The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kajiado South

Enkii Training Centre

location
Kuku (in Kajiado South)
year first funded
2006
action
Construction F New Dormitory
output
A Dormitory
implementation status
Complete
total cost
Ksh 4,755,000
estimate
Ksh 4,755,000

Constituenc Y OfficeSocial Hall

location
Kimana (in Kajiado South)
year first funded
2006
action
Construction Of As Ocial Hall At Kimana
output
Social Hall
implementation status
Public Toilets And Septic Tank To Be Done
total cost
Ksh 4,200,000
estimate
Ksh 4,200,000

Kuku Day Secondary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 3 Classrooms
output
3 Classrooms
implementation status
Complete And In Use
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Imurtot Primary School

location
Olchorro (in Kajiado South)
year first funded
2006
action
Construction F New Classrooms
output
6 Classrooms
implementation status
Complete And In Use
total cost
Ksh 2,920,000
estimate
Ksh 2,920,000

Olgulului Borehole

location
Lenkism (in Kajiado South)
year first funded
2005
action
Drilling A New Borehole And Purchase Of Generator
output
1 Borehole
implementation status
Complete And In Use
total cost
Ksh 2,491,250
estimate
Ksh 2,491,250

Namelok Day Secondary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of 3 Classrooms
output
3 Classrooms
implementation status
Complete
total cost
Ksh 2,300,000
estimate
Ksh 2,300,000

Ilkisonko Secondary School

location
Kuku (in Kajiado South)
year first funded
2006
action
Construction Of Dormitory And Office.
output
Dormitory And Office Block.
implementation status
Complete And In Use
total cost
Ksh 2,255,000
estimate
Ksh 2,255,000

Ilchalai Dispensary

location
Mbirikani (in Kajiado South)
year first funded
2005
action
Construction Of A Community Health Centre
output
1 Health Centre
implementation status
Complete And In Use
total cost
Ksh 2,195,768
estimate
Ksh 2,195,768

Meto Health Centre

location
Meto (in Kajiado South)
year first funded
2003
action
Construction Of A Health Centre Phase 1
output
Health Facility
implementation status
Complete And In Use
total cost
Ksh 2,090,000
estimate
Ksh 2,090,000

Meshanani

location
Lenkism (in Kajiado South)
year first funded
2006
action
Construction Of 2 New Classrooms And Desks.
output
2 Classrooms And Desks
implementation status
Complete And In Use
total cost
Ksh 2,010,000
estimate
Ksh 2,010,000

Kuku Water Project

location
Kuku (in Kajiado South)
year first funded
2009
action
Water Tank, Water Piping And Pipes A Lining
output
Water Tank, A Lined Pipes And Piped Water
implementation status
Complete Ready For Use
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Elangata Enkima Dispensary

location
Olorika (in Kajiado South)
year first funded
2003
action
Construction Of A New Dispensary Phase 1
output
Health Facility
implementation status
Complete And In Use
total cost
Ksh 1,950,000
estimate
Ksh 1,950,000

Olchorro Secondary School

location
Olchorr O (in Kajiado South)
year first funded
2004
action
Construction Of A New Building
output
1 Dormitory
implementation status
Complete And In Use
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Sompet Primary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Kimana Health Centre

location
Kimana (in Kajiado South)
year first funded
2003
action
Construction Of A New Section Extension Phase 1
output
Out Patient Block, Kitchen And Maternity
implementation status
Complete And In Use
total cost
Ksh 1,735,000
estimate
Ksh 1,735,000

Olgirra Primary School

location
Njukini (in Kajiado South)
year first funded
2005
action
To Build Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,730,000
estimate
Ksh 1,730,000

Elangata Enkima Dispensary

location
Kuku (in Kajiado South)
year first funded
2004
action
Construction Of A New Dispensary
output
Out Patient Block
implementation status
Complete And In Use
total cost
Ksh 1,650,000
estimate
Ksh 1,650,000

