The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kaloleni

Bursary

location
Kaloleni (in Kaloleni)
year first funded
2003
action
Giving Out Bursaries To Needy Students
output
To Enable Poor Students To Have Access To Higher Education.
implementation status
1460 Students? College.1296 University Students And 2089 Secondary. Students
total cost
Ksh 40,088,844
estimate
Ksh 19,990,754

Kaloleni Constituency Water Project

location
Kayafungo (in Kaloleni)
year first funded
2006
action
Construction Of Water Tank
output
Increase Access To Safe Water To The Residents Of Kayafungo, Mwanamwinga And Tsangatsini Locations.
implementation status
Work Is Complete
total cost
Ksh 24,800,000
estimate
Ksh 24,800,000

Constituency Office

location
Kaloleni (in Kaloleni)
year first funded
2005
action
Construction Of A Constituency Office
output
To Improve Delivery Of Services To Constituents
implementation status
Work Complete
total cost
Ksh 14,363,610
estimate
Ksh 14,363,610

Emergency

location
Kaloleni (in Kaloleni)
year first funded
2003
action
To Deal With Any Emergency Cases As Per The Cdfc
output
To Reconstruct The Project To Normal State
implementation status
Project Under Emergency Cases Are Complete
total cost
Ksh 13,057,833
estimate
Ksh 7,877,733

Ribe boys secondary School

location
Ribe (in Kaloleni)
year first funded
2004
action
Construction of a modern dormitory
output
De Congestions Of dormitory facility.
implementation status
2 phase has started
total cost
Ksh 10,537,030
estimate
Ksh 4,500,000

Office Administration

location
Kaloleni (in Kaloleni)
year first funded
2003
action
Office Administration Expenses
output
Smooth Office Running
implementation status
Amount Well Utilized
total cost
Ksh 10,120,376
estimate
Ksh 6,399,780

Desks Project

location
Kaloleni (in Kaloleni)
year first funded
2004
action
Making Desk
output
Improved Sitting Facility
implementation status
Work Is Complete
total cost
Ksh 9,768,613
estimate
Ksh 9,768,613

Ribe Girls Secondary School

location
Ribe (in Kaloleni)
year first funded
2004
action
Construction. Of Twin Dormitory
output
De Congestion Of Dormitory Facility.
implementation status
2 Phase Has Started
total cost
Ksh 9,315,000
estimate
Ksh 550,000

Kinarani Secondary School

location
Mwanamwinga (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classrooms And An Office Block (New)
output
Increase Access To Sec. School
implementation status
2Nd Phase Of The Project Is Going On, At Lintol Level.1St Phase Is Complete
total cost
Ksh 6,466,519
estimate
Ksh 3,866,519

Miyani Sc

location
(in Kaloleni)
year first funded
2009
action
Construction Of 4 Classrooms And Administration Block
output
Improve The Learning Facilities Of The Secondary
implementation status
Work Is Going On
total cost
Ksh 6,000,000
estimate
Ksh 0

Capacity Building, Monitoring And Evaluation

location
Kaloleni (in Kaloleni)
year first funded
2005
action
To Do Monitoring And Evaluation Of The Projects
output
Ensure Project Funds Are Well Utilized And Done Specifications And Benefit The Users
implementation status
Continuous Process
total cost
Ksh 5,294,600
estimate
Ksh 2,614,855

Virangoni Water Dam-Mapetia

location
Mwanamwinga (in Kaloleni)
year first funded
2008
action
Digging Of A Modern Dam
output
Increase Access To Safe Water
implementation status
Work Is Going On
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Mwawesa Divisional Headquarters

location
Mwawesa (in Kaloleni)
year first funded
2005
action
Construction Of Div Headquarters
output
Improve Security And Administration
implementation status
Work Is Going On
total cost
Ksh 4,700,000
estimate
Ksh 700,000

Tsangatsini Secondary School

location
Tsangatsini (in Kaloleni)
year first funded
2007
action
Construction Of A New Secondary Sch.
output
Increase Access To Secondary School
implementation status
Work Is Complete -2Nd Phase Has Started
total cost
Ksh 4,525,000
estimate
Ksh 1,000,000

Rabai Secondary School

location
Rabai (in Kaloleni)
year first funded
2004
action
Construction Of 4 Classrooms, Office And Toilets (New)
output
Increase Access To Sec. School
implementation status
Ist Phase Is Complete 2Nd Phase Not Started
total cost
Ksh 4,200,000
estimate
Ksh 3,400,000

