The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kajiado Central

Loodokilani secondary School

location
Loodokilani (in Kajiado Central)
year first funded
2005
action
To equip laboratory and purchased furniture.
output
Laboratory equipped and furniture purchased.
implementation status
Complete and in use
total cost
Ksh 4,000,000
estimate
Ksh 1,000,000

Enkorinka Boys Secondary School

location
Enkorika (in Kajiado Central)
year first funded
2004
action
Construction of Administration block
output
Administration Block Constructed
implementation status
Complete and in use
total cost
Ksh 2,800,000
estimate
Ksh 12,000,000

Enkorika secondary School

location
Enkorika (in Kajiado Central)
year first funded
2009
action
constructing of a dining hall and dormitory
output
dining hall, dormitory constructed.
implementation status
Complete and in use
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Arroi Bore-hole (Enkusero Water Project)

location
Arroi (in Kajiado Central)
year first funded
2003
action
Piping of Water to the Site
output
Water piped to the site
implementation status
Complete and in use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Lorngosua Bore-hole

location
Lorngosua (in Kajiado Central)
year first funded
2003
action
Drilling a new bore-hole
output
New borehole drilled
implementation status
Complete and in use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Oleleshwa Milk Project

location
Ildamat (in Kajiado Central)
year first funded
2006
action
dairy construction
output
constructed
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Iloshon Water Project

location
Loodokilani (in Kajiado Central)
year first funded
2004
action
Buying of Pipes
output
Connected pipes
implementation status
Complete and in use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Inkipirash Milk Project

location
Purko (in Kajiado Central)
year first funded
2006
action
dairy construction
output
constructed
implementation status
Ongoing
total cost
Ksh 1,150,000
estimate
Ksh 1,500,000

Lodookilani Secondary School

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
Construction of two Classroom and administrative block
output
Two classes Administration Block constructed
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Ilpurko Secondary School

location
Nkoile (in Kajiado Central)
year first funded
2007
action
construction 4 Classrooms admin office 3 toilets
output
constructed
implementation status
Complete and not in use
total cost
Ksh 1,000,000
estimate
Ksh 12,000,000

Enkorika boys Secondary School

location
Enkorika (in Kajiado Central)
year first funded
2006
action
Construction of students ablution block, kitchen, bath, dorm and dining hall + Purchase of office furniture
output
Constructed ablution block, temporary kitchen, dining hall, bathrooms, and dormitory and purchased of office furniture.
implementation status
(Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

A.I.C Girls secondary School

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Construction of 2 Classrooms
output
2 classroom constructed
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enkutoto Borehole

location
Osilalei (in Kajiado Central)
year first funded
2008
action
Drilling borehole and purchasing pump machine
output
Pump machine purchased and borehole drilled.
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enkorika boys Secondary School

location
Enkorika (in Kajiado Central)
year first funded
2007
action
Construction of science laboratory block.
output
Laboratory constructed
implementation status
complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Murantawua Borehole

location
Ildamat (in Kajiado Central)
year first funded
2006
action
Drilling of a borehole
output
A borehole and cased
implementation status
complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enkutoto Borehole

location
Osilalei (in Kajiado Central)
year first funded
2007
action
Drilling of a borehole
output
A borehole drilled
implementation status
complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ilpurko Secondary School

location
Nkoile (in Kajiado Central)
year first funded
2009
action
construction of a dining hall and dormitory
output
dining hall, dormitory constructed.
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Meto secondary School

location
Meto (in Kajiado Central)
year first funded
2008
action
furnishing office with typewriters textbooks.
output
office furnished
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

A.I.C secondary School

location
Sajiloni (in Kajiado Central)
year first funded
2008
action
Completing a dormitory, toilets and Class
output
Dormitory, toilets and classroom completed.
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ilpurko secondary School

location
Enkaroni (in Kajiado Central)
year first funded
2008
action
Construction of administration block
output
Administration block constructed.
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enkorika secondary School

location
Enkorika (in Kajiado Central)
year first funded
2008
action
Construction of a laboratory
output
Laboratory constructed.
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Inkiwanchani Water Project

location
Sajiloni (in Kajiado Central)
year first funded
2004
action
Buying of Pipes
output
Connected pipes
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Kilonito Dispensary

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
Finishing Dispensary
output
A dispensary finished
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Taretuoki mission Centre

location
Nkama (in Kajiado Central)
year first funded
2007
action
Construction of 1 dormitory
output
1 dormitory constructed
implementation status
Complete and in use
total cost
Ksh 700,000
estimate
Ksh 700,000

Enkaroni Primary School

location
Enkaroni (in Kajiado Central)
year first funded
2006
action
Construction of a dormitory
output
Dormitory constructed
implementation status
Complete and in use
total cost
Ksh 700,000
estimate
Ksh 700,000

Ngatataek Social hall

location
Bissil (in Kajiado Central)
year first funded
2006
action
Construction of social hall
output
Social hall erected
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Iltareto borehole

location
Sajiloni (in Kajiado Central)
year first funded
2008
action
Reinforcement of pump house with grills.
output
Pump house reinforced and grills.
implementation status
Complete not in use
total cost
Ksh 700,000
estimate
Ksh 700,000

