The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Karachuonyo

Kanyaluo Water Project

location
Kanyaluo South (in Karachuonyo)
year first funded
2004
action
Piping
output
Piping
implementation status
On-Going
total cost
Ksh 3,700,000
estimate
Ksh 0

Kendu Bay Sub District Hosp

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 2 Wards
output
2 Wards
implementation status
Complete
total cost
Ksh 3,400,000
estimate
Ksh 0

Achuna Dam

location
Koyugi (in Karachuonyo)
year first funded
2004
action
Drilling
output
Water Dam
implementation status
Complete
total cost
Ksh 2,700,000
estimate
Ksh 0

St Alfred Alara Secondary School

location
Kanam A (in Karachuonyo)
year first funded
2005
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 2,200,000
estimate
Ksh 2,500,000

Adiedo Health Centre

location
Kanyaluo West (in Karachuonyo)
year first funded
2003
action
Construction of Ward
output
Ward
implementation status
On-Going
total cost
Ksh 2,136,246
estimate
Ksh 0

Atandi Adc Farm

location
Kanjira (in Karachuonyo)
year first funded
2006
action
Irrigation
output
Irrigation
implementation status
On-Going
total cost
Ksh 2,000,000
estimate
Ksh 0

Constituency Office

location
Kokoth Kataa (in Karachuonyo)
year first funded
2009
action
Construction
output
Offices
implementation status
Underway
total cost
Ksh 2,000,000
estimate
Ksh 0

Wagwe Health Centre

location
Kobiero (in Karachuonyo)
year first funded
2003
action
Construction of Health Centre
output
Health Centre
implementation status
On-Going
total cost
Ksh 1,980,000
estimate
Ksh 3,000,000

Ongalo Secondary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
Incomplete
total cost
Ksh 1,850,000
estimate
Ksh 2,100,000

Kanyamfwa Secondary School

location
Kokoth Kateng (in Karachuonyo)
year first funded
2003
action
Construction of Staff Houses
output
Staff Houses
implementation status
Incomplete
total cost
Ksh 1,700,000
estimate
Ksh 1,500,000

Kobila Secondary School

location
Kanyaluo West (in Karachuonyo)
year first funded
2003
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 1,700,000
estimate
Ksh 800,000

Samanga Secondary School

location
Wadhgone Nyongo (in Karachuonyo)
year first funded
2003
action
Construction of Laboratory
output
Laboratory
implementation status
Incomplete
total cost
Ksh 1,650,000
estimate
Ksh 1,300,000

Omboga Secondary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2005
action
Construction of 6 Classrooms
output
6Classrooms
implementation status
On-Going
total cost
Ksh 1,600,000
estimate
Ksh 1,500,000

St Innocent Jonyo Sec

location
Kanam B (in Karachuonyo)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 800,000

Ng'Oche Primary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 6 Classrooms
output
6 Classrooms
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 0

Kandiege Health Centre

location
Koyugi (in Karachuonyo)
year first funded
2003
action
Construction of Wards
output
Wards
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Rabuor Dam

location
Kogweno Oriang (in Karachuonyo)
year first funded
2004
action
Drilling
output
Water Dam
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 2,300,000

Oriwo Health Centre

location
Kanyipir (in Karachuonyo)
year first funded
2005
action
Construction of Dispensery
output
Dispensery
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 800,000

Oindo Primary School

location
Kanjira (in Karachuonyo)
year first funded
2004
action
Construction of Staff House/Fencing
output
Staff Hse/Fencing
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Oriwo Secondary School

location
Kanyipir (in Karachuonyo)
year first funded
2006
action
Construction of Dining Hall
output
Dining Hall
implementation status
Incomplete
total cost
Ksh 1,426,000
estimate
Ksh 1,500,000

Nyakongo Youth Polytechnic

location
Central Karachuonyo (in Karachuonyo)
year first funded
2006
action
Rehabilitation
output
College
implementation status
On-Going
total cost
Ksh 1,400,000
estimate
Ksh 3,000,000

Wagwe Mixed secondary school

location
Kobiero (in Karachuonyo)
year first funded
2006
action
Construction of Office/ 1 Classroom
output
Office/ 1Classroom
implementation status
On-Going
total cost
Ksh 1,350,000
estimate
Ksh 800,000

Migingo Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2006
action
Construction of Offices/ 3 Classrooms
output
Offices/ 3 Classrooms
implementation status
Incomplete
total cost
Ksh 1,350,000
estimate
Ksh 0

Ogenya Girls Secondary School

location
Kanjira (in Karachuonyo)
year first funded
2005
action
Construction of Staff House
output
Staff Hse
implementation status
Incomplete
total cost
Ksh 1,300,000
estimate
Ksh 1,200,000

