It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kacheliba

Konyao School

location
Kapchok (in Kacheliba)
year first funded
2003
action
Finishing Of Admin Office
output
Laboratory,Dormitory& Admin Offices
implementation status
Lab And Dormitory Complete. Admin Needs Finishing
total cost
Ksh 7,000,000
estimate
Ksh 10,000,000

Cdf Office

location
Alale (in Kacheliba)
year first funded
2007
action
Building Cdf Offices,Quest House & Conference Hall
output
Offices,Conference Hall & Quest Rooms
implementation status
To Start June 2010
total cost
Ksh 6,128,753
estimate
Ksh 10,000,000

Kasei Health Centre

location
Kasei (in Kacheliba)
year first funded
2003
action
Finishing The In Patient Block
output
In-Patient/ Outpatient Services
implementation status
Outpatient Is Complete But Maternity Ward Needs Finishing
total cost
Ksh 4,800,000
estimate
Ksh 4,185,000

Konyao Health Centre

location
Kapchok (in Kacheliba)
year first funded
2003
action
Building Of Outpatient,Lab & Minor Operation Block
output
A New Health Center
implementation status
Inpatient & Outpatient Complete
total cost
Ksh 3,600,000
estimate
Ksh 2,762,000

Kangoletiang Health Centre

location
Korpu (in Kacheliba)
year first funded
2003
action
Finishing Of Staff Quarters
output
New Health Center
implementation status
Outpatient Is Complete & Staff Hse On Finishing
total cost
Ksh 3,150,000
estimate
Ksh 1,212,000

Kauriong Health Centre

location
Kiwawa (in Kacheliba)
year first funded
2003
action
None
output
A New Health Center
implementation status
Inpatient Block & Outpatient Complet
total cost
Ksh 3,100,000
estimate
Ksh 4,315,000

St Comboni Amakuriat

location
Alale (in Kacheliba)
year first funded
2004
action
Building Dining Hall
output
Dining Hall
implementation status
Dining Hall Complete. Remaining Fund(1.5M) Used To Purchase School Bus.
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Losam School

location
Kapchok (in Kacheliba)
year first funded
2004
action
Purchase Of Beds
output
Pupils Residents
implementation status
Girls, Boys Dormitory & 3 Classes Complete
total cost
Ksh 2,650,000
estimate
Ksh 500,000

NarworoAkoret

location
Akoret (in Kacheliba)
year first funded
2005
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks/Stumbs
total cost
Ksh 2,600,000
estimate
Ksh 5,000,000

Alale Health Centre

location
Alale (in Kacheliba)
year first funded
2003
action
None
output
New Health Center
implementation status
Outpatient & Latrine Complete
total cost
Ksh 2,600,000
estimate
Ksh 1,530,000

Kamketo Dispensary

location
Kasei (in Kacheliba)
year first funded
2006
action
Building A Nurse House
output
New Dispensary
implementation status
Outpatient Complete & Nurse Hse On Foundation.
total cost
Ksh 2,500,000
estimate
Ksh 2,456,000

Kasitet Dispensary

location
Kases (in Kacheliba)
year first funded
2006
action
Roofing And Finishing
output
New Dispensary
implementation status
On Roofing Satge
total cost
Ksh 2,500,000
estimate
Ksh 2,310,000

Tiyinei Dispensary

location
Kopulio (in Kacheliba)
year first funded
2006
action
Nurse House & Dispensary
output
New Dispensary
implementation status
Outpatient Complete
total cost
Ksh 2,350,000
estimate
Ksh 1,500,000

Katuperot Water Project

location
Suam (in Kacheliba)
year first funded
2003
action
Installation Of Power To Supply Water, Pipes And Labour Cost.
output
Distribution Of Clean Water To The Sorounding Village.
implementation status
Building Of Power Office & Store Is Complete
total cost
Ksh 2,200,000
estimate
Ksh 727,000

Chepkinagh School

location
Kiwawa (in Kacheliba)
year first funded
2005
action
5 Classrooms
output
Learing Facilities
implementation status
Needs Finishing
total cost
Ksh 2,187,500
estimate
Ksh 777,000

