The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Igembe North

Theera Dispensary

location
Antubetwe Kiongo (in Igembe North)
year first funded
2003
action
Facility Construction Fencing - Sewerage
output
To Serve Ndoleli Division As A Whole -No Other Health Facility
implementation status
1
total cost
Ksh 6,055,016
estimate
Ksh 7,000,000

Kithongo Borehole

location
Kawiru (in Igembe North)
year first funded
2006
action
Drill
output
Serve Kibikona
implementation status
1
total cost
Ksh 3,400,000
estimate
Ksh 1,900,000

Kawiru Secondary School

location
Kawiru (in Igembe North)
year first funded
2004
action
Construction Of Facilitates
output
Construction Of Classrooms In A New Day Sec Sch
implementation status
1
total cost
Ksh 2,661,000
estimate
Ksh 2,000,000

Kilera Water Tank

location
Ntunene (in Igembe North)
year first funded
2005
action
Sink A Borehole 220M Deep
output
Supplement The Rain Water
implementation status
Stalled
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Miuine Borehole

location
Antuambui (in Igembe North)
year first funded
2005
action
Drill
output
Serve Miune
implementation status
OnGoing
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Kamweline Kabachi Borehole

location
Kabachi (in Igembe North)
year first funded
2006
action
Drill Borehole
output
Serve Kabachi
implementation status
Stalled
total cost
Ksh 1,850,000
estimate
Ksh 1,850,000

Theera Borehole

location
Antubetwe Kiongo (in Igembe North)
year first funded
2005
action
Drill A Borehole
output
Supplement Rain Water To Inhabitants
implementation status
Stalled
total cost
Ksh 1,850,000
estimate
Ksh 1,850,000

Mbiriata Borehole

location
Kabachi (in Igembe North)
year first funded
2005
action
Sink Borehole 200M Deep
output
Supplement The Rain Water
implementation status
Stalled
total cost
Ksh 1,850,000
estimate
Ksh 1,850,000

Bulu borehole

location
Naathu (in Igembe North)
year first funded
2009
action
Sinking
output
Borehole
implementation status
Not started
total cost
Ksh 1,800,000
estimate
Ksh 0

Ithima Youth Polytechnic

location
Akirangondu (in Igembe North)
year first funded
2004
action
Construction Of Kitchen And Dh
output
Accommodate 400 Students
implementation status
1
total cost
Ksh 1,800,000
estimate
Ksh 2,000,000

Karichu Polytechnic

location
Antubetwe Kiongo (in Igembe North)
year first funded
2005
action
Construction of Facility
output
New Polytechnic
implementation status
0.6
total cost
Ksh 1,750,000
estimate
Ksh 1,000,000

Ngitana Mbiriata BoreholeExploration And Sinking Of Borehole

location
Kabachi (in Igembe North)
year first funded
2008
action
Borehole Sinking
output
Biregike
implementation status
Stalled
total cost
Ksh 1,700,000
estimate
Ksh 0

Nathu Secondary School

location
Naathu (in Igembe North)
year first funded
2004
action
Lab Construction
output
-
implementation status
1
total cost
Ksh 1,600,000
estimate
Ksh 3,000,000

Naikuriu Dispensary

location
Naathu (in Igembe North)
year first funded
2004
action
Facility Contraction
output
Serve People From The Area Of Naathu Loc.
implementation status
1
total cost
Ksh 1,550,000
estimate
Ksh 1,700,000

Antuambui Secondary School

location
Antuambui (in Igembe North)
year first funded
2004
action
Construction Of Dh
output
AccommodAte 300 Pupils
implementation status
1
total cost
Ksh 1,540,000
estimate
Ksh 1,800,000

Kathelwa Secondary School Construction Of The First Phase Of New Laboratory

location
Akirangondu (in Igembe North)
year first funded
2008
action
Laying Foundation
output
Laboratory Constructiion
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 0

Mea Primary School

location
Antuambui (in Igembe North)
year first funded
2004
action
Construction Of Four Classrooms
output
Serve A Large No. Of Pupils Due To Fpe
implementation status
1
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Mariri Secondary School

location
Ntunene (in Igembe North)
year first funded
2007
action
Laboratory
output
1 Lab
implementation status
0.7
total cost
Ksh 1,400,000
estimate
Ksh 0

Leeta Mixed Day SchoolConstruction Of New Classroom

location
Kabachi (in Igembe North)
year first funded
2008
action
Construction Of Three Classes
output
3 Classes
implementation status
Complete
total cost
Ksh 1,350,000
estimate
Ksh 0

Naathu Secondary School

location
Naathu (in Igembe North)
year first funded
2007
action
Laboratory
output
1 Lab
implementation status
1
total cost
Ksh 1,350,000
estimate
Ksh 0

Mariri Secondary School

location
Ntunene (in Igembe North)
year first funded
2004
action
Construction Of dining Hall
output
Only Day Sch In Linjoka Sub-Location
implementation status
1
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Laare Health Centre

location
Laare Division (in Igembe North)
year first funded
2007
action
Hospital Equipment
output
1 Theatre
implementation status
1
total cost
Ksh 1,121,540
estimate
Ksh 0

