It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Rachuonyo District Hospital
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Maternity Wards & Construction Of Amenity Ward.
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 5,389,863
- estimate
- Ksh 4,830,000
Nyangiela Secondary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Purchase Of School Bus
- output
- Improve School Exchange Programmes
- implementation status
- Bus Purchased
- total cost
- Ksh 3,850,000
- estimate
- Ksh 0
Ringa Boys Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Purchase Of School Bus
- output
- Improve School Exchange Programmes
- implementation status
- Bus Purchased
- total cost
- Ksh 3,850,000
- estimate
- Ksh 0
Wire Secondary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Purchase Of School Bus
- output
- Improve School Exchange Programmes
- implementation status
- Bus Purchased
- total cost
- Ksh 3,550,000
- estimate
- Ksh 0
West Kasipul Electiricty
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Power Installation
- output
- Improve Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 3,370,000
- estimate
- Ksh 5,200,000
Wire Secondary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renov.Of Dorm,Office& Classrooms
- output
- Improve The School Facilities.
- implementation status
- Complete
- total cost
- Ksh 3,091,457
- estimate
- Ksh 1,500,000
Nyamwaga Bridge Road
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Newest Bridge & Laying Of Deck
- output
- Improved Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 2,970,000
- estimate
- Ksh 5,597,995
St. Teresas Opanga Secondary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Adm. Block & Co-Funding For A Bus Project With Pta School Bus Project
- output
- Improve Working Environment For Teachers. & Improve School Exchange Programmes
- implementation status
- Incomplete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 3,500,000
Kabondo Silk Project
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Factory Construction
- output
- Factory
- implementation status
- Incomplete
- total cost
- Ksh 2,168,530
- estimate
- Ksh 2,728,620
Mititi Secondary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Co-Funding For A Bus Project With Pta
- output
- Improve School Exchange Programmes
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Karabok Secondary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Co-Funding For A Bus Project With Pta
- output
- Improve School Exchange Programmes
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Ober Boys Boarding
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Co-Funding For A Bus Project With Pta
- output
- Improve School Exchange Programmes
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Got Rateng Secondary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Co-Funding For A Bus Project With Pta
- output
- Improve School Exchange Programmes
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Rawinji Resource Centre
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Resource Centre
- output
- Resource Centres To Host Cultural Events.
- implementation status
- Incomplete
- total cost
- Ksh 1,820,000
- estimate
- Ksh 2,500,000
North Kamagak Rural Water
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,600,000
Rangwe Onjinyo Road
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Road
- output
- Improved Infrastructure
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 4,596,000
Nyasore Secondary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Laboratory
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 1,770,000
- estimate
- Ksh 250,000,000
Ramula Health Centre
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Wiring Of Adm. Block .& Construction Of Male Block.
- output
- Wired Adm. Block For Improved Healthcare.
- implementation status
- Incomplete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,900,000
Kabondo Divisional Headquaters
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Divisional Office Block
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,250,000
Ober Secondary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Completing Of Laboratory
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 1,520,000
- estimate
- Ksh 1,980,000
Ringa Girls Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Newest Tuition & Adm.Block
- output
- Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 1,509,150
- estimate
- Ksh 5,200,000
Kosele Water Borehole
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,600,000
Kulogwen Water Borehole
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,500,000
Kamai Water Borehole
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,800,000
Ongoro Water Borehole
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,700,000
Agoro Sare Secondary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Admin Office
- output
- For Good And Effective Working Environment.
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,450,000
Abura Bridge & Road
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Newest Bridge
- output
- Improved Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 480,000
Nyahera Girls Secondary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Toilets & 4 Classrooms
- output
- Improve Learning Environment & Sanitation.
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,900,000
Kowidi Secondary School
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Newest Laboratory
- output
- Improved Performance In Science Subjects.
- implementation status
- Complete
- total cost
- Ksh 1,320,000
- estimate
- Ksh 1,850,000
Dudi Girls Secondary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Admin Block
- output
- Improved Working Environment For Teachers.
- implementation status
- Incomplete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,850,000
Ombek Dispensary
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Newest Wards. Completion Of Labour Ward
- output
- Improve Health Care Of The People.
- implementation status
- Incomplete
- total cost
- Ksh 1,270,000
- estimate
- Ksh 1,771,200
Sino Dispensary
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Staff Quarter & Construction Of Newest Wards. Completion Of Ward (Plastering &Painting)
- output
- Improve Health Care Of The People.