Kaloleni Cdf Vehicle

location
Kaloleni (in Kaloleni)
year first funded
2008
action
To Purchase Office Vehicle
output
Timely Monitoring And Evaluation
implementation status
Facility In Use
total cost
Ksh 4,200,000
estimate
Ksh 4,200,000

Mulungu Wa Rero

location
Kayafungo (in Kaloleni)
year first funded
2005
action
Digging Of A Modern Dam
output
Increase Access To Safe Water
implementation status
Work Is Done And Facility In Use
total cost
Ksh 4,077,703
estimate
Ksh 4,077,703

Kombeni Girls

location
Mwawesa (in Kaloleni)
year first funded
2003
action
Construction Of Twin Dormitory Blocks.
output
Decongestion Of Dormitories
implementation status
Flooring Plastering Painting Of One Room Not Done
total cost
Ksh 4,050,000
estimate
Ksh 4,400,000

Recurrent Expenses

location
Kaloleni (in Kaloleni)
year first funded
2008
action
Repair And Maintenance Of Office Equipments And Machines
output
To Maintain Machines And Equipments In Good Condition
implementation status
All Office Machines And Equipments Are In Good Condition
total cost
Ksh 4,019,618
estimate
Ksh 18,100,494

Chalani Dispensary

location
Kaloleni (in Kaloleni)
year first funded
2005
action
Construction of a dispensary and staff houses
output
Improve access to health
implementation status
Work is going on
total cost
Ksh 3,900,000
estimate
Ksh 2,800,000

Ribe Health Centre

location
(in Kaloleni)
year first funded
2009
action
To Upgrade The Dispensary To Health Centre
output
To Improve Health Services For Women
implementation status
Work Is Going On
total cost
Ksh 3,750,000
estimate
Ksh 0

Kinarani Secondary School

location
Mwanamwinga (in Kaloleni)
year first funded
2009
action
Construction Of 4 Classrooms
output
Improve The Learning Facilities Of The Secondary
implementation status
Work Is Going On
total cost
Ksh 3,637,500
estimate
Ksh 4,850,000

Viragoni Dispensary

location
Mwanamwinga (in Kaloleni)
year first funded
2005
action
Construction Of A Dispensary & Staff House
output
Increase Access To Health
implementation status
Flooring Plastering Painting Of One Room Not Done
total cost
Ksh 3,604,719
estimate
Ksh 3,604,719

Kozini-Gandani Road

location
Rabai (in Kaloleni)
year first funded
2007
action
Up Grading Of The Road
output
Improve Access To Remote Areas
implementation status
Work Is Complete
total cost
Ksh 3,522,151
estimate
Ksh 1,600,000

Tsangatsini Secondary School

location
Tsangatsini (in Kaloleni)
year first funded
2005
action
Construction Of A New Secondary Sch.
output
Increase Access To Secondary School
implementation status
Work Is Complete
total cost
Ksh 3,333,880
estimate
Ksh 3,333,880

Shangia Dispensary

location
Mariakani (in Kaloleni)
year first funded
2005
action
Construction of New Dispensary
output
To Improve Health Services
implementation status
Work Complete
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Sports Activities

location
Kaloleni (in Kaloleni)
year first funded
2008
action
To Renovate Playing Ground At Kaloleni
output
Increase Youth Activities In The District
implementation status
Not Started
total cost
Ksh 2,679,745
estimate
Ksh 12,066,996

Chitswa Cha Mkamba Bridge

location
Ruruma (in Kaloleni)
year first funded
2007
action
Up Grading Of The Road
output
Improve Access To Remote Areas
implementation status
Work Is Going On
total cost
Ksh 2,569,080
estimate
Ksh 2,000,000

Changombe Secondary School

location
Mwawesa (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Easy Access To Education
implementation status
Work Is Complete
total cost
Ksh 2,551,800
estimate
Ksh 4,000,000

Kinung, Una Primary School

location
Ribe (in Kaloleni)
year first funded
2005
action
Construction Of 2 Classroom And Office
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 2,450,000
estimate
Ksh 2,450,000

Ushindi Abattoir

location
Rabai (in Kaloleni)
year first funded
2008
action
Construction Of An Abattoir
output
Bring The Services Of An Abattoir Close To The Boyani Sub-Location
implementation status
Work Has Started
total cost
Ksh 2,345,108
estimate
Ksh 23,451,084

