The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
KITAINGO BOREHOLE
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Drilling, Equipping,Construction of piping extensions, construction of distribution kiosks and purchase of 10 water tanks
- output
- Clean water for domestic use
- implementation status
- Complete and in use.
- total cost
- Ksh 5,200,000
- estimate
- Ksh 7,500,000
NEW KASIKEU S.H.G BOREHOLE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2003
- action
- Drilling, Equipping and Distribution of water to larger community
- output
- Provision of portable water
- implementation status
- Complete and in use.
- total cost
- Ksh 3,300,000
- estimate
- Ksh 5,000,000
KALIMBINI/LUMU W/P
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Piping Extensions from Nolturesh main pipe to kalimbini villages, construction of distribution kiosks and purchase of storage water tanks
- output
- Provision of safe drinking water
- implementation status
- Complete and in use.
- total cost
- Ksh 3,300,000
- estimate
- Ksh 5,000,000
KASIKEU GIRLS SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Class
- output
- Separate Girls from Boys
- implementation status
- On going.
- total cost
- Ksh 2,850,000
- estimate
- Ksh 5,000,000
KAYATA GIRLS SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of an administration block and Classrooms
- output
- Improve Girl child education
- implementation status
- On going
- total cost
- Ksh 2,700,000
- estimate
- Ksh 5,000,000
MUSAANI SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2003
- action
- Construction of Classrooms and Administration block
- output
- Provision of quality education to students
- implementation status
- Complete and operational.
- total cost
- Ksh 2,455,000
- estimate
- Ksh 5,000,000
NGAAMBA BOREHOLE
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Rehabilitation of facility
- output
- Provision of clean water for domestic use
- implementation status
- Complete but not in use
- total cost
- Ksh 2,400,000
- estimate
- Ksh 3,000,000
KIU SECONDARY School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of a dormitory and laboratory
- output
- Increase capacity intake for school
- implementation status
- On going
- total cost
- Ksh 2,250,000
- estimate
- Ksh 5,000,000
KAKETA W/P
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Desilting of dam, construction of additional walls and piping of water to the community.
- output
- Increase water volume
- implementation status
- Complete and in use.
- total cost
- Ksh 2,250,000
- estimate
- Ksh 3,000,000
St. MARTINS DE PORES MALILI SECONDARY School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Creation of learning facility to the society.
- implementation status
- On going and in use.
- total cost
- Ksh 2,200,000
- estimate
- Ksh 5,000,000
KWOTHITHU (KIOU) CHIEF's CAMP / AP LINE (NGOKOMI)
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Construction of AP lines at the divisional head quarters and an administration offices.
- output
- To improve security in the area and bring public services closer to the people.
- implementation status
- On going.
- total cost
- Ksh 2,100,000
- estimate
- Ksh 5,000,000
UPETE / UVETE HARAMBEE DISPENSARY/HEALTH CENTRE
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Purchase of additional piece of land and construction of staff quarters
- output
- Better healthcare to local residents
- implementation status
- Complete and in use
- total cost
- Ksh 2,025,000
- estimate
- Ksh 5,000,000
KITHINA BOREHOLE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Drilling, Equipping, Purchase of booster pump, water tanks and pipes for distribution of water to community
- output
- Distribute water to the people
- implementation status
- Complete and in use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 3,000,000
KWALE/KWOTHITHU SECONDARY School
- location
-
KIOU
(in Kilome)
- year first funded
- 2006
- action
- Construction of Classrooms and administration offices
- output
- Improving literacy of the community
- implementation status
- On going and in use.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
IANDUINI/UVALE W/P
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of water pipe extension from Kamuthini market water tank to Ianduini village.
- output
- Cover wider area of community
- implementation status
- Stalled
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
LUMU SECONDARY School
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms and an administration block
- output
- Enhance education to the community
- implementation status
- On going and in use.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
KIIMA KIU SECONDARY School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms and administration offices.
- output
- Better learning environment
- implementation status
- On going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
UVUNYE SECONDARY School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms and administration block
- output
- Increase learning facilities
- implementation status
- On going
- total cost
- Ksh 1,950,000
- estimate
- Ksh 5,000,000
MANGALA DISPENSARY/MUUA RURAL HEALTH CENTRE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of 5-room building to serve as Laboratory, Treatment room, Examination room, Pharmacy and Registry.
- output
- Improved healthcare, Antenatal clinic
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 5,000,000
KITONGUNI DAY MIXED SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2003
- action
- Construction of classroms and an adminstration block.
- output
- Increase school intake capacity
- implementation status
- On going and in use.
- total cost
- Ksh 1,855,000
- estimate
- Ksh 5,000,000
KIMA BOREHOLE WATER PROJECT
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Drilling and equipping of facility
- output
- Curb water scarcity in the semi-desert area.
- implementation status
- On going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 3,000,000
MASOKANI SECONDARY School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms and an administration block
- output
- Increase capacity intake for school
- implementation status
- On going and in use.
- total cost
- Ksh 1,770,000
- estimate
- Ksh 5,000,000
KWA KIKETI SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Construction of an administration block. And Classrooms
- output
- Improve literacy of the community
- implementation status
- On going.
- total cost
- Ksh 1,750,000
- estimate
- Ksh 5,000,000
MT.CARMEL GIRLS SECONDARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Renovation of buildings to make Classrooms and construction of girls' hostel
- output
- provision of adequate accomodation
- implementation status
- On going.
- total cost
- Ksh 1,725,000
- estimate
- Ksh 5,000,000
ITUMBULE DISPENSARY
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of staff quarters, toilets, maternity ward and purchase of laboratory equipment
- output
- Improved healthcare
- implementation status
- On going and partially in use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,000,000
MBIINI BOREHOLE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Drilling, Equipping and piping of water to Mbiini Secondary School, and servicing of borehole.
- output
- Provision of portable water for domestic use
- implementation status
- Complete.
- total cost
- Ksh 1,600,000
- estimate
- Ksh 3,000,000
MUTILUNI DISPENSARY
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- construction of staff quarters
- output
- Better healthcare to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
MUSAANI BOREHOLE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Drilling, Equipping and Piping of water to larger community
- output
- Provision of clean drinking water
- implementation status
- Complete and in use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,000,000
KIKONGOONI EARTH DAM
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2003
- action
- Dam rehabilitation
- output
- Provide water for domestic and irrigation
- implementation status
- Complete and in use.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,000,000
ITUMBULE BOREHOLE
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Drilling, Equipping, Fencing and construction of pump house and distribution kiosk.
- output
- Wider coverage of water supply
- implementation status
- Complete and in use.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,000,000
MULUMINI SECONDARY School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Completion of administration offices and construction of 2 Classrooms
- output
- Increase capacity intake for school
- implementation status
- Complete and in use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
SULTAN HAMUD BOREHOLE WATER PROJECT
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Borehole rehabilitation and Equiping
- output
- Provision of clean drinking water
- implementation status
- Complete and in use
- total cost
- Ksh 1,350,000
- estimate
- Ksh 3,000,000
KALIMBINI PRE – UNIT/PRIMARY School
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 1,350,000
- estimate
- Ksh 5,000,000
UTHINI GIRLS SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms and an administration block
- output
- Improvement of facility
- implementation status
- On going and in use.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,000,000
KILOME D.O’S OFFICE
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of the D.O’s office, electrification, construction of toilets and repair of landrover.
- output
- To provide comfortable offices that enhances administration of public affairs.
- implementation status
- Complete and in use.
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
KASIKEU GOVT DISPENSARY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Purchase of equipment, refurbishing of some building to create a marternity ward and construction of staff quarters
- output
- Better healthcare to local residents
- implementation status
- On going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,000,000
NZAINI BOREHOLE
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Drilling of borehole.
