The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Juja

Bursary

location
Juja (in Juja)
year first funded
2005
action
bursary
output
-
implementation status
not known
total cost
Ksh 18,776,342
estimate
Ksh 7,500,000

Emergency

location
Juja (in Juja)
year first funded
2004
action
n/a
output
-
implementation status
not known
total cost
Ksh 10,397,834
estimate
Ksh 5,547,733

Admin/Mon&Eval

location
Juja (in Juja)
year first funded
2003
action
n/a
output
-
implementation status
Not In use
total cost
Ksh 8,373,685
estimate
Ksh 5,073,047

Githurai Location Roads

location
Githurai (in Juja)
year first funded
2005
action
Light Grading
output
To Have Passable Roads
implementation status
Complete
total cost
Ksh 6,150,000
estimate
Ksh 6,000,000

Juja Location Road

location
Juja (in Juja)
year first funded
2004
action
Light Grading &Gravelling
output
To Enhance Movement Of Goods&Services
implementation status
Complete
total cost
Ksh 6,031,141
estimate
Ksh 6,000,000

Thika/Gatuanyaga Road

location
Thika (in Juja)
year first funded
2006
action
Light Grading&Culverts
output
To Have Efficient Road Network
implementation status
Complete
total cost
Ksh 5,917,000
estimate
Ksh 6,000,000

Ruiru Location Roads

location
Ruiru (in Juja)
year first funded
2006
action
Culverts,Grading&Murraming
output
To Have Proper Transport
implementation status
Complete
total cost
Ksh 5,900,000
estimate
Ksh 6,000,000

Gitothua Pri Boreholeprison

location
Ruiru (in Juja)
year first funded
2004
action
Tank Tower, Pipes&Water Kiosk
output
Provinding Clean Water To The Community
implementation status
Complete
total cost
Ksh 4,600,000
estimate
Ksh 3,000,000

Monitoring/Evaluation

location
Juja (in Juja)
year first funded
2005
action
n/a
output
-
implementation status
not known
total cost
Ksh 4,214,038
estimate
Ksh 1,910,526

Muigai Inn Borehole

location
Juja (in Juja)
year first funded
2004
action
Water Pipes
output
Provinding Clean Water To All
implementation status
Complete But Not Operational
total cost
Ksh 3,600,000
estimate
Ksh 3,600,000

Kilimambogo/Makutano Water Proj

location
Gatuanyaga (in Juja)
year first funded
2004
action
Water Tank Collection,Water Pipes
output
-
implementation status
Stalled
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Recurrent Expenditure

location
Juja (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 3,455,268
estimate
Ksh 0

Btl Water Project

location
Ruiru (in Juja)
year first funded
2004
action
Elec Inst,&Water Supply Pipes
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Kwihota Secondary School Borehole

location
Githurai (in Juja)
year first funded
2006
action
Elec Inst,&Water Supply Pipes
output
Provide Water To The School &Community
implementation status
Complete
total cost
Ksh 2,800,000
estimate
Ksh 2,800,000

Murera Kimbo/Gsu Borehole

location
Ruiru (in Juja)
year first funded
2004
action
Borehole,Pump House,Elec
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 2,642,000
estimate
Ksh 2,250,000

Ndururumo Dispensary Borehole

location
Githurai (in Juja)
year first funded
2005
action
Borehole,Pump House,Elec
output
-
implementation status
Stalled To Be Revived
total cost
Ksh 2,600,000
estimate
Ksh 2,600,000

Mirimaini Community Water Project

location
Juja (in Juja)
year first funded
2005
action
Borehole,Pump House,Elec
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 2,550,000
estimate
Ksh 2,550,000

Joytown Primary School Borehole

location
Thika (in Juja)
year first funded
2005
action
Borehole Drilling
output
To Have Clean Water To The School
implementation status
Complete
total cost
Ksh 2,500,000
estimate
Ksh 2,000,000

Tree Seedlings

location
Juja (in Juja)
year first funded
2003
action
Seedlings Across The Constituency
output
More Trees To Enhance Rainfall
implementation status
Complete
total cost
Ksh 2,484,584
estimate
Ksh 2,500,000

Githurai Mixed Secondary School

location
Githurai (in Juja)
year first funded
2005
action
Lab ConstructionPh2
output
Improve On Scien
implementation status
Complete
total cost
Ksh 2,450,000
estimate
Ksh 2,400,000

