The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kavilinguni Water Project
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2004
- action
- Completion Of Borehole And Electricity Supply
- output
- Borehole & Water Kiosks
- implementation status
- Bore Hole Drilled
- total cost
- Ksh 5,380,395
- estimate
- Ksh 4,515,674
Kwa Mangu Water Project
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Phase 1 Complete
- total cost
- Ksh 4,530,000
- estimate
- Ksh 5,465,635
Kivaani Health Centre
- location
-
(in Kangundo)
- year first funded
- 2008
- action
- Construction Of Maternity Ward
- output
- Maternity Ward
- implementation status
- At Tendering Stage
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Kwa Ezekiel Water Project
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Contraversial
- total cost
- Ksh 3,643,981
- estimate
- Ksh 4,688,586
Kimiti Electricity
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Katheka Water Project
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2008
- action
- Rehabilitation Of Spring
- output
- Spring With Water
- implementation status
- Complete
- total cost
- Ksh 3,370,000
- estimate
- Ksh 3,370,000
Kitongi Water Project
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Phase 1 Complete
- total cost
- Ksh 3,300,000
- estimate
- Ksh 4,100,000
Kyaume Water Project
- location
-
Tala
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Elect Inst. In Progress
- total cost
- Ksh 2,691,500
- estimate
- Ksh 3,500,000
Kwa Kathule Borehole
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 2,537,586
- estimate
- Ksh 4,500,000
Kyeleni Market Electricity
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Not Fully Funded
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,000,000
Kithimani/Tala Electricity
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Not Fully Funded
- total cost
- Ksh 2,500,000
- estimate
- Ksh 1,600,000
Kisukioni Borehole
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 2,487,000
- estimate
- Ksh 3,500,000
Kisukioni Water Project
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2009
- action
- Completion Of Borehole
- output
- Borehole And Water Kiosks
- implementation status
- Phase I At 90% Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Kolooso Dam
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,333,395
- estimate
- Ksh 2,333,395
Katulu Dam
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
Kwale Dam
- location
-
Koma
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,237,000
- estimate
- Ksh 2,237,000
Kikambuani Water Project
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Phase 1 Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,900,000
Kingoti Central B/H W/P
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,190,395
- estimate
- Ksh 990,395
Malatani/ Kivi Borehole
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 2,137,586
- estimate
- Ksh 4,500,000
Kwa Kiluli Dam
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Needs Repair
- total cost
- Ksh 2,100,000
- estimate
- Ksh 1,150,000
Kisukioni Adm Office
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 2,039,746
- estimate
- Ksh 639,746
Kinyui/Matungulu Hentre
- location
-
(in Kangundo)
- year first funded
- 2008
- action
- Completion Of Maternity Ward
- output
- Maternity Ward
- implementation status
- At Tendering Stage
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Mbilini Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 4 Classrooms And Toilets
- implementation status
- At Foundation Level
- total cost
- Ksh 2,000,000
- estimate
- Ksh 4,075,439
Mbiiani Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2008
- action
- Completion Of Classrooms
- output
- 8 Classrooms
- implementation status
- At Foundation Level
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Matakutha Electricity
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kyekoyo Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- Land, 2 Classrooms, Toilets
- implementation status
- At Foundation Level
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,868,176
Katwanyaa Secondary Sc
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2009
- action
- Classrooms Construction
- output
- 4 Storey Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kangundo District Hospb/H
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2009
- action
- Sinking Of Borehole
- output
- Borehole
- implementation status
- At Survey Stage
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Itetani Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2005
- action
- Completion Of Classrooms
- output
- 8 Classrooms
- implementation status
- 80 % Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 3,500,000
Kwa Munuvi Borehole
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 800,000
Donyo Sabuk Water Project
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Catchment/Piping/Water Tank
- total cost
- Ksh 1,757,000
- estimate
- Ksh 1,157,000
Mukaa Water Project
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Sighting Done
- total cost
- Ksh 1,750,000
- estimate
- Ksh 750,000
Kwa Mwaura W/Project
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Contracted
- total cost
- Ksh 1,700,000
- estimate
- Ksh 500,000
Kavilinguni Secondary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2008
- action
- Dh Rehab, Classroom Construction
- output
- 2 Classrooms And Dh
- implementation status
- 90% Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Kamanzi Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2008
