The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kilgoris

Kilgoris Girls Secondary School

location
Shankoe (in Kilgoris)
year first funded
2003
action
Completion of 4 Classes 1 Dorm
output
Complete 2 classes
implementation status
2nd allocation
total cost
Ksh 5,500,000
estimate
Ksh 2,500,000

CDF Office Extension & Furniture

location
Poroko (in Kilgoris)
year first funded
2009
action
Complete and furnish an extension of one storey office block currently on going
output
-
implementation status
not known
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Siria High School

location
Moyoi (in Kilgoris)
year first funded
2003
action
Roofing the Dormitory
output
Complete 2 classes
implementation status
On going
total cost
Ksh 3,200,000
estimate
Ksh 0

Enoosaen Girls

location
Enoosaen (in Kilgoris)
year first funded
2005
action
Completion of 4 classrooms and 1 Dormitory
output
Complete 4 classes 1 dorm
implementation status
On going
total cost
Ksh 2,900,000
estimate
Ksh 200,000

Kaplecho Girls Secondary School

location
E/Dikirr (in Kilgoris)
year first funded
2004
action
Construction of 4 classes
output
Complete 24 Class
implementation status
On going
total cost
Ksh 2,700,000
estimate
Ksh 1,400,000

Pirrar Girls Secondary School

location
Ololmasani (in Kilgoris)
year first funded
2005
action
Con 4 Cl 6 Pit Latrines
output
Complete and in use
implementation status
On going
total cost
Ksh 2,400,000
estimate
Ksh 1,400,000

Kilgoris Youth Polytechnic

location
Poroko (in Kilgoris)
year first funded
2008
action
To construct 4 classes
output
To complete 4 classes
implementation status
not known
total cost
Ksh 2,000,000
estimate
Ksh 3,000,000

Sosio Secondary school

location
Ololchani (in Kilgoris)
year first funded
2008
action
Construction to completion of 4 classes
output
To complete 4 classes
implementation status
On going
total cost
Ksh 2,000,000
estimate
Ksh 4,500,000

Poroko secondary School

location
Poroko (in Kilgoris)
year first funded
2003
action
Construction of 4 C 2 Pit La
output
Completeand in use
implementation status
2nd allocation
total cost
Ksh 1,800,000
estimate
Ksh 1,400,000

Nkararo Secondary School

location
Nkararo (in Kilgoris)
year first funded
2005
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 1,700,000
estimate
Ksh 700,000

Oldonyo Orok secondary School

location
Angata (in Kilgoris)
year first funded
2004
action
Construction of 3 Classes
output
Complete Classes
implementation status
On going
total cost
Ksh 1,600,000
estimate
Ksh 1,050,000

Enolkupelia Primary School

location
Enoosaen (in Kilgoris)
year first funded
2004
action
Construction of 3 classes
output
Complete 3 Classes
implementation status
2nd Alloction
total cost
Ksh 1,200,000
estimate
Ksh 1,050,000

Enekeshui primary Schooloo

location
Kapune (in Kilgoris)
year first funded
2005
action
Construction of 4 Classes
output
Complete 4 Classes
implementation status
On going
total cost
Ksh 1,200,000
estimate
Ksh 1,400,000

Shankoe Secondary School

location
Shankoe (in Kilgoris)
year first funded
2004
action
Construction of 4 Classes 2
output
Complete 3 classes
implementation status
2nd allocation
total cost
Ksh 1,150,000
estimate
Ksh 1,400,000

Oloibor Soito primary School

location
Olomismis (in Kilgoris)
year first funded
2003
action
Complete 4 Classrooms
output
Complete 1 classes
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,400,000

Nkararo Health Centre

location
Sikawa (in Kilgoris)
year first funded
2003
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 0

Murkan Secondary School

location
Murkan (in Kilgoris)
year first funded
2003
action
Construct1,1 dom
output
Complete, 1 dorm
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 2,350,000

E/Dikirr Secondary School

location
E/Dikirr (in Kilgoris)
year first funded
2003
action
Construction of Dom
output
Complete of Dorm.
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Nkararo Primary School

location
Nkararo (in Kilgoris)
year first funded
2005
action
Construction of 3 classes
output
Complete 3 Classes
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 1,050,000

Tororek Dispensary

location
Shartuka (in Kilgoris)
year first funded
2004
action
Construction of Staff House
output
Complete Staff House
implementation status
2nd Allocation
total cost
Ksh 1,100,000
estimate
Ksh 400,000

