The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Loodokilani secondary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2005
- action
- To equip laboratory and purchased furniture.
- output
- Laboratory equipped and furniture purchased.
- implementation status
- Complete and in use
- total cost
- Ksh 4,000,000
- estimate
- Ksh 1,000,000
Enkorinka Boys Secondary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of Administration block
- output
- Administration Block Constructed
- implementation status
- Complete and in use
- total cost
- Ksh 2,800,000
- estimate
- Ksh 12,000,000
Enkorika secondary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2009
- action
- constructing of a dining hall and dormitory
- output
- dining hall, dormitory constructed.
- implementation status
- Complete and in use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Arroi Bore-hole (Enkusero Water Project)
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2003
- action
- Piping of Water to the Site
- output
- Water piped to the site
- implementation status
- Complete and in use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Lorngosua Bore-hole
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2003
- action
- Drilling a new bore-hole
- output
- New borehole drilled
- implementation status
- Complete and in use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Oleleshwa Milk Project
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- dairy construction
- output
- constructed
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,500,000
Iloshon Water Project
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2004
- action
- Buying of Pipes
- output
- Connected pipes
- implementation status
- Complete and in use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Inkipirash Milk Project
- location
-
Purko
(in Kajiado Central)
- year first funded
- 2006
- action
- dairy construction
- output
- constructed
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,500,000
Lodookilani Secondary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of two Classroom and administrative block
- output
- Two classes Administration Block constructed
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Ilpurko Secondary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2007
- action
- construction 4 Classrooms admin office 3 toilets
- output
- constructed
- implementation status
- Complete and not in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 12,000,000
Enkorika boys Secondary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of students ablution block, kitchen, bath, dorm and dining hall + Purchase of office furniture
- output
- Constructed ablution block, temporary kitchen, dining hall, bathrooms, and dormitory and purchased of office furniture.
- implementation status
- (Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
A.I.C Girls secondary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkutoto Borehole
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2008
- action
- Drilling borehole and purchasing pump machine
- output
- Pump machine purchased and borehole drilled.
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkorika boys Secondary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of science laboratory block.
- output
- Laboratory constructed
- implementation status
- complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Murantawua Borehole
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- Drilling of a borehole
- output
- A borehole and cased
- implementation status
- complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkutoto Borehole
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2007
- action
- Drilling of a borehole
- output
- A borehole drilled
- implementation status
- complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ilpurko Secondary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of a dining hall and dormitory
- output
- dining hall, dormitory constructed.
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Meto secondary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2008
- action
- furnishing office with typewriters textbooks.
- output
- office furnished
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
A.I.C secondary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2008
- action
- Completing a dormitory, toilets and Class
- output
- Dormitory, toilets and classroom completed.
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ilpurko secondary School
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of administration block
- output
- Administration block constructed.
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkorika secondary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a laboratory
- output
- Laboratory constructed.
- implementation status
- Complete and in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Inkiwanchani Water Project
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2004
- action
- Buying of Pipes
- output
- Connected pipes
- implementation status
- Complete and in use
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kilonito Dispensary
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- Finishing Dispensary
- output
- A dispensary finished
- implementation status
- Complete and in use
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Taretuoki mission Centre
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 dormitory
- output
- 1 dormitory constructed
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Enkaroni Primary School
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of a dormitory
- output
- Dormitory constructed
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ngatataek Social hall
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of social hall
- output
- Social hall erected
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Iltareto borehole
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2008
- action
- Reinforcement of pump house with grills.
- output
- Pump house reinforced and grills.
