The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kipkelion

KipkelionDairy Plant

location
Kipchorian (in Kipkelion)
year first funded
2004
action
Buying cooling plant.
output
-
implementation status
Funds not yet released
total cost
Ksh 6,000,000
estimate
Ksh 16,564,000

Kipkelion Constituency office.

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Construction and equipping CDF office
output
Efficient delivery of service to wananchi
implementation status
Complete
total cost
Ksh 3,973,657
estimate
Ksh 3,973,657

Siret Water Project

location
Lesirwo (in Kipkelion)
year first funded
2004
action
Piping water
output
People will access clean drinking water
implementation status
1,145 pipes purchased and laid down,100 cubic metres tank constructed and completed
total cost
Ksh 3,450,000
estimate
Ksh 20,720,450

Kapngetuny Water Project

location
Kipteris (in Kipkelion)
year first funded
2007
action
Construction of water tank and purchase of water pipes
output
People will access clean drinking water
implementation status
Construction of weir going on & with 404(4”) pvc pipes purchased &laid down
total cost
Ksh 3,000,000
estimate
Ksh 26,942,900

Kedowa Girl’s Secondary School

location
Kedowa (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms
output
More students will access secondary education
implementation status
2 classrooms Complete
total cost
Ksh 2,450,000
estimate
Ksh 1,150,440

Tulwapmoi Water Project

location
Toroton (in Kipkelion)
year first funded
2005
action
Buying water pipes &construction of tank
output
People will access clean drinking water
implementation status
Pipes purchased &water tank is ongoing
total cost
Ksh 2,400,000
estimate
Ksh 1,436,925

Youth Centre

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Construction of youth centre hall
output
Improved social services for the youth and public
implementation status
At roofing lvel
total cost
Ksh 2,250,000
estimate
Ksh 2,036,920

Kipkelion dairy co operative society

location
Kipchorian (in Kipkelion)
year first funded
2009
action
Purchasing cooling plant
output
Milk waste will be reduced significantly
implementation status
Funds not released to project-advice from NMB
total cost
Ksh 2,000,000
estimate
Ksh 0

Timpilil Water Project

location
Kapkoros (in Kipkelion)
year first funded
2007
action
Purchase of 120 GI water pipes,400bags.
output
People will access clean drinking water
implementation status
Tendering done & work to start soon
total cost
Ksh 2,000,000
estimate
Ksh 2,298,315

Chepkechei Secondary School

location
Kipteris (in Kipkelion)
year first funded
2005
action
To do gas and water system fittings in the laboratory + purchase of school bus (1m)
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 1,900,000
estimate
Ksh 958,935

Londiani Girl’s Secondary School

location
Londiani (in Kipkelion)
year first funded
2004
action
Completion of 1 dormitory
output
Conducive sleeping environment
implementation status
5000,000 in 2007 funded from emergency
total cost
Ksh 1,800,000
estimate
Ksh 370,407

Kiployki Water Project

location
Masaita (in Kipkelion)
year first funded
2004
action
Construction of a tank, a reservoir, cattle trough and Piping water,desiltiting dam and purchase of hydrum
output
People will access clean drinking water
implementation status
Reservoir, cattle trough,purchase of 75 GI pipes and 76 pvc, tank are complete,disilting done,purchase of hydrum done,hydrum house built,installed hydrum and working
total cost
Ksh 1,800,000
estimate
Ksh 2,084,295

Kipkelion Water Project

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Purchase of engine motors using emergency funds
output
Water will be accessed easily
implementation status
Already purchased and installed
total cost
Ksh 1,779,819
estimate
Ksh 2,128,374

Londiani Girl’s Academy

location
Londiani (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms
output
More students will access secondary education
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,266,810

Barotion Water Project

location
Kipsirichet (in Kipkelion)
year first funded
2005
action
Buying electricity water pump construction of tank
output
People will access clean drinking water
implementation status
Pump purchased and installed tank construction is complete
total cost
Ksh 1,450,000
estimate
Ksh 1,946,000

Kunyak Bridges

location
Kunyak (in Kipkelion)
year first funded
2003
action
Building 3 bridges
output
Improve transport system for people and goods.
implementation status
1 bridge complete; 2 others without guard rails
total cost
Ksh 1,400,000
estimate
Ksh 2,462,149

Chilchila Secondary School

location
Chilchila (in Kipkelion)
year first funded
2005
action
Construction of administration block
output
Efficient and effective administration
implementation status
At finishing level
total cost
Ksh 1,300,000
estimate
Ksh 1,200,000

Kipteris Girls’ Secondary School

location
Kipteris (in Kipkelion)
year first funded
2003
action
Completion of laboratory and dormitory construction
output
Conducive learning environment and sleeping environment
implementation status
Laboratory is complete while the dormitory is at foundation stage
total cost
Ksh 1,300,000
estimate
Ksh 1,196,240

Chesonoi Roads Project

location
Kapkoros (in Kipkelion)
year first funded
2006
action
Manual roads construction
output
Improved transport
implementation status
6km opened up
total cost
Ksh 1,300,000
estimate
Ksh 1,655,000

Kipkelion Health Centre

location
Kipchorian (in Kipkelion)
year first funded
2005
action
Construction of Kitchen &theartre
output
Patients will get quality cooked food
implementation status
Kitchen is complete,children ward has not started
total cost
Ksh 1,300,000
estimate
Ksh 350,000

Kapcheplanga Secondary School

location
Lemotit (in Kipkelion)
year first funded
2005
action
Construction of a dining hall & library
output
Conducive dining & learning environment
implementation status
Dormitory at roofing stage,library at finishing stage
total cost
Ksh 1,200,000
estimate
Ksh 2,178,750

Tuyobei Bridge

location
Kimugul (in Kipkelion)
year first funded
2007
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Pillars done
total cost
Ksh 1,200,000
estimate
Ksh 2,400,000

Barsiele/

location
Barsiele (in Kipkelion)
year first funded
2007
action
Construction of water tank(spring protection)
output
People will access clean drinking water
implementation status
Springbox done and materials for tank purchased
total cost
Ksh 1,200,000
estimate
Ksh 696,735

Kipsegi Bridge

location
Kipsegi (in Kipkelion)
year first funded
2006
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
At deck level
total cost
Ksh 1,200,000
estimate
Ksh 1,876,430

Kapkondor-Kimaut Roads Project

location
Kipsirichet (in Kipkelion)
year first funded
2006
action
Roads gravelling/ culverts
output
Improvement of transport
implementation status
Done unblocking of culverts and gravelling of 3 km
total cost
Ksh 1,200,000
estimate
Ksh 6,140,000

Chagaik Secondary School

location
Cheboswa (in Kipkelion)
year first funded
2005
action
Equipping laboratory/
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 689,700

Subukia-Hilltop Roads Project

location
Subukia (in Kipkelion)
year first funded
2006
action
Roads drainage, culverts&gravelling
output
Improvement of transport
implementation status
7 lines spotted culverts & drainage done
total cost
Ksh 1,150,000
estimate
Ksh 1,655,000

Tendeno Secondary School

location
Tendeno (in Kipkelion)
year first funded
2004
action
Construction of twin laboratory
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 1,100,000
estimate
Ksh 2,200,000

Kipsegi Secondary School

location
Kipsegi (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
2 complete classrooms
total cost
Ksh 1,100,000
estimate
Ksh 1,412,800

Kapseger-Lesirwa Bridge

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Pillars done & work in progress
total cost
Ksh 1,100,000
estimate
Ksh 1,908,285

Tulwap Kipsigis Bridge

location
Kedowa (in Kipkelion)
year first funded
2007
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,885,950

Momoniat Secondary School

location
Chepseon (in Kipkelion)
year first funded
2005
action
Construction of laboratory
output
Conducive learning environment
implementation status
At roofing level
total cost
Ksh 1,100,000
estimate
Ksh 932,190

Kalyet Secondary School

location
Lemotit (in Kipkelion)
year first funded
2004
action
Construction of 2 Classrooms and laboratory
output
Conducive learning environment
implementation status
2 classrooms and a small office
total cost
Ksh 1,100,000
estimate
Ksh 1,580,940

Kimugul/

location
Kimugul (in Kipkelion)
year first funded
2006
action
Construction of a weir, 5 tanks, purchase of pipes
output
People will access clean drinking water
implementation status
Purchased 13 G.I pipes and 283 pvc pipes, weir done with concrete mixed and put in sacks.
total cost
Ksh 1,050,000
estimate
Ksh 14,044,097

