The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Ijara

Hulugho Road Upgading

location
Hulugho (in Ijara)
year first funded
2007
action
Upgrading Of Hulugho Roads
output
Improve Accesibilty
implementation status
Ongoing
total cost
Ksh 15,851,298
estimate
Ksh 15,851,298

Yusuf Haji Girls Secondary School

location
Masalani (in Ijara)
year first funded
2007
action
Completion Of The Lab And Construction Of A Dormitory
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 6,000,000
estimate
Ksh 6,000,000

Yusuf Haji Girls Secondary School -Bus Project

location
Masalani (in Ijara)
year first funded
2009
action
Purchase Of A School Bus
output
Better Education Facilities
implementation status
Ongoing
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Masalani Girls Secondary -Clssrooms,Dormitory &Staff House

location
Masalani (in Ijara)
year first funded
2003
action
Construction Of 3 Clss Room,Dorm&Staffhouse
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Masalani Girls Sec

location
Masalani (in Ijara)
year first funded
2005
action
Construction Of Admin Block,2Staff Houses,Desks &Beddings
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Masalani District Hospital Second Phase For The Construction Of A General Ward

location
Masalani (in Ijara)
year first funded
2009
action
Completion Of The General Ward-Painting, Installation Of Electricity, Plumbing Work
output
Better Health Facilities
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Masalani District Hospital

location
Masalani (in Ijara)
year first funded
2008
action
Construction A Of General Award
output
Better Health Facilities
implementation status
Complete
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Handaro Dispensary

location
Handaro (in Ijara)
year first funded
2004
action
Construction Of A Dispensay
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Masalani Library

location
Masalani (in Ijara)
year first funded
2005
action
Construction Of A Library
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kotile Cattle Dip

location
Kotile (in Ijara)
year first funded
2004
action
Construction Of 3 Cattle Crush & Store
output
Better Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Sangailu Catttle Dip

location
Sangailu (in Ijara)
year first funded
2004
action
Construction Of 3 Cattle Crush & Store
output
Better Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Jalish Cattle Dip-

location
Jalish (in Ijara)
year first funded
2004
action
Construction Of 3 Cattle Crush & Store
output
Better Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Ijara Police Station Ocs Staff House And A Toilet

location
Ijara (in Ijara)
year first funded
2009
action
Construction Of A Staff House And Toilet For Ijara Police Station
output
Improve Provincial Adm. Service Delivery
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Bodhai District Officer Staff House And A Toilet

location
Bodhai (in Ijara)
year first funded
2009
action
Construction Of A Staff House And Toilet For Bodhai District Officer
output
Improve Provincial Adm. Service Delivery
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Furqan Community Dispensary And A Toilet

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of A New Dispensary
output
Better Health Facilities
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kotile Primary School -Dormitory And Two Toilets

location
Kotile (in Ijara)
year first funded
2009
action
Construction Of A Dormitory
output
Better Education Facilities
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Hulugho Primary School

location
Hulugho (in Ijara)
year first funded
2008
action
Construction Of 2 No.Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Masalani Air Strip

location
Masalani (in Ijara)
year first funded
2004
action
2 Km Murraming Grading & Gravelling
output
Better Road Network
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Shurie Secondary School

location
Masalani (in Ijara)
year first funded
2007
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Ijara Police Station

location
Ijara (in Ijara)
year first funded
2007
action
Construction Of Police Station Officeandcell
output
Better Security
implementation status
Complete And Inuse
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Handaro Primary School -Dormitory And A Toilet

location
Handaro (in Ijara)
year first funded
2009
action
Construction Of A Dormitory And A Toilet
output
Better Education Facilities
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Shurie Secondary School

location
Masalani (in Ijara)
year first funded
2008
action
Construction Of A Dormitory
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Alfurqan Primary School

location
Masalani (in Ijara)
year first funded
2008
action
Construction Of A Dormitory
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Masalani District Ward-Equipments

location
Masalani (in Ijara)
year first funded
2009
action
Purchase Of Complete Set Of Equipments-Beds And Beddings
output
Better Health Facilities
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Ruqa Primary School

