The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Education Bursary
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2004
- action
- Assist Needy Students
- output
- Cover All Needy Cases
- implementation status
- Continuous
- total cost
- Ksh 24,178,069
- estimate
- Ksh 4,000,000
Kawaida Primary School
- location
-
Cianda
(in Kiambaa)
- year first funded
- 2004
- action
- Construction of Primary School And Purchase Of Locker And Desks
- output
- Provide 24 Storey Classroms ,Administration Block And Other Facilities
- implementation status
- On-Going
- total cost
- Ksh 23,153,409
- estimate
- Ksh 22,200,000
Primary School s Desks
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2004
- action
- Donate Primary School Desks
- output
- Provide Desks To All Primary Schools
- implementation status
- Complete
- total cost
- Ksh 7,600,000
- estimate
- Ksh 2,000,000
Office Running Expenses
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2003
- action
- Running Office
- output
- Day To Day Office
- implementation status
- On Going
- total cost
- Ksh 6,640,866
- estimate
- Ksh 12,000,000
Muchatha Dispensary
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Construction of Dispensary & Purchase Of Equipments
- output
- Offer Health Facilities To Area Residents
- implementation status
- On-Going
- total cost
- Ksh 6,156,557
- estimate
- Ksh 4,000,000
Riabai Ap Post
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2004
- action
- Rehabilitate Existing Structures
- output
- Construct Houses For Ap Personnel
- implementation status
- Complete
- total cost
- Ksh 5,243,336
- estimate
- Ksh 5,201,336
Njunu Administration Police Post
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2003
- action
- Construction of 1 Bedroomed Units & Administration On Block
- output
- House Ap Personnel
- implementation status
- On Going
- total cost
- Ksh 5,148,822
- estimate
- Ksh 3,200,000
Gatuikira Water Project
- location
-
Ruake
(in Kiambaa)
- year first funded
- 2005
- action
- Equiping Of Borehole,Pump House Construction, Buying And Laying Of Distribution Pipes
- output
- Provide Water To Area Residents
- implementation status
- On-Going
- total cost
- Ksh 5,100,000
- estimate
- Ksh 5,000,000
Mugumo Ap Post
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2004
- action
- Construction of Administration On Block & Housing Units For Ap Personnel
- output
- House Ap Personnel
- implementation status
- Complete
- total cost
- Ksh 4,795,454
- estimate
- Ksh 4,800,000
Ndenderu Health Centre
- location
-
Ruaka
(in Kiambaa)
- year first funded
- 2007
- action
- Construst Dispensary
- output
- Offer Health Facilities
- implementation status
- Not Started
- total cost
- Ksh 4,200,000
- estimate
- Ksh 3,000,000
Karura Wagunyu Water Project
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2006
- action
- Construction of Water Tank & Buy And Lay Distribution Pipes
- output
- Provide Water To The Local Community
- implementation status
- On Going
- total cost
- Ksh 4,100,000
- estimate
- Ksh 4,500,000
Kiambaa Waguthu Water Project
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2003
- action
- Equip Borehole
- output
- Provide Water To Area Residents
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Kihara Ap Post
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2003
- action
- Construction of 4- 1 Bedroom Unit And Administration On Block
- output
- House Ap Personnel
- implementation status
- On Going
- total cost
- Ksh 3,300,000
- estimate
- Ksh 3,300,000
Kiambaa Kawaida Water Project
- location
-
Cianda
(in Kiambaa)
- year first funded
- 2003
- action
- Rehabilitate The Water Project /Purchase A Piece Of Land
- output
- Provide Water To Area Residents
- implementation status
- Complete
- total cost
- Ksh 3,200,000
- estimate
- Ksh 2,800,000
Emergency Reserve
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Toilets and bathrooms need to be provided for it to be operational
- total cost
- Ksh 3,142,307
- estimate
- Ksh 0
Project Monitoring And Evaluation And Capacity Building
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Construction at Roofing level
- total cost
- Ksh 2,870,764
- estimate
- Ksh 1,150,000
Thindigua Primary School
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Rehabilitation Of School Plus Build A New Classs Room
- implementation status
- On-Going
- total cost
- Ksh 2,600,000
- estimate
- Ksh 1,000,000
Lioki Community Dispensary
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2008
- action
- Renovating And Equiping The Dispensary
- output
- Improve Health Facilities
- implementation status
- On Going
- total cost
- Ksh 2,500,000
- estimate
- Ksh 1,000,000
Kamiti Anmer Water Project
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2004
- action
- Equip Borehole
- output
- Provide Water To Area Residents
- implementation status
- On Going
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,100,000
Karunga Water Project
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2009
- action
- Borehole Drilling And Equipping
- output
- Provide Water To The Community
- implementation status
- Not Started
- total cost
- Ksh 2,300,000
- estimate
- Ksh 0
Ngegu Police Post
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2007
- action
- Constuct Ap Post
- output
- Security Services
- implementation status
- On Going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,500,000
Riabai Secondary School
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2006
- action
- Renovate Burnt Dormitory And Fencing Of The School. Construction Of Classroom Ongoing
- output
- Dormitory For The School
