The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Keiyo North

Kessup Day secondary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
dining/classes
output
4 classes
implementation status
Ongoing
total cost
Ksh 2,629,000
estimate
Ksh 1,200,000

Kabulwo Secondary School

location
Keu (in Keiyo North)
year first funded
2003
action
Classrooms construction
output
4 classes
implementation status
Complete
total cost
Ksh 2,579,000
estimate
Ksh 1,200,000

Sergoit/Kaplamai W/ P

location
Irong (in Keiyo North)
year first funded
2003
action
Piping
output
-
implementation status
Ongoing
total cost
Ksh 2,530,442
estimate
Ksh 3,600,000

Iten Mixed Day Secondary School

location
Irong (in Keiyo North)
year first funded
2005
action
8 Classes
output
8 Classes
implementation status
Ongoing
total cost
Ksh 2,529,000
estimate
Ksh 1,200,000

Korkitony Secondary School

location
Kapchemutwa (in Keiyo North)
year first funded
2005
action
Construction of 4 classrooms
output
4 classes
implementation status
Ongoing
total cost
Ksh 2,429,000
estimate
Ksh 1,200,000

Chebonet secondary School

location
Irong (in Keiyo North)
year first funded
2004
action
Construction of dining hall
output
1 dining hall
implementation status
Complete
total cost
Ksh 2,429,000
estimate
Ksh 2,000,000

Kaptum Secondary School

location
Kokwao (in Keiyo North)
year first funded
2003
action
Dormitory/dining
output
1 Dom/1dining
implementation status
Ongoing
total cost
Ksh 2,399,000
estimate
Ksh 2,400,000

Sergoit Secondary School

location
Irong (in Keiyo North)
year first funded
2005
action
Library/ Electricity
output
library
implementation status
Complete
total cost
Ksh 2,329,000
estimate
Ksh 1,400,000

Anin Secondary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
Dormitory /Classes
output
Dom/ 2classes
implementation status
Complete
total cost
Ksh 2,279,000
estimate
Ksh 1,600,000

Korkitony/Kendur water project

location
Kapchemutwa (in Keiyo North)
year first funded
2004
action
Piping
output
600 pipes
implementation status
Ongoing
total cost
Ksh 2,050,000
estimate
Ksh 3,000,000

Chebati water Project

location
Kiptuilong (in Keiyo North)
year first funded
2004
action
tank
output
construct a tank + 200 pipes
implementation status
Stalled
total cost
Ksh 1,950,000
estimate
Ksh 3,500,000

Bugar Mixed day secondary

location
Kapchemutwa (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 1,200,000

Kapkoi day Secondary

location
Mutei (in Keiyo North)
year first funded
2006
action
Dormitory+ 4 Classes
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 1,200,000

Kameza Primary School

location
Mutei (in Keiyo North)
year first funded
2003
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,780,000
estimate
Ksh 2,400,000

Kapchelal mixed day secondary

location
Kokwao (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,700,000
estimate
Ksh 1,200,000

Sergoit primary School

location
Irong (in Keiyo North)
year first funded
2004
action
8 Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,650,000
estimate
Ksh 2,400,000

Kimaisbai water project

location
Kapchemutwa (in Keiyo North)
year first funded
2005
action
Piping
output
Pump house, electricity
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 1,500,000

Chegilet Dispensary

location
Keu (in Keiyo North)
year first funded
2004
action
Maternity wing
output
1 maternity wing
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 2,000,000

Kapchelal Dispenary

location
Kokwao (in Keiyo North)
year first funded
2004
action
Maternity wing
output
1 marternity wing
implementation status
Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 1,500,000

Kendur primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,550,000
estimate
Ksh 2,400,000

Anin primary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
Dormitory /Classes
output
3 classes
implementation status
Ongoing
total cost
Ksh 1,550,000
estimate
Ksh 900,000

St. Alphonsus sec

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
3 classes/Adm
implementation status
Complete
total cost
Ksh 1,549,000
estimate
Ksh 1,500,000

Iten Medical Training College

location
Irong (in Keiyo North)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,500,000
estimate
Ksh 0