Buluu Earth Pun

location
Kabachi (in Igembe North)
year first funded
2006
action
Build Earth Pull
output
Conserve Water
implementation status
Stalled
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Nkanda Secondary School

location
Antuambui (in Igembe North)
year first funded
2005
action
Construction of A Lab
output
Accommodate At Least 40 Students
implementation status
1
total cost
Ksh 1,100,000
estimate
Ksh 1,800,000

Kirindara Primary School

location
Ntunene (in Igembe North)
year first funded
2006
action
Three Class
output
Serve 135
implementation status
Stalled
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Inono Borehole

location
Naathu (in Igembe North)
year first funded
2005
action
Piping & Tank Construction
output
Serve The Area
implementation status
1
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Antubetwe/Kiani/Ndoleli

location
A/kiongo (in Igembe North)
year first funded
2009
action
Grading, Gravelling, Creating Drainages
output
Passable road
implementation status
Not started
total cost
Ksh 1,000,000
estimate
Ksh 0

Bulu AP post

location
Naathu (in Igembe North)
year first funded
2009
action
Construction
output
AP Post
implementation status
Not started
total cost
Ksh 1,000,000
estimate
Ksh 0

Kithetu sec sch-New laboratory construction

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of laboratory
output
Laboratory
implementation status
Roofing
total cost
Ksh 1,000,000
estimate
Ksh 0

Theera Dispensary

location
Antubetwe (in Igembe North)
year first funded
2007
action
Hospital Equipment
output
Hosp. Equip
implementation status
1
total cost
Ksh 1,000,000
estimate
Ksh 0

Mutuati MuroEti Road

location
Kabachi (in Igembe North)
year first funded
2005
action
Grading The Road
output
Serve Also Part Of Mutuati Div.
implementation status
1
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mutuati Health Centre

location
Kabachi (in Igembe North)
year first funded
2005
action
Construction Of Theatre Rooms
output
Serve Mutuati Div.
implementation status
0.9
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Laare Health Centre

location
Ntunene (in Igembe North)
year first funded
2004
action
Construction Of Laundry And Kitchen
output
Serve The Maternity Hospital
implementation status
1
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kathelwa Dispensary

location
Akirangondu (in Igembe North)
year first funded
2003
action
Repair And Rehabilitation Of Existing Buildings
output
Serve The Upper Parts Of The Location
implementation status
1
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Kathanga Secondary School

location
Kabachi (in Igembe North)
year first funded
2004
action
Lab Construction
output
-
implementation status
1
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Kamweline Dispensary

location
Kabachi (in Igembe North)
year first funded
2004
action
Facility Construction
output
Serve The Area Of Kabachi Location
implementation status
0.6
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Ambaru Secondary School

location
Mutuati (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
2 Classes
implementation status
0.95
total cost
Ksh 1,000,000
estimate
Ksh 0

Kbaithai Primary School Construction Of New Classrooms

location
Naathu (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
Two Complete Classes
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Murungene pry sch-construction of two classes

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of 2 classrooms
output
2 Classes
implementation status
Not started
total cost
Ksh 900,000
estimate
Ksh 0

Nguthuki Pry sch-Construction of two classes

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of 2 classrooms
output
2 Classes
implementation status
lintel Level
total cost
Ksh 900,000
estimate
Ksh 0

Kirindara sec school-construction of two classes

location
Ntunene (in Igembe North)
year first funded
2009
action
Construction of 2 classrooms
output
2 Classes
implementation status
Roofed
total cost
Ksh 900,000
estimate
Ksh 0

Muromut Primary

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of 2 classrooms
output
2 Classes
implementation status
Foundation done
total cost
Ksh 900,000
estimate
Ksh 0

Ambaru Sec Sch-construction of a new lab.

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of laboratory
output
Laboratory
implementation status
Gabel level
total cost
Ksh 900,000
estimate
Ksh 0

Thitha Secondary School

location
Athiru Runjine (in Igembe North)
year first funded
2004
action
Contraction Of A Dormitory
output
Accommodate 100 Students
implementation status
1
total cost
Ksh 900,000
estimate
Ksh 1,200,000

Nkoe Primary School Construction Of New Classrooms

location
Akirangondu (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
One Complete Class
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Naathu Primary School Construction Of New Classrooms

location
Naathu (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
2 Complete Classes
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 0

Mutuati Primary School Construction Of New Classrooms

location
Kabachi (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
2 Complete Classes
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Kirindara Secondary School

location
Ntunene (in Igembe North)
year first funded
2006
action
Laboratory
output
Serve 90
implementation status
1
total cost
Ksh 900,000
estimate
Ksh 1,800,000

Antubetwe Kiongo Secondary School

location
Antubetwe Kiongo (in Igembe North)
year first funded
2004
action
Construction Of A Dormitory
output
Accommodate About 100 Students
implementation status
1
total cost
Ksh 900,000
estimate
Ksh 900,000

Kathanga Secondary School

location
(in Igembe North)
year first funded
2007
action
Laboratory
output
1 Lab
implementation status
0.5
total cost
Ksh 850,000
estimate
Ksh 0

