The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Ijara
Hulugho Road Upgading
- location
-
Hulugho
(in Ijara)
- year first funded
- 2007
- action
- Upgrading Of Hulugho Roads
- output
- Improve Accesibilty
- implementation status
- Ongoing
- total cost
- Ksh 15,851,298
- estimate
- Ksh 15,851,298
Yusuf Haji Girls Secondary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Completion Of The Lab And Construction Of A Dormitory
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 6,000,000
- estimate
- Ksh 6,000,000
Yusuf Haji Girls Secondary School -Bus Project
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Purchase Of A School Bus
- output
- Better Education Facilities
- implementation status
- Ongoing
- total cost
- Ksh 5,000,000
- estimate
- Ksh 5,000,000
Masalani Girls Secondary -Clssrooms,Dormitory &Staff House
- location
-
Masalani
(in Ijara)
- year first funded
- 2003
- action
- Construction Of 3 Clss Room,Dorm&Staffhouse
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Masalani Girls Sec
- location
-
Masalani
(in Ijara)
- year first funded
- 2005
- action
- Construction Of Admin Block,2Staff Houses,Desks &Beddings
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Masalani District Hospital Second Phase For The Construction Of A General Ward
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Completion Of The General Ward-Painting, Installation Of Electricity, Plumbing Work
- output
- Better Health Facilities
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Masalani District Hospital
- location
-
Masalani
(in Ijara)
- year first funded
- 2008
- action
- Construction A Of General Award
- output
- Better Health Facilities
- implementation status
- Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Handaro Dispensary
- location
-
Handaro
(in Ijara)
- year first funded
- 2004
- action
- Construction Of A Dispensay
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Masalani Library
- location
-
Masalani
(in Ijara)
- year first funded
- 2005
- action
- Construction Of A Library
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kotile Cattle Dip
- location
-
Kotile
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 3 Cattle Crush & Store
- output
- Better Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Sangailu Catttle Dip
- location
-
Sangailu
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 3 Cattle Crush & Store
- output
- Better Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Jalish Cattle Dip-
- location
-
Jalish
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 3 Cattle Crush & Store
- output
- Better Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Ijara Police Station Ocs Staff House And A Toilet
- location
-
Ijara
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Staff House And Toilet For Ijara Police Station
- output
- Improve Provincial Adm. Service Delivery
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Bodhai District Officer Staff House And A Toilet
- location
-
Bodhai
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Staff House And Toilet For Bodhai District Officer
- output
- Improve Provincial Adm. Service Delivery
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Furqan Community Dispensary And A Toilet
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A New Dispensary
- output
- Better Health Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kotile Primary School -Dormitory And Two Toilets
- location
-
Kotile
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Dormitory
- output
- Better Education Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Hulugho Primary School
- location
-
Hulugho
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 2 No.Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Masalani Air Strip
- location
-
Masalani
(in Ijara)
- year first funded
- 2004
- action
- 2 Km Murraming Grading & Gravelling
- output
- Better Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Shurie Secondary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Ijara Police Station
- location
-
Ijara
(in Ijara)
- year first funded
- 2007
- action
- Construction Of Police Station Officeandcell
- output
- Better Security
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Handaro Primary School -Dormitory And A Toilet
- location
-
Handaro
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Dormitory And A Toilet
- output
- Better Education Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Shurie Secondary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2008
- action
- Construction Of A Dormitory
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Alfurqan Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2008
- action
- Construction Of A Dormitory
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Masalani District Ward-Equipments
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Purchase Of Complete Set Of Equipments-Beds And Beddings
- output
- Better Health Facilities
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Ruqa Primary School
- location
-
Ruqa
(in Ijara)
- year first funded
- 2005
- action
- Construction of Of A Dormiroty Block
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Hara Primary School
- location
-
Hara
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 1 Dormitory
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Ijara Market
- location
-
Ijara
(in Ijara)
- year first funded
- 2007
- action
- Construction Of Open Air Market
- output
- Increased Trade
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Hara Primary School
- location
-
Hara
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 1 Dormitory
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Dololo Primary School
- location
-
Dololo
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Ijara Primary School
- location
-
Ijara
(in Ijara)
- year first funded
- 2004
- action
- Construction Of A Dormitory
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Korissa Dispensary