Siret Secondary School

location
Lesirwo (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 773,600

Fort Tenan Market Stalls

location
Chilchila (in Kipkelion)
year first funded
2007
action
To fence and Construction of market stalls
output
Improved market activities
implementation status
At roofing stage
total cost
Ksh 1,000,000
estimate
Ksh 3,877,230

Finch Secondary School

location
Londiani (in Kipkelion)
year first funded
2005
action
Construction of a laboratory
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 1,000,000
estimate
Ksh 850,140

Cherara Girl’s Sec

location
Kokwet (in Kipkelion)
year first funded
2004
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 856,380

Londiani market stalls

location
Londiani (in Kipkelion)
year first funded
2009
action
To fence and Construction of market stalls
output
Improved market activities
implementation status
Not yet started
total cost
Ksh 1,000,000
estimate
Ksh 0

Kipkelion Market Stalls

location
Kipchorian (in Kipkelion)
year first funded
2007
action
To fence and Construction of market stalls
output
Improved market activities
implementation status
complete
total cost
Ksh 1,000,000
estimate
Ksh 3,877,230

Siret-kaborok roads project

location
Lesirwa (in Kipkelion)
year first funded
2008
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
4 km opened up, drained and spot gravelledd
total cost
Ksh 1,000,000
estimate
Ksh 0

Kamachungwa/Kichawir Water Project

location
Kapseger (in Kipkelion)
year first funded
2007
action
Construction of reservoir,tank construction and purchasing pipes
output
People will access clean drinking water
implementation status
Springbox done
total cost
Ksh 1,000,000
estimate
Ksh 1,915,250

Kalyet Water Project

location
Lemotit (in Kipkelion)
year first funded
2005
action
Renovation ion of water tank and rehabilitation of borehole
output
People will access clean drinking water
implementation status
Tank rehabilitated,electric pump installed,
total cost
Ksh 1,000,000
estimate
Ksh 5,700,766

Londiani District Hospital

location
Londiani (in Kipkelion)
year first funded
2008
action
Construction of operation theathre
output
Patients will access efficient and affordable medical services ie operations
implementation status
Not yet started
total cost
Ksh 1,000,000
estimate
Ksh 0

Kipsinende Technical & Workshop

location
Kokwet (in Kipkelion)
year first funded
2008
action
Construction of Classroom,workshop,laboratory and buying equipments
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 1,000,000
estimate
Ksh 0

Taita Towett Secondary School

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Construction of dining hall
output
Conducive dining environment
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 2,500,000

Kotetni primary School

location
Kapkoros (in Kipkelion)
year first funded
2004
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 950,000
estimate
Ksh 659,380

Malaget Primary School

location
Subukia (in Kipkelion)
year first funded
2004
action
n/a
output
-
implementation status
not known
total cost
Ksh 950,000
estimate
Ksh 546,800

Leberer-Kamachungwa Road

location
Kapseger (in Kipkelion)
year first funded
2006
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
3km of the road done ,spot patching,culverts installation.
total cost
Ksh 900,000
estimate
Ksh 1,450,000

Koisagat Bridge

location
Chilchila (in Kipkelion)
year first funded
2005
action
Building a bridge
output
Improved transport
implementation status
not known
total cost
Ksh 900,000
estimate
Ksh 2,343,825

Utafiti Nursery School

location
Cheboswa (in Kipkelion)
year first funded
2004
action
Construction of 3 Classrooms and office
output
Boost enrollment for young kids
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 1,383,200

Kamuingi Dispensary

location
Sorget (in Kipkelion)
year first funded
2003
action
Construction of M C H and staff house
output
Expectant mothers will access safe facility, decnet house for living
implementation status
M C H Complete, staff house at roofing stage
total cost
Ksh 900,000
estimate
Ksh 1,163,400

Londiani T/Ship Secondary School

location
Londiani (in Kipkelion)
year first funded
2004
action
Construction of 3 Classrooms
output
More students will access secondary education
implementation status
At roofing stage
total cost
Ksh 900,000
estimate
Ksh 767,800

Blue Hill-Kipsegi Road

location
Lesirwa (in Kipkelion)
year first funded
2006
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
Done 3.5km of the road
total cost
Ksh 900,000
estimate
Ksh 2,360,500

Arorwet Water Project

location
Lemotit (in Kipkelion)
year first funded
2006
action
Construction of water tank,6 water trough and piping
output
People will access clean drinking water
implementation status
Water tank & water trough is complete
total cost
Ksh 900,000
estimate
Ksh 2,413,815

Sombo Bridge

location
Chilchila (in Kipkelion)
year first funded
2006
action
Construction of a bridge
output
Improve transport system
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 1,958,326

Barotion Secondary School

location
Sorget (in Kipkelion)
year first funded
2005
action
n/a
output
-
implementation status
not known
total cost
Ksh 850,000
estimate
Ksh 2,995,790

Sitian Girl’s Secondary School

location
Kimugul (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms and office
output
More students will access secondary education
implementation status
2 Incomplete classroomsat slab level
total cost
Ksh 800,000
estimate
Ksh 2,751,130

Sigowet primary School

location
Chepseon (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms and administration block
output
Conducive learning environment
implementation status
4 classrooms and administration block at finishing stage
total cost
Ksh 800,000
estimate
Ksh 1,965,600

Kotetni-Kapkoros Road

location
Kapkoros (in Kipkelion)
year first funded
2008
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
4 km opened up
total cost
Ksh 800,000
estimate
Ksh 0

Kaliyet-Tingoro Road

location
Lemotit (in Kipkelion)
year first funded
2008
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
3 km opened up
total cost
Ksh 800,000
estimate
Ksh 0

Miti Tatu-Benditai Mkt Road

location
Masaita (in Kipkelion)
year first funded
2008
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
3km opened up
total cost
Ksh 800,000
estimate
Ksh 0

Chesigot-Kiptenden Road

location
Kunyak (in Kipkelion)
year first funded
2007
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
5.km opened and gravelled
total cost
Ksh 800,000
estimate
Ksh 4,254,750

Tumaek Water Project

location
Lesirwo (in Kipkelion)
year first funded
2008
action
Purchase & laying of water pipes
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 800,000
estimate
Ksh 0

Kimaut Dispensary

location
Kipsirchiet (in Kipkelion)
year first funded
2004
action
Construction of MCH
output
Expectant mothers will access safe facility.
implementation status
At finishing level
total cost
Ksh 800,000
estimate
Ksh 950,000

Ng’endalelDispensary

location
Lesirwo (in Kipkelion)
year first funded
2003
action
Completing dispensary-Roofing MCH
output
People will access medication easily and cheaply
implementation status
One section is complete, other
total cost
Ksh 800,000
estimate
Ksh 877,000

Subukia Dispensary

location
Subukia (in Kipkelion)
year first funded
2003
action
Construction of MCH
output
Expectant mothers will access safe facility
implementation status
Complete-but need funds for painting
total cost
Ksh 800,000
estimate
Ksh 1,104,100

Kipkelion Girls Secondary School

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Construction of science laboratory
output
Conducive learning/practical environment
implementation status
At foundation level
total cost
Ksh 800,000
estimate
Ksh 2,496,920

Kunyak Secondary School

location
Kapkoros (in Kipkelion)
year first funded
2006
action
Completion of stalled laboratory-fixing gas and water system,tales and chairs
output
Conducive learning science room
implementation status
Gas,water system done and purchase of chairs and tables also done
total cost
Ksh 800,000
estimate
Ksh 1,054,220

United Soy Secondary School

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms& administration block
output
More students will access secondary education
implementation status
3 classrooms at roofing stage
total cost
Ksh 800,000
estimate
Ksh 1,465,530

Lesirwo Sec

location
Lesirwo (in Kipkelion)
year first funded
2004
action
Construction of twin laboratory
output
Conducive learning environment
implementation status
One part at roofing stage while the other is at foundation
total cost
Ksh 800,000
estimate
Ksh 2,619,182

Kabias primary School

location
Kapkoros (in Kipkelion)
year first funded
2004
action
Construction of 5 Classrooms
output
Conducive learning environment
implementation status
1 classroom is complete
total cost
Ksh 750,000
estimate
Ksh 1,580,000

Lelechwet Primary School

location
Barsiele (in Kipkelion)
year first funded
2005
action
Construction of 8 Classrooms
output
Conducive learning environment
implementation status
3 classrooms at roofing stage; one at lintel
total cost
Ksh 750,000
estimate
Ksh 2,500,000

Chesilyot WaterProject

location
Lemotit (in Kipkelion)
year first funded
2004
action
Building pump house and piping water
output
People will access clean drinking water
implementation status
Pump house is complete
total cost
Ksh 750,000
estimate
Ksh 787,300

