The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kiharu

Gakaki Water Project

location
Murarandia (in Kiharu)
year first funded
2003
action
Pipeworks
output
Clean Water
implementation status
Ongoing
total cost
Ksh 2,893,333
estimate
Ksh 10,000,000

Mukangu Dispensary

location
Kahuhia (in Kiharu)
year first funded
2004
action
Construction
output
Public Health
implementation status
Complete And Not In Use
total cost
Ksh 2,848,596
estimate
Ksh 1,922,596

Gacaru Water Project

location
Mbiri (in Kiharu)
year first funded
2007
action
Piping
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 6,000,000

Kiamugo Borehole

location
Gikindu (in Kiharu)
year first funded
2007
action
Drilling And Equipping
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 2,290,041
estimate
Ksh 5,000,000

Kaganda Secondary School

location
Murarandia (in Kiharu)
year first funded
2008
action
Construction Of 2 Classrooms
output
Expansion Of The Intake Capacity
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Mutitu Irrigation Project

location
Mugoiri (in Kiharu)
year first funded
2007
action
Phase 1 Irrigation
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 0

Gitui Police Post

location
Kahuhia (in Kiharu)
year first funded
2004
action
Construction
output
Security
implementation status
Ongoing
total cost
Ksh 1,955,096
estimate
Ksh 2,000,000

Gikandu Water Project

location
Mbiri (in Kiharu)
year first funded
2004
action
Gravity Water Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 1,922,596
estimate
Ksh 4,000,000

Muchungucha Water Project

location
Mbiri (in Kiharu)
year first funded
2007
action
Piping
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 1,900,000
estimate
Ksh 8,000,000

Theri Secondary School

location
Murarandia (in Kiharu)
year first funded
2004
action
Laboratory Construction
output
Better Learning Facilities
implementation status
Ongoing
total cost
Ksh 1,880,000
estimate
Ksh 2,000,000

Kiria Borehole

location
Mugoiri (in Kiharu)
year first funded
2007
action
Drilling
output
Provision Of Clean Water
implementation status
Drilled By Ministry Of Planning To Completion
total cost
Ksh 1,640,041
estimate
Ksh 2,000,000

Wanjengi Dispensary

location
Weithaga (in Kiharu)
year first funded
2004
action
Water Tank Construction,Construction Of 2 Residential Quarters
output
Better Infrastructure
implementation status
Ongoing
total cost
Ksh 1,517,596
estimate
Ksh 1,600,000

Mugeka Chief's Camp

location
Gaturi (in Kiharu)
year first funded
2007
action
Office Construction
output
Closer Public Services
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 3,000,000

Geitwa Police Post

location
Gaturi (in Kiharu)
year first funded
2004
action
Construction Of Quarters
output
Provide Security
implementation status
Ongoing
total cost
Ksh 1,488,334
estimate
Ksh 1,488,334

Kagaa Police Post

location
Mugoiri (in Kiharu)
year first funded
2005
action
Construction
output
Security
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,200,000

Karemaini Secondary School

location
Gikindu (in Kiharu)
year first funded
2004
action
2 Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 1,362,596
estimate
Ksh 1,362,596

Kiangochi Secondary School

location
Mbiri (in Kiharu)
year first funded
2003
action
2 Classroom Construction
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 1,320,000
estimate
Ksh 1,320,000

Weithaga Mixed Secondary School

location
Weithaga (in Kiharu)
year first funded
2004
action
Water Tank Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 1,296,596
estimate
Ksh 1,296,596

Mirira Secondary School

location
Gikindu (in Kiharu)
year first funded
2003
action
Construction Of 1 Classroom
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 1,200,096
estimate
Ksh 1,200,096

Kairegi Electricity Project

location
Murarandia (in Kiharu)
year first funded
2006
action
Purchase Of 2 Transformers
output
Alternative Power Source
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Kahuhia Borehole

location
Kahuhia (in Kiharu)
year first funded
2008
action
Piping
output
Better Infrastructure
implementation status
Reallocated To Kiaguthu Sec Sch To Construct The Second Floor Of Administration Block
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Muriranjas District Hospital

location
(in Kiharu)
year first funded
2008
action
Construction Of X Ray Room
output
-
implementation status
on going
total cost
Ksh 1,100,000
estimate
Ksh 0

Kiamuri Secondary School

location
Gaturi (in Kiharu)
year first funded
2004
action
4 Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 1,099,798
estimate
Ksh 2,000,000

Gathinja Secondary School

location
Kahuhia (in Kiharu)
year first funded
2003
action
Hall Completion
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 1,087,908
estimate
Ksh 687,908

Murarandia Tac Hall

location
Murarandia (in Kiharu)
year first funded
2004
action
Hall Construction And Providing Chairs
output
Service Delivery
implementation status
Ongoing
total cost
Ksh 1,085,000
estimate
Ksh 1,085,000

Mirichu Water Project

location
Mugoiri (in Kiharu)
year first funded
2008
action
Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 7,000,000