location
Ruqa (in Ijara)
year first funded
2005
action
Construction of Of A Dormiroty Block
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Hara Primary School

location
Hara (in Ijara)
year first funded
2007
action
Construction Of 1 Dormitory
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Ijara Market

location
Ijara (in Ijara)
year first funded
2007
action
Construction Of Open Air Market
output
Increased Trade
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Hara Primary School

location
Hara (in Ijara)
year first funded
2004
action
Construction Of 1 Dormitory
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Dololo Primary School

location
Dololo (in Ijara)
year first funded
2005
action
Construction Of 4 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Ijara Primary School

location
Ijara (in Ijara)
year first funded
2004
action
Construction Of A Dormitory
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Korissa Dispensary

location
Korissa (in Ijara)
year first funded
2004
action
Construction Of A Dispensay
output
Better Health Facilities
implementation status
Complete & In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Ruqa Dispensary

location
Ruqa (in Ijara)
year first funded
2004
action
Construction Of A Dispensay
output
Better Health Facilities
implementation status
Complete & In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Sangole Dispensary

location
Sangole (in Ijara)
year first funded
2004
action
Construction Of A Dispensay
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Masalani Library-Marram,Water &Toilets

location
Masalani (in Ijara)
year first funded
2007
action
Murraming Of Library,Tank & Construction Toilet
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,096,492
estimate
Ksh 1,096,492

Hulugho District Officer Staff House And A Toilet

location
Hulugho (in Ijara)
year first funded
2009
action
Construction Of A Staff House For Hulugho District Officer
output
Improve Provincial Adm. Service Delivery
implementation status
Planning Stage
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ijara District Peace Committee Office And A Toilet

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of An Office And Toilet For The Peace Committee At Masalani
output
Improve The Service Of Conflict Handling Service
implementation status
Planning Stage
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ijara Health Centre Staff House

location
Ijara (in Ijara)
year first funded
2009
action
Construction Of Staff House
output
Better Health Facilities
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Yusuf Haji Girls Secondary School -Internal Fencing

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of A Fence Around The Dormitory And Construction Of School Gate
output
Better Education Facilities
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Masalani Girls Primary School -Administration Block

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of School Compound Fence
output
Better Education Facilities
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Hadi Primary School

location
Hadi (in Ijara)
year first funded
2008
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Jalish Primary School

location
Jalish (in Ijara)
year first funded
2008
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kotile Primary School -Staff House

location
Kotile (in Ijara)
year first funded
2007
action
Construction Of 3 Unit Staff House
output
Construction Of 3 Unit Staff House
implementation status
Comple And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Handaro Primary School -Staff House

location
Handaro (in Ijara)
year first funded
2007
action
Construction Of 3 Unit Staff House
output
Construction Of 3 Unit Staff House
implementation status
Comple And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Dololo Primary School

location
Bodhai (in Ijara)
year first funded
2008
action
Construction Of 3 Unit Staff House
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ijara Primary School

location
Ijara (in Ijara)
year first funded
2008
action
Construction Of Adm. Block
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Wardeijab Primary School

location
Hulugho (in Ijara)
year first funded
2007
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Hulugho Bushclearing

location
Hulugho (in Ijara)
year first funded
2007
action
Bushclearing And Opening Upof Access Roads
output
Accessibility
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ijara Girls Primary School

location
Ijara (in Ijara)
year first funded
2007
action
Construction of1Dormitory
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gerille Primary School

location
Gerille (in Ijara)
year first funded
2004
action
Construction Of 3 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ijara Primary School

location
Ijara Div (in Ijara)
year first funded
2005
action
Construction Of Admin Block
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Shurie Secondary School -Adorm,Unit Staffhouse

location
Masalani (in Ijara)
year first funded
2003
action
Construction Of Dormitory & Statt House
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Alfurqan Primary School

location
Masalani (in Ijara)
year first funded
2005
action
Construction Of 2 Staff Houses
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gumarey Primary School

location
Masalani (in Ijara)
year first funded
2008
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 950,000
estimate
Ksh 950,000

Gababa Primary School

location
Masalani (in Ijara)
year first funded
2008
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 950,000
estimate
Ksh 950,000

