The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Gakaki Water Project
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2003
- action
- Pipeworks
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 2,893,333
- estimate
- Ksh 10,000,000
Mukangu Dispensary
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Construction
- output
- Public Health
- implementation status
- Complete And Not In Use
- total cost
- Ksh 2,848,596
- estimate
- Ksh 1,922,596
Gacaru Water Project
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2007
- action
- Piping
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 6,000,000
Kiamugo Borehole
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2007
- action
- Drilling And Equipping
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 2,290,041
- estimate
- Ksh 5,000,000
Kaganda Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Expansion Of The Intake Capacity
- implementation status
- Ongoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Mutitu Irrigation Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Phase 1 Irrigation
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Gitui Police Post
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Construction
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 1,955,096
- estimate
- Ksh 2,000,000
Gikandu Water Project
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2004
- action
- Gravity Water Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 1,922,596
- estimate
- Ksh 4,000,000
Muchungucha Water Project
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2007
- action
- Piping
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 1,900,000
- estimate
- Ksh 8,000,000
Theri Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Laboratory Construction
- output
- Better Learning Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,880,000
- estimate
- Ksh 2,000,000
Kiria Borehole
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Drilling
- output
- Provision Of Clean Water
- implementation status
- Drilled By Ministry Of Planning To Completion
- total cost
- Ksh 1,640,041
- estimate
- Ksh 2,000,000
Wanjengi Dispensary
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Water Tank Construction,Construction Of 2 Residential Quarters
- output
- Better Infrastructure
- implementation status
- Ongoing
- total cost
- Ksh 1,517,596
- estimate
- Ksh 1,600,000
Mugeka Chief's Camp
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2007
- action
- Office Construction
- output
- Closer Public Services
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,000,000
Geitwa Police Post
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Construction Of Quarters
- output
- Provide Security
- implementation status
- Ongoing
- total cost
- Ksh 1,488,334
- estimate
- Ksh 1,488,334
Kagaa Police Post
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Construction
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,200,000
Karemaini Secondary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2004
- action
- 2 Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 1,362,596
- estimate
- Ksh 1,362,596
Kiangochi Secondary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2003
- action
- 2 Classroom Construction
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 1,320,000
- estimate
- Ksh 1,320,000
Weithaga Mixed Secondary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Water Tank Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 1,296,596
- estimate
- Ksh 1,296,596
Mirira Secondary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- Construction Of 1 Classroom
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,096
- estimate
- Ksh 1,200,096
Kairegi Electricity Project
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- Purchase Of 2 Transformers
- output
- Alternative Power Source
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kahuhia Borehole
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2008
- action
- Piping
- output
- Better Infrastructure
- implementation status
- Reallocated To Kiaguthu Sec Sch To Construct The Second Floor Of Administration Block
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Muriranjas District Hospital
- location
-
(in Kiharu)
- year first funded
- 2008
- action
- Construction Of X Ray Room
- output
- -
- implementation status
- on going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kiamuri Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- 4 Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 1,099,798
- estimate
- Ksh 2,000,000
Gathinja Secondary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2003
- action
- Hall Completion
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 1,087,908
- estimate
- Ksh 687,908
Murarandia Tac Hall
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Hall Construction And Providing Chairs
- output
- Service Delivery
- implementation status
- Ongoing
- total cost
- Ksh 1,085,000
- estimate
- Ksh 1,085,000
Mirichu Water Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2008
- action
- Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 7,000,000
Mukangu Secondary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- dining Hall Construction
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kianjoya Coffee Factory
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2008
- action
- Water Tank Construction
- output
- -
- implementation status
- on going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mukurwe Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Dining Hall Construction
- output
- Promote Education
- implementation status
- Ongoing
- total cost
- Ksh 999,798
- estimate
- Ksh 1,000,000
Kandegenye Water Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2003
- action
- Water Pipe Works
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 996,667
- estimate
- Ksh 1,000,000
Kiboi Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- 2 Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 980,000
- estimate
- Ksh 980,000
Kahuti Assistant Chief's Office
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- 0ffice Construction
- output
- Service Delivery
- implementation status
- Ongoing
- total cost
- Ksh 960,000
- estimate
- Ksh 2,000,000
Mugoiri Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Renovation,Water Pump And Pipe Works
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 910,000
- estimate
- Ksh 510,000
Kiharu OrchaRoads
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2008
- action
- Construction Green House Shed And Piping
- output
- Higher Production Due To Scientific Generated Seedlings From Jkuat
- implementation status
- Shed Complete And In Operation
- total cost
- Ksh 897,556
- estimate
- Ksh 0
Gatheru Dispensary
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2003
- action
- Maternity Wing Creation
- output
- Public Health
- implementation status
- Ongoing
- total cost
- Ksh 895,000