- output
- Clean water for domestic use
- implementation status
- Complete
- total cost
- Ksh 1,225,000
- estimate
- Ksh 3,000,000
KIIMA – KIU, MAVIVYE, KIIMA – KIU SECONDARY School WATER PROJECT
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2004
- action
- Pipes to extend water from Nolturesh main pipe to Kiima – Kiu secondary school water tank and Construction of water kiosks
- output
- Provision of clean drinking water to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,000,000
MEKO MA KWA NDUUKA WOMEN GROUP WATER PROJECT
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of water tank and piping extenstion from the kaketa river to the water tank and water kiosks
- output
- Provision of clean drinking water to the community
- implementation status
- On going.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 500,000
MAIANI JOINT WOMEN GROUP WATER PROJECT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Construction of piping extensions from Nolturesh main pipe (Salama town) to maiani market and Kamuthini market, purchase of storage tanks and construction of distribution kiosks.
- output
- Cover wider community
- implementation status
- Complete and in use.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,000,000
MAVIVYE DISPENSARY
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Purchase of additional piece of land and electrification
- output
- Healthcare closer to people
- implementation status
- Complete and in use.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,000,000
MBYANI primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Improved learning facilities
- implementation status
- On going
- total cost
- Ksh 1,180,000
- estimate
- Ksh 1,000,000
MUKAA GIRLS SECONDARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms and staff quarters
- output
- Separate girls from boys for proper management
- implementation status
- Complete and in use.
- total cost
- Ksh 1,150,000
- estimate
- Ksh 2,000,000
MUMELA SECONDARY School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Construction of Class
- output
- Creation of additional institutions of higher learning
- implementation status
- On going
- total cost
- Ksh 1,120,000
- estimate
- Ksh 5,000,000
KAMUTHINI SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms and a dormitory
- output
- Increase school intake capacity
- implementation status
- On going.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 5,000,000
MUANGINI SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of more buildings
- output
- Increase learning facilities
- implementation status
- On going.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 5,000,000
KISAULU BOREHOLE ( S.H.G W/P )
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Drilling, Equiping and Construction of piping extension to distribute water to larger community
- output
- Provision of clean water to a hard – hit area by persistent drought.
- implementation status
- Complete and In use.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 5,000,000
KITAINGO SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Construction of additional Classrooms
- output
- Increase school’s intake capacity
- implementation status
- On going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,000,000
MBIINI SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of a Dining Hall
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 1,020,000
- estimate
- Ksh 2,000,000
KWA MUINDI WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Construction of a water tank that will trap water from an underground spring.
- output
- Increasing availability of reliable water flow in the community
- implementation status
- On going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
MBIINI DISPENSARY/COMMUNITY HEALTH CENTRE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of 4-room building to serve as treatment room, drug store, examination room and laboratory.
- output
- Cater for local residents healthcare
- implementation status
- on going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
KIONGWANI SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms, dormitory and toilets
- output
- Increase school’s intake capacity
- implementation status
- Complete and in use.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
AIM MA KILUNGU MARKET.
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Purchase of a transformer
- output
- Provision of electricity to open up area for business activities.
- implementation status
- Stalled
- total cost
- Ksh 1,000,000
- estimate
- Ksh 5,000,000
MAVIVYE BOEREHOLE
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Drilling and equipping of facility.
- output
- Avail clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
KWANGUMU BOREHOLE
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Drilling and equipping of borehole
- output
- Provision of clean reliable source of water for domestic use.
- implementation status
- On going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
MUANGINI AP CAMP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2009
- action
- Construction of AP Quarters at Muangini Market
- output
- Improving Security in the area
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
KIIMA KIU/KWA EKA /KWA KASEKE W/P
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Construction of Piping extensions and water kiosks to cover Kwa Eka village.
- output
- Coverage of wider community
- implementation status
- Complete.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
MIKUSYO EARTH DAM
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2003
- action
- Desilting of the Earth Dam
- output
- Avail water to the area residents
- implementation status
- Complete and in use.
- total cost
- Ksh 950,000
- estimate
- Ksh 2,000,000
KASIONI/KANDOLO WATER PROJECT
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Purchase of water tank and construction of a piping extension from the main pipe to Kandolo villages.
- output
- Provision of safe drinking water
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 500,000
MANGANI W/P
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Installation of pipes from Kamuthini market to Mangani villages and purchase of water tanks
- output
- Wider distribution of water
- implementation status
- Stalled
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
KIU A.P’S POST
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2005
- action
- Construction of AP quarters at Kiu AP Camp, a cell and chief's office
- output
- Enhancing Security in the village
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
ENGULI Secondary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of laboratory
- output
- Improve standards
- implementation status
- Complete and in use.
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
KWALE “B” MEN S.H.G
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- construction of piping extension from Nolturesh main pipe to kwale villages
- output
- Provide clean water
- implementation status
- Complete and in use
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
KASIKEU CATHOLIC DISPENSARY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Purchase of equipment and construction of a maternity ward
- output
- Better healthcare
- implementation status
- Complete and in use
- total cost
- Ksh 850,000
- estimate
- Ksh 2,000,000
MAIANI SECONDARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of dormitory.
- output
- Improve learning environment
- implementation status
- On going
- total cost
- Ksh 800,000
- estimate
- Ksh 2,000,000
KILOMBO primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
KEMAASYA COMMUNITY DAM
- location
-
KIOU
(in Kilome)
- year first funded
- 2006
- action
- Rehabilitation of Earth Dam
- output
- Catchment of water for community
- implementation status
- Complete.
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
KASIKEU D.O’S OFFICE.
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of D.O's office and repair of landrover
- output
- To create administration centre that would result in serving the people better.
- implementation status
- Complete and in use.
- total cost
- Ksh 750,000
- estimate
- Ksh 1,500,000
KISAULU BOREHOLE WATER PROJECT
- location
-
KIOU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and Installation of Power generator and control panel
- output
- -
- implementation status
- Complete
- total cost
- Ksh 727,488
- estimate
- Ksh 0
KASIKEU BOYS SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Construction of a dormitory
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 720,000
- estimate
- Ksh 2,000,000
MUKAA BOYS SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Extension of Dining Hall and renovation of Classrooms
- output
- Improve and increase school’s intake capacity
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
KWALE DISPENSARY
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Purchase of laboratory equipment
- output
- Easily accessible health services to the community.
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
MWANYANI/KIIMA - KIU DISPENSARY
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of 4- room building to house treatment room, drug store, examination room and registry
- output
- Increasing health care services to the community at affordable rates and easily accessible
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
KAMUTHIN HEALTH CENTRE
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Construction of Registry, Treatment room, Examination room, Drug store.
- output
- Provision of health services to the interior of the constituency
- implementation status
- Complete.
- total cost
- Ksh 700,000
- estimate
- Ksh 10,000,000
KAYATA BOREHOLE S.H.G WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extensions from borehole to water kiosks in the community
- output
- Increasing water flow in the community that is easily accessible and reliable
- implementation status
- Complete and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
KWA WALA WATER PROJECT
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of piping extensions from Nolturesh amin pipe to the water tank that serves the community.
- output
- Coverage of wider community
- implementation status
- Complete and in use.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
KATATU EARTH DAM W/P
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2003
- action
- Scooping of Earth Dam and construction of terraces to control water flow
- output
- Increase of water volume
- implementation status
- Complete and in use.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
NGIINI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of 1 Classroom and renovation of others.