- action
- Administration Block Construction
- output
- Administration Block
- implementation status
- At Lintel Level
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
S Nguluni Secondary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms
- implementation status
- 90 % Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Mbusyani Secondary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2008
- action
- Administration Block Construction
- output
- Administration Block
- implementation status
- At Walling Stage
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Katulye Secondary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2008
- action
- Library Construction
- output
- Library
- implementation status
- At Tendering State
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Kwa Muoki Dam
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,537,000
- estimate
- Ksh 1,437,000
Kwa Mweta Dam
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,537,000
- estimate
- Ksh 937,000
Nguluni Health Centre
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2008
- action
- Completion Of Maternity Ward
- output
- Maternity Ward
- implementation status
- At Tendering Stage
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Tala Secondary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- 3 Classrooms
- implementation status
- At Walling Stage
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kwa Mwaura Electricity
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Contracted
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kinyui Electricity
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Taken Over For Funding By Ministry
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,900,000
Kangundo Sub-District B/H
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,500,000
Kakuyuni Health Centre
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2008
- action
- Construction Of Maternity Ward
- output
- Maternity Ward
- implementation status
- At Tendering Stage
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Kawauni Dispensary
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,200,000
Kitunduni Water Project
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Done//Not Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 400,000
Kathaana Dispensary
- location
-
Kawethei
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Uamani Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2008
- action
- Completion Of Classrooms &Adm Block
- output
- 2 Classrooms & Adm Block
- implementation status
- At Roofing Level
- total cost
- Ksh 1,300,000
- estimate
- Ksh 3,200,000
Katine Borehole
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Handed Over To Donor
- total cost
- Ksh 1,237,000
- estimate
- Ksh 1,237,000
Kyaume Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2009
- action
- Completion Of Classrooms
- output
- 4 Classrooms & Toilets
- implementation status
- At Roofing Level
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,800,000
Kiomo Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Staff Room
- implementation status
- 90% Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,800,000
Kivaani Dispensary
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Kathithyamaa Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Lintel Level
- total cost
- Ksh 1,150,000
- estimate
- Ksh 3,200,000
Kwale Polytechnic
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 600,000
Katine Hgm Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Lintel Level
- total cost
- Ksh 1,100,000
- estimate
- Ksh 3,200,000
Kwa Keni Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2Classrooms
- implementation status
- At Walling Stage
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,600,000
Ndunduni Dispensary
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Borehole
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress
- total cost
- Ksh 1,076,395
- estimate
- Ksh 676,395
Uamani Dispensary
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,200,000
Kwa Mutula Borehole
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Drilling Done
- total cost
- Ksh 1,016,395
- estimate
- Ksh 735,000
Ngalalya Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Lintel Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,358,508
Nduu Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2009
- action
- Construction Of Treatment Block
- output
- Treatment Block
- implementation status
- Bqs Being Prepared
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Malatani Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Walling Stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 381,249,144
Matuu Wendano Secondary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- New School/ Major Project
- total cost
- Ksh 1,000,000
- estimate
- Ksh 300,000
Miu Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2009
- action
- Classrooms Construction
- output
- 2 Classrooms
- implementation status
- Toilets Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Muusini Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,400,000
Ack Mukengesya Secondary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- New School/ Major Project
- total cost
- Ksh 1,000,000
- estimate
- Ksh 300,000
D's Office Kangundo
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Itheuni Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Foundation Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,400,000
Kambai Secondary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,800,000
