The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Sericho secondary School
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2007
- action
- New school construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 4,100,000
- estimate
- Ksh 4,100,000
Isiolo south constituency office
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2006
- action
- Construction
- output
- Enhance management
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Malkadaka Irrigation Schooleme
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2003
- action
- Construction of canals
- output
- Avail Food
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Garfarsa Primary School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2004
- action
- 4 Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Malkadaka Irrigation Schooleme
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2004
- action
- Rehabilitation & desilting
- output
- Avail food
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Yaqbarsadi Borehole
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Fencing & store construction
- output
- Avail water
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Garbatulla Sub district Hospital
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2008
- action
- Operation Theatre construction
- output
- Uplift health
- implementation status
- Not Started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Modogashe Social Hall
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2004
- action
- construction and equiping
- output
- Avail social facilities
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,200,000
Badana Dispensary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Gubatu Primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2003
- action
- 3 Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,764,000
- estimate
- Ksh 1,940,000
Kinna Social Hall
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Social hall construction
- output
- Improve welfare
- implementation status
- Complete
- total cost
- Ksh 1,589,964
- estimate
- Ksh 1,589,964
Boji Dispensary
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2004
- action
- Dispensary construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,400,000
Boji Water Project
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2005
- action
- Digging Trences
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 1,505,482
- estimate
- Ksh 1,505,482
Eldera primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2004
- action
- Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Sericho secondary School
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2008
- action
- Completion of admin block
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kulamawe Dispensary
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- maternity construction
- output
- Uplift health
- implementation status
- complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Rapsu Dispensary
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2003
- action
- Nurse house construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 1,358,000
- estimate
- Ksh 1,400,000
Eldera Dispensary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Dispensary construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Gafarsa Water Project
- location
-
Gafarsa
(in Isiolo South)
- year first funded
- 2006
- action
- Water installation
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 1,220,482
- estimate
- Ksh 1,220,482
Kinna Market Store
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Construction
- output
- Improve local business
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Malkadaka Irrigation Schooleme
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2006
- action
- Store house construction
- output
- Avail food
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Eldera primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2006
- action
- 3 Classrooms construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Makarim primary School
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2006
- action
- 2 Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Sericho Primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2006
- action
- 3 Classrooms construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Badana Primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2006
- action
- 2 Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- dining hall construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
G/Tulla Water Project
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2005
- action
- Construction of water kiosks
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Biliqinuru primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Makarim primary School
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2005
- action
- Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Biliqinuru primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2006
- action
- Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,034,482
- estimate
- Ksh 1,034,482
Garfasa Primary School
- location
-
Gafarsa
(in Isiolo South)
- year first funded
- 2006
- action
- Classroo &store construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,014,000
- estimate
- Ksh 1,014,000
Muchuro Dispensary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Dispensary construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Malkadaka Irrigation Schooleme
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2005
- action
- Completion of canals construction
- output
- Avail food
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Makarim primary School
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2008
- action
- 2 Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Sericho Health Centre
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2008
- action
- Staff house Construction
- output
- Uplift health
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- dining hall completion
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Wako wario primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Class Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Garbatulla High School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 970,000
- estimate
- Ksh 1,000,000
Rapsu Irrigation Schooleme
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Food security
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Sericho Water Project
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2004
- action
- Water installation completion
- output
- Avail water
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kinna Cattle Dip
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Construction
- output
- Control of diseases
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Galma Dido Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Administration Block
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Modogashe Dispensary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Staff house construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kinna Health Centre
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- Maternity construction
- output
- Uplift health
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Muchuro Dispensary
- location
-
Gafarsa
(in Isiolo South)
- year first funded
- 2008
- action
- Saff house Construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 860,000
- estimate
- Ksh 860,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Lib. Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 852,000