Nyang'Ao Primary School

location
Koyugi (in Karachuonyo)
year first funded
2004
action
Construction of 8 Classrooms
output
8Classrooms
implementation status
On-Going
total cost
Ksh 1,300,000
estimate
Ksh 0

Migunde Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2004
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
Incomplete
total cost
Ksh 1,300,000
estimate
Ksh 0

Okiki Amayo Primary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2003
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
Incomplete
total cost
Ksh 1,212,000
estimate
Ksh 0

Mawego Girls Secondary School

location
Kobuya (in Karachuonyo)
year first funded
2004
action
Construction of 4Tanks/ 2 Classrooms
output
4Tanks/ 2Classrooms
implementation status
Incomplete
total cost
Ksh 1,200,000
estimate
Ksh 300,000

Otaro Mixed Secondary School

location
Kanjira (in Karachuonyo)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 1,200,000
estimate
Ksh 500,000

Lwanda Primary School

location
Kakdhimu East (in Karachuonyo)
year first funded
2004
action
Rehabilitation of 5 classrooms
output
5 Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Chiefs Office West Kanyaluo

location
Kanyaluo West (in Karachuonyo)
year first funded
2006
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 1,130,100
estimate
Ksh 0

Nduga Primary School

location
Kakdhimu East (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 1,112,000
estimate
Ksh 0

Got Okii Primary School

location
Kanyaluo West (in Karachuonyo)
year first funded
2003
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
On-Going
total cost
Ksh 1,112,000
estimate
Ksh 0

Simbi Kogembo Dispensary

location
Central Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Incomplete
total cost
Ksh 1,100,000
estimate
Ksh 500,000

St. Francis Nyanganjo Girls' secondary school

location
N/Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of Staff Houses/ 2 Classrooms
output
Staff Hses/ 2Classrooms
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 800,000

Kowour Secondary School

location
Kanyaluo East (in Karachuonyo)
year first funded
2003
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 800,000

Ajigo Primary School

location
Kanjira (in Karachuonyo)
year first funded
2004
action
Construction of 5 Classrooms
output
5Classrooms
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 0

Karabondi Girls Boarding

location
Rambira (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Incomplete
total cost
Ksh 1,061,000
estimate
Ksh 0

Kamwala Secondary School

location
Wangchieng (in Karachuonyo)
year first funded
2006
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 1,050,000
estimate
Ksh 400,000

Soko Kogira primary school

location
Kanyaluo West (in Karachuonyo)
year first funded
2003
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
On-Going
total cost
Ksh 1,050,000
estimate
Ksh 0

Wikondiek secondary school

location
Kanyaluo South (in Karachuonyo)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 800,000

Kamolo Secondary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 1,050,000
estimate
Ksh 0

Buru Primary School

location
Koyugi (in Karachuonyo)
year first funded
2003
action
Construction of Offices/8 Classroom
output
Offices/8Classroom
implementation status
On-Going
total cost
Ksh 1,012,000
estimate
Ksh 0

Mariwa Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3 Classrooms
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 0

Kendu Muslim Secondary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 400,000

Got Oyaro Health Centre

location
Kokoth Kateng (in Karachuonyo)
year first funded
2004
action
Construction of Health Centre
output
Health Centre
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 500,000

St Martin Oluti Secondary School

location
Kobuya (in Karachuonyo)
year first funded
2004
action
Construction of Admin Block/Lab
output
Admin Block/Lab
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Adhiro Secondary School

location
Kanjira (in Karachuonyo)
year first funded
2006
action
Construction of Offices/ 3 Classroom
output
Offices/ 3Classroom
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Gogo Primary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2004
action
Construction of Offices/ 8 Classrooms
output
Offices/ 8Classrooms
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 0

Warao Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 0

George Agola Owour Secondary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2006
action
Rehabilitation of office and 1 classroom
output
Office/ 1Classroom
implementation status
Complete
total cost
Ksh 965,000
estimate
Ksh 500,000

Kunya Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 962,000
estimate
Ksh 0

West Karachuonyo Education Office

location
Kokoth Kateng (in Karachuonyo)
year first funded
2006
action
Construction of Office
output
Office
implementation status
On-Going
total cost
Ksh 950,000
estimate
Ksh 0

Chiefs Office West Kakdhimu

location
Kakadhimu West (in Karachuonyo)
year first funded
2007
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 950,000
estimate
Ksh 0

Orire Primary School

location
Kanyaluo East (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 912,000
estimate
Ksh 0

Okiki Amayo Health Centre

location
Kakadhimu West (in Karachuonyo)
year first funded
2004
action
Construction of Staff Houses
output
Staff Houses
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 1,200,000

Wimagak Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2003
action
Construction of Offices/ 2 Classroom
output
Offices/ 2Classroom
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 0

