The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
    It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    
    
        
            
            Givogi Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1Dorm. & Elect. Instal.
- output
- Complete Dorm/Elect.
- implementation status
- Complete & In Use
- total cost
- Ksh 2,900,000
- estimate
- Ksh 3,300,000
 
    
        
            
            Givogi Bweywe Brid
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 24,000,000
 
    
        
            
            Jiviriri Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Admin. Block
- output
- Completed Adm./Block
- implementation status
- Incomplete
- total cost
- Ksh 2,050,000
- estimate
- Ksh 700,000
 
    
        
            
            Givole Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Instal Electricity
- output
- Complete Installation
- implementation status
- Complete & In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,400,000
 
    
        
            
            Kaptisi Kuywa Bridg
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 19,000,000
 
    
        
            
            Kaptieni Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovation 8 Classrooms & Elect. Instal.
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Erusui Secondary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Complete Library
- output
- Complete Library
- implementation status
- Incomplete But In Use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Museywa Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction Lab. & Elect. Instal
- output
- Completed Lab.Electr.
- implementation status
- Complete & In Use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Museywa Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction 1 Admin & Elctr.
- output
- Complete Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,551,000
- estimate
- Ksh 650,000
 
    
        
            
            Musunji Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Class &Electr.
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,800,000
 
    
        
            
            Imusutsu Secondary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Instal Electricity
- output
- Electricity Installation
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,358
- estimate
- Ksh 2,000,000
 
    
        
            
            Tea Nursery
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Planting Seedlings/Maintenance
- output
- Soil Conservation
- implementation status
- Incomplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
 
    
        
            
            DR. Dangana Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 dining Hall/Bus
- output
- Complete Dining Hall/Bus
- implementation status
- Incomplete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 4,000,000
 
    
        
            
            George Khaniri Secondary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Cosntruct 4 Classrooms
- output
- Completed Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,800,000
 
    
        
            
            Kaptis Dispensary
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,700,000
 
    
        
            
            Kisasi Dispensary
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,400,000
 
    
        
            
            Kapsotik Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 dining Hall
- output
- Complete Dining Halll
- implementation status
- Stalled
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
 
    
        
            
            Jeptulu Police Post
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 6 Rooms
- output
- Complete Construction
- implementation status
- Complete
- total cost
- Ksh 1,130,000
- estimate
- Ksh 1,130,000
 
    
        
            
            Gimengwa Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1dining Hall
- output
- Complete dining Hall
- implementation status
- Incomplete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Shiru Health Centre
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of Maternity Wing (1)
- output
- Complete M/Wing
- implementation status
- Incomplete But In Use
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,400,000
 
    
        
            
            Jirwani Dispensary
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Mungavo Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 4 Classrooms
- output
- Complete Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,150,000
 
    
        
            
            Kapsotik Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Renovate 8 Classrooms/Elect.
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Jepkoyai Health Centre
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 4 Rooms
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 974,858
- estimate
- Ksh 994,858
 
    
        
            
            Kaimosi Special School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Purchase Beds & Elect. Instal.
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 961,347
- estimate
- Ksh 1,150,000
 
    
        
            
            Kabinjari Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovation 8 Classrooms & Elect. Instal.
- output
- Complete Adm/Block
- implementation status
- Incomplete
- total cost
- Ksh 950,000
- estimate
- Ksh 1,050,000
 
    
        
            
            Chebunaywa Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 6 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete & In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 1,300,000
 
    
        
            
            Likindu Health Centre
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Staff Quarters & M/Wing
- output
- Completem/Wing
- implementation status
- Complete & In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Ivola Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction 2 Classrooms And Lab
- output
- Completed Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 900,000
 
    
        
            
            Jemochoji Dispensary
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,400,000
 
    
        
            
            Erusui Girls Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Library
- output
- Complete Library
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Jepkoyai Acamp
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of Staff Houses
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 880,000
- estimate
- Ksh 950,000
 
    
        
            
            Goibei Girls' Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Acquire Beds/Electr.
- implementation status
- Incomplete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Saosi Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 8 Classrooms
- output
- Complete Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 650,000
 
    
        
            
            KapchemgungsecSchool
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 1,100,000
 
    
        
            
            Kimogoi Dispensary
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,400,000
 
    
        
            
            Banja Health Centre
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of M/Wing 1 & Elect.
- output
- Complete M/Wing/Elec.
- implementation status
- Incomplete But In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 950,000
 
