The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kigumo

Kigumo Constituency Water Project

location
Kigumo (in Kigumo)
year first funded
2009
action
Construction Of Intake Dam, Purchase Of Pipes And Laying Of Pipes
output
-
implementation status
Dam Is Constructed. Sourcing And Purchase Of Pipes Going On
total cost
Ksh 16,578,260
estimate
Ksh 30,000,000

Boro Primary School

location
Kinyona (in Kigumo)
year first funded
2007
action
Class Rooms Construction
output
-
implementation status
3 Classes Done Up To Rental. Plastering Not Done
total cost
Ksh 7,000,000
estimate
Ksh 1,500,000

Constituency Office

location
Kigumo (in Kigumo)
year first funded
2003
action
Office Construction
output
-
implementation status
Over 90% Complete
total cost
Ksh 5,250,000
estimate
Ksh 3,000,000

Kigumo Social Hall

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of A Hall
output
-
implementation status
Construction Started
total cost
Ksh 3,000,000
estimate
Ksh 0

Kigumo Health Centre

location
Kigumo (in Kigumo)
year first funded
2004
action
Construction Of A Mortuary And Expansion Of Hospital
output
-
implementation status
Mortuary Complete But Not In Use Due To Lack Of Equipment. Wards Done On Foundation
total cost
Ksh 2,900,000
estimate
Ksh 5,947,450

Kangari Health Centre

location
Kangari (in Kigumo)
year first funded
2005
action
Health Centre Construction
output
-
implementation status
Work Done: One Storey Building With Wards & Maternity, Finishing Work Remaining
total cost
Ksh 2,800,187
estimate
Ksh 2,400,000

Gikoe Dispensary

location
Kinyona (in Kigumo)
year first funded
2004
action
Maternity Construction
output
-
implementation status
Over 80% Compete
total cost
Ksh 2,340,000
estimate
Ksh 0

Gakuyu Water Project

location
Kahumbu (in Kigumo)
year first funded
2003
action
Bore Hole Rehabilitation
output
-
implementation status
Complete
total cost
Ksh 1,997,939
estimate
Ksh 2,500,000

Ikumbi Secondary School

location
Kangari (in Kigumo)
year first funded
2005
action
Construction Of A Library,Lab & Electrification
output
-
implementation status
Library &Electrification Complete
total cost
Ksh 1,950,000
estimate
Ksh 1,922,613

Mahehe Water Project

location
Kinyona (in Kigumo)
year first funded
2004
action
Laying Of Pipes
output
-
implementation status
Over 70% Complete
total cost
Ksh 1,900,000
estimate
Ksh 0

Furaha Bridge

location
Kinyona (in Kigumo)
year first funded
2005
action
Construction Of Bridge & Road
output
-
implementation status
Bridge Complete And Road Is Under Construction
total cost
Ksh 1,824,199
estimate
Ksh 2,000,000

Karega Secondary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Construction Of Kitchen
output
-
implementation status
Over 50% Complete
total cost
Ksh 1,800,000
estimate
Ksh 1,200,000

Boro Water Project

location
Kinyona (in Kigumo)
year first funded
2004
action
Laying Of Pipes
output
-
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 3,400,000

Muthithi Secondary School

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction Of Comp & Chemistry Lab
output
-
implementation status
Chem. Lab Is Done And Equipped. Water Tank Constructed &Computer Lab But Not Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,500,000

Mununga Secondary School

location
Kinyona (in Kigumo)
year first funded
2004
action
Construction Of A Dormitory
output
-
implementation status
Over 60% Complete
total cost
Ksh 1,693,000
estimate
Ksh 2,000,000

Kigumo Education Task Force

location
(in Kigumo)
year first funded
2008
action
Monitoring Education Performance
output
-
implementation status
In Good Progress
total cost
Ksh 1,595,955
estimate
Ksh 0

Gachocho Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Construction Of A New Block
output
-
implementation status
Fully Complete
total cost
Ksh 1,560,000
estimate
Ksh 1,500,000

Kinyona Health Centre

location
Kinyona (in Kigumo)
year first funded
2004
action
Construction Of A Dispensary
output
-
implementation status
Over 80%Complete
total cost
Ksh 1,559,000
estimate
Ksh 0

Kigumo Bendera School

location
Kigumo (in Kigumo)
year first funded
2005
action
Sanitation & A Domitory
output
-
implementation status
Complete
total cost
Ksh 1,550,000
estimate
Ksh 2,000,000

Gatumbi Dispensary

location
Kigumo (in Kigumo)
year first funded
2006
action
Construction Of A Community Dispensary
output
-
implementation status
Work Have Not Commenced. Materials On Site
total cost
Ksh 1,500,000
estimate
Ksh 0