- location
-
Korissa
(in Ijara)
- year first funded
- 2004
- action
- Construction Of A Dispensay
- output
- Better Health Facilities
- implementation status
- Complete & In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Ruqa Dispensary
- location
-
Ruqa
(in Ijara)
- year first funded
- 2004
- action
- Construction Of A Dispensay
- output
- Better Health Facilities
- implementation status
- Complete & In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Sangole Dispensary
- location
-
Sangole
(in Ijara)
- year first funded
- 2004
- action
- Construction Of A Dispensay
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Masalani Library-Marram,Water &Toilets
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Murraming Of Library,Tank & Construction Toilet
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,096,492
- estimate
- Ksh 1,096,492
Hulugho District Officer Staff House And A Toilet
- location
-
Hulugho
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Staff House For Hulugho District Officer
- output
- Improve Provincial Adm. Service Delivery
- implementation status
- Planning Stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ijara District Peace Committee Office And A Toilet
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of An Office And Toilet For The Peace Committee At Masalani
- output
- Improve The Service Of Conflict Handling Service
- implementation status
- Planning Stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ijara Health Centre Staff House
- location
-
Ijara
(in Ijara)
- year first funded
- 2009
- action
- Construction Of Staff House
- output
- Better Health Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Yusuf Haji Girls Secondary School -Internal Fencing
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Fence Around The Dormitory And Construction Of School Gate
- output
- Better Education Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Masalani Girls Primary School -Administration Block
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of School Compound Fence
- output
- Better Education Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Hadi Primary School
- location
-
Hadi
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Jalish Primary School
- location
-
Jalish
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kotile Primary School -Staff House
- location
-
Kotile
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 3 Unit Staff House
- output
- Construction Of 3 Unit Staff House
- implementation status
- Comple And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Handaro Primary School -Staff House
- location
-
Handaro
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 3 Unit Staff House
- output
- Construction Of 3 Unit Staff House
- implementation status
- Comple And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Dololo Primary School
- location
-
Bodhai
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 3 Unit Staff House
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ijara Primary School
- location
-
Ijara
(in Ijara)
- year first funded
- 2008
- action
- Construction Of Adm. Block
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Wardeijab Primary School
- location
-
Hulugho
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Hulugho Bushclearing
- location
-
Hulugho
(in Ijara)
- year first funded
- 2007
- action
- Bushclearing And Opening Upof Access Roads
- output
- Accessibility
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ijara Girls Primary School
- location
-
Ijara
(in Ijara)
- year first funded
- 2007
- action
- Construction of1Dormitory
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gerille Primary School
- location
-
Gerille
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ijara Primary School
- location
-
Ijara Div
(in Ijara)
- year first funded
- 2005
- action
- Construction Of Admin Block
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Shurie Secondary School -Adorm,Unit Staffhouse
- location
-
Masalani
(in Ijara)
- year first funded
- 2003
- action
- Construction Of Dormitory & Statt House
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Alfurqan Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Staff Houses
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gumarey Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Gababa Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Farjana Primary School
- location
-
Hara
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Masalani Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Soganwater Kiosk
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Provision Of Piped Water To Community
- output
- Access To Safe Water
- implementation status
- Complete And Inuse
- total cost
- Ksh 857,000
- estimate
- Ksh 857,000
Yusuf Haji Girls Secondary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2006
- action
- Purchase Of Desks Antbeddings
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 833,000
- estimate
- Ksh 833,000
Bodhaitoilets
- location
-
Bodhai
(in Ijara)
- year first funded
- 2008
- action
- Construction of 8 Notoilets
- output
- Improved Hygiene
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Sangailu Health Centre
- location
-
Sangailu
(in Ijara)
- year first funded
- 2004
- action
- Construction Of Dispensary 3 Rooms
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Umulkher Water Kiosk
- location
-
Masalani
(in Ijara)
- year first funded
- 2005
- action
- Construction Of Water Kiosk
- output
- Provision Of Water Services
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kotile Primary School
- location
-
Kotile
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 1 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Sangaillu Dos Residence
- location
-
Sangailu
(in Ijara)
- year first funded
- 2006
- action
- Construction Of Residence
- output
- Better Security
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Deos Office