- implementation status
- Complete not in use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Uswa Borehole
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2004
- action
- Drill a new Borehole
- output
- Complete and in use
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Emurke Dispensary
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2009
- action
- Construction of a new Dispensary
- output
- Dispensary constructed
- implementation status
- ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ngatataek Dispensary
- location
-
Ilbissil
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of a dispensary
- output
- A dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Olosuyian primary School
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of dining hall
- output
- dining constructed
- implementation status
- ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
KMQ primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- construction of dining hall
- output
- dining hall constructed
- implementation status
- ongoing and at roofing level
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Entaretoi Primary
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 dormitory
- output
- Constructed 1 dormitory
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Murantawua Water project
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of pump house and buying
- output
- Buying and constructing a pump house
- implementation status
- Complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ngatu Dispensary
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of new Dispensary
- output
- A new dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Kerero Water Tank
- location
-
Namanga
(in Kajiado Central)
- year first funded
- 2009
- action
- constructing a water tank
- output
- tank constructed
- implementation status
- ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Enkusero community water project
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Piping of water
- output
- Water piped
- implementation status
- Complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Emarti Dispensary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Constructing Dispensary
- output
- A dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Ilmetio Primary School
- location
-
Lorngoswa
(in Kajiado Central)
- year first funded
- 2009
- action
- New Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olosuyian – Oloyiankalan Water Progm
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2004
- action
- Buying of Pipes
- output
- Connected pipes
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Oloyiankalani -Olosuyian water Supply Programme
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of water tank and sanitary facilities (toilet)
- output
- constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Iseuri Water Tank
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2008
- action
- Constructing water tank.
- output
- Water tank constructed
- implementation status
- complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Marantawua water Project
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2008
- action
- Purchase of pipes and pump machine
- output
- Pipes and pump machine purchased
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olepolos Water Project
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of a Tank
- output
- A water tank constructed
- implementation status
- Complete not in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Letoire Water Tank
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of a Tank
- output
- A water tank constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Iltareto Borehole
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Clean and removing rocks in the borehole
- output
- Borehole cleaned.
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olgirra Dispensary
- location
-
Olontulugum
(in Kajiado Central)
- year first funded
- 2009
- action
- Finishing of dispensary
- output
- dispensary finished
- implementation status
- Complete and not in use.
- total cost
- Ksh 500,000
- estimate
- Ksh 0
leboo Dispensary
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up drug store and observation room
- output
- constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maparasha health centre
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2009
- action
- completing Maternity wards
- output
- maternity wards completed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
megumi Dispensary
- location
-
osilalei
(in Kajiado Central)
- year first funded
- 2009
- action
- to complete observation room / drug store
- output
- observation room/drug store completed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Megumi Dispensary
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a Dispensary
- output
- A dispensary constructed
- implementation status
- Gravelling
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Maparasha health centre
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a Dispensary
- output
- A dispensary constructed
- implementation status
- Ongoing/ Foundation laid and walls erected
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Osarai Dispensary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a Dispensary
- output
- A dispensary constructed
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Enkaroni Dispensary
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2007
- action
- Constructing Dispensary
- output
- A dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Olenarau Dispensary
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a new dispensary
- output
- A new dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Emurkeya Dispensary
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a new dispensary
- output
- A new dispensary constructed
- implementation status
- Not Complete/plastering and painting
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kilonito Dispensary
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2003
- action
- Construction of a Nurse House
- output
- Nurse house constricted
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Oloomayian Primary School
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Lesoit Primary School
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olorngosuani Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up new Classroom
- output
- classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
samuli Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2009
- action
- A teachers house
- output
- teachers house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sunte primary shool
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2009
- action
- constructing a teacher's house
- output
- teachers house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sultan Hamoud Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Endoinyio Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Teachers Advisory Centre Management
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of TAC Office
- output
- TAC Office constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Meto secondary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2009
- action
- furnishing office and school desk
- output
- school furnished
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olosuyian primary School
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a dining hall
- output
- dining hall constructed.
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nkiito Primary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Oloirimirimi Primary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2009
- action
- Construction of administration block
- output
- administration block constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sare Nursery School
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
oletumuke Primary School
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
narrok Lukuny Primary School
- location
-
Namanga
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Engaboli Primary School
- location
-
Namanga
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
olobelibel Primary School
- location
-
olobelibel
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- classsoom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ilkiremisho Primary School
- location
-
Oloontulungum
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- classsoom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ilparrua Primary School
- location
-
enkaroni
(in Kajiado Central)
- year first funded
- 2009
- action
- putting up one new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Oltukai Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chyulu Nursery School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of teacher's house
- output
- teachers house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
oloserian Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- classsoom constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
maparash Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- classroom constructec
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sajiloni Primary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of a teacher's house
- output
- teachers house constructed
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Enkasurai Primary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2009
- action
- building a new Classroom
- output
- classroom built
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Osotua
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- dairy construction
- output
- constructed
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,500,000
Olgirra Dispensary
- location
-
Olontulugumu
(in Kajiado Central)
- year first funded
- 2006
- action
- Constructing a Dispensary
- output
- A new dispensary constructed
- implementation status
- complete and not in use
- total cost
- Ksh 450,000
- estimate
- Ksh 1,200,000
Arroi water
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a water tank.