Chathada Water Project

location
Kinyona (in Kigumo)
year first funded
2008
action
Construction Of Water Catchments Dam
output
-
implementation status
Work Has Commenced
total cost
Ksh 1,500,000
estimate
Ksh 0

Kamukabi Police Post

location
Kinyona (in Kigumo)
year first funded
2005
action
Police Post Construction
output
-
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 1,118,973

Mariira Dispensary

location
Kangari (in Kigumo)
year first funded
2005
action
Construction Of A Dispensary
output
-
implementation status
Dispensary Constructed , Toilets, Fencing &Steel Gate
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Githima Police Post

location
Kigumo (in Kigumo)
year first funded
2003
action
Police Post Construction
output
-
implementation status
About 70% Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Thuita Water Project

location
Kahumbu (in Kigumo)
year first funded
2004
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 1,325,000
estimate
Ksh 0

Rwanganga Water Project

location
Kahumbu (in Kigumo)
year first funded
2008
action
Borehole Construction
output
-
implementation status
60% Done
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Kinyona Secondary School

location
Kinyona (in Kigumo)
year first funded
2004
action
Office Completion
output
-
implementation status
Complete
total cost
Ksh 1,250,000
estimate
Ksh 2,000,000

Kagurumo-Ndiaini Water Project

location
Muthithi (in Kigumo)
year first funded
2005
action
Supply Of Water
output
-
implementation status
not known
total cost
Ksh 1,250,000
estimate
Ksh 2,599,918

Gikigie Primary School

location
Kinyona (in Kigumo)
year first funded
2005
action
Classrooms Plastering
output
-
implementation status
3 Classrooms Are Complete
total cost
Ksh 1,223,766
estimate
Ksh 1,200,000

Muthithi Polytechnic

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction Of Workshop & Administration Block
output
-
implementation status
Workshop Done Up To Slab, Few Materials On Site
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Wamahiga Secondary School

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction Of Administration Block
output
-
implementation status
Admin Block Built Up To Lintel; Some Materials On Site
total cost
Ksh 1,200,000
estimate
Ksh 1,700,000

Githembe Police Post

location
Kahumbu (in Kigumo)
year first funded
2005
action
Construction Of Police Post
output
-
implementation status
5 Staff Quarters Are Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,600,000

Kandani Water Project

location
Kahumbu (in Kigumo)
year first funded
2006
action
Digging Of Borehole
output
-
implementation status
Project Stalled. Water Was Not Found After Digging
total cost
Ksh 1,200,000
estimate
Ksh 900,000

Kiahiti Primary School

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of 2 Classes & 4 Toilets
output
-
implementation status
2 Classes Done. Toilets 20% Of Work Is Done
total cost
Ksh 1,200,000
estimate
Ksh 10,000,000

Nguku Secondary School

location
Kigumo (in Kigumo)
year first funded
2006
action
Construction Of Dining Hall
output
-
implementation status
Hall Structure Put Up, But Plastering, Floor, Windows &Doors Remaining
total cost
Ksh 1,150,000
estimate
Ksh 1,200,000

Karinga Secondary School

location
Kinyona (in Kigumo)
year first funded
2004
action
Class Rooms Construction
output
-
implementation status
Over 60% Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,200,000

Ndugamano Secondary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Completion Of Administration Block
output
-
implementation status
Over 98% Complete
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Gachocho Police Post

location
Kigumo (in Kigumo)
year first funded
2003
action
Police Post Construction
output
-
implementation status
Most Of Rooms Are In Use But Request Of 650,000 Has Been Submitted To Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Gikarangu Adult And Community Health Centre

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction of A Ward
output
-
implementation status
Over 80% Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Gakoeini Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Classrooms
output
-
implementation status
Fully Rehabilitated
total cost
Ksh 1,096,768
estimate
Ksh 1,500,000

Kimotho Primary School

location
Kangari (in Kigumo)
year first funded
2006
action
Construction Of A Class Room
output
-
implementation status
Materials Bought And Classroom 60% Done
total cost
Ksh 1,060,560
estimate
Ksh 1,000,000

Thamara Secondary School

location
Muthithi (in Kigumo)
year first funded
2008
action
Renovation Of Classroom
output
-
implementation status
8 Class Renovated
total cost
Ksh 1,060,000
estimate
Ksh 900,000

Githima Secondary School

location
Kigumo (in Kigumo)
year first funded
2003
action
Construction Toilets /Lab & Library
output
-
implementation status
Toilets Complete And Lab
total cost
Ksh 1,042,567
estimate
Ksh 1,500,000

Mairi Secondary School

location
Kangari (in Kigumo)
year first funded
2006
action
Construction Of Class Rooms And Toilets
output
-
implementation status
2 Classrooms &2 Toilet Complete And Digging Of One More Double Toilet
total cost
Ksh 1,000,000
estimate
Ksh 0