    
        
            
            Cheptech Secondary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Adm. Block & Ren. Classrooms
- output
- Complete Construction
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Ishiru Secondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Complete Laboratory
- implementation status
- Incomplete But In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 1,500,000
 
    
        
            
            Shamalago Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Reno 8 Classrooms & Elect.
- output
- Flooring & Plastering
- implementation status
- Incomplete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Kaptis Primary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- Completed Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
 
    
        
            
            Shamakhokho Secondary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of Two Classrooms
- output
- Completed Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Jeptorori Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 3 Classrooms
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 752,381
- estimate
- Ksh 2,000,000
 
    
        
            
            Mwembe/Gimariani Bridge
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Bridge
- output
- Complete Construction
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
 
    
        
            
            Shamakhokho Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovation 8 Classrooms/Elect. Inst.
- output
- Flooring/Plast./Electri.
- implementation status
- Incomplete
- total cost
- Ksh 750,000
- estimate
- Ksh 800,000
 
    
        
            
            Gimariani Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 750,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Givudemesi Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction 3 Classes & Reno
- output
- Complete Classrooms
- implementation status
- Incomplete & In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
 
    
        
            
            Gisambai Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Library
- output
- Complete Library
- implementation status
- Complete & In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Kapchemwani Clinic
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of & Perchase Of Equip.
- output
- Complete Construction
- implementation status
- Incomplete But In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Banja Acamp
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction 4 Rooms And Buy Land
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 730,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Shamakhokho Aline
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Contr. Staff Houses
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 730,000
- estimate
- Ksh 750,000
 
    
        
            
            Makuchi Secondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
 
    
        
            
            Bumira Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 7 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
 
    
        
            
            Mahanga Primary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction 2 Clasr & Ren.
- output
- Complete Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Bumuyange Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 7 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 650,000
 
    
        
            
            MusudzuPrimary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovation 8 Classrooms & Elect. Instal
- output
- Flooring, Plast. & Elect.
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Kamosi Girls Secondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Dormitory
- output
- Complete Dorrmitory
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Simbi Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Ren. & Con. Hall
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 450,000
 
    
        
            
            Boyani Bridge
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Bridge
- output
- Complete Construction
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Lwombei Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Complete Construction
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Simbi Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
 
    
        
            
            Givole Dispensary
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Kaimosi Boys Secondary School l
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Dormitory
- output
- Complete Dorrmitory
- implementation status
- Incomplete
- total cost
- Ksh 672,079
- estimate
- Ksh 972,079
 
    
        
            
            Erusui Boys Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Completed Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 650,000
- estimate
- Ksh 800,000
 
    
        
            
            Gamalenga Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Library
- output
- Complete Library
- implementation status
- Complete & In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Gamalenga Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Costruct 1 Laboratory
- output
- Complete Construction
- implementation status
- Incomplete & In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Friends Unv Kaimosi
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Construction of Hostel
- output
- Hostel
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 8,000,000
 
    
        
            
            Gavudunyi Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Ren. Classrooms & Con Lab
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 950,000
 
    
        
            
            Mungavo Tea Banda
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Tea Banda
- implementation status
- Complete & In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Shipala Secondary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete But In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Kapsogoro Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
 
    
        
            
            Hamisi Health Centre
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 M/Wing
- output
- Complete Wards
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 5,600,000
 
    
        
            
            Kaimosi DemSecondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
 
    
        
            
            Jidereri Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
 
    
        
            
            Kipsigori Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 6 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Gisambai A Camp
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 4 Rooms
- output
- Complete Construction
- implementation status
- Incomplete & In Use
- total cost
- Ksh 557,000
- estimate
- Ksh 600,000
 
    
        
            
            Khong'Onde Bridge
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2009
- action
- Construction Foot Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 555,225
- estimate
- Ksh 0
 
    
        
            
            Shamakhokho Dispensary
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
 
    
        
            
            Chepsaga Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
 
    
        
            
            Muhaya Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Buyangu Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 6 Classrooms
- output
- Complete Renovation
- implementation status
- Complete & In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
 
    
        
            
            Kisasi Primary 
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of two Classrooms
- output
- Completed Classrooms
- implementation status
- Incomplete but in use
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
 
    
        
            
            Senende Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
 
    
        
            
            Tigoi Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 6 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete & In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 800,000
 
    
        
            
            Serem Health Centre
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Constructe 1 M/Wing
- output
- Complte M/Wing
- implementation status
- Stalled
- total cost
- Ksh 550,000
- estimate
- Ksh 0
 