Uswa Borehole

location
Torosei (in Kajiado Central)
year first funded
2004
action
Drill a new Borehole
output
Complete and in use
implementation status
Complete and in use
total cost
Ksh 700,000
estimate
Ksh 700,000

Emurke Dispensary

location
Torosei (in Kajiado Central)
year first funded
2009
action
Construction of a new Dispensary
output
Dispensary constructed
implementation status
ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Ngatataek Dispensary

location
Ilbissil (in Kajiado Central)
year first funded
2004
action
Construction of a dispensary
output
A dispensary constructed
implementation status
Complete and in use
total cost
Ksh 700,000
estimate
Ksh 800,000

Olosuyian primary School

location
Ildamat (in Kajiado Central)
year first funded
2009
action
construction of dining hall
output
dining constructed
implementation status
ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

KMQ primary School

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
construction of dining hall
output
dining hall constructed
implementation status
ongoing and at roofing level
total cost
Ksh 700,000
estimate
Ksh 700,000

Entaretoi Primary

location
Nkama (in Kajiado Central)
year first funded
2007
action
Construction of 1 dormitory
output
Constructed 1 dormitory
implementation status
Complete and in use
total cost
Ksh 700,000
estimate
Ksh 700,000

Murantawua Water project

location
Ildamat (in Kajiado Central)
year first funded
2007
action
Construction of pump house and buying
output
Buying and constructing a pump house
implementation status
Complete and in use
total cost
Ksh 600,000
estimate
Ksh 600,000

Ngatu Dispensary

location
Imaroro (in Kajiado Central)
year first funded
2007
action
Construction of new Dispensary
output
A new dispensary constructed
implementation status
Complete and in use
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Kerero Water Tank

location
Namanga (in Kajiado Central)
year first funded
2009
action
constructing a water tank
output
tank constructed
implementation status
ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Enkusero community water project

location
Nkama (in Kajiado Central)
year first funded
2007
action
Piping of water
output
Water piped
implementation status
Complete and in use
total cost
Ksh 600,000
estimate
Ksh 600,000

Emarti Dispensary

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Constructing Dispensary
output
A dispensary constructed
implementation status
Complete and in use
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Ilmetio Primary School

location
Lorngoswa (in Kajiado Central)
year first funded
2009
action
New Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Olosuyian – Oloyiankalan Water Progm

location
Ildamat (in Kajiado Central)
year first funded
2004
action
Buying of Pipes
output
Connected pipes
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Oloyiankalani -Olosuyian water Supply Programme

location
Ildamat (in Kajiado Central)
year first funded
2009
action
construction of water tank and sanitary facilities (toilet)
output
constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Iseuri Water Tank

location
Sajiloni (in Kajiado Central)
year first funded
2008
action
Constructing water tank.
output
Water tank constructed
implementation status
complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Marantawua water Project

location
Ildamat (in Kajiado Central)
year first funded
2008
action
Purchase of pipes and pump machine
output
Pipes and pump machine purchased
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Olepolos Water Project

location
Bissil (in Kajiado Central)
year first funded
2006
action
Construction of a Tank
output
A water tank constructed
implementation status
Complete not in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Letoire Water Tank

location
Maparasha (in Kajiado Central)
year first funded
2006
action
Construction of a Tank
output
A water tank constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Iltareto Borehole

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Clean and removing rocks in the borehole
output
Borehole cleaned.
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Olgirra Dispensary

location
Olontulugum (in Kajiado Central)
year first funded
2009
action
Finishing of dispensary
output
dispensary finished
implementation status
Complete and not in use.
total cost
Ksh 500,000
estimate
Ksh 0

leboo Dispensary

location
Meto (in Kajiado Central)
year first funded
2009
action
putting up drug store and observation room
output
constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Maparasha health centre

location
Maparasha (in Kajiado Central)
year first funded
2009
action
completing Maternity wards
output
maternity wards completed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

megumi Dispensary

location
osilalei (in Kajiado Central)
year first funded
2009
action
to complete observation room / drug store
output
observation room/drug store completed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Megumi Dispensary

location
Osilalei (in Kajiado Central)
year first funded
2007
action
Construction of a Dispensary
output
A dispensary constructed
implementation status
Gravelling
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Maparasha health centre

location
Maparasha (in Kajiado Central)
year first funded
2007
action
Construction of a Dispensary
output
A dispensary constructed
implementation status
Ongoing/ Foundation laid and walls erected
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Osarai Dispensary

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Construction of a Dispensary
output
A dispensary constructed
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Enkaroni Dispensary

location
Enkaroni (in Kajiado Central)
year first funded
2007
action
Constructing Dispensary
output
A dispensary constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Olenarau Dispensary

location
Enkorika (in Kajiado Central)
year first funded
2007
action
Construction of a new dispensary
output
A new dispensary constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Emurkeya Dispensary

location
Torosei (in Kajiado Central)
year first funded
2007
action
Construction of a new dispensary
output
A new dispensary constructed
implementation status
Not Complete/plastering and painting
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kilonito Dispensary

location
Loodokilani (in Kajiado Central)
year first funded
2003
action
Construction of a Nurse House
output
Nurse house constricted
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 900,000

