The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kanyaluo Water Project
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2004
- action
- Piping
- output
- Piping
- implementation status
- On-Going
- total cost
- Ksh 3,700,000
- estimate
- Ksh 0
Kendu Bay Sub District Hosp
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Wards
- output
- 2 Wards
- implementation status
- Complete
- total cost
- Ksh 3,400,000
- estimate
- Ksh 0
Achuna Dam
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2004
- action
- Drilling
- output
- Water Dam
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 0
St Alfred Alara Secondary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,500,000
Adiedo Health Centre
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Ward
- output
- Ward
- implementation status
- On-Going
- total cost
- Ksh 2,136,246
- estimate
- Ksh 0
Atandi Adc Farm
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2006
- action
- Irrigation
- output
- Irrigation
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Constituency Office
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction
- output
- Offices
- implementation status
- Underway
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Wagwe Health Centre
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On-Going
- total cost
- Ksh 1,980,000
- estimate
- Ksh 3,000,000
Ongalo Secondary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Incomplete
- total cost
- Ksh 1,850,000
- estimate
- Ksh 2,100,000
Kanyamfwa Secondary School
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- Incomplete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,500,000
Kobila Secondary School
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 1,700,000
- estimate
- Ksh 800,000
Samanga Secondary School
- location
-
Wadhgone Nyongo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Incomplete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,300,000
Omboga Secondary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 6 Classrooms
- output
- 6Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,500,000
St Innocent Jonyo Sec
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 800,000
Ng'Oche Primary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 6 Classrooms
- output
- 6 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kandiege Health Centre
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Wards
- output
- Wards
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Rabuor Dam
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2004
- action
- Drilling
- output
- Water Dam
- implementation status
- Incomplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,300,000
Oriwo Health Centre
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Dispensery
- output
- Dispensery
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 800,000
Oindo Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Staff House/Fencing
- output
- Staff Hse/Fencing
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Oriwo Secondary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Incomplete
- total cost
- Ksh 1,426,000
- estimate
- Ksh 1,500,000
Nyakongo Youth Polytechnic
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Rehabilitation
- output
- College
- implementation status
- On-Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 3,000,000
Wagwe Mixed secondary school
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Office/ 1 Classroom
- output
- Office/ 1Classroom
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 800,000
Migingo Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Offices/ 3 Classrooms
- output
- Offices/ 3 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Ogenya Girls Secondary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Staff House
- output
- Staff Hse
- implementation status
- Incomplete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,200,000
Nyang'Ao Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 8 Classrooms
- output
- 8Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Migunde Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Okiki Amayo Primary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 1,212,000
- estimate
- Ksh 0
Mawego Girls Secondary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4Tanks/ 2 Classrooms
- output
- 4Tanks/ 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 300,000
Otaro Mixed Secondary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 500,000
Lwanda Primary School
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehabilitation of 5 classrooms
- output
- 5 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Chiefs Office West Kanyaluo
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 1,130,100
- estimate
- Ksh 0
Nduga Primary School
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,112,000
- estimate
- Ksh 0
Got Okii Primary School
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,112,000
- estimate
- Ksh 0
Simbi Kogembo Dispensary
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Incomplete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 500,000
St. Francis Nyanganjo Girls' secondary school
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Staff Houses/ 2 Classrooms
- output
- Staff Hses/ 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 800,000
Kowour Secondary School
- location
-
Kanyaluo East
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 800,000
Ajigo Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 5 Classrooms
- output
- 5Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Karabondi Girls Boarding
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 1,061,000
- estimate
- Ksh 0
Kamwala Secondary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 400,000
Soko Kogira primary school
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Wikondiek secondary school
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 800,000
Kamolo Secondary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Buru Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Offices/8 Classroom
- output
- Offices/8Classroom
- implementation status
- On-Going
- total cost
- Ksh 1,012,000
- estimate
- Ksh 0
Mariwa Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kendu Muslim Secondary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 400,000
Got Oyaro Health Centre
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
St Martin Oluti Secondary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Admin Block/Lab
- output
- Admin Block/Lab
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Adhiro Secondary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Offices/ 3 Classroom
- output
- Offices/ 3Classroom
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Gogo Primary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Offices/ 8 Classrooms
- output
- Offices/ 8Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Warao Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
George Agola Owour Secondary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Rehabilitation of office and 1 classroom
- output
- Office/ 1Classroom
- implementation status
- Complete
- total cost
- Ksh 965,000
- estimate
- Ksh 500,000
Kunya Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 962,000
- estimate
- Ksh 0
West Karachuonyo Education Office
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Office