- output
- Water tank constructed.
- implementation status
- complete and in use
- total cost
- Ksh 442,694
- estimate
- Ksh 442,694
Orine Primary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Orinie Primary
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of T/house
- output
- Teachers house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Emurkeya Primary School
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one T/house
- output
- 1 t/house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nempuya Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one T/house
- output
- 1 T/house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ngusso Primary
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of T/house
- output
- A new T/house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ewangan Primary T/hse
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of T/house
- output
- A T / house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Endikirr Primary
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of T/house
- output
- t/ house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Isiat Priamay School
- location
-
Purko
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed.
- implementation status
- complete an in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nkoile Primary School
- location
-
Purko
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Enkejo errop Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mailwa Primary School
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oloilalei Primary School
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oloolarroi Primary School
- location
-
Namanga
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karereo Primary School
- location
-
Namanga
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Iltirpen Primary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oloirimirimi Primary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Enkeruesuna Primary School
- location
-
Lorgosua
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sanare Primary
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Maroro Primary
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olmeleleki Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ilkimunyak Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Noompala Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Edepan Primary School
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of one Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oloomunyi primary School
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Esilalei primary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sunte primary shool
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 40,000
Esilalei ECD
- location
-
Oloontuligum.
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Chyulu primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oldupai primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ormanie primary School
- location
-
Namanga
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Eluanata primary School
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Arroi primary School
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Endoinyio ewuas nursery.
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olmaida primary School.
- location
-
Lorgosuea
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oloomunyi primary School
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2009
- action
- To complete Administration Block
- output
- administration block completed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Parsinti Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2009
- action
- completing 3 new Classrooms constructed
- output
- Classrooms constructed.
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
iltareto Primary School
- location
-
sajiloni
(in Kajiado Central)
- year first funded
- 2009
- action
- Construction of a new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olmoleleki primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kurket Primary School
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2009
- action
- Construction of a new Classroom
- output
- One classroom constructed
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Pelewa Dispensary
- location
-
Dalalekutok
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a nurse house
- output
- Nurse house constructed
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Maparasha health centre
- location
-
Ilbissil
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a nurse house
- output
- Nurse house constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olgos dam
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2003
- action
- Construction of a New dam
- output
- Water Dam constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lolkidongoi Water Pan
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2003
- action
- Construction of a New Water Pan
- output
- Water Dam constructed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oloolainyamok Dam
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Dam Distilling
- output
- A dam drilled
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Enkeresuna Dam
- location
-
Lorgosuwa
(in Kajiado Central)
- year first funded
- 2006
- action
- Distilling of Dam
- output
- A dam drilled
- implementation status
- Complete not in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Usua water project
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2008
- action
- Buying pipes and fixing them.