Kambusu Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,400,000
Kangundo Division Adm Office
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kathithyamaa Secondary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Major Project
- total cost
- Ksh 1,000,000
- estimate
- Ksh 600,000
Kikaatini Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,400,000
Kikuyuni Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Roofing Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,459,696
Kithaayoni Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Roofing Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,200,000
Kithuiani Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2008
- action
- Completion Of Classrooms
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,400,000
Kwa Muisyo Dam
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kwa Mutu Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,800,000
Kwathiong'O Dam
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kyelendu Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- 2 Classrooms And Toilets
- implementation status
- At Tendering State
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,800,000
Makuli Borehole
- location
-
Tala
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kwa Mutata Dam
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 970,000
- estimate
- Ksh 500,000
Mbuni Dispensary
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Kyeleni Katulye Road& Kwosau Bridge
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kakuyuni Chief's Camp
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Early Stages
- total cost
- Ksh 900,000
- estimate
- Ksh 400,000
Kwoasau Bridge Road
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 881,395
- estimate
- Ksh 0
Kiliku Dispensary
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 830,000
- estimate
- Ksh 1,000,000
Ndovoini Borehole
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Under Repair Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 400,000
Kawauni Dispensary
- location
-
(in Kangundo)
- year first funded
- 2009
- action
- Construction Of Treatment Block
- output
- Treatment Block
- implementation status
- Bqs Being Prepared
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kwa Kavii Drift
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete/Contractor Balance Not Paid
- total cost
- Ksh 800,000
- estimate
- Ksh 400,000
Kivaani Dam
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 775,000
- estimate
- Ksh 0
Kanzokea Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- Classrooms Construction
- output
- 8 Classrooms
- implementation status
- At Tendering State
- total cost
- Ksh 700,000
- estimate
- Ksh 2,800,000
Kasarani Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- New School Needs Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Kimanza Secondary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Major Project/Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Kambusu Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2009
- action
- Completion Of Maternity Ward
- output
- Maternity Ward
- implementation status
- Bqs Being Prepared
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kyanzabe Secondary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Major Project/Ongoing
- total cost
- Ksh 666,395
- estimate
- Ksh 800,000
Manyatta Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 450,000
Matetani Secondary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Grand Project Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 400,000
Matetani Water Project
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- In Progress
- total cost
- Ksh 623,800
- estimate
- Ksh 623,800
Kyawaa Polytechnic S
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 616,395
- estimate
- Ksh 416,395
Matetani Drift
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kituluni Polytechnic
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kwa Kasuva Bridge
- location
-
Tala
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Ngalalya Watchment Dam
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress Ongoing
- total cost
- Ksh 586,395
- estimate
- Ksh 386,395
Nguluni Chief's Office
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Early Stages
- total cost
- Ksh 550,000
- estimate
- Ksh 100,000
Kwambalu Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Grand Renovation Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 300,000
Kwa Muthuke Dam
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 541,395
- estimate
- Ksh 0
Mbilini Adm Office
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Syanthi Secondary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kasioni Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 250,000
Kamanzi Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Land Purchase
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Joska Police Patrol Base
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Finishing To Be Done
- total cost
- Ksh 500,000
- estimate
- Ksh 250,000
Itheuni Secondary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Kwanguu Dispensary
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kyeleni Health Centre
- location
-
(in Kangundo)
- year first funded
- 2008
- action
- Maternity Ward And Staff Houses
- output
- Maternity Ward And Houses
- implementation status
- At Tendering Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 2,500,000
Miu Dispensary
- location
-
(in Kangundo)
- year first funded
- 2009
- action
- Completion Of Treatment Block.