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
KILOME SA SECONDARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms and administration block
- output
- Improved learning facility
- implementation status
- Complete and in use
- total cost
- Ksh 650,000
- estimate
- Ksh 2,000,000
BISHOP NGALA SECONDARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Construction of a laboratory.
- output
- Better learning environment
- implementation status
- On going
- total cost
- Ksh 650,000
- estimate
- Ksh 2,000,000
MUKAA DAIRY
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Purchase and installation of a milk coolant plant at Mukaa Dairy Packaging premises
- output
- Promotion of dairy farming activities in the area.
- implementation status
- Complete and in use.
- total cost
- Ksh 644,407
- estimate
- Ksh 2,100,000
KILOME SA primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- On going
- total cost
- Ksh 630,000
- estimate
- Ksh 1,000,000
KITHEINI SECONDARY School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms and acquisition of a solar panel
- output
- Increase capacity intake for school
- implementation status
- Complete and in use
- total cost
- Ksh 620,000
- estimate
- Ksh 2,000,000
A.I.C NYAYO GIRLS SECONDARY School
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Fencing of school compound.
- output
- Increase security and create permanent boundary to wade off land encroachment.
- implementation status
- Complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
UVETE AP CAMP
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of land and fencing for the AP Lines project
- output
- Enhancing Security in the village
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 3,000,000
D DAM
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2003
- action
- Scooping of Earth Dam
- output
- Increase of water volume
- implementation status
- Complete and in use.
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
KIOU primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2003
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 590,000
- estimate
- Ksh 1,000,000
KILOME POLICE STATION
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of male and female cells.
- output
- Creation of more space to house criminals
- implementation status
- Complete and in use.
- total cost
- Ksh 586,000
- estimate
- Ksh 1,000,000
WIKWATO WA MUANI W/P
- location
-
KASI
(in Kilome)
- year first funded
- 2006
- action
- Construction of piping extensions and purchase of storage tanks
- output
- Provision of clean water to Muani villages.
- implementation status
- Complete and in use.
- total cost
- Ksh 550,000
- estimate
- Ksh 500,000
KWA KIKETI (S.H.G) DAM
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of piping extension from Nolturesh amin pipe to water kiosks for distribution
- output
- Wider distribution of water
- implementation status
- Complete and in use.
- total cost
- Ksh 550,000
- estimate
- Ksh 500,000
A.I.C MALILI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
NDULUNI SECONDARY School
- location
-
KASI
(in Kilome)
- year first funded
- 2004
- action
- Construction of a dining hall and equipping of a laboratory
- output
- Better learning facilities
- implementation status
- On going.
- total cost
- Ksh 520,000
- estimate
- Ksh 2,000,000
KAMUTHINI WATER PROJECT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2009
- action
- Construction of piping extension from salama to kamuthini market
- output
- creation of water source to the community
- implementation status
- on going
- total cost
- Ksh 500,000
- estimate
- Ksh 6,500,000
MBYANI DISPENSARY
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Construction of staff quarters and fencing of project compound, purchase of laboratory equipment.
- output
- provision of accomodation to staff, improving security and enhancement of treatment services.
- implementation status
- Complete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
NDULUNI DISPENSARY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of pit-latrine and completion of treatment room, examination room and drug store.
- output
- To increase health facilities in the division
- implementation status
- Complete.
- total cost
- Ksh 500,000
- estimate
- Ksh 5,000,000
KWA MAILU BOREHOLE
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Rehabilitation of facility.
- output
- Water source to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
KWA NTHOIA W/P
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Purchase of storage tank and construction of piping extension from water source to storage tank and primary school
- output
- Provision of clean water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
KALANZONI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
MARWA YOUTH CENTRE.
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Fencing of the institution acquisition of furniture and renovation of an administration block and Classrooms
- output
- Creation of a learning institution that would be multipurpose in offering all types of training to the youth plus a resource centre.
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 10,000,000
KIUMONI BOYS(NEW) SECONDARY School.
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of buildings to begin the school.
- output
- Increasing learning institutions in the constituency to easy congestion in established secondary schools.
- implementation status
- Stalled.
- total cost
- Ksh 500,000
- estimate
- Ksh 2,500,000
MUATHA primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2003
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 480,000
- estimate
- Ksh 1,000,000
TANGU primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms and construction of administration offices.
- output
- Improved learning facilities
- implementation status
- on going
- total cost
- Ksh 470,000
- estimate
- Ksh 1,000,000
THUMBI primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2003
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 465,000
- estimate
- Ksh 1,000,000
MWANYANI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2003
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 465,000
- estimate
- Ksh 1,000,000
ITUMBULE primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 460,000
- estimate
- Ksh 1,000,000
ACK STSTEPHEN SECONDARY School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms, construction of dining hall, toilets and girls’ hostels.
- output
- Improve learning facility
- implementation status
- Complete and in use
- total cost
- Ksh 450,000
- estimate
- Ksh 2,000,000
KYANGALA – MATUMBINI EXTENSION
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Construction of weir
- output
- Provision of water to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
WATHINI ACK DISPENSARY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Construction of Labour Ward
- output
- Improve healthcare to the locals
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 2,000,000
KWA NZANDU W/P
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Dam rehabilitation
- output
- Increase water volume
- implementation status
- Complete and in use.
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
SALAMA SHED AND JUA KALI
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to create a trading structure.
- output
- Creation of jobs through provision of juakali structures where small businesses can conducted.
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
KWA NGUMU primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms and fencing of school compound
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 430,000
- estimate
- Ksh 1,000,000
IKUUTANI – KWA KALELO AREA
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Installation of electricity to the Ikuutani market.
- output
- Improvement of living standards
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
MARWA YOUTH POLYTECHNIC
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Renovation of buildings donated by the co-operative society to house the polytechnic.
- output
- Better learning facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 5,000,000
KYANGALA COMMUNITY W/P
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of water kiosk
- output
- Provision of clean water
- implementation status
- Complete and in use.
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
KITHATA W/P
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Piping extension from Nolturesh main pipe (Salama market to kithata villages), construction of distribution kiosks & purchase of water tanks
- output
- Increase storage capacity
- implementation status
- Complete and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
KATHEMBONI/KWA KATIA/ KIMWII W/P
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Construction of piping extensions from kamuthini market to kathemboni/kwakatia villages and purchase of water tanks
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
LUMU / KATHANGA WATER PROJECT.
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Piping extensions from kalimbini/lumu, installation of booster pump, construction of pump house, connection of electricity, installation of storage water tanks from Lumu to Kathanga village
- output
- Provision of easily accessible water for domestic use to the villages
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 3,000,000
ULU BOREHOLE
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Piping of water to larger community and storage water tanks.
- output
- Provide clean water to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 400,000
- estimate
- Ksh 3,000,000
KIONGWANI DISPENSARY
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Renovation of the facility to operational level and equipping
- output
- Cater health services to the community and especially Kiongwani secondary school
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
KAVUKO(NEW) SECONDARY School
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of Classrooms and administration offices to begin the school.
- output
- Promotion of girl – education by increasing girls learning institutions.
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 5,000,000
MUUA PRIMARY School
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Construction of two classrooms and pit latrine
- output
- -
- implementation status
- Complete
- total cost
- Ksh 397,540
- estimate
- Ksh 0
KANDOLO primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 390,000
- estimate
- Ksh 1,000,000
KILOME POLICE CELLS
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Completion of women cell at Kilome police station.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 387,444
- estimate
- Ksh 0
MUANI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 380,000
- estimate
- Ksh 1,000,000
NGALANA primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2003
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 380,000
- estimate
- Ksh 1,000,000
KWA KATHENDU primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 370,000
- estimate
- Ksh 1,000,000
KATHUNGU primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 360,000
- estimate
- Ksh 1,000,000
ABC NGIINI SPRINGS OF HOPE S.H.G DISPENSARY
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of staff quarters
- output
- Increasing health care services to the community at affordable rates and easily accessible
- implementation status
- On going
- total cost
- Ksh 350,000
- estimate
- Ksh 2,000,000
KATONI PRE – UNIT
- location
-
KASI
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
NITWATHI SELF HELP GROUP
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Construction of a piping extension from the Nulturesh pipe to the villages.