Kilena primary school

location
Shartuka (in Kilgoris)
year first funded
2007
action
Completion of 2 classes currently at slab level
output
To complete the 2 class
implementation status
On going
total cost
Ksh 1,000,000
estimate
Ksh 1,150,000

Nkoirienito Primary School

location
Shartuka (in Kilgoris)
year first funded
2006
action
Construction of 1 Class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 1,000,000
estimate
Ksh 0

Mutenkuarr primary School

location
Olomismis (in Kilgoris)
year first funded
2004
action
Construction of 3 Classes
output
Complete Classes
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 1,050,000

Olalui Primary School

location
Osinoni (in Kilgoris)
year first funded
2003
action
Renovate 8 Classrooms
output
Complete 2 classes
implementation status
2nd allocation
total cost
Ksh 1,000,000
estimate
Ksh 400,000

Mashangwa primary School

location
Angata (in Kilgoris)
year first funded
2003
action
Construction of 2 Classess
output
Complete 3 classes
implementation status
2nd allocation
total cost
Ksh 1,000,000
estimate
Ksh 700,000

Masurura Comm. H/ C

location
Masurura (in Kilgoris)
year first funded
2006
action
Construction of health center
output
complete H/C
implementation status
On going
total cost
Ksh 950,000
estimate
Ksh 600,000

Moita Primary School

location
Nkararo (in Kilgoris)
year first funded
2004
action
Construct8 classes
output
Complete 8 Classes
implementation status
On going
total cost
Ksh 900,000
estimate
Ksh 2,800,000

Nyasita Primary School

location
Osinoni (in Kilgoris)
year first funded
2004
action
Construction of 3 Classes
output
Complete Classes
implementation status
On going
total cost
Ksh 900,000
estimate
Ksh 1,050,000

Mashangwa Disp

location
Angata (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete 1 class
implementation status
On going
total cost
Ksh 900,000
estimate
Ksh 600,000

Ilkerin Secondary school

location
Ilkerin (in Kilgoris)
year first funded
2008
action
Construction of 1 classes
output
To complete the 1 class
implementation status
On going
total cost
Ksh 900,000
estimate
Ksh 2,000,000

Enoosaen Boys Secondary school

location
Enoosaen (in Kilgoris)
year first funded
2003
action
Construction of 2 classes
output
To complete the 2 class
implementation status
On going
total cost
Ksh 900,000
estimate
Ksh 350,000

Olmelil secondary School

location
Kapune (in Kilgoris)
year first funded
2003
action
Construction 1 Class
output
complete 1 Class
implementation status
On going
total cost
Ksh 900,000
estimate
Ksh 1,200,000

Nailare Primary School

location
Poroko (in Kilgoris)
year first funded
2006
action
Construction of 2 Classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 700,000

Enkipai Primary School

location
Emarti (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 700,000

Kapweria secondary School

location
Shartuka (in Kilgoris)
year first funded
2003
action
Dorm Construction
output
Complete dorm
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 700,000

Angata Barrikoi Secondary School

location
Angata (in Kilgoris)
year first funded
2003
action
Construction of 2 Classess
output
Complete Classes
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 700,000

Kondamet Dieps

location
Angata (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 600,000

Olmotonyi primary School

location
Moyoi (in Kilgoris)
year first funded
2003
action
Construction of 2 Classess
output
Complete 2 classes
implementation status
2nd allocation
total cost
Ksh 750,000
estimate
Ksh 700,000

Kamermeru primarySchool

location
Ololmasani (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
complete 1 Class
implementation status
On going
total cost
Ksh 737,000
estimate
Ksh 350,000

Sitoka Primary School

location
Kimintet (in Kilgoris)
year first funded
2003
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 719,285
estimate
Ksh 700,000

Abbosi - Kelonget Road

location
Ololmasani (in Kilgoris)
year first funded
2005
action
Open Access Road
output
Complete Ac Rd
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 300,000

Naarolong Dispensary

location
Masurura (in Kilgoris)
year first funded
2004
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 600,000

Enoosaen Boys Secondary

location
Enoosaen (in Kilgoris)
year first funded
2003
action
Construction of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 350,000

Kinyibol primary School

location
Masurura (in Kilgoris)
year first funded
2004
action
Construction of 5 classes
output
Complete 5 Classes
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 1,750,000

Kiletien secondary School

location
E/Dikirr (in Kilgoris)
year first funded
2007
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 0