Makomboki Police Post

location
Kangari (in Kigumo)
year first funded
2003
action
Construction Of A Police Post
output
-
implementation status
6 Big Rooms &4 Rooms Done & Occupied
total cost
Ksh 1,000,000
estimate
Ksh 700,000

Mumbu Secondary School

location
Kahumbu (in Kigumo)
year first funded
2005
action
Laboratory Construction
output
-
implementation status
Lab Almost Fully Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,682,000

Mugumoini Primary School

location
Kahumbu (in Kigumo)
year first funded
2005
action
Rehabilitation Of Class Rooms
output
-
implementation status
8 Classes Rehabilitated
total cost
Ksh 1,000,000
estimate
Ksh 448,800

Kamukabi Secondary School

location
Kinyona (in Kigumo)
year first funded
2006
action
Construction Of A Library
output
-
implementation status
Library Complete
total cost
Ksh 1,000,000
estimate
Ksh 3,197,400

Ndugamano Primary School

location
Kigumo (in Kigumo)
year first funded
2006
action
Class Rooms Construction
output
-
implementation status
3 Classes Complete
total cost
Ksh 1,000,000
estimate
Ksh 3,359,730

Kigumo Multi Purpose Hall

location
Kigumo (in Kigumo)
year first funded
2006
action
Construction Of A Social Hall & Offices
output
-
implementation status
Offices Are Complete. Roofing Has Been Done In Hall & Strengthening The Walls
total cost
Ksh 1,000,000
estimate
Ksh 981,600

Kigumo Milk Cooler

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of Milk Cooler
output
-
implementation status
Work Not Started
total cost
Ksh 1,000,000
estimate
Ksh 0

Karega Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Class Rooms & Electrification
output
-
implementation status
Plastering, Floor, Repairs & Electrification
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Kamukabi Primary School

location
Kinyona (in Kigumo)
year first funded
2006
action
Renovation Of Class Rooms
output
-
implementation status
9 Classes Renovated
total cost
Ksh 981,766
estimate
Ksh 1,000,000

Kirere Water Tank

location
Kigumo (in Kigumo)
year first funded
2006
action
Rehabilitation & Covering Of Tank
output
-
implementation status
Piping And Water Chamber Done Its Partially Done
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Njora Secondary School

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction Of A Library & Adm Block
output
-
implementation status
Big Staff Room Constructed
total cost
Ksh 900,000
estimate
Ksh 5,000,000

Mutunguru Secondary School

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of An Admin Block
output
-
implementation status
Block Done Up To Lintal. Plastering & Roofing Remaining
total cost
Ksh 900,000
estimate
Ksh 700,000

Mugumoini Water Project

location
Kahumbu (in Kigumo)
year first funded
2006
action
Borehole Construction
output
-
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 901,171

Kangari Polytechnic

location
Kangari (in Kigumo)
year first funded
2008
action
Construction Of A Class Room
output
-
implementation status
2 Class Complete
total cost
Ksh 850,000
estimate
Ksh 2,000,000

Gachocho Water Well

location
Kigumo (in Kigumo)
year first funded
2005
action
Digging Well &Construction Of Water Tank
output
-
implementation status
Water Well Complete And Working. Tank Is 70% Done
total cost
Ksh 850,000
estimate
Ksh 700,000

Turuturu Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Toilets
output
-
implementation status
Toilets Are Complete But With No Doors
total cost
Ksh 820,000
estimate
Ksh 700,000

Makomboki -Gatiaini Water Project

location
Kangari (in Kigumo)
year first funded
2005
action
Laying Of Pipes
output
-
implementation status
Complete
total cost
Ksh 813,164
estimate
Ksh 953,643

Nyangagati Foot Bridge

location
Kahumbu (in Kigumo)
year first funded
2006
action
Construction Of A Foot Bridge
output
-
implementation status
80% Done. Construction Of Wings Remaining
total cost
Ksh 800,357
estimate
Ksh 0

Mariira Secondary School

location
Kangari (in Kigumo)
year first funded
2007
action
Construction Of Admin Block
output
-
implementation status
Building Done From Slab Upward. There Materials On Site
total cost
Ksh 800,000
estimate
Ksh 3,000,000

Kigumo Law Court

location
Kigumo (in Kigumo)
year first funded
2009
action
Construction Of Modern Law Court
output
-
implementation status
Work Not Started
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Turuturu Dispensary

location
Kigumo (in Kigumo)
year first funded
2005
action
Construction Of Maternity Wing
output
-
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 1,328,000

Nguku Water Project

location
Kigumo (in Kigumo)
year first funded
2007
action
Installation Of Pipes
output
-
implementation status
30% Done And In Good Progress
total cost
Ksh 800,000
estimate
Ksh 4,900,000