Orolwo Dispensary

location
Lokichar (in Kacheliba)
year first funded
2003
action
Building Two Satff Quarters
output
New Dispensary
implementation status
Main Block Is Complete & Staff Quarters On Completion Satage.
total cost
Ksh 2,150,000
estimate
Ksh 1,534,000

Nakwijit Dispensary

location
Kodich (in Kacheliba)
year first funded
2004
action
Fencing
output
New Dispensary
implementation status
Inpatient Block & Outpatient Complet
total cost
Ksh 2,150,000
estimate
Ksh 1,539,000

Losam Dispensary

location
Kapchok (in Kacheliba)
year first funded
2003
action
Finishing The Taff Quarter House.
output
New Dispensary
implementation status
Outpatient Complete & Nurse Hse On Finishing.
total cost
Ksh 2,150,000
estimate
Ksh 1,220,000

Sincholol School

location
Kiwawa (in Kacheliba)
year first funded
2006
action
Boys & Girls Dormitory Plus Beds
output
Pupils Residents
implementation status
Boys Dorm & 50 Beds Complete. Girls Dorm To Start.
total cost
Ksh 2,100,000
estimate
Ksh 906,000

Kapsintoi School

location
Kasei (in Kacheliba)
year first funded
2006
action
4 Classrooms
output
Learning Facilities
implementation status
Needs Finishing
total cost
Ksh 2,000,000
estimate
Ksh 3,278,000

Kases School

location
Kases (in Kacheliba)
year first funded
2003
action
Building Of 3 Classes
output
Learning Resources
implementation status
Complete
total cost
Ksh 1,987,500
estimate
Ksh 725,000

Mbaru/NakwpuoLopet

location
Lopet (in Kacheliba)
year first funded
2005
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks
total cost
Ksh 1,900,000
estimate
Ksh 7,160,000

Timale School

location
Kodich (in Kacheliba)
year first funded
2005
action
Girls And Boys Dormitory.
output
Students Residents
implementation status
Girls Dorm Complete & Boys Dorm Needs Finishing
total cost
Ksh 1,887,500
estimate
Ksh 5,700,000

KaseiKorokou

location
Kasei (in Kacheliba)
year first funded
2004
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks & Rifts
total cost
Ksh 1,800,000
estimate
Ksh 15,000,000

Kiwawa Dispensary

location
Kiwawa (in Kacheliba)
year first funded
2004
action
None
output
New Dispensary
implementation status
Outpatient Complete
total cost
Ksh 1,800,000
estimate
Ksh 1,719,000

Lokichar School

location
Kodich (in Kacheliba)
year first funded
2004
action
Twin Boys Dormitory
output
Students Residents
implementation status
On Finishing Stage
total cost
Ksh 1,740,000
estimate
Ksh 2,226,000

D's Office

location
Kiwawa (in Kacheliba)
year first funded
2008
action
Building Four Roomed Block And Food Store.
output
Admin Block
implementation status
On Foundation Level
total cost
Ksh 1,700,000
estimate
Ksh 2,000,000

Mading School

location
Kapchok (in Kacheliba)
year first funded
2005
action
Building Ten Classes
output
Learning Resources
implementation status
6 Complete
total cost
Ksh 1,687,500
estimate
Ksh 1,000,000

Mbaru School

location
Lopet (in Kacheliba)
year first funded
2003
action
Building Of 4 Classes
output
Learning Resources
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 672,000

Ngengechwo School

location
Suam (in Kacheliba)
year first funded
2007
action
2 Classes,Toilets & Admin Block
output
Learning Resources
implementation status
2 Classe And Admin Block On Lindal Stage.
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Chief's Office

location
Kasei (in Kacheliba)
year first funded
2008
action
Finishing
output
Admin Block
implementation status
Three Room On Roofing Stage
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Kasei Secondary

location
Kasei (in Kacheliba)
year first funded
2009
action
Admin Block
output
Learning Resources
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 10,000,000

Kasei

location
Kasei (in Kacheliba)
year first funded
2003
action
Build Two Staff Quarters
output
Staff Residents
implementation status
Second Staff Quaerter Is On Finishing Stage
total cost
Ksh 1,487,500
estimate
Ksh 1,500,000

KauriongWasat

location
Kiwawa (in Kacheliba)
year first funded
2005
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks
total cost
Ksh 1,400,000
estimate
Ksh 1,255,000