Naretisho Oloiborsloit Centre

location
Rombo (in Kajiado South)
year first funded
2005
action
Construction Of A Water Tank And Fencing
output
Water Tank And Fence
implementation status
Complete And In Use
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Enoosampurmpur Primary School

location
Namanga (in Kajiado South)
year first funded
2006
action
Construction Of Two New Classrooms And Desks
output
2 Classrooms And Desks
implementation status
Complete And In Use
total cost
Ksh 1,460,000
estimate
Ksh 1,460,000

Elangata Nkima Primary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms And Emergency Roof Repair
implementation status
Complete And In Use
total cost
Ksh 1,452,000
estimate
Ksh 1,452,000

Entarara Health Centre

location
Rombo (in Kajiado South)
year first funded
2003
action
Construction Of Septic Tank And Wiring
output
Health Facility
implementation status
Complete And In Use
total cost
Ksh 1,391,727
estimate
Ksh 13,917,268

Community Borehole

location
Lenkism (in Kajiado South)
year first funded
2006
action
Construction Of Water Tank And Piping
output
Water Tank
implementation status
Complete And In Use
total cost
Ksh 1,367,500
estimate
Ksh 1,367,500

Leboo Primary School

location
Meto (in Kajiado South)
year first funded
2004
action
Construction Of 3 Classrooms
output
3 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,360,000
estimate
Ksh 1,360,000

Emumuenyi Dispensary

location
Rombo (in Kajiado South)
year first funded
2004
action
Completion Of Remaining Phase
output
1 Dispensary
implementation status
RePainting To Be Under Taken
total cost
Ksh 1,330,000
estimate
Ksh 1,330,000

Oyarata Water Tank

location
Kuku (in Kajiado South)
year first funded
2008
action
Construction Of A Water Tank
output
A Water Tank
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Oyarata Primary School

location
Kuku (in Kajiado South)
year first funded
2004
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,240,000
estimate
Ksh 1,240,000

Loolakir Primary School

location
Lenkism (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Oilishooibor Nursery School

location
Meto (in Kajiado South)
year first funded
2007
action
Construction Of 3 Classrooms
output
3 Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Osoit Primary School

location
Entonet (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Work In Progress
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Paranai Primary School

location
Entonet (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete And Ready For Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Elangata Nkima Primary School

location
Kuku (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
80% Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Oloibor Osoit Primary School

location
Rombo (in Kajiado South)
year first funded
2009
action
Construction of A School Fence
output
A School Fence
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Olandi Primary School

location
Lenkism (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Oloilalei Primary School

location
Lenkism (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Olorika Primary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 3 Classrooms
output
3 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Lemongo Primary School

location
Kimana (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,160,000
estimate
Ksh 1,160,000

Ilchalai Primary School

location
Imbirikani (in Kajiado South)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Maisuyati Primary School

location
Kimana (in Kajiado South)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Project 85% Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Lenkism Primary School

location
Lenkism (in Kajiado South)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Nasipa Primary School

location
Rombo (in Kajiado South)
year first funded
2009
action
Construction of School Toilets
output
Constructed School Toilets
implementation status
Work In Progress
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Kuku Primary School

location
Kuku (in Kajiado South)
year first funded
2006
action
Erecting A School Fence.
output
Fence
implementation status
Complete And In Use
total cost
Ksh 1,059,450
estimate
Ksh 1,059,450

Loolakir Primary School

location
Lenkism (in Kajiado South)
year first funded
2004
action
To Build Three New Classrooms
output
3 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,030,000
estimate
Ksh 1,030,000

Kimana Secondary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Purchase Of School Bus
output
1 School Bus
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enkongu Narok Dispensary

location
Entonet (in Kajiado South)
year first funded
2008
action
Construction Of Extension Of Treatment Room
output
Extended Treatment Room
implementation status
Complete And Ready For Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Rombo Girls Rescue Centre

location
Rombo (in Kajiado South)
year first funded
2008
action
Construction Of Girls Rescue Centre
output
Rescue Centre
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Emashini Water Dam

location
Mailwa (in Kajiado South)
year first funded
2007
action
Construction Of A Dam
output
A Water Dam
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Namelok Furrow Ilparakuo Water Users Association

location
Imbirikani (in Kajiado South)
year first funded
2007
action
Piping Of Water System
output
Piped Water System
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Olkirenyi Water Project

