The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kasipul Kabondo

Rachuonyo District Hospital

location
West Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Maternity Wards & Construction Of Amenity Ward.
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 5,389,863
estimate
Ksh 4,830,000

Nyangiela Secondary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2008
action
Purchase Of School Bus
output
Improve School Exchange Programmes
implementation status
Bus Purchased
total cost
Ksh 3,850,000
estimate
Ksh 0

Ringa Boys Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2008
action
Purchase Of School Bus
output
Improve School Exchange Programmes
implementation status
Bus Purchased
total cost
Ksh 3,850,000
estimate
Ksh 0

Wire Secondary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2008
action
Purchase Of School Bus
output
Improve School Exchange Programmes
implementation status
Bus Purchased
total cost
Ksh 3,550,000
estimate
Ksh 0

West Kasipul Electiricty

location
Konuonga (in Kasipul Kabondo)
year first funded
2004
action
Power Installation
output
Improve Infrastructure
implementation status
Incomplete
total cost
Ksh 3,370,000
estimate
Ksh 5,200,000

Wire Secondary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Renov.Of Dorm,Office& Classrooms
output
Improve The School Facilities.
implementation status
Complete
total cost
Ksh 3,091,457
estimate
Ksh 1,500,000

Nyamwaga Bridge Road

location
Wangchieng (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Newest Bridge & Laying Of Deck
output
Improved Infrastructure
implementation status
Incomplete
total cost
Ksh 2,970,000
estimate
Ksh 5,597,995

St. Teresas Opanga Secondary School

location
Ramba (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Adm. Block & Co-Funding For A Bus Project With Pta School Bus Project
output
Improve Working Environment For Teachers. & Improve School Exchange Programmes
implementation status
Incomplete
total cost
Ksh 2,800,000
estimate
Ksh 3,500,000

Kabondo Silk Project

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Factory Construction
output
Factory
implementation status
Incomplete
total cost
Ksh 2,168,530
estimate
Ksh 2,728,620

Mititi Secondary School

location
Kodera (in Kasipul Kabondo)
year first funded
2009
action
Co-Funding For A Bus Project With Pta
output
Improve School Exchange Programmes
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Karabok Secondary School

location
Kachien (in Kasipul Kabondo)
year first funded
2009
action
Co-Funding For A Bus Project With Pta
output
Improve School Exchange Programmes
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Ober Boys Boarding

location
Kakelo (in Kasipul Kabondo)
year first funded
2009
action
Co-Funding For A Bus Project With Pta
output
Improve School Exchange Programmes
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Got Rateng Secondary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2009
action
Co-Funding For A Bus Project With Pta
output
Improve School Exchange Programmes
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Rawinji Resource Centre

location
West Kamagak (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Resource Centre
output
Resource Centres To Host Cultural Events.
implementation status
Incomplete
total cost
Ksh 1,820,000
estimate
Ksh 2,500,000

North Kamagak Rural Water

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 1,800,000
estimate
Ksh 2,600,000

Rangwe Onjinyo Road

location
Kodera (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Road
output
Improved Infrastructure
implementation status
On Going
total cost
Ksh 1,800,000
estimate
Ksh 4,596,000

Nyasore Secondary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Laboratory
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 1,770,000
estimate
Ksh 250,000,000

Ramula Health Centre

location
Ramula (in Kasipul Kabondo)
year first funded
2006
action
Wiring Of Adm. Block .& Construction Of Male Block.
output
Wired Adm. Block For Improved Healthcare.
implementation status
Incomplete
total cost
Ksh 1,600,000
estimate
Ksh 2,900,000

Kabondo Divisional Headquaters

location
Ramula (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Divisional Office Block
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 2,250,000

Ober Secondary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2003
action
Completing Of Laboratory
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 1,520,000
estimate
Ksh 1,980,000

Ringa Girls Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Newest Tuition & Adm.Block
output
Improved Learning Facilities
implementation status
Complete
total cost
Ksh 1,509,150
estimate
Ksh 5,200,000

Kosele Water Borehole

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 2,600,000

Kulogwen Water Borehole

location
Kachien (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 2,500,000

Kamai Water Borehole

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 2,800,000

Ongoro Water Borehole

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 2,700,000

Agoro Sare Secondary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Admin Office
output
For Good And Effective Working Environment.
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 2,450,000

