The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Sabane/Mmpaka Electricity
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Supply Of Electricity
- output
- Improve On Std Of Residents
- implementation status
- Not Started
- total cost
- Ksh 12,394,792
- estimate
- Ksh 10,000,000
Malinya Stadium
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2006
- action
- Expansion Of Field For The Stadium
- output
- Create Space For Recreation Activities
- implementation status
- On Going
- total cost
- Ksh 9,500,000
- estimate
- Ksh 15,000,000
Ihachi Bridge
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of The Bridge
- output
- To Link Imulama & Mutaho Villages
- implementation status
- Complete
- total cost
- Ksh 7,495,565
- estimate
- Ksh 7,495,565
Mushianda Imalaba Electrcity
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2005
- action
- Installation Of Electricity From Mushianda Via Lubambo Towards Imalaba
- output
- Provide Power At Lubambo/ Imalaba
- implementation status
- On Going Survey Done Pegging Done
- total cost
- Ksh 5,877,854
- estimate
- Ksh 3,800,000
Musingu Secondary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Administration Block
- output
- Create Room For Administrati
- implementation status
- 1St Phase Completed
- total cost
- Ksh 5,000,000
- estimate
- Ksh 7,000,000
Ilurechi W/Project
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Drill 4 Boreholes Establish Gravitational Water
- output
- Provide Water For The Local And Improve Agricultural Activities
- implementation status
- 3 Bore Holes Already In Use Gravity Water Ready Established On Going
- total cost
- Ksh 3,400,000
- estimate
- Ksh 3,500,000
Shikunga Secondary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of A Laboratory And Bus Purchase
- output
- Improve Academic Standards
- implementation status
- Completed
- total cost
- Ksh 2,700,000
- estimate
- Ksh 3,500,000
Shiveye Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2003
- action
- Flooring Of 5 Classrooms, Toilet &Classroom Construction.
- output
- Improve Hygienic Environment
- implementation status
- 1St Phase Completed. Toilets On Going
- total cost
- Ksh 2,250,000
- estimate
- Ksh 200,000
Constituency Office
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2003
- action
- Construction Of Office Supply Of Electricity
- output
- Development For A Centre Of Residents
- implementation status
- 1St Phase Completed
- total cost
- Ksh 2,113,398
- estimate
- Ksh 2,113,398
Shisesia Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of Collapsed Toilets Plus Classrooms & Adm. Block
- output
- Improve On Hygienic Stds And Leave The Current Land For The Secondary Section
- implementation status
- 1St Phase Complete, 2Nd Phase To Start Soon.
- total cost
- Ksh 2,050,000
- estimate
- Ksh 2,200,000
Shihalia Electricity
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Electricity Supply
- output
- Provide Electricity To The Locals
- implementation status
- On Going Project
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Shikokho Electricity
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2004
- action
- Supply Of Electricity
- output
- Improve Academic Standards In Schools
- implementation status
- 1St Phase Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 3,200,000
Shiduha Girls Secondary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Improve Academic Standards
- implementation status
- Completed 1St And 2Nd Phase. 3Rd Phase To Start Soon
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,500,000
Shanjetso Primary School
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2003
- action
- Built 4 Classrooms With Floor Complete
- output
- Improve Academic Stds
- implementation status
- 1St , 2Nd & 3Rd Phases Complete4Th Phase To Start Soon
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Shikokho Sec
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Dining Hall
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 1,155,385
- estimate
- Ksh 1,200,000
Shinyikha Ecd/Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms And Toilets
- output
- Improve Academic Standards
- implementation status
- 3 Classrooms Constructed & In Use Plus Toilets
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Shimanyiro Secondary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Adm Block
- output
- Create Space For Administrative
- implementation status
- 1St Phase Complete2Nd Phase To Start
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,739,990
Makhokho Secondary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of Library
- output
- Reduce Congestion
- implementation status
- 1St Phase Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Iremele Primary School
- location
-
Eregi and Shikumu
(in Ikolomani)
- year first funded
- 2004
- action
- Build 4 Class Rooms
- output
- Improve Academic Stds
- implementation status
- Phase 1 Complete, Phase 2 On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 600,000
Imbale Secondary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Improve Academic Standards
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Shisele Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms Repair Blown Off Roof
- output
- Improve Academic Standards
- implementation status
- Completed 1St Phase 2Nd Phase To Start Soon
- total cost
- Ksh 900,000
- estimate
- Ksh 987,280
Shibuname Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Completed
- total cost
- Ksh 823,640
- estimate
- Ksh 500,000
Shirandalo Ecd
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Classrooms Cum Office &Purchase Of Land
- output
- Improve Academic Standards
- implementation status
- Phase 1 Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 820,000
Isheywe Primary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2004
- action
- Build 2 Classroom Fitting &Flooring The Classrooms 9 In Number
- output
- Improve Academic Standards
- implementation status
- Phase 1And 2 Complete, Phase 23On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 600,000
Malinya Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2003
- action
- Construction Of 6 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St & 2Nd Phase Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Shivakala Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2004