- output
- Office
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Chiefs Office West Kakdhimu
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Orire Primary School
- location
-
Kanyaluo East
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 912,000
- estimate
- Ksh 0
Okiki Amayo Health Centre
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Wimagak Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Offices/ 2 Classroom
- output
- Offices/ 2Classroom
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Otok Ii Water Project
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2006
- action
- Piping
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
St Joseph Miranga Secondary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehabilitation of Lab
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 300,000
Hagai Koyier Primary School
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kandiege Secondary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 5 Classrooms
- output
- 5Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 600,000
Gendia Secondary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Wiring
- output
- Electrified Office
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 300,000
Konyach Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Chwowe Dispensary
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Twin Houses
- output
- Twin Houses
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 600,000
Kokoth Kataa Chief's Office
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Office
- output
- Office
- implementation status
- On-Going
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Siburi Secondary School
- location
-
Wadhgone Nyongo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 850,000
- estimate
- Ksh 500,000
Abundu Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Otaro Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Office/ 8 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 812,000
- estimate
- Ksh 0
Ngura Primary School
- location
-
Wadhgone Nyongo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 6 Classrooms
- output
- 6Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 812,000
- estimate
- Ksh 0
St Lucy Rarwowa Girls
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2004
- action
- Tanks
- output
- Water Tanks
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 500,000
Kanyadhiang Community Dispensary
- location
-
N. Karachuonyo
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction
- output
- Dispensary
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Angon'Ga Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehab/Construction
- output
- 8Classrooms
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Ong'Ang' Primary School
- location
-
Kanyaluo East
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Offices/ 2 Classroom
- output
- Offices/ 2Classroom
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Raongo Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 3 Classrooms
- output
- Offices/ 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Omollo Agar Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kobuya Dispensary
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Yala Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 2 Classroom
- output
- Offices/ 2 Classroom
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Chiefs Office Central Karachuonyo
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 1,500,000
Ngou Primary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
AsSt. Chief's Office Kadik
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Masogo Secondary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 780,000
- estimate
- Ksh 500,000
Kibugu Primary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 712,000
- estimate
- Ksh 0
Denga Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- On-Going
- total cost
- Ksh 712,000
- estimate
- Ksh 0
Kendu Muslim Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- On-Going
- total cost
- Ksh 712,000
- estimate
- Ksh 0
Gogo Secondary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Staff House
- output
- Staff Hse
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Kodula Dispensary
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Work In Progress
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kimira Primary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Osika Primary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 2 Classrooms
- output
- Offices/ 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Chief's Office Kanam A
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Offices
- output
- Offices
- implementation status
- Work In Progress
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Olando Dispensary
- location
-
Kanyaluo East
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Wards
- output
- Wards
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 450,000
Seme Kaima Primary School
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 2 Classroom
- output
- Offices/ 2Classroom
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Daraja Primary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Nyaoga Community Dispensary
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2008
- action
- n/a
- output
- Facility
- implementation status
- Work In Progress
- total cost
- Ksh 700,000
- estimate
- Ksh 0
God Ndonyo Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Mirembe Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Offices/ 6 Classrooms
- output
- Offices/ 6Classrooms
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 3,300,000
Miriu Health Centre
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ngeta Dispensary
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2008
- action
- Finishing of facility
- output
- Facility
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Obilo Primary School
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 662,000
- estimate
- Ksh 0
Siburi Primary School
- location
-
Wadhgone Nyongo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Otok Secondary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2003
- action
- Fencing/Lab Equip
- output
- Fence/Lab
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Rabuor Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kajiei Tree Nursery
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2005
- action
- Planting
- output
- Tree Nursery
- implementation status
- On-Going
- total cost
- Ksh 615,712
- estimate
- Ksh 0
Nyamwala Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Homa Lime Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Sangla Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- On-Going
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Anduu Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- On-Going
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Liera Primary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Maguti Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Fencing
- output
- Fence
- implementation status
- Incomplete
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Nyaola Primary School
- location
-
Wadhgone Nyongo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 612,000
- estimate
- Ksh 0
Loo-Rateng Primary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Lwala Primary School