Oloomayian Primary School

location
Arroi (in Kajiado Central)
year first funded
2009
action
putting up new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Lesoit Primary School

location
Arroi (in Kajiado Central)
year first funded
2009
action
putting up new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Olorngosuani Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2009
action
putting up new Classroom
output
classroom constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

samuli Primary School

location
Poka (in Kajiado Central)
year first funded
2009
action
A teachers house
output
teachers house constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Sunte primary shool

location
Nkama (in Kajiado Central)
year first funded
2009
action
constructing a teacher's house
output
teachers house constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Sultan Hamoud Primary School

location
Nkama (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Endoinyio Primary School

location
Osilalei (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Teachers Advisory Centre Management

location
Nkama (in Kajiado Central)
year first funded
2009
action
construction of TAC Office
output
TAC Office constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Meto secondary School

location
Meto (in Kajiado Central)
year first funded
2009
action
furnishing office and school desk
output
school furnished
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Olosuyian primary School

location
Ildamat (in Kajiado Central)
year first funded
2008
action
Construction of a dining hall
output
dining hall constructed.
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

Nkiito Primary School

location
Meto (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Oloirimirimi Primary School

location
Meto (in Kajiado Central)
year first funded
2009
action
Construction of administration block
output
administration block constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Sare Nursery School

location
Mailwa (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

oletumuke Primary School

location
Mailwa (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

narrok Lukuny Primary School

location
Namanga (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Engaboli Primary School

location
Namanga (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

olobelibel Primary School

location
olobelibel (in Kajiado Central)
year first funded
2009
action
construction of new Classroom
output
classsoom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Ilkiremisho Primary School

location
Oloontulungum (in Kajiado Central)
year first funded
2009
action
construction of new Classroom
output
classsoom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Ilparrua Primary School

location
enkaroni (in Kajiado Central)
year first funded
2009
action
putting up one new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Oltukai Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2009
action
construction of new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Chyulu Nursery School

location
Kenyewa (in Kajiado Central)
year first funded
2009
action
construction of teacher's house
output
teachers house constructed
implementation status
Complete and in use
total cost
Ksh 500,000
estimate
Ksh 500,000

oloserian Primary School

location
Maparasha (in Kajiado Central)
year first funded
2009
action
construction of new Classroom
output
classsoom constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

maparash Primary School

location
Maparasha (in Kajiado Central)
year first funded
2009
action
construction of new Classroom
output
classroom constructec
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Sajiloni Primary School

location
Sajiloni (in Kajiado Central)
year first funded
2009
action
construction of a teacher's house
output
teachers house constructed
implementation status
ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Enkasurai Primary School

location
Enkorika (in Kajiado Central)
year first funded
2009
action
building a new Classroom
output
classroom built
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Osotua

location
Nkama (in Kajiado Central)
year first funded
2006
action
dairy construction
output
constructed
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 1,500,000

Olgirra Dispensary

location
Olontulugumu (in Kajiado Central)
year first funded
2006
action
Constructing a Dispensary
output
A new dispensary constructed
implementation status
complete and not in use
total cost
Ksh 450,000
estimate
Ksh 1,200,000

Arroi water

location
Arroi (in Kajiado Central)
year first funded
2007
action
Construction of a water tank.
output
Water tank constructed.
implementation status
complete and in use
total cost
Ksh 442,694
estimate
Ksh 442,694

Orine Primary School

location
Enkorika (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Orinie Primary

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Construction of T/house
output
Teachers house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Emurkeya Primary School

location
Torosei (in Kajiado Central)
year first funded
2006
action
Construction of one T/house
output
1 t/house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Nempuya Primary School

location
Nkama (in Kajiado Central)
year first funded
2006
action
Construction of one T/house
output
1 T/house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Ngusso Primary

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of T/house
output
A new T/house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Ewangan Primary T/hse

location
Nkama (in Kajiado Central)
year first funded
2007
action
Construction of T/house
output
A T / house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Endikirr Primary

location
Maroro (in Kajiado Central)
year first funded
2007
action
Construction of T/house
output
t/ house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Isiat Priamay School

location
Purko (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed.
implementation status
complete an in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Nkoile Primary School

location
Purko (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Enkejo errop Primary School

location
Osilalei (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Mailwa Primary School

location
Mailwa (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oloilalei Primary School

location
Ildamat (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oloolarroi Primary School

location
Namanga (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Karereo Primary School

location
Namanga (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Iltirpen Primary School

location
Meto (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oloirimirimi Primary School

location
Meto (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Enkeruesuna Primary School

location
Lorgosua (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Sanare Primary

location
Maroro (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Maroro Primary

location
Maroro (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Olmeleleki Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Ilkimunyak Primary School

location
Nkama (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Noompala Primary School

location
Nkama (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Edepan Primary School

location
Torosei (in Kajiado Central)
year first funded
2008
action
Construction of one Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oloomunyi primary School

location
Olobelibel (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Esilalei primary School

location
Enkorika (in Kajiado Central)
year first funded
2008
action
Construction of a Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Sunte primary shool

location
Nkama (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 40,000

Esilalei ECD

location
Oloontuligum. (in Kajiado Central)
year first funded
2008
action
Construction of a Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Chyulu primary School

location
Kenyewa (in Kajiado Central)
year first funded
2008
action
Construction of a Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oldupai primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Ormanie primary School

location
Namanga (in Kajiado Central)
year first funded
2008
action
Construction of a Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Eluanata primary School

location
Mailwa (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Arroi primary School

location
Arroi (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Endoinyio ewuas nursery.