- action
- Renovation Construction Of 2 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Shikumu Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Completed 1St Phase
- total cost
- Ksh 750,000
- estimate
- Ksh 774,289
Madivini Primary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2004
- action
- Build 4 Classrooms Elevation Of Verandah Fitting
- output
- Improve Academic Standards
- implementation status
- Phase 1 Complete Phase 2 To Start Soon
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Ikhulili Primary School
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Built 4 Classrooms Fitting, Plaster &Flooring As Send Phase And Veranda
- output
- Improve Academic Stds
- implementation status
- All Phases Complete .
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Lusiola Primary School
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Completion Of Adm Block Fitting Plaster Ceiling Painting Flooring
- output
- Improve Academic Stds
- implementation status
- 1St And 2Nd Phases Complete 3Rd Phase To Start Soon
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Ichina Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2004
- action
- Renovation Construction Of 2 Classrooms
- output
- Reduce Congestion And Improve Hygienic Standards
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Matundu Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Adm Block
- output
- Reduce Congestion
- implementation status
- 1St Phase Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Busilwa Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Adm Block
- output
- Create Space For Administrative Office
- implementation status
- Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Shikhombelo Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 5 Classrooms
- output
- Improve Academic Standards
- implementation status
- Skeleton Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Kaluni Primary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2004
- action
- Build 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Phase 1 Complete, Phase 2 On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Itulubini E
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2004
- action
- Build To Shell Structure Classrooms & An Office Plaster & Fitting
- output
- Improve Academic Standards
- implementation status
- Completed
- total cost
- Ksh 620,000
- estimate
- Ksh 620,000
Ivole Tea Panda
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Tea Paying Centre
- output
- Bring Collection Centre Closer To Farmers
- implementation status
- On Going
- total cost
- Ksh 611,100
- estimate
- Ksh 611,100
Sabane Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Flooring Of 5 Classroom,Construction Of Class
- output
- Improve Hygienic Environment, Reduce Congestion
- implementation status
- 1St &2Nd Phase Completed,2Nd Phase On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 200,000
Shichinji Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Phase 1 Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 661,032
Ibwali Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2003
- action
- Office And Staffroom Construction
- output
- Improve Academic Standards
- implementation status
- Complete And In Use I.E 1St Phase
- total cost
- Ksh 600,000
- estimate
- Ksh 667,340
Mukoyani Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Construction Upto Roofing 2Nd Phase To Start Soon
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Imulama Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Improve Academic Standards
- implementation status
- 3 Classrooms (Skelton) Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 660,900
Lwanaswa Primary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2003
- action
- Build 4 Classrooms Renovation Flooring, Plastering & -General Repairs
- output
- Improve Academic Standards
- implementation status
- All Phases Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Imalaba Secondary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2006
- action
- Build A Laboratory And Toilets
- output
- Improve Academic Standards &Sanitation
- implementation status
- 1St Phase Complete 2Nd Phase To Start Soon
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Lubambo Primary School
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2005
- action
- Build Toilets
- output
- Improve On Sanitation &
- implementation status
- Toilets Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 200,000
Masiyenze Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Two Classroom
- output
- Start Up A Secondary Section
- implementation status
- 1St Phase Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Malinya Market
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Mkt,Stalls
- output
- Improve Stds Of Market Vendors
- implementation status
- 1St Phase Completed
- total cost
- Ksh 557,340
- estimate
- Ksh 557,340
Ivole Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Reduce Congestion
- implementation status
- 1St Phase Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Lwenya Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms & Adm Block
- output
- Reduce Congestion In Classes/Office
- implementation status
- 1St Phase Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Naliava Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Flooring Of 5 Classrooms
- output
- Improve Hygienic Environment
- implementation status
- 1St Phase Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Naliava/Imuliru Bridge
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of A Bridge
- output
- Connects Naliava And Imuliru
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Shiveye Secondary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Reduce Congestion In Classes
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Shiavihiga Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2003
- action
- Flooring Of 5 Classrooms, Construction Classes
- output
- Improve Hygienic & Academic Standards
- implementation status
- 1St Phase Completed 2Nd Phase To Start Soon