- estimate
- Ksh 852,000
Sericho Water Project
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Tanks construction
- output
- Avail water
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Rapsu primary School
- location
-
Rapsu
(in Isiolo South)
- year first funded
- 2005
- action
- Classroom &fencing
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 838,469
- estimate
- Ksh 838,469
Dabasiti Primary School
- location
-
Kulamawe
(in Isiolo South)
- year first funded
- 2008
- action
- Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Malkadaka Water Project
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2005
- action
- water installation
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Modogashe Water Supply
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2005
- action
- Desilting
- output
- Avail water
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Sericho Health Centre
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2007
- action
- VCT/Laborotary construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- dining hall construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 8,000,000
Modogashe Dispensary
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2005
- action
- Dispensary construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- Lib. Completion
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Matagari Primary School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2004
- action
- Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Omara Boarding primary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2008
- action
- Generator Purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Dabasiti Primary School
- location
-
Kulamawe
(in Isiolo South)
- year first funded
- 2004
- action
- Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Rapsu Water project
- location
-
Rapsu
(in Isiolo South)
- year first funded
- 2007
- action
- water connection
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Malkadaka Water Project
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
AP Post Sericho
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2007
- action
- AP house Construction
- output
- Imp. AP Welfare
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Belgesh nursery School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2007
- action
- Nursery & Classrooms construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Rapsu water and sanitation project
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- water & tanks installation and toilets construction
- output
- Avail water
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Muchuro Dispensary
- location
-
Gafarsa
(in Isiolo South)
- year first funded
- 2007
- action
- Fenching compound
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 610,000
- estimate
- Ksh 610,000
Didabakiri Primary School
- location
-
Kulamawe
(in Isiolo South)
- year first funded
- 2008
- action
- Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Omara Boarding primary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2007
- action
- Class Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Tana Nursery School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2007
- action
- Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Galma Dido Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- 1 Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kinna Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
AP Eldera Housing Project
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2007
- action
- Fencing,house &latrine construction
- output
- Imp. AP Welfare
- implementation status
- Complete
- total cost
- Ksh 560,000
- estimate
- Ksh 560,000
Rapsu Dispensary
- location
-
(in Isiolo South)
- year first funded
- 2008
- action
- Dispensary rehabilitation
- output
- uplift health
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Daawa Primary School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2006
- action
- Furniture purchase & water tank construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 529,000
- estimate
- Ksh 529,000
Malkadaka Water Project
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2008
- action
- Flood protection, repair & fencing
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Malkadaka Dispensary
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2007
- action
- Staff house Construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Malkadaka Dispensary
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2006
- action
- Dispensary construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kulamawe Dispensary
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- maternity construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
G/Tulla Boarding Primary
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2007
- action
- Dorm & Class renovation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Makarim primary School
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2007
- action
- 1 Classroom Construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tana Nursery School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2006
- action
- Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Didabakiri Primary School
- location
-
Kulamawe
(in Isiolo South)
- year first funded
- 2005
- action
- Class Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Didabakiri Primary School
- location
-
Kulamawe
(in Isiolo South)
- year first funded
- 2004
- action
- Class Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Duse Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- Class Construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Omara Boarding primary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2004
- action
- dining Hall construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Eldera Dispensary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2006
- action
- Construction completion
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Garbatulla High School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2008
- action
- Furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 5,000,000
Eldera Water Project
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Rapsu renovation of chief's office &AP post fencing
- location
-
Rapsu
(in Isiolo South)
- year first funded
- 2007
- action
- Chief's house renovation & fencing
- output
- Imp. AP Welfare
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kulamawe Primary
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- Store renovation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kinna Social Hall
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- furniture purchase
- output
- Improve welfare
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Malkadaka Water Project
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2007
- action
- Construction of water tanks
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Rapsu primary School
- location
-
Rapsu
(in Isiolo South)
- year first funded
- 2006
- action
- Construction
- output
- uplift education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Rapsu primary School
- location
-
Rapsu
(in Isiolo South)
- year first funded
- 2004
- action
- Classroom construction
- output
- uplift education
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Malkadaka Irrigation Schooleme
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2007
- action
- Generator purchase
- output
- Avail food
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Malkadaka primary