Isokon Primary School

location
Oloirien (in Kilgoris)
year first funded
2006
action
Construction of 2 Classess
output
Complete Classes
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 700,000

Olmaram Nyasita Road

location
Osinoni (in Kilgoris)
year first funded
2005
action
Open Access Road
output
Complete Ac RD
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Shankoe primary School

location
Shankoe (in Kilgoris)
year first funded
2003
action
Renovate 8 Classrooms
output
Complete 2 classes
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 400,000

Olkiloriti primary School

location
Moyoi (in Kilgoris)
year first funded
2003
action
Construction of 4 Classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 650,000
estimate
Ksh 1,400,000

Chesoen Kaplecho Emarti RD

location
E/Dikirr (in Kilgoris)
year first funded
2007
action
Open Access Road
output
complete Access RD
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 0

Ndamama Primary School

location
Ololmasani (in Kilgoris)
year first funded
2007
action
Construction of Classes
output
Complete 1 Class
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 0

Olonkolin Primary School

location
Emarti (in Kilgoris)
year first funded
2005
action
Construction of 4 classes
output
Complete 4 classes
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 1,400,000

Sosiana Primary School

location
kimintet (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 1,050,000

Mogondo Secondary School

location
Murkan (in Kilgoris)
year first funded
2006
action
Construction of 4 classes
output
Complete 4 classes
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 1,400,000

Emarti primary School

location
Emarti (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 350,000

Soget Primary School

location
Murkan (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 350,000

Kurankuriki Dispensary

location
Murkan (in Kilgoris)
year first funded
2003
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Olereko Primary School

location
Shankoe (in Kilgoris)
year first funded
2004
action
Rehabilated 8 classes
output
Complete Rehabi
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 400,000

Naarolong Primary School

location
Masurura (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 700,000

Ndoinyo Primary School

location
Masurura (in Kilgoris)
year first funded
2005
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 700,000

Ndamama secondary School

location
Ololmasani (in Kilgoris)
year first funded
2003
action
Roofing of classes
output
Complete roofing
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 350,000

Romosha Secondary School

location
Kapune (in Kilgoris)
year first funded
2005
action
4 Construction of Classes
output
45% Complete
implementation status
Stalled
total cost
Ksh 600,000
estimate
Ksh 0

Osonkoroi Secondary School

location
Poroko (in Kilgoris)
year first funded
2007
action
Construction of 1 Class
output
Complete Ac RD
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 0

Angata Barrikoi primary School

location
Angata (in Kilgoris)
year first funded
2006
action
Construction of 2 Classes
output
Complete 1 class
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 700,000

Ole Malit primary School

location
Moyoi (in Kilgoris)
year first funded
2005
action
Costruct 1 Class
output
Complete 1 class
implementation status
2nd allocation
total cost
Ksh 600,000
estimate
Ksh 350,000

Ololchani Dispensary

location
Shankoe (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete 1 class
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 700,000

Oronkai primary School

location
Shartuka (in Kilgoris)
year first funded
2005
action
2 Cl & Adm Office
output
75% completete
implementation status
On going
total cost
Ksh 550,000
estimate
Ksh 0

Tororek Primary School

location
Shartuka (in Kilgoris)
year first funded
2006
action
Construction of 1 class
output
complete 1 Class
implementation status
On going
total cost
Ksh 550,000
estimate
Ksh 350,000

Tumpelian Primary School

location
Kimintet (in Kilgoris)
year first funded
2004
action
Construction of 4 Classes
output
Complete Classes
implementation status
Well Done
total cost
Ksh 550,000
estimate
Ksh 0

Angata Disp

location
Angata (in Kilgoris)
year first funded
2003
action
Construction of Disp Block
output
Complete 1 class
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 600,000

Olepoipoi primary School

location
Moyoi (in Kilgoris)
year first funded
2004
action
Construction of 3 Classes
output
Complete 2 classes
implementation status
2nd allocation
total cost
Ksh 500,000
estimate
Ksh 1,050,000

Olopikidong'oi D.E.B mixed Primary school

location
Oloirien (in Kilgoris)
year first funded
2005
action
Construction of classrooms
output
Complete Classes
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Snr Chief Nkoidilla Primary School

location
Oloirien (in Kilgoris)
year first funded
2005
action
Construction of 2 Class
output
Complete Classes
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 0