Mukangu Secondary School

location
Kahuhia (in Kiharu)
year first funded
2006
action
dining Hall Construction
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kianjoya Coffee Factory

location
Murarandia (in Kiharu)
year first funded
2008
action
Water Tank Construction
output
-
implementation status
on going
total cost
Ksh 1,000,000
estimate
Ksh 0

Mukurwe Secondary School

location
Gaturi (in Kiharu)
year first funded
2004
action
Dining Hall Construction
output
Promote Education
implementation status
Ongoing
total cost
Ksh 999,798
estimate
Ksh 1,000,000

Kandegenye Water Project

location
Mugoiri (in Kiharu)
year first funded
2003
action
Water Pipe Works
output
Clean Water
implementation status
Ongoing
total cost
Ksh 996,667
estimate
Ksh 1,000,000

Kiboi Secondary School

location
Mugoiri (in Kiharu)
year first funded
2005
action
2 Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 980,000
estimate
Ksh 980,000

Kahuti Assistant Chief's Office

location
Weithaga (in Kiharu)
year first funded
2006
action
0ffice Construction
output
Service Delivery
implementation status
Ongoing
total cost
Ksh 960,000
estimate
Ksh 2,000,000

Mugoiri Secondary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
Renovation,Water Pump And Pipe Works
output
Clean Water
implementation status
Ongoing
total cost
Ksh 910,000
estimate
Ksh 510,000

Kiharu OrchaRoads

location
Mugoiri (in Kiharu)
year first funded
2008
action
Construction Green House Shed And Piping
output
Higher Production Due To Scientific Generated Seedlings From Jkuat
implementation status
Shed Complete And In Operation
total cost
Ksh 897,556
estimate
Ksh 0

Gatheru Dispensary

location
Kahuhia (in Kiharu)
year first funded
2003
action
Maternity Wing Creation
output
Public Health
implementation status
Ongoing
total cost
Ksh 895,000
estimate
Ksh 895,000

Gaciku Primary School

location
Mugoiri (in Kiharu)
year first funded
2007
action
Rehabilitating 8 Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 885,700
estimate
Ksh 1,000,000

Kairichi Primary School

location
Murarandia (in Kiharu)
year first funded
2004
action
4 Classroom Block Completion
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 877,596
estimate
Ksh 877,596

Kaganda Water Project

location
Murarandia (in Kiharu)
year first funded
2004
action
Pipe Works And Reservoir
output
Clean Water
implementation status
Complete And Not In Use
total cost
Ksh 867,596
estimate
Ksh 867,596

Icanjeru Police Post

location
Gaturi (in Kiharu)
year first funded
2003
action
Adminstration Block Construction
output
Promote Education
implementation status
Ongoing
total cost
Ksh 829,167
estimate
Ksh 1,029,167

Gikindu Water Project

location
Gikindu (in Kiharu)
year first funded
2007
action
Piping
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 828,800
estimate
Ksh 1,200,000

Koimbi Police Post

location
Weithaga (in Kiharu)
year first funded
2003
action
Construction
output
Security
implementation status
Ongoing
total cost
Ksh 815,000
estimate
Ksh 715,000

Gitiri Dispensary

location
Mugoiri (in Kiharu)
year first funded
2004
action
Construction
output
Public Health
implementation status
Ongoing
total cost
Ksh 815,000
estimate
Ksh 815,000

Murarandia Polytechnic

location
Murarandia (in Kiharu)
year first funded
2008
action
Construction Of 1 Classroom
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Kamararo Water Project

location
Weithaga (in Kiharu)
year first funded
2008
action
Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 3,000,000

Kambirwa Primary School

location
Gikindu (in Kiharu)
year first funded
2007
action
Construction Of 1 Classroom
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Mandundo-Theri Water Project

location
Murarandia (in Kiharu)
year first funded
2006
action
Construction Of Intake
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 400,000

Gaitheri Secondary School

location
Gaturi (in Kiharu)
year first funded
2005
action
1 Classroom Construction
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 788,951
estimate
Ksh 2,000,000

Kambirwa Police Post

location
Gikindu (in Kiharu)
year first funded
2005
action
Ap Quarters Construction
output
Security
implementation status
Ongoing
total cost
Ksh 767,500
estimate
Ksh 767,500

Gatara Police Post

location
Murarandia (in Kiharu)
year first funded
2004
action
Construction
output
Security
implementation status
Ongoing
total cost
Ksh 760,000
estimate
Ksh 760,000

Mukumu Secondary School

location
Murarandia (in Kiharu)
year first funded
2004
action
2 Classrooms Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 730,000
estimate
Ksh 730,000

Mugeka Dispensary

location
Gaturi (in Kiharu)
year first funded
2005
action
Laboratory Construction
output
Public Health
implementation status
Ongoing
total cost
Ksh 708,000
estimate
Ksh 450,000

Kirogo Primary School

location
Kahuhia (in Kiharu)
year first funded
2006
action
Construction Of 1 Classroom
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Kahuhia Mixed Secondary School

location
Kahuhia (in Kiharu)
year first funded
2004
action
Laboratory Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 683,798
estimate
Ksh 683,798