Abura Bridge & Road

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Newest Bridge
output
Improved Infrastructure
implementation status
Incomplete
total cost
Ksh 1,450,000
estimate
Ksh 480,000

Nyahera Girls Secondary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Toilets & 4 Classrooms
output
Improve Learning Environment & Sanitation.
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 2,900,000

Kowidi Secondary School

location
Ramula (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Newest Laboratory
output
Improved Performance In Science Subjects.
implementation status
Complete
total cost
Ksh 1,320,000
estimate
Ksh 1,850,000

Dudi Girls Secondary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Admin Block
output
Improved Working Environment For Teachers.
implementation status
Incomplete
total cost
Ksh 1,300,000
estimate
Ksh 1,850,000

Ombek Dispensary

location
Kodera (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Newest Wards. Completion Of Labour Ward
output
Improve Health Care Of The People.
implementation status
Incomplete
total cost
Ksh 1,270,000
estimate
Ksh 1,771,200

Sino Dispensary

location
East Kamagak (in Kasipul Kabondo)
year first funded
2003
action
Staff Quarter & Construction Of Newest Wards. Completion Of Ward (Plastering &Painting)
output
Improve Health Care Of The People.
implementation status
Complete
total cost
Ksh 1,220,000
estimate
Ksh 4,975,687

Otunga Water Project

location
North Kamagak (in Kasipul Kabondo)
year first funded
2009
action
Electrification Of Water Borehole
output
Improved Sanitation
implementation status
in use PTA/CDF
total cost
Ksh 1,200,000
estimate
Ksh 0

Got Rateng Secondary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Lab.
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 1,187,360
estimate
Ksh 1,200,000

Koywech Dispensary

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Dispensary (Wall & Floor, Plastering & Painting)
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 1,150,000
estimate
Ksh 1,200,000

Karabok Secondary School

location
Kachien (in Kasipul Kabondo)
year first funded
2003
action
Construction Of Adm. Block
output
Improve Working Environment For Teachers.
implementation status
Admin. In Progress.
total cost
Ksh 1,120,000
estimate
Ksh 1,250,000

Kakelo Mixed Secondary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of Classrooms And Lab
output
Renovated Classrooms & Lab.
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 2,150,000

Nyalenda Secondary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Laboratory & Purchase Of Equipment
output
For Good Performance In Science Subjects.
implementation status
Incomplete
total cost
Ksh 1,100,000
estimate
Ksh 900,800

Kotienditi Secondary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Lib. & 2 Classrooms
output
Imrpove Learning Environment
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,587,600

Bongu-God Ber Bridge

location
Kakelo (in Kasipul Kabondo)
year first funded
2009
action
Construction Of A Bridge.
output
Improved Infrastructure
implementation status
Not Yet Started
total cost
Ksh 1,000,000
estimate
Ksh 0

Pukamo Dairy Project

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Dairy Cooler
output
Dairy Cooler
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,303,411

Ragwe Dispensary

location
Kodera (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,690,000

St. Mary's Anding'o Girls

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Tuition Blocks
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,450,640

Nyagowa Lutheran Secondary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 780,000

Kamosi Pan

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Adwoyo Pan

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Nyangiela Health Centre

location
Konuonga (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 950,000
estimate
Ksh 1,040,000

Ogera Farmers Coop Society

location
Kojwach (in Kasipul Kabondo)
year first funded
2006
action
Repair Of Coffee Bed And Seedlings Project
output
Improve Cash Crop Production.
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 1,500,000

St. Peters Kotieno Secondary School

location
Kokech (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Laboratory & 1 Newest Classroom
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 957,250

Pala Farmers Co-P

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Repair Of Coffee Bed And Seedlings Project
output
Improve Cash Crop Production.
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 800,000

Kangode Bridge

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Bridge. Construction Of Box Culvert.
output
Improved Infrastructure
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 4,135,000

Orinde Farmers Co-P

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Repair Of Coffee Bed And Seedlings Project
output
Imrpove Cash Crop Production
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 800,000

Ayoro Farmers Co-P

location
Kowidi (in Kasipul Kabondo)
year first funded
2006
action
Repair Of Coffee Bed And Seedlings Project
output
Improve Cash Crop Production.
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 800,000