Olkiloriti- Osupukiai- Isokoni Rd

location
oloirien (in Kilgoris)
year first funded
2006
action
Open Access Road
output
Complete Dispensary Block
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 400,000

Township primary School

location
Poroko (in Kilgoris)
year first funded
2005
action
Construction of 1 Classroom
output
Complete 4 classes
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 400,000

Nganayio dispensary

location
Olomismis (in Kilgoris)
year first funded
2006
action
Construction of health centerentre
output
Complete Dispensary Block
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 700,000

Osinoni Primary School

location
Osinoni (in Kilgoris)
year first funded
2005
action
Construction of 1 Class
output
Complete Spring
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Saparinko primary School

location
Kimintet (in Kilgoris)
year first funded
2005
action
Construction of 1 Class
output
Complete 1 class
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 350,000

Oltanki primary school

location
Poroko (in Kilgoris)
year first funded
2007
action
Constructing a new class
output
To complete 1 class
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 200,000

Olpopong Primary School

location
Emarti (in Kilgoris)
year first funded
2004
action
Construction of 4 classes
output
Complete 4 classes
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 700,000

Kapsasian Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2005
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 700,000

Sosianoi Dispensary

location
Kimintet (in Kilgoris)
year first funded
2006
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 600,000

Ilpashire Primary School

location
Sikawa (in Kilgoris)
year first funded
2005
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 700,000

Oloontare Primary School

location
Sikawa (in Kilgoris)
year first funded
2005
action
Construction of 3 classes
output
Complete 3 Classes
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 1,050,000

Enoosaen Primary School

location
Enoosaen (in Kilgoris)
year first funded
2004
action
Construction of 3 classes
output
Complete 3 Classes
implementation status
complete
total cost
Ksh 500,000
estimate
Ksh 1,050,000

Empurkel Primary School

location
Enoosaen (in Kilgoris)
year first funded
2004
action
Construction of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 350,000

Enoosaen Health Centre

location
Enoosaen (in Kilgoris)
year first funded
2003
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 600,000

OlenKare W/P

location
Sikawa (in Kilgoris)
year first funded
2004
action
Spring Protection
output
Complete spring protection
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 300,000

Kisiara primary School

location
Ololmasani (in Kilgoris)
year first funded
2003
action
Construction of 2 Classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 700,000

Shartuka secondary School

location
Shartuka (in Kilgoris)
year first funded
2005
action
Adm. Block
output
Complete Adm. Block
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kapune Dispenasry

location
Kapune (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
Alocate more funds
total cost
Ksh 500,000
estimate
Ksh 600,000

Endonyo Onkopit primary School

location
Shankoe (in Kilgoris)
year first funded
2004
action
Construction of 2 Classes
output
Complete Classes
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 700,000

CDF Water tank

location
Poroko (in Kilgoris)
year first funded
2009
action
to purchase water to be used in the new office
output
-
implementation status
not known
total cost
Ksh 455,285
estimate
Ksh 455,285

Enooretet Primary School

location
Nkararo (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 450,000
estimate
Ksh 700,000

Ildolisho Enolkupelian Rd

location
Sikawa (in Kilgoris)
year first funded
2006
action
Open Acess Road
output
complete access road
implementation status
On going
total cost
Ksh 450,000
estimate
Ksh 500,000

Romosha Dispensary

location
Kapune (in Kilgoris)
year first funded
2004
action
Construction Disp Block
output
Complete Dispensary Block
implementation status
On going
total cost
Ksh 450,000
estimate
Ksh 600,000

Mapashi primary School

location
Sikawa (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 444,636
estimate
Ksh 350,000

Tagitech Dispensary

location
Shartuka (in Kilgoris)
year first funded
2005
action
Construction of Disp Block
output
Complete and in use
implementation status
Done
total cost
Ksh 437,000
estimate
Ksh 600,000

Nashili Enkare WP

location
Osinoni (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete Spring
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 0

Olengoloto Dispensary

location
Olomismis (in Kilgoris)
year first funded
2005
action
Construction of Disp Block
output
CompletE Dispensary Block
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 0

Mutenkuarr Olengoloto Road

location
Olomismis (in Kilgoris)
year first funded
2006
action
Open Access Road
output
Complete Spring
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 500,000

Oltanki Water Project

location
Poroko (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete Dispensary Block
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Osinoni Dispensary

location
Osinoni (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 700,000

Osupuko Dispensary

location
Poroko (in Kilgoris)
year first funded
2006
action
Construction of Disp Block
output
Complete Renov
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 700,000