Farjana Primary School

location
Hara (in Ijara)
year first funded
2005
action
Construction Of 3 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 900,000
estimate
Ksh 900,000

Masalani Primary School

location
Masalani (in Ijara)
year first funded
2007
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 900,000
estimate
Ksh 900,000

Soganwater Kiosk

location
Masalani (in Ijara)
year first funded
2007
action
Provision Of Piped Water To Community
output
Access To Safe Water
implementation status
Complete And Inuse
total cost
Ksh 857,000
estimate
Ksh 857,000

Yusuf Haji Girls Secondary School

location
Masalani (in Ijara)
year first funded
2006
action
Purchase Of Desks Antbeddings
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 833,000
estimate
Ksh 833,000

Bodhaitoilets

location
Bodhai (in Ijara)
year first funded
2008
action
Construction of 8 Notoilets
output
Improved Hygiene
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Sangailu Health Centre

location
Sangailu (in Ijara)
year first funded
2004
action
Construction Of Dispensary 3 Rooms
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Umulkher Water Kiosk

location
Masalani (in Ijara)
year first funded
2005
action
Construction Of Water Kiosk
output
Provision Of Water Services
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Kotile Primary School

location
Kotile (in Ijara)
year first funded
2004
action
Construction Of 1 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Sangaillu Dos Residence

location
Sangailu (in Ijara)
year first funded
2006
action
Construction Of Residence
output
Better Security
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Deos Office

location
Masalani (in Ijara)
year first funded
2007
action
Completion Of Stalled Deos Office
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Gerille Prymary School

location
Gerille (in Ijara)
year first funded
2007
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 800,000
estimate
Ksh 800,000

Warsame Ecd

location
Ruqa (in Ijara)
year first funded
2006
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 775,000
estimate
Ksh 775,000

Hara Primary School -A Classroom

location
Hara (in Ijara)
year first funded
2006
action
Construction 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 775,000
estimate
Ksh 775,000

Shabelley Ecd

location
Masalani (in Ijara)
year first funded
2006
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 775,000
estimate
Ksh 775,000

Gumarey Primary School

location
Masalani (in Ijara)
year first funded
2006
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 775,000
estimate
Ksh 775,000

Elmaan Primary School

location
Sangole (in Ijara)
year first funded
2006
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Gerille Prymary School

location
Gerille (in Ijara)
year first funded
2006
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Wakabharey Ecd

location
Sangaillu (in Ijara)
year first funded
2006
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Gedilun Primary School

location
Handaro (in Ijara)
year first funded
2006
action
Contruction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Bulakokon Ecd

location
Jalish (in Ijara)
year first funded
2006
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Waradegoga Ecd

location
Ijara (in Ijara)
year first funded
2006
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Dabelweney Ecd

location
Ijara (in Ijara)
year first funded
2006
action
Bushclearing
output
Accessibility
implementation status
Complete And Inuse
total cost
Ksh 750,000
estimate
Ksh 750,000

Waranwein Primary School

location
Ijara (in Ijara)
year first funded
2006
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 700,333
estimate
Ksh 700,333

Mai Primary School

location
Masalani (in Ijara)
year first funded
2005
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 700,000
estimate
Ksh 700,000

Maai Primary School

location
Masalani (in Ijara)
year first funded
2006
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 700,000
estimate
Ksh 700,000

Handaro Primary School

location
Handaro (in Ijara)
year first funded
2005
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 690,000
estimate
Ksh 690,000

Gerille Prymary School

location
Gerille (in Ijara)
year first funded
2008
action
Construction Of 1 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 650,000
estimate
Ksh 650,000

Kotile Primary School

location
Kotille (in Ijara)
year first funded
2006
action
Purchase Of Bedding Facilities
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 640,000
estimate
Ksh 640,000

Bulto Hama Ecd

location
Jalish (in Ijara)
year first funded
2005
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Gedilun Primary School

location
Handaro (in Ijara)
year first funded
2004
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Waranwein Primary School

location
Ijara (in Ijara)
year first funded
2004
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Alijarire Ecd

location
Kotile (in Ijara)
year first funded
2005
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Rahma Primary School

location
Hara (in Ijara)
year first funded
2005
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Ege Ecd School

location
Handaro (in Ijara)
year first funded
2005
action
Construction Of 2 Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Administration Police Staff House Sangailu

location
Sangailu (in Ijara)
year first funded
2005
action
Construction Of Ap Staff House
output
Improve Security
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