Momoniat Health Centre

location
Chepseon (in Kipkelion)
year first funded
2005
action
Construction of staff houses
output
Conducive living environment.
implementation status
at finishing level
total cost
Ksh 700,000
estimate
Ksh 754,806

Kaptembwo Pr School

location
Kimugul (in Kipkelion)
year first funded
2005
action
Construction of 3 Classrooms
output
More pupils will access pri educ
implementation status
3classrooms complete-2 at walling
total cost
Ksh 700,000
estimate
Ksh 1,059,600

Kiptenden primary School

location
Kunyak (in Kipkelion)
year first funded
2005
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
2 classroom at finishing stage other 2 under KESSP
total cost
Ksh 700,000
estimate
Ksh 1,090,840

Tingoro primary School

location
Barsiele (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
2 classrooms at finishing stage
total cost
Ksh 700,000
estimate
Ksh 242,900

Tugunon Secondary School

location
Kapseger (in Kipkelion)
year first funded
2004
action
Construction of 1 Classroom and fittings for laboratory
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 850,000

Barsiele Secondary

location
Barsiele (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 700,000
estimate
Ksh 797,600

Kipsimbol Polytechnic

location
Lesirwo (in Kipkelion)
year first funded
2008
action
Construction of a Classroom & a workshop
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Chepcholiet Dispensary

location
Kapseger (in Kipkelion)
year first funded
2004
action
Construction of M C H
output
Expectant mothers will access safe facility.
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 980,050

Kiplelechon/United bridge

location
Kimasian (in Kipkelion)
year first funded
2007
action
Completion of a bridge
output
Improve movement of people and goods
implementation status
No work done
total cost
Ksh 700,000
estimate
Ksh 1,834,650

Sing’oiwek primary School

location
Kunyak (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 650,000
estimate
Ksh 649,720

Kipchorian Day Secondary School

location
Kipchorian (in Kipkelion)
year first funded
2005
action
Finishing 2 Classrooms and construction of 2 more Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 951,800

Chebewor SecSchool

location
Kedowa (in Kipkelion)
year first funded
2004
action
Construction of laboratory
output
Conducive learning environment
implementation status
At roofing stage; preparation room at wall stage
total cost
Ksh 650,000
estimate
Ksh 338,900

Kapseger primary School

location
Kapseger (in Kipkelion)
year first funded
2005
action
Construction of administration block.
output
Conducive learning environment
implementation status
At finishing stage(painting, fixing window panes, ceiling)
total cost
Ksh 650,000
estimate
Ksh 370,960

Lelachbei Water Project

location
Kapseger (in Kipkelion)
year first funded
2005
action
Construction of water tank and piping
output
People will access clean drinking water
implementation status
Tank complete
total cost
Ksh 600,000
estimate
Ksh 2,338,650

Mugumoini Dispensary

location
Tendeno (in Kipkelion)
year first funded
2005
action
Construction of MCH
output
Expectant mothers will access safe facility to at birth
implementation status
At finishing level
total cost
Ksh 600,000
estimate
Ksh 1,300,000

Mentera Dispensary

location
Siwot (in Kipkelion)
year first funded
2004
action
Renovating building to be a dispensary
output
People will easily access medical services.
implementation status
Phase one
total cost
Ksh 600,000
estimate
Ksh 880,000

Kolongei Bridge

location
Masaita (in Kipkelion)
year first funded
2007
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
At finishing stage
total cost
Ksh 600,000
estimate
Ksh 794,000

Songonyet Water Project

location
Kipteris (in Kipkelion)
year first funded
2008
action
Construction of water tank
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 600,000
estimate
Ksh 0

Kimasian Secondary School Water Project

location
Kimasian (in Kipkelion)
year first funded
2006
action
Drilling borehole and purchase of submersion pump for pumping water
output
Students will access clean drinking water
implementation status
Water drilling is complete
total cost
Ksh 600,000
estimate
Ksh 585,750

Nyakinyua Water Project

location
Londiani (in Kipkelion)
year first funded
2005
action
n/a
output
-
implementation status
not known
total cost
Ksh 600,000
estimate
Ksh 650,000

Kimugul Dispensary

location
Kimugul (in Kipkelion)
year first funded
2004
action
Construction of dispensary block
output
Easy access to medical services
implementation status
One section at roofing & other at lintel level
total cost
Ksh 600,000
estimate
Ksh 800,000

Nyakinyua access road

location
Londiani (in Kipkelion)
year first funded
2009
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
Not yet started
total cost
Ksh 600,000
estimate
Ksh 0

Chebewor Bridges

location
Kedowa (in Kipkelion)
year first funded
2003
action
Building a bridge
output
Improve transport system for people and goods
implementation status
Pillars, walls done
total cost
Ksh 600,000
estimate
Ksh 2,900,000

Tegunot primary School

location
Londiani (in Kipkelion)
year first funded
2005
action
Completion of 3 Classrooms
output
Conduceive learning environment
implementation status
1 classroom at roofing stage
total cost
Ksh 600,000
estimate
Ksh 410,000

Murgut primary School

location
Chilchila (in Kipkelion)
year first funded
2005
action
Construction of 8 Classrooms
output
Conducive learning environment
implementation status
3 classrooms at roofing stage
total cost
Ksh 600,000
estimate
Ksh 3,733,445

Chesonoi Primary School

location
Kapkoros (in Kipkelion)
year first funded
2005
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
2 classrooms at roofing stage,other under KESSP
total cost
Ksh 600,000
estimate
Ksh 1,693,400

Tulwap Kipsigis Pr School

location
Kedowa (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 600,000
estimate
Ksh 797,600

Kedowa Special School For The Deaf

location
Kedowa (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 920,000

Tendeno primary Sc

location
Tendeno (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
At foundation level
total cost
Ksh 600,000
estimate
Ksh 353,200

Kamarus Secondary School

location
Chepseon (in Kipkelion)
year first funded
2004
action
Constructing 4 Classrooms
output
More students will access secondary education
implementation status
4 classrooms at roofing stage-2 classrooms complete
total cost
Ksh 600,000
estimate
Ksh 2,007,560

Cheres Secondary School

location
Sorget (in Kipkelion)
year first funded
2004
action
Completion of 2 Classrooms and 1 laboratory
output
More students will access secondary education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 503,200

Londiani Secondary School

location
Londiani (in Kipkelion)
year first funded
2004
action
Rebuilding burnt dormitory
output
Conducive sleeping environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 992,735

Kapkondor Secondary School

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
Construction of administration block
output
Efficient and
implementation status
150,000 in 2005 funded from emergency
total cost
Ksh 600,000
estimate
Ksh 935,000

Jagoror Secondary School

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 600,000
estimate
Ksh 686,800

Chemogoch Secondary School

location
Kunyak (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
More students will access secondary education
implementation status
One classroom complete,other at finishing stage
total cost
Ksh 600,000
estimate
Ksh 684,600

Kokwet Secondary

location
Kokwet (in Kipkelion)
year first funded
2006
action
Construction of dining hall
output
Conducive dining environment
implementation status
Bunker up to walling
total cost
Ksh 600,000
estimate
Ksh 3,858,920

Chepkendi Nursery School

location
Chilchila (in Kipkelion)
year first funded
2005
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 600,000
estimate
Ksh 1,152,330

Burutu Dispensary

location
Kokwet (in Kipkelion)
year first funded
2003
action
Construction of M C H.
output
Expectant mothers will access safe facility
implementation status
At roofing level
total cost
Ksh 600,000
estimate
Ksh 535,650

Chesinende Secondary School

location
Chepseon (in Kipkelion)
year first funded
2004
action
Renovating 3 Classrooms
output
More students will access sec education
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 586,800

Kericho Forest Dispensary

location
Cheboswa (in Kipkelion)
year first funded
2005
action
Construction of MCH
output
Expectant mothers will access safe facility
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 650,000

Kamachungwa Pr School

location
Kapseger (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
3 classrooms at roofing stage
total cost
Ksh 550,000
estimate
Ksh 1,381,320

Chupoit Water Project

location
Barsiele (in Kipkelion)
year first funded
2008
action
Construction of water tank
output
People will access clean drinking water
implementation status
Materials on site
total cost
Ksh 500,000
estimate
Ksh 0

Chesigot Primary School

location
Kunyak (in Kipkelion)
year first funded
2003
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 500,000
estimate
Ksh 1,059,600

Tinderet primary School

location
Kipteris (in Kipkelion)
year first funded
2005
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 702,400