Chebara Primary School

location
Murkan (in Kilgoris)
year first funded
2004
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 350,000

Kurankuriki Primary School

location
Murkan (in Kilgoris)
year first funded
2003
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

Changina primary School

location
E/Dikirr (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

Chilani primary School

location
E/Dikirr (in Kilgoris)
year first funded
2003
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

St. Joseph's primary School

location
Shankoe (in Kilgoris)
year first funded
2005
action
Renovate 8 Classrooms
output
Complete Renov
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Simotwet Secondary School

location
Ololmasani (in Kilgoris)
year first funded
2004
action
Construction of 1 Class
output
Complete and in use
implementation status
More Funds
total cost
Ksh 400,000
estimate
Ksh 0

Osonkoroi primary School

location
Poroko (in Kilgoris)
year first funded
2005
action
Construction of 2 Classes
output
Complete 4 classes
implementation status
2nd allocation
total cost
Ksh 400,000
estimate
Ksh 700,000

Kilgoris D.E.B School

location
Shankoe (in Kilgoris)
year first funded
2005
action
Construction 1 Class
output
Complete Renov
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kiribwet Community Dispensary

location
Emarti (in Kilgoris)
year first funded
2006
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 600,000

Mokondo Primary School

location
Murkan (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

Olokwaya Tumpelian Rd

location
Kimintet (in Kilgoris)
year first funded
2006
action
Open Access Road
output
complete AcRd
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kimintet Health centre

location
Kimintet (in Kilgoris)
year first funded
2007
action
Construction dispensary Block
output
Cheq Stalled Re All
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 0

Chemamit Dispensary

location
E/Dikirr (in Kilgoris)
year first funded
2006
action
Disp Bl Partly Spon
output
Complete Disp Block
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 0

Esoit Tumpelian RD

location
Kimintet (in Kilgoris)
year first funded
2005
action
Open Access Road
output
complete Access RD
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Karda Primary School

location
Sikawa (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 350,000

Ntuka Primary School

location
Sikawa (in Kilgoris)
year first funded
2005
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

Nentekeny Primary School

location
Nkararo (in Kilgoris)
year first funded
2004
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

Oldanyati Dispensary

location
Sikawa (in Kilgoris)
year first funded
2003
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 600,000

Osagam Lenkop W/P

location
Osinoni (in Kilgoris)
year first funded
2004
action
Spring Protection
output
complete spring protection
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 500,000

Mumeita Water Project

location
Sikawa (in Kilgoris)
year first funded
2007
action
Spring Protection
output
Complete Spring protection
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Meguarra primary School

location
Kapune (in Kilgoris)
year first funded
2006
action
Construction of 2 Classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 700,000

Kuresiet Dispensary

location
Ololmasani (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 600,000

Njipiship Dispensary

location
Shartuka (in Kilgoris)
year first funded
2005
action
Construction of Disp Block
output
Ongoing & 3 RM Com
implementation status
On going
total cost
Ksh 363,000
estimate
Ksh 0

Enkoiperiai primary School

location
Angata (in Kilgoris)
year first funded
2006
action
Construction of 1 Class
output
Complete 1 class
implementation status
2nd allocation
total cost
Ksh 350,000
estimate
Ksh 350,000

Emarti Dispensary

location
Emarti (in Kilgoris)
year first funded
2005
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Takitech Primary School

location
Shartuka (in Kilgoris)
year first funded
2005
action
Construction of 1 Class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Chelemei Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2006
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Chepkisa Primary School

location
Murkan (in Kilgoris)
year first funded
2007
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Esoit Naibor primary School

location
Kimintet (in Kilgoris)
year first funded
2006
action
Construct1 Class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Lelegoin primary School

location
E/Dikirr (in Kilgoris)
year first funded
2003
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Kapolecho Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2004
action
Re-Construction of 2 classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 700,000

Ntulele Dispensary

location
Emarti (in Kilgoris)
year first funded
2004
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Mogor secondary School

location
Murkan (in Kilgoris)
year first funded
2007
action
Contsrution of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Olpopong Secondary School

location
E/Dikirr (in Kilgoris)
year first funded
2007
action
Construction of 1 class
output
Complet 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Ilmeoshi Pre. School

location
Emarti (in Kilgoris)
year first funded
2007
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Ainamoi Primary School

location
Emarti (in Kilgoris)
year first funded
2007
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Sikawa Primary School

location
Sikawa (in Kilgoris)
year first funded
2006
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 700,000