Garissa Road Primary School

location
Thika (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 2,350,000
estimate
Ksh 2,400,000

Muigai Inn Kenyatta Road Borehole

location
Juja (in Juja)
year first funded
2006
action
Borehole&Pipes
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 2,350,000
estimate
Ksh 2,350,000

Toll Station Police Post

location
Ruiru (in Juja)
year first funded
2006
action
Armoury Houses
output
To Have A Secure Place For Weapons
implementation status
On Going
total cost
Ksh 2,250,760
estimate
Ksh 1,600,000

Gachororo Secondary School

location
Juja (in Juja)
year first funded
2004
action
Kit/Class/Elect
output
Improve Learning
implementation status
Complete
total cost
Ksh 2,062,250
estimate
Ksh 1,500,000

Komo Secondary School

location
Gatuanyaga (in Juja)
year first funded
2004
action
Classroom,Library
output
Enhance Learning
implementation status
Complete
total cost
Ksh 2,005,200
estimate
Ksh 1,500,000

Mwihoko Water Project

location
Githurai (in Juja)
year first funded
2004
action
Purchase Of Pipes
output
Water Distribution To The People
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Membly Water Project

location
Ruiru (in Juja)
year first funded
2006
action
Pipes Of Various Sizes
output
Clean Water Closer
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Rurii Primary School

location
Ruiru (in Juja)
year first funded
2005
action
Roofing
output
Structure Improvement
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 500,000

Gachororo Water Tanks

location
Juja (in Juja)
year first funded
2004
action
Tanking&Renovations
output
The Facility To Be Operational
implementation status
Complete
total cost
Ksh 1,980,000
estimate
Ksh 1,980,000

Ruiru Kihunguro Water Project

location
Ruiru (in Juja)
year first funded
2005
action
Drilling&Capping
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 1,800,000
estimate
Ksh 2,500,000

HaMundia Dispensary

location
Ruiru (in Juja)
year first funded
2004
action
Renovations
output
Enhance Health Care
implementation status
Complete
total cost
Ksh 1,800,000
estimate
Ksh 1,500,000

Murera Coffee Water Project

location
Ruiru (in Juja)
year first funded
2007
action
Bore Hole Rehab.
output
Provinding Clean Water To All
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

NjiraIgiri Water Project

location
Githurai (in Juja)
year first funded
2007
action
Borehole Drilling
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Maporomoko/Ndururumo Ppost

location
Thika (in Juja)
year first funded
2004
action
Police Houses
output
To Ease Congestion
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Kimuchu Secondary School

location
Thika (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 1,650,000
estimate
Ksh 1,650,000

Athi Primary School

location
Juja (in Juja)
year first funded
2004
action
Classrooms Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,800,000

Athi Dispensary

location
Juja (in Juja)
year first funded
2004
action
Construction
output
Affordable H/Care
implementation status
Complete
total cost
Ksh 1,579,350
estimate
Ksh 900,000

Kwihota Polytechnic

location
Githurai (in Juja)
year first funded
2005
action
Refabishment
output
-
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kwa Ngethe Primary School

location
Githurai (in Juja)
year first funded
2004
action
Classroom Construction
output
More Enrolment
implementation status
Complete
total cost
Ksh 1,467,900
estimate
Ksh 1,050,000

Kwihota Secondary School

location
Githurai (in Juja)
year first funded
2004
action
Classrooms Construction
output
Shorten Walking Distance
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Githunguri Secondary School

location
Ruiru (in Juja)
year first funded
2003
action
Classroom,Toilets Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Agape Community Water Project

location
Ruiru (in Juja)
year first funded
2005
action
Borehole Drilling
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Juja Farm Dispensary

location
Juja (in Juja)
year first funded
2004
action
Lab.Const
output
Cheap &Affordable Examinations
implementation status
Complete
total cost
Ksh 1,304,260
estimate
Ksh 800,000

Mwihoko Primary School

location
Githurai (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 1,297,200
estimate
Ksh 1,100,000

Btl A Post

location
Ruiru (in Juja)
year first funded
2006
action
Cell,Latrines,Bathroom,Fencing
output
Proper Sanitation&Hygiene At The Post
implementation status
On Going
total cost
Ksh 1,291,200
estimate
Ksh 800,000