El Maan Primary School

location
Sangole (in Ijara)
year first funded
2005
action
Construction Of 2 Classrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 600,000
estimate
Ksh 600,000

Masalani District Hospital

location
Masalani (in Ijara)
year first funded
2007
action
Provision Of Lab Equipment
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 520,000
estimate
Ksh 520,000

Masalani Primary School Fencing

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of School Compound Fence
output
Better Education Facilities
implementation status
Complete And In Use
total cost
Ksh 514,721
estimate
Ksh 514,721

D`S Office

location
Masalani (in Ijara)
year first funded
2005
action
Completion Of Do`S Office
output
Improve Service Delivery
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

KaRoadob Bush Clearing

location
Sangailu (in Ijara)
year first funded
2009
action
Bush Clearing Of Kardob-Sangailu Road
output
Improve The Road Network
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Hadi Bush Clearing

location
Hadi (in Ijara)
year first funded
2009
action
Bush Clearing Of The Hulugho-Hadi Road
output
Improve The Road Network
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Construction Of Falama Cattle Crush

location
Jalish (in Ijara)
year first funded
2009
action
Construction Of A Crush
output
Improve Livestock Facilities
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Ijara District Commissioners Office-Renovation

location
Ijara (in Ijara)
year first funded
2009
action
Renovation Of Ijara District Commissioners Office-Floor, Cracks,Painting
output
Improve Provincial Adm. Service Delivery
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Dabar Matan Water Supply

location
Masalani (in Ijara)
year first funded
2009
action
Purchase Of The Tanks And Installation Of The Pipelines
output
Access To Safe Water
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Hara Water Supply

location
Hara (in Ijara)
year first funded
2009
action
Purchase Of The Tanks And Installation Of The Pipelines
output
Access To Safe Water
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Hidaya Primary School -One Classroom And A Toilet

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of One Classroom And A Toilet
output
Better Education Facilities
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Warsame Bush Clearing

location
Ruqa (in Ijara)
year first funded
2006
action
Bush Clearing 17 Km
output
Accessibility
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Bulto Hama Bushclearing

location
Ijalish (in Ijara)
year first funded
2006
action
Bushclkearing 17Km
output
Accessibility
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Handaro Cattle Crush

location
Handaro (in Ijara)
year first funded
2006
action
Construction Of Cattle Crush
output
Better Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Ege Cattle Crush

location
Handaro (in Ijara)
year first funded
2006
action
Construction Of Cattle Crush
output
Better Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Korissa Dispensary

location
Korissa (in Ijara)
year first funded
2006
action
Constructin Of Store
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Dabelweney Jbush Clearing

location
Ijara (in Ijara)
year first funded
2005
action
Bush Clearing 17 Km
output
Opening Of Road Network
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Bothai Dispensary

location
Bothai (in Ijara)
year first funded
2005
action
Renovation Of Dispensary
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 500,000
estimate
Ksh 500,000

Ijara Cdf Office

location
Masalani (in Ijara)
year first funded
2008
action
Provision Of Office Equipment
output
Enhance Service Delivery
implementation status
Complete And Inuse
total cost
Ksh 497,433
estimate
Ksh 497,433

Kotile Health Centre

location
Kotile (in Ijara)
year first funded
2005
action
Construction Of 1 Ward,Provision Of Lab Equipment
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 450,000
estimate
Ksh 450,000