- output
- Pipes bought and fixed
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oiti dam
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nkoile Primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2009
- action
- to put up water system by installing pipes
- output
- installed
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ilmamen Water
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2009
- action
- purchase water pipes and piping water
- output
- purchased
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olper Elongo water
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2009
- action
- Construction of a pump house
- output
- constructed
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Elerai Girls Secondary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Renovation of a Classroom
- output
- Classroom renovated
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Mashuuru Secondary School
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2007
- action
- Repairing of blown room
- output
- Blown roof repaired
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Okiloriti Borehole
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2004
- action
- Renovation of a borehole
- output
- Repairing of a borehole
- implementation status
- complete and in use
- total cost
- Ksh 315,000
- estimate
- Ksh 0
Olgirra Dispensary
- location
-
Dalalekutok
(in Kajiado Central)
- year first funded
- 2008
- action
- Finishing doors, painting and windows
- output
- Doors ,windows and painting finished
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkaroni Dispensary
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2008
- action
- Finishing doors, painting and windows
- output
- Doors ,windows and painting finished
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kitonya water Users Association
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of borehole
- output
- Borehole constructed
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloikarra Water Project
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a borehole
- output
- Borehole constructed
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloserian Water Project
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2004
- action
- Supply of Pipes
- output
- Connected pipes
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkongue Enjore Water Project
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2004
- action
- Build a Water Tank at Leroire
- output
- A water Tank build
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Esukuta Borehole
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- Constructing pump house and piping
- output
- Repair pump machine / pumping water
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ruanche Borehole
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2009
- action
- rehabilitation of the machine
- output
- machine rehabilitated
- implementation status
- ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Uswa Water Project
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2009
- action
- To put up a water cattle trough and purchasing water pipes.
- output
- constructed
- implementation status
- ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilparrua Nursery School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2004
- action
- Fencing school compound
- output
- School compound fenced
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enoretet primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- Repairing of walls
- output
- Walls repaired
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkisudo Dispensary
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2005
- action
- Renovation of a dispensary
- output
- Dispensary renovated
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kenyewa D.O's office
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2009
- action
- renovation / furnishing D.Os' Office
- output
- furnished D.Os' Office
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkorika D.O's Office
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2009
- action
- renovation/ furnishing D.Os' Office
- output
- furnished D.Os' Office
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mailwa Primary School
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2009
- action
- repair of blown roof
- output
- Roof repaired
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nareto
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- dairy construction
- output
- constructed
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
Torosei Dispensary
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of one Room Dispensary
- output
- A one room dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Samuli Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of two Classroom
- output
- 2 classrooms constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Masimba Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of a Classroom
- output
- A classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
MCK Kiboko Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nguso Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Inkinye Primary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classrooms
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Inaudot Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emotoroki Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olchorro Olborr Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classrooms
- output
- One Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mashuuru Nursery
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Megumi Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emashini Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oltepesi Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emarti Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Osarai Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Malilima Primary School
- location
-
Oloontulugum
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloomunyi Primary School
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilkiremisho Primary School
- location
-
Oloontulugum
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nailumpe Primary School
- location
-
Oloontulugum
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Class
- output
- 1 classroom constructed
- implementation status
- Completed and not in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olosuyian – Oloyiankalan water Progm
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2007
- action
- Piping of water system
- output
- Water system piped
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkasura Primary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Class
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oltinka primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilamirior Primary
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmukutani Primary Dormitory
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 dormitory
- output
- 1 dormitory constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmejooli Primary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olmoleleki primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oldupai Pre-primary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloolngosuani Primary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Guadalupe Oltepesi Primary
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngatu Primary (Adm. Block)
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a admin block
- output
- Admin block constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilkidemy Primary
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lesonkoyo Primary
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olomayiana Primary
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lesoit Nursery
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkirrumu Nursery
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Imanyat Nursery
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olpolosie Nursery
- location
-
Oloontulugum
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Malilima Primary
- location
-
Oloontulugum
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilkeremisho Primary
- location
-
oloontulugum
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Indoinyio Primary
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enyonyor Nursery
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olgos Primary
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Isilale Primary
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkutoto nursery
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmolelian primary School
- location
-
Purko
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nkoile Pri/ nursery
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilparrua Primary
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete an d in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkaroni Primary
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Engejo Errap Primary
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1
- output
- 1 classroom constructed
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oldarpoi Primary
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkutoto Primary
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olchorro Olbor Primary
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emotoroki Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olmotiany Primary
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloborr soit Nursery
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lenkishon Primary
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nalepo Nursery
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkusero primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bissil Primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olepolos Nursery
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Iloshon Pre- Primary
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olosiyiamalil Nursery
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olomayiana Nursery
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Torosei Primary
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Ongoing /roofing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Torosei Nursery
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Ongoing / at roofing level
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kumpa primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2008
- action
- Equipping computer lab.
- output
- Computer lab equipped.