Kiangatia Primary School

location
Gikindu (in Kiharu)
year first funded
2003
action
2 Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 672,500
estimate
Ksh 672,500

Ndikwe Police Post

location
Mbiri (in Kiharu)
year first funded
2004
action
Walling And Roofing
output
Security
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 1,650,000

Gatara Secondary School

location
Murarandia (in Kiharu)
year first funded
2008
action
Construction Of 1 Classroom
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 800,000

Gitie Secondary School

location
Weithaga (in Kiharu)
year first funded
2005
action
2 Classroom Construction
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 645,000
estimate
Ksh 595,000

Gitaro Dispensary

location
Mugoiri (in Kiharu)
year first funded
2004
action
Construction With A Lab Unit
output
Public Health
implementation status
Ongoing
total cost
Ksh 640,000
estimate
Ksh 640,000

Karumia Bridge

location
Gikindu (in Kiharu)
year first funded
2006
action
Construction
output
Better Infrastructure
implementation status
Ongoing
total cost
Ksh 638,000
estimate
Ksh 800,000

DrSecondary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
dining Hall Completion
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 630,000
estimate
Ksh 630,000

Mirira Police Post

location
Gikindu (in Kiharu)
year first funded
2005
action
Fencing And Water Harvesting
output
Improved Security
implementation status
Complete And Not In Use
total cost
Ksh 630,000
estimate
Ksh 930,000

Kirogo Library

location
Kahuhia (in Kiharu)
year first funded
2004
action
Renovation And Equiping
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 620,000
estimate
Ksh 620,000

Gathambara-Gikondi Water Project

location
Kahuhia (in Kiharu)
year first funded
2006
action
Gravity Water Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Mugoiri Chief's Camp

location
Mugoiri (in Kiharu)
year first funded
2008
action
Office Construction
output
Closer Public Services
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 3,000,000

Kahuti Police Post

location
Weithaga (in Kiharu)
year first funded
2003
action
Police Quarters Construction
output
Security
implementation status
Complete And In Use
total cost
Ksh 595,000
estimate
Ksh 595,000

Koimbi Primary School

location
Weithaga (in Kiharu)
year first funded
2004
action
Library Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 590,596
estimate
Ksh 590,596

Kiawambeu Secondary School

location
Mbiri (in Kiharu)
year first funded
2005
action
2 Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 590,000
estimate
Ksh 590,000

Ndutumi Secondary School

location
Mugoiri (in Kiharu)
year first funded
2004
action
Water Supply
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 577,596
estimate
Ksh 600,000

Gitige Secondary School

location
Weithaga (in Kiharu)
year first funded
2004
action
Water Tank Construction
output
Clean Water
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 550,000

Kionjoini Secondary School

location
Murarandia (in Kiharu)
year first funded
2004
action
2 Classroom Completion
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 550,000
estimate
Ksh 550,000

Githuuri Primary School

location
Gikindu (in Kiharu)
year first funded
2003
action
2 Classroom Construction
output
Promote Education
implementation status
Ongoing
total cost
Ksh 546,667
estimate
Ksh 546,667

Mirichu Secondary School

location
Mugoiri (in Kiharu)
year first funded
2004
action
Construction Of Dining Hall
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 540,000
estimate
Ksh 540,000

Gikuu Primary School

location
Gikindu (in Kiharu)
year first funded
2005
action
Rehabilitation Of 3 Classrooms
output
Promote Education
implementation status
Ongoing
total cost
Ksh 540,000
estimate
Ksh 540,000

Kang'Ara Police Post

location
Gaturi (in Kiharu)
year first funded
2005
action
Renovation And Finishing
output
Provide Security
implementation status
Ongoing
total cost
Ksh 538,334
estimate
Ksh 700,000

Gakunja Nursery School

location
Gikindu (in Kiharu)
year first funded
2004
action
Construction 0F 1 Classroom And Fencing
output
Promote Education
implementation status
Ongoing
total cost
Ksh 512,596
estimate
Ksh 512,596

Kiamboka Irrigation Project

location
Mugoiri (in Kiharu)
year first funded
2007
action
Piping
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 510,000
estimate
Ksh 5,000,000

Gatuya Police Post

location
Murarandia (in Kiharu)
year first funded
2003
action
Construction Of Quarters
output
Security
implementation status
Complete And In Use
total cost
Ksh 508,000
estimate
Ksh 108,000

Kambirwa Mango Plant

location
Gikindu (in Kiharu)
year first funded
2007
action
Collection Shed Construction
output
Value Addition Of Fruits
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiria Dispensary

location
Mugoiri (in Kiharu)
year first funded
2004
action
Maternity Wing Creation
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiawambeu Gitei Water Project

location
Mbiri (in Kiharu)
year first funded
2008
action
Piping
output
-
implementation status
complete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kayahwegatuya-Kiander Bridge

location
Murarandia (in Kiharu)
year first funded
2005
action
Bridge Construction
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Wanjengi Police Post

location
Weithaga (in Kiharu)
year first funded
2003
action
Police Quarters Construction
output
Security
implementation status
Complete And In Use
total cost
Ksh 495,000
estimate
Ksh 495,000