- implementation status
- Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,200,000
Njoro Access Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2008
- action
- Re Carpet Rural Roads
- output
- Provdie Good Roads
- implementation status
- On Going
- total cost
- Ksh 2,100,000
- estimate
- Ksh 0
Kasphat Ap Post
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of Administration Block
- output
- House Ap Personnel
- implementation status
- Not Started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,300,000
Mugumo Kamiti Prison Road Upgrading
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2008
- action
- Re Carpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,500,000
Ndumberi Water Project
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2004
- action
- Rehabilitate The Water Project
- output
- Provide Water To Area Residents
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,500,000
Muchatha Water Project
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Buy And Lay Distribution Pipes
- output
- Provide Water To The Local Community
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,000,000
Sports Activities
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2008
- action
- Have A Sport Day On 1;0;09 For The Youth
- output
- Promote Youth 4 Positive Addiction
- implementation status
- 08/09 Sports Activity Was Successful
- total cost
- Ksh 1,867,901
- estimate
- Ksh 852,474
Gathanga Administration Police Post
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2003
- action
- Construction of Houses For Ap Personnel
- output
- House Ap Personnel
- implementation status
- On Going
- total cost
- Ksh 1,830,000
- estimate
- Ksh 1,830,000
Machiri Primary School
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2005
- action
- Construction Of A Septic Toilet
- output
- Complete Set Of 12Septic Toilets.
- implementation status
- Complete
- total cost
- Ksh 1,685,985
- estimate
- Ksh 800,000
Strategic Plan Kiambaa Project
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2008
- action
- Strategic Plan For Kiambaa Constituency
- output
- Strategic Plan For Kiambaa Constituency
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Karuri Secondary School Stadium
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2005
- action
- Fencing The Stadium
- output
- Provide Security To The School
- implementation status
- 2Nd Phase On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Muuru Road
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2006
- action
- Re-Carpet Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 500,000
Gachie Chiefs Camp
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of Chiefs Office
- output
- Offfer Security Services
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,200,000
St Joseph Gathanga Secondary School
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- Improve Education Facilities
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kilooma Nursery School
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of The Nursery School
- output
- Improve Learning Facilities
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Environmental Activities
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2008
- action
- Plant Trees
- output
- Plant Trees
- implementation status
- Maternity wing not in use due to huge cracks on the structure. The building Has been condemned
- total cost
- Ksh 1,455,403
- estimate
- Ksh 439,976
Kamiti Corner Ap Post
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2003
- action
- Construction of Chiefs Office. Constructing Houses For Ap Personnel
- output
- House Ap Personnel
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Karura Kirienye Road
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,000,000
Kirienye Ap Post
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2007
- action
- Renovation Of Administration Block And Construction Of A P Residential Houses
- output
- House Ap Personnel
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 500,000
Kiamumbi Primary School mary Immaculat
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2008
- action
- Purchase Of Pump,Storage Tank,Distribution Pipes And A 3 Phase Power Line
- output
- Provide Water
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Ndumberi Polytechnic
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2004
- action
- Rehabilitate The Polytechnic
- output
- Provide Education Facilities
- implementation status
- Complete
- total cost
- Ksh 1,270,000
- estimate
- Ksh 1,270,000
Waguthu A P Post
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2009
- action
- Construction Of A P Houses
- output
- House A P Personnel
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kiambu Primary School
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of Septic Toilet
- output
- Toilets For The School
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kihara Market Road Rehabilitation
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2008
- action
- Rehabilitate The Road
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 450,000
Ngaita Maracha Road
- location
-
Ting'Ang'A
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 500,000
Kamuiru Road
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 500,000
Rehabilitation Of Kabae Karunga Road
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2008
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Kongo Primary School
- location
-
Kamiti
(in Kiambaa)
- year first funded
- 2006
- action
- Construction Of A Septic Toilet
- output
- Complete Set Of 12Septic Toilets.