- output
- Provision of easily accessible clean water for domestic use.
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
LANDU primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 320,000
- estimate
- Ksh 1,000,000
MUTILUNI/KILOME/KIVUONI WATER PROJECT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Piping, extensions and water tanks
- output
- Supply water to schools and community
- implementation status
- On going
- total cost
- Ksh 320,000
- estimate
- Ksh 500,000
KATHII primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2003
- action
- Renovation of Classrooms
- output
- Improved learning institutions
- implementation status
- Complete and in use.
- total cost
- Ksh 315,000
- estimate
- Ksh 1,000,000
IANDUINI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 315,000
- estimate
- Ksh 1,000,000
NGAAMBA primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Construction of pit-latrines and renovation of delapidated structures
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 315,000
- estimate
- Ksh 1,000,000
UVETE / UPETE WATER PROJECT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Rehabilitation of the dam.
- output
- Increase water volume that serves a coffee factory.
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
ULU DISPENSARY
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Construction of 4 - room building to serve as drug store, examination room, treatment room and registry.
- output
- Improve healthcare to people
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
KITUMBINI BOREHOLE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Pipeline extension
- output
- Clean water for pupils in the school
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
KIU BOREHOLE EXTENSION
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2007
- action
- Extensions and purchase of water tanks
- output
- Provision of clean water to the community
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
MBONDONI W/P
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Purchase of water tanks and pipes for extensions
- output
- Provision of safe drinking water
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
MATUNDA KYANZISI W/P
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Rehabilitation of water pump
- output
- Avail clean drinking water to society
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
KIVAUWE/MUANGINI W/P
- location
-
MUMELA
(in Kilome)
- year first funded
- 2006
- action
- Construction of piping extensions and istallation of storage tanks.
- output
- Provision of clean water to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
IANDUINI/KILOMBO W/P
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Construction of piping extension from Kamuthini market to Ianduini and Kilombo villages and purchase of water tanks
- output
- Cover wider community
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
KATILIN W/P (DAM)
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Rehabilitation of an earth dam to increase surface water catchment areas
- output
- Provision of adequate and reliable source of clean water for domestic use
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
ENGULI SAND DAM
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Rehabilitation of sand Dam
- output
- Improve water Catchment area
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
MANYANZANI-SELF HELP GROUP
- location
-
KIIMA-KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a dam
- output
- Availability of water for domestic use.
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
MAIANI NETWORK S.H.G
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Construction of piping extension from Maiani market to Enzai market
- output
- provision of clean tap water to the Enzai communities
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
KWA WALA primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of 1 Classroom and administration office
- output
- Improved learning facilities
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
ENZAI POLITECHNIC
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Construction of a Classroom
- output
- Better learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
KIU –MWATUKYO WATER PROJECT
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extensions from Nulturesh main pipe to kiu villages.
- output
- Provision of clean tap water to the community
- implementation status
- Complete and in use.
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
KALANZONI – MASAANI WATER PROJECT
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension from Nulturesh main pipe to Kalanzoni – Masaani villages
- output
- Provision of clean tap water to the villages for domestic use
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
SULTAN HAMUD primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 295,000
- estimate
- Ksh 1,000,000
KILIA primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 280,000
- estimate
- Ksh 1,000,000
ENZAI primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 280,000
- estimate
- Ksh 1,000,000
MASAANI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 280,000
- estimate
- Ksh 1,000,000
KWA MALELU primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 280,000
- estimate
- Ksh 1,000,000
MUANI BOREHOLE
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension from Muani borehole to Muani secondary school.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 276,050
- estimate
- Ksh 0
KIONGWANI EARTH DAM
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2009
- action
- Disilting of Earth Dam
- output
- To increase the water catchment capacity
- implementation status
- on going
- total cost
- Ksh 275,000
- estimate
- Ksh 1,500,000
LUMU primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 270,000
- estimate
- Ksh 1,000,000
KITIVO primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 265,000
- estimate
- Ksh 1,000,000
NTHAANI W/P
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of storage tank
- output
- Increase storage capacity
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
KWANGOLE SAND DAM
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of sand dam to harvest rain water.
- output
- Creation of reliable source of water that is health to the environment.
- implementation status
- On going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
KATHANGA COMMUNITY W/P
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of piping extensions from Kasikeu (New) Borehole to Kathanga Villages.
- output
- Provision of water for domestic use to the community and ease water scarcity.
- implementation status
- On going
- total cost
- Ksh 250,000
- estimate
- Ksh 2,000,000
MUTWEAMBOO CATTLE DIP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of Cattle Dip
- output
- Provision of healthcare services to the communities' livestock
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
KYUUNGUNI primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 245,000
- estimate
- Ksh 1,000,000
KWA MBUMBU primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 240,000
- estimate
- Ksh 1,000,000
MBAA MWANIA WATER PROJECT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension, water kiosk and water tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 231,742
- estimate
- Ksh 0
KWA KALELO primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 230,000
- estimate
- Ksh 1,000,000
CHIEF KIAMBA primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use
- total cost
- Ksh 230,000
- estimate
- Ksh 1,000,000
NGUUNI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 230,000
- estimate
- Ksh 1,000,000
KATHII PRE – UNIT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 200,772
- estimate
- Ksh 200,000
LUMU SECONDARY School W/P
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Purchase of water tanks, extension pipes and a booster to source water from the Kalimbini – Lumu pipeline.
- output
- Storage facility for clean water
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
IKUUTANI S.H PROJECT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
KIONGWANI CATTLE DIP.
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Rehabilitation of the dipping area, fixing of guiding structures, and re-fencing of facility.
- output
- Provision of cattle treating facility that promote livestock health thus ensuring wealth creation in livestock.
- implementation status
- Complete and in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
KASIKEU CHIEF's OFFICE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of Kasikeu Location Chief's office
- output
- Provision of administration offices.
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
KASIKEU AP LINES
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Renovation of AP Lines at Kasikeu Divisional Head quarters
- output
- Provision of full time security
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
ULU(NEW) SECONDARY School
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of buildings to house the school.
- output
- Increase learning institutions in the constituency and easy congestions in established schools.
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 3,000,000
KIMA TECHNICAL COLLEGE
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Materials required Construction of additional buildings
- output
- Better learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
MASELENI WATER PROJECT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Construction of a Shallow well and acquisition & installation of hand pump.
- output
- Creation of additional water sources.
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
MUSWII WATER PROJECT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Harvesting of spring water and storing it in tanks for piping to larger community.
- output
- Provision of affordable and reliable source of water to the community.
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
ENGULI COMMUNITY WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of sand dam to harvest rain water
- output
- Provision of affordable and easily accessible reliable source of water for universal use.
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
KIONGWANI WATER PROJECT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Connection of pump booster and lying of pipes from Tanathi main pipe to Kiongwani villages.
- output
- Provision of clean affordable water for domestic use.
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
NDULUNI WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a water reservoir to trap water from a spring.
- output
- Creation of a stable water supply to the village and especially to Nduluni schools.