Gaichangere Primary School

location
Murarandia (in Kiharu)
year first funded
2005
action
2 Classrooms Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 490,000
estimate
Ksh 490,000

Gitweku West Water Project

location
Weithaga (in Kiharu)
year first funded
2006
action
Piping And Hydram
output
Clean Water
implementation status
Ongoing
total cost
Ksh 490,000
estimate
Ksh 190,000

Gatara Dispensary

location
Murarandia (in Kiharu)
year first funded
2003
action
Maternity Equipping
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 483,333
estimate
Ksh 483,333

Kagumo Secondary School

location
Mugoiri (in Kiharu)
year first funded
2005
action
Equipping The Library
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 460,000
estimate
Ksh 460,000

Gitaro Primary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
1 Classroom Renovation
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 450,000
estimate
Ksh 200,000

Gatitu Primary School

location
Gaturi (in Kiharu)
year first funded
2006
action
Construction Of 1 Classroom
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 438,334
estimate
Ksh 238,334

Gathiru Police Post

location
Mugoiri (in Kiharu)
year first funded
2004
action
Construction
output
Security
implementation status
Complete And In Use
total cost
Ksh 427,596
estimate
Ksh 427,596

Kiangochi Dispensary

location
Mbiri (in Kiharu)
year first funded
2004
action
Maternity Completion And Electrification
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 427,596
estimate
Ksh 427,596

Gaitega Polytechnic

location
Mbiri (in Kiharu)
year first funded
2006
action
2 Classroom Construction
output
Competent Youths
implementation status
Ongoing
total cost
Ksh 425,000
estimate
Ksh 775,000

Kiguru Police Post

location
Mugoiri (in Kiharu)
year first funded
2008
action
Partitioning
output
Better Infrastructure
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kambirwa Water Project

location
Gikindu (in Kiharu)
year first funded
2004
action
Tank Installation And Pipe Repair
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Kahuti-Wanjengi Water Project

location
Weithaga (in Kiharu)
year first funded
2006
action
Construction Of Water Tank
output
Clean Water
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Dr. Matharite Secondary School

location
Mugoiri (in Kiharu)
year first funded
2009
action
Construction Of 1 Classroom
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Gakuyu Primary School

location
Gaturi (in Kiharu)
year first funded
2009
action
Construction Of 1 Classroom
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Kahithe Secondary School

location
Murarandia (in Kiharu)
year first funded
2008
action
Construction Of 1 Classroom
output
-
implementation status
trees planted
total cost
Ksh 400,000
estimate
Ksh 400,000

Gikagi Water Project

location
Murarandia (in Kiharu)
year first funded
2009
action
Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Karingu Primary School

location
Kahuhia (in Kiharu)
year first funded
2006
action
1 Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 390,000
estimate
Ksh 390,000

Githambo Dispensary

location
Murarandia (in Kiharu)
year first funded
2004
action
Construction Of Lab
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 380,000
estimate
Ksh 380,000

Karuru Youth Polytechnic

location
Mugoiri (in Kiharu)
year first funded
2004
action
Equipment Purchase
output
Technical Skills Development
implementation status
Complete And In Use
total cost
Ksh 377,596
estimate
Ksh 377,596

Muthigiriri Primary School

location
Gikindu (in Kiharu)
year first funded
2006
action
Latrine Construction Following Collapse
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 362,500
estimate
Ksh 112,500

Matithi Primary School

location
Gikindu (in Kiharu)
year first funded
2006
action
Constructing 1 Classroom For Nursery
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Marewa Primary School

location
Gikindu (in Kiharu)
year first funded
2003
action
Construction Of 1 Classroom For Nursery
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 346,667
estimate
Ksh 346,667

Gakurwe Water Project

location
Gaturi (in Kiharu)
year first funded
2003
action
Materials Purchase
output
Provision Of Clean Water
implementation status
Complete And In Use
total cost
Ksh 346,667
estimate
Ksh 346,667

Githagara Dispensary

location
Mugoiri (in Kiharu)
year first funded
2003
action
Fencing And Renovations
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 343,333
estimate
Ksh 343,333

Kiumu Primary School

location
Mugoiri (in Kiharu)
year first funded
2003
action
Electricity Installations
output
Electricity Provision
implementation status
Ongoing
total cost
Ksh 338,667
estimate
Ksh 338,667

Gathinja Primary School

location
Kahuhia (in Kiharu)
year first funded
2006
action
Hall Completion
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 315,000
estimate
Ksh 315,000

Kionjoini Dispensary

location
Murarandia (in Kiharu)
year first funded
2009
action
Cementing And Installation Of Windows
output
Better Infrastructure
implementation status
Ongoing
total cost
Ksh 300,002
estimate
Ksh 300,002

Muthiria Resource Centre

location
Mugoiri (in Kiharu)
year first funded
2009
action
Purchase Of Furniture
output
Capacity Building Of Teachers
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Gaturumbari Road S Project

location
Gaturi (in Kiharu)
year first funded
2006
action
Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Gitura Secondary School

location
Mugoiri (in Kiharu)
year first funded
2007
action
Ablution Block Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 400,000

