The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Enkii Training Centre
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2006
- action
- Construction F New Dormitory
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 4,755,000
- estimate
- Ksh 4,755,000
Constituenc Y OfficeSocial Hall
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of As Ocial Hall At Kimana
- output
- Social Hall
- implementation status
- Public Toilets And Septic Tank To Be Done
- total cost
- Ksh 4,200,000
- estimate
- Ksh 4,200,000
Kuku Day Secondary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Imurtot Primary School
- location
-
Olchorro
(in Kajiado South)
- year first funded
- 2006
- action
- Construction F New Classrooms
- output
- 6 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 2,920,000
- estimate
- Ksh 2,920,000
Olgulului Borehole
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2005
- action
- Drilling A New Borehole And Purchase Of Generator
- output
- 1 Borehole
- implementation status
- Complete And In Use
- total cost
- Ksh 2,491,250
- estimate
- Ksh 2,491,250
Namelok Day Secondary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
Ilkisonko Secondary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Dormitory And Office.
- output
- Dormitory And Office Block.
- implementation status
- Complete And In Use
- total cost
- Ksh 2,255,000
- estimate
- Ksh 2,255,000
Ilchalai Dispensary
- location
-
Mbirikani
(in Kajiado South)
- year first funded
- 2005
- action
- Construction Of A Community Health Centre
- output
- 1 Health Centre
- implementation status
- Complete And In Use
- total cost
- Ksh 2,195,768
- estimate
- Ksh 2,195,768
Meto Health Centre
- location
-
Meto
(in Kajiado South)
- year first funded
- 2003
- action
- Construction Of A Health Centre Phase 1
- output
- Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 2,090,000
- estimate
- Ksh 2,090,000
Meshanani
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of 2 New Classrooms And Desks.
- output
- 2 Classrooms And Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 2,010,000
- estimate
- Ksh 2,010,000
Kuku Water Project
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2009
- action
- Water Tank, Water Piping And Pipes A Lining
- output
- Water Tank, A Lined Pipes And Piped Water
- implementation status
- Complete Ready For Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Elangata Enkima Dispensary
- location
-
Olorika
(in Kajiado South)
- year first funded
- 2003
- action
- Construction Of A New Dispensary Phase 1
- output
- Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 1,950,000
- estimate
- Ksh 1,950,000
Olchorro Secondary School
- location
-
Olchorr O
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of A New Building
- output
- 1 Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Sompet Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Kimana Health Centre
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2003
- action
- Construction Of A New Section Extension Phase 1
- output
- Out Patient Block, Kitchen And Maternity
- implementation status
- Complete And In Use
- total cost
- Ksh 1,735,000
- estimate
- Ksh 1,735,000
Olgirra Primary School
- location
-
Njukini
(in Kajiado South)
- year first funded
- 2005
- action
- To Build Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,730,000
- estimate
- Ksh 1,730,000
Elangata Enkima Dispensary
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of A New Dispensary
- output
- Out Patient Block
- implementation status
- Complete And In Use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Naretisho Oloiborsloit Centre
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2005
- action
- Construction Of A Water Tank And Fencing
- output
- Water Tank And Fence
- implementation status
- Complete And In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Enoosampurmpur Primary School
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Two New Classrooms And Desks
- output
- 2 Classrooms And Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 1,460,000
- estimate
- Ksh 1,460,000
Elangata Nkima Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms And Emergency Roof Repair
- implementation status
- Complete And In Use
- total cost
- Ksh 1,452,000
- estimate
- Ksh 1,452,000
Entarara Health Centre
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2003
- action
- Construction Of Septic Tank And Wiring
- output
- Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 1,391,727
- estimate
- Ksh 13,917,268
Community Borehole
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Water Tank And Piping
- output
- Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 1,367,500
- estimate
- Ksh 1,367,500
Leboo Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,360,000
- estimate
- Ksh 1,360,000
Emumuenyi Dispensary
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2004
- action
- Completion Of Remaining Phase
- output
- 1 Dispensary
- implementation status
- RePainting To Be Under Taken
- total cost
- Ksh 1,330,000
- estimate
- Ksh 1,330,000
Oyarata Water Tank
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2008
- action
- Construction Of A Water Tank
- output
- A Water Tank
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Oyarata Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,240,000
- estimate
- Ksh 1,240,000
Loolakir Primary School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Oilishooibor Nursery School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Osoit Primary School
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Work In Progress
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Paranai Primary School
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And Ready For Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Elangata Nkima Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 80% Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Oloibor Osoit Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of A School Fence
- output
- A School Fence
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Olandi Primary School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Oloilalei Primary School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Olorika Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Lemongo Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,160,000
- estimate
- Ksh 1,160,000
Ilchalai Primary School
- location
-
Imbirikani
(in Kajiado South)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Maisuyati Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Project 85% Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Lenkism Primary School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Nasipa Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of School Toilets
- output
- Constructed School Toilets
- implementation status
- Work In Progress
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Kuku Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2006
- action
- Erecting A School Fence.