Kamkunji Water Project

location
Rabai (in Kaloleni)
year first funded
2008
action
Laying Of Pipes
output
Increase Access To Safe Water
implementation status
Work Is Going On
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Mariakani Water Tank

location
Mariakani (in Kaloleni)
year first funded
2005
action
Construction Of Water Tank
output
Increase Access To Safe Water To The Residents Of Mariakani Location.
implementation status
Work Is Complete
total cost
Ksh 2,200,000
estimate
Ksh 2,000,000

Gotani Dispensary

location
Kaya Fungo (in Kaloleni)
year first funded
2004
action
Construction Of Dispensary.
output
Improve Health Service To Community
implementation status
80% Complete. Finishing And Plastering Not Done.
total cost
Ksh 1,850,000
estimate
Ksh 1,850,000

Mkapuni Dzanikeni Water Project

location
Ruruma (in Kaloleni)
year first funded
2004
action
Laying Of Pipeline.
output
Increase Access To Safe Water To Resident Of Ruruma Location
implementation status
Work Is Complete
total cost
Ksh 1,838,810
estimate
Ksh 1,815,938

Makini Mleje Water Project

location
Kambe (in Kaloleni)
year first funded
2004
action
Laying Of Pipes & 2 Tanks
output
Increase Access To Safe Water To Kambe Resident
implementation status
Work Is Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Vifanjoni Primary School

location
Mwawesa (in Kaloleni)
year first funded
2007
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Masaani Primary School

location
Ruruma (in Kaloleni)
year first funded
2007
action
Construction Of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is At Window Level
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Walea Primary School

location
Jibana (in Kaloleni)
year first funded
2007
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is At Roofing Level
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Jeuri Primary School

location
Kambe (in Kaloleni)
year first funded
2007
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Kambe Secondary School

location
Kambe (in Kaloleni)
year first funded
2004
action
Construction Of 3 Classroom And A dining All
output
Provision Of Conducive Learning Environment And Hygienic dining Facility
implementation status
Work Is Complete
total cost
Ksh 1,597,554
estimate
Ksh 1,597,554

Maandani Secondary School

location
Jibana (in Kaloleni)
year first funded
2004
action
Digging Of Borehole
output
Increase Access To Safe Water
implementation status
Work Is Complete
total cost
Ksh 1,546,053
estimate
Ksh 1,146,053

Kasidi Secondary School

location
Ruruma (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom & Library
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kambe Dispensary

location
Kambe (in Kaloleni)
year first funded
2004
action
Construction Of Staff House And Extension Of Dispensary.
output
Improve Health Service To Community
implementation status
90% Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,000,000

Jeuri Primary School

location
Kambe (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Flooring Plastering Painting Of One Room Not Done
total cost
Ksh 1,400,000
estimate
Ksh 900,000

Tsagwa Secondary School

location
Jibana (in Kaloleni)
year first funded
2008
action
Construction Of 1 Classroom And An Office
output
In More Access To Secondary School Education
implementation status
Work Not Started
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Kaloleni Kizurini Water Project

location
Kaloleni (in Kaloleni)
year first funded
2004
action
Laying Of Pipes & Tanks
output
Increase Access To Safe Water To Kaloleni Resident
implementation status
Work Is Complete
total cost
Ksh 1,250,000
estimate
Ksh 1,250,000

Jibana Chiefs Office Borehole

location
Jibana (in Kaloleni)
year first funded
2005
action
To Dig A Borehole
output
To Provide Water
implementation status
Work Is Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Moi Kadzonzo Girls Sec

location
Mariakani (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 1,152,902
estimate
Ksh 1,000,000

Vishakani Dispensary

location
Kaloleni (in Kaloleni)
year first funded
2005
action
Construction Of A Dispensary
output
Improve Access To Health
implementation status
Project At Lintol Level,40% Complete
total cost
Ksh 1,150,000
estimate
Ksh 500,000

Uhuru Nursery School And Primary School

location
Kayafungo (in Kaloleni)
year first funded
2005
action
Construction Of A Classroom & Office
output
Improve Learning Facilities
implementation status
Flooring, Plastering, Painting To Be Done
total cost
Ksh 1,145,688
estimate
Ksh 545,688