- implementation status
- Complete
- total cost
- Ksh 1,220,000
- estimate
- Ksh 4,975,687
Otunga Water Project
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Electrification Of Water Borehole
- output
- Improved Sanitation
- implementation status
- in use PTA/CDF
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Got Rateng Secondary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Lab.
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 1,187,360
- estimate
- Ksh 1,200,000
Koywech Dispensary
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Dispensary (Wall & Floor, Plastering & Painting)
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,200,000
Karabok Secondary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Construction Of Adm. Block
- output
- Improve Working Environment For Teachers.
- implementation status
- Admin. In Progress.
- total cost
- Ksh 1,120,000
- estimate
- Ksh 1,250,000
Kakelo Mixed Secondary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of Classrooms And Lab
- output
- Renovated Classrooms & Lab.
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,150,000
Nyalenda Secondary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Laboratory & Purchase Of Equipment
- output
- For Good Performance In Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 900,800
Kotienditi Secondary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Lib. & 2 Classrooms
- output
- Imrpove Learning Environment
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,587,600
Bongu-God Ber Bridge
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Construction Of A Bridge.
- output
- Improved Infrastructure
- implementation status
- Not Yet Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Pukamo Dairy Project
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Dairy Cooler
- output
- Dairy Cooler
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,303,411
Ragwe Dispensary
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,690,000
St. Mary's Anding'o Girls
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Tuition Blocks
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,450,640
Nyagowa Lutheran Secondary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 780,000
Kamosi Pan
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Adwoyo Pan
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Nyangiela Health Centre
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 950,000
- estimate
- Ksh 1,040,000
Ogera Farmers Coop Society
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Repair Of Coffee Bed And Seedlings Project
- output
- Improve Cash Crop Production.
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
St. Peters Kotieno Secondary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Laboratory & 1 Newest Classroom
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 957,250
Pala Farmers Co-P
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Repair Of Coffee Bed And Seedlings Project
- output
- Improve Cash Crop Production.
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 800,000
Kangode Bridge
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Bridge. Construction Of Box Culvert.
- output
- Improved Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 4,135,000
Orinde Farmers Co-P
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Repair Of Coffee Bed And Seedlings Project
- output
- Imrpove Cash Crop Production
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 800,000
Ayoro Farmers Co-P
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Repair Of Coffee Bed And Seedlings Project
- output
- Improve Cash Crop Production.
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 800,000
St. Anns Ojwando Girls Secondary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms & Construction Of 4 Classrooms, Laboratory, Admin Block & 8 Door Latrine
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 900,000
- estimate
- Ksh 500,000
Sino Sda Secondary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,450,000
Kasipul Division Offices
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of Office & Renovation Of Floor Using Emergency Funds
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,800,000
Kokwanyo Secondary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction of Twin Lab.
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,227,129
Kimonge Dispensary
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Completion Of Wards
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Orembe Bridge
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Construction Of A Bridge
- output
- Improved Infrastructure
- implementation status
- Not Yet Started
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Nyamwaga Secondary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Lab.
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 2,900,000
Kauma Dispensary
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Treatment Rooms + Completion Of 2 Observation Rooms & Male Ward
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,650,550
Owiro Secondary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Newest Lab
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,500,780
Saye Secondary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Water Tank
- output
- Improved Sanitation
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 980,000
Mithui Secondary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Twin Lab
- output
- Improve Performance Of Science Subjects.
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,276,528
Kokwanyo Health Centre
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Newest Wards
- output
- Improve Health Care.
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 1,771,200
Kabondo Farmers Co-P Society
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Repair Of Coffee Bed And Seedlings Project
- output
- Improve Cash Crop Production.
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,150,402
God Ber Secondary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of Tuition Block, 4 Classrooms, Laboratory,Staffhouse & Adm Block.
- output
- Improve The School Facilities.
- implementation status
- Laboratory & Staff House Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Waradho Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 4Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,800,000
Agawo Dispensary
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 800,000
- estimate
- Ksh 2,638,043
Nyandiwa Secondary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Lab & 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomple
- total cost
- Ksh 750,000
- estimate
- Ksh 1,450,000
Awach Dispensary
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Dispensary. Construction Of Placenta Pit, Veranda Lobby & Fencing.
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 750,000
- estimate
- Ksh 1,850,000
St. Teresa Nyalgosi Girls Secondary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 3 Newest Classrooms
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 840,000
God Ber Dispensary
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Newest Wards
- output
- Improve Health Care.