Ihigaini Water Project

location
Mugoiri (in Kiharu)
year first funded
2009
action
Intake,Perimeter Fencing
output
Clean Water
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Kamaguta Secondary School

location
Mugoiri (in Kiharu)
year first funded
2007
action
Rehabilitation Of Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 500,000

Kangirima Water Project

location
Mugoiri (in Kiharu)
year first funded
2009
action
Intake,Perimeter Fencing
output
Clean Water
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Mumbi Primary School

location
Weithaga (in Kiharu)
year first funded
2006
action
1 Classroom Construction
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyakio Tea Buying Centre

location
Murarandia (in Kiharu)
year first funded
2007
action
Construction
output
Promote Tea Farming
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 305,000

Mbari Ya Hiti Primary School

location
Mugoiri (in Kiharu)
year first funded
2005
action
Renovating 4 Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 295,000
estimate
Ksh 295,000

Mirichu Primary School

location
Mugoiri (in Kiharu)
year first funded
2003
action
Toilets Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 288,667
estimate
Ksh 307,000

Kaganda Primary School

location
Murarandia (in Kiharu)
year first funded
2003
action
Construction
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 282,222
estimate
Ksh 282,222

Kiambugi Secondary School

location
Gaturi (in Kiharu)
year first funded
2004
action
1 Classroom Construction
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 279,596
estimate
Ksh 279,596

Gathaithi Dispensary

location
Murarandia (in Kiharu)
year first funded
2004
action
Water Tank Completion,Doors,Windows
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 277,596
estimate
Ksh 277,596

Gikandu Secondary School

location
Mbiri (in Kiharu)
year first funded
2006
action
Lab,Library,Water Storage And Renovation
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 274,000
estimate
Ksh 224,000

Gitige Dispensary

location
Weithaga (in Kiharu)
year first funded
2006
action
Construction
output
Public Health
implementation status
Ongoing
total cost
Ksh 260,000
estimate
Ksh 260,000

Kaihungu-Kiria Water Project

location
Mugoiri (in Kiharu)
year first funded
2005
action
Gravity Water Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

Thengeini Primary School

location
Murarandia (in Kiharu)
year first funded
2006
action
I Classroom Construction
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

Ndutumi Youth Polytechnic

location
Mugoiri (in Kiharu)
year first funded
2004
action
Equipments Purchase
output
Technical Skills Development
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 250,000

Mukangu Primary School

location
Kahuhia (in Kiharu)
year first funded
2006
action
Constructing A Water Tank
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 250,000

Kadonga-Muringa Road S

location
Gaturi (in Kiharu)
year first funded
2006
action
Digging
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 250,000

Kahatia Dispensary

location
Murarandia (in Kiharu)
year first funded
2004
action
Lab And Gate Construction
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 247,596
estimate
Ksh 247,596

Kayuyu Primary School

location
Gikindu (in Kiharu)
year first funded
2006
action
Construction Of 1 Classroom
output
More Learning Space
implementation status
Ongoing
total cost
Ksh 245,000
estimate
Ksh 245,000

Muchungucha Secondary School

location
Mbiri (in Kiharu)
year first funded
2005
action
Lab Equipping And Fittings
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 235,000
estimate
Ksh 185,000

Gatuya Primary School

location
Murarandia (in Kiharu)
year first funded
2003
action
Construction Of 1 Classroom
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 232,222
estimate
Ksh 232,222

Theri Primary School

location
Murarandia (in Kiharu)
year first funded
2006
action
1 Classroom Construction
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 230,000
estimate
Ksh 230,000

Kaganda Police Post

location
Murarandia (in Kiharu)
year first funded
2004
action
Ap Quarters Extension
output
Security
implementation status
Complete And Not In Use
total cost
Ksh 230,000
estimate
Ksh 230,000

Kambirwa Youth Polytechnic

location
Gikindu (in Kiharu)
year first funded
2003
action
Renovation And Equiping
output
Technical Skills Development
implementation status
Complete And In Use
total cost
Ksh 224,110
estimate
Ksh 450,000

Mirira Primary School

location
Gikindu (in Kiharu)
year first funded
2006
action
Latrine Construction Following Collapse
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 220,000
estimate
Ksh 220,000

Mugeka Secondary School

location
Gaturi (in Kiharu)
year first funded
2004
action
Water Tank Construction
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 219,596
estimate
Ksh 219,596

Kahatia Primary School

location
Murarandia (in Kiharu)
year first funded
2004
action
Water Tank
output
Clean Water
implementation status
Ongoing
total cost
Ksh 210,000
estimate
Ksh 210,000

Koimbi Chief's Camp

location
Weithaga (in Kiharu)
year first funded
2005
action
Construction
output
Service Delivery
implementation status
Complete And In Use
total cost
Ksh 202,000
estimate
Ksh 202,000