Ngoliba A Post

location
Gatuanyaga (in Juja)
year first funded
2006
action
Admin Block/Houses
output
Efficiency&Good Houses
implementation status
Complete
total cost
Ksh 1,225,580
estimate
Ksh 600,000

Gatuanyaga Dispensary

location
Gatuanyaga (in Juja)
year first funded
2003
action
Septic Tank,Elects
output
Bring Health Care Closer To The People
implementation status
Complete
total cost
Ksh 1,213,354
estimate
Ksh 1,200,000

Ruiru Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 1,206,000
estimate
Ksh 900,000

Kenyatta Secondary School

location
Thika (in Juja)
year first funded
2004
action
Lab Equipments
output
Improve On Scien
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

New Mugutha Primary School

location
Githurai (in Juja)
year first funded
2006
action
Classroom Construction
output
Enhance Enrolment
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Githurai Dispensary

location
Githurai (in Juja)
year first funded
2005
action
Construction of Dispensary
output
Bring Health Care Closer To The People
implementation status
To Be Converted To A Police Post
total cost
Ksh 1,200,000
estimate
Ksh 1,400,000

Ruiru Girls Secondary School La

location
Ruiru (in Juja)
year first funded
2004
action
Adm Block
output
School Modernization
implementation status
On Going
total cost
Ksh 1,190,000
estimate
Ksh 1,190,000

Broadway Secondary School

location
Thika (in Juja)
year first funded
2004
action
Classrooms Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 1,185,000
estimate
Ksh 785,000

Ngoliba Secondary School

location
Gatuanyaga (in Juja)
year first funded
2004
action
Classroom Construction
output
Modern Classes
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 550,000

Muthaara Primary School

location
Juja (in Juja)
year first funded
2004
action
Classroom Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 350,000

Ruiru Mkt Water Tanks

location
Ruiru (in Juja)
year first funded
2004
action
Water Kiosks
output
Easier Access Of Water To The Community
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Juja Farm Water Pipes

location
Juja (in Juja)
year first funded
2004
action
Pipes&Fittings
output
Extentions To Cover A Wide Area
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Mwiki Primary School

location
Githurai (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,050,000

Kisiwa Primary School

location
Thika (in Juja)
year first funded
2004
action
Classroom Construction
output
Facilitate Learning
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 350,000

Githunguri Primary School

location
Ruiru (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 1,025,200
estimate
Ksh 550,000

Kahawa Wendani Police Post

location
Githurai (in Juja)
year first funded
2007
action
Construction
output
Better Housing For Officers
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Thome Primary School

location
Githurai (in Juja)
year first funded
2005
action
Classroom,Latrines
output
Proper Sanitation
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Makongeni Social Hall

location
Thika (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mwiki Police Post

location
Githurai (in Juja)
year first funded
2004
action
Residential Units
output
To Ease Congestion
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kalimoni Health Centre

location
Juja (in Juja)
year first funded
2006
action
Renovations
output
To Have Modern Equipments
implementation status
Complete
total cost
Ksh 971,940
estimate
Ksh 300,000

Muthaara Dispensary

location
Juja (in Juja)
year first funded
2003
action
Staff Houses
output
To Have Staff On A 24Hr Bases
implementation status
On Going
total cost
Ksh 950,000
estimate
Ksh 650,000

Murera Primary School

location
Ruiru (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 905,800
estimate
Ksh 350,000

Gatuanyaga Police Post

location
Gatuanyaga (in Juja)
year first funded
2004
action
Construction
output
To Enhance Security
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Magogoni Nursery School

location
Gatuanyaga (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 900,000

St. Pauls Primary School gachoro

location
Juja (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 350,000

Kiandutu Police Post

location
Thika (in Juja)
year first funded
2005
action
Admin Blockand Cell
output
Improve Efficiency
implementation status
On Going
total cost
Ksh 846,500
estimate
Ksh 600,000

Athena Primary School

location
Thika (in Juja)
year first funded
2005
action
Classrooms Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 828,700
estimate
Ksh 700,000