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kimingini Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 5 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Lusui Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Shivakala Secondary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Busula Bridge
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Bridge
- output
- Connects Lwenya To Impaka
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Shikondi Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Lirhembe /Shitoli Road
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Road Opening And Murraming And Classrooms
- output
- Connect Lirhembe & Shitoli S/Locations
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Shisejeri Market
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Build Market Stalls 25 In Number
- output
- Improve Stds Of The Market Vendors
- implementation status
- All Phases Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mwilongo Bridge
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2003
- action
- Build A Culvert Bridge
- output
- Joining Ivonda & Shanjetso
- implementation status
- Phase 1 And 2 Complete,
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Lusiola Secondary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2006
- action
- Build A Laboratory And Toilets
- output
- Improve Academic Standards
- implementation status
- 1St Phase Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,200,000
Eregi Girls High
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2006
- action
- Build Laboratory
- output
- Improve Academic Standards
- implementation status
- Not Started Due To Procurement Has Not Taken Place
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Eregi Chief Camp
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2006
- action
- Build Chief Office
- output
- Curb Insecurity In The Area
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mumbetsa Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Improve Academic Standards
- implementation status
- Skeleton Complete 2Nd Phase To Start Soon
- total cost
- Ksh 500,000
- estimate
- Ksh 564,400
Mwikhomo Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms & Adm Block
- output
- Improve Academic Standards
- implementation status
- 3 Classrooms Complete Adm Block Up To Lidol Level
- total cost
- Ksh 500,000
- estimate
- Ksh 499,300
Mutaho Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Adm Blcok And Classrooms
- output
- Improve Academic Standards
- implementation status
- Both Structures Put Up, Classroms In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 567,690
Ibwali/Munyanza Bridge
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of A Bridge
- output
- Connects Ibwali And Munyanza Village
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Bushiangala Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Classrooms Renovation (2)
- output
- Improve Academic Standards
- implementation status
- Flooring,Plater,ReRoofing & Facia Board Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Bushiangala Health Centre
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Electricity Fencing, Lab Renovation Medical Equipment
- output
- Improve Health Services
- implementation status
- Fencing, Medical Equipment Purchase Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Shihalia Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- 8 Classrooms Renovation Flooring, Plaster Shutters
- output
- Improve Academic Standards
- implementation status
- Completed Phase 1 Phase 2 To Start Soon
- total cost
- Ksh 500,000
- estimate
- Ksh 761,085
Imusali Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Musali Secondary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of A Laboratory
- output
- Improve Academic Standards
- implementation status
- On Going Project
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Shikumu Health Centre
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of A Health Facility
- output
- Improve Health Care In The Community
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Musoli Mixed Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms And Toilets
- output
- Improve Academic Standards
- implementation status
- Excavation Works, Walling & Roofing Completed
- total cost
- Ksh 405,000
- estimate
- Ksh 500,000
Shikulu Tea
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Supply Of Tea Seedlings
- output
- Reduce Poverty Level
- implementation status
- Farmers Yet To Be Supplied
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lunenele Tea
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Supply Of Tea Seedlings
- output
- Reduce Poverty Level
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mukongolo Tea
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Supply Of Tea Seedlings
- output
- Reduce Poverty Level
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Musoli Tea
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Supply Of Tea Seedlings
- output
- Reduce Poverty Level
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Irechelo E
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2007
- action
- Constructios Of Classrooms
- output
- Improve Academic Standards
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Munyanza E
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Improve Academic Standards
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Imulembo E
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Not Stated
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Imbale Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2006
- action
- Classrooms Renovations Flooring,Plaster,Shutters,Wall Rough Casting And Painting
- output
- Improve Academic Standards
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Shiseso Tea Nursery
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2005
- action
- Tea Planting
- output
- Improve Farmers Income
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Shinyikha E Shiduha
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Improve Academic Standards
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Shisele Market
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Mkt Stalls
- output
- Space For Mkt Verandars
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Shikumu Tea Buying Centre