Yamugwe Primary School

location
Mugoiri (in Kiharu)
year first funded
2007
action
Roofing 4 Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Tugana Bridge

location
Mugoiri (in Kiharu)
year first funded
2006
action
Bridge Construction
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kiawambeu Primary School

location
Mbiri (in Kiharu)
year first funded
2004
action
Blown Up Roof Repair
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kianderi Primary School

location
Weithaga (in Kiharu)
year first funded
2006
action
Rehabilitation Of 2 Classrooms
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Kari Primary School

location
Mugoiri (in Kiharu)
year first funded
2005
action
Renovation Of 3 Classrooms And Latrines
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Kahuti Youth Polytechnic

location
Weithaga (in Kiharu)
year first funded
2004
action
Equipping
output
Technical Skills Development
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kaganda-Gatuya Bridge

location
Murarandia (in Kiharu)
year first funded
2006
action
Construction
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kirogo Dispensary

location
Kahuhia (in Kiharu)
year first funded
2003
action
Vct Centre Creation
output
Public Health
implementation status
Complete And Not In Use
total cost
Ksh 193,333
estimate
Ksh 193,333

Ndutumi Non Formal

location
Mugoiri (in Kiharu)
year first funded
2005
action
Renovation Of 1 Classroom
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 185,000
estimate
Ksh 185,000

Matharite Dispensary

location
Murarandia (in Kiharu)
year first funded
2004
action
Electrification
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 177,596
estimate
Ksh 177,596

Gitweku Secondary School

location
Weithaga (in Kiharu)
year first funded
2004
action
Piping And Hydram
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 175,000
estimate
Ksh 175,000

Gitweku Primary School

location
Weithaga (in Kiharu)
year first funded
2004
action
Water Connection From Mains
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 175,000
estimate
Ksh 175,000

Ndikwe Primary School

location
Mbiri (in Kiharu)
year first funded
2006
action
Renovation Of 1 Classroom
output
Condusive Learning
implementation status
Ongoing
total cost
Ksh 174,000
estimate
Ksh 124,050

Mbiri Micro Hydro Power

location
Mbiri (in Kiharu)
year first funded
2006
action
Trenching
output
Electricity Provision
implementation status
Ongoing
total cost
Ksh 172,000
estimate
Ksh 7,000,000

Mamumbu Primary School

location
Mbiri (in Kiharu)
year first funded
2003
action
1 Classroom Construction
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 162,771
estimate
Ksh 162,771

Kigetuini Dispensary

location
Kimathi (in Kiharu)
year first funded
2004
action
Lab Unit Creation
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 160,000
estimate
Ksh 160,000

Kamuiru Nursery School

location
Gikindu (in Kiharu)
year first funded
2006
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kangu Footbridge

location
Gaturi (in Kiharu)
year first funded
2004
action
Footbridge
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kanguyo Water Project

location
Weithaga (in Kiharu)
year first funded
2006
action
Piping
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kiaguthu Secondary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
Equipments Purchase
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kiamuri Primary School

location
Gaturi (in Kiharu)
year first funded
2007
action
Latrines
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kionjoini Primary School

location
Murarandia (in Kiharu)
year first funded
2007
action
2 Classroom Completion
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Kirogo Police Post

location
Kahuhia (in Kiharu)
year first funded
2005
action
Renovation And Staff Quarters
output
Security
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Koimbi Do's Field

location
Weithaga (in Kiharu)
year first funded
2006
action
Levelling
output
Enhance Sports
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Mugeka Water Project

location
Gaturi (in Kiharu)
year first funded
2006
action
Piping
output
Provision Of Clean Water
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 400,000

Mugoiri Non Formal

location
Mugoiri (in Kiharu)
year first funded
2006
action
Lab,Equipment,Renovation And Books
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Mugoiri Watersprings

location
Mugoiri (in Kiharu)
year first funded
2004
action
Well Preservation
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Gathuguya Water Project

location
Kahuhia (in Kiharu)
year first funded
2006
action
Piping
output
Clean Water
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Kahuro Police Post

location
Mugoiri (in Kiharu)
year first funded
2006
action
Renovation And Rehabilitaion
output
Security
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Gatheru Subchief's Office

location
Kahuhia (in Kiharu)
year first funded
2005
action
Renovations
output
Service Delivery
implementation status
Complete And In Use
total cost
Ksh 147,500
estimate
Ksh 147,500

Gitungano Primary School

location
Gikindu (in Kiharu)
year first funded
2003
action
1 Classroom Construction
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 145,000
estimate
Ksh 145,000

Mwara Primary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
2 Classrooms Renovation
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 140,000
estimate
Ksh 140,000

Mbiri Nursery School

location
Mbiri (in Kiharu)
year first funded
2005
action
Renovating 2 Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 140,000
estimate
Ksh 140,000

Ithiki Primary School

location
Kahuhia (in Kiharu)
year first funded
2003
action
Electrification Of Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 138,667
estimate
Ksh 138,667

Iregigitweku-Kahut Bridge

location
Weithaga (in Kiharu)
year first funded
2005
action
Construction
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 135,000
estimate
Ksh 135,000

Kahuro Sublocation Cattle Dip

location
Mugoiri (in Kiharu)
year first funded
2004
action
Renovation An Rehabilitaion
output
Productive Cattle
implementation status
Complete And Not In Use
total cost
Ksh 127,596
estimate
Ksh 127,596

