassi)
year first funded
2007
action
n/a
output
-
implementation status
More funds needed
total cost
Ksh 132,740
estimate
Ksh 0

Nyandiwa Polytechnic Renovation

location
Gwassi West (in Gwassi)
year first funded
2007
action
Extension Work And Baseline Survey Report
output
-
implementation status
On Going
total cost
Ksh 115,375
estimate
Ksh 0

Kisegi Sub District Hosp Reticulation Improvement

location
Gwassi North (in Gwassi)
year first funded
2005
action
Reticulation Improvement
output
Water
implementation status
Complete
total cost
Ksh 114,000
estimate
Ksh 114,000

Tonga Mission Health Centre

location
Gwassi North (in Gwassi)
year first funded
2006
action
n/a
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Kigwa Medical Camp,Uterere Primary School

location
Gwassi East (in Gwassi)
action
n/a
output
-
implementation status
On Going
total cost
Ksh 0
estimate
Ksh 131,550