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Kasewe Dispensary
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- n/a
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,455,800
Atemo Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,250,000
Got Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Othoro Secondary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Staff Twin Houses
- output
- Provision Of Accommodation For Teachers
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 2,543,720
Ayoro Kowin Bridge
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of A Newest Bridge. Completion Of Bridge (Backfilling, Rials & River Diversion)
- output
- Improved Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 699,660
- estimate
- Ksh 550,000
Kokech Health Centre
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Dispensary.
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 650,000
- estimate
- Ksh 1,430,000
Othoro Health Centre
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Newest Wards
- output
- Hospital Wards
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 454,300
Kokech Chiefs Offices
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Newest Offices. Completion (Painting & Finishing)
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 860,000
Nyangiela Admpolice Post
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Ap Quarters.
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 990,000
Mithui Primary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 900,700
Otula Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 980,000
God Miaha Pri, School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 970,000
Kango Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 960,000
Nyatindo Secondary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Admin Office
- output
- For Good And Effective Working Environment.
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,180,600
Kalando Secondary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Lab & Classrooms
- output
- Improve School Learning Facilities
- implementation status
- Lab Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,430,000
St. Joseph Sino Secondary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Completion Of Labaratory
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Kachieng Mixed Secondary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 460,000
Nyatwere Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,357,020
Nyalgosi Health Centre
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of Dispensary & Water Tank Installation.
- output
- Improve Health Care.
- implementation status
- Complete & Water Tank Installation Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 980,000
Kitare Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 3,183,409
Dudu Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of Classrooms & Construction Of Newest Classrooms
- output
- Improve Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,550,000
Apondo Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 919,572
Ogilo Secondary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Water Tank & Construction Of Twin Houses
- output
- Improve School Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 480,000
Rawinji Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms + Construction Of 2 Class
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 560,000
- estimate
- Ksh 800,000
Kachien Resource Centre
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Resource Centre
- output
- Resource Centres To Host Cultural Events.
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,850,000
Yala Secondary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms & Construction Of 4 Classrooms, Admin Block & 8-Door Latrine
- output
- Improve Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 850,000
Kosira Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Completion Of Adm. Offices + Re-Roofing Of 8 Classrooms, Re-Carpeting, Wall Renovation & veranda erection
- output
- Good Working Environment For The Teachers
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Jwelu Pri, School
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 550,000
- estimate
- Ksh 640,000
Kwoyo Secondary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Admin Office
- output
- For Good And Effective Working Environment.
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 2,543,720
Kamuga Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Roofing 3 Classrooms
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 680,000
Kokech Konuonga Piped Waterline
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Extension Of Piped Water
- output
- Improved Sanitation
- implementation status
- Not Yet Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Bonge Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 601,060
God Agulu Secondary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 400,000
Awuoro Primary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Adm. Offices
- output
- Good Working Environment For The Teachers
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Nyahera Primary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 580,000
Buoye Secondary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Lab
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,690,000
Kowidi Resource Centre
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Resource Centre
- output
- Resource Centres To Host Cultural Events.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,980,000
God Nyango Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 748,500
Kosele Dispensary
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Newest Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 957,250
Omiro Dispensary
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Kabongo Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 780,000
Gweno Kipodi Primary School
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 990,000
Kowidi Primary School
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 980,000
Oyugis Juakali Electricity
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Power Installation
- output
- Improve Infrastructure
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,611,000
Wire Complex Water Project
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Pala Secondary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 400,000
Katanga Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,367,000
Dol Kodera Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Roofing Of 2 Classrooms & Office
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 702,600
Nyakwaka Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Kojwach Resource Centre
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Resource Centre
- output
- Resource Centres To Host Cultural Events.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,352,441
Kojwach Piped Water Supply
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Extension Of Piped Water
- output
- Improved Sanitation
- implementation status
- Not Yet Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kakelo Technical Awach/Kokwanyo
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction oof Newest Road
- output
- Improved Infrastructure
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Adega Secondary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Lab & Matrons House
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,800,000
Mumbo Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 2,851,675
Ondiwa Gamba Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Labour Cost For Co-Funding With Good News Trust Uk For Construction Of 4 Newest Class
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 910,000
Ojuando Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Adm. Offices & Construction Of 8 New Classrooms, Admin Block, 8-Door Toilet & Erection Of Water Tank
- output
- Adm.Offices, 8 Classrooms ,8 Door Pit Latrine & Water Tank
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 960,000
Manganga Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 845,000
Kayoma Bridge
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of Culverts
- output
- Improved Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Alero Nanga Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 487,821
- estimate
- Ksh 900,000
Omolo Mado Primary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Completion Of Roofing + Construction Of 6 Newest Classroom, 8-Door Latrine & Water Tank.