Kessup primary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 1,200,000

Cheberen primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 2,400,000

Chebonet primary School

location
Irong (in Keiyo North)
year first funded
2003
action
Toilets
output
20 toilets
implementation status
Complete
total cost
Ksh 1,430,000
estimate
Ksh 600,000

Kapsoiyo primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2004
action
Computers/Classrooms
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,200,000

Kobil primary School

location
Kamoi (in Keiyo North)
year first funded
2004
action
staff houses/Classrooms
output
2 classes
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,200,000

Singore primary School

location
Kamoi (in Keiyo North)
year first funded
2003
action
Classes/Adm
output
2 classes
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 600,000

Kibendo Secondary School

location
Kokwao (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,400,000
estimate
Ksh 0

Chelingwa Secondary School

location
Mutei (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,400,000
estimate
Ksh 0

Kapsinende Primary School

location
Irong (in Keiyo North)
year first funded
2004
action
8 Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,350,000
estimate
Ksh 2,400,000

Kiptoro primary School

location
Keu (in Keiyo North)
year first funded
2003
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,340,000
estimate
Ksh 2,400,000

Muno primary School

location
Mutei (in Keiyo North)
year first funded
2003
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,323,000
estimate
Ksh 1,200,000

Kipka primary School

location
Kiptuilong (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,320,000
estimate
Ksh 1,200,000

Kamariny primary School

location
Irong (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 2,400,000

Nyawa primary School

location
Kamogich (in Keiyo North)
year first funded
2003
action
dining/classes
output
dining/ 2 classes
implementation status
Complete
total cost
Ksh 1,250,000
estimate
Ksh 1,000,000

Kipkulot primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing.
total cost
Ksh 1,250,000
estimate
Ksh 2,400,000

Kibargoiyet primary School

location
Irong (in Keiyo North)
year first funded
2004
action
Classes/Renovation
output
2 classes
implementation status
Complete
total cost
Ksh 1,250,000
estimate
Ksh 600,000

Kimuron secondary School

location
Kapchemutwa (in Keiyo North)
year first funded
2004
action
2 dormitories
output
2 dormitory
implementation status
Ongoing
total cost
Ksh 1,229,000
estimate
Ksh 2,400,000

Kipkenda Pre. School

location
Kokwao (in Keiyo North)
year first funded
2005
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 2,400,000

Kiptabus primary School

location
Irong (in Keiyo North)
year first funded
2004
action
4 Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Kipchawat Primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
10 Classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 2,400,000

Kokwao primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 2,400,000

Kermuk primary School

location
Keu (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 2,400,000

Yokot Primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Korkitony Primary E/Project

location
Kapchemutwa (in Keiyo North)
year first funded
2003
action
Electrification
output
Electrification
implementation status
Complete
total cost
Ksh 1,154,442
estimate
Ksh 1,200,000

Moi Tambach

location
Kiptuilong (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,150,000
estimate
Ksh 1,200,000

Kabulwo primary School

location
Keu (in Keiyo North)
year first funded
2004
action
Renovation of 8 classrooms
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,120,000
estimate
Ksh 2,400,000

Kipyeigor primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 2,400,000

Kapteren primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 2,400,000

Chegilet primary School

location
Keu (in Keiyo North)
year first funded
2004
action
Renovation of 8 classrooms
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 2,400,000

Chepkogin primary School

location
Kiptuilong (in Keiyo North)
year first funded
2004
action
Renovation/Classrooms
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Kapsisi Primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
6 classes
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 3,600,000

Siroch primary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
Dormitory /Classes
output
6 classes
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 1,800,000

Chelingwa water project

location
Mutei (in Keiyo North)
year first funded
2005
action
Tank
output
500 pipes
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 1,200,000

Kipsoen Dispensary

location
Mutei (in Keiyo North)
year first funded
2005
action
Adm block
output
3 Adm block
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 1,000,000

Kapkei primary School

location
Kokwao (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 2,400,000

Kipsoen secondary

location
Mutei (in Keiyo North)
year first funded
2006
action
Dormitory
output
1 Dormitory
implementation status
Ongoing
total cost
Ksh 1,029,000
estimate
Ksh 1,200,000

Songeto primary School

location
Kiptuilong (in Keiyo North)
year first funded
2003
action
Renovation
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,011,000
estimate
Ksh 2,400,000