Strategic Plan Project

location
Kaloleni (in Kaloleni)
year first funded
2006
action
To Facilitate Mobilization Of Community, Traveling And Report Preparation
output
Annual Plans Will Be Ready In Good Time
implementation status
The Document Is Ready
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Kaloleni Youth Polytechnic

location
Kaloleni (in Kaloleni)
year first funded
2005
action
Construction of 2 Workshops And 4 Lavatories
output
Capacity Building Of Trainees
implementation status
Work Is Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Kadzonzo Primary School

location
Mariakani (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom And Office
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 1,099,141
estimate
Ksh 1,099,141

Mariakani Water Tank

location
Mariakani (in Kaloleni)
year first funded
2004
action
Construction Of Water Tank
output
Increase Access To Safe Water To The Residents Of Mariakani Location.
implementation status
Work Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mwakolo Nursery

location
Kaloleni (in Kaloleni)
year first funded
2007
action
Construction Of 1 Classroom & Office
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Migwaleni Nursery

location
Kayafungo (in Kaloleni)
year first funded
2007
action
Construction Of 1 Classroom
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 400,000

Kasemeni Nursery

location
Kayafungo (in Kaloleni)
year first funded
2008
action
Construction Of 1 Classroom
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mariakani Youth Polytechnic

location
Mariakani (in Kaloleni)
year first funded
2007
action
Construction of Store For Equipments
output
Capacity Building Of Trainees
implementation status
Work Is At Finishing Level
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mikuluni Nursey

location
Tsangatsini (in Kaloleni)
year first funded
2007
action
Construction Of 1 Classroom & Office
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mzinzi Nursery

location
Tsangatsini (in Kaloleni)
year first funded
2008
action
Construction Of 1 Classroom & Office
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Going On
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mutulu Nursery

location
Mwanamwinga (in Kaloleni)
year first funded
2007
action
Construction Of 1 Classroom & Office
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Bikidzaya Nursery

location
Mwanamwinga (in Kaloleni)
year first funded
2007
action
Construction Of 1 Classroom & Office
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is At Roofing Level
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Tsagwa Secondary School

location
Jibana (in Kaloleni)
year first funded
2007
action
Construction Of 1 Classroom
output
In More Access To Secondary School Education
implementation status
Work Is Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Bofu Secondary School

location
Ruruma (in Kaloleni)
year first funded
2008
action
Construction Of A 2 Classrooms And An Office
output
In More Access To Secondary School Education
implementation status
Work Not Started
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

St. Georges secondary School

location
Kayafungo (in Kaloleni)
year first funded
2006
action
Construction of a dormitory
output
To decongest Dormitories
implementation status
Work is complete
total cost
Ksh 1,000,000
estimate
Ksh 3,100,000

Mikahani Water Project

location
Mwawesa (in Kaloleni)
year first funded
2005
action
To Build 3 Water Tanks & To Do Piping
output
To Supply Residents With Clean Water
implementation status
Work Is Complete
total cost
Ksh 995,000
estimate
Ksh 435,000

Ziro Nursery School

location
Kambe (in Kaloleni)
year first funded
2005
action
Construction Of 2 Classrooms & Office.
output
Improve The Learning Facilities Of The Pre-School
implementation status
Work Is Complete
total cost
Ksh 960,000
estimate
Ksh 960,000

Vuga Primary School

location
Jibana (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 959,321
estimate
Ksh 959,321

Mtsengo Primary School

location
Mwanamwinga (in Kaloleni)
year first funded
2006
action
Construction Of 2 Classrooms
output
Improve Learning Facility
implementation status
Work Is Complete
total cost
Ksh 950,000
estimate
Ksh 950,000

Lenga Dispensary

location
Kambe (in Kaloleni)
year first funded
2005
action
To Extend The Dispensary
output
To Improve Health Services
implementation status
Work Is Complete
total cost
Ksh 943,735
estimate
Ksh 943,735

Mgamboni Primary School

location
Jibana (in Kaloleni)
year first funded
2004
action
Renovation Of All Classrooms
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Tsakarolovu Nursery School

location
Jibana (in Kaloleni)
year first funded
2006
action
Construction Of A Classroom And An Office
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 900,000
estimate
Ksh 550,000

Katsangani Nursery School

location
Kayafungo (in Kaloleni)
year first funded
2006
action
Construction Of A Classroom And An Office
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 900,000
estimate
Ksh 550,000