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 460,000
- estimate
- Ksh 900,000
Dudi Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 2,080,000
Opondo Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 5 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,690,000
Nyalenda Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Aramo Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 620,080
Yadhwelo Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Labour Cost For Construction Of 8 Classrooms, 8 Door Toilet & Erection Of Water Tank.
- output
- Improve Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Kilusi Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 980,000
Suna Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Adm. Offices
- output
- Good Working Environment For Teachers
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 950,000
Awuor Dimo Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,200,000
Odino Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Opanga Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 720,000
Kabondo Dos Residence
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Construction Of Dos Residence.
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ramula Chiefs Office
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Chief'S Offices
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Nyandiwa Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of 9 Class
- output
- Good Learning Environment.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Obisa Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Agoro Sare Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms + Repair Of Floor, Walls, Doors, Windows, Veranda for 8 Classrooms & Admin. Office.
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 945,876
Obisa Mixed Secondary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Completion Of 2 Classrooms & Construction Of 1 Newest Classroom
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,670,000
Anyona Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 1 Newest Classroom
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 748,500
Aolo Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of 9 Classrooms And Lab
- output
- Good Learning Environment
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 840,000
Simbiri Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 557,250
Ngulu Primary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction of Admin Office
- output
- Good Working Environment For Teachers
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Nyangiela Secondary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Lab.And Electricity
- output
- Improve Performance Of Science Subjects.
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,200,000
Nyimbi Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of 5 Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 980,000
Umai Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of 3 Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 750,000
Nyanduma Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Adm. Offices
- output
- Good Working Environment For Teachers
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Mirondo Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Admin Office
- output
- Good Working Environment For Teachers
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,800,000
Rungu Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Adm. Offices
- output
- Admin Office
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 3,300,000
God Kwach Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 680,000
Nyakiya Secondary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- For Good Performance In Science Subjects.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 750,000
Wirabuor Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 4 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Nandi Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,367,000
Ober Mxed Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Renovation Of 8 Classrooms & Construction Of A School Kitchen Using Emergency Funds
- output
- Imrpove Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Gangre Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 1 Newest Classroom & Construction Of A School Kitchen Using Emergency Funds
- output
- Improve Learning Environment
- implementation status
- Classroom Complete & Kitchen Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,240,000
Ragogo Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 4 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,980,000
Kombaka Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 533,220
Ochunyno Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,600,000
Agawo Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Fence, Toilet, Renov. Of 4 Classrooms
- output
- Improve Facilities In School
- implementation status
- Complete
- total cost
- Ksh 390,000
- estimate
- Ksh 680,000
Masogo Dispensary
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Medical Block
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 3,580,000
D Office Rachuonyo
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2003
- action
- Furnishing Of Dc Office
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 600,000
Mititi Secondary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Dormitory
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 997,210
Nyarabi Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 587,600
Ombek Secondary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 997,000
Kaluoch Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Karabok Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Oriri Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Saramba Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
God Ber Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of 2 Classrooms & Construction Of A School Kitchen Using Emergency Funds
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 702,600
Riwo Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improved Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Omiro Youth Polytechnic
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Construction Of Workshop
- output
- Improve Learning Environment
- implementation status
- Const.On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Karoko Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,277,400
Chagere Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 2,512,720
Ayiengo Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 5 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,130,000
Kanyangwara Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 690,870
Nyasore Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Osuri Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 748,500
Ombek Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,184,000
Kodera Forest Coservation
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Afforestation
- output
- Water Catchment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
God Agak Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
Njura Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 657,000
Otel Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Good Working Environment For Teachers
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 658,070
Kojwach Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 853,829
Ratila Bridge
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Connecting Bridge
- output
- Improved Infrastructure
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,900,000
Oriwo Youth Polytechnic
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Purchase Of Tools & Equipment
- output
- Improve Learning Environment
- implementation status
- Const.On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kotieno Dok Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Fencing & Renovation Of 8 Classrooms
- output
- Good Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 560,000
Kasimba Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Adm. Offices
- output
- Good Working Environment For Teachers
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 860,000
Kokech Resource Centre
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Chief'S Offices
- output
- Resource Centre To Host Cultural Evnts.