- estimate
- Ksh 895,000
Gaciku Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Rehabilitating 8 Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 885,700
- estimate
- Ksh 1,000,000
Kairichi Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- 4 Classroom Block Completion
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 877,596
- estimate
- Ksh 877,596
Kaganda Water Project
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Pipe Works And Reservoir
- output
- Clean Water
- implementation status
- Complete And Not In Use
- total cost
- Ksh 867,596
- estimate
- Ksh 867,596
Icanjeru Police Post
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2003
- action
- Adminstration Block Construction
- output
- Promote Education
- implementation status
- Ongoing
- total cost
- Ksh 829,167
- estimate
- Ksh 1,029,167
Gikindu Water Project
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2007
- action
- Piping
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 828,800
- estimate
- Ksh 1,200,000
Koimbi Police Post
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2003
- action
- Construction
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 815,000
- estimate
- Ksh 715,000
Gitiri Dispensary
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Construction
- output
- Public Health
- implementation status
- Ongoing
- total cost
- Ksh 815,000
- estimate
- Ksh 815,000
Murarandia Polytechnic
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kamararo Water Project
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2008
- action
- Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 3,000,000
Kambirwa Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mandundo-Theri Water Project
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of Intake
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 400,000
Gaitheri Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 788,951
- estimate
- Ksh 2,000,000
Kambirwa Police Post
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2005
- action
- Ap Quarters Construction
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 767,500
- estimate
- Ksh 767,500
Gatara Police Post
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Construction
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Mukumu Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- 2 Classrooms Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 730,000
- estimate
- Ksh 730,000
Mugeka Dispensary
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Laboratory Construction
- output
- Public Health
- implementation status
- Ongoing
- total cost
- Ksh 708,000
- estimate
- Ksh 450,000
Kirogo Primary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kahuhia Mixed Secondary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Laboratory Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 683,798
- estimate
- Ksh 683,798
Kiangatia Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- 2 Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 672,500
- estimate
- Ksh 672,500
Ndikwe Police Post
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2004
- action
- Walling And Roofing
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 1,650,000
Gatara Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 800,000
Gitie Secondary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2005
- action
- 2 Classroom Construction
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 645,000
- estimate
- Ksh 595,000
Gitaro Dispensary
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Construction With A Lab Unit
- output
- Public Health
- implementation status
- Ongoing
- total cost
- Ksh 640,000
- estimate
- Ksh 640,000
Karumia Bridge
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Construction
- output
- Better Infrastructure
- implementation status
- Ongoing
- total cost
- Ksh 638,000
- estimate
- Ksh 800,000
DrSecondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- dining Hall Completion
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 630,000
- estimate
- Ksh 630,000
Mirira Police Post
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2005
- action
- Fencing And Water Harvesting
- output
- Improved Security
- implementation status
- Complete And Not In Use
- total cost
- Ksh 630,000
- estimate
- Ksh 930,000
Kirogo Library
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Renovation And Equiping
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 620,000
- estimate
- Ksh 620,000
Gathambara-Gikondi Water Project
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- Gravity Water Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mugoiri Chief's Camp
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2008
- action
- Office Construction
- output
- Closer Public Services
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 3,000,000
Kahuti Police Post
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2003
- action
- Police Quarters Construction
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 595,000
- estimate
- Ksh 595,000
Koimbi Primary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Library Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 590,596
- estimate
- Ksh 590,596
Kiawambeu Secondary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2005
- action
- 2 Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 590,000
- estimate
- Ksh 590,000
Ndutumi Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Water Supply
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 577,596
- estimate
- Ksh 600,000
Gitige Secondary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Water Tank Construction
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Kionjoini Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- 2 Classroom Completion
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Githuuri Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- 2 Classroom Construction
- output
- Promote Education
- implementation status
- Ongoing
- total cost
- Ksh 546,667
- estimate
- Ksh 546,667
Mirichu Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Construction Of Dining Hall
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 540,000
- estimate
- Ksh 540,000
Gikuu Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2005
- action
- Rehabilitation Of 3 Classrooms
- output
- Promote Education
- implementation status
- Ongoing
- total cost
- Ksh 540,000
- estimate
- Ksh 540,000
Kang'Ara Police Post
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Renovation And Finishing
- output
- Provide Security
- implementation status
- Ongoing
- total cost
- Ksh 538,334
- estimate
- Ksh 700,000
Gakunja Nursery School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2004
- action
- Construction 0F 1 Classroom And Fencing
- output
- Promote Education
- implementation status
- Ongoing
- total cost
- Ksh 512,596
- estimate
- Ksh 512,596
Kiamboka Irrigation Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Piping