- output
- Fence
- implementation status
- Complete And In Use
- total cost
- Ksh 1,059,450
- estimate
- Ksh 1,059,450
Loolakir Primary School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2004
- action
- To Build Three New Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,030,000
- estimate
- Ksh 1,030,000
Kimana Secondary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Purchase Of School Bus
- output
- 1 School Bus
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkongu Narok Dispensary
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2008
- action
- Construction Of Extension Of Treatment Room
- output
- Extended Treatment Room
- implementation status
- Complete And Ready For Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Rombo Girls Rescue Centre
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2008
- action
- Construction Of Girls Rescue Centre
- output
- Rescue Centre
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Emashini Water Dam
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of A Dam
- output
- A Water Dam
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Namelok Furrow Ilparakuo Water Users Association
- location
-
Imbirikani
(in Kajiado South)
- year first funded
- 2007
- action
- Piping Of Water System
- output
- Piped Water System
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Olkirenyi Water Project
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Water Rehabilitation And Pipes Lining
- output
- Water System
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Impiron Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkongu Narok Dispensary
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of Health Facility
- output
- Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Moilo Nursery School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Two New Classrooms Desk And Completing Two Other Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kijito Water Tank
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2005
- action
- Construction of A Water Tank
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kiluani Secondary School
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2004
- action
- Dormitory Construction
- output
- 1 Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ilgarrunyoni Water Project
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2006
- action
- Purchase Of Water Pipes
- output
- Pipes
- implementation status
- Complete And In Use
- total cost
- Ksh 970,000
- estimate
- Ksh 970,000
Naaroklukuny Water Project
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2003
- action
- Supply And Delivery Of Pvc Class 2 Pipes
- output
- Purchased Pipes
- implementation status
- Complete And In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Emaoi Water Tank
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2005
- action
- Construction Of A Water Tank
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Esosian Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2005
- action
- To Build Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kimana Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2005
- action
- To Build Two New Classrooms
- output
- 2 Clasrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Loolakir Nursery
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2005
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Ilumbwa Water Tank
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2006
- action
- Purchase Of Pipes And Constructing Of Water Tank
- output
- Pipes And Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Kisioki Canal
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2005
- action
- Catchment Protection
- output
- Catchment Protection
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Olbili Borehole
- location
-
Imbirikani
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of Borehole
- output
- Borehole
- implementation status
- Complete And In Use
- total cost
- Ksh 816,000
- estimate
- Ksh 816,000
Elerai Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Putting Up Of Toilets
- output
- Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kitenden Borehole
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2004
- action
- Buying Pumping Machine And Constructing Anew Building
- output
- Pumping Machine
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Rombo Girls Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2005
- action
- To Build Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Loitokitok Jua Kali Artisan
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2006
- action
- Purchase Of Land And Construction Of A Shelter
- output
- 1 Shelter Jua Kali
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Oloile Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Enkongu Nursery School
- location
-
Imbirikani
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Empukani Nursery School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of23 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Elerai Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Inchulai Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Shokut Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Olkaria Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Enoosampurmpur Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Intialogoi Nursery School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Endapudapoi Furrow
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Furrow
- output
- Water Furrow
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Rombo Divisional Development Project
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of Administration Block
- output
- Administration Block
- implementation status
- Complete And Ready For Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kimana Christ The King Secondary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of A New Building
- output
- 1 Building
- implementation status
- Complete And In Use
- total cost
- Ksh 794,000
- estimate
- Ksh 794,000
Imbirikani Water Project
- location
-
Imbirikani
(in Kajiado South)
- year first funded
- 2005
- action
- Supply Of Pipes
- output
- Water Pipes
- implementation status
- Complete And In Use
- total cost
- Ksh 787,415
- estimate
- Ksh 800,000
Nolasiti Nursary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Nairaballa Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Two New Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Inkariak Ronkena Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Two New Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Loormeuti Nursery School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Two New Classrooms And Desks
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Maisuyati Nusery School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2005
- action
- Construction F New Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 660,000
- estimate
- Ksh 660,000
Namanga Primary School
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms And Desks
- output
- 2 Classrooms And Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 660,000
- estimate
- Ksh 660,000
Islamic Education Centre
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of 2 New Classrooms And Desks.