Blue Hills primary School

location
Lesirwo (in Kipkelion)
year first funded
2005
action
Construction of 2 Classroom
output
Conducive learning environment
implementation status
1 classroom completed other at lintel.
total cost
Ksh 500,000
estimate
Ksh 419,536

Barotion Primary School

location
Sorget (in Kipkelion)
year first funded
2005
action
Completion of 8 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 650,480

Sogobet primary School

location
Chepseon (in Kipkelion)
year first funded
2005
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
2 classrooms at roofing stage
total cost
Ksh 500,000
estimate
Ksh 1,812,000

Kimaut primary School

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
1 classroom Complete
total cost
Ksh 500,000
estimate
Ksh 787,750

Simotwet Primary School

location
Lemotit (in Kipkelion)
year first funded
2006
action
Completion of Classrooms
output
Conducive learning environment
implementation status
complete
total cost
Ksh 500,000
estimate
Ksh 1,345,050

Masaita primary School

location
Masaita (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
1 classroom at roofing stage. Constructed 3 temporary classrooms-made of iron sheets
total cost
Ksh 500,000
estimate
Ksh 797,600

Song’onyet Dispensary

location
Kipteris (in Kipkelion)
year first funded
2003
action
Construction of M C H
output
Expectant mothers will access safe facility
implementation status
At roofing stage
total cost
Ksh 500,000
estimate
Ksh 940,006

Jagoror Dispensary

location
Kipsirchiet (in Kipkelion)
year first funded
2004
action
Construction of staff house-(self contained)
output
Conducive living environment for the staff
implementation status
One section at finishing stage
total cost
Ksh 500,000
estimate
Ksh 792,860

Makyolok-Magire Dispensary

location
Toroton (in Kipkelion)
year first funded
2004
action
Completion of M C H
output
Expectant mothers will access safe facility.
implementation status
At roofing stage
total cost
Ksh 500,000
estimate
Ksh 900,000

Lemotit Dispensary

location
Lemotit (in Kipkelion)
year first funded
2006
action
Construction of MCH
output
Expectant mothers will access safe facility to give birth
implementation status
At lintel level
total cost
Ksh 500,000
estimate
Ksh 2,545,587

Kipkelion Town Public Toilets

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Construction of decent public toilets
output
Conduceive sanitary facility
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 547,106

Tendeno water project

location
Tendeno (in Kipkelion)
year first funded
2008
action
Construction of water tank & purchase of pipes
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Mashariki borehole

location
Masaita (in Kipkelion)
year first funded
2009
action
Rehabilitation of borehole
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Cheres borehole

location
Sorget (in Kipkelion)
year first funded
2009
action
Rehabilitation of borehole
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Tulwap moi water projecr phase II

location
Toroton (in Kipkelion)
year first funded
2009
action
Buying and laying water pipes
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Coffee Milling Project

location
Chilchila (in Kipkelion)
year first funded
2008
action
Construction of coffe milling plant
output
Improved coffee output
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Magire Bridge

location
Toroton (in Kipkelion)
year first funded
2006
action
Construction of a bridge
output
Improved transport system
implementation status
Purchased materials, on site
total cost
Ksh 500,000
estimate
Ksh 1,148,117

Jambo Bridge

location
Masaita (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Pillars done
total cost
Ksh 500,000
estimate
Ksh 0

Sosiot Bridge

location
Masaita (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Materials on site
total cost
Ksh 500,000
estimate
Ksh 0

Chesinende-Kiletien Road

location
Chepseon (in Kipkelion)
year first funded
2007
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
2.7km opened up but 1 km gravelled
total cost
Ksh 500,000
estimate
Ksh 700,000

Chepsir-Tendwet Road

location
Kapseger (in Kipkelion)
year first funded
2008
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
1 km done-spot patching
total cost
Ksh 500,000
estimate
Ksh 0

Junction d 314-sachangwan-gwitu primary road project

location
Masaita (in Kipkelion)
year first funded
2009
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Chepseon polytechnic-millenium road project

location
Chepseon (in Kipkelion)
year first funded
2009
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
Just started
total cost
Ksh 500,000
estimate
Ksh 0

DO’s Office- Chepseon

location
Chepseon (in Kipkelion)
year first funded
2008
action
Construction of DO’s office
output
Improve security &service delivery to wananchi
implementation status
Materials on site-project stoped
total cost
Ksh 500,000
estimate
Ksh 0

Kipkelion community Library

location
Kipchorian (in Kipkelion)
year first funded
2009
action
Construction of community library
output
Improved reading culture among constituents
implementation status
Not yet started
total cost
Ksh 500,000
estimate
Ksh 0

Cheboswa Educational Trust Fund

location
Cheboswa (in Kipkelion)
year first funded
2005
action
To assist needy students
output
More needy students will access education.
implementation status
Funds not released
total cost
Ksh 500,000
estimate
Ksh 0

Lelkures Bridge

location
Kipteris (in Kipkelion)
year first funded
2003
action
Building bridge
output
Improve transport system for people and goods.
implementation status
At deck level
total cost
Ksh 460,000
estimate
Ksh 1,897,885

Masaita Secondary School

location
Masaita (in Kipkelion)
year first funded
2004
action
Completion of laboratory
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 450,000
estimate
Ksh 946,000

Kipsirchet SecSchool

location
Kipsirchiet (in Kipkelion)
year first funded
2004
action
Construction of 2 Classrooms & laboratory
output
More students will access sec educ
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 705,450

Leldet primary School

location
Kipsegi (in Kipkelion)
year first funded
2004
action
Constructing 2 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 706,400

Kondamet primary School

location
Chepseon (in Kipkelion)
year first funded
2005
action
Completion of 4 Classrooms
output
Conducive learning environment
implementation status
complete
total cost
Ksh 450,000
estimate
Ksh 939,218

Lesirwo primary School

location
Lesirwo (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
Complete and in use
total cost
Ksh 450,000
estimate
Ksh 540,000

Korosyot primary School

location
Kipteris (in Kipkelion)
year first funded
2004
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
Under audit
total cost
Ksh 450,000
estimate
Ksh 680,500

Testai primary School

location
Kimasian (in Kipkelion)
year first funded
2004
action
Completing 8 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 1,600,000

Kapseger Dispensary

location
Kapseger (in Kipkelion)
year first funded
2003
action
Lighting/wiring system (100k) + Construction of MCH
output
Improved preservation of drugs, service rendered at night due to lighting system
implementation status
At finishing stage
total cost
Ksh 450,000
estimate
Ksh 707,500

Moi Sorget Secondary School

location
Sorget (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms, office and laboratory + completion of a dining hall
output
Conducive learning environment
implementation status
2classrooms and office complete, laboratory in progress
total cost
Ksh 450,000
estimate
Ksh 647,000

Siret Cattle Dip

location
Lesirwo (in Kipkelion)
year first funded
2006
action
Construction of cattle dip
output
To improve livestock production.
implementation status
Complete & in use
total cost
Ksh 450,000
estimate
Ksh 406,750

Kapseger Water Project

location
Kapseger (in Kipkelion)
year first funded
2004
action
Piping water
output
People will access clean drinking water
implementation status
Laying down of pipes has been done half way
total cost
Ksh 450,000
estimate
Ksh 2,620,000

Blue Hills Water Project

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Purchase and laying down of 500 water pipes
output
People will access clean drinking water
implementation status
Complete & in use
total cost
Ksh 404,480
estimate
Ksh 404,480

Chepseon Secondary School

location
Chepseon (in Kipkelion)
year first funded
2004
action
Completion of 2 Classrooms
output
More students will access secondary education
implementation status
Windows,doors,ceiling and painting not yet done
total cost
Ksh 400,000
estimate
Ksh 1,255,518

Baraka Secondary School

location
Masaita (in Kipkelion)
year first funded
2004
action
Construction of a laboratory
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 827,220

Kipsirichet primary School

location
Kipsirichet (in Kipkelion)
year first funded
2009
action
Completion of 4 Classrooms
output
Conduceive learning environment
implementation status
At finishing stage
total cost
Ksh 400,000
estimate
Ksh 0

Tugunon primary School

location
Kapseger (in Kipkelion)
year first funded
2006
action
Construction of 1 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 400,000
estimate
Ksh 353,200

Kichawir primary School

location
Kapseger (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
1 is complete the other at foundation
total cost
Ksh 400,000
estimate
Ksh 706,400

Timpilil Primary School

location
Kapkoros (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 400,000
estimate
Ksh 3,094,400

Kapkoros Primary School

location
Kapkoros (in Kipkelion)
year first funded
2005
action
Construction of 5 Classrooms
output
Conducive learning environment
implementation status
2 classrooms been completed, other under KESSP
total cost
Ksh 400,000
estimate
Ksh 1,302,650