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mirengo Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kowour Primary School
- location
-
Kanyaluo East
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Nyakango Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Omindi Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Oriwo Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kingii Primary School
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Wagwe Primary School
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Burlum Primary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 2 Classroom
- output
- Offices/ 2Classroom
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kogembo Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Wang Got Primary School
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 9 Classrooms
- output
- 9Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Karabondi Bidii Mixed Sec
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation
- output
- 6Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,800,000
Obangla Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Samba Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kajiei Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kawiti Primary School
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehabilitation of 6 classrooms
- output
- 6 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Chiefs Office Kanyipir
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kajiei Secondary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2003
- action
- Lab Equiping
- output
- Lab Equipment
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 250,000
Homa Hills Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kamser Mixed Secondary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 200,000
Awach Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation of 7 classrooms
- output
- 7 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 400,000
Kodhoch Secondary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Siala Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 524,000
- estimate
- Ksh 0
Kibaga Primary School
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 5 Classrooms
- output
- 5Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 512,000
- estimate
- Ksh 0
Alaro Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 512,000
- estimate
- Ksh 0
Makaka Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 512,000
- estimate
- Ksh 0
Bware Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 512,000
- estimate
- Ksh 0
Gungu Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 512,000
- estimate
- Ksh 732,750
Kagai Primary School
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Omboga health center
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Kital Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Simbi Birds Sanctuary
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2008
- action
- Fencing
- output
- Secured Site
- implementation status
- Awaiting Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nyatir Primary School
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Offices/ 2 Classroom
- output
- Offices/ 2 Classroom
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lieta Mixed Secondary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Fence
- output
- Fence
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Alego Primary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kondega Comm Learning Resource Centre
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Offices
- output
- Offices
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Rabuor Koguta Bridge
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
St Dalmas Ndere Dispensary
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Angong'a Adult basic L C
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nyanja Rateng' Nursery
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Nursery
- output
- Nursery
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ngolo Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 1 Classroom
- output
- Offices/ 1Classroom
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ndhole Primary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Apuko Dho Primary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kasibos Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kokoth Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 6 Classrooms
- output
- 6 Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanyamfwa Primary School
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nyawi Omuga Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Awach Gendia Water Project
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2007
- action
- Piping
- output
- Piped Water
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mabati Sita Makaka Bawre Road
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Passable Road
- output
- Passable Road
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ogango Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kendu Town Council
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2008
- action
- Completion of Council Hall
- output
- Council Hall
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Seka Dok Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Akwakra Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Karabondi Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Dunga-Mawego Road
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Miyuga Secondary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Offices/ 1 Classroom
- output
- Offices/ 1Classroom
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Adita Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Homa Lime Health Centre
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2003
- action
- Rehabilitation of health centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 470,000
- estimate
- Ksh 470,000
Kanyadhiang Primary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 462,000
- estimate
- Ksh 0
Kendu Bay Water Project
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Oriang' Manywanda primary school
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Lieta Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 413,000
- estimate
- Ksh 400,000
Koboo Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2003
- action
- Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 412,000
- estimate
- Ksh 0
Ndere Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- On-Going
- total cost
- Ksh 412,000
- estimate
- Ksh 0
Ngeta Secondary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mango Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of Offices&1 Classroom
- output
- Offices&1Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Apuko Sda Primary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kamser Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Katonje Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Achuth Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation of 8 classrooms
- output
- 8 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Owiti Ayoma Ecd
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Adiedo Primary School
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Offices/ 3 Classroom
- output
- Offices/ 3Classroom