Chanagande Secondary School

location
Kaloleni (in Kaloleni)
year first funded
2006
action
Construction Of Water Tank (Rain Water And Kaloleni Pipe)
output
Increase Water Storage For The School
implementation status
Work Is Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Wells Chalani, Birini, Chandani & Mikiriani

location
Kaloleni (in Kaloleni)
year first funded
2004
action
Digging Of Wells
output
Increase Access To Water To Resident Of Kaloleni Location
implementation status
Chalani & Brini Are Complete. Chandani Has Done Design, Survey And Drawing.
total cost
Ksh 880,000
estimate
Ksh 880,000

Changombe Primary School

location
Mwawesa (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 850,000
estimate
Ksh 600,000

Gogoraruhe Nursery School

location
Kayafungo (in Kaloleni)
year first funded
2006
action
Construction Of A Classroom And An Office
output
Improve Learning Facilities
implementation status
Work Is Going On
total cost
Ksh 850,000
estimate
Ksh 500,000

Mariakani Garrison Primary School

location
Mariakani (in Kaloleni)
year first funded
2007
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mleji Primary School

location
Ruruma (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Bofu Primary School

location
Ruruma (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Tunzanani Primary School

location
Kambe (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mahenzo Nursery School

location
Kaloleni (in Kaloleni)
year first funded
2005
action
Construction Of A Classroom And Office
output
Improve The Learning Facilities
implementation status
At Roofing Level
total cost
Ksh 785,268
estimate
Ksh 535,268

Mwatsama Water Project

location
Rabai (in Kaloleni)
year first funded
2005
action
Construction of A Pipeline
output
To Provide Clean Piped Water
implementation status
1St Phase Is Complete
total cost
Ksh 725,000
estimate
Ksh 725,000

Madzimbani Primary School

location
Mariakani (in Kaloleni)
year first funded
2003
action
Construction Of 3 Classrooms
output
Improve Learning Facility
implementation status
External Plastering, Painting & Pavement Not Done
total cost
Ksh 700,000
estimate
Ksh 900,000

Chiefs Office Project Ribe

location
Ribe (in Kaloleni)
year first funded
2005
action
Renovation
output
To Improve Security & Administration
implementation status
Work Is Complete
total cost
Ksh 683,638
estimate
Ksh 0

Tsagwa primary School

location
Jibana (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Decongest classes
implementation status
Work is complete
total cost
Ksh 652,259
estimate
Ksh 500,000

Mwamtsunga Youth Poly

location
Mwawesa (in Kaloleni)
year first funded
2003
action
Construction Of 2 Classrooms
output
Expansion Of Capacity
implementation status
Construction Is Complete
total cost
Ksh 650,000
estimate
Ksh 650,000

Chiferi Primary School

location
Mwawesa (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Kadzandani Primary School

location
Mariakani (in Kaloleni)
year first funded
2003
action
Construction Of 1 Classroom & Office
output
Provision Of Conducive Learning Environment
implementation status
Construction Is Complete
total cost
Ksh 600,000
estimate
Ksh 500,000

Ngoja Papo Water Project

location
Tsangatsini (in Kaloleni)
year first funded
2004
action
Digging Of Dam
output
Increase Access To Safe Water
implementation status
Work Is Complete
total cost
Ksh 560,461
estimate
Ksh 560,461

Mitsikitsini Primary School

location
Kayafungo (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 545,316
estimate
Ksh 800,000

Kibao Kiche Primary School

location
Kayafungo (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 545,316
estimate
Ksh 800,000

Miyani Primary School

location
Kayafungo (in Kaloleni)
year first funded
2005
action
Construction of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 545,316
estimate
Ksh 800,000

Kaliangombe Primary School

location
Rabai (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 525,000
estimate
Ksh 325,000

Lugwe Primary School

location
Rabai (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Decongest Classes
implementation status
Work Is Complete
total cost
Ksh 525,000
estimate
Ksh 325,000

Kajiwe Primary School

location
Rabai (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Decongest Classes
implementation status
Work Is Complete
total cost
Ksh 525,000
estimate
Ksh 325,000

Bedida Primary School

location
Mwawesa (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom & Office
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 500,238
estimate
Ksh 500,000