Chania Girls Secondary School

location
Thika (in Juja)
year first funded
2005
action
Library Construction
output
Encourage Studies
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Magogoni Springs

location
Gatuanyaga (in Juja)
year first funded
2004
action
Tanking&Piping
output
Water Closer To The People
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Kihunguro/Matopeni Ap Post

location
Ruiru (in Juja)
year first funded
2004
action
Houses
output
Better Housing For Officers
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mwihoko Village Police Post

location
Githurai (in Juja)
year first funded
2005
action
Latrines/Fencing
output
Provide Good Sanitation
implementation status
Complete
total cost
Ksh 797,600
estimate
Ksh 800,000

St. Georges Primary School

location
Ruiru (in Juja)
year first funded
2005
action
Latrines
output
Proper Sanitation
implementation status
Complete
total cost
Ksh 775,000
estimate
Ksh 775,000

Mwireri Primary School

location
Juja (in Juja)
year first funded
2003
action
Classroom Construction
output
Modern Classes
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Munyu Mixed Day Secondary School

location
Gatuanyaga (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Gikumari Water Project

location
Githurai (in Juja)
year first funded
2003
action
Pump&Piping
output
Community To Have Water For Farming
implementation status
Complete
total cost
Ksh 745,000
estimate
Ksh 745,000

Thika H/School For The Blind

location
Thika (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 735,000
estimate
Ksh 735,000

Gathanji West Bridge

location
Gatuanyaga (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 710,000
estimate
Ksh 0

Kiratina Primary School

location
Githurai (in Juja)
year first funded
2005
action
Classroom Construction
output
More Enrolment
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Munyu Health Centre

location
Gatuanyaga (in Juja)
year first funded
2006
action
Lab.Const
output
-
implementation status
Not Started
total cost
Ksh 700,000
estimate
Ksh 700,000

Kianjahi Primary School

location
Gatuanyaga (in Juja)
year first funded
2005
action
Classroom Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Thika Primary School

location
Thika (in Juja)
year first funded
2005
action
Perim/Wall
output
Prevent Intruders
implementation status
Complete
total cost
Ksh 677,250
estimate
Ksh 550,000

Magogoni Primary School

location
Gatuanyaga (in Juja)
year first funded
2004
action
Classrooms Construction
output
Get Mordern Classes
implementation status
Complete
total cost
Ksh 660,000
estimate
Ksh 660,000

Juja Secondary School

location
Juja (in Juja)
year first funded
2003
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Ndula Community Dispensary

location
Gatuanyaga (in Juja)
year first funded
2005
action
Completion of Dispensary
output
Enhance Health Care
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Murera Secondary School

location
Ruiru (in Juja)
year first funded
2003
action
Staff/Rm Ext.
output
Room For More Staff
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 650,000

Karibaribi Primary School

location
Thika (in Juja)
year first funded
2006
action
Classroom Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 350,000

Gatumaini Primary School

location
Thika (in Juja)
year first funded
2005
action
School Facelift
output
Improve Facility
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Athi Secondary School

location
Juja (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
Complete
total cost
Ksh 615,200
estimate
Ksh 0

Munyu Girls Secondary School

location
Gatuanyaga (in Juja)
year first funded
2006
action
Classrooms Construction
output
Create Space
implementation status
On Going
total cost
Ksh 600,400
estimate
Ksh 350,000

Kimuchu Ap Post

location
Thika (in Juja)
year first funded
2006
action
Admin Block Competion
output
Improve Efficiency
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Kiaheho / Kiahuria Borehole

location
Ruiru (in Juja)
year first funded
2003
action
Pump
output
To Get Water Efficiently
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 500,000

Gachagi Water Project Pipe

location
Thika (in Juja)
year first funded
2006
action
Pipes&Fittings
output
More People To Access Water
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Mirimaini Primary School

location
Juja (in Juja)
year first funded
2004
action
Classrooms Construction
output
Improve Facility
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Matopeni Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Classroom,Latrines
output
Ease Congest.
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Athena Dispensary

location
Thika (in Juja)
year first funded
2006
action
Dispensary Construction
output
Enhance Health Care
implementation status
Not Started
total cost
Ksh 600,000
estimate
Ksh 600,000

Mugutha Water Project

location
Githurai (in Juja)
year first funded
2003
action
Pump&Accessories
output
Community To Have Water
implementation status
Complete
total cost
Ksh 590,000
estimate
Ksh 810,000

Gachororo Primary School

location
Juja (in Juja)
year first funded
2006
action
Classrooms Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 584,250
estimate
Ksh 300,000