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Rabware Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Omboga Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Yao Kamolo Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kogweno Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation of 4 classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kobala Secondary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
Chief's office Kanyaluo East
- location
-
Kanyaluo East
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction of offices
- output
- Offices
- implementation status
- on-going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Oriang' Pottery
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction of shade and reroofing of workshop
- output
- Shade/workshop
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kobala Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Work In Progress
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Oindo Secondary School
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Alara Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Miti Mbili Tree Nursery
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2005
- action
- Planting
- output
- Tree Nursery
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Nyabiage Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Nyangajo Primary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 370,000
- estimate
- Ksh 0
Chief's Office Kogweno Oriang
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Offices
- output
- Offices
- implementation status
- Awaiting Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Ngeta Primary School
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Homa Hills Polytechnic
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Work In Progress
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Remo Beach
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2008
- action
- Rehabilitation of Banda
- output
- Banda
- implementation status
- Awaiting Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Rambira Chief's Office
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Offices
- output
- Offices
- implementation status
- Awaiting Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Chief's Office Wadhgone Nyongo
- location
-
Wadhgone Nyongo
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Offices
- output
- Offices
- implementation status
- Awaiting Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Wangadonji Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 348,000
- estimate
- Ksh 0
Chiefs' Office Wang'chieng AP
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2009
- action
- Renovation of halls
- output
- 6 Rooms
- implementation status
- Complete
- total cost
- Ksh 345,000
- estimate
- Ksh 0
Rongo Nyagowa Pr
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2003
- action
- Rehabilitation
- output
- 3 Classrooms
- implementation status
- Complete
- total cost
- Ksh 312,000
- estimate
- Ksh 0
Simbi Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- On-Going
- total cost
- Ksh 312,000
- estimate
- Ksh 1,200,000
Sombro Primary School
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 312,000
- estimate
- Ksh 0
Bongia Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 312,000
- estimate
- Ksh 0
Nyawino Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 312,000
- estimate
- Ksh 0
Sanda Primary School
- location
-
Kobiero
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 312,000
- estimate
- Ksh 0
Kanam Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- Complete
- total cost
- Ksh 312,000
- estimate
- Ksh 0
Otok Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Rehabilitation
- output
- Rehabilitation
- implementation status
- Work In Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kodhoch Primary School
- location
-
Kanyipir
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chulla Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nyasanja Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Asuenyinya Adult B Literacy C
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Work In Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
D.O'S Residence W Karachuonyo
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2009
- action
- Renovation
- output
- House
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Onyaa Kodula Market
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2008
- action
- Electrification
- output
- Electricity
- implementation status
- Awaiting Funds
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kanjira primary school
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction of fence
- output
- Secure school
- implementation status
- incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ochuoga primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Work In Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Abala Horticultural Project
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2007
- action
- Farming
- output
- Horticulture Farm
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Oneno Nam Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nyaburi Integrated School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Gate
- output
- Gate
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Osakwe Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices
- output
- Offices
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Bala Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Onyando Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
St John Seka secondary school
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2009
- action
- Completion 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 0
Miyuga Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehabilitation of 3 classrooms
- output
- Office/ 3Classrooms
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 0
Nyangwete Resource Centre
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Work In Progress
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kanjira water project
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2009
- action
- piping
- output
- pipied water
- implementation status
- on-going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mawego Centre
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2008
- action
- Etouch internet
- output
- Internet
- implementation status
- Awaiting Funds
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Adiedo Market
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2008
- action
- E-Touch internet
- output
- Internet
- implementation status
- Work In Progress
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kisindi Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehab/Construction
- output
- 7Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
St Douglus Weta School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 212,000
- estimate
- Ksh 0
Nyandusi Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 212,000
- estimate
- Ksh 0
Kokun Earth Dam
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction
- output
- Water pan
- implementation status
- Underway
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ndwara Primary School
- location
-
Kokoth Kateng
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation
- output