Kiikat Primary School

location
Sikawa (in Kilgoris)
year first funded
2006
action
Construction of 2 classes
output
Complete 2 Classes
implementation status
Completed and in use
total cost
Ksh 300,000
estimate
Ksh 700,000

Masurura primary School

location
Masurura (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 700,000

Olereko Dispensary

location
Shankoe (in Kilgoris)
year first funded
2003
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
Deviated
total cost
Ksh 300,000
estimate
Ksh 600,000

Ole Moroon W/P

location
Sikawa (in Kilgoris)
year first funded
2004
action
Construction of health center
output
complete H/C
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Empurkel Comm. Rd

location
Enoosaen (in Kilgoris)
year first funded
2006
action
Open Acess Road
output
complete access road
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 600,000

Ogwedhi Kiikat Rd

location
Masurura (in Kilgoris)
year first funded
2006
action
Open Acess Road
output
complete access road
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Osagam Naarolong Road

location
Masurura (in Kilgoris)
year first funded
2007
action
Open Acess Road
output
complete ac Rd
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Oldanyati Primary

location
Sikawa (in Kilgoris)
year first funded
2006
action
Construction of Classes
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Olasenua Primary School

location
Sikawa (in Kilgoris)
year first funded
2006
action
Construction of Classes
output
Complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Entargeeti Disp

location
Enoosaen (in Kilgoris)
year first funded
2003
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kapune primary Schooloool

location
Kapune (in Kilgoris)
year first funded
2004
action
Costruct 1 Class
output
complete 1 Class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Kaperekeiywo Road

location
Kapune (in Kilgoris)
year first funded
2006
action
Open Access Road
output
Complete Access Road
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 400,000

Oronkai -Tororek Road

location
Shartuka (in Kilgoris)
year first funded
2006
action
Open Access Road
output
Complete Ac Rd
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 700,000

Chesoen Cattle Dip

location
Ololmasani (in Kilgoris)
year first funded
2006
action
Construction of Cattle Dip
output
Complete Cattle Dip
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Ololchani primary School

location
Shankoe (in Kilgoris)
year first funded
2003
action
Construction of 2 Classes
output
Complete 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 700,000

Nyasita Enarau WP

location
Osinoni (in Kilgoris)
year first funded
2007
action
Spring Protection
output
Complete Spring
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Sirua Enkiteng WP

location
Osinoni (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete Spring
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Olchoro Oirowua WP

location
Shankoe (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete Ac RD
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Ngendalel primary School

location
Angata (in Kilgoris)
year first funded
2006
action
Construction of 4 Classes
output
Complete 2 classes
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 1,400,000

Olmotonyi Dispensary

location
Moyoi (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
2nd allocation
total cost
Ksh 300,000
estimate
Ksh 0

Ilkarian primary School

location
Moyoi (in Kilgoris)
year first funded
2006
action
Construction of 2 Classes
output
Complete 4 classes
implementation status
2nd allocation
total cost
Ksh 300,000
estimate
Ksh 700,000

Emurtoto Primary School

location
Oloirien (in Kilgoris)
year first funded
2006
action
Construction of 1 Class
output
Complete 3 classes
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Ilopilukuny Pre. School

location
Moyoi (in Kilgoris)
year first funded
2006
action
Construction of 1 Classes
output
Complete 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Olaitong primary School

location
Angata (in Kilgoris)
year first funded
2005
action
Construction of 1 Class
output
Complete 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 350,000

Chebitok primary school

location
E/ Dikirr (in Kilgoris)
year first funded
2005
action
Construction of 2 started classes
output
To complete the 2 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Kipupu primary school

location
Poroko (in Kilgoris)
year first funded
2009
action
Constructing a new class
output
To complete 1 class
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 0

Lelechonic Community Library

location
E/Dkirr (in Kilgoris)
year first funded
2006
action
Construction of Lib Block
output
Complete Lib Block
implementation status
On going
total cost
Ksh 291,449
estimate
Ksh 0

Mosocho Nentekeny R

location
Osinoni (in Kilgoris)
year first funded
2006
action
Open Access Road
output
Complete Ac RD
implementation status
not known
total cost
Ksh 272,679
estimate
Ksh 0

Ololmong'i Pre School

location
Oloirien (in Kilgoris)
year first funded
2006
action
Construction of 1 Class
output
Complete 2 classes
implementation status
On going
total cost
Ksh 250,000
estimate
Ksh 350,000