Urafiki Primary School

location
Kapkoros (in Kipkelion)
year first funded
2005
action
Completion of 8 Classrooms
output
Conducive learning environment
implementation status
The project was completely destroyed during postelection violence
total cost
Ksh 400,000
estimate
Ksh 1,798,960

Barsielle Primary School

location
Barsiele (in Kipkelion)
year first funded
2005
action
Construction of 8 Classrooms
output
Conducive learning environment
implementation status
2 classrooms at roofing stage
total cost
Ksh 400,000
estimate
Ksh 3,094,400

Cherara Dispensary

location
Kokwet (in Kipkelion)
year first funded
2005
action
Construction of dispensary
output
Expectant mothers will access safe facility to give birth
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 700,000

Kedowa Dispensary

location
Kedowa (in Kipkelion)
year first funded
2006
action
Expansion of MCH
output
Expectant mothers will access safe facility at birth
implementation status
At roofing level
total cost
Ksh 400,000
estimate
Ksh 540,000

Kedowa Water Project

location
Kedowa (in Kipkelion)
year first funded
2004
action
Re-placing old pipes and construction of pump house
output
People will access clean drinking water
implementation status
Pump house complete
total cost
Ksh 400,000
estimate
Ksh 2,163,539

Masaita Bridges

location
Masaita (in Kipkelion)
year first funded
2005
action
Building a bridge
output
Improved transport
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 1,829,520

Kimasian/Testai bridge

location
Kimasian (in Kipkelion)
year first funded
2006
action
Construction of a bridge
output
Improved movement of people and goods
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 621,445

Cherara Bridge

location
Kokwet (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kamogoon-Sailo Bridge

location
Kapseger (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 400,000
estimate
Ksh 0

Kipteris-Magire Bridge

location
Kipteris (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Pillars done
total cost
Ksh 400,000
estimate
Ksh 0

Siret Primary School

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Completion of blown off roof
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kitoi primary School

location
Kunyak (in Kipkelion)
year first funded
2005
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
2 classrooms at roofing stage
total cost
Ksh 400,000
estimate
Ksh 1,954,060

Kipkelion /Kamarus Spl School

location
Kipchorian (in Kipkelion)
year first funded
2006
action
n/a
output
Conducive living environment
implementation status
more funds required for completion
total cost
Ksh 400,000
estimate
Ksh 0

Samolel primary

location
Kipteris (in Kipkelion)
year first funded
2004
action
Completion of 4 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 400,000
estimate
Ksh 913,900

Ewaat Primary School

location
Kedowa (in Kipkelion)
year first funded
2003
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 729,000

Township primary SchoolKipkelion

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Construction of pupils’ toilets
output
Conduceive sanitary environment
implementation status
complete
total cost
Ksh 400,000
estimate
Ksh 0

Sereng Dispensary

location
Siwot (in Kipkelion)
year first funded
2004
action
Construction of dispensary & M C H
output
Residents will easily access medical attention
implementation status
Dispensary at roofing stage while MCH has not started
total cost
Ksh 400,000
estimate
Ksh 943,870

Keringet Dispensary

location
Masaita (in Kipkelion)
year first funded
2004
action
Construction of M C H
output
Expectant mothers will access safe facility.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 870,000

Kipsegi Dispensary

location
Kipsegi (in Kipkelion)
year first funded
2004
action
Construction of MCH
output
Expectant mothers will access safe facility
implementation status
At slab level
total cost
Ksh 400,000
estimate
Ksh 1,399,000

Kedowa secondary School

location
kedowa (in Kipkelion)
year first funded
2009
action
Construction of Classroom
output
Conducive learning environment
implementation status
Materials on site
total cost
Ksh 400,000
estimate
Ksh 0

Kipkelion Girls Secondary School

location
Kipchorian (in Kipkelion)
year first funded
2008
action
Construction of 4 Classroom
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 400,000
estimate
Ksh 0

Saramek Secondary School

location
Lemotit (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
-
implementation status
At roofing stage
total cost
Ksh 400,000
estimate
Ksh 797,600

Chebewor Primary School

location
Kedowa (in Kipkelion)
year first funded
2004
action
Replacing blown off roof & reinforcing walls
output
Conducive learning environment
implementation status
Complete and in use
total cost
Ksh 370,000
estimate
Ksh 370,000

Sugutek primary School

location
Lemotit (in Kipkelion)
year first funded
2009
action
Construction of one Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 350,000
estimate
Ksh 0

Leberer Primary School

location
Kapseger (in Kipkelion)
year first funded
2004
action
Completing 8 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 1,329,370

Kiletien Primary School

location
Chepseon (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
1 Complete, other at finishing stage
total cost
Ksh 350,000
estimate
Ksh 403,251

Kapkures Primary School

location
Chilchila (in Kipkelion)
year first funded
2005
action
Construction of 8 Classrooms and administration block
output
Conducive learning environment
implementation status
2 classrooms at walling stage
total cost
Ksh 350,000
estimate
Ksh 2,700,000

Ringa primary School

location
Kimasian (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms and staff room
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 350,000
estimate
Ksh 978,955

Kapkondor Secondary School

location
Kipsirchiet (in Kipkelion)
year first funded
2006
action
n/a
output
-
implementation status
One section is complete,other at roofing stage
total cost
Ksh 350,000
estimate
Ksh 0

Kaptich polytechnic

location
Sorget (in Kipkelion)
year first funded
2009
action
Construction of a Classroom & a workshop
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 350,000
estimate
Ksh 0

Gwitu Nursery

location
Masaita (in Kipkelion)
year first funded
2004
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 350,000
estimate
Ksh 553,200

Kapcheplanga

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
Purchase of submersible pump
output
Pump installed
implementation status
Tank is complete
total cost
Ksh 350,000
estimate
Ksh 968,050

Lesirwo Chief’s Office

location
Lesirwo (in Kipkelion)
year first funded
2005
action
Construction of Chief’s Office
output
wananchi will access gov’t services easily/improvement of security
implementation status
At finishing stage
total cost
Ksh 350,000
estimate
Ksh 513,020

Dc’s Office-Kipkelion

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Renovation of DC’s office and connecting electricity
output
Conducive working environment
implementation status
Complete
total cost
Ksh 332,550
estimate
Ksh 332,550

Ewat Primary Road

location
Kedowa (in Kipkelion)
year first funded
2008
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Murgut Bridge

location
Chilchila (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Chesumey Bridge

location
Kimugul (in Kipkelion)
year first funded
2008
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Lamayiat Bridge

location
Kedowa (in Kipkelion)
year first funded
2008
action
installation of box culverts
output
Improve movement of people and goods
implementation status
Purchased culverts
total cost
Ksh 300,000
estimate
Ksh 0

Kiptenden oasis water project

location
Chepseon (in Kipkelion)
year first funded
2009
action
Buying and laying water pipes
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Kivuno- Arahuka Water Project

location
Sorget (in Kipkelion)
year first funded
2006
action
Purchase of water pipes
output
People will access clean drinking water
implementation status
Not yet started & is being audited
total cost
Ksh 300,000
estimate
Ksh 1,729,258

Kiplelechon-Topentai Community Water Project

location
Kimasian (in Kipkelion)
year first funded
2006
action
Purchase of hydrum pump and pipes&construction of tank
output
People will access clean drinking water
implementation status
Building materials purchased & on site
total cost
Ksh 300,000
estimate
Ksh 639,528

Teldet Water Project

location
Toroton (in Kipkelion)
year first funded
2006
action
Construction of tank and purchase of pipes
output
Access to clean drinking water
implementation status
Purchased 250 pipes
total cost
Ksh 300,000
estimate
Ksh 4,114,050

TRF Dispensary

location
Cheboswa (in Kipkelion)
year first funded
2008
action
Construction of dispensary
output
Easy access to medical services
implementation status
At walling level-2 courses
total cost
Ksh 300,000
estimate
Ksh 0

Masaita Dispensary

location
Masaita (in Kipkelion)
year first funded
2005
action
Construction of Maternity wing
output
Expectant mothers will access safe facility at birth
implementation status
At slab level
total cost
Ksh 300,000
estimate
Ksh 800,000

Chepseon Dispensary

location
Chepseon (in Kipkelion)
year first funded
2004
action
Renovating a building
output
People will access medical services easily,
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 4,632,010

Koisagat Dispensary

location
Chilchila (in Kipkelion)
year first funded
2003
action
Construction of Dispensary
output
Easy access to medical services
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 608,000