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Tea Buying Centre
- output
- Bring Collection Centre Closer To Farmers
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Shabwali Tea
- location
-
Eregi and Shikumu
(in Ikolomani)
- year first funded
- 2006
- action
- Buy Tea Seedlings And Supply To The Farmers
- output
- Improve Farmers Income
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Madivini Tea
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2006
- action
- Buy Tea Seedlings And Supply To The Farmers
- output
- Improve Farmers Income
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Shanjetso Tea
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2006
- action
- Buy Tea Seedlings And Supply To The Farmers
- output
- Improve Farmers Income
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Shisejeri Tea Nursery
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Buy Tea Seedlings And Supply To The Farmers
- output
- Improve Farmers Income
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lukose Tea Nursery
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Buy Tea Seedlings And Supply To The Farmers
- output
- Improve Farmers Income
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kaluni Tea Nursery
- location
-
Eregi
(in Ikolomani)
- year first funded
- 2004
- action
- Buy Tea Seedlings And Supply To The Farmers
- output
- Improve Farmers Income
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Malinya Tea Panda
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2006
- action
- Purchase & Supply Of Tea Seedlings
- output
- Reduction Of Poverty Level
- implementation status
- 1St Phase Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Shivakala Tea
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2006
- action
- Purchase &Supply Of Tea Seedling
- output
- Reduction Of Poverty Level
- implementation status
- 1St Phase Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ibuka E
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Musingu Ecd
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of 3 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Lirhembe Tea
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Purchase & Supply Of Tea Seedlings
- output
- Reduce Poverty Levels
- implementation status
- 1St Phase Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Iluya Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Adm Block
- output
- Create Room For Administrati
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Shitoli Tea Nursery
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Purchase & Supply Of Tea Seedlings
- output
- Eradicate Poverty Level
- implementation status
- 1St Phase 1St Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ivonda Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Improve Stds Of School
- implementation status
- 1St Phase Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Makhokho Tea
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Purchase & Transport Of Tea Seedlings
- output
- Eradicate Poverty Level
- implementation status
- 1St Phase Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Shibuname Tea
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Supply Of Tea Seedlings
- output
- Reduce Poverty Level
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Makhokho Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2003
- action
- Renovation Of Classrooms Transportation Of Computers
- output
- Improve Hygienic & Academic Standards
- implementation status
- 1St Phase Completed
- total cost
- Ksh 379,000
- estimate
- Ksh 379,000
Ivole Bridge
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of A Deck
- output
- Connect Shisesia &Ivole Village
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Itecheti Bridge
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of The Bridge
- output
- Links Bushiangala & Eregi Villages
- implementation status
- Completed Phase 1 Phase 2 To Start Soon
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
Shitechia Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Adm Block
- output
- Create Space For Administrative Offices
- implementation status
- Excavation Works, Waling & Roofing Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 589,880
Musoli Heath Centre
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- Extension & Renovation Of The Centre Improve On Health Services
- output
- Improve Medical Standards
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 420,000
Isulu Primary School
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2004
- action
- 1 Classroom Construction And Renovation
- output
- Improve Academic Standards
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,700
Bushiangala T
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Adm Block
- output
- Improve Academic Standards
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Shichinji Secondary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Laboratory Construction
- output
- Improve Academic Standards
- implementation status
- Extravacationslab Walling & Roofing Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 461,032
Shimanyiro Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Completion Of Adm Block
- output
- Create Space For Administrative Offices
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Mumbetsa Polytechnic
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Improve Academic Standards
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Imalaba Primary School
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2004
- action
- Completion Of Adm Block Walling, Plaster, Roofing And Fitting
- output
- Improve Academic Standards
- implementation status
- Phase 1 Complete,
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Lirhembe Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Musingu Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Shitoli Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2007
- action
- Renovation Of Classrooms
- output
- Improve On The Face Of The Schooll
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Shiseno Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Shikokho Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Class Rooms.