Joytown Secondary School

location
Thika (in Juja)
year first funded
2007
action
Dorm/Repair
output
Create Space
implementation status
Complete
total cost
Ksh 582,200
estimate
Ksh 350,000

Witeithie A P Post

location
Thika (in Juja)
year first funded
2005
action
Post Construction
output
Improve Efficiency
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Ngoliba Water Project

location
Gatuanyaga (in Juja)
year first funded
2003
action
Tank Construction
output
Storage Of More Water
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 550,000

Umoja Primary School

location
Thika (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Nyacaba Primary School

location
Juja (in Juja)
year first funded
2005
action
Latrines
output
Proper Sanitation
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Kigwe Primary School

location
Juja (in Juja)
year first funded
2005
action
Latrines
output
Improve Sanitation
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Gitothua Primary School

location
Ruiru (in Juja)
year first funded
2005
action
Latrines
output
Improve Hygiene
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Gachagi Nursery School

location
Thika (in Juja)
year first funded
2006
action
Classrooms Construction
output
Child Care
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Kianjau Primary School

location
Thika (in Juja)
year first funded
2003
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 530,000
estimate
Ksh 530,000

Munyu Water Project Pum

location
Gatuanyaga (in Juja)
year first funded
2005
action
Pump
output
To Get Water Efficiently
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Jua Kali Realocation

location
Thika (in Juja)
year first funded
2004
action
n/a
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiganjo A Post

location
Thika (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Thika River Water Project

location
Gatuanyaga (in Juja)
year first funded
2006
action
Pipping
output
Easier Access Of Water To The Community
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Wataalam Water Project Pum

location
Ruiru (in Juja)
year first funded
2003
action
Pump
output
To Get Water With Ease
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiandutu Health Centre

location
Thika (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Mirimaini Health Centre

location
Juja (in Juja)
year first funded
2006
action
Construction of Dispensary
output
Enhance Health Care
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Redcross Disaster Store

location
Thika (in Juja)
year first funded
2005
action
Disaster Store
output
Food Storage
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kwa Forty Apost

location
Githurai (in Juja)
year first funded
2007
action
Police Houses
output
Better Housing For Officers
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mugutha A Post

location
Ruiru (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyacaba Police Post

location
Juja (in Juja)
year first funded
2007
action
Admin/Staff Houses
output
Improve Efficiency
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

School Libraries

location
Juja (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Theta Girls Secondary School

location
Ruiru (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Gikumari Primary School

location
Juja (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Juja Farn Polytechnic

location
Juja (in Juja)
year first funded
2007
action
W/Shop Refab
output
Improve Skills
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ndiini Primary School

location
Githurai (in Juja)
year first funded
2006
action
Latrines
output
Proper Sanitation
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ngewe Primary School

location
Ruiru (in Juja)
year first funded
2006
action
Classroom Construction
output
Enhance Enrolment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Thika Secondary School

location
Thika (in Juja)
year first funded
2007
action
Computer Lab
output
Enhance It Knowledge
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mama Ngina Resource

location
Thika (in Juja)
year first funded
2004
action
n/a
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Magogoni CommSecondary School

location
Gatuanyaga (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
On Going
total cost
Ksh 478,600
estimate
Ksh 478,000

Matopeni Secondary School

location
Ruiru (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
Complete
total cost
Ksh 475,200
estimate
Ksh 470,000

Karakuta Primary School

location
Juja (in Juja)
year first funded
2005
action
Classroom Construction
output
Improve Learning
implementation status
Complete
total cost
Ksh 455,200
estimate
Ksh 300,000

Komo Primary School

location
Gatuanyaga (in Juja)
year first funded
2006
action
Library
output
Enhance Learning
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 200,000

Kwihota Water Project

location
Githurai (in Juja)
year first funded
2003
action
Pump
output
To Get Water Efficiently
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Kwa Forty Borehole

location
Githurai (in Juja)
year first funded
2004
action
Pump
output
To Get Water With Ease
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

St. Pauls Gatuanyaga Secondary School

location
Gatuanyaga (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Juja Farm Secondary School

location
Juja (in Juja)
year first funded
2006
action
Classroom Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 448,000
estimate
Ksh 300,000