Chepwareng Pre School

location
Kapseger (in Kipkelion)
year first funded
2009
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Kimandui Pre School

location
Chilchila (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Materials on site
total cost
Ksh 300,000
estimate
Ksh 0

Murgut Nursery School

location
Chilchila (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
Materials on site
total cost
Ksh 300,000
estimate
Ksh 706,400

Chepseon youth polytechnic

location
Chepseon (in Kipkelion)
year first funded
2009
action
Construction of sanitary facility
output
Conduceive sanitary environment
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Leldet polytechnic

location
Kipsegi (in Kipkelion)
year first funded
2008
action
Construction of a Classroom & a workshop
output
Conducive learning environment
implementation status
At foundation
total cost
Ksh 300,000
estimate
Ksh 0

Chepsir Secondary School

location
Kapseger (in Kipkelion)
year first funded
2008
action
Construction of 1 dormitory
output
Conduceive sleeping environment
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Kimugul Secondary School

location
Kimugul (in Kipkelion)
year first funded
2008
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At lintel level
total cost
Ksh 300,000
estimate
Ksh 0

Mosomborik Primary School

location
Kapseger (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive sleeping environment
implementation status
At roofing stage
total cost
Ksh 300,000
estimate
Ksh 0

Murasoi Primary School

location
Kapseger (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive sleeping environment
implementation status
At roofing stage
total cost
Ksh 300,000
estimate
Ksh 0

Gwitu primary School

location
Masaita (in Kipkelion)
year first funded
2006
action
Completion of 3 Classrooms
output
Conducive learning environment
implementation status
Diverted funds to school misleneous
total cost
Ksh 300,000
estimate
Ksh 289,000

Tilolwet primary School

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
Construction of 4 Classrooms
output
Conducive learning environment
implementation status
1 classroom at roofing stage
total cost
Ksh 300,000
estimate
Ksh 980,000

Soil Conservation &primary School

location
Kipchorian (in Kipkelion)
year first funded
2009
action
Construction of one Classroom
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 300,000
estimate
Ksh 0

Soil Conservation &primary School

location
Kipchorian (in Kipkelion)
year first funded
2005
action
Completion of 4 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 1,342,020

Kisabo Pr School

location
Kimugul (in Kipkelion)
year first funded
2005
action
Completion of 2 Classrooms
output
Conducive learning environment
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 491,430

Ng’endalel primary School

location
Lesirwo (in Kipkelion)
year first funded
2005
action
Reconstruction of 2 Classrooms
output
Conduceive learning environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 802,400

Chebewor Primary School

location
Kedowa (in Kipkelion)
year first funded
2009
action
Construction of one Classroom
output
-
implementation status
Not yet started
total cost
Ksh 300,000
estimate
Ksh 0

Tegunot Assistant Chief’s Office

location
Londiani (in Kipkelion)
year first funded
2005
action
Construction Of Chief’s Office
output
wananchi will access gov’t services easily/improvement of security
implementation status
At roofing level
total cost
Ksh 300,000
estimate
Ksh 401,606

Kedowa primary School

location
Kedowa (in Kipkelion)
year first funded
2005
action
Completion of 8 Classrooms
output
Conducive learning environment
implementation status
Work done half way
total cost
Ksh 300,000
estimate
Ksh 808,800

Ndarugu primary School

location
Kedowa (in Kipkelion)
year first funded
2005
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
1 classroom
total cost
Ksh 300,000
estimate
Ksh 1,160,400

Momoniat primary School

location
Chepseon (in Kipkelion)
year first funded
2007
action
Replacement of blown off roof
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 300,000
estimate
Ksh 487,000

Kamuingi Primary School

location
Sorget (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
One classroom complete
total cost
Ksh 300,000
estimate
Ksh 398,800

Sorget primary School

location
Sorget (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
Project was completely destroyed during post election violence of 2008
total cost
Ksh 300,000
estimate
Ksh 386,800

Kipteris primary School

location
Kipteris (in Kipkelion)
year first funded
2005
action
Completion of 6 Classrooms
output
Conducive learning environment
implementation status
Partial work has been done.
total cost
Ksh 300,000
estimate
Ksh 749,894

Ndubusat primary School

location
Kipteris (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
2 classrooms 4 courses from foundation
total cost
Ksh 300,000
estimate
Ksh 773,600

Kapsenda primary School

location
Kipsirchiet (in Kipkelion)
year first funded
2004
action
Completion of 8 Classrooms
output
Conducive learning environment
implementation status
Work is half way complete
total cost
Ksh 300,000
estimate
Ksh 577,800

Dr. Koech primary School

location
Lemotit (in Kipkelion)
year first funded
2004
action
Completion of 4 Classrooms
output
Conducive learning environment
implementation status
Work is half way complete
total cost
Ksh 300,000
estimate
Ksh 865,890

Chepkitar Bridge

location
Kipteris (in Kipkelion)
year first funded
2004
action
Replace swept bridge
output
Ease movement of people
implementation status
Complete
total cost
Ksh 280,000
estimate
Ksh 775,270

Mtaragon Dispensary

location
Kamasian (in Kipkelion)
year first funded
2006
action
Construction of MCH
output
Expectant mothers will access safe facility at birth
implementation status
At finishing level
total cost
Ksh 250,000
estimate
Ksh 350,000

Kapchomisian Water Project

location
Kapseger (in Kipkelion)
year first funded
2006
action
Construction of spring box, and purchase of pipes
output
Access to clean drinking water
implementation status
Spring box complete and purchased 314 pipes
total cost
Ksh 250,000
estimate
Ksh 1,023,510

Ng’endalel primary School

location
Lesirwo (in Kipkelion)
year first funded
2005
action
Completion of 2 Classrooms
output
Conducive learning environment
implementation status
2 classrooms Complete and in use
total cost
Ksh 250,000
estimate
Ksh 372,198

D.O’S Office Londiani

location
Londiani (in Kipkelion)
year first funded
2004
action
Completion of D.O’S Office
output
People will access quality government service easily.
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 280,000

Mariam Water Project

location
Toroton (in Kipkelion)
year first funded
2005
action
Construction of reservoir and purchase of pipes
output
People will access clean drinking water
implementation status
Reservoir complete
total cost
Ksh 250,000
estimate
Ksh 503,555

Siret Nursery School

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
-
implementation status
At roofing stage
total cost
Ksh 250,000
estimate
Ksh 353,200

Kamotogo Water Project

location
Kimugul (in Kipkelion)
year first funded
2006
action
Construction of spring box,tank and purchase of pipes
output
People will access clean drinking water
implementation status
Springbox is complete,laying down of pipes ongoing
total cost
Ksh 250,000
estimate
Ksh 436,540

Kiptenden Pre School

location
Londiani (in Kipkelion)
year first funded
2009
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 250,000
estimate
Ksh 0

Taita Towett Secondary School

location
Kipchorian (in Kipkelion)
year first funded
2008
action
Finishing up the dining hall
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kedowa Miti Moja Bridge

location
Kedowa (in Kipkelion)
year first funded
2006
action
Construction of culverts
output
Improved movement of people and goods
implementation status
6 culverts done but fixing niot yet done
total cost
Ksh 200,000
estimate
Ksh 305,800

Kaptuiya Nursery School

location
Kipteris (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
More pupil will access basic education
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 353,200

Ngomwo Nursery School

location
Kipsegi (in Kipkelion)
year first funded
2006
action
Construction of one Classroom
output
More pupil will access basic education
implementation status
At roofing level
total cost
Ksh 200,000
estimate
Ksh 353,200

Seguton Nursery School

location
Lemotit (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
More pupils will access basic education
implementation status
1 classroom at roofing stage,other at foundation
total cost
Ksh 200,000
estimate
Ksh 829,100

Nyakinyua Nursery School

location
Londiani (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
conducive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 353,200

Kimaut Nursery School

location
Kipsirichet (in Kipkelion)
year first funded
2007
action
Construction of 3 Classroom
output
-
implementation status
At walling stage
total cost
Ksh 200,000
estimate
Ksh 1,059,600

Mosomborik Nursery School

location
Kapseger (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
-
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 353,200

Kaplelit Nursery School

location
Kokwet (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
-
implementation status
Materials on site
total cost
Ksh 200,000
estimate
Ksh 353,200

Sitian Nursery School

location
Kimugul (in Kipkelion)
year first funded
2007
action
Construction of 2 Classrooms with office
output
-
implementation status
At walling stage-4 courses
total cost
Ksh 200,000
estimate
Ksh 706,400