Cherangan School

location
Kodich (in Kacheliba)
year first funded
2006
action
Purchase Of Beds
output
Students Residents
implementation status
Dorm Is Complete
total cost
Ksh 1,350,000
estimate
Ksh 1,500,000

Tiyinei Borehole

location
Kopulio (in Kacheliba)
year first funded
2005
action
Installing Pump
output
New Borehole
implementation status
Complete
total cost
Ksh 1,315,000
estimate
Ksh 1,315,000

Konyao Borehole

location
Kapchok (in Kacheliba)
year first funded
2005
action
Drill And Install Pump
output
New Borehole
implementation status
Complete
total cost
Ksh 1,315,000
estimate
Ksh 1,315,000

Tapadany

location
Suam (in Kacheliba)
year first funded
2005
action
Drill And Install Pump
output
New Borehole
implementation status
Contract Signed
total cost
Ksh 1,315,000
estimate
Ksh 1,315,500

Lokichar Borehole

location
Lokichar (in Kacheliba)
year first funded
2005
action
Drill And Install Pump
output
New Borehole
implementation status
Contract Signed
total cost
Ksh 1,315,000
estimate
Ksh 1,315,000

Kituti School

location
Alale (in Kacheliba)
year first funded
2004
action
Boys Dormitory
output
Pupils Residents
implementation status
Complete
total cost
Ksh 1,287,500
estimate
Ksh 924,000

Kodera School

location
Kapchok (in Kacheliba)
year first funded
2008
action
Boys Dormitory
output
Dormitory
implementation status
Foundation Complete & 40% Wall Construction.
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

LosamKatuda

location
Kiwawa (in Kacheliba)
year first funded
2004
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks/Stumbs
total cost
Ksh 1,200,000
estimate
Ksh 500,000

Nasal School

location
Lokitonyala (in Kacheliba)
year first funded
2006
action
Two Classes & Office
output
Learning Facilities
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 3,114,000

Akelin School

location
Kasei (in Kacheliba)
year first funded
2006
action
4 Classrooms
output
Learning Facilities
implementation status
2 Classes Needs Finishing & 2 Classes On Foundation Stage.
total cost
Ksh 1,200,000
estimate
Ksh 1,620,000

Korpu School

location
Korpu (in Kacheliba)
year first funded
2008
action
Finishing
output
Dormitory
implementation status
The Roofing Is Complete.
total cost
Ksh 1,200,000
estimate
Ksh 2,000,000

Akiriamet

location
Kasei (in Kacheliba)
year first funded
2008
action
3 Classroom construction
output
Learning Resources
implementation status
On Roofing Stage
total cost
Ksh 1,200,000
estimate
Ksh 2,000,000

Ompolion Sand Dam

location
Kaptolomwo (in Kacheliba)
year first funded
2005
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 489,000

Kasaka School

location
Kaptolomwo (in Kacheliba)
year first funded
2004
action
Five Classrooms
output
Learning Resources
implementation status
Complete
total cost
Ksh 1,187,500
estimate
Ksh 725,000

Kamketo

location
Kasei (in Kacheliba)
year first funded
2003
action
Purchase Of Beds
output
Administration Block/Beds
implementation status
Admin Block Complete
total cost
Ksh 1,140,000
estimate
Ksh 725,000

Kodich School

location
Kodich (in Kacheliba)
year first funded
2005
action
Building Dormitory
output
Clean Water And Dormitory
implementation status
Dormitory On Foundation Stage
total cost
Ksh 1,140,000
estimate
Ksh 2,500,000

Kasitet School

location
Alale (in Kacheliba)
year first funded
2008
action
3 Classroom construction
output
Learning Resources
implementation status
Not Started
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

AmakuriatKalapata

location
Kalapata (in Kacheliba)
year first funded
2004
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks
total cost
Ksh 1,100,000
estimate
Ksh 4,800,000

Kacheliba Girls School

location
Suam (in Kacheliba)
year first funded
2008
action
3 Classroom construction
output
Learning Resources
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

KaptolomwoKasaka

location
Kaptolomwo (in Kacheliba)
year first funded
2008
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks/Stumbs
total cost
Ksh 1,000,000
estimate
Ksh 5,000,000