St. Anns Ojwando Girls Secondary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms & Construction Of 4 Classrooms, Laboratory, Admin Block & 8 Door Latrine
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 500,000

Sino Sda Secondary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 850,000
estimate
Ksh 1,450,000

Kasipul Division Offices

location
Kowidi (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of Office & Renovation Of Floor Using Emergency Funds
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 1,800,000

Kokwanyo Secondary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction of Twin Lab.
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 850,000
estimate
Ksh 1,227,129

Kimonge Dispensary

location
East Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Completion Of Wards
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Orembe Bridge

location
East Kamagak (in Kasipul Kabondo)
year first funded
2009
action
Construction Of A Bridge
output
Improved Infrastructure
implementation status
Not Yet Started
total cost
Ksh 800,000
estimate
Ksh 0

Nyamwaga Secondary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Lab.
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 2,900,000

Kauma Dispensary

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Treatment Rooms + Completion Of 2 Observation Rooms & Male Ward
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 1,650,550

Owiro Secondary School

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Newest Lab
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 1,500,780

Saye Secondary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Water Tank
output
Improved Sanitation
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 980,000

Mithui Secondary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Twin Lab
output
Improve Performance Of Science Subjects.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 1,276,528

Kokwanyo Health Centre

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Newest Wards
output
Improve Health Care.
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 1,771,200

Kabondo Farmers Co-P Society

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Repair Of Coffee Bed And Seedlings Project
output
Improve Cash Crop Production.
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 1,150,402

God Ber Secondary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2007
action
Construction Of Tuition Block, 4 Classrooms, Laboratory,Staffhouse & Adm Block.
output
Improve The School Facilities.
implementation status
Laboratory & Staff House Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Waradho Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 4Newest Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 1,800,000

Agawo Dispensary

location
East Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 2,638,043

Nyandiwa Secondary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Lab & 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomple
total cost
Ksh 750,000
estimate
Ksh 1,450,000

Awach Dispensary

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Dispensary. Construction Of Placenta Pit, Veranda Lobby & Fencing.
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 750,000
estimate
Ksh 1,850,000

St. Teresa Nyalgosi Girls Secondary School

location
Kachien (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 3 Newest Classrooms
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 840,000

God Ber Dispensary

location
Kakelo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Newest Wards
output
Improve Health Care.
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Kasewe Dispensary

location
Kasewe (in Kasipul Kabondo)
year first funded
2005
action
n/a
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 1,455,800

Atemo Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Laboratory
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 1,250,000

Got Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Othoro Secondary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Staff Twin Houses
output
Provision Of Accommodation For Teachers
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 2,543,720

Ayoro Kowin Bridge

location
West Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Construction Of A Newest Bridge. Completion Of Bridge (Backfilling, Rials & River Diversion)
output
Improved Infrastructure
implementation status
Incomplete
total cost
Ksh 699,660
estimate
Ksh 550,000

Kokech Health Centre

location
Kokech (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Dispensary.
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 650,000
estimate
Ksh 1,430,000

Othoro Health Centre

location
Wangchieng (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Newest Wards
output
Hospital Wards
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 454,300

Kokech Chiefs Offices

location
Kokech (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Newest Offices. Completion (Painting & Finishing)
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 860,000

Nyangiela Admpolice Post

location
Konuonga (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Ap Quarters.
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 990,000

Mithui Primary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 900,700

Otula Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 980,000

God Miaha Pri, School

location
Ramba (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 970,000

Kango Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 960,000

Nyatindo Secondary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Admin Office
output
For Good And Effective Working Environment.
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,180,600

Kalando Secondary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Lab & Classrooms
output
Improve School Learning Facilities
implementation status
Lab Incomplete
total cost
Ksh 600,000
estimate
Ksh 1,430,000

St. Joseph Sino Secondary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Completion Of Labaratory
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 800,000

Kachieng Mixed Secondary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 460,000

Nyatwere Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 1,357,020

Nyalgosi Health Centre

location
Kachien (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of Dispensary & Water Tank Installation.
output
Improve Health Care.
implementation status
Complete & Water Tank Installation Ongoing
total cost
Ksh 600,000
estimate
Ksh 980,000