Otok Ii Water Project

location
Kogweno Oriang (in Karachuonyo)
year first funded
2006
action
Piping
output
Water
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

St Joseph Miranga Secondary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2004
action
Rehabilitation of Lab
output
Laboratory
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 300,000

Hagai Koyier Primary School

location
Kokoth Kateng (in Karachuonyo)
year first funded
2004
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 0

Kandiege Secondary School

location
Koyugi (in Karachuonyo)
year first funded
2005
action
Construction of 5 Classrooms
output
5Classrooms
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 600,000

Gendia Secondary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2004
action
Wiring
output
Electrified Office
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 300,000

Konyach Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2006
action
Construction of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Chwowe Dispensary

location
Wangchieng (in Karachuonyo)
year first funded
2005
action
Construction of Twin Houses
output
Twin Houses
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 600,000

Kokoth Kataa Chief's Office

location
Kokoth Kataa (in Karachuonyo)
year first funded
2005
action
Construction of Office
output
Office
implementation status
On-Going
total cost
Ksh 850,000
estimate
Ksh 0

Siburi Secondary School

location
Wadhgone Nyongo (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 850,000
estimate
Ksh 500,000

Abundu Primary School

location
Kanam B (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 850,000
estimate
Ksh 0

Otaro Primary School

location
Kanjira (in Karachuonyo)
year first funded
2003
action
Rehabilitation
output
Office/ 8 Classrooms
implementation status
On-Going
total cost
Ksh 812,000
estimate
Ksh 0

Ngura Primary School

location
Wadhgone Nyongo (in Karachuonyo)
year first funded
2003
action
Construction of 6 Classrooms
output
6Classrooms
implementation status
Incomplete
total cost
Ksh 812,000
estimate
Ksh 0

St Lucy Rarwowa Girls

location
Koyugi (in Karachuonyo)
year first funded
2004
action
Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 500,000

Kanyadhiang Community Dispensary

location
N. Karachuonyo (in Karachuonyo)
year first funded
2009
action
Construction
output
Dispensary
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 0

Angon'Ga Primary School

location
Kanam A (in Karachuonyo)
year first funded
2004
action
Rehab/Construction
output
8Classrooms
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 0

Ong'Ang' Primary School

location
Kanyaluo East (in Karachuonyo)
year first funded
2004
action
Construction of Offices/ 2 Classroom
output
Offices/ 2Classroom
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 0

Raongo Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 3 Classrooms
output
Offices/ 3 Classrooms
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 0

Omollo Agar Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 0

Kobuya Dispensary

location
Kobuya (in Karachuonyo)
year first funded
2003
action
Construction of Dispensary
output
Dispensary
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 0

Yala Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 2 Classroom
output
Offices/ 2 Classroom
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Chiefs Office Central Karachuonyo

location
Central Karachuonyo (in Karachuonyo)
year first funded
2006
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 1,500,000

Ngou Primary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2004
action
Construction of 5 Classrooms
output
5 Classrooms
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 0

AsSt. Chief's Office Kadik

location
Kanjira (in Karachuonyo)
year first funded
2007
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 0

Masogo Secondary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 780,000
estimate
Ksh 500,000

Kibugu Primary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 712,000
estimate
Ksh 0

Denga Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2003
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
On-Going
total cost
Ksh 712,000
estimate
Ksh 0

Kendu Muslim Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
On-Going
total cost
Ksh 712,000
estimate
Ksh 0

Gogo Secondary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2006
action
Construction of Staff House
output
Staff Hse
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 800,000

Kodula Dispensary

location
Kakdhimu East (in Karachuonyo)
year first funded
2008
action
Construction of Dispensary
output
Dispensary
implementation status
Work In Progress
total cost
Ksh 700,000
estimate
Ksh 0

Kimira Primary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 0

Osika Primary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 2 Classrooms
output
Offices/ 2Classrooms
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 0

Chief's Office Kanam A

location
Kanam A (in Karachuonyo)
year first funded
2008
action
Construction of Offices
output
Offices
implementation status
Work In Progress
total cost
Ksh 700,000
estimate
Ksh 0

Olando Dispensary

location
Kanyaluo East (in Karachuonyo)
year first funded
2005
action
Construction of Wards
output
Wards
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 450,000

Seme Kaima Primary School

location
Kanyaluo West (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 2 Classroom
output
Offices/ 2Classroom
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 0

Daraja Primary School

location
Kobuya (in Karachuonyo)
year first funded
2006
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 0

Nyaoga Community Dispensary

location
Kokoth Kataa (in Karachuonyo)
year first funded
2008
action
n/a
output
Facility
implementation status
Work In Progress
total cost
Ksh 700,000
estimate
Ksh 0

God Ndonyo Primary School

location
Koyugi (in Karachuonyo)
year first funded
2006
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 0