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Completion Of Stalled Deos Office
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Gerille Prymary School
- location
-
Gerille
(in Ijara)
- year first funded
- 2007
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Warsame Ecd
- location
-
Ruqa
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 775,000
- estimate
- Ksh 775,000
Hara Primary School -A Classroom
- location
-
Hara
(in Ijara)
- year first funded
- 2006
- action
- Construction 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 775,000
- estimate
- Ksh 775,000
Shabelley Ecd
- location
-
Masalani
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 775,000
- estimate
- Ksh 775,000
Gumarey Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 775,000
- estimate
- Ksh 775,000
Elmaan Primary School
- location
-
Sangole
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Gerille Prymary School
- location
-
Gerille
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Wakabharey Ecd
- location
-
Sangaillu
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Gedilun Primary School
- location
-
Handaro
(in Ijara)
- year first funded
- 2006
- action
- Contruction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Bulakokon Ecd
- location
-
Jalish
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Waradegoga Ecd
- location
-
Ijara
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Dabelweney Ecd
- location
-
Ijara
(in Ijara)
- year first funded
- 2006
- action
- Bushclearing
- output
- Accessibility
- implementation status
- Complete And Inuse
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Waranwein Primary School
- location
-
Ijara
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 700,333
- estimate
- Ksh 700,333
Mai Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Maai Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Handaro Primary School
- location
-
Handaro
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 690,000
- estimate
- Ksh 690,000
Gerille Prymary School
- location
-
Gerille
(in Ijara)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Kotile Primary School
- location
-
Kotille
(in Ijara)
- year first funded
- 2006
- action
- Purchase Of Bedding Facilities
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 640,000
- estimate
- Ksh 640,000
Bulto Hama Ecd
- location
-
Jalish
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Gedilun Primary School
- location
-
Handaro
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Waranwein Primary School
- location
-
Ijara
(in Ijara)
- year first funded
- 2004
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Alijarire Ecd
- location
-
Kotile
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Rahma Primary School
- location
-
Hara
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ege Ecd School
- location
-
Handaro
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Administration Police Staff House Sangailu
- location
-
Sangailu
(in Ijara)
- year first funded
- 2005
- action
- Construction Of Ap Staff House
- output
- Improve Security
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
El Maan Primary School
- location
-
Sangole
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Masalani District Hospital
- location
-
Masalani
(in Ijara)
- year first funded
- 2007
- action
- Provision Of Lab Equipment
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 520,000
- estimate
- Ksh 520,000
Masalani Primary School Fencing
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of School Compound Fence
- output
- Better Education Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 514,721
- estimate
- Ksh 514,721
D`S Office
- location
-
Masalani
(in Ijara)
- year first funded
- 2005
- action
- Completion Of Do`S Office
- output
- Improve Service Delivery
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
KaRoadob Bush Clearing
- location
-
Sangailu
(in Ijara)
- year first funded
- 2009
- action
- Bush Clearing Of Kardob-Sangailu Road
- output
- Improve The Road Network
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Hadi Bush Clearing
- location
-
Hadi
(in Ijara)
- year first funded
- 2009
- action
- Bush Clearing Of The Hulugho-Hadi Road
- output
- Improve The Road Network
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Construction Of Falama Cattle Crush
- location
-
Jalish
(in Ijara)
- year first funded
- 2009
- action
- Construction Of A Crush
- output
- Improve Livestock Facilities
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ijara District Commissioners Office-Renovation
- location
-
Ijara
(in Ijara)
- year first funded
- 2009
- action
- Renovation Of Ijara District Commissioners Office-Floor, Cracks,Painting
- output
- Improve Provincial Adm. Service Delivery
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Dabar Matan Water Supply
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Purchase Of The Tanks And Installation Of The Pipelines
- output
- Access To Safe Water
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Hara Water Supply
- location
-
Hara
(in Ijara)
- year first funded
- 2009
- action
- Purchase Of The Tanks And Installation Of The Pipelines
- output
- Access To Safe Water
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Hidaya Primary School -One Classroom And A Toilet
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of One Classroom And A Toilet
- output
- Better Education Facilities
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Warsame Bush Clearing
- location
-
Ruqa
(in Ijara)
- year first funded
- 2006
- action
- Bush Clearing 17 Km
- output
- Accessibility
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Bulto Hama Bushclearing
- location
-
Ijalish
(in Ijara)
- year first funded
- 2006
- action
- Bushclkearing 17Km
- output
- Accessibility
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Handaro Cattle Crush
- location
-
Handaro
(in Ijara)
- year first funded
- 2006
- action
- Construction Of Cattle Crush
- output