NgotutKamketo

location
Kasei (in Kacheliba)
year first funded
2004
action
Extending,Culverts,Gravelling&Bridges
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Kacheliba Health Centre

location
Kachelliba (in Kacheliba)
year first funded
2008
action
Building Of Theater
output
Operation Of Patients
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kanyerus Community Centre

location
Kopulio (in Kacheliba)
year first funded
2005
action
None
output
Eight Roomed Ap Admin Block
implementation status
Eight Roomed Block Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ompolion Community Centre

location
Kasei (in Kacheliba)
year first funded
2005
action
None
output
Ap Line Block
implementation status
Four Roomed Block Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kacheliba Mix

location
Suam (in Kacheliba)
year first funded
2007
action
Building Of 2 Staff Houses
output
Teachers Residents
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Alale Girls

location
Alale (in Kacheliba)
year first funded
2008
action
Dormitory
output
Pupils Residents
implementation status
On Roofing Stage
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Kanyerus Dispensary

location
Riwo (in Kacheliba)
year first funded
2008
action
Renovation: Roofing,Plaster,Doors/ Windows & Painting.
output
Dispensary
implementation status
Finishing Stage
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Asilangayan Sand Dam

location
Lokitonyala (in Kacheliba)
year first funded
2004
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 500,000

Alany Sand Dam

location
Alale (in Kacheliba)
year first funded
2006
action
Needs 3Rd Phase Construction
output
Clean Drinking Water
implementation status
Ist Phase And 2Nd Phase Construction Complete
total cost
Ksh 800,000
estimate
Ksh 730,000

Lopet Sand Dam

location
Lopet (in Kacheliba)
year first funded
2004
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 500,000

Kases Dam

location
Kases (in Kacheliba)
year first funded
2004
action
None
output
Clean Drinking Water
implementation status
Complete But Does Not Hold Water
total cost
Ksh 800,000
estimate
Ksh 794,000

Korokou Primary

location
Kasei (in Kacheliba)
year first funded
2009
action
2 Classes
output
Learning Resources
implementation status
Not Started
total cost
Ksh 700,000
estimate
Ksh 2,500,000

Atatar Sand Dam

location
Kiwawa (in Kacheliba)
year first funded
2005
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 400,000

Chepurwo Sand Dam

location
Kaptolomwo (in Kacheliba)
year first funded
2005
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 400,000

Natemeri Sand Dam

location
Kiwawa (in Kacheliba)
year first funded
2005
action
None
output
Clean Drinking Water
implementation status
Complete Though Washed Away Because Of Loose Soil In The Area.
total cost
Ksh 700,000
estimate
Ksh 584,000

Kasitot Sand Dam

location
Alale (in Kacheliba)
year first funded
2005
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 584,000

Kiwawa Primary

location
Kiwawa (in Kacheliba)
year first funded
2009
action
2 Classes
output
Learning Resources
implementation status
Not Started
total cost
Ksh 700,000
estimate
Ksh 2,000,000

Ngotut Primary

location
Kapchok (in Kacheliba)
year first funded
2009
action
2 Classes
output
Learning Resources
implementation status
Not Started
total cost
Ksh 700,000
estimate
Ksh 3,000,000

KangoletiangKachawa

location
Korpu (in Kacheliba)
year first funded
2005
action
Extending & Gravelling
output
Usable Roads
implementation status
Clearing,Levelling,Removing Rocks
total cost
Ksh 600,000
estimate
Ksh 3,000,000

Alale Water Project

location
Alale (in Kacheliba)
year first funded
2003
action
Servicing Of Existing Boreholes
output
Clean Drinking Water From Rehabilitated 3 Boreholes
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 300,000

Atulia School

location
Kopulio (in Kacheliba)
year first funded
2008
action
2 Classrooms
output
Learning Resources
implementation status
Not Started
total cost
Ksh 600,000
estimate
Ksh 1,200,000

KodichNakwijit

location
Kodich (in Kacheliba)
year first funded
2006
action
Murraming
output
Usable Roads
implementation status
Murramming
total cost
Ksh 600,000
estimate
Ksh 5,500,000