location
Osilalei (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Olmaida primary School.

location
Lorgosuea (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oloomunyi primary School

location
Olobelibel (in Kajiado Central)
year first funded
2009
action
To complete Administration Block
output
administration block completed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Parsinti Primary School

location
Imaroro (in Kajiado Central)
year first funded
2009
action
completing 3 new Classrooms constructed
output
Classrooms constructed.
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

iltareto Primary School

location
sajiloni (in Kajiado Central)
year first funded
2009
action
Construction of a new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Olmoleleki primary School

location
Nkoile (in Kajiado Central)
year first funded
2009
action
construction of new Classroom
output
classroom constructed
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Kurket Primary School

location
Mailwa (in Kajiado Central)
year first funded
2009
action
Construction of a new Classroom
output
One classroom constructed
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Pelewa Dispensary

location
Dalalekutok (in Kajiado Central)
year first funded
2008
action
Construction of a nurse house
output
Nurse house constructed
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Maparasha health centre

location
Ilbissil (in Kajiado Central)
year first funded
2008
action
Construction of a nurse house
output
Nurse house constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Olgos dam

location
Sajiloni (in Kajiado Central)
year first funded
2003
action
Construction of a New dam
output
Water Dam constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Lolkidongoi Water Pan

location
Enkaroni (in Kajiado Central)
year first funded
2003
action
Construction of a New Water Pan
output
Water Dam constructed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oloolainyamok Dam

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Dam Distilling
output
A dam drilled
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Enkeresuna Dam

location
Lorgosuwa (in Kajiado Central)
year first funded
2006
action
Distilling of Dam
output
A dam drilled
implementation status
Complete not in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Usua water project

location
Torosei (in Kajiado Central)
year first funded
2008
action
Buying pipes and fixing them.
output
Pipes bought and fixed
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oiti dam

location
Bissil (in Kajiado Central)
year first funded
2007
action
Construction of one Classroom
output
One classroom constructed
implementation status
complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Nkoile Primary School

location
Nkoile (in Kajiado Central)
year first funded
2009
action
to put up water system by installing pipes
output
installed
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Ilmamen Water

location
Ilmunkush (in Kajiado Central)
year first funded
2009
action
purchase water pipes and piping water
output
purchased
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Olper Elongo water

location
Ilmunkush (in Kajiado Central)
year first funded
2009
action
Construction of a pump house
output
constructed
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Elerai Girls Secondary School

location
Nkama (in Kajiado Central)
year first funded
2007
action
Renovation of a Classroom
output
Classroom renovated
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 700,000

Mashuuru Secondary School

location
Maroro (in Kajiado Central)
year first funded
2007
action
Repairing of blown room
output
Blown roof repaired
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Okiloriti Borehole

location
Ildamat (in Kajiado Central)
year first funded
2004
action
Renovation of a borehole
output
Repairing of a borehole
implementation status
complete and in use
total cost
Ksh 315,000
estimate
Ksh 0

Olgirra Dispensary

location
Dalalekutok (in Kajiado Central)
year first funded
2008
action
Finishing doors, painting and windows
output
Doors ,windows and painting finished
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkaroni Dispensary

location
Nkoile (in Kajiado Central)
year first funded
2008
action
Finishing doors, painting and windows
output
Doors ,windows and painting finished
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kitonya water Users Association

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of borehole
output
Borehole constructed
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloikarra Water Project

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of a borehole
output
Borehole constructed
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloserian Water Project

location
Maparasha (in Kajiado Central)
year first funded
2004
action
Supply of Pipes
output
Connected pipes
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkongue Enjore Water Project

location
Maparasha (in Kajiado Central)
year first funded
2004
action
Build a Water Tank at Leroire
output
A water Tank build
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Esukuta Borehole

location
Ildamat (in Kajiado Central)
year first funded
2006
action
Constructing pump house and piping
output
Repair pump machine / pumping water
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ruanche Borehole

location
Lorngosua (in Kajiado Central)
year first funded
2009
action
rehabilitation of the machine
output
machine rehabilitated
implementation status
ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Uswa Water Project

location
Torosei (in Kajiado Central)
year first funded
2009
action
To put up a water cattle trough and purchasing water pipes.
output
constructed
implementation status
ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilparrua Nursery School

location
Nkama (in Kajiado Central)
year first funded
2004
action
Fencing school compound
output
School compound fenced
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enoretet primary School

location
Nkama (in Kajiado Central)
year first funded
2006
action
Repairing of walls
output
Walls repaired
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkisudo Dispensary

location
Loodokilani (in Kajiado Central)
year first funded
2005
action
Renovation of a dispensary
output
Dispensary renovated
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kenyewa D.O's office

location
Kenyewa (in Kajiado Central)
year first funded
2009
action
renovation / furnishing D.Os' Office
output
furnished D.Os' Office
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkorika D.O's Office

location
Enkorika (in Kajiado Central)
year first funded
2009
action
renovation/ furnishing D.Os' Office
output
furnished D.Os' Office
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Mailwa Primary School

location
Mailwa (in Kajiado Central)
year first funded
2009
action
repair of blown roof
output
Roof repaired
implementation status
complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Nareto