Ambaru Primary School

location
Kabachi (in Igembe North)
year first funded
2005
action
Construction of Facility
output
New Sec Sch
implementation status
1
total cost
Ksh 850,000
estimate
Ksh 850,000

Anjalu Primary School

location
Antubetwe (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
2 Classes
implementation status
0.95
total cost
Ksh 800,000
estimate
Ksh 0

Akirangondu Secondary School

location
Akirangondu (in Igembe North)
year first funded
2004
action
Construction Of A Dormitory
output
Accommodate 80 Students
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 800,000

K.K.-Gituine-kathelwa-Kibuline

location
Akirangondu (in Igembe North)
year first funded
2009
action
Grading, Gravelling, Creating Drainages
output
Passable road
implementation status
Not started
total cost
Ksh 800,000
estimate
Ksh 0

Theera maternity

location
A/kiongo (in Igembe North)
year first funded
2009
action
Construction of maternity wing
output
Maternity Wing
implementation status
not known
total cost
Ksh 800,000
estimate
Ksh 0

Inono/Ncukuine/Bulu road

location
Naathu (in Igembe North)
year first funded
2009
action
Grading, Gravelling, Creating Drainages
output
Passable road
implementation status
Not started
total cost
Ksh 800,000
estimate
Ksh 0

Thitha Secondary School Construction Of St Phase Of New Laboratory

location
Athiru Ruunijine (in Igembe North)
year first funded
2008
action
Laying Foundation
output
Laboratory Construction
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 0

Theera Primary School

location
Antubetwe (in Igembe North)
year first funded
2007
action
2 Classes
output
2 Classes
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 0

St. Malaene school

location
Antubetwe (in Igembe North)
year first funded
2007
action
2 Classes
output
2 Classes
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 0

Ntaanka Secondary school

location
Luciuti (in Igembe North)
year first funded
2006
action
Two Classrooms
output
Serve 90
implementation status
0.6
total cost
Ksh 800,000
estimate
Ksh 800,000

Naikuriu Primary School

location
Mutuati (in Igembe North)
year first funded
2007
action
Construction of classrooms
output
2 Classes
implementation status
0.95
total cost
Ksh 800,000
estimate
Ksh 0

Mwerongai Primary School

location
Akirangondu (in Igembe North)
year first funded
2007
action
2 Classes
output
2 Classes
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 0

Mariri Secondary School

location
Laare (in Igembe North)
year first funded
2007
action
Laboratory
output
1 Lab
implementation status
0.5
total cost
Ksh 800,000
estimate
Ksh 0

Limbuku Primary School

location
Akirangondu (in Igembe North)
year first funded
2006
action
Two Class
output
Serve 90
implementation status
Stalled
total cost
Ksh 800,000
estimate
Ksh 800,000

Leeta Dispensary

location
Kabachi (in Igembe North)
year first funded
2004
action
Facility Construction
output
Serve Naathu Location
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 1,500,000

Kithetu Secondary School

location
Athiru (in Igembe North)
year first funded
2007
action
2 Classes
output
2 Classes
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 0

Kiolo Primary School

location
Mutuati (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
2 Classes
implementation status
0.7
total cost
Ksh 800,000
estimate
Ksh 0

Kilera Primary School

location
Laare (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
2 Classes
implementation status
1
total cost
Ksh 800,000
estimate
Ksh 0

Kamiruru Primary School

location
Antubetwe (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
2 Classes
implementation status
0.95
total cost
Ksh 800,000
estimate
Ksh 0

Kathanga Secondary School LaboratoryRoofing, Plastering, Ceiling And Floor Screed

location
Kabachi (in Igembe North)
year first funded
2008
action
Laboratory Roofing, Plastering, Ceiling;Flooring
output
Laboratory
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 0

Kanthali Primary School

location
Naathu (in Igembe North)
year first funded
2005
action
Construction of Two Classes
output
Accommodate 80 Pupils
implementation status
1
total cost
Ksh 700,000
estimate
Ksh 700,000

Thirua Primary School

location
Naathu (in Igembe North)
year first funded
2005
action
Contract Two Classes
output
Accommodate 80 Pupils
implementation status
1
total cost
Ksh 700,000
estimate
Ksh 700,000

Nkamathi Secondary School -Construction Of One New And Compl Of Classroom

location
Kabachi (in Igembe North)
year first funded
2008
action
One New Class Construction And One Class Completion
output
2 Classes To Completion
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Murera Primary School

location
Kawiru (in Igembe North)
year first funded
2005
action
Construction Of Two Classes
output
Accommodate 100 Pupils
implementation status
1
total cost
Ksh 700,000
estimate
Ksh 700,000

Kilera Primary School

location
Ntunene (in Igembe North)
year first funded
2005
action
Classrooms Construction
output
Avoid Drying
implementation status
1
total cost
Ksh 700,000
estimate
Ksh 700,000

Kiani Primary School

location
Antubetwe Kiongo (in Igembe North)
year first funded
2006
action
Two Class
output
Serve 90
implementation status
1
total cost
Ksh 700,000
estimate
Ksh 700,000