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Komolo Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 756,600
Ogilo Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 860,500
St. Dislaus Nyawango Secondary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,342,000
Ogilo Culverts Project
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Culverts
- output
- Improved Infrastructure
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,400,000
Ondiko Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Adm. Offices
- output
- Good Working Environment For The Teachers
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 980,000
Got Kagumbo Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 4 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 865,000
Nyagowa Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Adm.Offices
- output
- Improved Working Environment For Teachers.
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 940,000
Kowidi Chief's Office
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of Chief'S Offices
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kosele Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Renovation Of 4 Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,250,600
Saye Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 865,200
Nyafare Primary School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Teachers Houses And Fencing
- output
- Improved School Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 340,000
Ongoro Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Admin Block
- output
- Improved School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 860,000
Kabondo Ramba Chief's Offices
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Completion Of Chief'S Office. Completion (Painting & Fittings)
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 702,600
Kolal Elck Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- Improve Learning Environment
- implementation status
- Const.On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kabondo Centre Ap Line
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Construction Of Ap Quarters.
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- funds required
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Oyugis Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Completion Of Adm. Offices
- output
- Administration Block
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 250,000
Agoro Sare Mixed Secondary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Construction Of 4 Newest Classrooms, Administration Block, Laboratory, 8 Door Latrines & Water Tank.
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 584,000
Pala Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 2 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,350,000
Ongujo Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Incomplete
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,430,000
Othoro Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Completion Of 2 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 702,600
Nyandiwa Dispensary
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,450,000
Manga Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 250,000
- estimate
- Ksh 680,000
Kojwach Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 240,000
- estimate
- Ksh 300,000
Njura Water Project
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Electrification Of Water Borehole
- output
- Improved Sanitation
- implementation status
- Not Yet Started
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kakelo Chief's Office
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of Chief'S Office. Completion (Painting & Fittings)
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,200,000
Omiro Secondary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Rehabilitation Of 3 Classrooms (Floor Works, Painting & Fittings.
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kotienditi Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 1 Newest Classroom
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,587,600
Ogenga Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,062
Kogalo Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Improve Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 2,290,900
Got Rateng Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 702,600
Atono Nursery School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,748,000
Magungu Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Adm. Block
- output
- Good Working Environment For Teachers
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 655,800
Nyambare Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 680,190
Kalanding Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 962,500
Mititi Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 510,000
Dol-Kodera Secondary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 404,000
Ombek Resource Centre
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Chief'S Offices
- output
- Resource Centre To Host Cultural Evnts.
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Orinde Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 3 Newest Classrooms
- output
- Good Learning Environment.
- implementation status
- Incomplete.
- total cost
- Ksh 200,000
- estimate
- Ksh 2,100,000
Harambee Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Renovation Of 9 Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 280,000
Ogera Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 416,000
Ringa Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Nyaluru Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Adm. Offices
- output
- Adm.Offices
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,172,760
Ringa Boys Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Roofing Of Dormitory
- output
- Improve School Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,516,000
Harambee Secondary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Apondo Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Library Cum Adm.Block
- output
- Improved School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,153,580
Yala Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 950,000
Nyawango Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of Tuition Block
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 227,400
Kokwanyo Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 680,580
Angino Mixed Secondary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Staff Houses
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,400,000
Kokwanyo Chief's Office
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Roofing Of Office. Completion (Painting & Fittings)
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 765,900
Tala Dispensary
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Completion Of Dispensary Block Currenly At Windowest Level
- output
- Improve Health Care Of The People.
- implementation status
- in use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kanga Omuga Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 850,000
God Agulu Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of 6 Classrooms And Lab
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Nyangiela Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Renovation Of Tuition Block
- output
- Improve Working Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Nyagowa Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Renovation Of Tuition Block
- output
- Improve Working Envioronment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Buoye Primary School
- location
-
Kowidi
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,350,000
North Kamagak Chief's Office
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Renovation Of Office
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 940,000
Yadh Welo Nursery School
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Construction Of 1 Class
- output
- Improve Learning Environment
- implementation status
- Const.On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Masogo Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 870,530
Owiro Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 680,000
Kogolla Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 3,183,409
Kilusi Secondary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Rehabilitation Of 2 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Wire Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of Class
- output
- 13 Renovated Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Ranyienya Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 2,543,720
Wkamagak Water Catchment
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Water Catchment
- output
- Water Catchment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Alaro Water And Soil Conservation
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Water/Soil Convservation
- output
- Improving Soil Conservation.