location
Kimana (in Kajiado South)
year first funded
2007
action
Water Rehabilitation And Pipes Lining
output
Water System
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Impiron Primary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enkongu Narok Dispensary

location
Entonet (in Kajiado South)
year first funded
2007
action
Construction Of Health Facility
output
Health Facility
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Moilo Nursery School

location
Kuku (in Kajiado South)
year first funded
2006
action
Construction Of Two New Classrooms Desk And Completing Two Other Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kijito Water Tank

location
Lenkism (in Kajiado South)
year first funded
2005
action
Construction of A Water Tank
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kiluani Secondary School

location
Namanga (in Kajiado South)
year first funded
2004
action
Dormitory Construction
output
1 Dormitory
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ilgarrunyoni Water Project

location
Mailwa (in Kajiado South)
year first funded
2006
action
Purchase Of Water Pipes
output
Pipes
implementation status
Complete And In Use
total cost
Ksh 970,000
estimate
Ksh 970,000

Naaroklukuny Water Project

location
Namanga (in Kajiado South)
year first funded
2003
action
Supply And Delivery Of Pvc Class 2 Pipes
output
Purchased Pipes
implementation status
Complete And In Use
total cost
Ksh 950,000
estimate
Ksh 950,000

Emaoi Water Tank

location
Mailwa (in Kajiado South)
year first funded
2005
action
Construction Of A Water Tank
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Esosian Primary School

location
Rombo (in Kajiado South)
year first funded
2005
action
To Build Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Kimana Primary School

location
Kimana (in Kajiado South)
year first funded
2005
action
To Build Two New Classrooms
output
2 Clasrooms
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Loolakir Nursery

location
Lenkism (in Kajiado South)
year first funded
2005
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 850,000
estimate
Ksh 850,000

Ilumbwa Water Tank

location
Mailwa (in Kajiado South)
year first funded
2006
action
Purchase Of Pipes And Constructing Of Water Tank
output
Pipes And Water Tank
implementation status
Complete And In Use
total cost
Ksh 850,000
estimate
Ksh 850,000

Kisioki Canal

location
Rombo (in Kajiado South)
year first funded
2005
action
Catchment Protection
output
Catchment Protection
implementation status
Complete And In Use
total cost
Ksh 850,000
estimate
Ksh 850,000

Olbili Borehole

location
Imbirikani (in Kajiado South)
year first funded
2007
action
Construction Of Borehole
output
Borehole
implementation status
Complete And In Use
total cost
Ksh 816,000
estimate
Ksh 816,000

Elerai Primary School

location
Rombo (in Kajiado South)
year first funded
2009
action
Putting Up Of Toilets
output
Toilets
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Kitenden Borehole

location
Entonet (in Kajiado South)
year first funded
2004
action
Buying Pumping Machine And Constructing Anew Building
output
Pumping Machine
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Rombo Girls Primary School

location
Rombo (in Kajiado South)
year first funded
2005
action
To Build Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Loitokitok Jua Kali Artisan

location
Kuku (in Kajiado South)
year first funded
2006
action
Purchase Of Land And Construction Of A Shelter
output
1 Shelter Jua Kali
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Oloile Primary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Enkongu Nursery School

location
Imbirikani (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Empukani Nursery School

location
Meto (in Kajiado South)
year first funded
2007
action
Construction Of23 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Elerai Primary School

location
Rombo (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Inchulai Primary School

location
Rombo (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Shokut Primary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Olkaria Primary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Enoosampurmpur Primary School

location
Meto (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Intialogoi Nursery School

location
Meto (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Endapudapoi Furrow

location
Kimana (in Kajiado South)
year first funded
2006
action
Construction Of Furrow
output
Water Furrow
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Rombo Divisional Development Project

location
Rombo (in Kajiado South)
year first funded
2009
action
Construction of Administration Block
output
Administration Block
implementation status
Complete And Ready For Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Kimana Christ The King Secondary School

location
Kimana (in Kajiado South)
year first funded
2004
action
Construction Of A New Building
output
1 Building
implementation status
Complete And In Use
total cost
Ksh 794,000
estimate
Ksh 794,000