- output
- 2 Classrooms And Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 660,000
- estimate
- Ksh 660,000
Enkusero PreSchool
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2004
- action
- Classroom Construction
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 625,000
- estimate
- Ksh 625,000
Eluanata Primary School
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 620,000
- estimate
- Ksh 620,000
Olepolos Water Project
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2003
- action
- Construction Of Storage Tank And Pipes Supply And Fitting.
- output
- Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 606,150
- estimate
- Ksh 610,000
Mailwa Primary School
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of An Administrati On Block
- output
- Administra Tion Block
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Oloile Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of Toilets
- output
- Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kikelelwa Water Tank
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of A Water Tank
- output
- A Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Linti Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2005
- action
- Construction of Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Iltilal Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2005
- action
- To Build Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Elangata Enkima Canal
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2005
- action
- Canal Lining
- output
- Canal Lining
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Matepes Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nkama Dispensary
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2003
- action
- Continuation Of The Community Reaching Point
- output
- Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 599,385
- estimate
- Ksh 59,938,635
Mountain Water Project
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Water Pipe Line
- output
- Water Pipes
- implementation status
- Complete And In Use
- total cost
- Ksh 572,000
- estimate
- Ksh 572,000
Rombo Girls Secondary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Isinet Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 540,000
- estimate
- Ksh 540,000
Namelok Secondary School
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2009
- action
- Purchase Of Furniture
- output
- School Furniture
- implementation status
- Purchased And In Use
- total cost
- Ksh 530,000
- estimate
- Ksh 530,000
Olkulenyet Water Tank
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of A Water Tank
- output
- A Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Rombo Community Rescue Centre
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of A Dormitory
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Naretisho Olibor Soit Community Health Centre
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Repairing And Repainting
- output
- Repaired And Repainted Building
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Enkongu Narok Dispensary
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2009
- action
- Roofing And Windows
- output
- A Roof And Windows
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olchorro Secondary School
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And Ready For Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kimana Secondary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2009
- action
- Purchase Of A Bus
- output
- A School Bus
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olkilenyiet Water Tank
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of A Water Tank
- output
- A Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Moilo Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sumpet/Enkonak Rongena Muungano Water Project
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Water Rehabilitation
- output
- Water System
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olgolului Borehole
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of Borehole
- output
- Borehole
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Illasiti Secondary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of Admin. Block
- output
- Admin. Block
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
St. Clares Girls Secondary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2006
- action
- Purchase Of School Bus
- output
- 1 School Bus
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Impiron Maji Safi Water Project
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2005
- action
- Construction of A Water Tank
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Iltirpen Water Project
- location
-
Meto
(in Kajiado South)
- year first funded
- 2005
- action
- Provide Water To The Community
- output
- Piping Water
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Namelok Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2004
- action
- Classrooms Taken Away By Wind
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Oldule Water Project
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2004
- action
- Completion Of Extension Part And Buying Of Water Pipes
- output
- Purchased Pipes
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Inkati Nursery School
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Aic Primary School Namanga
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kijito Borehole
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of Borehole
- output
- Borehole
- implementation status
- Complete And In Use
- total cost
- Ksh 498,050
- estimate
- Ksh 498,060
Ilmisigiyo Water Project
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2005
- action
- Construction Of Water Pipe Line
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 480,000
- estimate
- Ksh 480,000
Emmumunyi Dispensaryansary
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2009
- action
- Rehabitating Water System
- output
- Rehabitated Water System
- implementation status
- Water System Complete
- total cost
- Ksh 475,000
- estimate