Ilmeshuki primary school

location
Olalui (in Kilgoris)
year first funded
2009
action
Construction to completion of 1 class
output
To complete the 1 class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 400,000

Murkan primary School

location
Murkan (in Kilgoris)
year first funded
2007
action
Construction 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Kibisorwet primary School

location
Murkan (in Kilgoris)
year first funded
2007
action
Construction 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Murkan junction Mogor Rd

location
Murkan (in Kilgoris)
year first funded
2007
action
Open Access Road
output
complete Access RD
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Operai Foot Bridge

location
Kimintet (in Kilgoris)
year first funded
2007
action
Construction of foot brdge
output
Complete Foot bridge
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Chebitoik Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2005
action
Construction of 1 Class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Soymingin Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2005
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Chepkoiyet Water Project

location
E/Dikirr (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete Spring
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Chebulu Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2005
action
Construction of Classes
output
Complete Classes
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Ereko Primary School

location
Nkararo (in Kilgoris)
year first funded
2006
action
Construction of 1 class
output
Complete 1 class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 350,000

Enkiwancha Primary School

location
Masurura (in Kilgoris)
year first funded
2004
action
Construction of 3 classes
output
Complete 3 Classes
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 1,050,000

Isampin Primary School

location
Enoosaen (in Kilgoris)
year first funded
2004
action
Construction of 1 class
output
Complete 1 class
implementation status
Complete and in use
total cost
Ksh 200,000
estimate
Ksh 350,000

Enooretet Road

location
Enoosaen (in Kilgoris)
year first funded
2007
action
Open Acess Road
output
complete ac Rd
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Angaset primary School

location
Ololmasani (in Kilgoris)
year first funded
2006
action
Construction of 1 class
output
complete 1 Class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 350,000

Kelonget primary School

location
Ololmasani (in Kilgoris)
year first funded
2003
action
Construction of 1 class
output
complete 1 Class
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 350,000

Abossi primary School

location
Ololmasani (in Kilgoris)
year first funded
2004
action
Construction of 2 Classes
output
Complete 2 classes
implementation status
Alocate more funds
total cost
Ksh 200,000
estimate
Ksh 700,000

Ololmasani Water project

location
Ololmasani (in Kilgoris)
year first funded
2005
action
Spring Protecction
output
Complete Spring
implementation status
2nd Allocation
total cost
Ksh 200,000
estimate
Ksh 300,000

Selembu Cattle Dip

location
Ololmasani (in Kilgoris)
year first funded
2006
action
Costruct Cattle Dip
output
Complete Cattle Dip
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 300,000

Cheplakwet Road

location
Kapune (in Kilgoris)
year first funded
2007
action
Open Access Road
output
Complete Ac. R
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Olesentu Dispensary

location
Osinoni (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
2nd allocation
total cost
Ksh 200,000
estimate
Ksh 700,000

Nyasita - Olalui Bridge

location
Osinoni (in Kilgoris)
year first funded
2004
action
Open Access Road
output
Complete Ac RD
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 300,000

Endoinyo Onkopit C.D.C

location
Shankoe (in Kilgoris)
year first funded
2007
action
Construction of Office Block
output
Comp Off Blo
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Naronyo Primary School

location
Olomismis (in Kilgoris)
year first funded
2006
action
Construction of 1 Class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 300,000

Olepoipoi Dispensary

location
Moyoi (in Kilgoris)
year first funded
2004
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
2nd allocation
total cost
Ksh 200,000
estimate
Ksh 0

Soimet Disp

location
Kimintet (in Kilgoris)
year first funded
2005
action
Construction of Disp Block
output
Complete Dispensary Block
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 600,000

Olgos Sopia Primary School

location
Kimintet (in Kilgoris)
year first funded
2003
action
Construction of 1 Class
output
Complete Classes
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 0

Kigonor Primary School

location
kImintet (in Kilgoris)
year first funded
2004
action
Construction of classrooms
output
Complete Classes
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Chemamit Primary School

location
E/Dikirr (in Kilgoris)
year first funded
2003
action
Construction of 1 class
output
Not Complete & in use
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 350,000

Sitoka Dispensary

location
Kimintet (in Kilgoris)
year first funded
2004
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Ilkeek oado Spring

location
Shankoe (in Kilgoris)
year first funded
2005
action
Spring Protection
output
Complete spring protection
implementation status
On going
total cost
Ksh 194,559
estimate
Ksh 400,000