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Shirumba Primary School
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classrooms
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Shibwe Health Centre
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2003
- action
- Construction Of 2 Wards
- output
- Create Room For In-Patients
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Lirhembe Girls
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Funding For Adm Block
- output
- Reduce Congestion
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Butsetse Bridge
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Culvert Bridge
- output
- Connect Lirhembe & Makhokho Village
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Shisesia Secondary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Improve Performance In Science Subjects
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Imuliru Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classes
- implementation status
- 1St Phase Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Shiseso Health Centre
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Purchase Of Hospital Equipment & Furniture
- output
- Improve On Service At The Hospital
- implementation status
- Complete
- total cost
- Ksh 255,000
- estimate
- Ksh 300,000
Shiduha Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2005
- action
- Classrooms Renovations,Shutters,Flooring,Plastering&General Repairs
- output
- Improve Academic Standards
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
Imulama Health Centre
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2003
- action
- Wall Plaster,Flooring,Shutters, Facia Board
- output
- Providehelath Services To The Community
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Buchelemi Cattle Dip
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2005
- action
- Renovation Of The Dip & Fencing
- output
- Improve On Vetinary Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Burendwa Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- Improve Academic Standards
- implementation status
- Construction Skeleton Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 247,340
Ikangubu/Iluya Bridge
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2006
- action
- Construction Of Culvert Bridge
- output
- Connect Shitoli And Iluya
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Musasa Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Flooring Of 5 Classrooms
- output
- Improve Hygienic Environment
- implementation status
- 1St Phase Completed 2Nd Phase To Start Soon
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ds Office
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2007
- action
- Partitioning Of Office
- output
- Accommodate D.E.O Kakamega South
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 260,000
Shamusinjiri Primary School
- location
-
Shisele
(in Ikolomani)
- year first funded
- 2004
- action
- Classrooms Renovations, Flooring, Shutters, Wall Roughcasting & Painting
- output
- Improve Academic Standards
- implementation status
- 1St Phase Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 398,992
Iguhu Primary School
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Reduce Congestion In Classes
- implementation status
- 1St Phase Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Shitoli Polytechnic
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2003
- action
- Purchase Of Tools
- output
- Completed
- implementation status
- Enrolment Has Gone Up
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lirhembe Cattle Dip
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Renovation Of Cattle Dip
- output
- Improve Stds Of Livestock?S
- implementation status
- 1St Phase Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Litambitsa Cattle Dip
- location
-
Iguhu
(in Ikolomani)
- year first funded
- 2005
- action
- Renovation Of Cattle Dip
- output
- Improve Stds Of Livestock?S
- implementation status
- 1St Phase Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
D Ikolomani North Office
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2007
- action
- Office Renovation And Toilet Construction
- output
- Accommodate New D.O
- implementation status
- Tendering On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Irechelo Water Pump
- location
-
Isulu
(in Ikolomani)
- year first funded
- 2007
- action
- Repair Of A Pumping System
- output
- Provide Water For Community
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Malinya Slaughter House
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2007
- action
- Construction Of Slaughter House
- output
- Bring To Residents Closer Services
- implementation status
- 1St Phase Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ilucheo/W/ Spring
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Water Springs
- output
- Improve Standards Of Water
- implementation status
- Completed
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Kustini W/Spring
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Water Spring
- output
- Improve Standards Of Water
- implementation status
- 1St Phase Completed
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Shiabiranga Water Spring
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Renovation Of Water Spring
- output
- Improve Standards Of Water
- implementation status
- Completed
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Muyele W/ Spring
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Water Springs
- output
- Improve Standards Of Water
- implementation status
- Completed
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Ishianore W/Spring
- location
-
Shirumba
(in Ikolomani)
- year first funded
- 2005
- action
- Construction Of Water
- output
- Improve Standards Of Water
- implementation status
- Completed
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Madivini Borehole
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2007
- action
- Repair Borehole
- output
- Provide Clean Water
- implementation status
- Tendering On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Imalaba Borehole
- location
-
Shikumu
(in Ikolomani)
- year first funded
- 2007
- action
- Repair Of Borehole
- output
- Improve Standards Of Water
- implementation status
- On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Eregi Mixed Primary School
- location
-
Eregi
(in Ikolomani)
- action
- Build A Library
- output
- Improve Academic Stds
- implementation status
- All Phases Complete
- total cost
- Ksh 0
- estimate
- Ksh 450,000