Kamweline Primary School

location
Kabachi (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Serve 45
implementation status
1
total cost
Ksh 700,000
estimate
Ksh 700,000

Nkamathi Special Unit

location
Kabachi (in Igembe North)
year first funded
2004
action
Facility Construction
output
Serve Mutuati Div
implementation status
1
total cost
Ksh 675,000
estimate
Ksh 675,000

Kangenyone Primary School

location
Antuambui (in Igembe North)
year first funded
2005
action
n/a
output
Classs
implementation status
1
total cost
Ksh 650,000
estimate
Ksh 350,000

Ntunene Secondary School

location
Ntunene (in Igembe North)
year first funded
2005
action
Administration Block
output
Serve The School Community
implementation status
0.2
total cost
Ksh 600,000
estimate
Ksh 600,000

Kithingangu Water Project

location
Akirangondu (in Igembe North)
year first funded
2004
action
Intake Construction Spring Protection
output
Supply The People With Clean Water
implementation status
1
total cost
Ksh 600,000
estimate
Ksh 600,000

Kaelo Pharmacy

location
Antuambui (in Igembe North)
year first funded
2005
action
Construction of 2 Vip Toilets
output
Serve A Community Pharmacy About 300 Families
implementation status
1
total cost
Ksh 600,000
estimate
Ksh 100,000

Tamani Spring Water Tank

location
Naathu (in Igembe North)
year first funded
2004
action
Construction of 30M3 Mansonary Tank
output
Serve The Lower Part Of The Loc. About 400 Households
implementation status
1
total cost
Ksh 550,000
estimate
Ksh 400,000

Kiutine Police Post-completion of a police post

location
Kawiru (in Igembe North)
year first funded
2009
action
construction
output
5 housing units
implementation status
Not started
total cost
Ksh 500,000
estimate
Ksh 0

Kantheleo

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of tank
output
Intake and Tank
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Nkanda Secondary school

location
Antubetwe (in Igembe North)
year first funded
2007
action
Lab Completion
output
1 Lab
implementation status
1
total cost
Ksh 500,000
estimate
Ksh 0

Naathu Secondary LaboratoryPlastering, Ceiling $ Floor Screed

location
Naathu (in Igembe North)
year first funded
2008
action
Laboratory
output
Complete Laboratory
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Contribution To The Establishment Of Njuri Ncheke Cultural Centre

location
Akirangondu (in Igembe North)
year first funded
2008
action
Construction Of Njuri Ncheke Centre
output
Development Of Njuri Ncheke Centre
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 0

Antuambui Secondary School dining Hall/Kitchen Plastering And Flooring

location
Antuambui (in Igembe North)
year first funded
2008
action
dining/Kitchen Plastering And Flooring
output
Completion Of dining/Kitchen
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Mutuati Secondary School

location
Naathu (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 50
implementation status
1
total cost
Ksh 500,000
estimate
Ksh 500,000

Anjalu Primary School

location
Luciuti (in Igembe North)
year first funded
2004
action
Construction Of Two Classes
output
Accommodate 100 Pupils Due To F.P.E
implementation status
1
total cost
Ksh 500,000
estimate
Ksh 500,000

Kathelwa Secondary School

location
Akirangondu (in Igembe North)
year first funded
2005
action
Construction of The School Administration Block
output
Serve The Sch Community
implementation status
1
total cost
Ksh 500,000
estimate
Ksh 700,000

Kilera AP Post

location
Ntunene (in Igembe North)
year first funded
2009
action
Construction
output
AP Post
implementation status
Not started
total cost
Ksh 500,000
estimate
Ksh 0

District Education Office-D.E.O's office renovation

location
Ntunene (in Igembe North)
year first funded
2009
action
Renovations
output
good Office
implementation status
Not started
total cost
Ksh 500,000
estimate
Ksh 0

Tamani Water Project-construction of water 4 tanks

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of 4 tanks
output
4 Tanks
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Inono Borehole

location
Naathu (in Igembe North)
year first funded
2009
action
Piping extention
output
Piping extention
implementation status
Not started
total cost
Ksh 500,000
estimate
Ksh 0

Muringene Pry school-one classroom construction

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
lintel Level
total cost
Ksh 450,000
estimate
Ksh 0

Aithu Primary School Construction Of New Classroom

location
Kabachi (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
One Complete Classes
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Kathanga Primary School Construction Of New Classroom

location
Kabachi (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
One Complete Class
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Kathithine Kwa Bb Borehole

location
Kawiru (in Igembe North)
year first funded
2005
action
Tank Construction And Piping
output
Serve More Than 100 Families
implementation status
1
total cost
Ksh 450,000
estimate
Ksh 800,000

Lubua Primary School Construction Of New Classroom

location
Antuambui (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
One Complete Class
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Machungulu Secondary School Construction Of One Classroom

location
Akirangondu (in Igembe North)
year first funded
2008
action
Class Construction
output
One Class
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Murungene Primary School Construction Of New Classroom

location
Ntunene (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
One Complete Classes
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