Chemulunjo Sand Dam

location
Alale (in Kacheliba)
year first funded
2008
action
Needs 2Nd Phase Construction.
output
Clean Drinking Water
implementation status
1St Phase Complete
total cost
Ksh 500,000
estimate
Ksh 800,000

Naruora Water Project

location
Alale (in Kacheliba)
year first funded
2006
action
Water Connection To Main Pipe
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 3,700,000

Asilong Borehole

location
Suam (in Kacheliba)
year first funded
2004
action
None
output
Clean Drinking Water
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,315,000

Nauyapong School

location
Lokitonyala (in Kacheliba)
year first funded
2008
action
School Fencing
output
School Security
implementation status
Purchase Of Materials Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Lokomolo School

location
Suam (in Kacheliba)
year first funded
2004
action
One Classroom
output
Learning Resources
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Chepunpun

location
Kaptolomwo (in Kacheliba)
year first funded
2009
action
1St Phase Construction
output
Clean Drinking Water
implementation status
1St Phase Construction Is On.
total cost
Ksh 500,000
estimate
Ksh 900,000

Kauriong Sand Dam

location
Kiwawa (in Kacheliba)
year first funded
2008
action
Needs 2Nd Phase Construction.
output
Clean Drinking Water
implementation status
1St Phase Complete
total cost
Ksh 500,000
estimate
Ksh 800,000

Lokitalamakala Sand Dam

location
Kases (in Kacheliba)
year first funded
2008
action
Needs 2Nd Phase Construction.
output
Clean Drinking Water
implementation status
1St Phase Complete
total cost
Ksh 500,000
estimate
Ksh 800,000

Kanyerru Health Centre

location
Kopulio (in Kacheliba)
year first funded
2009
action
Finishing
output
-
implementation status
Dispensary
total cost
Ksh 350,000
estimate
Ksh 600,000

Chepongolenyang

location
Kasei (in Kacheliba)
year first funded
2009
action
1St Phase Construction
output
Clean Drinking Water
implementation status
1St Phase Construction Is On.
total cost
Ksh 300,000
estimate
Ksh 900,000

Kodich Water Supply

location
Kodich (in Kacheliba)
year first funded
2009
action
Instalation Of Power To Supply Water.
output
Clean Drinking Water
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Chepkes Sand Dam

location
Korpu (in Kacheliba)
year first funded
2009
action
1St Phase Construction
output
Clean Drinking Water
implementation status
1St Phase Construction Is On.
total cost
Ksh 300,000
estimate
Ksh 900,000

Shongen Sand Dam

location
Lopet (in Kacheliba)
year first funded
2009
action
1St Phase Construction
output
Clean Drinking Water
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 900,000

Kodich Polytechnic

location
Kodich (in Kacheliba)
year first funded
2005
action
Purchase Of Technical Tools
output
Working Tools
implementation status
Complete
total cost
Ksh 285,000
estimate
Ksh 285,000

Karameri Borehole Rehabilitation

location
Kodich (in Kacheliba)
year first funded
2004
action
None
output
Rehabilitated Borehole
implementation status
Complete
total cost
Ksh 253,000
estimate
Ksh 103,000

Krimti Borehole Rehabilitation

location
Kodich (in Kacheliba)
year first funded
2004
action
None
output
Rehabilitated Borehole
implementation status
Complete
total cost
Ksh 253,000
estimate
Ksh 103,000

Katuda School

location
Kiwawa (in Kacheliba)
year first funded
2005
action
3 Classroom construction
output
Learning Facilities
implementation status
Made 18,000 Bricks
total cost
Ksh 187,500
estimate
Ksh 606,000

Sasak School

location
Lokitonyala (in Kacheliba)
year first funded
2003
action
Semi Permanent Dormitory
output
Dormitory
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Karon School

location
Suam (in Kacheliba)
year first funded
2005
action
Water Tank & Toiletand Girls Dorm
output
Clean Water
implementation status
Complete
total cost
Ksh 40,000
estimate
Ksh 40,000

Konyao Primary School

location
Kapchok (in Kacheliba)
year first funded
2005
action
Water Tank And Toilet
output
Clean Water And Toilet
implementation status
Complete
total cost
Ksh 40,000
estimate
Ksh 40,000