- implementation status
- Complete and in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
MWOLOOTO KWA EKA C.B.O
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension from Nulturesh main pipe to the community
- output
- Provision of clean drinking water to the community
- implementation status
- On going.
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
TANGU MUTUI SELF HELP GROUP WATER PROJECT
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension from Nulturesh main pipe to water kiosks in Tangu Village
- output
- Provision of clean tap water in Tangu villages for domestic use
- implementation status
- Complete and in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
KATHANGATHINI SELF HELP GROUP
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Construction of an earth dam
- output
- Provision of reliable source of water
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
KIMWII WATER PROJECT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a dam to create a water catchment area
- output
- Provision of reliable source of water for domestic use.
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
KATUMBULE – LYUKI SELF HELP GROUP
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Construction of a sand dam to increase surface water catchment areas in the village
- output
- Increase water availability in the village
- implementation status
- On going.
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
KANINI KASEO SELF HELP GROUP
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a dam wall that also serves as a footbridge across the river.
- output
- Increase water availability to the community and ease transport across the river
- implementation status
- Complete and in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
KYUNGUNI WEIR
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Construction of gabion
- output
- Increase water volume
- implementation status
- Complete in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
NZEVENI W/P
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Installation of pipes from Itumbule borehole to Nzeveni market.
- output
- Wider distribution of water
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
MBIINI Secondary W/P
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Purchase of water tank and construction of piping extension from mbiini borehole to mbiini secondary school
- output
- Provision of clean water
- implementation status
- Complete.
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
KATHIKWANI EXTENSION
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Extensions and purchase of water tanks. Water to be sourced from New Kasikeu Borehole.
- output
- Cover wider area of community
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
MBONDONI BOREHOLE
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Acquisition of water pump and electification of project.
- output
- Provision of clean drinking water
- implementation status
- Complete and in use.
- total cost
- Ksh 200,000
- estimate
- Ksh 3,000,000
MUKAA DISPENSARY
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Purchase of drugs
- output
- Improved healthcare
- implementation status
- Complete and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
UTHINI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 195,000
- estimate
- Ksh 1,000,000
MUSAANI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 195,000
- estimate
- Ksh 1,000,000
KINGOONI PRIMARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Acquisition of construction materials and a water tank. Technical College in the financial year 2007/08 to re-roof classrooms that had been blown off by strong winds.
- output
- -
- implementation status
- On going
- total cost
- Ksh 194,840
- estimate
- Ksh 0
KAVUKO primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Purchase of beddings for the boarding facility
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 190,000
- estimate
- Ksh 1,000,000
KATULYANI primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
KWAMBEU primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
KITHINA primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
MBIINI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
ISIKA primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
MUKAA primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
KATHIKWANI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Construction of pupils pit-latrine that had sunk due to have rains
- output
- Improved learning facilities
- implementation status
- Complete and in use
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
NDULUNI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
KWALE primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 165,000
- estimate
- Ksh 1,000,000
MUUA primary School
- location
-
KASI
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms that collapsed during the rain season and renovation of delapidated structures
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 165,000
- estimate
- Ksh 2,000,000
MUTHITHA primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 165,000
- estimate
- Ksh 1,000,000
MAIANI SA primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 165,000
- estimate
- Ksh 1,000,000
KWA MBOTOE primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 165,000
- estimate
- Ksh 1,000,000
KASIKEU ENVIRONMENTAL FREEDOM S.H.G
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Acquisition of water tank and watering accessories
- output
- Creation of a water catchment area to provide water for irrigating seedlings.
- implementation status
- Complete and in use.
- total cost
- Ksh 160,000
- estimate
- Ksh 500,000
MASOKANI DISPENSARY
- location
-
MUMELA
(in Kilome)
- year first funded
- 2007
- action
- Acquisition of land Construction of the facility
- output
- Easily accessible and affordable health services to the community
- implementation status
- Stalled
- total cost
- Ksh 150,000
- estimate
- Ksh 3,000,000
KAVUTI WATER WEIR
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Rehabilitation of Earth Dam
- output
- Catchment of water for community
- implementation status
- Complete and in use.
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
KWA MATINGA DAM
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of Dam
- output
- Water Catchment for community
- implementation status
- Complete and in use
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
KWA KAVITA WEIR
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Construction of water weir
- output
- Provision of clean water to community
- implementation status
- Complete and in use.
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
MBUUNI WEIR
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Rehabilitation of weir
- output
- Provision of clean water to community
- implementation status
- Complete and in use.
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
KWA MUULU WEIR S.H.G
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Construction of weir
- output
- Increase of water volume
- implementation status
- On going.
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
KWAKASEKE ADULT LITERACY SELF HELP GROUP
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of an earth dam.
- output
- Provision of reliable source of water
- implementation status
- On going
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
MASEKINI NURSARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Roofing, plastering and flooring of Classroom and office.
- output
- Creation of learning facility for young ones who cannot trek long distances.
- implementation status
- On going
- total cost
- Ksh 150,000
- estimate
- Ksh 1,500,000
WENDO WA KASIKEU ACCESS ROAD
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Formating, mapping and bush clearing.
- output
- Construction of passable roads.
- implementation status
- Complete and in use.
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
KYAKILELE SELF HELP GROUP.
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Formating, mapping and bush clearing
- output
- Construction of passable roads
- implementation status
- Complete and in use.
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
ENZAI PRIMARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2009
- action
- Construction of Pitlatrines that collapsed after heavy rains
- output
- -
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
KWAMWINGIO PRIMARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2009
- action
- Construction of Pitlatrines
- output
- -
- implementation status
- complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
KASIKEU DIVMGNT COMMIT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2009
- action
- Completion of Kasikeu Chief's office
- output
- -
- implementation status
- complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
KILIA PRIMARY School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2009
- action
- Construction of Pitlatrines
- output
- -
- implementation status
- complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
ISIKA PRIMARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2009
- action
- Construction of Pit latrines
- output
- -
- implementation status
- complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
NGILUNI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 145,000
- estimate
- Ksh 1,000,000
KWA KATHENDU PRE – UNIT.
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 130,000
- estimate
- Ksh 2,000,000
MASOKANI primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 130,000
- estimate
- Ksh 1,000,000
MASIVE primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 130,000
- estimate
- Ksh 1,000,000
KITUMBINI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 130,000
- estimate
- Ksh 1,000,000
KATHII PRIMARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of a roof
- output
- -
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 0
T.O.C SULTAN primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 120,000
- estimate
- Ksh 1,000,000
MUKAA PRIMARY School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Construction of pit-latrines
- output
- -
- implementation status
- Complete
- total cost
- Ksh 113,700
- estimate
- Ksh 0
MUSAANI TREE NURSARY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and installation of water tank
- output
- Provision of reliable water supply
- implementation status
- Complete and in use.
- total cost
- Ksh 110,000
- estimate
- Ksh 1,500,000
HILL WOMEN GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and installation of water pump to a shallow well
- output
- Provision of equipment to help draw water from the shallow well
- implementation status
- Complete and in use.