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 510,000
- estimate
- Ksh 5,000,000
Gatuya Police Post
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2003
- action
- Construction Of Quarters
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 508,000
- estimate
- Ksh 108,000
Kambirwa Mango Plant
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2007
- action
- Collection Shed Construction
- output
- Value Addition Of Fruits
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiria Dispensary
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Maternity Wing Creation
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiawambeu Gitei Water Project
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2008
- action
- Piping
- output
- -
- implementation status
- complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kayahwegatuya-Kiander Bridge
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2005
- action
- Bridge Construction
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Wanjengi Police Post
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2003
- action
- Police Quarters Construction
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 495,000
- estimate
- Ksh 495,000
Gaichangere Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2005
- action
- 2 Classrooms Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 490,000
- estimate
- Ksh 490,000
Gitweku West Water Project
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Piping And Hydram
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 490,000
- estimate
- Ksh 190,000
Gatara Dispensary
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2003
- action
- Maternity Equipping
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 483,333
- estimate
- Ksh 483,333
Kagumo Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Equipping The Library
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 460,000
- estimate
- Ksh 460,000
Gitaro Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- 1 Classroom Renovation
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 200,000
Gatitu Primary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 438,334
- estimate
- Ksh 238,334
Gathiru Police Post
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Construction
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 427,596
- estimate
- Ksh 427,596
Kiangochi Dispensary
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2004
- action
- Maternity Completion And Electrification
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 427,596
- estimate
- Ksh 427,596
Gaitega Polytechnic
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2006
- action
- 2 Classroom Construction
- output
- Competent Youths
- implementation status
- Ongoing
- total cost
- Ksh 425,000
- estimate
- Ksh 775,000
Kiguru Police Post
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2008
- action
- Partitioning
- output
- Better Infrastructure
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kambirwa Water Project
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2004
- action
- Tank Installation And Pipe Repair
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kahuti-Wanjengi Water Project
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of Water Tank
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Dr. Matharite Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2009
- action
- Construction Of 1 Classroom
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Gakuyu Primary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2009
- action
- Construction Of 1 Classroom
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kahithe Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- -
- implementation status
- trees planted
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Gikagi Water Project
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2009
- action
- Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karingu Primary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 390,000
- estimate
- Ksh 390,000
Githambo Dispensary
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Construction Of Lab
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Karuru Youth Polytechnic
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Equipment Purchase
- output
- Technical Skills Development
- implementation status
- Complete And In Use
- total cost
- Ksh 377,596
- estimate
- Ksh 377,596
Muthigiriri Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Latrine Construction Following Collapse
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 362,500
- estimate
- Ksh 112,500
Matithi Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Constructing 1 Classroom For Nursery
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Marewa Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- Construction Of 1 Classroom For Nursery
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 346,667
- estimate
- Ksh 346,667
Gakurwe Water Project
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2003
- action
- Materials Purchase
- output
- Provision Of Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 346,667
- estimate
- Ksh 346,667
Githagara Dispensary
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2003
- action
- Fencing And Renovations
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 343,333
- estimate
- Ksh 343,333
Kiumu Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2003
- action
- Electricity Installations
- output
- Electricity Provision
- implementation status
- Ongoing
- total cost
- Ksh 338,667
- estimate
- Ksh 338,667
Gathinja Primary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- Hall Completion
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 315,000
- estimate
- Ksh 315,000
Kionjoini Dispensary
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2009
- action
- Cementing And Installation Of Windows
- output
- Better Infrastructure
- implementation status
- Ongoing
- total cost
- Ksh 300,002
- estimate
- Ksh 300,002
Muthiria Resource Centre
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2009
- action
- Purchase Of Furniture
- output
- Capacity Building Of Teachers
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gaturumbari Road S Project
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gitura Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Ablution Block Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Ihigaini Water Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2009
- action
- Intake,Perimeter Fencing
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamaguta Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Rehabilitation Of Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Kangirima Water Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2009
- action
- Intake,Perimeter Fencing
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mumbi Primary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyakio Tea Buying Centre