- output
- Treatment Block
- implementation status
- At Tendering Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kitwii Miu Road
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
St. Joseph's Secondary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Fittings For Lab Needed
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Kithuani Secondary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2009
- action
- Comp. Laboratory& Adm Block
- output
- Laboratoty& Adm Block
- implementation status
- 80% Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 2,400,000
Kiboko Secondary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- Lab renovation
- output
- -
- implementation status
- Lab. Renovation Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Katheka Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2009
- action
- Completion Of Classrooms
- output
- 4 Classrooms
- implementation status
- At Lintel Level
- total cost
- Ksh 500,000
- estimate
- Ksh 2,400,000
Kiatineni Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 200,000
Matungulu Chief's Camp
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Electricity Not Done
- total cost
- Ksh 450,000
- estimate
- Ksh 50,000
Kyamutwooi Polytechnic
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 450,000
- estimate
- Ksh 400,000
Imilini Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Kambusu Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 450,000
- estimate
- Ksh 300,000
Kambusu Abc Secondary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- -
- implementation status
- Construction Of Classrooms Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 200,000
Uthiini Dam
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 400,395
- estimate
- Ksh 0
Kantafu Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2005
- action
- Classrooms Construction
- output
- -
- implementation status
- 2 Classrooms Needs Finishing
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Frheeran Secondary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Dining Hall At Advanced Stage
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kijito Borehole Sekan W/Projec
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Contraversial
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kisekini Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Miseleni Polytechnic
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Wendano Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- New School Needs Classes
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kathiini Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Office Complete
- total cost
- Ksh 381,395
- estimate
- Ksh 150,000
Kwa Mutalia Dispensary
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Kayatta Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- In Progress Ongoing
- total cost
- Ksh 360,000
- estimate
- Ksh 500,000
Nduu Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Kitwii Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Misyani Girls Secondary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mbuni Primary School
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Land Purchase
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Kwa Kasivi Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Classroom Constructed
- total cost
- Ksh 350,000
- estimate
- Ksh 250,000
Isooni Dam
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Scooping Done
- total cost
- Ksh 331,395
- estimate
- Ksh 331,395
Kwathathi Bridge
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kisukioni Secondary School
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Katheka Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Kanzalu Spolytechnic
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- -
- implementation status
- Classroom Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Kalandini Secondary School
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kakuyuni Secondary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kakuyuni Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete Renovation & Toilet Construction
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tala Girls Secondary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs Funds To Complete Classroom
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Syumbuni Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Construction Of Classroom Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Sengani Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Sengani Post
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngulini Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mulingana Secondary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Lab Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mbilini / Kyelendu Road
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Kyeleni Secondary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Unyuani Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovation Of Classes Ongoing
- total cost
- Ksh 281,395
- estimate
- Ksh 100,000
Chief's Office Matuu
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 281,395
- estimate
- Ksh 0
Matithini Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Replacing Roof - Complete
- total cost
- Ksh 275,000
- estimate
- Ksh 100,000
Kituluni Dispensary
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2004
- action
- Renovation
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 258,500
- estimate
- Ksh 258,500
Mbusyani Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Wendano Nursery School
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Ndulya Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Kangundo Secondary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Katine Youth Poly
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Funding Will Complete Finishing
- total cost
- Ksh 216,395
- estimate
- Ksh 116,395
Kivaani Chief's Camp
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Under Construction
- total cost
- Ksh 206,395
- estimate
- Ksh 106,395
Tala Boys Unit
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mithini Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mukalwa Borehole
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Abc Kivi Secondary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Aps Lines Kyanzavi
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Assistant Chief's Office Kalandini
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Baringo Drift
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Iie Itune Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ituusya Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Verandah Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kakutha Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kalandini Primary School
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovation Not Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kambai Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Construction Of Classroom Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kamwanyani Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kangundo Kikambuani Road
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kanzalu Chief's Camp
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Toilet Complete & Renovations
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kanzalu Hill Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Katine S Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kawauni Secondary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovation Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kikondeni Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kilalani Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kilindiloni Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiluluini Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- Office construction
- output
- -
- implementation status
- Office Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kisitimani Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Needs More Funds For Toilets
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kithaayoni Nursary
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- -
- implementation status
- Construction Of Classrooms Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kitwii Admffice
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kitwii Girls Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovations Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kivaani Township Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kwa Ken Water Tank
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kwakaveti Nursary
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Finishing Remaining
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kwale Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kwangii Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Steel Doors & Indoor Fixed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kwatombe Primary School
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kyamulendu Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Fencing Done, Needs Renovations