Karinga Primary School

location
Kinyona (in Kigumo)
year first funded
2006
action
Construction Of Water Tank
output
-
implementation status
3 Classes Complete
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Githembe-Kahariro Water Project

location
Kahumbu (in Kigumo)
year first funded
2008
action
Construction Of Water Tank
output
-
implementation status
50% Done
total cost
Ksh 800,000
estimate
Ksh 1,500,000

St. Francis Mukuyuini Secondary School

location
Kangari (in Kigumo)
year first funded
2006
action
Construction Of Kitchen And Dining Hall
output
-
implementation status
Kitchen Is Almost Fully Complete &Is In Use
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Muthithi Divisional Head Office

location
Muthithi (in Kigumo)
year first funded
2009
action
Construction Of A District Officer Office
output
-
implementation status
Work In Progress
total cost
Ksh 750,000
estimate
Ksh 1,000,000

Samuka Dairy Project

location
Muthithi (in Kigumo)
year first funded
2007
action
Cooler And Milk Collection Centre
output
-
implementation status
Less Than 30% Done
total cost
Ksh 750,000
estimate
Ksh 1,000,000

Kiangagirwa Water Project

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Water Well
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 800,000

Gacharage Divisional Head Office

location
Kinyona (in Kigumo)
year first funded
2009
action
Construction Of District Officer Office
output
-
implementation status
Work In Progress
total cost
Ksh 750,000
estimate
Ksh 1,200,000

Mathareini Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Class Rooms
output
-
implementation status
Over 80% Complete
total cost
Ksh 720,000
estimate
Ksh 1,200,000

Mutunguru Secondary School

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of An Admin Bock
output
-
implementation status
60% Done
total cost
Ksh 700,000
estimate
Ksh 700,000

Magutuini Water Project

location
Muthithi (in Kigumo)
year first funded
2006
action
Replacement Of Old Pipes With G.I
output
-
implementation status
Pipes Are Laid Up To 1Km. 235 Pipes Worth Kshs 705,000 On Site
total cost
Ksh 700,000
estimate
Ksh 784,000

Muthithi Dispensary

location
Muthithi (in Kigumo)
year first funded
2008
action
Expansion Of Dispensary
output
-
implementation status
Work In Progress
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Kirere Primary School

location
Kigumo (in Kigumo)
year first funded
2006
action
Rehabilitation Of Latrines
output
-
implementation status
4 Classrooms Done, Painting, Floor, Windows
total cost
Ksh 650,000
estimate
Ksh 800,000

Gatumbi Special Unit

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Classes
output
-
implementation status
Class Constructed
total cost
Ksh 650,000
estimate
Ksh 1,300,000

Gacuca Bridge

location
Kinyona (in Kigumo)
year first funded
2008
action
Construction Of Bridge
output
-
implementation status
Work Not Commenced
total cost
Ksh 650,000
estimate
Ksh 700,000

Rarakwa Secondary School

location
Kinyona (in Kigumo)
year first funded
2008
action
Construction Of Admin Block
output
-
implementation status
70% Done
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Mutunguru Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 850,000

Maragwa/Miya Gatumbi Foot Bridge

location
Kigumo (in Kigumo)
year first funded
2003
action
Construction Of A Bridge
output
-
implementation status
Fully Complete
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Uithirandu Water Project

location
Muthithi (in Kigumo)
year first funded
2006
action
Water Supply
output
-
implementation status
Fully Complete
total cost
Ksh 600,000
estimate
Ksh 700,000

Gakarati Primary School

location
Kahumbu (in Kigumo)
year first funded
2005
action
Construction Of Boys And Girls Latrines
output
-
implementation status
Complete
total cost
Ksh 560,000
estimate
Ksh 0

Kamukabi-Gathaithi-Mukeu Foot Bridge

location
Kinyona (in Kigumo)
year first funded
2005
action
Construction Of A Bridge
output
-
implementation status
Less Than 40% Done
total cost
Ksh 550,000
estimate
Ksh 0

Kamiraba Water

location
Kigumo (in Kigumo)
year first funded
2008
action
Installation Of Water
output
-
implementation status
In Good Progress
total cost
Ksh 516,770
estimate
Ksh 200,000

Gitwe Water Project

location
Kangari (in Kigumo)
year first funded
2008
action
Connection Of Water Pipes
output
-
implementation status
In Good Progress
total cost
Ksh 504,770
estimate
Ksh 600,000

Turuturu Secondary School

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Classrooms
output
-
implementation status
1 Class Complete
total cost
Ksh 500,000
estimate
Ksh 0