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Riara Primary School
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2007
- action
- Renovate The School
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
St Ann Gichocho
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2006
- action
- Levelling Of Play Ground. And Plant Grass
- output
- Provide A Good Play Ground For The Students
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ndumberi Health Centre
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Provide Health Facilities
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kiamumbi Water Project
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2004
- action
- Equip The Borehole
- output
- Provide Water To Area Residents
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gichocho Water Project
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2007
- action
- Buy And Lay Distribution Pipes
- output
- Provide Water To The Local Communiyt
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ack St Emmanuel Mugumo Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- Re-Carpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Kanunga Kasphat Road
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
General Gichore Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Ngurwe Githima Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Thimbigwa Gathiri Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kiambu District Hospital
- location
-
Kiambu Settled Area
(in Kiambaa)
- year first funded
- 2008
- action
- Equip The Water
- output
- Provide Water To The Hospital
- implementation status
- Complete
- total cost
- Ksh 991,000
- estimate
- Ksh 491,000
Kiambu Township Secondary School
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2009
- action
- Consturction Of Laboratory And Purchase Of Laboratory Equipments
- output
- Provide Laboratory For He School
- implementation status
- Not Started
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kiambaa Water Project
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2008
- action
- Emergency Was To Purchase A Water Pump
- output
- Provide Water To The Local Community
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Gichocho Riabai Road
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 400,000
Muchunu White College Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2009
- action
- Rehabilitation And Drainage
- output
- Re Carpet Rural Access Roads
- implementation status
- Not Started
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Riabai Polytechnic
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2008
- action
- Rehabilitate Riabai Polytechinc Classrooms
- output
- Provide Polytechnic
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Loreto Primary School
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2008
- action
- Constrution Of Septic Toilets
- output
- Complete Set Of 12Septic Toilets.
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 800,000
Kawaida Water Project
- location
-
Cianda
(in Kiambaa)
- year first funded
- 2004
- action
- Rehabilitate The Water Projet
- output
- Provide Water To The Local Community
- implementation status
- Complete
- total cost
- Ksh 819,500
- estimate
- Ksh 819,500
Capacity Building
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- Train Locational Dev.Committee Members
- output
- Build Capacity
- implementation status
- Seminar Held On 7Th April 2006. -Second Capacity Building Held On 21/11/07
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kiambaa Primary School
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2009
- action
- Construction Of A Septic Toilet
- output
- Toilets For School
- implementation status
- Not Started
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kagondo Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 500,000
Wangunyu Rweno Road
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2009
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kangoya Primary School
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2005
- action
- Costruct An Exhaustible Toilet Block
- output
- Complete Set Of 12Septic Toilets.
- implementation status
- Complete
- total cost
- Ksh 752,610
- estimate
- Ksh 780,000
Chief Wandie Primary School
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2007
- action
- Constructin Of Aseptic Toilet
- output
- Complete Set Of 12Septic Toilets.