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
dairy construction
output
constructed
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Torosei Dispensary

location
Torosei (in Kajiado Central)
year first funded
2004
action
Construction of one Room Dispensary
output
A one room dispensary constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 600,000

Samuli Primary School

location
Poka (in Kajiado Central)
year first funded
2005
action
Construction of two Classroom
output
2 classrooms constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Masimba Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2005
action
Construction of a Classroom
output
A classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

MCK Kiboko Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nguso Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Inkinye Primary School

location
Sajiloni (in Kajiado Central)
year first funded
2005
action
Construction of one Classrooms
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Inaudot Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Emotoroki Primary School

location
Maparasha (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olchorro Olborr Primary School

location
Osilalei (in Kajiado Central)
year first funded
2005
action
Construction of one Classrooms
output
One Classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Mashuuru Nursery

location
Osilalei (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Megumi Primary School

location
Osilalei (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Emashini Primary School

location
Osilalei (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oltepesi Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Emarti Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Osarai Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Malilima Primary School

location
Oloontulugum (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloomunyi Primary School

location
Olobelibel (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilkiremisho Primary School

location
Oloontulugum (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nailumpe Primary School

location
Oloontulugum (in Kajiado Central)
year first funded
2005
action
Construction of one Class
output
1 classroom constructed
implementation status
Completed and not in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olosuyian – Oloyiankalan water Progm

location
Ildamat (in Kajiado Central)
year first funded
2007
action
Piping of water system
output
Water system piped
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkasura Primary School

location
Enkorika (in Kajiado Central)
year first funded
2005
action
Construction of one Class
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oltinka primary School

location
Nkama (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilamirior Primary

location
Nkama (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmukutani Primary Dormitory

location
Nkama (in Kajiado Central)
year first funded
2007
action
Construction of 1 dormitory
output
1 dormitory constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmejooli Primary

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olmoleleki primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oldupai Pre-primary

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloolngosuani Primary

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Guadalupe Oltepesi Primary

location
Maroro (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ngatu Primary (Adm. Block)

location
Maroro (in Kajiado Central)
year first funded
2007
action
Construction of a admin block
output
Admin block constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilkidemy Primary

location
Maroro (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Lesonkoyo Primary

location
Arroi (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olomayiana Primary

location
Arroi (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Lesoit Nursery

location
Arroi (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkirrumu Nursery

location
Olobelibel (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Imanyat Nursery

location
Olobelibel (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olpolosie Nursery

location
Oloontulugum (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Malilima Primary

location
Oloontulugum (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilkeremisho Primary

location
oloontulugum (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Indoinyio Primary

location
Sajiloni (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enyonyor Nursery

location
Sajiloni (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olgos Primary

location
Enkorika (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Isilale Primary

location
Enkorika (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkutoto nursery

location
Enkorika (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmolelian primary School

location
Purko (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nkoile Pri/ nursery

location
Nkoile (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilparrua Primary

location
Enkaroni (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete an d in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkaroni Primary

location
Enkaroni (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Engejo Errap Primary

location
Osilalei (in Kajiado Central)
year first funded
2007
action
Construction of 1
output
1 classroom constructed
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oldarpoi Primary

location
Osilalei (in Kajiado Central)
year first funded
2007
action
Construction of 1
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkutoto Primary

location
Osilalei (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olchorro Olbor Primary

location
Maparasha (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Emotoroki Primary School

location
Maparasha (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olmotiany Primary

location
Maparasha (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloborr soit Nursery

location
Lorngosua (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Lenkishon Primary

location
Lorngosua (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nalepo Nursery

location
Lorngosua (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkusero primary School

location
Bissil (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Bissil Primary School

location
Bissil (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Olepolos Nursery

location
Bissil (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Iloshon Pre- Primary

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olosiyiamalil Nursery

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
construction of 1 Classroom
output
1 classroom constructed
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olomayiana Nursery

location
Torosei (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Torosei Primary

location
Torosei (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Ongoing /roofing
total cost
Ksh 300,000
estimate
Ksh 300,000

Torosei Nursery

location
Torosei (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Ongoing / at roofing level
total cost
Ksh 300,000
estimate
Ksh 300,000

Kumpa primary School

location
Nkoile (in Kajiado Central)
year first funded
2008
action
Equipping computer lab.
output
Computer lab equipped.
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Inchorroi nursery School

location
Imaroro (in Kajiado Central)
year first funded
2008
action
Construction of a Class
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Entaretoi Primary School

location
Poka (in Kajiado Central)
year first funded
2009
action
to equip dormitory with 40 beds
output
dormitory equipped
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

mashuuru Primary School

location
Imaroro (in Kajiado Central)
year first funded
2009
action
renovation of 8 Classrooms, roofing
output
classroom renovated
implementation status
ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkisukudo Dispensary

