The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Juja
Bursary
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- bursary
- output
- -
- implementation status
- not known
- total cost
- Ksh 18,776,342
- estimate
- Ksh 7,500,000
Emergency
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 10,397,834
- estimate
- Ksh 5,547,733
Admin/Mon&Eval
- location
-
Juja
(in Juja)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- Not In use
- total cost
- Ksh 8,373,685
- estimate
- Ksh 5,073,047
Githurai Location Roads
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Light Grading
- output
- To Have Passable Roads
- implementation status
- Complete
- total cost
- Ksh 6,150,000
- estimate
- Ksh 6,000,000
Juja Location Road
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Light Grading &Gravelling
- output
- To Enhance Movement Of Goods&Services
- implementation status
- Complete
- total cost
- Ksh 6,031,141
- estimate
- Ksh 6,000,000
Thika/Gatuanyaga Road
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Light Grading&Culverts
- output
- To Have Efficient Road Network
- implementation status
- Complete
- total cost
- Ksh 5,917,000
- estimate
- Ksh 6,000,000
Ruiru Location Roads
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Culverts,Grading&Murraming
- output
- To Have Proper Transport
- implementation status
- Complete
- total cost
- Ksh 5,900,000
- estimate
- Ksh 6,000,000
Gitothua Pri Boreholeprison
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Tank Tower, Pipes&Water Kiosk
- output
- Provinding Clean Water To The Community
- implementation status
- Complete
- total cost
- Ksh 4,600,000
- estimate
- Ksh 3,000,000
Monitoring/Evaluation
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 4,214,038
- estimate
- Ksh 1,910,526
Muigai Inn Borehole
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Water Pipes
- output
- Provinding Clean Water To All
- implementation status
- Complete But Not Operational
- total cost
- Ksh 3,600,000
- estimate
- Ksh 3,600,000
Kilimambogo/Makutano Water Proj
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Water Tank Collection,Water Pipes
- output
- -
- implementation status
- Stalled
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Recurrent Expenditure
- location
-
Juja
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 3,455,268
- estimate
- Ksh 0
Btl Water Project
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Elec Inst,&Water Supply Pipes
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Kwihota Secondary School Borehole
- location
-
Githurai
(in Juja)
- year first funded
- 2006
- action
- Elec Inst,&Water Supply Pipes
- output
- Provide Water To The School &Community
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Murera Kimbo/Gsu Borehole
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Borehole,Pump House,Elec
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 2,642,000
- estimate
- Ksh 2,250,000
Ndururumo Dispensary Borehole
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Borehole,Pump House,Elec
- output
- -
- implementation status
- Stalled To Be Revived
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,600,000
Mirimaini Community Water Project
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Borehole,Pump House,Elec
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 2,550,000
- estimate
- Ksh 2,550,000
Joytown Primary School Borehole
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Borehole Drilling
- output
- To Have Clean Water To The School
- implementation status
- Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,000,000
Tree Seedlings
- location
-
Juja
(in Juja)
- year first funded
- 2003
- action
- Seedlings Across The Constituency
- output
- More Trees To Enhance Rainfall
- implementation status
- Complete
- total cost
- Ksh 2,484,584
- estimate
- Ksh 2,500,000
Githurai Mixed Secondary School
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Lab ConstructionPh2
- output
- Improve On Scien
- implementation status
- Complete
- total cost
- Ksh 2,450,000
- estimate
- Ksh 2,400,000
Garissa Road Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 2,350,000
- estimate
- Ksh 2,400,000
Muigai Inn Kenyatta Road Borehole
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Borehole&Pipes
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 2,350,000
- estimate
- Ksh 2,350,000
Toll Station Police Post
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Armoury Houses
- output
- To Have A Secure Place For Weapons
- implementation status
- On Going
- total cost
- Ksh 2,250,760
- estimate
- Ksh 1,600,000
Gachororo Secondary School
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Kit/Class/Elect
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 2,062,250
- estimate
- Ksh 1,500,000
Komo Secondary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Classroom,Library
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 2,005,200
- estimate
- Ksh 1,500,000
Mwihoko Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Purchase Of Pipes
- output
- Water Distribution To The People
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Membly Water Project
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Pipes Of Various Sizes
- output
- Clean Water Closer
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Rurii Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Roofing
- output
- Structure Improvement
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 500,000
Gachororo Water Tanks
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Tanking&Renovations
- output
- The Facility To Be Operational
- implementation status
- Complete
- total cost
- Ksh 1,980,000
- estimate
- Ksh 1,980,000
Ruiru Kihunguro Water Project
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Drilling&Capping
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,500,000
HaMundia Dispensary
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Renovations
- output
- Enhance Health Care
- implementation status
- Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,500,000
Murera Coffee Water Project
- location
-
Ruiru
(in Juja)
- year first funded
- 2007
- action
- Bore Hole Rehab.