Gatuanyaga Commmakongo Bridge

location
Gatuanyaga (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 430,500
estimate
Ksh 440,000

Thika Muslim Primary School

location
Thika (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 410,000
estimate
Ksh 410,000

Karibaribi Dispensary

location
Thika (in Juja)
year first funded
2003
action
Construction of Dispensary
output
Bring Health Care Closer To The People
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Karibaribi Secondary School

location
Thika (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Kalimoni Primary School

location
Juja (in Juja)
year first funded
2007
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Jamhuri Primary School

location
Thika (in Juja)
year first funded
2007
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

KiaOra Primary School

location
Juja (in Juja)
year first funded
2007
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Miumbu Makongo Village Water Primary School

location
Thika (in Juja)
year first funded
2007
action
Water Pipes
output
Clean Water Closer
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kinyathena Water Supply Project

location
Thika (in Juja)
year first funded
2007
action
Pipes
output
Provinding Clean Water To All
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Juja Farm Zone P Pipe

location
Juja (in Juja)
year first funded
2006
action
Pipes&Accessories
output
Extentions To Cover A Wide Area
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Githurai Seconday School Pipe

location
Githurai (in Juja)
year first funded
2006
action
Pipes
output
Easier Access To Water
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Wendano E Centre

location
Gatuanyaga (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Twiga Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Thika Primary School for The Blind

location
Thika (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mountainview Primary School

location
Thika (in Juja)
year first funded
2007
action
Classroom,Electricity
output
Facilitate Learning
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kibii Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mirimaini Apost

location
Juja (in Juja)
year first funded
2007
action
Post Construction
output
-
implementation status
Not Started
total cost
Ksh 400,000
estimate
Ksh 400,000

Komo Apost

location
Gatuanyaga (in Juja)
year first funded
2007
action
Post Construction
output
-
implementation status
Not Started
total cost
Ksh 400,000
estimate
Ksh 400,000

Kilimambogo Police Post

location
Gatuanyaga (in Juja)
year first funded
2006
action
n/a
output
-
implementation status
Not Started
total cost
Ksh 400,000
estimate
Ksh 400,000

Gachororo Ap Base

location
Juja (in Juja)
year first funded
2006
action
Construction
output
Improve Security In The Area
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Gitothua Power Project

location
Ruiru (in Juja)
year first funded
2007
action
Electricity Rerouting
output
To Have A Wider Coverage
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Witeithie Dispensary

location
Thika (in Juja)
year first funded
2006
action
Dispensary Construction
output
-
implementation status
Not Started
total cost
Ksh 400,000
estimate
Ksh 400,000

Ndururumo Primary School

location
Githurai (in Juja)
year first funded
2004
action
Classroom Construction
output
Modern Classes
implementation status
Complete
total cost
Ksh 395,000
estimate
Ksh 395,000

Kumura Primary School

location
Githurai (in Juja)
year first funded
2004
action
Classroom Construction
output
Structure Improvement
implementation status
Complete
total cost
Ksh 395,000
estimate
Ksh 395,000

Gatongora Primary School

location
Githurai (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Mukuyu Water Project

location
Githurai (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 350,000

Ngoliba Primary School

location
Gatuanyaga (in Juja)
year first funded
2005
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Munyu Nursery Centre

location
Gatuanyaga (in Juja)
year first funded
2007
action
Classroom Construction
output
Facilitate Learning
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kilimambogo Primary School

location
Gatuanyaga (in Juja)
year first funded
2006
action
Classroom Construction
output
Enhance Learning
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kiboko Primary School

location
Thika (in Juja)
year first funded
2004
action
Classroom Construction
output
Improve Facility
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kamenu Primary School

location
Thika (in Juja)
year first funded
2005
action
Classroom Construction
output
Improve Facility
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Githurai Kimbo School

location
Githurai (in Juja)
year first funded
2004
action
Classroom Construction
output
Improve Learning
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Jacaranda Primary School

location
Ruiru (in Juja)
year first funded
2006
action
Classroom Construction
output
Create Space
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Gatuanyaga Primary School

location
Gatuanyaga (in Juja)
year first funded
2004
action
Classroom Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kwihota Chiefs Camp

location
Githurai (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Rurii Apost

location
Ruiru (in Juja)
year first funded
2007
action
A.Phouses
output
To Ease Congestion
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Murera Police Post

location
Githurai (in Juja)
year first funded
2005
action
Construction
output
Improve Efficiency
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Murera Matangini A Post

location
Githurai (in Juja)
year first funded
2005
action
Construction
output
Improve Security In The Area
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Landless Ap Post

location
Thika (in Juja)
year first funded
2006
action
n/a
output
-
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 300,000