Empurkel Bridge

location
Enoosaen (in Kilgoris)
year first funded
2005
action
Construction of Foot Bridge
output
Complete Foot Bridge
implementation status
complete
total cost
Ksh 155,364
estimate
Ksh 160,000

E/Dkirr Dispensary

location
E/Dikirr (in Kilgoris)
year first funded
2004
action
Construction of dispensaryBlock
output
Complete Disp Block
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Olalui Ilkutot Water project

location
Osinoni (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete Spring
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Ololtele Water Project

location
Poroko (in Kilgoris)
year first funded
2007
action
Spring Protection
output
Complete Ac RD
implementation status
On going
total cost
Ksh 150,000
estimate
Ksh 0

Olereko secondary School

location
Shankoe (in Kilgoris)
year first funded
2007
action
Construction of 4 classes
output
Complete 4 classes
implementation status
On going
total cost
Ksh 130,000
estimate
Ksh 1,200,000

Chilani Cattle Dip

location
E/Dkirr (in Kilgoris)
year first funded
2006
action
Construction of Cattle Dip
output
Complete c. Dip
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 0

Kuresiet primary School

location
Ololmasani (in Kilgoris)
year first funded
2004
action
Construct1 class
output
complete 1 Class
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 350,000

Olmelil primary School

location
Ololmasani (in Kilgoris)
year first funded
2004
action
Construction of 1 class
output
complete 1 Class
implementation status
Alocate more funds
total cost
Ksh 100,000
estimate
Ksh 350,000

Kapkosros primary School

location
Ololmasani (in Kilgoris)
year first funded
2004
action
Construction of 1 class
output
complete 1 Class
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 350,000

St. Thomas Aquinas School

location
Ololmasani (in Kilgoris)
year first funded
2003
action
Construction of 1 class
output
complete 1 Class
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 350,000

Kamaget Dispensary

location
Murkan (in Kilgoris)
year first funded
2004
action
Costruct Disp Block
output
Complete Dispensary Block
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 200,000

Kimugul Cattle Dip

location
Ololmasani (in Kilgoris)
year first funded
2007
action
Construction of Cattle Dip
output
Complete Cattle Dip
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 0

Abossi - Chesoen Road

location
Ololmasani (in Kilgoris)
year first funded
2007
action
Open Access Road
output
Complete Ac Rd
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 0

Poroko Water Project

location
Poroko (in Kilgoris)
year first funded
2004
action
Spring Protection
output
Complete Dispensary Block
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Olosayiet Water Project

location
Olomismis (in Kilgoris)
year first funded
2006
action
Spring Protection
output
Complete H/ Centre
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 400,000

Ileleshwani WP

location
Olomismis (in Kilgoris)
year first funded
2007
action
Spring Protection
output
-
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 0

Kerinkani Disp

location
oloirien (in Kilgoris)
year first funded
2006
action
Construction of Disp Block
output
Complete 1 class
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 600,000

Simotwet primary school

location
Ololmasani (in Kilgoris)
year first funded
2009
action
Construction of 1 classroom
output
To complete 1 class
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 0

Mogor primary Schooloo

location
Murkan (in Kilgoris)
year first funded
2003
action
Renovate 4 Classrooms
output
Complete 4 classes
implementation status
Allo. funds
total cost
Ksh 100,000
estimate
Ksh 200,000

Lelechonik primary School

location
E/Dikirr (in Kilgoris)
year first funded
2004
action
Construction of 1 class
output
Complete 1 Class
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 350,000

Mogor Dispensary

location
Murkan (in Kilgoris)
year first funded
2004
action
Construction of dispensary Block
output
Complete Disp Block
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 600,000

Chebungei Cattle Dip

location
Murkan (in Kilgoris)
year first funded
2007
action
Construction ca Dip
output
Complete 1 cattle Dip
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 0

Tumda Cattle Dip

location
E/Dikirr (in Kilgoris)
year first funded
2006
action
Construction of Dip
output
Complete Disp Block
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 0

St. Mathew E/Nkopit W/p

location
Shankoe (in Kilgoris)
year first funded
2004
action
Spring Protection
output
Complete Spring
implementation status
No Work Done
total cost
Ksh 70,000
estimate
Ksh 100,000

Shololo Water Project

location
Poroko (in Kilgoris)
action
Spring Protection
output
Complete Spring
implementation status
On going
total cost
Ksh 0
estimate
Ksh 250,000