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
Construction of a dispensary
output
A new dispensary constructed
implementation status
complete and not in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Simba health centre

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of health centre
output
A health centre constructed
implementation status
complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Pelewa Dispensary

location
Olobelibel (in Kajiado Central)
year first funded
2004
action
Construction of a New Dispensary
output
A new dispensary constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 800,000

Ilparakuo Primary School

location
Nkoile (in Kajiado Central)
year first funded
2003
action
Construction of one Classroom
output
One classrooms constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Isara Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2003
action
Renovation of the existing Classrooms
output
Existing Classroom renovated
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Etepesi Primary School

location
Imaroro (in Kajiado Central)
year first funded
2004
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Samuli Primary School

location
Poka (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olkatetemai Primary

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Esarunoto Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oidoinyo Sampu primary

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oidoinyo Lenkai Primary

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Mopia Primary School

location
Bissil (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmotio Primary School

location
Lorngosua (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Emotoroki Primary School

location
Maparasha (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olchorro olborr Ajijik Primary School

location
Osilalei (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloomunyi Primary School

location
Olobelibel (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilparrua Primary School

location
Nkama (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloibor Ajijik Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Emurkeya Primary School

location
Torosei (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilparakuo Primary School

location
Nkoile (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Sanare Primary

location
Arroi (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Noongabolo Primary School

location
Nkama (in Kajiado Central)
year first funded
2006
action
Construction of Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilkishumu Primary School

location
Nkama (in Kajiado Central)
year first funded
2006
action
Construction of Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Inaudot Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Elangata Wuas Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Tikoishi Primary

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Paranae Primary

location
Ildamat (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Esukuta Primary

location
Ildamat (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Iltareto Primary

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkutoto Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Chyulu Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Eselenkei Primary School

location
Kenyewa (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nkiwanjani Primary School

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Olmotiany Primary School

location
Maparasha (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ololngosuani Primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Parsinti Primary School

location
Imaroro (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Ongoing /at roofing level
total cost
Ksh 300,000
estimate
Ksh 300,000

Entaretoi Primary School

location
Poka (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1 classroom
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Erankau Primary School

location
Nkama (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1classroomconstructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloolainyamok Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oloilalei Nursery School

location
Ildamat (in Kajiado Central)
year first funded
2006
action
Construction of 2 Classrooms
output
1 classroom constructed
implementation status
Ongoing /roofing level
total cost
Ksh 300,000
estimate
Ksh 300,000

Imanyat Primary School

location
Olobelibel (in Kajiado Central)
year first funded
2006
action
Construction 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Isilale Primary School

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Construction of 1 Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Sinkiraine Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Torosei Primary School

location
Torosei (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nkoile Primary School

location
Nkoile (in Kajiado Central)
year first funded
2005
action
Construction of 1 Classroom
output
Construction of 1 classroom
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilparakuo Primary School

location
Nkoile (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enchorro e Senteu Pri

location
Loodokilani (in Kajiado Central)
year first funded
2005
action
Construction of 1 Classrooms
output
1 classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Sinkiraine Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2005
action
Construction of two Classroom
output
Two classrooms constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Enkaroni Primary School

location
Enkaroni (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nkuseron Primary School

location
Sajiloni (in Kajiado Central)
year first funded
2005
action
Construction of one Classrooms
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Mopia Primary School

location
Bissil (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmotio Primary School

location
Lorngosua (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilpartimaro Primary School

location
Bissil (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmisigiyio Primary School

location
Lorngosua (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oiti Primary School

location
Lorngosua (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilmukutani Primary School

location
Nkama (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Oltinka Primary School

location
Poka (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ilaimirro Primary School

location
Poka (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Ewangan Primary School

location
Nkama (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Emarti Oloibora Ajikjik Road

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Inkiwanjani road

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
bush clearing
output
bush cleared
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Noosidan water project

location
Ilmunkush (in Kajiado Central)
year first funded
2007
action
Replacement of pipes
output
Pipes replaced
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Orinie Bridge

location
Enkorika (in Kajiado Central)
year first funded
2004
action
Rehabilitation of a bridge
output
Bridge rehabilitated
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Tikoshi Nursery School

location
Loodokilani (in Kajiado Central)
year first funded
2004
action
Construction of a Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Enkorika Secondary School

location
Enkorika (in Kajiado Central)
year first funded
2007
action
To buy solar panel
output
Solar panel installed
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Oiti Nalepo road

location
Sajiloni (in Kajiado Central)
year first funded
2008
action
Bush clearing
output
Bush cleared
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Kajiado iltareto road

location
Sajiloni (in Kajiado Central)
year first funded
2008
action
Bush clearing and draining water
output
Bush cleared and water drained.
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Tikoishi-Kilonito road

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
Clearing and uprooting shrubs. (New)
output
Cleared road
implementation status
Complete and in use
total cost
Ksh 250,000
estimate
Ksh 250,000