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2006
- action
- Furniture supply
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 334,482
- estimate
- Ksh 334,482
G/Tulla Day Primary School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2007
- action
- Nursery & Classrooms renovation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Matagari Primary School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2007
- action
- Fencing
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Malkadaka primary
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2007
- action
- Fencing
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Eldera A.P. Housing Project
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2006
- action
- Construction
- output
- Good houses for APS
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Duse AP Housing project
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- AP house Construction
- output
- Improve scurity welfare
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Malkadaka Water Project
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2007
- action
- Solar installation
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kinna Health Centre
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- Staff house construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kinna Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Classrooms rehabilitation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Algani Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- Purchase of furniture
- output
- Uplift education
- implementation status
- complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Rapsu primary School
- location
-
Rapsu
(in Isiolo South)
- year first funded
- 2008
- action
- Furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Yaqbarsadi Borehole
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Equiping
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 236,481
- estimate
- Ksh 236,481
Gafarsa Water Project
- location
-
Gafarsa
(in Isiolo South)
- year first funded
- 2008
- action
- Tanks construction
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 226,350
- estimate
- Ksh 226,350
Duse Sanitation Project
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- Toilet Construction
- output
- Improved sanitation
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Lib. Construction
- output
- uplift education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- Furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kinna secondary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- Wiring
- output
- Uplift education
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Tana Nursery School
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2008
- action
- Furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kinna Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- furnuture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Muchuro Primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2008
- action
- 2 Classroom construction
- output
- Uplft education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kulamawe Primary
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- water installation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kinna Health Centre
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- furnuture purchase
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Malkadaka Water Project
- location
-
Malkadaka
(in Isiolo South)
- year first funded
- 2007
- action
- Construction of pump house & store
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Galma Dido Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- Classroom renovation
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 152,000
- estimate
- Ksh 152,000
Kinna Health Centre
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2008
- action
- Electricity connection
- output
- Uplift health
- implementation status
- complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kombola Irrigation Schooleme
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2004
- action
- Survey
- output
- Avail food
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Modogashe Dispensary
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2007
- action
- Toilet Construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Duse Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Boji Dispensary
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2007
- action
- Equipments supply
- output
- Uplift health
- implementation status
- complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Eldera Dispensary
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2007
- action
- furnuture purchase
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
Kinna Water Supply
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Survey
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 137,587
- estimate
- Ksh 0
Wako wario primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2006
- action
- Furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 127,000
- estimate
- Ksh 127,000
DaawaChildren Home
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2006
- action
- Toilet Construction
- output
- Improved sanitation
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Modogashe Water Project
- location
-
Modogashe
(in Isiolo South)
- year first funded
- 2005
- action
- Water survey
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Kinna Cattle Dip
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2007
- action
- Construction
- output
- Control of diseases
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Rapsu Sanitation
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Toilet Construction
- output
- Improved sanitation
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Duse Primary School
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Nursery Class construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Eldera primary School
- location
-
Sericho
(in Isiolo South)
- year first funded
- 2005
- action
- Furniture purchase
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Rapsu Dispensary
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2005
- action
- Toilet Construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Boji Dispensary
- location
-
G/Tulla
(in Isiolo South)
- year first funded
- 2005
- action
- Toilet Construction
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Charabadicha water Project
- location
-
Kinna
(in Isiolo South)
- year first funded
- 2004
- action
- Pipeline extension
- output
- Provide safe drinking
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kombola Primary School
- location
-
Sericho
(in Isiolo South)
- action
- 2 Classroom construction
- output
- Uplift education
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 1,200,000
Kinna Health Centre
- location
-
Kinna
(in Isiolo South)
- action
- Rehabilitation
- output
- Uplift health
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 1,400,000
Kinna Kachoradi
- location
-
Kinna
(in Isiolo South)
- action
- Water survey
- output
- Avail water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 100,000
Kulamawe Water Project
- location
-
Kulamawe
(in Isiolo South)
- action
- Rehabilitation
- output
- Safe drinking water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 734,482
G/Tulla Childrens Home
- location
-
G/Tulla
(in Isiolo South)
- action
- Construction
- output
- Improve child welfare
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 500,000