Masaani Nursery School

location
Ruruma (in Kaloleni)
year first funded
2006
action
Construction Of A Classroom And An Office
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Dr. Krapf secondary School

location
Mwawesa (in Kaloleni)
year first funded
2004
action
Construction. Of dormitory
output
De Congestion Of dormitory facility.
implementation status
Work is complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mwanjama Nursery School

location
Ruruma (in Kaloleni)
year first funded
2006
action
Construction Of A Classroom And An Office
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ruruma Chief Office

location
Ruruma (in Kaloleni)
year first funded
2004
action
Constructions Of Chief Office
output
To Improve Security & Admns.
implementation status
Work Stopped
total cost
Ksh 500,000
estimate
Ksh 750,000

Tsunguni Primary School

location
Jibana (in Kaloleni)
year first funded
2003
action
Construction Of 2 Classrooms
output
Improve Learning Facility
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kinarani Dispensary

location
Mwanamwinga (in Kaloleni)
year first funded
2003
action
Renovation Of Dispensary & Staff Houses & Equipment
output
Providing Health Facility To The Community
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 0

Tsangatsini Primary School

location
Tsangatsini (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Plastering & Painting To Be Done
total cost
Ksh 500,000
estimate
Ksh 650,000

Maereni Primary School

location
Kambe (in Kaloleni)
year first funded
2003
action
Construction Of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 625,000

Bengo-Jimba Water Project

location
Rabai (in Kaloleni)
year first funded
2006
action
Construction of A Pipeline
output
To Provide Clean Piped Water
implementation status
1St Phase Complete. Fixing Of Water Pipes 3Km
total cost
Ksh 500,000
estimate
Ksh 0

Bonje/Buni Nursery

location
Rabai (in Kaloleni)
year first funded
2003
action
Construction Of 1 Classroom & Office
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mariakani Primary School

location
Mariakani (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kaloleni Child Devcentre

location
Kaloleni (in Kaloleni)
year first funded
2006
action
Construction Of An Office
output
Strengthening School Administration
implementation status
Work Is Going On
total cost
Ksh 500,000
estimate
Ksh 500,000

Chanagande Secondary School

location
Kaloleni (in Kaloleni)
year first funded
2008
action
Renovation Of A Burnt Library
output
Improve Education Standard
implementation status
Work Not Started
total cost
Ksh 500,000
estimate
Ksh 500,000

St. Johns Girls Secondary School

location
Kaloleni (in Kaloleni)
year first funded
2006
action
Completion Of A Dormitory (Roofing)
output
To Decongest Dormitories
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 3,100,000

Kibojoni Water Pan

location
Kaloleni (in Kaloleni)
year first funded
2005
action
To Dig A Water Pan
output
To Provide Water
implementation status
Design Work Done
total cost
Ksh 500,000
estimate
Ksh 500,000

Mikiriani Primary School

location
Kaloleni (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Not Complete, Plastering & Painting To Be Done
total cost
Ksh 500,000
estimate
Ksh 500,000

Imani Primary School

location
Kaloleni (in Kaloleni)
year first funded
2003
action
Construction Of 2 Classrooms
output
Improve Learning Facility
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kizurini Secondary School

location
Kaloleni (in Kaloleni)
year first funded
2003
action
Construction Of 2 Classrooms
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Gandani Primary School

location
Rabai (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision of conducive learning environment
implementation status
Work is complete
total cost
Ksh 486,525
estimate
Ksh 686,525

Kibanda Hasara Primary School

location
Mariakani (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 483,270
estimate
Ksh 583,270

Ndatani Primary School

location
Tsangatsini (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 466,092
estimate
Ksh 500,000

Ribe Primary School

location
Ribe (in Kaloleni)
year first funded
2004
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 456,281
estimate
Ksh 456,281

Kirumbi Primary School

location
Tsangatsini (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 456,092
estimate
Ksh 500,000

Mbungoni Child Devcentre

location
Kambe (in Kaloleni)
year first funded
2006
action
Construction Of An Office
output
Strengthening School Administration
implementation status
Work Is Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Mwangutwa Child Devcentre

location
Rabai (in Kaloleni)
year first funded
2006
action
Construction Of An Office
output
Strengthening School Administration
implementation status
Work Is Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Mwele Child Evcentre

location
Mwawesa (in Kaloleni)
year first funded
2006
action
Construction Of An Office
output
Strengthening School Administration
implementation status
Work Is Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Mwabaya Nyundo Poly

location
Kayafungo (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Nyalani Child Devcentre

location
Jibana (in Kaloleni)
year first funded
2006
action
Construction Of An Office
output
Strengthening School Administration
implementation status
Work Is Complete
total cost
Ksh 450,000
estimate
Ksh 300,000