Theri Chief's Office Water Tank

location
Murarandia (in Kiharu)
year first funded
2005
action
Construction
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 117,284
estimate
Ksh 117,284

Karuriini Primary School

location
Murarandia (in Kiharu)
year first funded
2004
action
Adminstration Block Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 110,000
estimate
Ksh 50,000

Mukangu Youth Polytechnic

location
Kahuhia (in Kiharu)
year first funded
2003
action
Equipping
output
Technical Skills Development
implementation status
Complete And In Use
total cost
Ksh 108,000
estimate
Ksh 108,000

Miumu Cbo

location
Mugoiri (in Kiharu)
year first funded
2003
action
Land Purchase For Ridge
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 101,500
estimate
Ksh 101,500

Muchungucha Cattle Dip

location
Mbiri (in Kiharu)
year first funded
2006
action
Rehabilitation
output
Productive Cattle
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Mugeka Youth Polytechnic

location
Gaturi (in Kiharu)
year first funded
2006
action
Production Workshop
output
Enhance Technical Skills
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 300,000

Gatara Youth Polytechnic

location
Murarandia (in Kiharu)
year first funded
2005
action
Equipments Purchase
output
Technical Skills Development
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gathambara Primary School

location
Murarandia (in Kiharu)
year first funded
2006
action
Cementing 2 Classrooms
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gikandu Police Post

location
Mbiri (in Kiharu)
year first funded
2006
action
Construction Of Quarters
output
Security
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Githambara Primary School

location
Murarandia (in Kiharu)
year first funded
2005
action
Construction Of 1 Classroom
output
Condusive Learning
implementation status
Complete And Inuse
total cost
Ksh 100,000
estimate
Ksh 100,000

Githuuri Assistant Chief's Office

location
Gikindu (in Kiharu)
year first funded
2006
action
Office Construction
output
Community Service
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gitige Primary School

location
Weithaga (in Kiharu)
year first funded
2006
action
1 Classroom Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kambirwa Dispensary

location
Gikindu (in Kiharu)
year first funded
2004
action
Laboratory Unit Creation
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kangara Primary School

location
Gaturi (in Kiharu)
year first funded
2007
action
Flooring 2 Classrooms
output
Condusive Learning
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Karuri Nursery School

location
Murarandia (in Kiharu)
year first funded
2006
action
Construction Of One Classroom
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiamugo Well And Afforestation Group

location
Gikindu (in Kiharu)
year first funded
2006
action
Well Preservation
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiayatta Primary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
1 Classroom Construction
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Mariaini Primary School

location
Murarandia (in Kiharu)
year first funded
2006
action
Renovating 2 Classrooms
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Mugeka Tac Multipurpose Hall

location
Gaturi (in Kiharu)
year first funded
2003
action
Latrine Construction
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 96,667
estimate
Ksh 96,667

Thangathi Primary School

location
Gikindu (in Kiharu)
year first funded
2003
action
Renovating 1 Classroom
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 96,667
estimate
Ksh 96,667

Mukangu Chief's Camp

location
Kahuhia (in Kiharu)
year first funded
2006
action
Electrification
output
Service Delivery
implementation status
Complete And In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Gakurwe Dispensary

location
Gaturi (in Kiharu)
year first funded
2004
action
Gate Construction
output
Public Health
implementation status
Complete And In Use
total cost
Ksh 80,000
estimate
Ksh 80,000

Kaganda Coffee Factory

location
Murarandia (in Kiharu)
year first funded
2004
action
Water Pump
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 80,000
estimate
Ksh 80,000

Gichore Footbridge

location
Gaturi (in Kiharu)
year first funded
2004
action
Path Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 80,000
estimate
Ksh 80,000

Koimbi Secondary School

location
Weithaga (in Kiharu)
year first funded
2003
action
Playground Levelling And Latrines
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 74,114
estimate
Ksh 74,114

Gaturi Girls Secondary School

location
Gaturi (in Kiharu)
year first funded
2003
action
Electrification
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 72,500
estimate
Ksh 72,500

Githunguri Water Project

location
Weithaga (in Kiharu)
year first funded
2006
action
Piping
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 70,000
estimate
Ksh 70,000

Gathiru Primary School

location
Mugoiri (in Kiharu)
year first funded
2006
action
Cementing 1 Classroom
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 70,000
estimate
Ksh 70,000

Gakurwe Secondary School

location
Gaturi (in Kiharu)
year first funded
2005
action
Dining Hall Construction
output
More Learning Space
implementation status
Complete And In Use
total cost
Ksh 65,000
estimate
Ksh 65,000

Gathanji Footbridge

location
Gaturi (in Kiharu)
year first funded
2006
action
Footbridge Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 64,998
estimate
Ksh 64,998

Matharite Secondary School

location
Murarandia (in Kiharu)
year first funded
2003
action
Renovating 1 Classroom
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 58,000
estimate
Ksh 58,000