Naudot-Singiraine road

location
Loodokilani (in Kajiado Central)
year first funded
2003
action
Clear the road by removing rocks. 9km
output
9km road cleared by removed rocks
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Lenkishon Primary School

location
Bissil (in Kajiado Central)
year first funded
2006
action
To build a water tank
output
Water tank built
implementation status
Complete and in use
total cost
Ksh 230,000
estimate
Ksh 230,000

Paranae primary School

location
Ildamat (in Kajiado Central)
year first funded
2004
action
Construction of Classroom
output
Classroom constructed
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Almanie Mashuuru borehole

location
Maroro (in Kajiado Central)
year first funded
2008
action
Repairing of pump machine
output
Pump machine repaired
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Mashuuru borehole

location
Osilalei (in Kajiado Central)
year first funded
2006
action
Repairing pump house
output
Pump house repaired
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Lele primary School

location
Bissil (in Kajiado Central)
year first funded
2006
action
Clearing of road
output
Road cleared
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Eluanata Water Catchment

location
Mailwa (in Kajiado Central)
year first funded
2008
action
Repairing pump machine
output
Pump machine repaired
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Megumi Primary School

location
Osilalei (in Kajiado Central)
year first funded
2008
action
Finishing Classroom
output
Classroom finished
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Meto Primary School

location
Meto (in Kajiado Central)
year first funded
2008
action
Finishing Classroom
output
Classroom finished
implementation status
complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Ilmejooli Primary

location
Ilmunkush (in Kajiado Central)
year first funded
2008
action
Roofing blown roof.
output
Blown roof repaired
implementation status
complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Ilamirror Primary School

location
Nkama (in Kajiado Central)
year first funded
2008
action
Roofing blown roof.
output
Blown roof repaired
implementation status
complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Ildonyo Nursery

location
Enkorika (in Kajiado Central)
year first funded
2008
action
Roofing blown roof.
output
Blown roof repaired
implementation status
complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Oloontulugum Primary School

location
Oloontulugum (in Kajiado Central)
year first funded
2005
action
To repair blown roof
output
Roof repaired or replaced
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Olchorro Oibor Primary School

location
Osilalei (in Kajiado Central)
year first funded
2008
action
Finishing Classroom roof
output
Classroom roof finished
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Imao Primary School

location
Arroi (in Kajiado Central)
year first funded
2009
action
to complete 2 teachers house started painting, lumbering
output
teachers houses started
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Enkaroni Primary School

location
Enkaroni (in Kajiado Central)
year first funded
2009
action
Complete a Classroom doors, window, and painting.
output
classroom completed
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Ewangan Primary School

location
Nkama (in Kajiado Central)
year first funded
2009
action
Completing 3 teacher's houses.
output
Teachers houses completed
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Ilamirror Primary School

location
Poka (in Kajiado Central)
year first funded
2009
action
Renovation of library by fixing books shelves
output
library renovated
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Endikirr Primary School

location
Imaroro (in Kajiado Central)
year first funded
2009
action
Completion of Classroom, plastering, painting, roofing, putting windows and doors
output
classroom completed
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Impiro Primary School

location
sajiloni (in Kajiado Central)
year first funded
2009
action
to complete a started Class
output
classroom completed
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 200,000

Emarti Dispensary

location
Ilmunkush (in Kajiado Central)
year first funded
2008
action
Finishing of a drug store.
output
Drug store finished
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngatu Dispensary

location
Imaroro (in Kajiado Central)
year first funded
2008
action
Fencing Dispensary compound
output
Dispensary compound fenced
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Masikiria Dispensary

location
Lorngosua (in Kajiado Central)
year first funded
2009
action
Painting, plastering furnishing drug store. Observation
output
Drug store/ observation putted
implementation status
Complete and not in use
total cost
Ksh 200,000
estimate
Ksh 200,000

KMQ primary School

location
Loodokilani (in Kajiado Central)
year first funded
2004
action
Repair of blown roofs
output
Blown roofs repaired
implementation status
Complete and in use
total cost
Ksh 180,000
estimate
Ksh 180,000

Inkiwanchani Pipe Net work

location
Sajiloni (in Kajiado Central)
year first funded
2003
action
Installation New Engine at Eiti Borehole
output
New engine drilled
implementation status
Complete and in use
total cost
Ksh 160,000
estimate
Ksh 160,000

Kumpa primary School

location
Purko (in Kajiado Central)
year first funded
2005
action
Repairing of a damaged rood
output
Damaged roof repaired
implementation status
Complete and in use
total cost
Ksh 160,000
estimate
Ksh 160,000

Oltinga Oibor borehole

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
To buy motor and repair the pump
output
Motor bought and pump repaired
implementation status
complete and in use
total cost
Ksh 150,000
estimate
Ksh 150,000

Loodokilani community policy

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Repairing and painting of A.PS’ house
output
APs houses Painted / repaired
implementation status
Complete and in use
total cost
Ksh 150,000
estimate
Ksh 150,000

Enkerse Una Torosei Road

location
Torosei (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 150,000
estimate
Ksh 150,000

Nkoile Primary School

location
Nkoile (in Kajiado Central)
year first funded
2009
action
fencing to stop land grabbers
output
fenced
implementation status
complete and in use
total cost
Ksh 150,000
estimate
Ksh 150,000