- implementation status
- Complete
- total cost
- Ksh 720,000
- estimate
- Ksh 1,000,000
Makiu Gachichio Road
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2009
- action
- Rehabilitation And Drainage
- output
- Re Carpet Rural Roads
- implementation status
- Not Started
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Construction Of Ndumberi Chiefs Camp
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2008
- action
- Construction Of Chiefs Camp
- output
- House Ap Personnel
- implementation status
- Not Started
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Karuri Health Centre
- location
-
Kiambu Settled Area
(in Kiambaa)
- year first funded
- 2005
- action
- Equip The Health Centre
- output
- Provide Health Facilities
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kasarini Primary School
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of Septic Toilets
- output
- Toilets For The School
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kihara Sub District Hospital
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2008
- action
- Equip The Hospital
- output
- Offer Health Facilities
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Ngegu Ibonia Road
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Recarpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 300,000
Ngegu Primary School
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Construction of Toilets
- output
- Toilets For School
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 350,000
Gachie Primary School
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of Septic Toilet
- output
- Toilets For The School
- implementation status
- Complete
- total cost
- Ksh 630,000
- estimate
- Ksh 700,000
Ndumberi Golf Club Stadiu
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2005
- action
- Fencing The Sports Ground
- output
- Beatifying The Sports Ground
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mahindi A P Post
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2009
- action
- Construction of A P Houses
- output
- House A P Personnel
- implementation status
- Not Started
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Riabai Coffee Factory To Kihingo Road
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2008
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Office Furniture
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2004
- action
- Equip Cdf Office
- output
- Office To Be Fully
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Njunu Water Project
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2008
- action
- Equip The Water
- output
- Provide Water To The Local Community
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kibathi Primary School
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2008
- action
- Construction of Septic Toilets
- output
- Complete Set Of 12Septic Toilets.
- implementation status
- Complete
- total cost
- Ksh 540,000
- estimate
- Ksh 600,000
Maria Immaculata Children Centre
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2005
- action
- Construction of Septic Toilet Block
- output
- Toilet For The School
- implementation status
- Complete
- total cost
- Ksh 519,000
- estimate
- Ksh 520,000
Kibubuti Primary School
- location
-
Cianda
(in Kiambaa)
- year first funded
- 2009
- action
- Construction of Septic Toilets
- output
- Toilets For The School
- implementation status
- On Going
- total cost
- Ksh 501,012
- estimate
- Ksh 0
Senior Chief Koinange Road
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ack Ndumberi
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Yamogo Road
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kambara Road
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Turitu Ndumberi Bridge
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2009
- action
- Renovation Of The Bridge
- output
- Provide Good Road
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Karuri Primary School
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- Construction Of A Septic Toilet
- output
- Complete Set Of 12 Toilets.