- Ksh 475,000
Inkisanjani Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2003
- action
- Renovation Of Existing Building
- output
- Renovate Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 458,000
- estimate
- Ksh 458,000
Eluai Pipeline Water
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2009
- action
- A Lining Of Water Pipes
- output
- A Lined Water Pipes
- implementation status
- Work Done
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Engaboli Primary School
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2005
- action
- To Build Two New Class
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kumpaa Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2004
- action
- Repairing Of Damaged Classrooms
- output
- Renovated Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kimana Social Hall
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2009
- action
- Fixing Gate
- output
- Fixed Gate
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lemongo Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 2 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Oldonyo Oibor Water Project
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Water Tank
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Njukini Dispensary
- location
-
Njukini
(in Kajiado South)
- year first funded
- 2005
- action
- Construction of A New Dispensary
- output
- Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Noonganayi Ok Water Project
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2003
- action
- Construction Of Water Tank
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Kuku Day Secondary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2009
- action
- Purchase Of Furniture
- output
- School Furniture
- implementation status
- Purchased And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Okesi Division Canal Association
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of Canal
- output
- Diversion Canal
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Lenkism Primary School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2009
- action
- Painting Of Admin. And Kitchen Block And Purchase Of Furniture
- output
- Furniture And Painted Block
- implementation status
- Furniture Bought And Block Painted
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Inkati Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2004
- action
- Making Of Desks
- output
- Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Olmoti Borehole
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2007
- action
- Water Rehabilitation
- output
- Water System
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kurket Nursery School
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of A Classroom And Desks.
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
Kurket Nursery School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
Inkati Primary School
- location
-
Namanga
(in Kajiado South)
- year first funded
- 2005
- action
- To Build One More Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nkama Dispensary
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Continuation Of The Comm. Health Point
- output
- Heath Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Aic Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Water Tank
- output
- 1 Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Illaingarruun Yoi Water Project
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2005
- action
- Construction of A Water Pipe Line
- output
- Water Pipes
- implementation status
- Complete And In Use
- total cost
- Ksh 280,000
- estimate
- Ksh 280,000
Inkati Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2007
- action
- Completion Of Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 275,000
- estimate
- Ksh 275,000
Nolasiti Primary School
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2007
- action
- Completion Of 2 Classroom
- output
- 2 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Nolasiti Community Borehole
- location
-
Rombo
(in Kajiado South)
- year first funded
- 2006
- action
- Construction Of Water Trough
- output
- Water Trough
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mailwa Dispensary Water Project
- location
-
Mailwa
(in Kajiado South)
- year first funded
- 2006
- action
- Completion Of A Borehole
- output
- Borehole
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Olchorro Entonet Community Water Tank
- location
-
Entonet
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of A Water Tank
- output
- Water Tank
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kisapuk Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2005
- action
- Construction of An Administration Block
- output
- 1 Administration Block
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Oldonyio Orbor Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2006
- action
- Completion Of Constructed Building
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Loormeuti Nursery
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Completion Of 2 Classroom
- output
- 2 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Enkariak Rongena Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2008
- action
- Completion Of A Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Iltuleta Nursery School
- location
-
Lenkism
(in Kajiado South)
- year first funded
- 2007
- action
- Completion Of Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Aic Primary School
- location
-
Kuku
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nkiito Primary School
- location
-
Meto
(in Kajiado South)
- year first funded
- 2004
- action
- Building Of A New Desk
- output
- Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Oldoinyio Oibor Primary School
- location
-
Kimana
(in Kajiado South)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ilchalai Primary School
- location
-
Imbirikani
(in Kajiado South)
- year first funded
- 2008
- action
- Completion Of A Classroom
- output
- A Classroom
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000