- 8 Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ombujo Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kandiege Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of 3 Classrooms
- output
- 3Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Rarua Primary School
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Offices/ 1 Classroom
- output
- Offices/ 1Classroom
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gendia Primary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 12 Doors Latrines
- output
- 12 Doors Latrines
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nyaganjo Bridge
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kideswa Primary School
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation of 7 classrooms
- output
- 7Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Konyango Delta Irrigation
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Irrigation
- output
- Re-Directing
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Soko Kagwa Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chuth Ber Dispensary
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Staff Houses
- output
- Staff Houses
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Akwakra MixedSecondary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Achuodho Beach
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Banda
- output
- Banda
- implementation status
- Awaiting Funds
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamenya Commproject
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2007
- action
- Fencing
- output
- Horticulture Farm
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kobala Horticultural Project
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2007
- action
- Fencing
- output
- Horticulture Farm
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Simbi Nyaima shade
- location
-
C. Karachuonyo
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction shade
- output
- Shade
- implementation status
- Underway
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Bala Hot Spring Shade
- location
-
Kakdhimu East
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction
- output
- Shade
- implementation status
- Underway
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Homa Hills Agri Demo
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2009
- action
- Construction
- output
- Demo station
- implementation status
- Underway
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Omuga Primary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Rehabilitation
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Lieta Secondary School
- location
-
Central Karachuonyo
(in Karachuonyo)
- year first funded
- 2004
- action
- Lab Equiping
- output
- Equipment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Rabuor Koguta Primary School
- location
-
Kanam A
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Migeni Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation of 4 classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Jonyo Primary School
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Homa Hills Health Centre
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation of health centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Abundu Commhort project
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2007
- action
- Irrigation
- output
- Horticulture
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Oyombe Primary School
- location
-
Kanyaluo South
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kobila Primary School
- location
-
Kanyaluo West
(in Karachuonyo)
- year first funded
- 2006
- action
- Rehabilitation
- output
- 4Classrooms
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mawego Primary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 1 Classrooms
- output
- 1Classrooms
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
St Joseph Kobuya Secondary School
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ahango Kiosk Water Users
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2008
- action
- Construction of Water Kiosk
- output
- Water Kiosk
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kogweno Oriang Dispensary
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Katuola Borehole Project
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2007
- action
- Drilling
- output
- Borehole
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Orian'G Sda Dispensary
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Nyagweno Comm Borehole Project
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2007
- action
- Drilling
- output
- Borehole
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Karik Commecd Project
- location
-
Kanjira
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Funds Reallocated
- total cost
- Ksh 192,324
- estimate
- Ksh 0
Ayub Okoko Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2008
- action
- Electrification
- output
- -
- implementation status
- Work In Progress
- total cost
- Ksh 126,000
- estimate
- Ksh 0
Masogo Primary School
- location
-
Kakadhimu West
(in Karachuonyo)
- year first funded
- 2003
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 112,000
- estimate
- Ksh 0
Piergot Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kobiero Fish Banda
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Fish Banda
- output
- Fish Banda
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Koliech Primary School
- location
-
Kokoth Kataa
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kojwang Sub Location Office
- location
-
Koyugi
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Office
- output
- Office
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nyanganjo Community Dispensarye
- location
-
N/Karachuonyo
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kotieno Gumba Primary School
- location
-
Neast Karachuonyo
(in Karachuonyo)
- year first funded
- 2006
- action
- Fencing
- output
- Fence
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kogana Primary School
- location
-
Rambira
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kanyangwena Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Admin Block
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Osodo Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2006
- action
- Rehabilitation
- output
- School
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kamwala Primary School
- location
-
Wangchieng
(in Karachuonyo)
- year first funded
- 2004
- action
- Rehabilitation
- output
- School
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kodero Fish Banda
- location
-
Kanam B
(in Karachuonyo)
- year first funded
- 2007
- action
- Construction of Fish Banda
- output
- Fish Banda
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Athanyra Water Project
- location
-
Kobuya
(in Karachuonyo)
- year first funded
- 2006
- action
- Construction of Water Dam
- output
- Water Dam
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nyakech Primary School
- location
-
Kogweno Oriang
(in Karachuonyo)
- year first funded
- 2006
- action
- Rehabilitation of 2 classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Koriko Moyie Women Group
- location
-
Kamser Nyakongo
(in Karachuonyo)
- year first funded
- 2008
- action
- Farming
- output
- Paultry
- implementation status
- Work In Progress
- total cost
- Ksh 20,686
- estimate
- Ksh 0