- total cost
- Ksh 110,000
- estimate
- Ksh 1,000,000
KATHANGA WOMEN GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of shallow well
- output
- Provision of reliable, easily accessible and affordable source of water
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 1,000,000
KIIMA KIU primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 110,000
- estimate
- Ksh 1,000,000
KIKONGOONI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 110,000
- estimate
- Ksh 1,000,000
KITUMBINI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Purchase pipes and pay for connection of water from Kitumbini borehole to the school compound.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 108,220
- estimate
- Ksh 0
MIKUSYO EARTH DAM
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Construction of the wall of an earth dam.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 101,500
- estimate
- Ksh 0
MANGANI PRE – UNIT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Acquisition of playing equipment for the kids
- output
- Enhance activities for P.E lessons
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
MITAMBONI NURSERY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2009
- action
- Finishing of a classroom
- output
- -
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
MUTWEAMBOO PRIMARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2009
- action
- Construction of Pitlatrines
- output
- -
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
KIU PRIMARY School
- location
-
KIIMAKIU
(in Kilome)
- year first funded
- 2009
- action
- Construction of Pit latrines
- output
- -
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
MASEKINI NURSERY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2009
- action
- Completion of nursery school
- output
- -
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
UMIISYO WA MAKUMBINI W/G
- location
-
KIOU
(in Kilome)
- year first funded
- 2009
- action
- Construction of wall of earth dam
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
SALUSYA WONE MBEE YIIANI SELF HELP GROUP
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Digging of a shallow well to increase surface water catchment areas
- output
- Provision of easily accessible water that serves a specific purpose
- implementation status
- On going.
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KWA KATIA PRE – UNIT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Construction of a Classroom
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
KALANZONI PRE – UNIT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Construction of a Classroom
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
IKUUTANI BOREHOLE (KIONGWANI EXTENSION)
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a piping extension from the borehole to Kiongwani secondary school
- output
- Provision of clean domestic water to the school
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
KITHITUNI BOREHOLE
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extensions from borehole to water kiosks
- output
- Increasing water accessibility in the area
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
MAIANI BOREHOLE
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extensions from borehole to water kiosks.
- output
- Improve water accessibility by community.
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
KWA MATEE KIU
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of water kiosks and piping of water to larger community
- output
- Provision of safe drinking water
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
MIUMBUNI S.H.G
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2007
- action
- Purchase of water tank and pipes for distribution of water.
- output
- Storage of water for domestic use
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KWA LONGO W/P
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of weir
- output
- Increase water volume
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KWA IVOSE SAND DAM
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Rehabilitation of earth Dam
- output
- Provision of clean water
- implementation status
- Complete.
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KWA LOA DAM
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of Earth Dam
- output
- Increase water volume to the community
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KWA MASILA MUTUA S/W
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Initiation of project
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
KWA KITUVA KIKULUI S/W
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Initiation of project
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
KWA KILONZO S/W
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Initiation of project
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
KYANGOLO WATER PROJECT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Installation of a water tank
- output
- Increment in water storage facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KWA MUTAVA
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a shallow well
- output
- Provision of water for irrigating tree nursery beds.
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
KYAMUUMBA KALANZONI.
- location
-
KIIMA-KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension from Nulturesh main pipe to Kalanzoni village.
- output
- Provision of clean tap water for domestic use.
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
MUKATHI SISAL SELF HELP GROUP
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of shallow well
- output
- Provision of water that is utilized in irrigating nursery beds for seedlings
- implementation status
- On going.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
AITHI MA NZUKI MAWA SELF HELP GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of piping extension from new Kasikeu borehole to mawa village
- output
- Creation of easily accessible source of water to ease burden of traveling kilometers looking for water.
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
KEYENEE KE MUATHI YOUTH GROUP
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Rehabilitation of a sand dam.
- output
- Creation of water catchment area to be used for irrigating tree nursery beds.
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
KIMIA COMMUNITY S.H.G
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Construction of shallow well to harvest water for maintaining tree nursery bed.
- output
- Rehabilitation of environment
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
SINAI KIIMA KIU YOUTH GROUP
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2008
- action
- Construction of piping extensions from the Tanathi main pipe to water kiosks
- output
- Creation of water out-lets for convinience usage.
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
KALANZONI FARMERS S.H.G
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2008
- action
- Construction of sand dam to provide water for irrigation.
- output
- Creation of affordable reliable source of water for irrigation.
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
AMUKA TWENDE WOMEN GROUP
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2008
- action
- Installation of water tank
- output
- Creation of water resorvior for reliable water supply.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MAVIVYE NETWORK WATER PROJECT
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2008
- action
- Construction of Tree Nursary bed and installation of watering facilities
- output
- To increase availability of tree seedlings for the rehabilitation of the environment.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
KWAMBITA KUWETA NA KWIKA WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of tree nursary beds and installation of watering facilities
- output
- To provide tree seedlings for planting
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MUSYAMONI MBUKUNI COMMUNITY W/P
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and installation of water tank
- output
- Provision of water harvesting and storage facility
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
NEW GENERATION MANGANI S.H.G
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Construction of earth dam
- output
- Provision of affordable, easily accessible and reliable water supply.
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 2,500,000
OKOA POVERTY FIGHTERS
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Construction of earth dam to harvest rain water
- output
- Creation of additional water resorviors
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 3,000,000
KWATA VINYA S.H.G
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and installation of water tank
- output
- Provision of water harvesting and storage facility
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
KWA KAVITA SOIL CONSERVATION PROJECT.
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Construction of gabions
- output
- Controlling of soil erosion and creation of water catchment areas.
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
MUKI DIVISIONAL YOUTH GROUP
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Construction of earth dam
- output
- Creation of water catchment facility
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
UMIISYO WA MAKUMBINI
- location
-
KIOU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and installation of water tank
- output
- Provision of water harvesting and storage facility
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MUKAA CHILDRENS
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MBONDONI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MUMELA FOUNDATION YOUTH POLYTECHNIC
- location
-
MUMELA
(in Kilome)
- year first funded
- 2007
- action
- Completion of a Classroom
- output
- Increasing tertiary learning institutions in the constituency that offer quality training to the youths at affordable rates.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 5,000,000
MUMELA AP CAMP
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Construction of an AP Camp at Mumela Location chief's office
- output
- Provision of full time guaranteed security
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 4,000,000
NGIINI EVERGREEN S.H.G
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2008
- action
- Construction of nursary beds for seedlings and fencing of farm.
- output
- Provision of seedlings for planting to the farmers.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MBYANI CATTLE DIP
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of treatment kit and fixing of delapidated structures
- output
- Provision of healthcare services to the communities' livestock
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
ITHEMBONI WOMEN GROUP
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of fertiliser, seeds and farming tools
- output
- Promotion of farming activities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
UVALENI VILLAGE GREEN FRENCH
- location
-
MUMELA
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of fertiliser, seeds and farming tools
- output
- Promotion of farming activities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KYENI KYA NGILUNI S.H.G
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of fertiliser, seeds and farming tools
- output
- Promotion of farming activities
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
NGUUNI CATTLE DIP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of treatment kit and fixing of delapidated structures
- output
- Provision of healthcare services to the communities' livestock
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MATENDO WOMEN GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisiton of fertiliser,seeds and farming tools
- output
- Promotion of farming activities and creation of self-employment
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KASIKEU SHED
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter.
- output
- Promotion of job creation through provision of trading structures to small scale mobile traders.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KITAINGO/UPETE MARKET SHED
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Construction of a modified juakali closed shed.
- output
- Provision of secured trading facility for small mobile vendors.
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
ITUMBULE DISPENSARY
- location
-
KIIMA – KIU
(in Kilome)
- year first funded
- 2007
- action
- Roofing staff quarters
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
KIWIWA – KILOME WIDOWS ASSOCIATION
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Construction of social halls for widows, widowers, and orphans as a source of income.
- output
- Creation of source of income
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
MITABONI PRE – UNIT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a Classroom and an office.
- output
- Bringing learning institutions closer to the people.
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
MALILI ROAD
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Bush clearing and earth refilling of Malili road from the Kautandini junction leading to Mavivye town.
- output
- Improvement of the road condition to be more passable thus opening newly settled area for trade and other economic activities.
- implementation status
- Complete and in use.