Kedowa Nursery School

location
Kedowa (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom(diverted funds to renovate Classroom)
output
-
implementation status
Renovation of classroom complete
total cost
Ksh 200,000
estimate
Ksh 353,200

Korosyot Nursery School

location
Kipteris (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
-
implementation status
Materials
total cost
Ksh 200,000
estimate
Ksh 353,200

Kaborok Nursery School

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
-
implementation status
Constructed 3 temporary classrooms
total cost
Ksh 200,000
estimate
Ksh 353,200

Tulwap Kipsigis Nursery School

location
Kedowa (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
-
implementation status
At walling level-3 courses
total cost
Ksh 200,000
estimate
Ksh 353,200

Singoiwek Nursery School

location
Kunyak (in Kipkelion)
year first funded
2007
action
Construction of 1 Classroom
output
More pupils will access basic education
implementation status
Completed with partnership with LATF
total cost
Ksh 200,000
estimate
Ksh 353,200

Ndarugu Nursery School

location
Kedowa (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
More pupils will access basic education
implementation status
At lintel level
total cost
Ksh 200,000
estimate
Ksh 706,200

Malaget Pre School

location
Subukia (in Kipkelion)
year first funded
2008
action
Construction of 2 Classrooms
output
Conduceive learning environment
implementation status
At lintel stage
total cost
Ksh 200,000
estimate
Ksh 0

Mugumoini Pre School

location
Tendeno (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At lintel stage
total cost
Ksh 200,000
estimate
Ksh 0

Chebaibai Pre School

location
Masaita (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 0

Lelsotet Pre School

location
Londiani (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Kapchorwa Pre School

location
Lemotit (in Kipkelion)
year first funded
2008
action
Construction of 2 Classrooms
output
Conduceive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 0

Jagoror Pre School

location
Kipsirichet (in Kipkelion)
year first funded
2008
action
Construction of 2 Classrooms and office
output
Conduceive learning environment
implementation status
Office and one class at lintel level,other at foundation level
total cost
Ksh 200,000
estimate
Ksh 0

Tingoro Pre School

location
Barsiele (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 0

Ewat Pre School

location
Kedowa (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Koshin Pre School

location
Londiani (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At lintel stage
total cost
Ksh 200,000
estimate
Ksh 0

Subunit Pre School

location
Chepseon (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Sigowet Pre School

location
Chepseon (in Kipkelion)
year first funded
2008
action
Construction of 2 Classrooms,office,store
output
Conduceive learning environment
implementation status
At lintel stage
total cost
Ksh 200,000
estimate
Ksh 0

Koibarak Pre School

location
Chepseon (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 0

Lingisha Pre School

location
Lesirwa (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At lintel stage
total cost
Ksh 200,000
estimate
Ksh 0

Laliat Pre School

location
Kipsegi (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 0

Kaula B Pre School

location
Chilchila (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Pinus pre School

location
Lemotit (in Kipkelion)
year first funded
2009
action
Construction of 1 Classroom
output
Conduceive learning environment
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Kisabo Pre School

location
Kimugul (in Kipkelion)
year first funded
2009
action
Completion of Classrooms
output
Conduceive learning environment
implementation status
At finishing stage
total cost
Ksh 200,000
estimate
Ksh 0

Chebewor Dispensary

location
Kedowa (in Kipkelion)
year first funded
2006
action
Construction of MCH
output
Expectant mothers will access safe facility at birth
implementation status
At finishing level
total cost
Ksh 200,000
estimate
Ksh 412,400

Urafiki Dispensary

location
Kapkoros (in Kipkelion)
year first funded
2008
action
Construction of dispensary
output
Easy access to medical services
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Kipchorian Water Project

location
Kapseger (in Kipkelion)
year first funded
2005
action
Buying water pumps(2),pipes,costruction of tanks
output
People will access clean drinking water
implementation status
Pump purchased, clearing bore hole,purchase of windows for pump house and timber
total cost
Ksh 200,000
estimate
Ksh 1,309,640

Kiptangit Water Project

location
Lemotit (in Kipkelion)
year first funded
2005
action
Building a springbox and piping water
output
People will access clean drinking water
implementation status
Protection of the water source has been done
total cost
Ksh 200,000
estimate
Ksh 500,000

Lelsotet Water Project

location
Londiani (in Kipkelion)
year first funded
2005
action
Buying pipes
output
People will access clean drinking water
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 239,178

Sirigoi-Ngomwo Water Project

location
Kipsegi (in Kipkelion)
year first funded
2005
action
Construction of a dam
output
Accessibility of domestic water
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 757,900

United Soy Water Project

location
Kipsirchiet (in Kipkelion)
year first funded
2005
action
n/a
output
-
implementation status
Tank complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chepsir Rural Electrication

location
Kapseger (in Kipkelion)
year first funded
2005
action
Dropping of electricity for pumping water.
output
People and livestock to access water easily.
implementation status
Dropping of electricity not yet done
total cost
Ksh 200,000
estimate
Ksh 300,000

Lamayiat water project

location
Chepseon (in Kipkelion)
year first funded
2009
action
Construction of water tank
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Tebesonik water project

location
Kimugul (in Kipkelion)
year first funded
2009
action
Spring protection
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

United Soi Cattle Dip

location
Kipsirichet (in Kipkelion)
year first funded
2008
action
Rehabilitation of cattle dip
output
ECF will be put under control
implementation status
Renovation done
total cost
Ksh 200,000
estimate
Ksh 0

Kipteris Cattle Dip

location
Kipteris (in Kipkelion)
year first funded
2008
action
Rehabilitation of cattle dip
output
ECF will be put under control
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Kapluso Coffee Farmers Project

location
Kipsegi (in Kipkelion)
year first funded
2008
action
Purchasing coffee machine
output
Improved coffee output
implementation status
Materials on site
total cost
Ksh 200,000
estimate
Ksh 0

Kisabo Chesumei Bridge

location
Kimugul (in Kipkelion)
year first funded
2006
action
Construction of a bridge
output
Improved movement of people and goods
implementation status
Purchased building materials-on site
total cost
Ksh 200,000
estimate
Ksh 1,843,820

Kapsenda-jagoror foot bridge

location
Kipsirichet (in Kipkelion)
year first funded
2009
action
Construction of a foot bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Ndiwa-united foot bridge

location
Londiani (in Kipkelion)
year first funded
2009
action
Construction of a foot bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Chepwareng foot bridge

location
Kapseger (in Kipkelion)
year first funded
2009
action
Construction of a foot bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Kapsaos-kapkorech bridge

location
Cheboswa (in Kipkelion)
year first funded
2009
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Nauro-leldet foot bridge

location
Kipsegi (in Kipkelion)
year first funded
2009
action
Construction of a foot bridge
output
Improve movement of people and goods
implementation status
Pillars done
total cost
Ksh 200,000
estimate
Ksh 0

Kapsaos-kapkorech foot bridge

location
Cheboswa (in Kipkelion)
year first funded
2009
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

United Soy Roads Project

location
Kipsirichet (in Kipkelion)
year first funded
2006
action
Roads gravelling/murrumming
output
Improvement of transport
implementation status
1 Km done
total cost
Ksh 200,000
estimate
Ksh 2,098,705

Sitian Kisabo Roads Project

location
Kimugul (in Kipkelion)
year first funded
2006
action
Roads drainage, culverts&gravelling
output
Improvement of transport
implementation status
2.5km done
total cost
Ksh 200,000
estimate
Ksh 1,201,057

Kipkelion-Taitta Road

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Roads drainage, culverts&gravelling
output
Improved transport
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kipkelion Police Station

location
Kipchorian (in Kipkelion)
year first funded
2008
action
Connecting KPLC Power and wiring police station
output
Improve office management and service delivery
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Fort Tenan Stadium

location
Chilchila (in Kipkelion)
year first funded
2007
action
Leveling of stadium
output
Youths will have access to decent play field
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 300,000

Kipkelion Stadium

location
Kipchorian (in Kipkelion)
year first funded
2007
action
Leveling of the field
output
Youths will have access to decent play field
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 450,000

Chekong’ony primary School

location
Londiani (in Kipkelion)
year first funded
2004
action
Construction of 2 Class
output
Conducive learning environment.
implementation status
1 classroomComplete and in use
total cost
Ksh 200,000
estimate
Ksh 400,000

Chesinende primary School

location
Chepseon (in Kipkelion)
year first funded
2009
action
n/a
output
-
implementation status
ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Township primary SchoolKipkelion

location
Kipchorian (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
1 classroom complete
total cost
Ksh 200,000
estimate
Ksh 670,000

Kipsegi primary School

location
Kipsegi (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
At lintel stage
total cost
Ksh 200,000
estimate
Ksh 215,452