- output
- Provinding Clean Water To All
- implementation status
- On Going
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
NjiraIgiri Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2007
- action
- Borehole Drilling
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Maporomoko/Ndururumo Ppost
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Police Houses
- output
- To Ease Congestion
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Kimuchu Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Athi Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,800,000
Athi Dispensary
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Construction
- output
- Affordable H/Care
- implementation status
- Complete
- total cost
- Ksh 1,579,350
- estimate
- Ksh 900,000
Kwihota Polytechnic
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Refabishment
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kwa Ngethe Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- More Enrolment
- implementation status
- Complete
- total cost
- Ksh 1,467,900
- estimate
- Ksh 1,050,000
Kwihota Secondary School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Shorten Walking Distance
- implementation status
- Complete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Githunguri Secondary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2003
- action
- Classroom,Toilets Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Agape Community Water Project
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Borehole Drilling
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Juja Farm Dispensary
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Lab.Const
- output
- Cheap &Affordable Examinations
- implementation status
- Complete
- total cost
- Ksh 1,304,260
- estimate
- Ksh 800,000
Mwihoko Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 1,297,200
- estimate
- Ksh 1,100,000
Btl A Post
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Cell,Latrines,Bathroom,Fencing
- output
- Proper Sanitation&Hygiene At The Post
- implementation status
- On Going
- total cost
- Ksh 1,291,200
- estimate
- Ksh 800,000
Ngoliba A Post
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Admin Block/Houses
- output
- Efficiency&Good Houses
- implementation status
- Complete
- total cost
- Ksh 1,225,580
- estimate
- Ksh 600,000
Gatuanyaga Dispensary
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2003
- action
- Septic Tank,Elects
- output
- Bring Health Care Closer To The People
- implementation status
- Complete
- total cost
- Ksh 1,213,354
- estimate
- Ksh 1,200,000
Ruiru Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 1,206,000
- estimate
- Ksh 900,000
Kenyatta Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Lab Equipments
- output
- Improve On Scien
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
New Mugutha Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Enhance Enrolment
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Githurai Dispensary
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Bring Health Care Closer To The People
- implementation status
- To Be Converted To A Police Post
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,400,000
Ruiru Girls Secondary School La
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Adm Block
- output
- School Modernization
- implementation status
- On Going
- total cost
- Ksh 1,190,000
- estimate
- Ksh 1,190,000
Broadway Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 1,185,000
- estimate
- Ksh 785,000
Ngoliba Secondary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Modern Classes
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 550,000
Muthaara Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 350,000
Ruiru Mkt Water Tanks
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Water Kiosks
- output
- Easier Access Of Water To The Community
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Juja Farm Water Pipes
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Pipes&Fittings
- output
- Extentions To Cover A Wide Area
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Mwiki Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,050,000
Kisiwa Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Facilitate Learning
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 350,000
Githunguri Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 1,025,200
- estimate
- Ksh 550,000
Kahawa Wendani Police Post
- location
-
Githurai
(in Juja)
- year first funded
- 2007
- action
- Construction
- output
- Better Housing For Officers
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Thome Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Classroom,Latrines
- output
- Proper Sanitation
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Makongeni Social Hall
- location
-
Thika
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mwiki Police Post
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Residential Units
- output
- To Ease Congestion
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kalimoni Health Centre
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Renovations
- output
- To Have Modern Equipments
- implementation status
- Complete
- total cost
- Ksh 971,940
- estimate
- Ksh 300,000
Muthaara Dispensary
- location
-
Juja
(in Juja)
- year first funded
- 2003
- action
- Staff Houses
- output
- To Have Staff On A 24Hr Bases
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 650,000
Murera Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 905,800
- estimate
- Ksh 350,000
Gatuanyaga Police Post
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Construction
- output
- To Enhance Security
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Magogoni Nursery School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
St. Pauls Primary School gachoro
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 350,000
Kiandutu Police Post
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Admin Blockand Cell
- output
- Improve Efficiency
- implementation status
- On Going
- total cost
- Ksh 846,500
- estimate
- Ksh 600,000
Athena Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Classrooms Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 828,700
- estimate
- Ksh 700,000
Chania Girls Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Library Construction
- output
- Encourage Studies
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Magogoni Springs
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Tanking&Piping
- output
- Water Closer To The People
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kihunguro/Matopeni Ap Post
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Houses
- output
- Better Housing For Officers
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mwihoko Village Police Post
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Latrines/Fencing
- output
- Provide Good Sanitation
- implementation status
- Complete
- total cost
- Ksh 797,600
- estimate
- Ksh 800,000
St. Georges Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Latrines
- output
- Proper Sanitation
- implementation status
- Complete
- total cost
- Ksh 775,000
- estimate
- Ksh 775,000
Mwireri Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Modern Classes
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Munyu Mixed Day Secondary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Gikumari Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2003
- action
- Pump&Piping
- output
- Community To Have Water For Farming
- implementation status
- Complete
- total cost
- Ksh 745,000
- estimate
- Ksh 745,000
Thika H/School For The Blind
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 735,000
- estimate
- Ksh 735,000
Gathanji West Bridge
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 710,000
- estimate
- Ksh 0
Kiratina Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- More Enrolment
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Munyu Health Centre
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Lab.Const
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kianjahi Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Thika Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Perim/Wall
- output
- Prevent Intruders
- implementation status
- Complete
- total cost