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Inchorroi nursery School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a Class
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Entaretoi Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2009
- action
- to equip dormitory with 40 beds
- output
- dormitory equipped
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
mashuuru Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2009
- action
- renovation of 8 Classrooms, roofing
- output
- classroom renovated
- implementation status
- ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkisukudo Dispensary
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of a dispensary
- output
- A new dispensary constructed
- implementation status
- complete and not in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Simba health centre
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of health centre
- output
- A health centre constructed
- implementation status
- complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Pelewa Dispensary
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of a New Dispensary
- output
- A new dispensary constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Ilparakuo Primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2003
- action
- Construction of one Classroom
- output
- One classrooms constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Isara Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2003
- action
- Renovation of the existing Classrooms
- output
- Existing Classroom renovated
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Etepesi Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Samuli Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olkatetemai Primary
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Esarunoto Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oidoinyo Sampu primary
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oidoinyo Lenkai Primary
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mopia Primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmotio Primary School
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emotoroki Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olchorro olborr Ajijik Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloomunyi Primary School
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilparrua Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloibor Ajijik Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emurkeya Primary School
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilparakuo Primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sanare Primary
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Noongabolo Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilkishumu Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Inaudot Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Elangata Wuas Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tikoishi Primary
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Paranae Primary
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Esukuta Primary
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Iltareto Primary
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkutoto Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Chyulu Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Eselenkei Primary School
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nkiwanjani Primary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olmotiany Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ololngosuani Primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Parsinti Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Ongoing /at roofing level
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Entaretoi Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 classroom
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Erankau Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1classroomconstructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloolainyamok Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oloilalei Nursery School
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 1 classroom constructed
- implementation status
- Ongoing /roofing level
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Imanyat Primary School
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Isilale Primary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sinkiraine Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Torosei Primary School
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nkoile Primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of 1 Classroom
- output
- Construction of 1 classroom
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilparakuo Primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enchorro e Senteu Pri
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of 1 Classrooms
- output
- 1 classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sinkiraine Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of two Classroom
- output
- Two classrooms constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Enkaroni Primary School
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nkuseron Primary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classrooms
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mopia Primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmotio Primary School
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilpartimaro Primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmisigiyio Primary School
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oiti Primary School
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilmukutani Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oltinka Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ilaimirro Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ewangan Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emarti Oloibora Ajikjik Road
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Inkiwanjani road
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- bush clearing
- output
- bush cleared
- implementation status
- complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Noosidan water project
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2007
- action
- Replacement of pipes
- output
- Pipes replaced
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Orinie Bridge
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2004
- action
- Rehabilitation of a bridge
- output
- Bridge rehabilitated
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Tikoshi Nursery School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of a Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Enkorika Secondary School
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2007
- action
- To buy solar panel
- output
- Solar panel installed
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Oiti Nalepo road
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2008
- action
- Bush clearing
- output
- Bush cleared
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kajiado iltareto road
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2008
- action
- Bush clearing and draining water
- output
- Bush cleared and water drained.
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Tikoishi-Kilonito road
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and uprooting shrubs. (New)
- output
- Cleared road
- implementation status
- Complete and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Naudot-Singiraine road
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2003
- action
- Clear the road by removing rocks. 9km
- output
- 9km road cleared by removed rocks
- implementation status
- complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Lenkishon Primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2006
- action
- To build a water tank
- output
- Water tank built
- implementation status
- Complete and in use
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Paranae primary School
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2004
- action
- Construction of Classroom
- output
- Classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Almanie Mashuuru borehole
- location
-
Maroro
(in Kajiado Central)
- year first funded
- 2008
- action
- Repairing of pump machine
- output
- Pump machine repaired
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mashuuru borehole
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2006
- action
- Repairing pump house
- output
- Pump house repaired
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lele primary School
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2006
- action
- Clearing of road
- output
- Road cleared
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Eluanata Water Catchment
- location
-
Mailwa
(in Kajiado Central)
- year first funded
- 2008
- action
- Repairing pump machine
- output
- Pump machine repaired
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Megumi Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2008
- action
- Finishing Classroom
- output
- Classroom finished
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Meto Primary School
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2008
- action
- Finishing Classroom
- output
- Classroom finished
- implementation status
- complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ilmejooli Primary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2008
- action
- Roofing blown roof.