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2007
- action
- Construction
- output
- Promote Tea Farming
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 305,000
Mbari Ya Hiti Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Renovating 4 Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 295,000
- estimate
- Ksh 295,000
Mirichu Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2003
- action
- Toilets Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 288,667
- estimate
- Ksh 307,000
Kaganda Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2003
- action
- Construction
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 282,222
- estimate
- Ksh 282,222
Kiambugi Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 279,596
- estimate
- Ksh 279,596
Gathaithi Dispensary
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Water Tank Completion,Doors,Windows
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 277,596
- estimate
- Ksh 277,596
Gikandu Secondary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2006
- action
- Lab,Library,Water Storage And Renovation
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 274,000
- estimate
- Ksh 224,000
Gitige Dispensary
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Construction
- output
- Public Health
- implementation status
- Ongoing
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Kaihungu-Kiria Water Project
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Gravity Water Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Thengeini Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- I Classroom Construction
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Ndutumi Youth Polytechnic
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Equipments Purchase
- output
- Technical Skills Development
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mukangu Primary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- Constructing A Water Tank
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kadonga-Muringa Road S
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2006
- action
- Digging
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kahatia Dispensary
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Lab And Gate Construction
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 247,596
- estimate
- Ksh 247,596
Kayuyu Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- More Learning Space
- implementation status
- Ongoing
- total cost
- Ksh 245,000
- estimate
- Ksh 245,000
Muchungucha Secondary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2005
- action
- Lab Equipping And Fittings
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 235,000
- estimate
- Ksh 185,000
Gatuya Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2003
- action
- Construction Of 1 Classroom
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 232,222
- estimate
- Ksh 232,222
Theri Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Kaganda Police Post
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Ap Quarters Extension
- output
- Security
- implementation status
- Complete And Not In Use
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Kambirwa Youth Polytechnic
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- Renovation And Equiping
- output
- Technical Skills Development
- implementation status
- Complete And In Use
- total cost
- Ksh 224,110
- estimate
- Ksh 450,000
Mirira Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Latrine Construction Following Collapse
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Mugeka Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Water Tank Construction
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 219,596
- estimate
- Ksh 219,596
Kahatia Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Water Tank
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 210,000
- estimate
- Ksh 210,000
Koimbi Chief's Camp
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2005
- action
- Construction
- output
- Service Delivery
- implementation status
- Complete And In Use
- total cost
- Ksh 202,000
- estimate
- Ksh 202,000
Yamugwe Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2007
- action
- Roofing 4 Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Tugana Bridge
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Bridge Construction
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiawambeu Primary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2004
- action
- Blown Up Roof Repair
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kianderi Primary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Rehabilitation Of 2 Classrooms
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kari Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Renovation Of 3 Classrooms And Latrines
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kahuti Youth Polytechnic
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Equipping
- output
- Technical Skills Development
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kaganda-Gatuya Bridge
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- Construction
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kirogo Dispensary
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2003
- action
- Vct Centre Creation
- output
- Public Health
- implementation status
- Complete And Not In Use
- total cost
- Ksh 193,333
- estimate
- Ksh 193,333
Ndutumi Non Formal
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Renovation Of 1 Classroom
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 185,000
- estimate
- Ksh 185,000
Matharite Dispensary
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Electrification
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 177,596
- estimate
- Ksh 177,596
Gitweku Secondary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Piping And Hydram
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Gitweku Primary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Water Connection From Mains
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 175,000
- estimate
- Ksh 175,000
Ndikwe Primary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2006
- action
- Renovation Of 1 Classroom
- output
- Condusive Learning
- implementation status
- Ongoing
- total cost
- Ksh 174,000
- estimate
- Ksh 124,050
Mbiri Micro Hydro Power
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2006
- action
- Trenching
- output
- Electricity Provision
- implementation status
- Ongoing
- total cost
- Ksh 172,000
- estimate
- Ksh 7,000,000
Mamumbu Primary School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2003
- action
- 1 Classroom Construction
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 162,771
- estimate
- Ksh 162,771
Kigetuini Dispensary
- location
-
Kimathi
(in Kiharu)
- year first funded
- 2004
- action
- Lab Unit Creation