Kitare Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 3,183,409

Dudu Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of Classrooms & Construction Of Newest Classrooms
output
Improve Learning Facilities
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 1,550,000

Apondo Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 919,572

Ogilo Secondary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Water Tank & Construction Of Twin Houses
output
Improve School Sanitation
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 480,000

Rawinji Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms + Construction Of 2 Class
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 560,000
estimate
Ksh 800,000

Kachien Resource Centre

location
Kachien (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Resource Centre
output
Resource Centres To Host Cultural Events.
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 1,850,000

Yala Secondary School

location
Kokech (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 2 Classrooms & Construction Of 4 Classrooms, Admin Block & 8-Door Latrine
output
Improve Learning Facilities
implementation status
Incomplete
total cost
Ksh 550,000
estimate
Ksh 850,000

Kosira Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Completion Of Adm. Offices + Re-Roofing Of 8 Classrooms, Re-Carpeting, Wall Renovation & veranda erection
output
Good Working Environment For The Teachers
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 700,000

Jwelu Pri, School

location
Ramula (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 550,000
estimate
Ksh 640,000

Kwoyo Secondary School

location
Kokech (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Admin Office
output
For Good And Effective Working Environment.
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 2,543,720

Kamuga Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2006
action
Roofing 3 Classrooms
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 680,000

Kokech Konuonga Piped Waterline

location
Kokech (in Kasipul Kabondo)
year first funded
2008
action
Extension Of Piped Water
output
Improved Sanitation
implementation status
Not Yet Started
total cost
Ksh 500,000
estimate
Ksh 0

Bonge Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 601,060

God Agulu Secondary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Classroom
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 400,000

Awuoro Primary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Adm. Offices
output
Good Working Environment For The Teachers
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 900,000

Nyahera Primary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 580,000

Buoye Secondary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Lab
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,690,000

Kowidi Resource Centre

location
Kowidi (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Resource Centre
output
Resource Centres To Host Cultural Events.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,980,000

God Nyango Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 748,500

Kosele Dispensary

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Newest Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 957,250

Omiro Dispensary

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Kabongo Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 780,000

Gweno Kipodi Primary School

location
Ramula (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 990,000

Kowidi Primary School

location
Ramula (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 980,000

Oyugis Juakali Electricity

location
West Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Power Installation
output
Improve Infrastructure
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,611,000

Wire Complex Water Project

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Pala Secondary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 400,000

Katanga Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2004
action
Construction of 2 Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,367,000

Dol Kodera Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Roofing Of 2 Classrooms & Office
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 702,600

Nyakwaka Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 5 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Kojwach Resource Centre

location
Kojwach (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Resource Centre
output
Resource Centres To Host Cultural Events.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,352,441

Kojwach Piped Water Supply

location
Kojwach (in Kasipul Kabondo)
year first funded
2008
action
Extension Of Piped Water
output
Improved Sanitation
implementation status
Not Yet Started
total cost
Ksh 500,000
estimate
Ksh 0

Kakelo Technical Awach/Kokwanyo

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Construction oof Newest Road
output
Improved Infrastructure
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Adega Secondary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Lab & Matrons House
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,800,000

Mumbo Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 2,851,675

Ondiwa Gamba Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Labour Cost For Co-Funding With Good News Trust Uk For Construction Of 4 Newest Class
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 910,000

Ojuando Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Adm. Offices & Construction Of 8 New Classrooms, Admin Block, 8-Door Toilet & Erection Of Water Tank
output
Adm.Offices, 8 Classrooms ,8 Door Pit Latrine & Water Tank
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 960,000

Manganga Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 845,000

Kayoma Bridge

location
Kachien (in Kasipul Kabondo)
year first funded
2007
action
Construction Of Culverts
output
Improved Infrastructure
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Alero Nanga Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 487,821
estimate
Ksh 900,000

Omolo Mado Primary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2008
action
Completion Of Roofing + Construction Of 6 Newest Classroom, 8-Door Latrine & Water Tank.
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 460,000
estimate
Ksh 900,000

Dudi Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 450,000
estimate
Ksh 2,080,000

Opondo Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 5 Newest Classrooms
output
Good Learning Environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 1,690,000