- total cost
- Ksh 100,000
- estimate
- Ksh 3,700,000
KISAULU PRE – UNIT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a Classroom and an office
- output
- Creation of learning facility closer to the people
- implementation status
- On going.
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
KIU DISPENSARY
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Purchase of laboratory equipment and electrification
- output
- Improved healthcare
- implementation status
- Complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
MUTWEAMBOO primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 95,000
- estimate
- Ksh 1,000,000
KWA KIKETI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 95,000
- estimate
- Ksh 1,000,000
KITUMBINI PRIMARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2009
- action
- Acquisition of Iron sheets and cement to construct a pit latrine
- output
- -
- implementation status
- complete
- total cost
- Ksh 89,380
- estimate
- Ksh 0
ENGULI Secondary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Completion of a laboratory equipping
- output
- -
- implementation status
- Complete
- total cost
- Ksh 84,050
- estimate
- Ksh 0
MULUMINI S/W
- location
-
MUMELA
(in Kilome)
- year first funded
- 2003
- action
- Construction of shallow well
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 80,000
- estimate
- Ksh 100,000
MBYANI RIVER SELF HELP GROUP
- location
-
MUMELA
(in Kilome)
- year first funded
- 2007
- action
- Construction of a wall to create a dam across Mbyani river.
- output
- Creation of water catchment area and controlling of soil erosion
- implementation status
- On going.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
WIKWATYO WA MASAANI
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2008
- action
- Construction of sand dam to harvest rain water
- output
- Creation of reliable source of water for irrigating tree nursary beds.
- implementation status
- On going
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
MUMELA primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of buildings
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KITHEINI primary School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KITONGUNI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
MATIANI primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KWA KAVITA primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
ENGULI primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KIONGWANI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
MULUMINI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
MARWA primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KWA KYAMBU primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KWA KATIA primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 80,000
- estimate
- Ksh 1,000,000
KALEMBWANI S/W
- location
-
KIOU
(in Kilome)
- year first funded
- 2003
- action
- Construction of shallow well
- output
- Provision of water for community.
- implementation status
- Stalled
- total cost
- Ksh 80,000
- estimate
- Ksh 100,000
LUMU SHALLOW WELL
- location
-
KIOU
(in Kilome)
- year first funded
- 2003
- action
- Revival of project
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 80,000
- estimate
- Ksh 100,000
MIKUYU/KAYATA S/W
- location
-
MUKAA
(in Kilome)
- year first funded
- 2003
- action
- Construction of shallow well
- output
- Provision of clean water to the community
- implementation status
- Complete.
- total cost
- Ksh 80,000
- estimate
- Ksh 100,000
NDULUNI S/W
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2003
- action
- Initiation of project
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 80,000
- estimate
- Ksh 100,000
UTHINI GIRLS SECONDARY School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2008
- action
- Construction of a kitchen
- output
- -
- implementation status
- Complete
- total cost
- Ksh 76,040
- estimate
- Ksh 0
WENDO WA MUTWEAMBOO
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of fertiliser, seeds and farming tools
- output
- Promotion of farming activities
- implementation status
- Complete
- total cost
- Ksh 75,000
- estimate
- Ksh 500,000
KUWETA NA KWIKA WOMEN GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of fertiliser, seeds and farming tools
- output
- Promotion of farming activities
- implementation status
- Complete
- total cost
- Ksh 75,000
- estimate
- Ksh 500,000
KWAMII TREE NURSARY S.H.G
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Acquisition and installation of water tank
- output
- Provision of water harvesting and storage facility
- implementation status
- Complete and in use.
- total cost
- Ksh 70,000
- estimate
- Ksh 500,000
UVUNYE primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
WATHINI primary School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
KWA KASEKE
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
KWA MWINGIO primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
MWANYA MBEVO primary School
- location
-
MUKAA
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
KAMUTHINI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
MBUKUNI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
KITAINGO primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
NZEVENI primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 65,000
- estimate
- Ksh 1,000,000
NGIINI NGASYA S.H.G
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2007
- action
- Purchase of water tank.
- output
- Storage of water for domestic use
- implementation status
- Complete
- total cost
- Ksh 62,000
- estimate
- Ksh 500,000
NEW NGWATA S.H.G
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Bush clearing and earth refilling of a village feeder road
- output
- Ease transport problems in the village.
- implementation status
- Stalled
- total cost
- Ksh 60,000
- estimate
- Ksh 2,500,000
KASIKEU CATHOLIC School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Creation of learning facility
- implementation status
- Stalled
- total cost
- Ksh 60,000
- estimate
- Ksh 5,000,000
KALATINE PRE - School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Acquisition of furniture and practical education learning kit
- output
- Provision of learning facilities
- implementation status
- Complete and in use
- total cost
- Ksh 60,000
- estimate
- Ksh 1,500,000
KASEVE PRE - School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Plastering of building and flooring
- output
- Provision of condusive learning environment
- implementation status
- Complete and in use
- total cost
- Ksh 60,000
- estimate
- Ksh 2,000,000
NGIINI NGASYA S.H.G
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Purchase of a water tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 58,400
- estimate
- Ksh 0
KWA KALYEKE SPRINGS
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Initiation of project
- output
- Provision of clean water to the community
- implementation status
- Stalled
- total cost
- Ksh 50,449
- estimate
- Ksh 100,000
FOREST EXTENSION OFFICE.
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Conduction of local research to determine the conducive plant varieties for the region.
- output
- Improving plant varieties that are climatic friendly and survive in the area.
- implementation status
- On going
- total cost
- Ksh 50,127
- estimate
- Ksh 1,000,000
KWA KYESU PRE – UNIT
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KWA KAVITA PRE – UNIT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
MUATHA PRE – UNIT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KWAKOLO REDEEMED NURSERY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a Classroom and an office
- output
- Creation of learning facility closer to the people
- implementation status
- On going
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
LANDU PRE – UNIT
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Flooring of a Classroom, fitting of door and window shutters and acquisition of desks.
- output
- Provision of standard learning institutions.
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
MASAANI PRE – UNIT
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Flooring of a Classroom and fitting of door and window shutters and acquisition of desks.
- output
- Creation of standard learning institutions.
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
NDUUNDUNE PRE – UNIT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a Classroom
- output
- Creation of learning institution that is easily accessible by the community.
- implementation status
- On going
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KID – KAVUKO CENTRE
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2005
- action
- Preparation of seed beds for seedlings.
- output
- Provision of tree seedlings for planting.
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
NGUUNI S.H.G
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a poultry farming facility.
- output
- Creation of self employment and provision of health diet to the village
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
KWALE “B” MEN S.H.G
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Installation of Bee-Hive boxes and acquisition of honey harvesting equipment
- output
- Creation of self employment thus reducing poverty in the area.
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
MUTILUNI COMMUNITY KILOME ELDERS.
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Installation of Bee-Hive boxes and acquisition of honey harvesting equipment
- output
- Creation of self employment thus reducing poverty in the area.
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
ATUMIA ATAI S.H.G - KATALANI CATTLE DIP
- location
-
MUKAA
(in Kilome)
- year first funded
- 2008
- action
- Purchase of chemicals and treatment kit to revive the facility
- output
- Provision of healthcare services to the communities' livestock
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KIMA SOKONI SHED
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a juakali open shed to provide shelter.
- output
- Creation of shelter for travelers and motorcyclists.
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KAMUTHINI MARKET SHED
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a juakali open shed to provide shelter.
- output
- Creation of shelter for public gatherings.
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
ENZAI MARKET SHED
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Construction of a juakali open shed to provide shelter.
- output
- Promotion of self employment by creating trading structures.