- Better Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ege Cattle Crush
- location
-
Handaro
(in Ijara)
- year first funded
- 2006
- action
- Construction Of Cattle Crush
- output
- Better Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Korissa Dispensary
- location
-
Korissa
(in Ijara)
- year first funded
- 2006
- action
- Constructin Of Store
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Dabelweney Jbush Clearing
- location
-
Ijara
(in Ijara)
- year first funded
- 2005
- action
- Bush Clearing 17 Km
- output
- Opening Of Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Bothai Dispensary
- location
-
Bothai
(in Ijara)
- year first funded
- 2005
- action
- Renovation Of Dispensary
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ijara Cdf Office
- location
-
Masalani
(in Ijara)
- year first funded
- 2008
- action
- Provision Of Office Equipment
- output
- Enhance Service Delivery
- implementation status
- Complete And Inuse
- total cost
- Ksh 497,433
- estimate
- Ksh 497,433
Kotile Health Centre
- location
-
Kotile
(in Ijara)
- year first funded
- 2005
- action
- Construction Of 1 Ward,Provision Of Lab Equipment
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Domi Bushclearing
- location
-
Hulugho
(in Ijara)
- year first funded
- 2008
- action
- Bushclearing And Opening Upof Access Roads
- output
- Improve Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sinai Ecd
- location
-
Hadi
(in Ijara)
- year first funded
- 2008
- action
- Completion Of Stalled Of Stalled TwoClassrooms
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kotile Bushclearing
- location
-
Kotile
(in Ijara)
- year first funded
- 2008
- action
- Bushclearing And Opening Upof Access Roads
- output
- Accessibility
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Suufi Bashir Cattle Crush
- location
-
Hara
(in Ijara)
- year first funded
- 2008
- action
- Construction Of Cattle Crush
- output
- Improved Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Dispensary Equipment
- location
-
Kotile, Ruqa, Sangole, Handaro
(in Ijara)
- year first funded
- 2006
- action
- Purchase Of Mattresses & Beds
- output
- Improve Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Bultohama Water Pan
- location
-
Jalish
(in Ijara)
- year first funded
- 2006
- action
- Construction Of Water Pan
- output
- Storage Of Water
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Hussein Katalo Bushclearing
- location
-
Gerille
(in Ijara)
- year first funded
- 2006
- action
- Bushclearing 14Km
- output
- Better Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Warabesa Bush Clearing
- location
-
Hara
(in Ijara)
- year first funded
- 2005
- action
- Bush Clearing 14 Km
- output
- Opening Up To The Road
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Maol Bush Clearing
- location
-
Ijara
(in Ijara)
- year first funded
- 2005
- action
- Bush Clearing
- output
- Opening Up To The Road
- implementation status
- Complete And Inuse
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Jalish Bush Clearing
- location
-
Jalish
(in Ijara)
- year first funded
- 2005
- action
- Bush Clearing 10 Km
- output
- Opening Of Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 383,809
- estimate
- Ksh 383,809
Farjana Primary School
- location
-
Hara
(in Ijara)
- year first funded
- 2009
- action
- Finishing Of The Two Classrooms And Two Toilets-Painting, Roofing And Doors
- output
- Better Education Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kotile Dispensary Lab Equip
- location
-
Kotile
(in Ijara)
- year first funded
- 2008
- action
- Purchase Of Lab Equipment
- output
- Better Health Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Korissa Cattle Crush
- location
-
Korisa
(in Ijara)
- year first funded
- 2006
- action
- Construction Of 1 Cattle Crush
- output
- Improve Livestock Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ijara Bushclearing
- location
-
Ijara
(in Ijara)
- year first funded
- 2006
- action
- Bushclearing 10Km
- output
- Accessibility
- implementation status
- Complete And Inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Moit Bush Clearing
- location
-
Ijara
(in Ijara)
- year first funded
- 2005
- action
- Bush Clearing 10 Km
- output
- Opening Of Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Jalish Water Pump
- location
-
Jalish
(in Ijara)
- year first funded
- 2005
- action
- Construction Of A Water Pump
- output
- Provision Of Water Services
- implementation status
- Complete And Inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Hara Primary School -A Classroom
- location
-
Hara
(in Ijara)
- year first funded
- 2003
- action
- Construction A Classroom
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Furqan Primary School
- location
-
Masalani
(in Ijara)
- year first funded
- 2009
- action
- Construction Of Two Toilets
- output
- Better Education Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gabaya Drift
- location
-
Handaro
(in Ijara)
- year first funded
- 2004
- action
- Construction Of Drift
- output
- Better Road Network
- implementation status
- Complete And Inuse
- total cost
- Ksh 187,000
- estimate
- Ksh 187,000
Alijarire Ecd
- location
-
Kotile
(in Ijara)
- year first funded
- 2006
- action
- Purchase Of Classroom Desks
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Waranwein
- location
-
Ijara
(in Ijara)
- year first funded
- 2005
- action
- Purchase O Classroom Desks
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Muhumed Dahir Primary School -Completion Of A Classroom
- location
-
Masalani
(in Ijara)
- year first funded
- 2003
- action
- Completion Of A Classroom Started By Parent
- output
- Better Education Facilities
- implementation status
- Complete And Inuse
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Training Of Community Health Workers
- location
-
Masalani
(in Ijara)
- action
- Training Of 4 Community Health Workers
- output
- Improve Health Services
- implementation status
- Complete And Inuse
- total cost
- Ksh 0
- estimate
- Ksh 0