- Ksh 677,250
- estimate
- Ksh 550,000
Magogoni Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Get Mordern Classes
- implementation status
- Complete
- total cost
- Ksh 660,000
- estimate
- Ksh 660,000
Juja Secondary School
- location
-
Juja
(in Juja)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Ndula Community Dispensary
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Completion of Dispensary
- output
- Enhance Health Care
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Murera Secondary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2003
- action
- Staff/Rm Ext.
- output
- Room For More Staff
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Karibaribi Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 350,000
Gatumaini Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- School Facelift
- output
- Improve Facility
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Athi Secondary School
- location
-
Juja
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 615,200
- estimate
- Ksh 0
Munyu Girls Secondary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- Create Space
- implementation status
- On Going
- total cost
- Ksh 600,400
- estimate
- Ksh 350,000
Kimuchu Ap Post
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Admin Block Competion
- output
- Improve Efficiency
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kiaheho / Kiahuria Borehole
- location
-
Ruiru
(in Juja)
- year first funded
- 2003
- action
- Pump
- output
- To Get Water Efficiently
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Gachagi Water Project Pipe
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Pipes&Fittings
- output
- More People To Access Water
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mirimaini Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Improve Facility
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Matopeni Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Classroom,Latrines
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Athena Dispensary
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Dispensary Construction
- output
- Enhance Health Care
- implementation status
- Not Started
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mugutha Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2003
- action
- Pump&Accessories
- output
- Community To Have Water
- implementation status
- Complete
- total cost
- Ksh 590,000
- estimate
- Ksh 810,000
Gachororo Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 584,250
- estimate
- Ksh 300,000
Joytown Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Dorm/Repair
- output
- Create Space
- implementation status
- Complete
- total cost
- Ksh 582,200
- estimate
- Ksh 350,000
Witeithie A P Post
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Post Construction
- output
- Improve Efficiency
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Ngoliba Water Project
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2003
- action
- Tank Construction
- output
- Storage Of More Water
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Umoja Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Nyacaba Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Latrines
- output
- Proper Sanitation
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Kigwe Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Latrines
- output
- Improve Sanitation
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Gitothua Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Latrines
- output
- Improve Hygiene
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Gachagi Nursery School
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- Child Care
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Kianjau Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 530,000
- estimate
- Ksh 530,000
Munyu Water Project Pum
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Pump
- output
- To Get Water Efficiently
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Jua Kali Realocation
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiganjo A Post
- location
-
Thika
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Thika River Water Project
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Pipping
- output
- Easier Access Of Water To The Community
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Wataalam Water Project Pum
- location
-
Ruiru
(in Juja)
- year first funded
- 2003
- action
- Pump
- output
- To Get Water With Ease
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiandutu Health Centre
- location
-
Thika
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mirimaini Health Centre
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Enhance Health Care
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Redcross Disaster Store
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Disaster Store
- output
- Food Storage
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kwa Forty Apost
- location
-
Githurai
(in Juja)
- year first funded
- 2007
- action
- Police Houses
- output
- Better Housing For Officers
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mugutha A Post
- location
-
Ruiru
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyacaba Police Post
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Admin/Staff Houses
- output
- Improve Efficiency
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
School Libraries
- location
-
Juja
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Theta Girls Secondary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gikumari Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Juja Farn Polytechnic
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- W/Shop Refab
- output
- Improve Skills
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ndiini Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2006
- action
- Latrines
- output
- Proper Sanitation
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ngewe Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Enhance Enrolment
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Thika Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Computer Lab
- output
- Enhance It Knowledge
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mama Ngina Resource
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Magogoni CommSecondary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 478,600
- estimate
- Ksh 478,000
Matopeni Secondary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 475,200
- estimate
- Ksh 470,000
Karakuta Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 455,200
- estimate
- Ksh 300,000
Komo Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Library
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 200,000
Kwihota Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2003
- action
- Pump
- output
- To Get Water Efficiently
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kwa Forty Borehole
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Pump
- output
- To Get Water With Ease
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
St. Pauls Gatuanyaga Secondary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Juja Farm Secondary School
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 448,000
- estimate
- Ksh 300,000
Gatuanyaga Commmakongo Bridge
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 430,500
- estimate
- Ksh 440,000
Thika Muslim Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 410,000
- estimate
- Ksh 410,000
Karibaribi Dispensary
- location
-
Thika
(in Juja)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Bring Health Care Closer To The People
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karibaribi Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kalimoni Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Jamhuri Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
KiaOra Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Miumbu Makongo Village Water Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Water Pipes
- output
- Clean Water Closer
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kinyathena Water Supply Project
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Pipes
- output
- Provinding Clean Water To All
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Juja Farm Zone P Pipe