Thamara Primary School

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of 3 Classes,Office & 4 Toilets
output
-
implementation status
1 Class Roofed &Not Complete. 1 Class Done Up To Lintel. 1 Class Only Foundation Done.60% Of Work Remaining
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Githembe Secondary School

location
Kahumbu (in Kigumo)
year first funded
2006
action
Construction Of Library Hall
output
-
implementation status
80% Of Work Is Done. There Some Cracks On Wall Which Need To Be ReDone
total cost
Ksh 500,000
estimate
Ksh 682,000

Githiru Water Project

location
Kigumo (in Kigumo)
year first funded
2008
action
Installation Of Pipes
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 700,000

Gichenga Water Project

location
Kigumo (in Kigumo)
year first funded
2007
action
Installation Of Pipes
output
-
implementation status
Not Started
total cost
Ksh 500,000
estimate
Ksh 600,000

Kigumo Polytechnic

location
Kigumo (in Kigumo)
year first funded
2006
action
Construction Of Class Rooms
output
-
implementation status
Over 60% Complete
total cost
Ksh 500,000
estimate
Ksh 800,000

Karia-Ini Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Classrooms
output
-
implementation status
Work Don Plastering, Floor Painting Of B/Board, Windows
total cost
Ksh 500,000
estimate
Ksh 1,200,000

Kiugu Secondary School

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of Classrooms
output
-
implementation status
2 Classes Constructed
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kiugu Secondary School

location
Muthithi (in Kigumo)
year first funded
2007
action
Build Two Classes Adm Block &4 Toilets
output
-
implementation status
2 Classrooms Set, 1 Roofed But Not Complete, One Up To Foundation Only. Only 40% Of Work Done
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Iria- Ini Water Project

location
Kigumo (in Kigumo)
year first funded
2008
action
Installation Of Pipes
output
-
implementation status
Pipes Installed
total cost
Ksh 472,650
estimate
Ksh 700,000

Kanderendu Primary School

location
Kangari (in Kigumo)
year first funded
2008
action
Construction Of A Class Room
output
-
implementation status
In Good Progress
total cost
Ksh 471,560
estimate
Ksh 900,000

Kirere Police Post

location
Kigumo (in Kigumo)
year first funded
2008
action
Police Post Construction
output
-
implementation status
Work In Progress
total cost
Ksh 456,093
estimate
Ksh 600,000

Thukumu Nursery School

location
Kigumo (in Kigumo)
year first funded
2005
action
Construction & Roofing Of 2 Classes
output
-
implementation status
2 Classes Roofed .3Rd Class Done Up To Rental
total cost
Ksh 450,000
estimate
Ksh 2,800,000

Marumi Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Classrooms
output
-
implementation status
12 Classrooms Floored & Veranda
total cost
Ksh 450,000
estimate
Ksh 800,000

Kahuti Nursery

location
Kangari (in Kigumo)
year first funded
2008
action
Construction Of A Class Room
output
-
implementation status
50% Work Is Done
total cost
Ksh 420,000
estimate
Ksh 420,000

Mugumoini Dispensary

location
Kahumbu (in Kigumo)
year first funded
2008
action
Lab Construction
output
-
implementation status
Roofing Remaining
total cost
Ksh 400,000
estimate
Ksh 700,000

Gathimaini Primary School

location
Kahumbu (in Kigumo)
year first funded
2006
action
Renovation Of Class Rooms
output
-
implementation status
Renovation Not Complete
total cost
Ksh 400,000
estimate
Ksh 1,500,000

Mbogoini Primary School

location
Kahumbu (in Kigumo)
year first funded
2006
action
Rehabilitation Of Class Rooms
output
-
implementation status
In Good Progress
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kahariro Dispensary

location
Kahumbu (in Kigumo)
year first funded
2005
action
Completion Of Dispensary
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 420,000

Muiria Primary School

location
Kinyona (in Kigumo)
year first funded
2008
action
Construction Of Toilets
output
-
implementation status
6 Toilets Constructed
total cost
Ksh 400,000
estimate
Ksh 800,000

Matu Special Unit

location
Kinyona (in Kigumo)
year first funded
2005
action
Construction Of Class Rooms
output
-
implementation status
50% Done
total cost
Ksh 400,000
estimate
Ksh 0

Mathare-Ini Water Dev Proj

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of A Spring
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 800,000

Marumi Secondary School

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of 4 Classes
output
-
implementation status
1 Class Complete
total cost
Ksh 400,000
estimate
Ksh 1,800,000

Njoguini Primary School

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Classes
output
-
implementation status
1 Class Complete
total cost
Ksh 400,000
estimate
Ksh 500,000

Kanyiriri Water Pro

location
Kigumo (in Kigumo)
year first funded
2007
action
Supply Of Water
output
-
implementation status
In Good Progress. 60% Done
total cost
Ksh 400,000
estimate
Ksh 800,000