    
        
            
            Kaptech Dispensary
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Dispensary
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
 
    
        
            
            Siekuti Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
 
    
        
            
            Kapkoi Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
 
    
        
            
            Hamisi Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
 
    
        
            
            Musiri Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 750,000
 
    
        
            
            Jebrongo Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 850,000
 
    
        
            
            Saride Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
 
    
        
            
            Lwombei Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovat 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
 
    
        
            
            Kaptik Secondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Instal Electricity
- output
- Electricity Installation
- implementation status
- Complete & In Use
- total cost
- Ksh 510,000
- estimate
- Ksh 480,000
 
    
        
            
            Muhudu Secondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 4 Classrooms
- output
- Complete Dining Halll
- implementation status
- Incomplete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Butiti Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 7 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 650,000
 
    
        
            
            Kitagwa Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovation 4 Classrooms/Re-Roofing
- output
- Floor, Plast./Re-Roofing 
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 650,000
 
    
        
            
            Gamoi Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Nyang'Ori Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Virembe Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
 
    
        
            
            Musasa Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Galona Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 6 Classrooms
- output
- Complete Classroooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
 
    
        
            
            Mutiva Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Classroom
- output
- Complete Construction
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Gimengwa Bridge
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Repair Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Jebrok/ Kimagwa Br
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2009
- action
- Construction Foot Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            MusudzuPrimary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 12 Classrooms
- output
- Complete  Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
 
    
        
            
            Jepkoyai Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 800,000
 
    
        
            
            Bulukhombe Primary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Renovate 7 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
 
    
        
            
            Shikomoli Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Renovate 6 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 550,000
 
    
        
            
            Malinda Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete But In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
 
    
        
            
            Senende Secondary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 1 Laboratory
- output
- Complete Laboratory
- implementation status
- Incomplete & In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 900,000
 
    
        
            
            Boyani Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 7 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 550,000
 
    
        
            
            Kapsaoi Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 7 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 550,000
 
    
        
            
            Gamuguywa Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 750,000
 
    
        
            
            Bumuyange Dispensary
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Stalled
- total cost
- Ksh 450,000
- estimate
- Ksh 250,000
 
    
        
            
            Zululu Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Admin. Block
- output
- Complete Adm/Block
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
 
    
        
            
            Munzatsi Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 950,000
 
    
        
            
            Shiru Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 420,000
- estimate
- Ksh 720,000
 
    
        
            
            Givavei School For Deaf
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Complete Classroomsl
- implementation status
- Incomplete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
 
    
        
            
            Irukose Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Classroom
- output
- Complete Classroooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 650,000
 
    
        
            
            Kakubudu Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 550,000
 
    
        
            
            Kimarani Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 6 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
 
    
        
            
            Mudindi Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 6 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
 
    
        
            
            Gimaswaji Tea Banda
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
 
    
        
            
            Kaimosi DemPrimary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kaimosi Friends Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Dormitory
- output
- Complete Dormitory
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
 
    
        
            
            Friends College Kaimosi
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Complete F& B Classroom
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Itiengere Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
 
    
        
            
            Jimarani Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Gimengwa Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
 
    
        
            
            Mutiva Dispensary
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Kimugoitraditiona Forest
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Fencing & Planting
- output
- Protect The Forest
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Muyere Primary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Complete Construction
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Tigoi Girls Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of Ablusion Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
 
    
        
            
            Kaptech Secondary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Purchase Land
- output
- Expand Compound
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
 
    
        
            
            Mudindi Bridge
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2009
- action
- Construction Foot Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kaptenje/Kisingoi Road
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2009
- action
- Road Approaches
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Tigoi Health Centre
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of A Kitchen (1)
- output
- Complete Kitchen
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
 
    
        
            
            GimomoiPrimary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Adm. Block
- output
- Complete Adm/Block
- implementation status
- Incomplete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
 
    
        
            
            Madeya Tea Banda
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 550,000
 
    
        
            
            Jepkoyai Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Construction of Adm. Block (1)
- output
- Completed Adm./Block
- implementation status
- Incomplete But In Use
- total cost
- Ksh 370,000
- estimate
- Ksh 370,000
 
    
        
            
            Kaptech Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Bumbo Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Shivembe Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 550,000
 
    
        
            
            Gidagadi Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
 
    
        
            
            Madeya Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovat 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Shaviringa Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
 
    
        
            
            Kaptis Special School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Jamulongoji Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Goibei Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Gimariani Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
 