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Pipes&Accessories
- output
- Extentions To Cover A Wide Area
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Githurai Seconday School Pipe
- location
-
Githurai
(in Juja)
- year first funded
- 2006
- action
- Pipes
- output
- Easier Access To Water
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Wendano E Centre
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Twiga Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Thika Primary School for The Blind
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mountainview Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Classroom,Electricity
- output
- Facilitate Learning
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kibii Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mirimaini Apost
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Post Construction
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Komo Apost
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2007
- action
- Post Construction
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kilimambogo Police Post
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Gachororo Ap Base
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- Construction
- output
- Improve Security In The Area
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Gitothua Power Project
- location
-
Ruiru
(in Juja)
- year first funded
- 2007
- action
- Electricity Rerouting
- output
- To Have A Wider Coverage
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Witeithie Dispensary
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Dispensary Construction
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ndururumo Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Modern Classes
- implementation status
- Complete
- total cost
- Ksh 395,000
- estimate
- Ksh 395,000
Kumura Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Structure Improvement
- implementation status
- Complete
- total cost
- Ksh 395,000
- estimate
- Ksh 395,000
Gatongora Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mukuyu Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ngoliba Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Munyu Nursery Centre
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Facilitate Learning
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kilimambogo Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kiboko Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Improve Facility
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kamenu Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Improve Facility
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Githurai Kimbo School
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Jacaranda Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Create Space
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gatuanyaga Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kwihota Chiefs Camp
- location
-
Githurai
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rurii Apost
- location
-
Ruiru
(in Juja)
- year first funded
- 2007
- action
- A.Phouses
- output
- To Ease Congestion
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Murera Police Post
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Construction
- output
- Improve Efficiency
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Murera Matangini A Post
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Construction
- output
- Improve Security In The Area
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Landless Ap Post
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiahuria Police Post
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Construction
- output
- Better Housing For Officers
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Karamaini Police Post
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Post Construction
- output
- Improve Security In The Area
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kahawa Sukari Police Post
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Construction
- output
- Improve Security In The Area
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Juja Farm Patrol Base
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Electricity Wiring
- output
- To Improve On Lighting&Use Of Modern Equipments
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gachororo Cattle Dip
- location
-
Juja
(in Juja)
- year first funded
- 2006
- action
- To Be Reallocated
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngoliba Health Centre
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Water Tank&Incenerator
- output
- Proper Waste Disposal
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Njeki Self Help Group Witeithie
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Pipes,3Inch&T Connections
- output
- Water Distribution To The People
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Murera Matangini Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Pump
- output
- To Get Water With Ease
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kilimambogo Gachagi Water
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2007
- action
- Water Extention
- output
- Extentions To Cover A Wide Area
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Thiririka Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Classroom,Desks
- output
- Structure Imp&Easing Congestion
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 365,000
Maria Magdalene Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Tanking,Piping
- output
- Plenty Water Supply
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kitamaiyu Secondary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiandutu Nursery School
- location
-
Thika
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Child Care
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Juja Farm Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
General Kago Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Toilet Construction
- output
- Improve Sanitation
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gatuanyaga Cattle Dip
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2003
- action
- Overhaul W/Dam
- output
- To Have A Modern Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Madaraka Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Ngoliba Cattle Dip
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Dip Rehab
- output
- Operationalize The Dip
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Muthaara Cattle Dip
- location
-
Juja
(in Juja)
- year first funded
- 2003
- action
- Renovations
- output
- Keep The Dip Operational
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Magogoni Cattle Dip
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2007
- action
- Renovations
- output
- Keep The Dip Operational
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kwihota Cattle Dip
- location
-
Githurai
(in Juja)
- year first funded
- 2003
- action
- Renovations
- output
- Keep The Dip Operational
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Githurai Dispensary Water Tan
- location
-
Githurai
(in Juja)
- year first funded
- 2006
- action
- Water Tank
- output
- Proper Water Storage
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kitamaiyu Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Good Shelter
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Magomano Primary School
- location
-
Githurai
(in Juja)
- year first funded
- 2005
- action
- Classrooms Construction
- output
- Proper Floors
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mukuyu Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Provide Good Shelter
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Oaklands Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Latrines
- output
- Proper Sanitation
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ruiru Secondary School comp
- location
-
Ruiru
(in Juja)
- year first funded
- 2005
- action
- Computers
- output
- Enhance It Knowledge
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. Patricks Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Renovations
- output
- Structure Improvement
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Tatu Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Ease Congest.