Mirembe Primary School

location
Rambira (in Karachuonyo)
year first funded
2003
action
Construction of Offices/ 6 Classrooms
output
Offices/ 6Classrooms
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 3,300,000

Miriu Health Centre

location
Wangchieng (in Karachuonyo)
year first funded
2005
action
Construction of Ward
output
Ward
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Ngeta Dispensary

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2008
action
Finishing of facility
output
Facility
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Obilo Primary School

location
Kanyaluo West (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 662,000
estimate
Ksh 0

Siburi Primary School

location
Wadhgone Nyongo (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 0

Otok Secondary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2003
action
Fencing/Lab Equip
output
Fence/Lab
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 500,000

Rabuor Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2004
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 0

Kajiei Tree Nursery

location
Wangchieng (in Karachuonyo)
year first funded
2005
action
Planting
output
Tree Nursery
implementation status
On-Going
total cost
Ksh 615,712
estimate
Ksh 0

Nyamwala Primary School

location
Koyugi (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 612,000
estimate
Ksh 0

Homa Lime Primary School

location
Kanam A (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 612,000
estimate
Ksh 0

Sangla Primary School

location
Kanam A (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
On-Going
total cost
Ksh 612,000
estimate
Ksh 0

Anduu Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2003
action
Construction of Office Block
output
Office Block
implementation status
On-Going
total cost
Ksh 612,000
estimate
Ksh 0

Liera Primary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 612,000
estimate
Ksh 0

Maguti Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2003
action
Fencing
output
Fence
implementation status
Incomplete
total cost
Ksh 612,000
estimate
Ksh 0

Nyaola Primary School

location
Wadhgone Nyongo (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 612,000
estimate
Ksh 0

Loo-Rateng Primary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Lwala Primary School

location
Kakdhimu East (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3 Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Mirengo Primary School

location
Kanjira (in Karachuonyo)
year first funded
2004
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

Kowour Primary School

location
Kanyaluo East (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Nyakango Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2004
action
Construction of 5 Classrooms
output
5 Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

Omindi Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Oriwo Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

Kingii Primary School

location
Kobiero (in Karachuonyo)
year first funded
2004
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Wagwe Primary School

location
Kobiero (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Burlum Primary School

location
Kobuya (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 2 Classroom
output
Offices/ 2Classroom
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Kogembo Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3 Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

Wang Got Primary School

location
Kokoth Kateng (in Karachuonyo)
year first funded
2004
action
Construction of 9 Classrooms
output
9Classrooms
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Karabondi Bidii Mixed Sec

location
Rambira (in Karachuonyo)
year first funded
2005
action
Rehabilitation
output
6Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,800,000

Obangla Primary School

location
Rambira (in Karachuonyo)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 500,000

Samba Primary School

location
Rambira (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

Kajiei Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2006
action
Construction of Admin Block
output
Admin Block
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Kawiti Primary School

location
Kakdhimu East (in Karachuonyo)
year first funded
2004
action
Rehabilitation of 6 classrooms
output
6 Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

Chiefs Office Kanyipir

location
Kanyipir (in Karachuonyo)
year first funded
2007
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 0

Kajiei Secondary School

location
Wangchieng (in Karachuonyo)
year first funded
2003
action
Lab Equiping
output
Lab Equipment
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 250,000

Homa Hills Primary School

location
Kanam B (in Karachuonyo)
year first funded
2004
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
Incomplete
total cost
Ksh 550,000
estimate
Ksh 0

Kamser Mixed Secondary School

location
Rambira (in Karachuonyo)
year first funded
2005
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 200,000

Awach Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2005
action
Rehabilitation of 7 classrooms
output
7 Classrooms
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 400,000

Kodhoch Secondary School

location
Kanyipir (in Karachuonyo)
year first funded
2007
action
Construction of Classroom
output
Classroom
implementation status
Incomplete
total cost
Ksh 550,000
estimate
Ksh 0

Siala Primary School

location
Kanjira (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 524,000
estimate
Ksh 0

Kibaga Primary School

location
Kobiero (in Karachuonyo)
year first funded
2003
action
Construction of 5 Classrooms
output
5Classrooms
implementation status
Incomplete
total cost
Ksh 512,000
estimate
Ksh 0

Alaro Primary School

location
Koyugi (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 512,000
estimate
Ksh 0

Makaka Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 512,000
estimate
Ksh 0

Bware Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 5 Classrooms
output
5 Classrooms
implementation status
On-Going
total cost
Ksh 512,000
estimate
Ksh 0

Gungu Primary School

location
Rambira (in Karachuonyo)
year first funded
2003
action
Construction of 5 Classrooms
output
5 Classrooms
implementation status
On-Going
total cost
Ksh 512,000
estimate
Ksh 732,750