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Kamuiru Nursery School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kangu Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Footbridge
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kanguyo Water Project
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Piping
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kiaguthu Secondary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Equipments Purchase
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kiamuri Primary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2007
- action
- Latrines
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kionjoini Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2007
- action
- 2 Classroom Completion
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kirogo Police Post
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2005
- action
- Renovation And Staff Quarters
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Koimbi Do's Field
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Levelling
- output
- Enhance Sports
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mugeka Water Project
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2006
- action
- Piping
- output
- Provision Of Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Mugoiri Non Formal
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Lab,Equipment,Renovation And Books
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mugoiri Watersprings
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Well Preservation
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Gathuguya Water Project
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- Piping
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kahuro Police Post
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Renovation And Rehabilitaion
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Gatheru Subchief's Office
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2005
- action
- Renovations
- output
- Service Delivery
- implementation status
- Complete And In Use
- total cost
- Ksh 147,500
- estimate
- Ksh 147,500
Gitungano Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- 1 Classroom Construction
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 145,000
- estimate
- Ksh 145,000
Mwara Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- 2 Classrooms Renovation
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
Mbiri Nursery School
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2005
- action
- Renovating 2 Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
Ithiki Primary School
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2003
- action
- Electrification Of Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 138,667
- estimate
- Ksh 138,667
Iregigitweku-Kahut Bridge
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2005
- action
- Construction
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 135,000
- estimate
- Ksh 135,000
Kahuro Sublocation Cattle Dip
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Renovation An Rehabilitaion
- output
- Productive Cattle
- implementation status
- Complete And Not In Use
- total cost
- Ksh 127,596
- estimate
- Ksh 127,596
Theri Chief's Office Water Tank
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2005
- action
- Construction
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 117,284
- estimate
- Ksh 117,284
Karuriini Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Adminstration Block Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 110,000
- estimate
- Ksh 50,000
Mukangu Youth Polytechnic
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2003
- action
- Equipping
- output
- Technical Skills Development
- implementation status
- Complete And In Use
- total cost
- Ksh 108,000
- estimate
- Ksh 108,000
Miumu Cbo
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2003
- action
- Land Purchase For Ridge
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 101,500
- estimate
- Ksh 101,500
Muchungucha Cattle Dip
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Productive Cattle
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mugeka Youth Polytechnic
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2006
- action
- Production Workshop
- output
- Enhance Technical Skills
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Gatara Youth Polytechnic
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2005
- action
- Equipments Purchase
- output
- Technical Skills Development
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gathambara Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- Cementing 2 Classrooms
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gikandu Police Post
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of Quarters
- output
- Security
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Githambara Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Condusive Learning
- implementation status
- Complete And Inuse
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Githuuri Assistant Chief's Office
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Office Construction
- output
- Community Service
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gitige Primary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kambirwa Dispensary
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2004
- action
- Laboratory Unit Creation
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kangara Primary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2007
- action
- Flooring 2 Classrooms
- output
- Condusive Learning
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Karuri Nursery School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiamugo Well And Afforestation Group
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2006
- action
- Well Preservation
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiayatta Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mariaini Primary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2006
- action
- Renovating 2 Classrooms
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mugeka Tac Multipurpose Hall
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2003
- action
- Latrine Construction
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 96,667
- estimate
- Ksh 96,667
Thangathi Primary School
- location
-
Gikindu
(in Kiharu)
- year first funded
- 2003
- action
- Renovating 1 Classroom
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 96,667
- estimate
- Ksh 96,667
Mukangu Chief's Camp
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2006
- action
- Electrification
- output
- Service Delivery
- implementation status
- Complete And In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Gakurwe Dispensary
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Gate Construction
- output
- Public Health
- implementation status
- Complete And In Use