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ndururumo Dispensary
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Completion of Dispensary
- output
- Enhance Health Care
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Salama Community Dispensary
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Completion of Dispensary
- output
- Bring Health Care Closer To The People
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Maganjo Electrification
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2007
- action
- Transformer&Elect. Inst
- output
- To Bring Power Closer To The People
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Matopeni Power
- location
-
Ruiru
(in Juja)
- year first funded
- 2007
- action
- Power Installation
- output
- Have Power In Schools
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Assistant Chief Office Munyu
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2007
- action
- Patrol Base,Dog Kennel
- output
- To Enhance Security
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Juja Police Station Kenne
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Dog Kennels
- output
- Improve On Patrols
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Makongeni Police Post
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Dog Kennels
- output
- Improve On Patrols
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Muigai Inn Ap Post
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Construction
- output
- Better Housing For Officers
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Munyu Patrol Base
- location
-
C
(in Juja)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngoingwa Police Post
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Latrines
- output
- Provide Good Sanitation
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Chania Boys Secondary School
- location
-
Thika
(in Juja)
- year first funded
- 2007
- action
- Dom.Renovation
- output
- Create Bed Space
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kimuchu Primary School
- location
-
Thika
(in Juja)
- year first funded
- 2005
- action
- Classrooms Rehabs
- output
- Improve Facility
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gatuanyaga Resource Cener
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 190,000
Munyu Cattle Dip
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2003
- action
- C/Dip Rehab
- output
- Access Of Dip To Many Farmers
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Komo Cattle Dip
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2003
- action
- Renovations
- output
- To Reduce The Number Of Distance Travelled
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Ithuri Star Pipes
- location
-
Juja
(in Juja)
- year first funded
- 2004
- action
- Pipes&Accessories
- output
- Operationalize The Project
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Juja Farm Cattle Dip
- location
-
Juja
(in Juja)
- year first funded
- 2007
- action
- Dip W/Storage Tank
- output
- To Have Enough Water
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ndula Cattle Dip
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Dip Rehab
- output
- Operationalize The Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
D O Office Ruiru
- location
-
Ruiru
(in Juja)
- year first funded
- 2008
- action
- Renovations
- output
- Bring Services Closer To The People
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mutundu/ Billian Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Latrines
- output
- Proper Sanitation
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Magana Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2006
- action
- Computers Purchase
- output
- Enhance It
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 110,000
Progressive Water Project
- location
-
Githurai
(in Juja)
- year first funded
- 2004
- action
- Pipes
- output
- Easier Access Of Water To The Community
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ruera Primary School
- location
-
Ruiru
(in Juja)
- year first funded
- 2004
- action
- Desks
- output
- Proper Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kuraiha Primary School
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Roofing
- output
- Structure Improvement
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Thika Location Chief's Toilets
- location
-
Thika
(in Juja)
- year first funded
- 2004
- action
- Latrines
- output
- Provide Good Sanitation
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Githima Primary School
- location
-
Gatuanyaga
(in Juja)
- year first funded
- 2005
- action
- Classroom Rehabilitation
- output
- Improve Facility
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Juja Mirimaini Cattle Dip
- location
-
Juja
(in Juja)
- year first funded
- 2005
- action
- Renovations
- output
- To Have Healthy &Productive Animals
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Githunguri Cattle Dip
- location
-
Ruiru
(in Juja)
- year first funded
- 2007
- action
- C/Dip Rehab
- output
- Operationalize The Dip
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Jomo Kenyatta Primary School
- location
-
Juja
(in Juja)
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 300,000