Kagai Primary School

location
Kobiero (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Omboga health center

location
Kanyaluo South (in Karachuonyo)
year first funded
2005
action
Construction of Admin Block
output
Admin Block
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 600,000

Kital Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Simbi Birds Sanctuary

location
Central Karachuonyo (in Karachuonyo)
year first funded
2008
action
Fencing
output
Secured Site
implementation status
Awaiting Funds
total cost
Ksh 500,000
estimate
Ksh 0

Nyatir Primary School

location
Kakdhimu East (in Karachuonyo)
year first funded
2003
action
Construction of Offices/ 2 Classroom
output
Offices/ 2 Classroom
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Lieta Mixed Secondary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2008
action
Construction of Fence
output
Fence
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Alego Primary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2007
action
Construction of Classroom
output
Classroom
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Kondega Comm Learning Resource Centre

location
Kanam A (in Karachuonyo)
year first funded
2007
action
Construction of Offices
output
Offices
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Rabuor Koguta Bridge

location
Kanam A (in Karachuonyo)
year first funded
2007
action
Construction of Road
output
Road
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

St Dalmas Ndere Dispensary

location
Kanam A (in Karachuonyo)
year first funded
2008
action
Construction of Dispensary
output
Dispensary
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Angong'a Adult basic L C

location
Kanam A (in Karachuonyo)
year first funded
2008
action
Construction of Classrooms
output
Classrooms
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Nyanja Rateng' Nursery

location
Kanam B (in Karachuonyo)
year first funded
2008
action
Construction of Nursery
output
Nursery
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Ngolo Primary School

location
Kanjira (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 1 Classroom
output
Offices/ 1Classroom
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Ndhole Primary School

location
Kanjira (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Apuko Dho Primary School

location
Kobuya (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Kasibos Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2004
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Kokoth Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2005
action
Construction of 6 Classrooms
output
6 Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kanyamfwa Primary School

location
Kokoth Kateng (in Karachuonyo)
year first funded
2005
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Nyawi Omuga Primary School

location
Koyugi (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Awach Gendia Water Project

location
N/Karachuonyo (in Karachuonyo)
year first funded
2007
action
Piping
output
Piped Water
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Mabati Sita Makaka Bawre Road

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2006
action
Construction of Passable Road
output
Passable Road
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Ogango Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2006
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Kendu Town Council

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2008
action
Completion of Council Hall
output
Council Hall
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Seka Dok Primary School

location
Rambira (in Karachuonyo)
year first funded
2006
action
Construction of Classroom
output
Classroom
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Akwakra Primary School

location
Rambira (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Karabondi Primary School

location
Rambira (in Karachuonyo)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Dunga-Mawego Road

location
Wangchieng (in Karachuonyo)
year first funded
2006
action
Construction of Road
output
Road
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Miyuga Secondary School

location
Wangchieng (in Karachuonyo)
year first funded
2007
action
Construction of Offices/ 1 Classroom
output
Offices/ 1Classroom
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Adita Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2004
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Homa Lime Health Centre

location
Kanam A (in Karachuonyo)
year first funded
2003
action
Rehabilitation of health centre
output
Health Centre
implementation status
Complete
total cost
Ksh 470,000
estimate
Ksh 470,000

Kanyadhiang Primary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2003
action
Desks
output
Desks
implementation status
Complete
total cost
Ksh 462,000
estimate
Ksh 0

Kendu Bay Water Project

location
N/Karachuonyo (in Karachuonyo)
year first funded
2008
action
Rehabilitation
output
Piped Water
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Oriang' Manywanda primary school

location
Kogweno Oriang (in Karachuonyo)
year first funded
2006
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 450,000
estimate
Ksh 0

Lieta Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 413,000
estimate
Ksh 400,000

Koboo Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2003
action
Desks
output
Desks
implementation status
Complete
total cost
Ksh 412,000
estimate
Ksh 0

Ndere Primary School

location
Kanam A (in Karachuonyo)
year first funded
2003
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
On-Going
total cost
Ksh 412,000
estimate
Ksh 0

Ngeta Secondary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2005
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Mango Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of Offices&1 Classroom
output
Offices&1Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 600,000

Apuko Sda Primary School

location
Kobuya (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Kamser Primary School

location
Rambira (in Karachuonyo)
year first funded
2005
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Katonje Primary School

location
Koyugi (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Achuth Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2005
action
Rehabilitation of 8 classrooms
output
8 Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Owiti Ayoma Ecd

location
Kanyipir (in Karachuonyo)
year first funded
2007
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Adiedo Primary School

location
Kanyaluo West (in Karachuonyo)
year first funded
2004
action
Construction of Offices/ 3 Classroom
output
Offices/ 3Classroom
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Rabware Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Omboga Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2004
action
Construction of 4 Classrooms
output
4Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Yao Kamolo Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2005
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Kogweno Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2005
action
Rehabilitation of 4 classrooms
output
4 Classrooms
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Kobala Secondary School

location
Wangchieng (in Karachuonyo)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 300,000