    
        
            
            Nyang'Ori Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
 
    
        
            
            Jeblabuk Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 650,000
 
    
        
            
            Gamalenga Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 8 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
 
    
        
            
            Kamuluguywa Tea Banda
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Rehabilte 1 Tea Banda
- output
- Complete Rehabilitation
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
 
    
        
            
            Goibei Tea Banda
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 1 Tea Banda
- output
- Complete Tea Banda
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 600,000
 
    
        
            
            Boyani Culverts Bridge
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Bridge
- output
- Complete Rehablitation
- implementation status
- Complete
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
 
    
        
            
            Makutano Tea Banda
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete & In Use
- total cost
- Ksh 320,000
- estimate
- Ksh 420,000
 
    
        
            
            Shaviringa A Camp
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Chief'S Office
- output
- Complete Construction
- implementation status
- Incomplete & In Use
- total cost
- Ksh 310,000
- estimate
- Ksh 400,000
 
    
        
            
            Gidimo Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
 
    
        
            
            Isikhi Primary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2003
- action
- Renovate 5 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
 
    
        
            
            Mwembe Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- Incomplete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
 
    
        
            
            Kamuluguywa Primary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Admin. Block
- output
- Complete Adm/Block
- implementation status
- Incomplete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
 
    
        
            
            Muhudu Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
 
    
        
            
            Kitambazi Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Admin. Block
- output
- Complete Adm/Block
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
 
    
        
            
            Kakubudu Tea Banda
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
 
    
        
            
            Museywa Tea Banda
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kapchemgung Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 2 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
 
    
        
            
            Munzatsi Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
 
    
        
            
            Kapchemwani/Lwombeibridge
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Bridge
- output
- Complete Construction
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Gimarakwa Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate Classrooms
- output
- Complete Renovation
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Bundorovo Tea Banda
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 1 Tea Banda
- output
- Complete Tea Banda
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
 
    
        
            
            Gamoi Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Purchase Land
- output
- Expand Compound
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
 
    
        
            
            Chepsaga Saride Br
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Construction Foot Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Gisambai Cattle Dip
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Rehabilite 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Complete & In Use
- total cost
- Ksh 279,440
- estimate
- Ksh 150,000
 
    
        
            
            Buyangu Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 3 Classrooms & Elect.Install.
- output
- Complete Classroom/ Elect.
- implementation status
- Incomplete
- total cost
- Ksh 270,000
- estimate
- Ksh 970,000
 
    
        
            
            Jivuye Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Electricity Installation
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 550,000
 
    
        
            
            Hamisi Resource Centre
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 1 Block
- output
- Complete Rehabilitation
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
 
    
        
            
            Ivumbu Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 dining Hall
- output
- Flooring & Plastering
- implementation status
- Incomplete & In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 550,000
 
    
        
            
            Tiriki Resource Centre
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 1 Block
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 400,000
 
    
        
            
            Ivola Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Complte Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 450,000
 
    
        
            
            Kapsotik Cattle Dip
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Rehabilite 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Complete & In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 200,000
 
    
        
            
            Kisasi Tea Banda
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete & In Use
- total cost
- Ksh 240,000
- estimate
- Ksh 340,000
 
    
        
            
            Givogi Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
 
    
        
            
            Kaptech Tea Banda
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Tea Banda
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
 
    
        
            
            Kinu Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 4 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
 
    
        
            
            Muhaya Primary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Construction of 1 Admin. Block
- output
- Complete Adm/Block
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
 
    
        
            
            Banja Muslim Primary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
 
    
        
            
            Jeptulu Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
 
    
        
            
            Mwembe Cattle Dip
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Rehabilite 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 150,000
 
    
        
            
            Makuchi Primary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
 
    
        
            
            Musasa Shaviri Brid
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Construction of Foot Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Gamei Tea Banda
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Renovate Tea Banda
- output
- Complete Tea Banda
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
 
    
        
            
            Kisasi Cattle Dip
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 1 Cattle Dip
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
 
    
        
            
            Tigoi Girls Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Instal Water Tanks
- output
- Complete Installation
- implementation status
- Complete & In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Givigoi Youth Polytechnic
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Renovate Classrooms
- output
- Complete Renovation
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
 
    
        
            
            Jeptile Cultural Forest
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Fencing & Planting Seedlings
- output
- Protect The Forest
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Gisambai Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Rehabilite 3 Classrooms
- output
- Complete Rehabilitation
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
 