Kiahuria Police Post

location
Juja (in Juja)
year first funded
2004
action
Construction
output
Better Housing For Officers
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Karamaini Police Post

location
Juja (in Juja)
year first funded
2007
action
Post Construction
output
Improve Security In The Area
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kahawa Sukari Police Post

location
Githurai (in Juja)
year first funded
2004
action
Construction
output
Improve Security In The Area
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Juja Farm Patrol Base

location
Juja (in Juja)
year first funded
2007
action
Electricity Wiring
output
To Improve On Lighting&Use Of Modern Equipments
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Gachororo Cattle Dip

location
Juja (in Juja)
year first funded
2006
action
To Be Reallocated
output
-
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 300,000

Ngoliba Health Centre

location
Gatuanyaga (in Juja)
year first funded
2006
action
Water Tank&Incenerator
output
Proper Waste Disposal
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Njeki Self Help Group Witeithie

location
Juja (in Juja)
year first funded
2007
action
Pipes,3Inch&T Connections
output
Water Distribution To The People
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 300,000

Murera Matangini Water Project

location
Githurai (in Juja)
year first funded
2004
action
Pump
output
To Get Water With Ease
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kilimambogo Gachagi Water

location
Gatuanyaga (in Juja)
year first funded
2007
action
Water Extention
output
Extentions To Cover A Wide Area
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Thiririka Primary School

location
Juja (in Juja)
year first funded
2004
action
Classroom,Desks
output
Structure Imp&Easing Congestion
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 365,000

Maria Magdalene Primary School

location
Gatuanyaga (in Juja)
year first funded
2006
action
Tanking,Piping
output
Plenty Water Supply
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kitamaiyu Secondary School

location
Ruiru (in Juja)
year first funded
2006
action
Classroom Construction
output
Enhance Learning
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kiandutu Nursery School

location
Thika (in Juja)
year first funded
2006
action
Classroom Construction
output
Child Care
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Juja Farm Primary School

location
Juja (in Juja)
year first funded
2005
action
Classroom Construction
output
Increase Enrolment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

General Kago Primary School

location
Thika (in Juja)
year first funded
2007
action
Toilet Construction
output
Improve Sanitation
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Gatuanyaga Cattle Dip

location
Gatuanyaga (in Juja)
year first funded
2003
action
Overhaul W/Dam
output
To Have A Modern Cattle Dip
implementation status
Complete
total cost
Ksh 260,000
estimate
Ksh 260,000

Madaraka Primary School

location
Thika (in Juja)
year first funded
2009
action
n/a
output
-
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 300,000

Ngoliba Cattle Dip

location
Gatuanyaga (in Juja)
year first funded
2005
action
Dip Rehab
output
Operationalize The Dip
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Muthaara Cattle Dip

location
Juja (in Juja)
year first funded
2003
action
Renovations
output
Keep The Dip Operational
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Magogoni Cattle Dip

location
Gatuanyaga (in Juja)
year first funded
2007
action
Renovations
output
Keep The Dip Operational
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Kwihota Cattle Dip

location
Githurai (in Juja)
year first funded
2003
action
Renovations
output
Keep The Dip Operational
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Githurai Dispensary Water Tan

location
Githurai (in Juja)
year first funded
2006
action
Water Tank
output
Proper Water Storage
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kitamaiyu Primary School

location
Ruiru (in Juja)
year first funded
2006
action
Classroom Construction
output
Good Shelter
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Magomano Primary School

location
Githurai (in Juja)
year first funded
2005
action
Classrooms Construction
output
Proper Floors
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mukuyu Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Classrooms Construction
output
Provide Good Shelter
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Oaklands Primary School

location
Ruiru (in Juja)
year first funded
2006
action
Latrines
output
Proper Sanitation
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ruiru Secondary School comp

location
Ruiru (in Juja)
year first funded
2005
action
Computers
output
Enhance It Knowledge
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