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KALEMBWANI MARKET SHED
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KILOME MARKET SHED
- location
-
MUKAA
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KAYATA MARKET SHED
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
MUANGINI MARKET SHED
- location
-
MUMELA
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete and in use
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
MANGALA AMRKET SHED
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
ULU MARKET SHED
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete but not in use
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KIONGWANI MARKET SHED
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2006
- action
- Construction of a juakali open shed to provide shelter
- output
- Creation of public amenity
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KATHII FOOTBALL ASSOCIATION
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Leveling of the playground, fixing of metallic goal posts and construction of a stadium
- output
- Promotion of sporting activities that engage the youth and harness sporting talents.
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 1,500,000
KWAKING'OTOLE FC
- location
-
KIOU
(in Kilome)
- year first funded
- 2008
- action
- Levelling of the playground, fixing of metallic goal posts and acquisition of balls.
- output
- Promotion of sporting activities that engage the youth and harness sporting talents
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
LUMU FC
- location
-
KIOU
(in Kilome)
- year first funded
- 2008
- action
- Levelling of the playground, fixing of metallic goal posts and acquisition of balls.
- output
- Promotion of sporting activities that engage the youth and harness sporting talents
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
LANDU ROAD
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Earth refilling of road that enters Landu Primary School.
- output
- Ease transport to the school and the villages beyond the school.
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 1,500,000
MASAANI PRIMARY School
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of pupils pit-latrine
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
MBIINI SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2008
- action
- Construction of pit-latrines
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
MUANGINI MARKET SHED
- location
-
MUMELA
(in Kilome)
- year first funded
- 2009
- action
- Renovation of market shed
- output
- -
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
LUMU PRE – UNIT
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KWOTHITHU WATER PROJECT.
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Construction of a piping extension from the Tanathi pipeline to Kwothithu villages.
- output
- Provision of clean water at closer source to the people.
- implementation status
- Complete and in use.
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
ILAWANI B S.H.G
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a water weir.
- output
- Provision of reliable source of water for group activities.
- implementation status
- On going
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KWA TEI WOMEN GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Rehabilitation of a water weir.
- output
- Provision of reliable water source to support group activities.
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
NDIKAEMWA S.H.G
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Construction of a water weir to provide water for environmental activities.
- output
- Provision of reliable source of water to irrigate tree nursery beds.
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KALIMBINI FC
- location
-
KIOU
(in Kilome)
- year first funded
- 2008
- action
- Levelling of the playground, fixing of metallic goal posts and acquisition of balls.
- output
- Promotion of sporting activities that engage the youth and harness sporting talent
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
MASAANI GROUP
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Acquisition of a hand pump to be used on a shallow well.
- output
- Provision of water to supplement other sources.
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
MUTILUNI PRE – UNIT
- location
-
KASI
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
NGUUNI PRE – UNIT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KWA MWINGIO PRE – UNIT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KWA NGANGA PRE – UNIT
- location
-
MUMELA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KATALANI PRE – UNIT
- location
-
KIOU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
NDULUNI PRE – UNIT
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
NDALANI PRE – UNIT
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KATHUNGU PRE – UNIT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KYUNGUNI PRE – UNIT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KATULYANI PRE – UNIT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KIU PRE – UNIT
- location
-
MUKAA
(in Kilome)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
MULUMINI PRE – UNIT
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
MARWA PRE – UNIT
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
MUTHITHA PRE – UNIT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
NDUMBINI PRE – UNIT
- location
-
KASI
(in Kilome)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Better learning environment
- implementation status
- On going.
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
KYANDUE WATER PROJECT
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Construction of a water weir
- output
- Provision of water to support the group’s environmental activities.
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
MWANGAZA WA NDIZI WATER PROJECT
- location
-
KIOU
(in Kilome)
- year first funded
- 2008
- action
- Construction of nursary bed to prepare seedlings for planting
- output
- To provide banana seedlings for trans-planting
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
KASIKEU CATHOLIC DISPENSARY
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Install water system
- output
- -
- implementation status
- Complete
- total cost
- Ksh 47,790
- estimate
- Ksh 0
MUANGINI primary School
- location
-
KASI
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 45,000
- estimate
- Ksh 1,000,000
KIUMONI primary School
- location
-
KIOU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 45,000
- estimate
- Ksh 1,000,000
KIU primary School
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 45,000
- estimate
- Ksh 1,000,000
MASOKANI PRIMARY School
- location
-
MUMELA
(in Kilome)
- year first funded
- 2009
- action
- Acquisition of Iron sheets and cement to construct a pit latrine
- output
- -
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 0
MBONDONI YOUTH GROUP
- location
-
KIIMA KIU
(in Kilome)
- year first funded
- 2008
- action
- Constructin of piping extension from Mbondoni borehole to a water kiosks
- output
- Creation of water source to irrigate vegetable farm.
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 1,000,000
KIKONGOONI primary School
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Improved learning facilities
- implementation status
- Complete and in use.
- total cost
- Ksh 30,000
- estimate
- Ksh 1,000,000
KWAWALA FOOTBALL CLUB
- location
-
KIIMA - KIU
(in Kilome)
- year first funded
- 2007
- action
- Leveling of the playground, fixing of metallic goal posts and construction of a stadium
- output
- Promotion of sporting activities that engage the youth and harness sporting talents
- implementation status
- Stalled
- total cost
- Ksh 20,000
- estimate
- Ksh 1,500,000
MAIANI FOOTBALL CLUB
- location
-
MUKAA
(in Kilome)
- year first funded
- 2007
- action
- Leveling of the playground, fixing of metallic goal posts and construction of a stadium
- output
- Promotion of sporting activities that engage the youth and harness sporting talents
- implementation status
- Stalled
- total cost
- Ksh 20,000
- estimate
- Ksh 1,500,000
KAYATA GIRLS SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Completion of construction of a laboratory.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 11,695
- estimate
- Ksh 0
KIN FOOTBALL CLUB
- location
-
KITAINGO
(in Kilome)
- year first funded
- 2007
- action
- Leveling of the playground, fixing of metallic goal posts and construction of a stadium
- output
- Promotion of sporting activities that engage the youth and harness sporting talents
- implementation status
- Stalled
- total cost
- Ksh 10,000
- estimate
- Ksh 1,500,000
MASAA FOOTBALL CLUB
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Leveling of the playground, fixing of metallic goal posts and construction of a stadium
- output
- Promotion of sporting activities that engage the youth and harness sporting talents
- implementation status
- Stalled
- total cost
- Ksh 10,000
- estimate
- Ksh 1,500,000
KWALE GIRLS SECONDARY School
- location
-
KIOU
(in Kilome)
- year first funded
- 2007
- action
- Construction of the form three classroom.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 7,160
- estimate
- Ksh 0
MUSAANI SECONDARY School
- location
-
KASIKEU
(in Kilome)
- year first funded
- 2007
- action
- Putting up a laboratory
- output
- -
- implementation status
- Complete
- total cost
- Ksh 933
- estimate
- Ksh 0
NGANDANI PRE-UNIT
- location
-
KASIKEU
(in Kilome)
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 1,000,000
KIWAU WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 3,000,000
KITONGUNI - KWAKATHENDU WATER PROJECT
- location
-
KITAINGO
(in Kilome)
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 2,000,000
KIKONGOONI SECONDARY School
- location
-
KITAINGO
(in Kilome)
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 10,000,000
IVOLENI BOREHOLE WATER PROJECT
- location
-
KASIKEU
(in Kilome)
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 2,000,000
KYAKITOO NURSERY School
- location
-
KITAINGO
(in Kilome)
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 1,000,000