    
        
            
            Mugangu Dispensary
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 1 Dispensary
- output
- Complete Construction
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
 
    
        
            
            Bumbo Tea Banda
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2008
- action
- Renovate Tea Banda
- output
- Complete Renovation
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Gavudunyi Primary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Renovate 2 Classrooms
- output
- Flooring & Plastering
- implementation status
- Complete & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
 
    
        
            
            Senende Cattle Dip
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Rehabilitate 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Complete & Not In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Jeptul Cattle Dip
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Rehabilitate 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Complete & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Siekuti Cattle Dip
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Rehabilitate 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Complete & Not In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Givole Primary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Renovate 3 Classrooms
- output
- Flooring & Plastering
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 250,000
 
    
        
            
            Shinyenya Cattle Dip
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Rehabilitate 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
 
    
        
            
            Tigoi Cattle Dip
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Rehabilitate 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
 
    
        
            
            Jepkoyai Cattle Dip
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2005
- action
- Rehabilitate 1 Cattle Dip
- output
- Complete Rehabilitation
- implementation status
- Stalled
- total cost
- Ksh 150,000
- estimate
- Ksh 0
 
    
        
            
            Musukura Traditional Forest
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Fencing & Planting
- output
- Protect The Forest
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Banja Cattle Dip
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Renovate 1 Cattle Dip
- output
- Complete Renovation
- implementation status
- Complete & Not In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Musengei Cattle Dip
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Renovate 1 Cattle Dip
- output
- Complete Renovation
- implementation status
- Complete & Not In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Gimogoi Cattle Dip
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 1 Cattle Dip
- output
- Complete Cattle Dip
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 700,000
 
    
        
            
            Gimarakwa Cattle Dip
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Renovation
- output
- Renovation Complete
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Jidereri Tea Banda
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Construction of 1 Tea Banda
- output
- Complete Tea Banda
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
 
    
        
            
            Jeptorori Tea Banda
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Renovate 1 Tea Banda
- output
- Complete Renovation
- implementation status
- Complete & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Chepkose Tea Banda
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2009
- action
- Construction of Tea Banda
- output
- Complete Tea Banda
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
 
    
        
            
            Jivukunei/Kalwani Forest
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Fencing & Planting
- output
- Protect The Forest
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Givogi Tea Banda
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Renovate 1 Tea Banda
- output
- Complete Renovation
- implementation status
- Complete & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Mudindi Cultural Forest
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2009
- action
- Plant Trees And Fence
- output
- Forest
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
 
    
        
            
            Kapchevugei Forest
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Fencing & Planting
- output
- Protect The Forest
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 100,000
 
    
        
            
            Kapsotik Tea Banda
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2007
- action
- Rehablitate 1 Tea Banda
- output
- Complete Rehabilitation
- implementation status
- Complete
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
 
    
        
            
            Bumavi Tea Banda
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2004
- action
- Plustering 1 Tea Banda
- output
- Complete Plastering
- implementation status
- Incomplete & In Use
- total cost
- Ksh 60,000
- estimate
- Ksh 80,000
 
    
        
            
            George Khaniri Secondary School
            
            
                - location
- 
                        Shaviringa
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Museywa Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Givole Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Incomplete But In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Erusui Secondary School
            
            
                - location
- 
                        Shamakhokho
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- n/a
- output
- Purchased T/Books
- implementation status
- Complete & In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
 
    
        
            
            Ishiru Secondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Complete & In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Kapsotik Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Incomplete & In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Givogi Secondary School
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Complete & In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            KapchemgungsecSchool
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Equip School Library
- output
- Purchased T/Books
- implementation status
- Incomplete & In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Gimengwa Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Gimariani Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Kaimosi DemSecondary School
            
            
                - location
- 
                        Shavirnga
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Buyangu Secondary School
            
            
                - location
- 
                        Jepkoyai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Munzatsi Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Gavudunyi Secondary School
            
            
                - location
- 
                        Gisambai
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Muhaya Secondary School
            
            
                - location
- 
                        Tambua
                        (in Hamisi)
                    
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Purchased T/Books
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
 
    
        
            
            Jivutavachi Polytechnic
            
            
                - location
- 
                        Banja
                        (in Hamisi)
                    
- action
- Costruct Classrooms
- output
- Complete Classroom
- implementation status
- Incomplete
- total cost
- Ksh 0
- estimate
- Ksh 0