- output
- Blown roof repaired
- implementation status
- complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ilamirror Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2008
- action
- Roofing blown roof.
- output
- Blown roof repaired
- implementation status
- complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ildonyo Nursery
- location
-
Enkorika
(in Kajiado Central)
- year first funded
- 2008
- action
- Roofing blown roof.
- output
- Blown roof repaired
- implementation status
- complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Oloontulugum Primary School
- location
-
Oloontulugum
(in Kajiado Central)
- year first funded
- 2005
- action
- To repair blown roof
- output
- Roof repaired or replaced
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Olchorro Oibor Primary School
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2008
- action
- Finishing Classroom roof
- output
- Classroom roof finished
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Imao Primary School
- location
-
Arroi
(in Kajiado Central)
- year first funded
- 2009
- action
- to complete 2 teachers house started painting, lumbering
- output
- teachers houses started
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Enkaroni Primary School
- location
-
Enkaroni
(in Kajiado Central)
- year first funded
- 2009
- action
- Complete a Classroom doors, window, and painting.
- output
- classroom completed
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ewangan Primary School
- location
-
Nkama
(in Kajiado Central)
- year first funded
- 2009
- action
- Completing 3 teacher's houses.
- output
- Teachers houses completed
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ilamirror Primary School
- location
-
Poka
(in Kajiado Central)
- year first funded
- 2009
- action
- Renovation of library by fixing books shelves
- output
- library renovated
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Endikirr Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2009
- action
- Completion of Classroom, plastering, painting, roofing, putting windows and doors
- output
- classroom completed
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Impiro Primary School
- location
-
sajiloni
(in Kajiado Central)
- year first funded
- 2009
- action
- to complete a started Class
- output
- classroom completed
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Emarti Dispensary
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2008
- action
- Finishing of a drug store.
- output
- Drug store finished
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngatu Dispensary
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2008
- action
- Fencing Dispensary compound
- output
- Dispensary compound fenced
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Masikiria Dispensary
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2009
- action
- Painting, plastering furnishing drug store. Observation
- output
- Drug store/ observation putted
- implementation status
- Complete and not in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
KMQ primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2004
- action
- Repair of blown roofs
- output
- Blown roofs repaired
- implementation status
- Complete and in use
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Inkiwanchani Pipe Net work
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2003
- action
- Installation New Engine at Eiti Borehole
- output
- New engine drilled
- implementation status
- Complete and in use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Kumpa primary School
- location
-
Purko
(in Kajiado Central)
- year first funded
- 2005
- action
- Repairing of a damaged rood
- output
- Damaged roof repaired
- implementation status
- Complete and in use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Oltinga Oibor borehole
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- To buy motor and repair the pump
- output
- Motor bought and pump repaired
- implementation status
- complete and in use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Loodokilani community policy
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Repairing and painting of A.PS’ house
- output
- APs houses Painted / repaired
- implementation status
- Complete and in use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Enkerse Una Torosei Road
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nkoile Primary School
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2009
- action
- fencing to stop land grabbers
- output
- fenced
- implementation status
- complete and in use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Oiti- Nalepo road
- location
-
Lorngosua
(in Kajiado Central)
- year first funded
- 2006
- action
- Clearing trees.
- output
- Cleared road
- implementation status
- Complete and in use
- total cost
- Ksh 137,684
- estimate
- Ksh 137,684
Indupa Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Painting and repairing of a Classroom
- output
- Classroom painted and repaired
- implementation status
- Complete and in use
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Isara Kuunvhub Road
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Esoiti Primary School
- location
-
Maparasha
(in Kajiado Central)
- year first funded
- 2007
- action
- Repair of blown off roofs
- output
- Blown roof repaired
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Eiti Primary School
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Repair of blown off roofs
- output
- Blown roofs repaired
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Osarai primary School
- location
-
Ilmunkush
(in Kajiado Central)
- year first funded
- 2006
- action
- Repairing of wall
- output
- Wall repaired
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Merrueshi borehole
- location
-
Kenyewa
(in Kajiado Central)
- year first funded
- 2006
- action
- Repairing pump house.