Gikandu Cattle Dip

location
Mbiri (in Kiharu)
year first funded
2003
action
Renovation
output
Productive Cattle
implementation status
Complete And Not In Use
total cost
Ksh 58,000
estimate
Ksh 58,000

Muringa Nursery School

location
Gaturi (in Kiharu)
year first funded
2005
action
Revovating 1 Classroom
output
Promote Education
implementation status
Complete And Not In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Gitweku Field Levelling

location
Weithaga (in Kiharu)
year first funded
2006
action
Levelling
output
Enhance Sports
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Kahuti Cattle Dip

location
Weithaga (in Kiharu)
year first funded
2004
action
Renovation And Rehabilitation
output
Productive Cattle
implementation status
Complete And Not In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Kamwara Footbridge

location
Gaturi (in Kiharu)
year first funded
2005
action
Path Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Karuchu Water Springs

location
Mugoiri (in Kiharu)
year first funded
2005
action
Well Preservation
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Karuri Water Well

location
Mugoiri (in Kiharu)
year first funded
2006
action
Well Preservation
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Kiambugi Primary School

location
Gaturi (in Kiharu)
year first funded
2005
action
Floor Renovation
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Kirogo Cattle Dip

location
Kahuhia (in Kiharu)
year first funded
2004
action
Renovation And Rehabilitation
output
Productive Cattle
implementation status
Complete And Not In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Mukangu Cattle Dip

location
Kahuhia (in Kiharu)
year first funded
2004
action
Piping
output
Productive Cattle
implementation status
Complete And Not In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Munyu-Mugeka Path

location
Gaturi (in Kiharu)
year first funded
2005
action
Rehabilitating 1 Km Stretch
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Gitui Cattle Dip

location
Kahuhia (in Kiharu)
year first funded
2004
action
Renovations
output
Productive Cattle
implementation status
Complete And Not In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Ngaru Water Springs

location
Mugoiri (in Kiharu)
year first funded
2006
action
Rehabilitation Of Spring
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Nyakarai Well

location
Gaturi (in Kiharu)
year first funded
2005
action
Intake Construction
output
Clean Water
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Giikuni-Kabui Footbridge

location
Gaturi (in Kiharu)
year first funded
2005
action
Path Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Gathinja Cattle Dip

location
Kahuhia (in Kiharu)
year first funded
2004
action
Renovation And Rehabilitation
output
Productive Cattle
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Gakurwe-Gitugi Footbridge

location
Gaturi (in Kiharu)
year first funded
2005
action
Interconstituency Bridge Construction
output
Better Infrastructure
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 150,000

Gakurwe Footbridge

location
Gaturi (in Kiharu)
year first funded
2004
action
Quarry Waste
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Matathi Footbridge

location
Mugoiri (in Kiharu)
year first funded
2005
action
Construction
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 45,000
estimate
Ksh 45,000

Kang'Ong'I-Gathambara Devroject

location
Gaturi (in Kiharu)
year first funded
2005
action
Road Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 45,000
estimate
Ksh 45,000

Gatundu Primary School

location
Mugoiri (in Kiharu)
year first funded
2003
action
Cementing 1 Classroom
output
Condusive Learning
implementation status
Complete And In Use
total cost
Ksh 40,281
estimate
Ksh 40,281

Mirichu-Kahuro Joining Range

location
Mugoiri (in Kiharu)
year first funded
2004
action
Purchase Of Access Road
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 40,000
estimate
Ksh 40,000

Karumiri Irrigation Project

location
Weithaga (in Kiharu)
year first funded
2006
action
Construction Of Intake
output
Farming Water
implementation status
Complete And In Use
total cost
Ksh 31,000
estimate
Ksh 31,000

Mweru Wazee S

location
Gaturi (in Kiharu)
year first funded
2005
action
Rehabilitating 1 Km Stretch
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 30,000
estimate
Ksh 30,000

Mirichu Assistant Chief's Office

location
Mugoiri (in Kiharu)
year first funded
2006
action
Equipment Purchase
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 30,000
estimate
Ksh 30,000

Kiawamuthige Boulder

location
Kahuhia (in Kiharu)
year first funded
2005
action
Rock Blasting
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 30,000
estimate
Ksh 30,000

Kiamuri-Karinga Footbridge

location
Gaturi (in Kiharu)
year first funded
2005
action
Road Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 30,000
estimate
Ksh 30,000

Ituguta Footbridge

location
Gaturi (in Kiharu)
year first funded
2004
action
Path Rehabilitation
output
Better Infrastructure
implementation status
Complete And In Use
total cost
Ksh 30,000
estimate
Ksh 30,000

Gaitheri Police Post

location
Gaturi (in Kiharu)
year first funded
2003
action
Water Tank Purchase
output
Provide Security
implementation status
Complete And In Use
total cost
Ksh 24,167
estimate
Ksh 24,167

Gatharaini Waterspring

location
Gaturi (in Kiharu)
year first funded
2005
action
Purchase Of Land To Access The Well
output
Provision Of Clean Water
implementation status
Complete And In Use
total cost
Ksh 20,000
estimate
Ksh 20,000