Nyalenda Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 700,000

Aramo Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 620,080

Yadhwelo Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2009
action
Labour Cost For Construction Of 8 Classrooms, 8 Door Toilet & Erection Of Water Tank.
output
Improve Learning Environment.
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 500,000

Kilusi Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 980,000

Suna Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Adm. Offices
output
Good Working Environment For Teachers
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 950,000

Awuor Dimo Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 1,200,000

Odino Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 800,000

Opanga Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 720,000

Kabondo Dos Residence

location
Ramula (in Kasipul Kabondo)
year first funded
2009
action
Construction Of Dos Residence.
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 0

Ramula Chiefs Office

location
Ramula (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Chief'S Offices
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 450,000

Nyandiwa Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of 9 Class
output
Good Learning Environment.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 500,000

Obisa Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 900,000

Agoro Sare Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Classrooms + Repair Of Floor, Walls, Doors, Windows, Veranda for 8 Classrooms & Admin. Office.
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 945,876

Obisa Mixed Secondary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Completion Of 2 Classrooms & Construction Of 1 Newest Classroom
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 1,670,000

Anyona Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 1 Newest Classroom
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 748,500

Aolo Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of 9 Classrooms And Lab
output
Good Learning Environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 840,000

Simbiri Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 557,250

Ngulu Primary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2004
action
Construction of Admin Office
output
Good Working Environment For Teachers
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 800,000

Nyangiela Secondary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Lab.And Electricity
output
Improve Performance Of Science Subjects.
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 1,200,000

Nyimbi Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of 5 Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 980,000

Umai Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of 3 Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 750,000

Nyanduma Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Adm. Offices
output
Good Working Environment For Teachers
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 800,000

Mirondo Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Admin Office
output
Good Working Environment For Teachers
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 1,800,000

Rungu Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Adm. Offices
output
Admin Office
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 3,300,000

God Kwach Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 680,000

Nyakiya Secondary School

location
Kodera (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Laboratory
output
For Good Performance In Science Subjects.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 750,000

Wirabuor Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 4 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 900,000

Nandi Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 1,367,000

Ober Mxed Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2007
action
Renovation Of 8 Classrooms & Construction Of A School Kitchen Using Emergency Funds
output
Imrpove Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 500,000

Gangre Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 1 Newest Classroom & Construction Of A School Kitchen Using Emergency Funds
output
Improve Learning Environment
implementation status
Classroom Complete & Kitchen Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,240,000

Ragogo Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 4 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 1,980,000

Kombaka Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 533,220

Ochunyno Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 400,000
estimate
Ksh 1,600,000

Agawo Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Fence, Toilet, Renov. Of 4 Classrooms
output
Improve Facilities In School
implementation status
Complete
total cost
Ksh 390,000
estimate
Ksh 680,000

Masogo Dispensary

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Medical Block
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 3,580,000

D Office Rachuonyo

location
North Kamagak (in Kasipul Kabondo)
year first funded
2003
action
Furnishing Of Dc Office
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 600,000

Mititi Secondary School

location
Kodera (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Dormitory
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 997,210

Nyarabi Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 587,600

Ombek Secondary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 997,000

Kaluoch Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 700,000

Karabok Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 800,000

Oriri Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,200,000

Saramba Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 700,000

God Ber Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of 2 Classrooms & Construction Of A School Kitchen Using Emergency Funds
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 702,600

Riwo Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improved Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 500,000

Omiro Youth Polytechnic

location
Kakelo (in Kasipul Kabondo)
year first funded
2008
action
Construction Of Workshop
output
Improve Learning Environment
implementation status
Const.On Going
total cost
Ksh 300,000
estimate
Ksh 0

Karoko Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,277,400

Chagere Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 2,512,720

Ayiengo Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 5 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,130,000

Kanyangwara Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 690,870

Nyasore Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Facilities
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,200,000

Osuri Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 748,500

Ombek Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,184,000

Kodera Forest Coservation

location
Kodera (in Kasipul Kabondo)
year first funded
2004
action
Afforestation
output
Water Catchment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 350,000

God Agak Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Njura Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment.
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 657,000

Otel Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Good Working Environment For Teachers
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 658,070

Kojwach Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 853,829

Ratila Bridge

location
Kojwach (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Connecting Bridge
output
Improved Infrastructure
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 1,900,000