Domi Bushclearing

location
Hulugho (in Ijara)
year first funded
2008
action
Bushclearing And Opening Upof Access Roads
output
Improve Road Network
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Sinai Ecd

location
Hadi (in Ijara)
year first funded
2008
action
Completion Of Stalled Of Stalled TwoClassrooms
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Kotile Bushclearing

location
Kotile (in Ijara)
year first funded
2008
action
Bushclearing And Opening Upof Access Roads
output
Accessibility
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Suufi Bashir Cattle Crush

location
Hara (in Ijara)
year first funded
2008
action
Construction Of Cattle Crush
output
Improved Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Dispensary Equipment

location
Kotile, Ruqa, Sangole, Handaro (in Ijara)
year first funded
2006
action
Purchase Of Mattresses & Beds
output
Improve Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Bultohama Water Pan

location
Jalish (in Ijara)
year first funded
2006
action
Construction Of Water Pan
output
Storage Of Water
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Hussein Katalo Bushclearing

location
Gerille (in Ijara)
year first funded
2006
action
Bushclearing 14Km
output
Better Road Network
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Warabesa Bush Clearing

location
Hara (in Ijara)
year first funded
2005
action
Bush Clearing 14 Km
output
Opening Up To The Road
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Maol Bush Clearing

location
Ijara (in Ijara)
year first funded
2005
action
Bush Clearing
output
Opening Up To The Road
implementation status
Complete And Inuse
total cost
Ksh 400,000
estimate
Ksh 400,000

Jalish Bush Clearing

location
Jalish (in Ijara)
year first funded
2005
action
Bush Clearing 10 Km
output
Opening Of Road Network
implementation status
Complete And Inuse
total cost
Ksh 383,809
estimate
Ksh 383,809

Farjana Primary School

location
Hara (in Ijara)
year first funded
2009
action
Finishing Of The Two Classrooms And Two Toilets-Painting, Roofing And Doors
output
Better Education Facilities
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kotile Dispensary Lab Equip

location
Kotile (in Ijara)
year first funded
2008
action
Purchase Of Lab Equipment
output
Better Health Facilities
implementation status
Complete And Inuse
total cost
Ksh 300,000
estimate
Ksh 300,000

Korissa Cattle Crush

location
Korisa (in Ijara)
year first funded
2006
action
Construction Of 1 Cattle Crush
output
Improve Livestock Facilities
implementation status
Complete And Inuse
total cost
Ksh 300,000
estimate
Ksh 300,000

Ijara Bushclearing

location
Ijara (in Ijara)
year first funded
2006
action
Bushclearing 10Km
output
Accessibility
implementation status
Complete And Inuse
total cost
Ksh 300,000
estimate
Ksh 300,000

Moit Bush Clearing

location
Ijara (in Ijara)
year first funded
2005
action
Bush Clearing 10 Km
output
Opening Of Road Network
implementation status
Complete And Inuse
total cost
Ksh 300,000
estimate
Ksh 300,000

Jalish Water Pump

location
Jalish (in Ijara)
year first funded
2005
action
Construction Of A Water Pump
output
Provision Of Water Services
implementation status
Complete And Inuse
total cost
Ksh 300,000
estimate
Ksh 300,000

Hara Primary School -A Classroom

location
Hara (in Ijara)
year first funded
2003
action
Construction A Classroom
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 300,000
estimate
Ksh 300,000

Furqan Primary School

location
Masalani (in Ijara)
year first funded
2009
action
Construction Of Two Toilets
output
Better Education Facilities
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Gabaya Drift

location
Handaro (in Ijara)
year first funded
2004
action
Construction Of Drift
output
Better Road Network
implementation status
Complete And Inuse
total cost
Ksh 187,000
estimate
Ksh 187,000

Alijarire Ecd

location
Kotile (in Ijara)
year first funded
2006
action
Purchase Of Classroom Desks
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 160,000
estimate
Ksh 160,000

Waranwein

location
Ijara (in Ijara)
year first funded
2005
action
Purchase O Classroom Desks
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 150,000
estimate
Ksh 150,000

Muhumed Dahir Primary School -Completion Of A Classroom

location
Masalani (in Ijara)
year first funded
2003
action
Completion Of A Classroom Started By Parent
output
Better Education Facilities
implementation status
Complete And Inuse
total cost
Ksh 130,000
estimate
Ksh 130,000

Training Of Community Health Workers

location
Masalani (in Ijara)
action
Training Of 4 Community Health Workers
output
Improve Health Services
implementation status
Complete And Inuse
total cost
Ksh 0
estimate
Ksh 0