MweroEkala Water Intake And Tank

location
Kabachi (in Igembe North)
year first funded
2005
action
Intake And Tank
output
Supply Asal Area Of Kabachi Loc.
implementation status
1
total cost
Ksh 450,000
estimate
Ksh 450,000

Mwerongundu Secondary School Construction Of New Classes

location
Antuambui (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
1 Classroom
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Ngitana Primary School Construction Of New Classroon

location
Kabachi (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
One Complete Class
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Nkanda Secondary School Construction Of New Classroom

location
Antuambui (in Igembe North)
year first funded
2008
action
Class Construction
output
1 Classroom
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Nkiriana pry sch-One class construction

location
Antuambui (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
complete; in use
total cost
Ksh 450,000
estimate
Ksh 0

Miuine Pry school-one classroom construction

location
Antuambui (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Lukunu pry sch-classes contruction

location
Antuambui (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Sub-structure level
total cost
Ksh 450,000
estimate
Ksh 0

K.K. Itama pry sch-one classroom construction

location
Antuambui (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Roofing
total cost
Ksh 450,000
estimate
Ksh 0

Nkamathi pry sch-one class construction

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Leeta sec sch-one classroom construction

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Sub-structure level
total cost
Ksh 450,000
estimate
Ksh 0

Kamboo Pry school-one new classroom

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Mburanjiru pry sch-one classroom construction

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Sub-structure level
total cost
Ksh 450,000
estimate
Ksh 0

Ngukuine pry sch-one classroom construction

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Sub-structure level
total cost
Ksh 450,000
estimate
Ksh 0

Aithu pry sch-one classroom construction

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Sub-structure level
total cost
Ksh 450,000
estimate
Ksh 0

Ngitana Pry sch-construction of one classroom

location
Kabachi (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Kanthali Pry sch-One classroom construction

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

K.K.Baithai sec sch-New classroom construction

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Thirua Pry Sch-New classroom construction

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Roofing
total cost
Ksh 450,000
estimate
Ksh 0

Mbayo pry sch- one classroom construction

location
Naathu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Machungulu sec sch-Construction of a class

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Thimbili Sec sch-One classroom construction

location
A/ruujine (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Limbuku Pry sch-one classroom construction

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
lintel Level
total cost
Ksh 450,000
estimate
Ksh 0

Kathatene Pry school-one classroom construction

location
A/kiongo (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Tuuru Pry school-one classroom construction

location
Akirangondu (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
lintel Level
total cost
Ksh 450,000
estimate
Ksh 0

K.K. Aaru pry sch-one classroom construction

location
A/ruujine (in Igembe North)
year first funded
2009
action
Construction of 1 classroom
output
1 Class
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Kabukuro Primary School

location
Antubetwe (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
1 Classroom
implementation status
0.95
total cost
Ksh 400,000
estimate
Ksh 0

Tatha Dam

location
Kabachi (in Igembe North)
year first funded
2009
action
Excavation/DesiltingDam
output
Desilting
implementation status
Not started
total cost
Ksh 400,000
estimate
Ksh 0

Thirua Primary School

location
Naathu (in Igembe North)
year first funded
2007
action
1 Classroom Construction
output
1 Lab
implementation status
0.95
total cost
Ksh 400,000
estimate
Ksh 0

Theera DispensarydaryPurchase Of Hospital Equipment

location
Antubetwe (in Igembe North)
year first funded
2008
action
Equipment
output
Equipment
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Ntunene Girls Sec

location
Ntunene (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45 Students
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 15,000,000

Nkoe Primary School

location
Akirangondu (in Igembe North)
year first funded
2004
action
Repair The Classrooms Damaged By Wind
output
Accommodate Pupils In Four Classrooms
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 500,000

Nkanda Secondary school

location
Antubetwe (in Igembe North)
year first funded
2007
action
Class Construction
output
1 Classroom
implementation status
0.95
total cost
Ksh 400,000
estimate
Ksh 0

Naathu Hall

location
Naathu (in Igembe North)
year first funded
2006
action
Build Hall
output
Serve Mutuati
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Mwerongundu Sec

location
Antuambui (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Knanga Primary School

location
Akirangondu (in Igembe North)
year first funded
2007
action
Construction Of One Classroom
output
1 Classroom
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 0

Mwerongundu S

location
Antuambui (in Igembe North)
year first funded
2007
action
Class
output
1 Classroom
implementation status
0.95
total cost
Ksh 400,000
estimate
Ksh 0

Mutuati Secondary School Construction Of Latrine Blocks

location
Kabachi (in Igembe North)
year first funded
2008
action
Pit Latrine Construction
output
Two Toilets
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Murungene Primary School

location
Ntunene (in Igembe North)
year first funded
2005
action
Construction of A Class
output
Serve F.P.E Numbers
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 350,000

Miriki Primary School

location
Antubetwe (in Igembe North)
year first funded
2007
action
One Classroom
output
1 Classroom
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 0