Oriwo Youth Polytechnic

location
Kojwach (in Kasipul Kabondo)
year first funded
2008
action
Purchase Of Tools & Equipment
output
Improve Learning Environment
implementation status
Const.On Going
total cost
Ksh 300,000
estimate
Ksh 0

Kotieno Dok Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2004
action
Fencing & Renovation Of 8 Classrooms
output
Good Learning Environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 560,000

Kasimba Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Adm. Offices
output
Good Working Environment For Teachers
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 860,000

Kokech Resource Centre

location
Kokech (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Chief'S Offices
output
Resource Centre To Host Cultural Evnts.
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 500,000

Komolo Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 756,600

Ogilo Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 860,500

St. Dislaus Nyawango Secondary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,342,000

Ogilo Culverts Project

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Culverts
output
Improved Infrastructure
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 1,400,000

Ondiko Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Adm. Offices
output
Good Working Environment For The Teachers
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 980,000

Got Kagumbo Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 4 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 865,000

Nyagowa Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Adm.Offices
output
Improved Working Environment For Teachers.
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 940,000

Kowidi Chief's Office

location
Kowidi (in Kasipul Kabondo)
year first funded
2007
action
Construction Of Chief'S Offices
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Kosele Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Renovation Of 4 Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 1,250,600

Saye Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 865,200

Nyafare Primary School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Teachers Houses And Fencing
output
Improved School Facilities
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 340,000

Ongoro Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Admin Block
output
Improved School Facilities
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 860,000

Kabondo Ramba Chief's Offices

location
Ramba (in Kasipul Kabondo)
year first funded
2004
action
Completion Of Chief'S Office. Completion (Painting & Fittings)
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 702,600

Kolal Elck Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2008
action
Construction of 1 Classroom
output
Improve Learning Environment
implementation status
Const.On Going
total cost
Ksh 300,000
estimate
Ksh 0

Kabondo Centre Ap Line

location
Ramula (in Kasipul Kabondo)
year first funded
2009
action
Construction Of Ap Quarters.
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
funds required
total cost
Ksh 300,000
estimate
Ksh 0

Oyugis Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Completion Of Adm. Offices
output
Administration Block
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 250,000

Agoro Sare Mixed Secondary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2009
action
Construction Of 4 Newest Classrooms, Administration Block, Laboratory, 8 Door Latrines & Water Tank.
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 584,000

Pala Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 2 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,350,000

Ongujo Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Incomplete
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 1,430,000

Othoro Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Completion Of 2 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 702,600

Nyandiwa Dispensary

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 250,000
estimate
Ksh 1,450,000

Manga Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 250,000
estimate
Ksh 680,000

Kojwach Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 240,000
estimate
Ksh 300,000

Njura Water Project

location
Kakelo (in Kasipul Kabondo)
year first funded
2009
action
Electrification Of Water Borehole
output
Improved Sanitation
implementation status
Not Yet Started
total cost
Ksh 200,000
estimate
Ksh 0

Kakelo Chief's Office

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of Chief'S Office. Completion (Painting & Fittings)
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,200,000

Omiro Secondary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2009
action
Rehabilitation Of 3 Classrooms (Floor Works, Painting & Fittings.
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Kotienditi Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 1 Newest Classroom
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 1,587,600

Ogenga Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 500,062

Kogalo Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Completion Of Classrooms
output
Improve Learning Facilities
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 2,290,900

Got Rateng Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 702,600

Atono Nursery School

location
Kodera (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 1,748,000

Magungu Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Adm. Block
output
Good Working Environment For Teachers
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 655,800

Nyambare Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 680,190

Kalanding Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 962,500

Mititi Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 510,000

Dol-Kodera Secondary School

location
Kodera (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 404,000

Ombek Resource Centre

location
Kodera (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Chief'S Offices
output
Resource Centre To Host Cultural Evnts.
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 450,000

Orinde Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 3 Newest Classrooms
output
Good Learning Environment.
implementation status
Incomplete.
total cost
Ksh 200,000
estimate
Ksh 2,100,000

Harambee Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2005
action
Renovation Of 9 Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 280,000

Ogera Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 416,000

Ringa Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 500,000

Nyaluru Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Adm. Offices
output
Adm.Offices
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,172,760

Ringa Boys Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2004
action
Roofing Of Dormitory
output
Improve School Facilities
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 1,516,000

Harambee Secondary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Classroom
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 400,000