St Patricks High School

location
Irong (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 0

Kapsio primary School

location
Irong (in Keiyo North)
year first funded
2007
action
Classrooms construction
output
-
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 0

Iten primary School

location
Irong (in Keiyo North)
year first funded
2004
action
8 Classes
output
8 Classes
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,800,000

Kayoi primary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
2 classes
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Salaba primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Adm block/ classes
output
4 classes/adm
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,700,000

Kapchelal primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Dormitory/dining
output
2 classes
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Singore water project

location
Kamoi (in Keiyo North)
year first funded
2003
action
Piping
output
3,000 pipes
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Kiptingo Primary School

location
Irong (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Engut water Project

location
Kamogich (in Keiyo North)
year first funded
2003
action
Intake/piping
output
2,000 pipes
implementation status
Ongoing
total cost
Ksh 980,000
estimate
Ksh 1,200,000

Rimoi Primary School

location
Kamogich (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 950,000
estimate
Ksh 2,400,000

Enoo water project

location
Keu (in Keiyo North)
year first funded
2005
action
Piping
output
3,000 GI PIPES
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 2,000,000

Iten Youth Polytechnic

location
Irong (in Keiyo North)
year first funded
2003
action
Tools
output
Various
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Cheptarit primary School

location
Keu (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 2,400,000

Kabore primary School

location
Kiptuilong (in Keiyo North)
year first funded
2003
action
Class/Renovation
output
Ren. 8 Classes Class
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 2,400,000

Kaptum Primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 1,200,000

Kaplamai Primary School

location
Irong (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 1,200,000

Kipsoen Water Project

location
Mutei (in Keiyo North)
year first funded
2005
action
Tank
output
1,000, pipes
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 800,000

Kapchebar Dispensary

location
Kiptuilong (in Keiyo North)
year first funded
2005
action
Maternity wing
output
1 maternity wing
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 1,200,000

Bugar primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2003
action
Construction of 4 classrooms
output
4 classes
implementation status
Ongoing
total cost
Ksh 833,000
estimate
Ksh 1,200,000

Iten Special School

location
Irong (in Keiyo North)
year first funded
2005
action
Dormitories
output
2 dormitory
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Kewapsos Pre. School

location
Kamogich (in Keiyo North)
year first funded
2005
action
Dormitory /Classes
output
8 Classes
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 2,400,000

Kabulwo Dispensary

location
Keu (in Keiyo North)
year first funded
2005
action
Adm block
output
3 rooms
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 1,200,000

Msekekwa primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2004
action
Renovation
output
8 Classes
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 500,000

Kapkoi Primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
2 classes
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 600,000

AIC Kessup girls secondary

location
Kamogich (in Keiyo North)
year first funded
2006
action
Dormitory
output
1 Dormitory
implementation status
Complete
total cost
Ksh 729,000
estimate
Ksh 1,200,000

Songeto Dispensary

location
Kiptuilong (in Keiyo North)
year first funded
2004
action
Adm block
output
3 rooms 2 staff houses
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Kibendo Dispensary

location
Kokwao (in Keiyo North)
year first funded
2004
action
Adm block
output
3 rooms
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Kapkonga Rural Electricii

location
kamoi (in Keiyo North)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 0

Lelachbei water project

location
Kiptuilong (in Keiyo North)
year first funded
2006
action
Intake
output
1,250 pipes
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Kiplus Primary School

location
Irong (in Keiyo North)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 0

Kapteren Dispensary

location
Mutei (in Keiyo North)
year first funded
2004
action
2 staff houses
output
2 staff houses
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Kipchukuu Water Project

location
Keu (in Keiyo North)
year first funded
2005
action
Piping
output
2,500 GI pipes
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 800,000

Mogon Emboch w/project

location
Kiptuilong (in Keiyo North)
year first funded
2005
action
Intake
output
Fencing / planting trees
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 800,000

Kibendo primary School

location
Kokwao (in Keiyo North)
year first funded
2004
action
Classrooms construction
output
4 classes
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 1,200,000

Chelingwa Primary School

location
Mutei (in Keiyo North)
year first funded
2004
action
Renovation/Toilets
output
8 Classes renovation/Toilets
implementation status
Complete
total cost
Ksh 620,000
estimate
Ksh 500,000