Kahariro Primary School

location
Kahumbu (in Kigumo)
year first funded
2008
action
Renovation Of Class Rooms
output
-
implementation status
4 Classes Renovated
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kahumbu Primary School

location
Kahumbu (in Kigumo)
year first funded
2008
action
Renovation Of Class Rooms
output
-
implementation status
4 Classes Renovated
total cost
Ksh 400,000
estimate
Ksh 600,000

Kanderendu Health Centre

location
Kangari (in Kigumo)
year first funded
2005
action
Water Tank Construction
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Gakeu Primary School

location
Muthithi (in Kigumo)
year first funded
2005
action
Classroom Construction
output
-
implementation status
1 Class Done
total cost
Ksh 400,000
estimate
Ksh 900,000

Kiugu Primary School

location
Muthithi (in Kigumo)
year first funded
2005
action
Class Room Construction
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kangari Asst Chief Office

location
Kangari (in Kigumo)
year first funded
2008
action
Asst Chief Office
output
-
implementation status
2 Rooms Constructed
total cost
Ksh 398,819
estimate
Ksh 500,000

Kagwathi Nursery

location
Kahumbu (in Kigumo)
year first funded
2006
action
Construction Of Nursery Sch
output
-
implementation status
Complete
total cost
Ksh 398,520
estimate
Ksh 500,000

Gakeu Nursery

location
Muthithi (in Kigumo)
year first funded
2005
action
Class Room Construction
output
-
implementation status
1 Class Done
total cost
Ksh 350,000
estimate
Ksh 500,000

Kimakia Ngaragu Irrigation Pro

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Water Well
output
-
implementation status
70% Complete
total cost
Ksh 350,000
estimate
Ksh 900,000

Nguku Primary School

location
Kigumo (in Kigumo)
year first funded
2005
action
Rehabilitation Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 351,200

Marumi Water Project

location
Kigumo (in Kigumo)
year first funded
2004
action
Installation Of Water Pipes
output
-
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 450,000

Kahuho Nursery School

location
Kahumbu (in Kigumo)
year first funded
2005
action
Nursery School Completion
output
-
implementation status
Complete
total cost
Ksh 345,000
estimate
Ksh 0

Kagurumo Nursery

location
Muthithi (in Kigumo)
year first funded
2004
action
Class Rooms Construction
output
-
implementation status
1 Class Done
total cost
Ksh 320,000
estimate
Ksh 450,000

Mukoe Water Project

location
Muthithi (in Kigumo)
year first funded
2007
action
Construction Of Water Well
output
-
implementation status
Complete
total cost
Ksh 312,795
estimate
Ksh 400,000

Kaimiri Primary School

location
Kigumo (in Kigumo)
year first funded
2006
action
Rehabilitation Of Class Rooms
output
-
implementation status
8 Classes Floored, Walls Remaining
total cost
Ksh 300,000
estimate
Ksh 689,400

Mbage Foot Bridge

location
Kigumo (in Kigumo)
year first funded
2003
action
Foot Bridge Construction
output
-
implementation status
Fully Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Irigiro Dispensary

location
Muthithi (in Kigumo)
year first funded
2008
action
Construction Of Dispensary
output
-
implementation status
1 Room Done
total cost
Ksh 300,000
estimate
Ksh 2,000,000

Irigiro Nursery

location
Muthithi (in Kigumo)
year first funded
2007
action
Class Room Construction
output
-
implementation status
In Good Progress
total cost
Ksh 300,000
estimate
Ksh 600,000

Muthithi Primary School

location
Muthithi (in Kigumo)
year first funded
2007
action
Classrooms Renovation
output
-
implementation status
1 Class Over 65% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Njora Primary School

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of Administration Block
output
-
implementation status
Adm Block Over 50% Done
total cost
Ksh 300,000
estimate
Ksh 0

Muthithi School For The Mentally Handicapped

location
Muthithi (in Kigumo)
year first funded
2004
action
Rehabilitation Of Classrooms
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Gachuhiro Nursery School

location
Kahumbu (in Kigumo)
year first funded
2006
action
Construction Of A Nursery Sch.
output
-
implementation status
Over 80% Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Ndonga Primary School

location
Kahumbu (in Kigumo)
year first funded
2006
action
Construction Of Toilets& Renovation Of Classrooms
output
-
implementation status
Toilets Are Complete &7 Classrooms Renovated
total cost
Ksh 300,000
estimate
Ksh 0

Kinyona Primary School

location
Kinyona (in Kigumo)
year first funded
2006
action
Rehabilitation Of Classrooms
output
-
implementation status
3 Classes Renovated
total cost
Ksh 300,000
estimate
Ksh 0

Kiamaingi Primary School

location
Kinyona (in Kigumo)
year first funded
2005
action
Rehabilitation Of Class Rooms
output
-
implementation status
50% Done
total cost
Ksh 300,000
estimate
Ksh 779,600