Imbirikani Water Project

location
Imbirikani (in Kajiado South)
year first funded
2005
action
Supply Of Pipes
output
Water Pipes
implementation status
Complete And In Use
total cost
Ksh 787,415
estimate
Ksh 800,000

Nolasiti Nursary School

location
Rombo (in Kajiado South)
year first funded
2006
action
Construction Of Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 760,000
estimate
Ksh 760,000

Nairaballa Primary School

location
Meto (in Kajiado South)
year first funded
2006
action
Construction Of Two New Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 760,000
estimate
Ksh 760,000

Inkariak Ronkena Primary School

location
Kimana (in Kajiado South)
year first funded
2006
action
Construction Of Two New Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 760,000
estimate
Ksh 760,000

Loormeuti Nursery School

location
Kimana (in Kajiado South)
year first funded
2006
action
Construction Of Two New Classrooms And Desks
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 760,000
estimate
Ksh 760,000

Maisuyati Nusery School

location
Kuku (in Kajiado South)
year first funded
2005
action
Construction F New Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 660,000
estimate
Ksh 660,000

Namanga Primary School

location
Namanga (in Kajiado South)
year first funded
2006
action
Construction Of 2 Classrooms And Desks
output
2 Classrooms And Desks
implementation status
Complete And In Use
total cost
Ksh 660,000
estimate
Ksh 660,000

Islamic Education Centre

location
Namanga (in Kajiado South)
year first funded
2006
action
Construction Of 2 New Classrooms And Desks.
output
2 Classrooms And Desks
implementation status
Complete And In Use
total cost
Ksh 660,000
estimate
Ksh 660,000

Enkusero PreSchool

location
Kuku (in Kajiado South)
year first funded
2004
action
Classroom Construction
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 625,000
estimate
Ksh 625,000

Eluanata Primary School

location
Mailwa (in Kajiado South)
year first funded
2004
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 620,000
estimate
Ksh 620,000

Olepolos Water Project

location
Entonet (in Kajiado South)
year first funded
2003
action
Construction Of Storage Tank And Pipes Supply And Fitting.
output
Water Tank
implementation status
Complete And In Use
total cost
Ksh 606,150
estimate
Ksh 610,000

Mailwa Primary School

location
Mailwa (in Kajiado South)
year first funded
2004
action
Construction Of An Administrati On Block
output
Administra Tion Block
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Oloile Primary School

location
Kimana (in Kajiado South)
year first funded
2009
action
Construction of Toilets
output
Toilets
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Kikelelwa Water Tank

location
Rombo (in Kajiado South)
year first funded
2007
action
Construction Of A Water Tank
output
A Water Tank
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Linti Primary School

location
Meto (in Kajiado South)
year first funded
2005
action
Construction of Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Iltilal Primary School

location
Kuku (in Kajiado South)
year first funded
2005
action
To Build Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Elangata Enkima Canal

location
Kuku (in Kajiado South)
year first funded
2005
action
Canal Lining
output
Canal Lining
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Matepes Primary School

location
Rombo (in Kajiado South)
year first funded
2004
action
Construction Of Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Nkama Dispensary

location
Kuku (in Kajiado South)
year first funded
2003
action
Continuation Of The Community Reaching Point
output
Health Facility
implementation status
Complete And In Use
total cost
Ksh 599,385
estimate
Ksh 59,938,635

Mountain Water Project

location
Mailwa (in Kajiado South)
year first funded
2006
action
Construction Of Water Pipe Line
output
Water Pipes
implementation status
Complete And In Use
total cost
Ksh 572,000
estimate
Ksh 572,000

Rombo Girls Secondary School

location
Rombo (in Kajiado South)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 550,000
estimate
Ksh 550,000

Isinet Primary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 540,000
estimate
Ksh 540,000

Namelok Secondary School

location
Entonet (in Kajiado South)
year first funded
2009
action
Purchase Of Furniture
output
School Furniture
implementation status
Purchased And In Use
total cost
Ksh 530,000
estimate
Ksh 530,000