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kaganda Coffee Factory
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2004
- action
- Water Pump
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Gichore Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Path Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Koimbi Secondary School
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2003
- action
- Playground Levelling And Latrines
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 74,114
- estimate
- Ksh 74,114
Gaturi Girls Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2003
- action
- Electrification
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 72,500
- estimate
- Ksh 72,500
Githunguri Water Project
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Piping
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Gathiru Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Cementing 1 Classroom
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Gakurwe Secondary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Dining Hall Construction
- output
- More Learning Space
- implementation status
- Complete And In Use
- total cost
- Ksh 65,000
- estimate
- Ksh 65,000
Gathanji Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2006
- action
- Footbridge Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 64,998
- estimate
- Ksh 64,998
Matharite Secondary School
- location
-
Murarandia
(in Kiharu)
- year first funded
- 2003
- action
- Renovating 1 Classroom
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 58,000
- estimate
- Ksh 58,000
Gikandu Cattle Dip
- location
-
Mbiri
(in Kiharu)
- year first funded
- 2003
- action
- Renovation
- output
- Productive Cattle
- implementation status
- Complete And Not In Use
- total cost
- Ksh 58,000
- estimate
- Ksh 58,000
Muringa Nursery School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Revovating 1 Classroom
- output
- Promote Education
- implementation status
- Complete And Not In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gitweku Field Levelling
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Levelling
- output
- Enhance Sports
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kahuti Cattle Dip
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2004
- action
- Renovation And Rehabilitation
- output
- Productive Cattle
- implementation status
- Complete And Not In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kamwara Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Path Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Karuchu Water Springs
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Well Preservation
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Karuri Water Well
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Well Preservation
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kiambugi Primary School
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Floor Renovation
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kirogo Cattle Dip
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Renovation And Rehabilitation
- output
- Productive Cattle
- implementation status
- Complete And Not In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mukangu Cattle Dip
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Piping
- output
- Productive Cattle
- implementation status
- Complete And Not In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Munyu-Mugeka Path
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Rehabilitating 1 Km Stretch
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gitui Cattle Dip
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Renovations
- output
- Productive Cattle
- implementation status
- Complete And Not In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ngaru Water Springs
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Rehabilitation Of Spring
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Nyakarai Well
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Intake Construction
- output
- Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Giikuni-Kabui Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Path Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gathinja Cattle Dip
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2004
- action
- Renovation And Rehabilitation
- output
- Productive Cattle
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Gakurwe-Gitugi Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Interconstituency Bridge Construction
- output
- Better Infrastructure
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Gakurwe Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Quarry Waste
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Matathi Footbridge
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2005
- action
- Construction
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 45,000
- estimate
- Ksh 45,000
Kang'Ong'I-Gathambara Devroject
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Road Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 45,000
- estimate
- Ksh 45,000
Gatundu Primary School
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2003
- action
- Cementing 1 Classroom
- output
- Condusive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 40,281
- estimate
- Ksh 40,281
Mirichu-Kahuro Joining Range
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2004
- action
- Purchase Of Access Road
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Karumiri Irrigation Project
- location
-
Weithaga
(in Kiharu)
- year first funded
- 2006
- action
- Construction Of Intake
- output
- Farming Water
- implementation status
- Complete And In Use
- total cost
- Ksh 31,000
- estimate
- Ksh 31,000
Mweru Wazee S
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Rehabilitating 1 Km Stretch
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Mirichu Assistant Chief's Office
- location
-
Mugoiri
(in Kiharu)
- year first funded
- 2006
- action
- Equipment Purchase
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kiawamuthige Boulder
- location
-
Kahuhia
(in Kiharu)
- year first funded
- 2005
- action
- Rock Blasting
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Kiamuri-Karinga Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Road Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Ituguta Footbridge
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2004
- action
- Path Rehabilitation
- output
- Better Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Gaitheri Police Post
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2003
- action
- Water Tank Purchase
- output
- Provide Security
- implementation status
- Complete And In Use
- total cost
- Ksh 24,167
- estimate
- Ksh 24,167
Gatharaini Waterspring
- location
-
Gaturi
(in Kiharu)
- year first funded
- 2005
- action
- Purchase Of Land To Access The Well
- output
- Provision Of Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000