Apondo Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Library Cum Adm.Block
output
Improved School Facilities
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,153,580

Yala Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2004
action
Renovation Of Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 950,000

Nyawango Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of Tuition Block
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 227,400

Kokwanyo Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 680,580

Angino Mixed Secondary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Staff Houses
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,400,000

Kokwanyo Chief's Office

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2005
action
Roofing Of Office. Completion (Painting & Fittings)
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 765,900

Tala Dispensary

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2009
action
Completion Of Dispensary Block Currenly At Windowest Level
output
Improve Health Care Of The People.
implementation status
in use
total cost
Ksh 200,000
estimate
Ksh 0

Kanga Omuga Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 850,000

God Agulu Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of 6 Classrooms And Lab
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 500,000

Nyangiela Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2007
action
Renovation Of Tuition Block
output
Improve Working Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 600,000

Nyagowa Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2007
action
Renovation Of Tuition Block
output
Improve Working Envioronment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 800,000

Buoye Primary School

location
Kowidi (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,350,000

North Kamagak Chief's Office

location
North Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Renovation Of Office
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 940,000

Yadh Welo Nursery School

location
North Kamagak (in Kasipul Kabondo)
year first funded
2008
action
Construction Of 1 Class
output
Improve Learning Environment
implementation status
Const.On Going
total cost
Ksh 200,000
estimate
Ksh 0

Masogo Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2005
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 870,530

Owiro Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 680,000

Kogolla Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 3,183,409

Kilusi Secondary School

location
Ramba (in Kasipul Kabondo)
year first funded
2009
action
Rehabilitation Of 2 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 400,000

Wire Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of Class
output
13 Renovated Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 600,000

Ranyienya Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 2,543,720

Wkamagak Water Catchment

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Water Catchment
output
Water Catchment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 500,000

Alaro Water And Soil Conservation

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Water/Soil Convservation
output
Improving Soil Conservation.
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 350,000

Sino Doh Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 4 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,276,528

Kachieng Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2009
action
Rehabilitation Of 8 Classrooms (Re-Carpeting Of Floors, Re-Painting)
output
Improve School Learning Facilities
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Nyalgosi Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 300,000

Kaditonge Primary School

location
Kachien (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 600,000

Cfa Kafoma

location
Kachien (in Kasipul Kabondo)
year first funded
2007
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 400,000

Ranena Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of 4 Newest Classrooms
output
Good Learning Environment
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 1,430,000

Nyabondo Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of 9 Class
output
Improved School Facilities
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 680,000

Siany Community Water Project

location
North Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Drilling Of Boreholes
output
Potato Shed
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 400,000

Sowacko Tea

location
Kakelo (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Tea Nurseries
output
Tea Shed
implementation status
Incomplete
total cost
Ksh 150,000
estimate
Ksh 2,500,000

East Kamagak Chief's Office

location
East Kamagak (in Kasipul Kabondo)
year first funded
2005
action
Renovation Of Office
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 150,000
estimate
Ksh 680,000

St. Vincent Secondary School

location
Kachien (in Kasipul Kabondo)
year first funded
2005
action
1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 480,000

Kachien Locational Offices

location
Kachien (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Chief'S Offices
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 800,000

Kakelo Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 500,000

Ober Boys Boarding

location
Kakelo (in Kasipul Kabondo)
year first funded
2007
action
Renovation Of The Dormitory Roof.
output
Imrpove School Facilities
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 1,200,000

Ober Health Centre

location
Kakelo (in Kasipul Kabondo)
year first funded
2007
action
Installation Of Electricity & Wiring.
output
Improve Hospital Facilities
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 400,000

Omiro Primary School

location
Kakelo (in Kasipul Kabondo)
year first funded
2008
action
Construction Of A School Kitchen Using Emergency Funds
output
Improve Learning Environment
implementation status
Const.On Going
total cost
Ksh 100,000
estimate
Ksh 0

Adega Primary School

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Desks, Wiring Completion
output
Improved Learning Facilities
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 2,664,000

Kasewe Chief's Office

location
Kasewe (in Kasipul Kabondo)
year first funded
2006
action
Improve Administrative Facilities To Provide Good Services To The People.
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 450,800

Makaa Agroforestry

location
Kasewe (in Kasipul Kabondo)
year first funded
2007
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 300,000