Mariri Primary School

location
Luciuti (in Igembe North)
year first funded
2004
action
Construction Of One Classroom
output
Accommodate Increasing Number Due To F.P.E
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Machungulu Primary School

location
Runjine (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Linjoka Primary School

location
Laare (in Igembe North)
year first funded
2007
action
1 Classroom Construction
output
1 Classroom
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 0

Kithetu Secondary School

location
Naathu (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Serve 45
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Kiromwathi Primary School

location
Luciuti (in Igembe North)
year first funded
2004
action
Construction Of One Classroom
output
Accommodate 50 Pupils Due To F.P.E
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Karama Secondary School

location
Akirangondu (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Serve 45
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Kanthali Primary School

location
Mutuati (in Igembe North)
year first funded
2007
action
1 Classroom Construction
output
1 Lab
implementation status
0.95
total cost
Ksh 400,000
estimate
Ksh 0

Kamuwe Primary School

location
Antubetwe Kiongo (in Igembe North)
year first funded
2004
action
Classroom Construction
output
Accommodate F.P.E
implementation status
1
total cost
Ksh 400,000
estimate
Ksh 400,000

Kalankware Primary School

location
Antubetwe (in Igembe North)
year first funded
2007
action
2 Classrooms Construction
output
1 Classroom
implementation status
0.95
total cost
Ksh 400,000
estimate
Ksh 0

Thangarine PreSchool

location
Kabachi (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Tuuru Primary School

location
Akirangondu (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
0.85
total cost
Ksh 350,000
estimate
Ksh 350,000

Thimbili Primary School

location
Athiru Ruunijine (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Nkiriana Primary School

location
Antuambui (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
0.7
total cost
Ksh 350,000
estimate
Ksh 350,000

Nguthunki Primary School

location
Naathu (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Ndoleli Primary School

location
Kawiru (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Naituna Primary School

location
Kabachi (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Nairuru Primary School

location
Antubetwe Kiongo (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Naathu Primary School

location
Naathu (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Mwerene Primary School

location
Akirangondu (in Igembe North)
year first funded
2005
action
n/a
output
Class
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Mutuati Primary School

location
Naathu (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Murweti Primary School

location
Kabachi (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Muromutua Primary School

location
Naathu (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Muringene Primary School

location
Akirangondu (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Mporoko Primary School

location
Akirangondu (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
0.6
total cost
Ksh 350,000
estimate
Ksh 350,000

Miuine Primary School

location
Antuambui (in Igembe North)
year first funded
2005
action
Construction of A Class
output
Serve F.P.E Population
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Mburanjiru Primary School

location
Kabachi (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
0.4
total cost
Ksh 350,000
estimate
Ksh 350,000

Mbayo Primary School

location
Naathu (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
-
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Matirine Primary School

location
Kawiru (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Matirine Borehole

location
Kawiru (in Igembe North)
year first funded
2005
action
Repair Generator
output
Serve 200 Families
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 400,000

Lukununu Primary School

location
Antuambui (in Igembe North)
year first funded
2005
action
Construction of A Class
output
Serve F.P.E Increase
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Luciuti Primary School

location
Luciuti (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Lubua Primary School

location
Antuambui (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Liundu School

location
Naathu (in Igembe North)
year first funded
2006
action
One Classroom
output
Serve 45
implementation status
0.6
total cost
Ksh 350,000
estimate
Ksh 350,000

Linjoka Primary School

location
Ntunene (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Classs
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kiula Primary School

location
Antuambui (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Serve 45
implementation status
0.95
total cost
Ksh 350,000
estimate
Ksh 350,000

Kiolo Primary School

location
Kabachi (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kibukona Primary School

location
Kawiru (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kathatene Primary School

location
Antubetwe Kiongo (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kaoronene School

location
Antuambui (in Igembe North)
year first funded
2006
action
Construction of 1 classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kanathu Primary School

location
Athiru Ruunijine (in Igembe North)
year first funded
2006
action
1 Classroom Construction
output
Storage
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kamboo Primary School

location
Kabachi (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Kaluluu Primary School

location
Naathu (in Igembe North)
year first funded
2005
action
Construction of One Classroom
output
Accommodate 40 Pupils
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 700,000

K Baithai School

location
Naathu (in Igembe North)
year first funded
2006
action
Construction Of One Classroom
output
Serve 45
implementation status
0.6
total cost
Ksh 350,000
estimate
Ksh 350,000

Inono Water Project

location
Naathu (in Igembe North)
year first funded
2004
action
Intake And Piping
output
Serve The Lower Naathu Location
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Barenta Primary School

location
Kabachi (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Barenta Primary School

location
Kabachi (in Igembe North)
year first funded
2006
action
Construction Of One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Baibariu Primary School

location
Kawiru (in Igembe North)
year first funded
2006
action
Construction Of One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Athiru Ruujine Primary School

location
Athiru Ruunijine (in Igembe North)
year first funded
2005
action
Construction of A Classroom
output
Accommodate 50 Pupils
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Aruu Primary School

location
Akirangondu (in Igembe North)
year first funded
2006
action
Construction Of One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Akuune Primary School

location
Athiru Ruunijine (in Igembe North)
year first funded
2006
action
Construction Of One Classroom
output
Serve 45
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Aithu Primary School

location
Kabachi (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Leeta Primary School

location
Naathu (in Igembe North)
year first funded
2005
action
1 Classroom Construction
output
Serve 45 Students
implementation status
1
total cost
Ksh 350,000
estimate
Ksh 350,000