Oiti- Nalepo road

location
Lorngosua (in Kajiado Central)
year first funded
2006
action
Clearing trees.
output
Cleared road
implementation status
Complete and in use
total cost
Ksh 137,684
estimate
Ksh 137,684

Indupa Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Painting and repairing of a Classroom
output
Classroom painted and repaired
implementation status
Complete and in use
total cost
Ksh 130,000
estimate
Ksh 130,000

Isara Kuunvhub Road

location
Kenyewa (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Esoiti Primary School

location
Maparasha (in Kajiado Central)
year first funded
2007
action
Repair of blown off roofs
output
Blown roof repaired
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Eiti Primary School

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Repair of blown off roofs
output
Blown roofs repaired
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Osarai primary School

location
Ilmunkush (in Kajiado Central)
year first funded
2006
action
Repairing of wall
output
Wall repaired
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Merrueshi borehole

location
Kenyewa (in Kajiado Central)
year first funded
2006
action
Repairing pump house.
output
Pump house repaired
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Nkoile orine road

location
Nkoile (in Kajiado Central)
year first funded
2006
action
Clearing of trees
output
Trees cleared
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Namelok Lenkisho Road

location
Bissil (in Kajiado Central)
year first funded
2006
action
Road clearing
output
Road cleared
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Indupa primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Replacing blown roof
output
Blown roof replaced
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Ololepo borehole

location
Loodokilani (in Kajiado Central)
year first funded
2005
action
Replacing a mortar.
output
Mortar replaced.
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Lorngosua Borehole

location
lorgosua (in Kajiado Central)
year first funded
2008
action
Repairing of mortar
output
Mortar repaired
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Matuu Water Project

location
lorgosua (in Kajiado Central)
year first funded
2008
action
Repairing of mortar
output
Mortar repaired
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Uswa Water Project

location
Torosei (in Kajiado Central)
year first funded
2008
action
Drilling borehole and constructing water trough
output
Borehole drilled and water trough constructed.
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Oloosuyian Road

location
Ildamat (in Kajiado Central)
year first funded
2006
action
Clearing and maintaining the road
output
Maintained and cleared road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 250,000

Oloomunyi Road

location
Olobelibel (in Kajiado Central)
year first funded
2006
action
Clearing and maintained the road
output
Maintained cleared road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 250,000

Kukua water project

location
Meto (in Kajiado Central)
year first funded
2007
action
Repair of a pump machine
output
Pump machine repaired
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Impiro Emarti Road

location
Sajiloni (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Oldarpoi Enkutoto Road

location
Osilalei (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Bissil Olmotony Road

location
Bissil (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Esukuta Olooruyian Road

location
Ildamat (in Kajiado Central)
year first funded
2007
action
Clearing and opening
output
Cleared and opened road
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Endikirr Primary School

location
Imaroro (in Kajiado Central)
year first funded
2005
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 300,000

Emaroro Primary School

location
Imaroro (in Kajiado Central)
year first funded
2005
action
Connecting electricity to the Emaroro Pri School
output
electricity connected to the school
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Sajiloni water project

location
Sajiloni (in Kajiado Central)
year first funded
2006
action
Buying of pipes
output
Pipes purchased
implementation status
complete and in use
total cost
Ksh 100,000
estimate
Ksh 100,000

Oloontulungum primary School

location
Oloontulungum (in Kajiado Central)
year first funded
2006
action
Repair of blown off roofs
output
Blown roofs repaired
implementation status
Complete and in use
total cost
Ksh 75,000
estimate
Ksh 75,000

Iloshon Primary School

location
Loodokilani (in Kajiado Central)
year first funded
2006
action
Replacing blown roof
output
Blown roof repaired
implementation status
Complete and in use
total cost
Ksh 75,000
estimate
Ksh 75,000

Iloshon Pre-primary School

location
Loodokilani (in Kajiado Central)
year first funded
2007
action
Repairing of blown roof
output
Blown roof repaired
implementation status
Complete and in use
total cost
Ksh 50,000
estimate
Ksh 50,000

Ngatu Dispensary

location
Imaroro (in Kajiado Central)
action
fencing
output
dispensary fenced
implementation status
complete
total cost
Ksh 0
estimate
Ksh 200,000

Maparasha health centre

location
Maparasha (in Kajiado Central)
action
Maternity block. (continuation advice)
output
Continuation of a maternity block
implementation status
complete
total cost
Ksh 0
estimate
Ksh 400,000

Enkaroni dispensary

location
Enkaroni (in Kajiado Central)
action
Plastering and painting.
output
Dispensary plastered and painted.
implementation status
Plastering/painting/ceiling
total cost
Ksh 0
estimate
Ksh 300,000

Linti dispensary

location
Meto (in Kajiado Central)
year first funded
2008
action
Construction of a nurse house.
output
A nurse house constructed
implementation status
ongoing
total cost
Ksh 0
estimate
Ksh 400,000

Ilmarba Primary School

location
Bissil (in Kajiado Central)
action
Construction of one Classroom
output
One classroom constructed
implementation status
Complete and in use
total cost
Ksh 0
estimate
Ksh 300,000