Olkulenyet Water Tank

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of A Water Tank
output
A Water Tank
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Rombo Community Rescue Centre

location
Rombo (in Kajiado South)
year first funded
2009
action
Construction of A Dormitory
output
A Dormitory
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Naretisho Olibor Soit Community Health Centre

location
Rombo (in Kajiado South)
year first funded
2009
action
Repairing And Repainting
output
Repaired And Repainted Building
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Enkongu Narok Dispensary

location
Entonet (in Kajiado South)
year first funded
2009
action
Roofing And Windows
output
A Roof And Windows
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 500,000

Olchorro Secondary School

location
Entonet (in Kajiado South)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
Complete And Ready For Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Kimana Secondary School

location
Kimana (in Kajiado South)
year first funded
2009
action
Purchase Of A Bus
output
A School Bus
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Olkilenyiet Water Tank

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of A Water Tank
output
A Water Tank
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Moilo Primary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Sumpet/Enkonak Rongena Muungano Water Project

location
Kimana (in Kajiado South)
year first funded
2007
action
Water Rehabilitation
output
Water System
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Olgolului Borehole

location
Lenkism (in Kajiado South)
year first funded
2007
action
Construction Of Borehole
output
Borehole
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Illasiti Secondary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of Admin. Block
output
Admin. Block
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

St. Clares Girls Secondary School

location
Rombo (in Kajiado South)
year first funded
2006
action
Purchase Of School Bus
output
1 School Bus
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Impiron Maji Safi Water Project

location
Kimana (in Kajiado South)
year first funded
2005
action
Construction of A Water Tank
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Iltirpen Water Project

location
Meto (in Kajiado South)
year first funded
2005
action
Provide Water To The Community
output
Piping Water
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Namelok Primary School

location
Kimana (in Kajiado South)
year first funded
2004
action
Classrooms Taken Away By Wind
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Oldule Water Project

location
Rombo (in Kajiado South)
year first funded
2004
action
Completion Of Extension Part And Buying Of Water Pipes
output
Purchased Pipes
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Inkati Nursery School

location
Namanga (in Kajiado South)
year first funded
2004
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Aic Primary School Namanga

location
Namanga (in Kajiado South)
year first funded
2004
action
Construction Of Classroom
output
Classrooms
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Kijito Borehole

location
Lenkism (in Kajiado South)
year first funded
2007
action
Construction Of Borehole
output
Borehole
implementation status
Complete And In Use
total cost
Ksh 498,050
estimate
Ksh 498,060

Ilmisigiyo Water Project

location
Entonet (in Kajiado South)
year first funded
2005
action
Construction Of Water Pipe Line
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 480,000
estimate
Ksh 480,000

Emmumunyi Dispensaryansary

location
Rombo (in Kajiado South)
year first funded
2009
action
Rehabitating Water System
output
Rehabitated Water System
implementation status
Water System Complete
total cost
Ksh 475,000
estimate
Ksh 475,000

Inkisanjani Primary School

location
Kuku (in Kajiado South)
year first funded
2003
action
Renovation Of Existing Building
output
Renovate Classroom
implementation status
Complete And In Use
total cost
Ksh 458,000
estimate
Ksh 458,000

Eluai Pipeline Water

location
Entonet (in Kajiado South)
year first funded
2009
action
A Lining Of Water Pipes
output
A Lined Water Pipes
implementation status
Work Done
total cost
Ksh 450,000
estimate
Ksh 450,000

Engaboli Primary School

location
Namanga (in Kajiado South)
year first funded
2005
action
To Build Two New Class
output
2 Classrooms
implementation status
Complete And In Use
total cost
Ksh 450,000
estimate
Ksh 450,000

Kumpaa Primary School

location
Meto (in Kajiado South)
year first funded
2004
action
Repairing Of Damaged Classrooms
output
Renovated Classrooms
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Kimana Social Hall

location
Kimana (in Kajiado South)
year first funded
2009
action
Fixing Gate
output
Fixed Gate
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Lemongo Primary School

location
Rombo (in Kajiado South)
year first funded
2007
action
Construction Of 1 Classroom
output
2 Classroom
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Oldonyo Oibor Water Project

location
Kimana (in Kajiado South)
year first funded
2006
action
Construction Of Water Tank
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Njukini Dispensary

location
Njukini (in Kajiado South)
year first funded
2005
action
Construction of A New Dispensary
output
Health Facility
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Noonganayi Ok Water Project

location
Mailwa (in Kajiado South)
year first funded
2003
action
Construction Of Water Tank
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 380,000
estimate
Ksh 380,000