- output
- Pump house repaired
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nkoile orine road
- location
-
Nkoile
(in Kajiado Central)
- year first funded
- 2006
- action
- Clearing of trees
- output
- Trees cleared
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Namelok Lenkisho Road
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2006
- action
- Road clearing
- output
- Road cleared
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Indupa primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Replacing blown roof
- output
- Blown roof replaced
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ololepo borehole
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2005
- action
- Replacing a mortar.
- output
- Mortar replaced.
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Lorngosua Borehole
- location
-
lorgosua
(in Kajiado Central)
- year first funded
- 2008
- action
- Repairing of mortar
- output
- Mortar repaired
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Matuu Water Project
- location
-
lorgosua
(in Kajiado Central)
- year first funded
- 2008
- action
- Repairing of mortar
- output
- Mortar repaired
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Uswa Water Project
- location
-
Torosei
(in Kajiado Central)
- year first funded
- 2008
- action
- Drilling borehole and constructing water trough
- output
- Borehole drilled and water trough constructed.
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Oloosuyian Road
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2006
- action
- Clearing and maintaining the road
- output
- Maintained and cleared road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Oloomunyi Road
- location
-
Olobelibel
(in Kajiado Central)
- year first funded
- 2006
- action
- Clearing and maintained the road
- output
- Maintained cleared road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Kukua water project
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2007
- action
- Repair of a pump machine
- output
- Pump machine repaired
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Impiro Emarti Road
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Oldarpoi Enkutoto Road
- location
-
Osilalei
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bissil Olmotony Road
- location
-
Bissil
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Esukuta Olooruyian Road
- location
-
Ildamat
(in Kajiado Central)
- year first funded
- 2007
- action
- Clearing and opening
- output
- Cleared and opened road
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Endikirr Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Emaroro Primary School
- location
-
Imaroro
(in Kajiado Central)
- year first funded
- 2005
- action
- Connecting electricity to the Emaroro Pri School
- output
- electricity connected to the school
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Sajiloni water project
- location
-
Sajiloni
(in Kajiado Central)
- year first funded
- 2006
- action
- Buying of pipes
- output
- Pipes purchased
- implementation status
- complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Oloontulungum primary School
- location
-
Oloontulungum
(in Kajiado Central)
- year first funded
- 2006
- action
- Repair of blown off roofs
- output
- Blown roofs repaired
- implementation status
- Complete and in use
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Iloshon Primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2006
- action
- Replacing blown roof
- output
- Blown roof repaired
- implementation status
- Complete and in use
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Iloshon Pre-primary School
- location
-
Loodokilani
(in Kajiado Central)
- year first funded
- 2007
- action
- Repairing of blown roof
- output
- Blown roof repaired
- implementation status
- Complete and in use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ngatu Dispensary
- location
-
Imaroro
(in Kajiado Central)
- action
- fencing
- output
- dispensary fenced
- implementation status
- complete
- total cost
- Ksh 0
- estimate
- Ksh 200,000
Maparasha health centre
- location
-
Maparasha
(in Kajiado Central)
- action
- Maternity block. (continuation advice)
- output
- Continuation of a maternity block
- implementation status
- complete
- total cost
- Ksh 0
- estimate
- Ksh 400,000
Enkaroni dispensary
- location
-
Enkaroni
(in Kajiado Central)
- action
- Plastering and painting.
- output
- Dispensary plastered and painted.
- implementation status
- Plastering/painting/ceiling
- total cost
- Ksh 0
- estimate
- Ksh 300,000
Linti dispensary
- location
-
Meto
(in Kajiado Central)
- year first funded
- 2008
- action
- Construction of a nurse house.
- output
- A nurse house constructed
- implementation status
- ongoing
- total cost
- Ksh 0
- estimate
- Ksh 400,000
Ilmarba Primary School
- location
-
Bissil
(in Kajiado Central)
- action
- Construction of one Classroom
- output
- One classroom constructed
- implementation status
- Complete and in use
- total cost
- Ksh 0
- estimate
- Ksh 300,000