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Gachie Secondary School
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2009
- action
- Purchase Of Laboratory Equipments
- output
- Laboratory Equipemtns
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Cianda Secondary School
- location
-
Cianda
(in Kiambaa)
- year first funded
- 2005
- action
- Equip School Laboratory
- output
- Make The School Laboratory Operational
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kimuga Water Project
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Laying Distribution Pipes
- output
- Provide Water To The Local Communiyt
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Ngegu Water Project
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2007
- action
- Funds Re-Allocated
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Muchatha Kibecheni Road
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Recarpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Rehabilitation Of Kiamumbi Roads
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2008
- action
- Recarpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Rehabilitation Of Riara Bridge
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2007
- action
- Provide Good Roads
- output
- Not Started
- implementation status
- Not Started
- total cost
- Ksh 437,818
- estimate
- Ksh 0
Ruaka A P Post
- location
-
Ruaka
(in Kiambaa)
- year first funded
- 2009
- action
- Relocation Of The A P Post
- output
- Provide Security
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Boro Road
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kiriguini Road
- location
-
Riabai
(in Kiambaa)
- year first funded
- 2007
- action
- Rehabilitate Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ndumberi Secondary School
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2005
- action
- Repair Works On A Burnt Dormitory
- output
- To Improve Boarding Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Karambaini Road
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2006
- action
- Re-Carpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 382,000
- estimate
- Ksh 400,000
Karunga-Ndumberi Road
- location
-
Ndumberi
(in Kiambaa)
- year first funded
- 2006
- action
- Recarpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Complete
- total cost
- Ksh 300,062
- estimate
- Ksh 306,000
Gathanga Bridge
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2005
- action
- Constuction Of The Bridge
- output
- Improe Infrastructure Re-Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Karura Mahindi Road
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2009
- action
- Re Carpet Rural Roads
- output
- Provide Good Roads
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kanunga Secondary School
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Re-Construction Of Building S Destroyed By Fire
- output
- Improving Boarding Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Locational Committee Workshop
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2005
- action
- Train Locational Dev.Committee Members
- output
- Train Locational Dev.Committee Members
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiambaa Township Water Project
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- Rehabilitate The Water Projet
- output
- Provide Water To Area Residents
- implementation status
- Complete
- total cost
- Ksh 250,560
- estimate
- Ksh 250,560
Transconstituency Visit
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 0
St Monica Childrens Home
- location
-
Settled Area
(in Kiambaa)
- year first funded
- 2006
- action
- Rehabilitate The Orphanage
- output
- Cater For More Orphans
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Thimbigua Primary School
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2006
- action
- Level And Plant Grass On The Playing Ground And Exhaust Filled Up Toilets
- output
- Well Leveled Playing Ground And Emptying Of Septic Toilets For Re-Use
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 0
Ask Show Nyeri
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2004
- action
- To Represent Cdf Kiambaa
- output
- To Represent Cdf Kiambaa
- implementation status
- Complete
- total cost
- Ksh 220,000
- estimate
- Ksh 0
Kihara Water Project
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2006
- action
- Buy And Lay Distribution Pipes
- output
- Provide Water To The Local Communiyt
- implementation status
- Complete
- total cost
- Ksh 215,000
- estimate
- Ksh 215,000
Kiambaa Sublocation Chiefs Office
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Construction of Chiefs Office
- output
- Provide Security Services
- implementation status
- Complete
- total cost
- Ksh 210,000
- estimate
- Ksh 0
Gacharage Secondary School
- location
-
Ruaka
(in Kiambaa)
- year first funded
- 2009
- action
- Renovation Of Classrooms
- output
- Provide Classes For The School
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kanunga Police Post
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2009
- action
- Completion Of Adminstration Base
- output
- Security Services
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Loreto Kiambu Secondary Shool
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2005
- action
- Repair Works On A Burnt Dormitory
- output
- To Improve Boarding Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mungai Chengecha Primary School
- location
-
Waguthu
(in Kiambaa)
- year first funded
- 2006
- action
- Level And Plant Grass On The Ground
- output
- Well Leveled Playing Ground
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kihara Zone Education Office
- location
-
Kihara
(in Kiambaa)
- year first funded
- 2007
- action
- Not Started
- output
- Not Started
- implementation status
- Not Started
- total cost
- Ksh 170,000
- estimate
- Ksh 0
Office Laptop/ Computer
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Bought A Laptop
- output
- Bought A Laptop
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Office Executive Table And File Cabinet
- location
-
Kiambaa
(in Kiambaa)
- year first funded
- 2007
- action
- Purchased Of Office Table And File Cabinet
- output
- Purchased Of Office Table And File Cabinet
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kiambaa Dispensary
- location
-
Kiambaa
(in Kiambaa)
- action
- Reallocated To Machiri Primary Ksh 102,510 & Njunu Police 397,490
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 500,000
Youth Development Activities
- location
-
Kiambaa
(in Kiambaa)
- action
- Funds Re-Allocated
- output
- Funds Re-Allocated
- implementation status
- Funds Re-Allocated
- total cost
- Ksh 0
- estimate
- Ksh 0