St. Patricks Primary School

location
Thika (in Juja)
year first funded
2005
action
Renovations
output
Structure Improvement
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Tatu Primary School

location
Ruiru (in Juja)
year first funded
2006
action
Classroom Construction
output
Ease Congest.
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ndururumo Dispensary

location
Githurai (in Juja)
year first funded
2004
action
Completion of Dispensary
output
Enhance Health Care
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Salama Community Dispensary

location
Thika (in Juja)
year first funded
2005
action
Completion of Dispensary
output
Bring Health Care Closer To The People
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Maganjo Electrification

location
Gatuanyaga (in Juja)
year first funded
2007
action
Transformer&Elect. Inst
output
To Bring Power Closer To The People
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 400,000

Matopeni Power

location
Ruiru (in Juja)
year first funded
2007
action
Power Installation
output
Have Power In Schools
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Assistant Chief Office Munyu

location
Gatuanyaga (in Juja)
year first funded
2007
action
Patrol Base,Dog Kennel
output
To Enhance Security
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Juja Police Station Kenne

location
Juja (in Juja)
year first funded
2005
action
Dog Kennels
output
Improve On Patrols
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Makongeni Police Post

location
Thika (in Juja)
year first funded
2007
action
Dog Kennels
output
Improve On Patrols
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 400,000

Muigai Inn Ap Post

location
Juja (in Juja)
year first funded
2005
action
Construction
output
Better Housing For Officers
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Munyu Patrol Base

location
C (in Juja)
year first funded
2006
action
n/a
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngoingwa Police Post

location
Thika (in Juja)
year first funded
2007
action
Latrines
output
Provide Good Sanitation
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chania Boys Secondary School

location
Thika (in Juja)
year first funded
2007
action
Dom.Renovation
output
Create Bed Space
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kimuchu Primary School

location
Thika (in Juja)
year first funded
2005
action
Classrooms Rehabs
output
Improve Facility
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Gatuanyaga Resource Cener

location
Gatuanyaga (in Juja)
year first funded
2008
action
n/a
output
-
implementation status
Complete
total cost
Ksh 190,000
estimate
Ksh 190,000

Munyu Cattle Dip

location
Gatuanyaga (in Juja)
year first funded
2003
action
C/Dip Rehab
output
Access Of Dip To Many Farmers
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 160,000

Komo Cattle Dip

location
Gatuanyaga (in Juja)
year first funded
2003
action
Renovations
output
To Reduce The Number Of Distance Travelled
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 160,000

Ithuri Star Pipes

location
Juja (in Juja)
year first funded
2004
action
Pipes&Accessories
output
Operationalize The Project
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Juja Farm Cattle Dip

location
Juja (in Juja)
year first funded
2007
action
Dip W/Storage Tank
output
To Have Enough Water
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Ndula Cattle Dip

location
Gatuanyaga (in Juja)
year first funded
2005
action
Dip Rehab
output
Operationalize The Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

D O Office Ruiru

location
Ruiru (in Juja)
year first funded
2008
action
Renovations
output
Bring Services Closer To The People
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Mutundu/ Billian Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Latrines
output
Proper Sanitation
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 130,000

Magana Primary School

location
Gatuanyaga (in Juja)
year first funded
2006
action
Computers Purchase
output
Enhance It
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 110,000

Progressive Water Project

location
Githurai (in Juja)
year first funded
2004
action
Pipes
output
Easier Access Of Water To The Community
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ruera Primary School

location
Ruiru (in Juja)
year first funded
2004
action
Desks
output
Proper Facilities
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kuraiha Primary School

location
Juja (in Juja)
year first funded
2005
action
Roofing
output
Structure Improvement
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Thika Location Chief's Toilets

location
Thika (in Juja)
year first funded
2004
action
Latrines
output
Provide Good Sanitation
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Githima Primary School

location
Gatuanyaga (in Juja)
year first funded
2005
action
Classroom Rehabilitation
output
Improve Facility
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Juja Mirimaini Cattle Dip

location
Juja (in Juja)
year first funded
2005
action
Renovations
output
To Have Healthy &Productive Animals
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Githunguri Cattle Dip

location
Ruiru (in Juja)
year first funded
2007
action
C/Dip Rehab
output
Operationalize The Dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Jomo Kenyatta Primary School

location
Juja (in Juja)
action
n/a
output
-
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 300,000