Mwanawiji Nursery School

location
Jibana (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom, Office & Toilets
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mtendani NurserySchool

location
Jibana (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom, Office & Toilets
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mkwajuni NurserySchool

location
Jibana (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom, Office & Toilets
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Glolomoya Mwalikongindo Water Project

location
Mwawesa (in Kaloleni)
year first funded
2005
action
Piping
output
Supply Clean Piped Water
implementation status
Design Is Ready
total cost
Ksh 400,000
estimate
Ksh 400,000

Kavuka Primary School

location
Mariakani (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom & Office
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 400,000
estimate
Ksh 500,000

Mwambani Primary School

location
Kaloleni (in Kaloleni)
year first funded
2003
action
Construction Of 1 Classroom & Office
output
Improve Learning Facility
implementation status
Work Is Complete
total cost
Ksh 400,000
estimate
Ksh 500,000

Kayaa Spring

location
Jibana (in Kaloleni)
year first funded
2005
action
To Build A Reservoir Tank
output
To Provide Water
implementation status
Design Work Is Ready
total cost
Ksh 400,000
estimate
Ksh 400,000

Kitengwani & Hademu Wells

location
Mwanamwinga (in Kaloleni)
year first funded
2005
action
To Dig 3 Wells
output
To Provide Clean Water
implementation status
Work Not Started
total cost
Ksh 368,240
estimate
Ksh 1,104,720

Mnyenzeni Primary School

location
Mariakani (in Kaloleni)
year first funded
2004
action
Construction Of 1 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Is Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Bwagamoyo Dispensary

location
Mwawesa (in Kaloleni)
year first funded
2007
action
Expansion and Electrification of the Dispensary
output
Improve health services to the community
implementation status
Work is complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Ngome Waterproject

location
Kaloleni (in Kaloleni)
year first funded
2004
action
Digging Of A Well
output
Increase Access To Safe Water To Resident Of Kaloleni Location
implementation status
Design Work Done
total cost
Ksh 213,970
estimate
Ksh 513,970

Rabai Divisional Headquarters

location
Rabai (in Kaloleni)
year first funded
2005
action
Construction Of Div Headquarters
output
Improve Security And Administration
implementation status
Work Stopped At Foundation Level
total cost
Ksh 206,092
estimate
Ksh 700,000

Kaliangombe Water Project

location
Rabai (in Kaloleni)
year first funded
2007
action
Construction of A Pipeline
output
To Provide Clean Piped Water
implementation status
Fixing Of The Pipes Not Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ruruma Divisional Headquarters

location
Ruruma (in Kaloleni)
year first funded
2005
action
Construction Of Div Headquarters
output
Improve Security And Administration
implementation status
Work Stopped At Foundation Level
total cost
Ksh 200,000
estimate
Ksh 700,000

Kombeni Dispensary

location
Ruruma (in Kaloleni)
year first funded
2005
action
Installation Of Electricity
output
Improve Services To The Community
implementation status
Work Is Complete
total cost
Ksh 154,193
estimate
Ksh 154,193

Kawala Primary School

location
Ruruma (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Jimba Primary School

location
Ruruma (in Kaloleni)
year first funded
2005
action
Construction of 1 Classroom
output
Improve Learning Facilities
implementation status
Work Is Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Rabai Education Office

location
Rabai (in Kaloleni)
year first funded
2005
action
Construction Of Offices
output
Improve Education Supervision
implementation status
Work Is Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ruruma Education Office

location
Ruruma (in Kaloleni)
year first funded
2005
action
Construction Of Offices
output
Improve Education Supervision
implementation status
At Finishing Level
total cost
Ksh 90,000
estimate
Ksh 90,000

Mwawesa Education Office

location
Mwawesa (in Kaloleni)
year first funded
2005
action
Construction Of Offices
output
Improve Education Supervision
implementation status
Work Complete
total cost
Ksh 89,000
estimate
Ksh 89,000

Mihingoni Primary School

location
Kaloleni (in Kaloleni)
action
Construction Of 2 Classroom
output
Provision Of Conducive Learning Environment
implementation status
Work Not Complete, Plastering & Painting To Be Done
total cost
Ksh 0
estimate
Ksh 650,000