Ngurunga Ndabibi Access Road

location
Kigumo (in Kigumo)
year first funded
2009
action
Grading Of Access Road
output
-
implementation status
Work Not Commenced
total cost
Ksh 300,000
estimate
Ksh 600,000

Suta Bridge Project

location
Kigumo (in Kigumo)
year first funded
2009
action
Bridge Construction
output
-
implementation status
Work Not Commenced
total cost
Ksh 300,000
estimate
Ksh 400,000

Gakima Electricity Project

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Highdro-Electric Power
output
-
implementation status
Some Equipments Bought
total cost
Ksh 300,000
estimate
Ksh 500,000

Gachocho A Centre

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Trough & Crush
output
-
implementation status
Fencing Using Cemented Pillar & Barbed Wire70% Done
total cost
Ksh 300,000
estimate
Ksh 500,000

Magiki Tree Pranting Project

location
Kigumo (in Kigumo)
year first funded
2007
action
Hiring Of Land, Purchase Of Seedlings, Bag, Manure
output
-
implementation status
Seedling Ready For Planting
total cost
Ksh 300,000
estimate
Ksh 300,000

Mwarano Primary School

location
Kangari (in Kigumo)
year first funded
2008
action
Rehabilitation Of Classrooms
output
-
implementation status
4 Class Rehabiliteted
total cost
Ksh 296,130
estimate
Ksh 0

Gikarangu Chiefs Office

location
Muthithi (in Kigumo)
year first funded
2009
action
Construction Of Chief Office
output
-
implementation status
Work In Progress
total cost
Ksh 250,000
estimate
Ksh 600,000

Muthithi Chiefs Office

location
Muthithi (in Kigumo)
year first funded
2009
action
Construction Of Chief Office
output
-
implementation status
Work In Progress
total cost
Ksh 250,000
estimate
Ksh 500,000

Nyakongo Foot Bridge

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of A Foot Bridge
output
-
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 230,000

Sabasaba Health Centre

location
Kahumbu (in Kigumo)
year first funded
2008
action
X-Ray Machine Battery Park
output
-
implementation status
Machine In Place
total cost
Ksh 226,092
estimate
Ksh 500,000

Kiriti Water Project

location
Kigumo (in Kigumo)
year first funded
2008
action
Installation Of Pipes
output
-
implementation status
Pipes Installed
total cost
Ksh 214,300
estimate
Ksh 300,000

Karura Footbridge

location
Muthithi (in Kigumo)
year first funded
2009
action
Construction Of A Bridge
output
-
implementation status
80% Done
total cost
Ksh 200,187
estimate
Ksh 300,000

Gatiaini Primary School

location
Kangari (in Kigumo)
year first funded
2008
action
Rehabilitation Of Classrooms
output
-
implementation status
3 Class Rehabiliteted
total cost
Ksh 200,000
estimate
Ksh 0

Irati Gakurwe Well

location
Kigumo (in Kigumo)
year first funded
2004
action
Construction Of Toilets
output
-
implementation status
Fully Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Irati Gakurwe Well

location
Kigumo (in Kigumo)
year first funded
2004
action
Construction A Of Well
output
-
implementation status
Fully Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Gatuyaini Well

location
Kigumo (in Kigumo)
year first funded
2004
action
Construction Of A Water Well
output
-
implementation status
Fully Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

Kamumbui- Gakoeini Water Project

location
Kigumo (in Kigumo)
year first funded
2006
action
Distribution Of Water Through Piping
output
-
implementation status
Over 60% Complete
total cost
Ksh 200,000
estimate
Ksh 400,000

Kaibuti Water Project

location
Kigumo (in Kigumo)
year first funded
2007
action
Construction Of Water Well
output
-
implementation status
In Good Progress
total cost
Ksh 200,000
estimate
Ksh 400,000

Kamunganga Primary School

location
Kigumo (in Kigumo)
year first funded
2009
action
Renovation Of 3 Classroom
output
-
implementation status
Work Not Commenced
total cost
Ksh 200,000
estimate
Ksh 500,000

Matu Primary School

location
Kinyona (in Kigumo)
year first funded
2007
action
Construction Of Class Rooms
output
-
implementation status
Only 80% Done
total cost
Ksh 200,000
estimate
Ksh 0

Kahariro Police Post

location
Kahumbu (in Kigumo)
year first funded
2006
action
Construction Of Police Post
output
-
implementation status
20% Done
total cost
Ksh 200,000
estimate
Ksh 0

Ithe-Rui Well

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of Water Well
output
-
implementation status
Well Constructed
total cost
Ksh 200,000
estimate
Ksh 200,000