Chief's office Kanyaluo East

location
Kanyaluo East (in Karachuonyo)
year first funded
2009
action
Construction of offices
output
Offices
implementation status
on-going
total cost
Ksh 400,000
estimate
Ksh 0

Oriang' Pottery

location
Kogweno Oriang (in Karachuonyo)
year first funded
2009
action
Construction of shade and reroofing of workshop
output
Shade/workshop
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kobala Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2008
action
Construction of Classroom
output
Classroom
implementation status
Work In Progress
total cost
Ksh 400,000
estimate
Ksh 0

Oindo Secondary School

location
Kanjira (in Karachuonyo)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Alara Primary School

location
Kanam A (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Miti Mbili Tree Nursery

location
Kanjira (in Karachuonyo)
year first funded
2005
action
Planting
output
Tree Nursery
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Nyabiage Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 395,000
estimate
Ksh 0

Nyangajo Primary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2006
action
Construction of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 370,000
estimate
Ksh 0

Chief's Office Kogweno Oriang

location
Kogweno Oriang (in Karachuonyo)
year first funded
2008
action
Construction of Offices
output
Offices
implementation status
Awaiting Funds
total cost
Ksh 350,000
estimate
Ksh 0

Ngeta Primary School

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Homa Hills Polytechnic

location
Kanam B (in Karachuonyo)
year first funded
2008
action
Construction of Classroom
output
Classroom
implementation status
Work In Progress
total cost
Ksh 350,000
estimate
Ksh 0

Remo Beach

location
Kokoth Kataa (in Karachuonyo)
year first funded
2008
action
Rehabilitation of Banda
output
Banda
implementation status
Awaiting Funds
total cost
Ksh 350,000
estimate
Ksh 0

Rambira Chief's Office

location
Rambira (in Karachuonyo)
year first funded
2008
action
Construction of Offices
output
Offices
implementation status
Awaiting Funds
total cost
Ksh 350,000
estimate
Ksh 0

Chief's Office Wadhgone Nyongo

location
Wadhgone Nyongo (in Karachuonyo)
year first funded
2008
action
Construction of Offices
output
Offices
implementation status
Awaiting Funds
total cost
Ksh 350,000
estimate
Ksh 0

Wangadonji Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2005
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Incomplete
total cost
Ksh 348,000
estimate
Ksh 0

Chiefs' Office Wang'chieng AP

location
Wangchieng (in Karachuonyo)
year first funded
2009
action
Renovation of halls
output
6 Rooms
implementation status
Complete
total cost
Ksh 345,000
estimate
Ksh 0

Rongo Nyagowa Pr

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2003
action
Rehabilitation
output
3 Classrooms
implementation status
Complete
total cost
Ksh 312,000
estimate
Ksh 0

Simbi Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
On-Going
total cost
Ksh 312,000
estimate
Ksh 1,200,000

Sombro Primary School

location
Kokoth Kateng (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 312,000
estimate
Ksh 0

Bongia Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 312,000
estimate
Ksh 0

Nyawino Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 312,000
estimate
Ksh 0

Sanda Primary School

location
Kobiero (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 312,000
estimate
Ksh 0

Kanam Primary School

location
Kanam B (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
Complete
total cost
Ksh 312,000
estimate
Ksh 0

Otok Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2008
action
Construction of Rehabilitation
output
Rehabilitation
implementation status
Work In Progress
total cost
Ksh 300,000
estimate
Ksh 0

Kodhoch Primary School

location
Kanyipir (in Karachuonyo)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Chulla Primary School

location
Kanam B (in Karachuonyo)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Nyasanja Primary School

location
Kanam B (in Karachuonyo)
year first funded
2004
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Asuenyinya Adult B Literacy C

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2008
action
Construction of Classroom
output
Classroom
implementation status
Work In Progress
total cost
Ksh 300,000
estimate
Ksh 0

D.O'S Residence W Karachuonyo

location
Kokoth Kateng (in Karachuonyo)
year first funded
2009
action
Renovation
output
House
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Onyaa Kodula Market

location
Kakdhimu East (in Karachuonyo)
year first funded
2008
action
Electrification
output
Electricity
implementation status
Awaiting Funds
total cost
Ksh 300,000
estimate
Ksh 0

Kanjira primary school

location
Kanjira (in Karachuonyo)
year first funded
2009
action
Construction of fence
output
Secure school
implementation status
incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Ochuoga primary School

location
Wangchieng (in Karachuonyo)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
Work In Progress
total cost
Ksh 300,000
estimate
Ksh 0