Mbiriata Primary School

location
Kabachi (in Igembe North)
year first funded
2006
action
Rehabilitation
output
Serve 90
implementation status
1
total cost
Ksh 347,000
estimate
Ksh 347,000

Aithu Primary School

location
Kabachi (in Igembe North)
year first funded
2005
action
Repair Of Roofs Ripped By Wind
output
Serve The Pupils
implementation status
1
total cost
Ksh 300,000
estimate
Ksh 300,000

Mwerongundu P

location
Antuambui (in Igembe North)
year first funded
2007
action
Toilets
output
6 Toilets
implementation status
0.95
total cost
Ksh 300,000
estimate
Ksh 0

Kalakware Primary School

location
Athiru Ruunijine (in Igembe North)
year first funded
2005
action
Construction Of One Classroom
output
Accommodate 50 Pupils
implementation status
1
total cost
Ksh 300,000
estimate
Ksh 350,000

Aithu Primary School Emergency

location
Kabachi (in Igembe North)
year first funded
2005
action
Repair Roof Ripped Off By Wind
output
Conducive Environment For Learning
implementation status
1
total cost
Ksh 300,000
estimate
Ksh 300,000

Laare Police Station

location
Antuambui (in Igembe North)
year first funded
2006
action
Ocs House
output
Ocs House
implementation status
1
total cost
Ksh 300,000
estimate
Ksh 300,000

Matirine Water Project

location
Kabachi (in Igembe North)
year first funded
2004
action
Construction Of 2 Ferro Cement Water Tank
output
Serve People Of Kamweline Area
implementation status
1
total cost
Ksh 300,000
estimate
Ksh 300,000

Linjoka Water Tank

location
Ntunene (in Igembe North)
year first funded
2005
action
Tank Construction
output
Serve Asal Area Of Ntunene Loc.
implementation status
1
total cost
Ksh 300,000
estimate
Ksh 300,000

Kiromwathi Primary School

location
Luciuti (in Igembe North)
year first funded
2007
action
Construction Of 6 Toilets
output
6 Toilets
implementation status
in use
total cost
Ksh 300,000
estimate
Ksh 0

Gituine Cattie Dip

location
Akirangondu (in Igembe North)
year first funded
2003
action
Repair Of Dip Tank And Fencing Compound
output
-
implementation status
0.4
total cost
Ksh 264,000
estimate
Ksh 270,000

Kalutine Water Tank

location
Antuambui (in Igembe North)
year first funded
2005
action
Construction of 30M3 Tank
output
Store 30M Of Water For Domestic Use
implementation status
1
total cost
Ksh 260,000
estimate
Ksh 260,000

Mituntune Water Tank

location
Kabachi (in Igembe North)
year first funded
2005
action
Construction of 30M3 Tank
output
Store 30M3 Of Water
implementation status
1
total cost
Ksh 260,000
estimate
Ksh 260,000

Ketama Water Tank

location
Antuambui (in Igembe North)
year first funded
2004
action
Construction Of A Masonry 30M3 Tank
output
Serve About 500 Families
implementation status
1
total cost
Ksh 260,000
estimate
Ksh 260,000

Nkiriana Primary School Plastering, Windows And Doors For Classrooms

location
Antuambui (in Igembe North)
year first funded
2008
action
Laying Foundation To Roofing/Plastering
output
2 Complete Classes
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Nkolu Tank

location
Naathu (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Nkanda Tank

location
Antubetwe (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Muthura Tank

location
Naathu (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Mbayo Tank

location
Antuambui (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Liundune Tank

location
Kabachi (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Kiutine Tank

location
Naathu (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Kithingangu Tank

location
Akirangondu (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Kauu Miriki Water Tank

location
Luciuti (in Igembe North)
year first funded
2005
action
Tank Construction
output
Serve Kiani SubLoc.
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Kaai Water Project

location
Akirangondu (in Igembe North)
year first funded
2005
action
Tank Construction
output
Supply Clean Water
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 450,000

Buantome Tank

location
Ntunene (in Igembe North)
year first funded
2006
action
Build Tank
output
Storage
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Atununu Water Tank

location
Akirangondu (in Igembe North)
year first funded
2005
action
Tank Construction
output
Supply Clean Water To 150 Households
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Thaka Shg Watertank

location
Kabachi (in Igembe North)
year first funded
2005
action
Tank Construction
output
Supply Clean Water To200 Households
implementation status
1
total cost
Ksh 250,000
estimate
Ksh 250,000

Leeta Primary School Emergency

location
Kabachi (in Igembe North)
year first funded
2005
action
Repair Of Roof Ripped Off By Wind
output
Serve The Pupils In These Classes
implementation status
1
total cost
Ksh 200,000
estimate
Ksh 200,000