Kipchawat Primary School

location
Mutei (in Keiyo North)
year first funded
2006
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 450,000

Chesitek Primary School

location
Irong (in Keiyo North)
year first funded
2007
action
Land
output
5 acres
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 500,000

Tambach Sub-District Hospital

location
Kamogich (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 600,000
estimate
Ksh 0

Logogo water project

location
Irong (in Keiyo North)
year first funded
2006
action
tank
output
2 tank
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 1,200,000

Simotwo rural Electrification

location
Kapchemutwa (in Keiyo North)
year first funded
2005
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 700,000

Kapkoi Youth Poly

location
Mutei (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 571,440
estimate
Ksh 0

Rimoi Dispensary

location
Kamogich (in Keiyo North)
year first funded
2004
action
Building adm
output
3 rooms
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 1,200,000

Kwalel /Kapteren w/project

location
Mutei (in Keiyo North)
year first funded
2004
action
tank
output
1 tank
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 600,000

Ematu Emkong w/project

location
Kiptuilong (in Keiyo North)
year first funded
2006
action
Intake
output
2,000 pipes/conservation
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kapkonga Water project

location
Kamoi (in Keiyo North)
year first funded
2006
action
Piping
output
300 pipes
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 700,000

Kiptingo water project

location
Irong (in Keiyo North)
year first funded
2005
action
Piping
output
1 Tank
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,200,000

Kibomoo water project

location
Keu (in Keiyo North)
year first funded
2006
action
Piping
output
1,000 pipes
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 400,000

Kong Chepkese W/Project

location
Kokwao (in Keiyo North)
year first funded
2005
action
Intake
output
Fencing / planting trees
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Chebinyiny W. Project

location
Keu (in Keiyo North)
year first funded
2006
action
Piping
output
1,000 pipes
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 600,000

Kapchepkoima w/project

location
Kamogich (in Keiyo North)
year first funded
2006
action
tank
output
1 tank
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 600,000

Kapsesia Dam

location
Irong (in Keiyo North)
year first funded
2006
action
Dam protection
output
Dam Protection,piping
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 4,000,000

Kapchawat Primary School

location
Mutei (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kapsaniak Upper Pre.School

location
Kiptuilong (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 2,400,000

Korkitony primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2006
action
Construction of 2 classrooms
output
2 classes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 600,000

Iten primary public library

location
Irong (in Keiyo North)
year first funded
2006
action
Library
output
library
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,200,000

Emsoo water Project

location
Kokwao (in Keiyo North)
year first funded
2006
action
Piping
output
1,000 GI Pipes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Nyalil Matany w/project

location
Keu (in Keiyo North)
year first funded
2006
action
Piping
output
500 pipes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 300,000

Kiptabus W.project

location
Irong (in Keiyo North)
year first funded
2006
action
Piping
output
525 Pipes
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Kamworiem Electricity Project

location
Kapchemutwa (in Keiyo North)
year first funded
2007
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Cheberen Primary School

location
Mutei (in Keiyo North)
year first funded
2006
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 450,000

Rochim Electricity Project

location
Mutei (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Chebokwo Primary School

location
Chebaror (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kapkoi/Koibarak/Simotwo

location
Mutei (in Keiyo North)
year first funded
2005
action
visibility study
output
Visibility study, Tank
implementation status
Ongoing
total cost
Ksh 396,000
estimate
Ksh 400,000

Kapteren Simotwo Borehole

location
Mutei (in Keiyo North)
year first funded
2006
action
n/a
output
1,000 pipes
implementation status
Stalled
total cost
Ksh 350,000
estimate
Ksh 200,000

Kiboi ECD

location
Kiptuilong (in Keiyo North)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 0

Emoi water project

location
Kokwao (in Keiyo North)
year first funded
2006
action
intake
output
Fencing / planting trees
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 300,000

Anin Dispensary

location
Kamogich (in Keiyo North)
year first funded
2005
action
Adm block
output
4 Adm offices
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Kamariny Somongi w/p

location
Irong (in Keiyo North)
year first funded
2006
action
Piping
output
500 pipes
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 300,000