Gatunguru Natural Spring

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of A Spring
output
-
implementation status
Complete
total cost
Ksh 180,300
estimate
Ksh 400,000

Njogu-Ini Natural Spring

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of A Spring
output
-
implementation status
Complete
total cost
Ksh 180,160
estimate
Ksh 200,000

Gakare Nursery School

location
Kigumo (in Kigumo)
year first funded
2008
action
Renovation Of Classroom
output
-
implementation status
Nursery Renovated
total cost
Ksh 167,850
estimate
Ksh 500,000

Iriguini Chiefs Office

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of Rain Shed
output
-
implementation status
Not Commenced
total cost
Ksh 155,000
estimate
Ksh 155,000

Kiangai Primary School

location
Kinyona (in Kigumo)
year first funded
2008
action
Construction Of Class Rooms
output
-
implementation status
40% Done
total cost
Ksh 150,460
estimate
Ksh 800,000

Kahethu Nursery School

location
Kigumo (in Kigumo)
year first funded
2008
action
Construction Of Toilets And Water Tank
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 200,000

Kamukabi Polytechnic

location
Kinyona (in Kigumo)
year first funded
2008
action
Electrification
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 300,000

Njora Nursery School

location
Muthithi (in Kigumo)
year first funded
2004
action
Class Rooms Construction
output
-
implementation status
1 Class Over 65% Complete
total cost
Ksh 150,000
estimate
Ksh 0

Ngaburi Nursery School

location
Muthithi (in Kigumo)
year first funded
2004
action
Class Room Rehab
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kiawaititu Access Road

location
Kigumo (in Kigumo)
year first funded
2008
action
Grading Of Access Road
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 200,000

Huma Ridge Access Road

location
Kigumo (in Kigumo)
year first funded
2008
action
Grading Of Access Road
output
-
implementation status
Complete
total cost
Ksh 132,000
estimate
Ksh 300,000

Matadara Nursery School

location
Kinyona (in Kigumo)
year first funded
2008
action
Class Rooms Construction
output
-
implementation status
Class Done Up To Lintel
total cost
Ksh 120,000
estimate
Ksh 400,000

Kaimururu Water Well

location
Muthithi (in Kigumo)
year first funded
2006
action
Water Supply
output
-
implementation status
Fully Complete
total cost
Ksh 120,000
estimate
Ksh 200,000

Karura Foot Bridge

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction Of A Bridge
output
-
implementation status
Complete
total cost
Ksh 115,000
estimate
Ksh 0

Ceera Water Well

location
Muthithi (in Kigumo)
year first funded
2006
action
Construction of A Well
output
-
implementation status
Fully Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiawanyago Well

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of A Water Well
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 100,000

Wangari Fresh Water Spring

location
Muthithi (in Kigumo)
year first funded
2005
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyagitembe Water Spring

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of A Well
output
-
implementation status
Well Constructed
total cost
Ksh 100,000
estimate
Ksh 500,000

Kia Waihuro Well

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of A Water Well
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kawangai Well

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of A Water Well
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kanyoya Well

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of A Water Well
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 10,000

Gitomboya Water Well

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of Water Well
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Cheera Well

location
Muthithi (in Kigumo)
year first funded
2004
action
Construction Of Water Well
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Irati Water Well

location
Kigumo (in Kigumo)
year first funded
2004
action
Construction Of A Well
output
-
implementation status
Fully Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Boro Cattle Dip

location
Kinyona (in Kigumo)
year first funded
2008
action
Renovation Of Cattle Dip
output
-
implementation status
Cattle Dip Renovated
total cost
Ksh 100,000
estimate
Ksh 200,000

Rwanyaga Well

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of A Water Well
output
-
implementation status
Little Work Done. Few Stones On Site
total cost
Ksh 100,000
estimate
Ksh 100,000

Gathima Unit Water Project

location
Muthithi (in Kigumo)
year first funded
2005
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 100,000

Matuto Well

location
Muthithi (in Kigumo)
year first funded
2005
action
Construction Of A Water Well
output
-
implementation status
not known
total cost
Ksh 65,000
estimate
Ksh 100,000

Kiugu Cattle Dip

location
Muthithi (in Kigumo)
action
Fencing &Renovation Of A Cattle Dip
output
-
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 0

Kiahiti Nursery School

location
Kangari (in Kigumo)
action
n/a
output
-
implementation status
not known
total cost
Ksh 0
estimate
Ksh 500,000

Githembe Primary School

location
Kahumbu (in Kigumo)
action
Construction Of A Library
output
-
implementation status
not known
total cost
Ksh 0
estimate
Ksh 682,000

Kiawanda Water Well

location
Muthithi (in Kigumo)
action
n/a
output
-
implementation status
not known
total cost
Ksh 0
estimate
Ksh 150,000