Mwerongundu Primary School Emergency

location
Antuambui (in Igembe North)
year first funded
2004
action
Repair Roof Ripped Off By Wind
output
Accommodate Pupils In Four Classrooms
implementation status
1
total cost
Ksh 200,000
estimate
Ksh 200,000

Naathu Cattle Dip

location
Naathu (in Igembe North)
year first funded
2004
action
Repair Dip Tank
output
Control Tick Borne Diseases
implementation status
1
total cost
Ksh 200,000
estimate
Ksh 200,000

Ndoleli D's Water Tank

location
Antubetwe Kiongo (in Igembe North)
year first funded
2004
action
Construction Of 20M3 Water Tank
output
Serve Over 200 Families
implementation status
1
total cost
Ksh 200,000
estimate
Ksh 200,000

D.C's Office-Electricity installation/fencing

location
Ntunene (in Igembe North)
year first funded
2009
action
Electrification/fencing DCs Office
output
Electricity,Fencing
implementation status
complete; in use
total cost
Ksh 200,000
estimate
Ksh 0

Athindi Water Springs Protection

location
Kawiru (in Igembe North)
year first funded
2009
action
Fencing/piping/Tree Nursay
output
fencing/piping/Tree nursary
implementation status
Fencing going on
total cost
Ksh 200,000
estimate
Ksh 0

Ntunene Secondary School

location
Ntunene (in Igembe North)
year first funded
2006
action
Purchase Of Computer And Comp Tables
output
Serve The Students
implementation status
1
total cost
Ksh 200,000
estimate
Ksh 200,000

Ambaru Secondary School

location
(in Igembe North)
year first funded
2007
action
Toilets
output
5 Toilets
implementation status
0.95
total cost
Ksh 200,000
estimate
Ksh 0

Kathelwa Secondary School

location
Akirangondu (in Igembe North)
year first funded
2007
action
Construction Of Toilets
output
5 Classes
implementation status
1
total cost
Ksh 200,000
estimate
Ksh 0

Thitha Secondary School Emergency

location
Athiru Ruunijine (in Igembe North)
year first funded
2005
action
Toilets Construction
output
Serve Students
implementation status
1
total cost
Ksh 170,000
estimate
Ksh 170,000

Laare Sports Stadium

location
Ntunene (in Igembe North)
year first funded
2009
action
Renovation
output
Usable Stadium
implementation status
Not started
total cost
Ksh 152,017
estimate
Ksh 0

Kalui Water Project

location
Antuambui (in Igembe North)
year first funded
2005
action
Repair Tank & Fencing Plus Planting Trees
output
Spring Protection To Save From Drying
implementation status
1
total cost
Ksh 150,000
estimate
Ksh 200,000

Laare Football/netball clubs

location
Ntunene (in Igembe North)
year first funded
2009
action
Donation of balls
output
Clubs equipped with balls
implementation status
Quotations floated
total cost
Ksh 150,000
estimate
Ksh 0

Ndoleli Football/netball clubs

location
A/kiongo (in Igembe North)
year first funded
2009
action
Donation of balls
output
Clubs equipped with balls
implementation status
Quotations floated
total cost
Ksh 150,000
estimate
Ksh 0

Naathu Water Springs Protection

location
Naathu (in Igembe North)
year first funded
2009
action
Fencing/piping/Tree Nursay
output
fencing/piping/Tree nursary
implementation status
Not started
total cost
Ksh 150,000
estimate
Ksh 0

Ndoleli Borehole

location
Kawiru (in Igembe North)
year first funded
2005
action
Repair Works
output
Serve 500 Families
implementation status
1
total cost
Ksh 120,000
estimate
Ksh 120,000

Karama Antwamuo Primary School

location
Akirangondu (in Igembe North)
year first funded
2005
action
Digging Toilets Damaged By Flood
output
Serve The Pupils
implementation status
1
total cost
Ksh 100,000
estimate
Ksh 200,000

Ndoleli Kwa Musa Borehole

location
Kawiru (in Igembe North)
year first funded
2004
action
Repair Damaged Pump
output
Supply Clean Water 400 Families
implementation status
1
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiutine Borehole

location
Kawiru (in Igembe North)
year first funded
2004
action
Repair The Borehole Pump
output
Serve About 300 Families
implementation status
1
total cost
Ksh 100,000
estimate
Ksh 100,000

Kilera Primary School

location
Ntunene (in Igembe North)
year first funded
2005
action
Repair Of Roofs Ripped By Wind
output
Serve Pupils
implementation status
1
total cost
Ksh 98,750
estimate
Ksh 98,750

Luciuti Cattle Dip

location
Lucuiti (in Igembe North)
year first funded
2005
action
Repair Works
output
Serve Location
implementation status
1
total cost
Ksh 50,000
estimate
Ksh 50,000

Right Of Passage

location
Kabachi (in Igembe North)
action
n/a
output
Awareness
implementation status
0.95
total cost
Ksh 0
estimate
Ksh 100,000

Kirindara Road

location
Ntunene (in Igembe North)
action
Manual Works
output
Serve Ntunene
implementation status
1
total cost
Ksh 0
estimate
Ksh 400,000