Yatia water project

location
Kokwao (in Keiyo North)
year first funded
2006
action
Piping
output
500 pipes
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 400,000

Kobil Electricity

location
Kamoi (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Mindiliwo Electricity Project

location
Chebaror (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Arar Kamoigon

location
Keu (in Keiyo North)
year first funded
2006
action
intake
output
500 pipes
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 100,000

Kipche water project

location
Kiptuilong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kapkerembe Ecd

location
mutei (in Keiyo North)
year first funded
2009
action
plastering&Roofing
output
1
implementation status
ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Emkong Pre. School

location
Kiptuilong (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 2,400,000

Elgeyo Saw Mill

location
Kapchemutwa (in Keiyo North)
year first funded
2005
action
Computers/Classrooms
output
4 classes
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,200,000

Kiptieltiel water project

location
Kokwao (in Keiyo North)
year first funded
2003
action
Piping
output
600 pipes
implementation status
Ongoing
total cost
Ksh 290,000
estimate
Ksh 400,000

Emget Kapkobol water project

location
Kiptuilong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 275,000
estimate
Ksh 0

Iten District Hospital

location
Irong (in Keiyo North)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 250,000
estimate
Ksh 0

Kwalel Pre. School

location
Mutei (in Keiyo North)
year first funded
2006
action
Renovation/Toilets
output
8 Classes
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 2,400,000

Kokwao Chiefs office

location
Kokwao (in Keiyo North)
year first funded
2006
action
Build of Office
output
Adminstration Office
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kabeei water project

location
Kiptuilong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 225,000
estimate
Ksh 0

Torok Electricity Project

location
Mutei (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kaptomoger Pre. School

location
Kiptuilong (in Keiyo North)
year first funded
2005
action
Renovation
output
8 Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 2,400,000

Kabilil Pre. School

location
Kiptuilong (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
8 Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 2,400,000

Bugar Special Unit

location
Kapchemutwa (in Keiyo North)
year first funded
2006
action
Computers/Classrooms
output
8 Classes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 2,400,000

Kipgorngor water Project

location
Kokwao (in Keiyo North)
year first funded
2005
action
Piping
output
7,000 GI pipes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 500,000

Emcheptui W/project

location
Kokwao (in Keiyo North)
year first funded
2006
action
Piping
output
500 pipes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Chepkesum Water project

location
Kokwao (in Keiyo North)
year first funded
2009
action
Purchase of pipes
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 500,000

Tutuwo water project

location
Kamogich (in Keiyo North)
year first funded
2006
action
Intake/piping
output
500 pipes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 400,000

Enego water project

location
Kamogich (in Keiyo North)
year first funded
2006
action
Piping
output
1,000 pipes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 500,000

Sengwet /Kipsabu

location
Kamogich (in Keiyo North)
year first funded
2006
action
Piping
output
1,000 pipes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 500,000

Sorbich Water Project

location
Irong (in Keiyo North)
year first funded
2009
action
Piping
output
-
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Kiborgoiyet Electricity

location
Irong (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Tuiyobei Electricity

location
Irong (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Chebonet Electricity

location
Irong (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Kamelilo Electricity

location
Irong (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Katalel West Electricity

location
Irong (in Keiyo North)
year first funded
2006
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 450,000

Chotwo Electricity

location
Kapchemutwa (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Sebako Electricity

location
Kapchemutwa (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Kapkatui Electricity

location
Kapchemutwa (in Keiyo North)
year first funded
2009
action
Electrification
output
Electrification
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Barasin/Kamotony/Seah

location
Kapchemutwa (in Keiyo North)
year first funded
2007
action
Electrification
output
Electrification
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kameza Kobele Belgut Electricity Project

location
Mutei (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kaptilit Electricity Project

location
Mutei (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kokwao Electricity

location
Kokwao (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Komoigon Dispensary

location
Kamogich (in Keiyo North)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kapkoi Cattle Dip

location
Mutei (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/ Foot bath
implementation status
Stalled
total cost
Ksh 175,000
estimate
Ksh 150,000

Kamaigon Cattle Dip

location
Keu (in Keiyo North)
year first funded
2005
action
Renovation
output
crush/FFB/roof
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 120,000