Kuku Day Secondary School

location
Kuku (in Kajiado South)
year first funded
2009
action
Purchase Of Furniture
output
School Furniture
implementation status
Purchased And In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Okesi Division Canal Association

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of Canal
output
Diversion Canal
implementation status
Complete And In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Lenkism Primary School

location
Lenkism (in Kajiado South)
year first funded
2009
action
Painting Of Admin. And Kitchen Block And Purchase Of Furniture
output
Furniture And Painted Block
implementation status
Furniture Bought And Block Painted
total cost
Ksh 350,000
estimate
Ksh 350,000

Inkati Primary School

location
Meto (in Kajiado South)
year first funded
2004
action
Making Of Desks
output
Desks
implementation status
Complete And In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Olmoti Borehole

location
Entonet (in Kajiado South)
year first funded
2007
action
Water Rehabilitation
output
Water System
implementation status
Complete And In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Kurket Nursery School

location
Mailwa (in Kajiado South)
year first funded
2006
action
Construction Of A Classroom And Desks.
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 330,000
estimate
Ksh 330,000

Kurket Nursery School

location
Lenkism (in Kajiado South)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 330,000
estimate
Ksh 330,000

Inkati Primary School

location
Namanga (in Kajiado South)
year first funded
2005
action
To Build One More Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nkama Dispensary

location
Kuku (in Kajiado South)
year first funded
2007
action
Continuation Of The Comm. Health Point
output
Heath Facility
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Aic Primary School

location
Kimana (in Kajiado South)
year first funded
2006
action
Construction Of Water Tank
output
1 Water Tank
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Illaingarruun Yoi Water Project

location
Mailwa (in Kajiado South)
year first funded
2005
action
Construction of A Water Pipe Line
output
Water Pipes
implementation status
Complete And In Use
total cost
Ksh 280,000
estimate
Ksh 280,000

Inkati Primary School

location
Meto (in Kajiado South)
year first funded
2007
action
Completion Of Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 275,000
estimate
Ksh 275,000

Nolasiti Primary School

location
Rombo (in Kajiado South)
year first funded
2007
action
Completion Of 2 Classroom
output
2 Classroom
implementation status
Complete And In Use
total cost
Ksh 260,000
estimate
Ksh 260,000

Nolasiti Community Borehole

location
Rombo (in Kajiado South)
year first funded
2006
action
Construction Of Water Trough
output
Water Trough
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Mailwa Dispensary Water Project

location
Mailwa (in Kajiado South)
year first funded
2006
action
Completion Of A Borehole
output
Borehole
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Olchorro Entonet Community Water Tank

location
Entonet (in Kajiado South)
year first funded
2007
action
Construction Of A Water Tank
output
Water Tank
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kisapuk Primary School

location
Meto (in Kajiado South)
year first funded
2005
action
Construction of An Administration Block
output
1 Administration Block
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Oldonyio Orbor Primary School

location
Kimana (in Kajiado South)
year first funded
2006
action
Completion Of Constructed Building
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 160,000
estimate
Ksh 160,000

Loormeuti Nursery

location
Kimana (in Kajiado South)
year first funded
2007
action
Completion Of 2 Classroom
output
2 Classroom
implementation status
Complete And In Use
total cost
Ksh 160,000
estimate
Ksh 160,000

Enkariak Rongena Primary School

location
Kimana (in Kajiado South)
year first funded
2008
action
Completion Of A Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Iltuleta Nursery School

location
Lenkism (in Kajiado South)
year first funded
2007
action
Completion Of Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Aic Primary School

location
Kuku (in Kajiado South)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nkiito Primary School

location
Meto (in Kajiado South)
year first funded
2004
action
Building Of A New Desk
output
Desks
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Oldoinyio Oibor Primary School

location
Kimana (in Kajiado South)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Ilchalai Primary School

location
Imbirikani (in Kajiado South)
year first funded
2008
action
Completion Of A Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000