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Sino Doh Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 4 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,276,528
Kachieng Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2009
- action
- Rehabilitation Of 8 Classrooms (Re-Carpeting Of Floors, Re-Painting)
- output
- Improve School Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Nyalgosi Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kaditonge Primary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Cfa Kafoma
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Ranena Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of 4 Newest Classrooms
- output
- Good Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,430,000
Nyabondo Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of 9 Class
- output
- Improved School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 680,000
Siany Community Water Project
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Drilling Of Boreholes
- output
- Potato Shed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Sowacko Tea
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Tea Nurseries
- output
- Tea Shed
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 2,500,000
East Kamagak Chief's Office
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Renovation Of Office
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 680,000
St. Vincent Secondary School
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 480,000
Kachien Locational Offices
- location
-
Kachien
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Chief'S Offices
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 800,000
Kakelo Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Ober Boys Boarding
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Renovation Of The Dormitory Roof.
- output
- Imrpove School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,200,000
Ober Health Centre
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Installation Of Electricity & Wiring.
- output
- Improve Hospital Facilities
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Omiro Primary School
- location
-
Kakelo
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Construction Of A School Kitchen Using Emergency Funds
- output
- Improve Learning Environment
- implementation status
- Const.On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Adega Primary School
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Desks, Wiring Completion
- output
- Improved Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 2,664,000
Kasewe Chief's Office
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Improve Administrative Facilities To Provide Good Services To The People.
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 450,800
Makaa Agroforestry
- location
-
Kasewe
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Nyakiya Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Atono Primary School
- location
-
Kodera
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 3 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,048,000
Atemo Primary School
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kojwach Sweet Potatoes
- location
-
Kojwach
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Potato Shed
- output
- Potato Shed
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kwoyo Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 650,000
Mawira Primary School
- location
-
Kokech
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 5 Door Toilets
- output
- Improved Sanitation
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Anding'o Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of Adm Block
- output
- Good Working Environment For Teachers
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Angino Primary School
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Facilities
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Kokwanyo Bridge
- location
-
Kokwanyo
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Improved Infrastructure
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 556,250
Konuonga Tree Nursery
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Const.On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kosele United Youth
- location
-
North Kamagak
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Not Yet Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kauma Primary School
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 2 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 738,000
Kilusi Tree Nursery Project
- location
-
Ramba
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Const.On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ramula Tree Nursery Project
- location
-
Ramula
(in Kasipul Kabondo)
- year first funded
- 2008
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Const.On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Wire Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Renovation Of 1 Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 650,000
Bung Kich Road
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2004
- action
- Repair Of Culverts
- output
- Improve Infrastructure
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 997,210
Rongo Primary School
- location
-
West Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Labour Cost For Toilets & Classrooms
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Nyamwaga Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Fencing
- output
- Improve School Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Wangchieng Locational Offices
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Completion Of Chief'S Office & Toiletes
- output
- Improve Administrative Facilities To Provide Good Services To The People.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kasewe Resource Centre
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Resource Centre
- output
- Resource Centre To Host Cultural Evnts.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 640,000
Otondo Dispensary
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Completion Of The Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 870,000
Otondo Dispensary
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Completion Of Dispensary
- output
- Improve Health Care.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Lwanda Basi Bridge
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of Newest Bridge
- output
- Improved Infrastructure
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Nyapalo Sweet Potatoes
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2005
- action
- Construction Of Potato Shed
- output
- Potato Shed
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Otondo Primary School
- location
-
Wangchieng
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Fencing
- output
- Improve School Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kalando Primary School
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2006
- action
- Construction Of 1 Newest Classrooms
- output
- Improve Learning Environment
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Bidii Tree Nursary
- location
-
East Kamagak
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Tree Nursery
- output
- Improving Environmental Conservation.
- implementation status
- Incomplete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Nyabola Primary School
- location
-
Konuonga
(in Kasipul Kabondo)
- year first funded
- 2007
- action
- Renovation
- output
- Improve School Facilities
- implementation status
- Incomplete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
St. Francis Of Assisi
- location
-
Kowidi
(in Kasipul Kabondo)
- action
- Construction Of Latrines
- output
- Improve Sanitation
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 70,000
Nyadero Water Pan
- location
-
Kachien
(in Kasipul Kabondo)
- action
- Drilling Of Boreholes
- output
- Improved Sanitation
- implementation status
- Incomplete
- total cost
- Ksh 0
- estimate
- Ksh 2,443,400