Kabulwo Cattle Dip

location
Keu (in Keiyo North)
year first funded
2005
action
Renovation
output
crush/ FB/Roof
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 130,000

Kaptul ECD

location
Kiptuilong (in Keiyo North)
year first funded
2009
action
Class Rooms
output
-
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Kaplolo Primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2006
action
Computers/Classrooms
output
2 classes
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 1,200,000

Uswo Primary School

location
Kapchemutwa (in Keiyo North)
year first funded
2006
action
Classrooms construction
output
2 classes
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 600,000

Kapkerembe water project

location
Kiptuilong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 0

Chegilet Cattle Dip

location
Keu (in Keiyo North)
year first funded
2005
action
Renovation
output
crush/Foot bath
implementation status
Ongoing
total cost
Ksh 140,000
estimate
Ksh 150,000

Anin/Nyawa Cattle Dip

location
Kamogich (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 140,000

Kabore Cattle Dip

location
Kiptuilong (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 130,000

Kapteren Cattle Dip

location
Mutei (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 135,000

Kiptorok Spring

location
Kiptuilong (in Keiyo North)
year first funded
2009
action
Intake
output
Clean Water
implementation status
Started
total cost
Ksh 129,918
estimate
Ksh 0

Cheberen/Simotwo Dip

location
Mutei (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Stalled
total cost
Ksh 125,000
estimate
Ksh 130,000

Kapsisi Cattle Dip

location
Mutei (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/Roof
implementation status
Stalled
total cost
Ksh 120,000
estimate
Ksh 125,000

Kipsongol Cattle Dip

location
Irong (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 125,000

Kibendo Cattle Dip

location
Kokwao (in Keiyo North)
year first funded
2006
action
Renovation
output
Crush/Dip Tank
implementation status
Ongoing
total cost
Ksh 110,000
estimate
Ksh 120,000

Orkut Road

location
Kokwao (in Keiyo North)
year first funded
2006
action
Road
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chebonet secondary Water Project

location
Irong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kaplamai Cattle Dip

location
Irong (in Keiyo North)
year first funded
2006
action
Renovation
output
Dip Tank
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 250,000

Kipkulot water project

location
Kokwao (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 96,832
estimate
Ksh 0

Bugar Cattle Dip

location
Kapchemutwa (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 100,000

Kapchiga Cattle Dip

location
Kamoi (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Kiptoro Cattle Dip

location
Keu (in Keiyo North)
year first funded
2007
action
Renovation
output
crush/ FB/Roof
implementation status
Ongoing
total cost
Ksh 70,000
estimate
Ksh 0

Kaptarit Cattle Dip

location
Irong (in Keiyo North)
year first funded
2007
action
Renovation
output
Crush/FB/Roof
implementation status
Ongoing
total cost
Ksh 70,000
estimate
Ksh 0

Chesitek Cattle Dip

location
Irong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 70,000
estimate
Ksh 0

Sergoit (Kapchemoto) Dip

location
Irong (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 80,000

Kapkong'a Cattle Dip

location
Kamoi (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Samongi Cattle Dip

location
Irong (in Keiyo North)
year first funded
2005
action
Renovation
output
Crush/FB/Roof
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 70,000

Katalel /Kiboa cattle Dip

location
Irong (in Keiyo North)
year first funded
2006
action
Renovation
output
Crush /FB
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Songeto Cattle Dip

location
Kiptuilong (in Keiyo North)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Yokot Cattle Dip

location
Mutei (in Keiyo North)
year first funded
2006
action
Renovation
output
Crush/FB
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 70,000

Kessup Cattle Dip

location
Kamogich (in Keiyo North)
year first funded
2006
action
Renovation
output
Crush /FB
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 55,000

Emiat Bridge

location
Mutei (in Keiyo North)
year first funded
2006
action
Bridge Repair
output
-
implementation status
Stalled
total cost
Ksh 50,000
estimate
Ksh 0

Kiptabus Cattle Dip

location
Irong (in Keiyo North)
year first funded
2006
action
Renovation
output
Crush/FB
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 70,000

Lamaon Nursery School

location
Kapchemutwa (in Keiyo North)
year first funded
2006
action
Classroom
output
-
implementation status
not known
total cost
Ksh 30,000
estimate
Ksh 0