Abala Horticultural Project

location
Rambira (in Karachuonyo)
year first funded
2007
action
Farming
output
Horticulture Farm
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Oneno Nam Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of 5 Classrooms
output
5 Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Nyaburi Integrated School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2005
action
Construction of Gate
output
Gate
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Osakwe Primary School

location
Koyugi (in Karachuonyo)
year first funded
2005
action
Construction of Offices
output
Offices
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Bala Primary School

location
Koyugi (in Karachuonyo)
year first funded
2005
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Onyando Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2005
action
Construction of Admin Block
output
Admin Block
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

St John Seka secondary school

location
Rambira (in Karachuonyo)
year first funded
2009
action
Completion 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 280,000
estimate
Ksh 0

Miyuga Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2004
action
Rehabilitation of 3 classrooms
output
Office/ 3Classrooms
implementation status
Complete
total cost
Ksh 280,000
estimate
Ksh 0

Nyangwete Resource Centre

location
Kanam A (in Karachuonyo)
year first funded
2008
action
Construction of Dispensary
output
Dispensary
implementation status
Work In Progress
total cost
Ksh 250,000
estimate
Ksh 0

Kanjira water project

location
Kanjira (in Karachuonyo)
year first funded
2009
action
piping
output
pipied water
implementation status
on-going
total cost
Ksh 250,000
estimate
Ksh 0

Mawego Centre

location
Kobuya (in Karachuonyo)
year first funded
2008
action
Etouch internet
output
Internet
implementation status
Awaiting Funds
total cost
Ksh 250,000
estimate
Ksh 0

Adiedo Market

location
Kanyaluo West (in Karachuonyo)
year first funded
2008
action
E-Touch internet
output
Internet
implementation status
Work In Progress
total cost
Ksh 250,000
estimate
Ksh 0

Kisindi Primary School

location
Kanam A (in Karachuonyo)
year first funded
2004
action
Rehab/Construction
output
7Classrooms
implementation status
Incomplete
total cost
Ksh 250,000
estimate
Ksh 0

St Douglus Weta School

location
Wangchieng (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 212,000
estimate
Ksh 0

Nyandusi Primary School

location
Rambira (in Karachuonyo)
year first funded
2003
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 212,000
estimate
Ksh 0

Kokun Earth Dam

location
Kanjira (in Karachuonyo)
year first funded
2009
action
Construction
output
Water pan
implementation status
Underway
total cost
Ksh 200,000
estimate
Ksh 0

Ndwara Primary School

location
Kokoth Kateng (in Karachuonyo)
year first funded
2005
action
Rehabilitation
output
8 Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Ombujo Primary School

location
Koyugi (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Kandiege Primary School

location
Koyugi (in Karachuonyo)
year first funded
2007
action
Construction of 3 Classrooms
output
3Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Rarua Primary School

location
Koyugi (in Karachuonyo)
year first funded
2005
action
Construction of Offices/ 1 Classroom
output
Offices/ 1Classroom
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Gendia Primary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2006
action
Construction of 12 Doors Latrines
output
12 Doors Latrines
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Nyaganjo Bridge

location
N/Karachuonyo (in Karachuonyo)
year first funded
2004
action
Construction of Bridge
output
Bridge
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Kideswa Primary School

location
N/Karachuonyo (in Karachuonyo)
year first funded
2005
action
Rehabilitation of 7 classrooms
output
7Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Konyango Delta Irrigation

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2006
action
Irrigation
output
Re-Directing
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Soko Kagwa Primary School

location
Rambira (in Karachuonyo)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Chuth Ber Dispensary

location
Rambira (in Karachuonyo)
year first funded
2005
action
Construction of Staff Houses
output
Staff Houses
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

Akwakra MixedSecondary School

location
Rambira (in Karachuonyo)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Achuodho Beach

location
Rambira (in Karachuonyo)
year first funded
2008
action
Construction of Banda
output
Banda
implementation status
Awaiting Funds
total cost
Ksh 200,000
estimate
Ksh 0

Kamenya Commproject

location
Wangchieng (in Karachuonyo)
year first funded
2007
action
Fencing
output
Horticulture Farm
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Kobala Horticultural Project

location
Wangchieng (in Karachuonyo)
year first funded
2007
action
Fencing
output
Horticulture Farm
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Simbi Nyaima shade

location
C. Karachuonyo (in Karachuonyo)
year first funded
2009
action
Construction shade
output
Shade
implementation status
Underway
total cost
Ksh 200,000
estimate
Ksh 0

Bala Hot Spring Shade

location
Kakdhimu East (in Karachuonyo)
year first funded
2009
action
Construction
output
Shade
implementation status
Underway
total cost
Ksh 200,000
estimate
Ksh 0