Nyakiya Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 500,000

Atono Primary School

location
Kodera (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 3 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 1,048,000

Atemo Primary School

location
Kojwach (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 500,000

Kojwach Sweet Potatoes

location
Kojwach (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Potato Shed
output
Potato Shed
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 300,000

Kwoyo Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 650,000

Mawira Primary School

location
Kokech (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 5 Door Toilets
output
Improved Sanitation
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Anding'o Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2007
action
Construction Of Adm Block
output
Good Working Environment For Teachers
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 400,000

Angino Primary School

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2007
action
Construction Of 2 Newest Classrooms
output
Improve Learning Facilities
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 600,000

Kokwanyo Bridge

location
Kokwanyo (in Kasipul Kabondo)
year first funded
2004
action
Construction Of Bridge
output
Improved Infrastructure
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 556,250

Konuonga Tree Nursery

location
Konuonga (in Kasipul Kabondo)
year first funded
2008
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Const.On Going
total cost
Ksh 100,000
estimate
Ksh 0

Kosele United Youth

location
North Kamagak (in Kasipul Kabondo)
year first funded
2008
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Not Yet Started
total cost
Ksh 100,000
estimate
Ksh 0

Kauma Primary School

location
Ramba (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 2 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 738,000

Kilusi Tree Nursery Project

location
Ramba (in Kasipul Kabondo)
year first funded
2008
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Const.On Going
total cost
Ksh 100,000
estimate
Ksh 0

Ramula Tree Nursery Project

location
Ramula (in Kasipul Kabondo)
year first funded
2008
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Const.On Going
total cost
Ksh 100,000
estimate
Ksh 0

Wire Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Renovation Of 1 Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 650,000

Bung Kich Road

location
West Kamagak (in Kasipul Kabondo)
year first funded
2004
action
Repair Of Culverts
output
Improve Infrastructure
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 997,210

Rongo Primary School

location
West Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Labour Cost For Toilets & Classrooms
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 600,000

Nyamwaga Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Fencing
output
Improve School Facilities
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Wangchieng Locational Offices

location
Wangchieng (in Kasipul Kabondo)
year first funded
2005
action
Completion Of Chief'S Office & Toiletes
output
Improve Administrative Facilities To Provide Good Services To The People.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 300,000

Kasewe Resource Centre

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Resource Centre
output
Resource Centre To Host Cultural Evnts.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 640,000

Otondo Dispensary

location
Wangchieng (in Kasipul Kabondo)
year first funded
2007
action
Completion Of The Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 870,000

Otondo Dispensary

location
Wangchieng (in Kasipul Kabondo)
year first funded
2007
action
Completion Of Dispensary
output
Improve Health Care.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 400,000

Lwanda Basi Bridge

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Construction Of Newest Bridge
output
Improved Infrastructure
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 300,000

Nyapalo Sweet Potatoes

location
Wangchieng (in Kasipul Kabondo)
year first funded
2005
action
Construction Of Potato Shed
output
Potato Shed
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 300,000

Otondo Primary School

location
Wangchieng (in Kasipul Kabondo)
year first funded
2006
action
Fencing
output
Improve School Facilities
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kalando Primary School

location
East Kamagak (in Kasipul Kabondo)
year first funded
2006
action
Construction Of 1 Newest Classrooms
output
Improve Learning Environment
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 350,000

Bidii Tree Nursary

location
East Kamagak (in Kasipul Kabondo)
year first funded
2007
action
Tree Nursery
output
Improving Environmental Conservation.
implementation status
Incomplete
total cost
Ksh 100,000
estimate
Ksh 200,000

Nyabola Primary School

location
Konuonga (in Kasipul Kabondo)
year first funded
2007
action
Renovation
output
Improve School Facilities
implementation status
Incomplete
total cost
Ksh 50,000
estimate
Ksh 500,000

St. Francis Of Assisi

location
Kowidi (in Kasipul Kabondo)
action
Construction Of Latrines
output
Improve Sanitation
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 70,000

Nyadero Water Pan

location
Kachien (in Kasipul Kabondo)
action
Drilling Of Boreholes
output
Improved Sanitation
implementation status
Incomplete
total cost
Ksh 0
estimate
Ksh 2,443,400