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kyeleni Chiefs Office
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kyevaluki Polytechnic
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kyevaluki Secondary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- H/M House Requires Finishing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Matungulu Boys Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Matungulu Dispensary
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mililu Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mukalwa Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Renovation Of Classrooms/ Floor Not Done
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwisyani Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete Renovation
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngunga Primary School
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Classroom Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nzambani Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Syanthi SPrimary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Ngomani Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 181,395
- estimate
- Ksh 0
Koma Ranch Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2005
- action
- Classrooms Construction
- output
- -
- implementation status
- Classroom Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kwa Mangu Water Project
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2009
- action
- Rehabilitaion Of W/Project
- output
- Spring With Water
- implementation status
- At Tendering Stage
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kwandiu Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mukuyuni Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Plastic Tank, Toilet Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kamotonga Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Koma Borehole
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Piping Done
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ngomeni Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 131,395
- estimate
- Ksh 0
Itetani / Baringo Road
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 131,395
- estimate
- Ksh 0
Mukunike Dispensary
- location
-
Kawethei
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 106,395
- estimate
- Ksh 106,395
Nzambani Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Adm.Block Not Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
St. Francis Misyani Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovations Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tala Girls Primary School
- location
-
Tala
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs Funds To Complete Toilets
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tala SPrimary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovation Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Utooni Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Renovations Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mbondoni Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Miseleni / Kalala Road
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mususye Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muumoni SPrimary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Construction Of Classrooms Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mwatati Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ndovoini Primary School
- location
-
Koma
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Classroom Not Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ndunduni / Mwatati Road
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Nduu Road
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nguluni Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovation Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nguluni Township Primary School
- location
-
Nguluni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete Renovation
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kyevaluki Dispensary
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Warming Bay Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Maindandu Bridge
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Malatani Polytechnic
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Manyatta Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Activity Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Masewani Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Construction Of Classes Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Matungulu D Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete Classroom
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mikoikoni Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Mukolya Water Pump
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Assistant Chief's Office Mukunike
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kakulutuini Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovation Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kakuyuni Dispensary
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Equip For Lab Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kamanzi Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kambusu Solytechnic
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Classroom Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kambusu Ypolytechnic
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kangundo Aic Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- -
- implementation status
- Construction Of Classes Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kangundo Chief's Camp
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kathatani Drift
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kathithyamaa Unit For M
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kathome Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- Renovation
- output
- -
- implementation status
- Renovation Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kathuli Well
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Katuluni Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- Construction
- output
- -
- implementation status
- Construction Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kavati Nursery School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- -
- implementation status
- Classroom Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kavilinguni Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kikambuani Primary School
- location
-
Kangundo
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
King'Oti Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- -
- implementation status
- Construction Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kinyui Primary School
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kinyungu Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Completion Of Classroom Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kisioni Nursery
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Classroom Not Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kisukioni Primary School
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kithunthi Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovations Of Entire School Needed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kitwii Boys Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kivi Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kivuluni Primary School
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Mwenze Primary School
- location
-
Kakuyuni
(in Kangundo)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- -
- implementation status
- Construction Of Clasroom Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kwa Mwilile Primary School
- location
-
Kanzalu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovations Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kyanzavi Chief's Office
- location
-
Kyanzavi
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Renovation Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kyeleni Primary School
- location
-
Kyeleni
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Roof Installed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Uvalini Gabion
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 81,395
- estimate
- Ksh 0
Kithumuoni Water Project
- location
-
Kivaani
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Uamani Cattle Dip
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- In Progress
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
C Kalandini
- location
-
Kalandini
(in Kangundo)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Matheini Water Project
- location
-
Matungulu
(in Kangundo)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 26,000
- estimate
- Ksh 26,000
Kisukioni Secondary School
- location
-
Kalandini
(in Kangundo)
- action
- n/a
- output
- -
- implementation status
- Advanced Stage
- total cost
- Ksh 0
- estimate
- Ksh 300,000
Wendano Primary School
- location
-
Koma
(in Kangundo)
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 400,000