Homa Hills Agri Demo

location
Kanam B (in Karachuonyo)
year first funded
2009
action
Construction
output
Demo station
implementation status
Underway
total cost
Ksh 200,000
estimate
Ksh 0

Omuga Primary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2006
action
Rehabilitation
output
2 Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 700,000

Lieta Secondary School

location
Central Karachuonyo (in Karachuonyo)
year first funded
2004
action
Lab Equiping
output
Equipment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Rabuor Koguta Primary School

location
Kanam A (in Karachuonyo)
year first funded
2003
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Migeni Primary School

location
Kanam B (in Karachuonyo)
year first funded
2005
action
Rehabilitation of 4 classrooms
output
4 Classrooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Jonyo Primary School

location
Kanam B (in Karachuonyo)
year first funded
2004
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Homa Hills Health Centre

location
Kanam B (in Karachuonyo)
year first funded
2005
action
Rehabilitation of health centre
output
Health Centre
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Abundu Commhort project

location
Kanam B (in Karachuonyo)
year first funded
2007
action
Irrigation
output
Horticulture
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Oyombe Primary School

location
Kanyaluo South (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Kobila Primary School

location
Kanyaluo West (in Karachuonyo)
year first funded
2006
action
Rehabilitation
output
4Classrooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Mawego Primary School

location
Kobuya (in Karachuonyo)
year first funded
2006
action
Construction of 1 Classrooms
output
1Classrooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

St Joseph Kobuya Secondary School

location
Kobuya (in Karachuonyo)
year first funded
2007
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Ahango Kiosk Water Users

location
Kobuya (in Karachuonyo)
year first funded
2008
action
Construction of Water Kiosk
output
Water Kiosk
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kogweno Oriang Dispensary

location
Kogweno Oriang (in Karachuonyo)
year first funded
2005
action
Rehabilitation
output
Dispensary
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

Katuola Borehole Project

location
Kogweno Oriang (in Karachuonyo)
year first funded
2007
action
Drilling
output
Borehole
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Orian'G Sda Dispensary

location
Kogweno Oriang (in Karachuonyo)
year first funded
2005
action
Construction of Dispensary
output
Dispensary
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 400,000

Nyagweno Comm Borehole Project

location
Kokoth Kataa (in Karachuonyo)
year first funded
2007
action
Drilling
output
Borehole
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Karik Commecd Project

location
Kanjira (in Karachuonyo)
year first funded
2007
action
Construction of Classroom
output
Classroom
implementation status
Funds Reallocated
total cost
Ksh 192,324
estimate
Ksh 0

Ayub Okoko Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2008
action
Electrification
output
-
implementation status
Work In Progress
total cost
Ksh 126,000
estimate
Ksh 0

Masogo Primary School

location
Kakadhimu West (in Karachuonyo)
year first funded
2003
action
Construction of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 112,000
estimate
Ksh 0

Piergot Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 0

Kobiero Fish Banda

location
Kokoth Kataa (in Karachuonyo)
year first funded
2007
action
Construction of Fish Banda
output
Fish Banda
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Koliech Primary School

location
Kokoth Kataa (in Karachuonyo)
year first funded
2005
action
Construction of 2 Classrooms
output
2Classrooms
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 0

Kojwang Sub Location Office

location
Koyugi (in Karachuonyo)
year first funded
2006
action
Construction of Office
output
Office
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 0

Nyanganjo Community Dispensarye

location
N/Karachuonyo (in Karachuonyo)
year first funded
2005
action
Construction of Dispensary
output
Dispensary
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 300,000

Kotieno Gumba Primary School

location
Neast Karachuonyo (in Karachuonyo)
year first funded
2006
action
Fencing
output
Fence
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 0

Kogana Primary School

location
Rambira (in Karachuonyo)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 0

Kanyangwena Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2005
action
Construction of Admin Block
output
Admin Block
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Osodo Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2006
action
Rehabilitation
output
School
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kamwala Primary School

location
Wangchieng (in Karachuonyo)
year first funded
2004
action
Rehabilitation
output
School
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kodero Fish Banda

location
Kanam B (in Karachuonyo)
year first funded
2007
action
Construction of Fish Banda
output
Fish Banda
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Athanyra Water Project

location
Kobuya (in Karachuonyo)
year first funded
2006
action
Construction of Water Dam
output
Water Dam
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Nyakech Primary School

location
Kogweno Oriang (in Karachuonyo)
year first funded
2006
action
Rehabilitation of 2 classrooms
output
2 Classrooms
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Koriko Moyie Women Group

location
Kamser Nyakongo (in Karachuonyo)
year first funded
2008
action
Farming
output
Paultry
implementation status
Work In Progress
total cost
Ksh 20,686
estimate
Ksh 0