Londiani Farmers primary School

location
Masaita (in Kipkelion)
year first funded
2005
action
Construction of one Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 398,800

Mashariki Pr School

location
Masaita (in Kipkelion)
year first funded
2005
action
Construction 2 of Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 398,800

Londiani Central primary School

location
Londiani (in Kipkelion)
year first funded
2005
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 386,800

Chepcholiet primary School

location
Kapseger (in Kipkelion)
year first funded
2005
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 200,000
estimate
Ksh 597,000

Kisabo Pr School

location
Kimugul (in Kipkelion)
year first funded
2005
action
Completion of 2 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 405,410

Kisabo Pr School

location
Kimugul (in Kipkelion)
year first funded
2007
action
Completion of pre school
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 0

Simpoyon primary School

location
Masaita (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
Materials on site
total cost
Ksh 200,000
estimate
Ksh 356,300

Kimugul primary School

location
Kimugul (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 651,460

Chepsir primary School

location
Kapseger (in Kipkelion)
year first funded
2006
action
Completion Of Library
output
Conducive learning environment
implementation status
At walling stage
total cost
Ksh 200,000
estimate
Ksh 341,000

Kapkese Primary School

location
Kokwet (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 200,000
estimate
Ksh 550,000

Furaha Primary School

location
Londiani (in Kipkelion)
year first funded
2006
action
Construction of an administration block
output
Conducive learning environment
implementation status
At lintel level
total cost
Ksh 200,000
estimate
Ksh 0

Tumaek primary School

location
Lesirwao (in Kipkelion)
year first funded
2007
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
1 classroom at roofing level
total cost
Ksh 200,000
estimate
Ksh 1

Londiani Boys Primary School

location
Londiani (in Kipkelion)
year first funded
2007
action
Replacing sunken toilets
output
Conducive sanitary facilities
implementation status
complete
total cost
Ksh 200,000
estimate
Ksh 210,750

Chagaik Primary School

location
Cheboswa (in Kipkelion)
year first funded
2008
action
Construction of 1 Classroom
output
Conduceive sleeping environment
implementation status
Not yet started
total cost
Ksh 200,000
estimate
Ksh 0

Lesirwo Sec

location
Lesirwo (in Kipkelion)
year first funded
2009
action
Completion of 3 Classrooms
output
Conducive learning environment
implementation status
(emergency)
total cost
Ksh 200,000
estimate
Ksh 0

Chesinende Secondary School

location
Chepseon (in Kipkelion)
year first funded
2007
action
Reconstruction of sunken toilets
output
Conduceive sanitary environment
implementation status
Not yet started(used funds for roofing classroom)
total cost
Ksh 200,000
estimate
Ksh 0

Sugutek Girl’s Secondary School

location
Lemotit (in Kipkelion)
year first funded
2005
action
Construction of 3 Classrooms and office
output
Conducive learning environment
implementation status
At foundation level
total cost
Ksh 200,000
estimate
Ksh 1,160,400

Chilchila Secondary School

location
Chilchila (in Kipkelion)
year first funded
2007
action
n/a
output
Conduceive living environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kaula Nursery School

location
Barsiele (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
At finishing stage
total cost
Ksh 200,000
estimate
Ksh 653,200

Chesigot-Kiptenden Road

location
Kunyak (in Kipkelion)
year first funded
2008
action
for purchase of murrum and culverts
output
-
implementation status
Emergency
total cost
Ksh 172,414
estimate
Ksh 0

Tilito Primary School

location
Kapseger (in Kipkelion)
year first funded
2006
action
Construction of 1 Classrooms
output
Conducive learning environment
implementation status
Construction of one temporary classroom completed
total cost
Ksh 150,000
estimate
Ksh 342,300

Kaplelit Primary School

location
Kokwet (in Kipkelion)
year first funded
2006
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
Materials on site
total cost
Ksh 150,000
estimate
Ksh 575,220

Kipsinende Primary School

location
Kokwet (in Kipkelion)
year first funded
2006
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 150,000
estimate
Ksh 1,176,650

Kamarus Primary School

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Completion of 5 Classrooms
output
conducive learning environment
implementation status
At roofing stage stage
total cost
Ksh 150,000
estimate
Ksh 936,900

Londiani Township Pr School

location
Londiani (in Kipkelion)
year first funded
2006
action
Construction of an administration block
output
Efficient and effectiveadministratio
implementation status
Not yet started
total cost
Ksh 150,000
estimate
Ksh 700,000

Kedowa River Farm primary School

location
Kimasian (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 800,000

Kabisoi Water Project

location
Kimasian (in Kipkelion)
year first funded
2004
action
Constructing a reservoir
output
People will access clean drinking water
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 157,290

Sachoran Water Project

location
Kapseger (in Kipkelion)
year first funded
2006
action
Construction of spring box and 2 tanks
output
Access to clean drinking water
implementation status
Springbox is complete
total cost
Ksh 150,000
estimate
Ksh 1,237,333

Kiptenden-Simotwet Water Project

location
Londiani (in Kipkelion)
year first funded
2004
action
Buying water pipes
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 150,000
estimate
Ksh 2,220,100

Kiptangit Water Project

location
Lemotit (in Kipkelion)
year first funded
2008
action
Being deposit to K-Rep to fund the project
output
-
implementation status
Emergency
total cost
Ksh 150,000
estimate
Ksh 0

Itoik dip

location
Masaita (in Kipkelion)
year first funded
2009
action
Rehabilitation of cattle dip
output
ECF will be put under control
implementation status
Not yet started
total cost
Ksh 150,000
estimate
Ksh 0

Kiptenden Bridge

location
Kunyak (in Kipkelion)
year first funded
2008
action
Completion of a bridge
output
Improve movement of people and goods
implementation status
At deck level(partial)
total cost
Ksh 150,000
estimate
Ksh 0

Kapkwen Bridge

location
Kapkwen (in Kipkelion)
year first funded
2008
action
Completion of a bridge
output
Improve movement of people and goods
implementation status
At deck level(partial)
total cost
Ksh 150,000
estimate
Ksh 0

Kipsegi Chief’s Office

location
Kipsegi (in Kipkelion)
year first funded
2005
action
Construction of Chief’s Office
output
wananchi will access gov’t services easily
implementation status
At finishing stage
total cost
Ksh 150,000
estimate
Ksh 600,000

Dr.Rutto Girl’s Secondary School

location
Masaita (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
Not constructed
total cost
Ksh 150,000
estimate
Ksh 342,300

Kapcheplanga primary

location
Lemotit (in Kipkelion)
year first funded
2006
action
Construction of 4 Classroom
output
Conducive learning environment
implementation status
At foundation level.
total cost
Ksh 150,000
estimate
Ksh 976,000

Chief’s Office Kimugul

location
Kimugul (in Kipkelion)
year first funded
2004
action
Construction of chief’s office
output
People will access quality government service easily.
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 200,000

Fort Tenan Market Stalls

location
Chilchila (in Kipkelion)
year first funded
2009
action
Completion of market stalls
output
-
implementation status
(emergency)
total cost
Ksh 140,000
estimate
Ksh 0

Tumaek Water Project

location
Kimasian (in Kipkelion)
year first funded
2006
action
Construction of tank and purchase of pipes
output
People will access safe clean drinking water
implementation status
Tank complete
total cost
Ksh 100,000
estimate
Ksh 489,760

Kaplaba Water Project

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Purchase of pipes
output
People will access clean drinking water
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 250,000

Kapkele Community Based Organisation Water Project

location
Chepseon (in Kipkelion)
year first funded
2007
action
Purchase of water pipes
output
People will access clean drinking water
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 220,000

Kimereng Water Project

location
Chilchila (in Kipkelion)
year first funded
2008
action
Purchase of water pipes
output
People will access clean drinking water
implementation status
Not yet started
total cost
Ksh 100,000
estimate
Ksh 0

Leldet Cattle Dip

location
Chilchila (in Kipkelion)
year first funded
2006
action
Renovation of cattle dip, water ramp, reservoir.
output
ECF will be put under control
implementation status
Roofing done and wash tank
total cost
Ksh 100,000
estimate
Ksh 408,280

Kimologit Farmers Co Operative Society

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Construction of fermentation tank
output
Improved coffee output
implementation status
At walling stage
total cost
Ksh 100,000
estimate
Ksh 483,090

CRF Bridge

location
Kunyak (in Kipkelion)
year first funded
2008
action
Completion of a bridge
output
Improve movement of people and goods
implementation status
At deck level
total cost
Ksh 100,000
estimate
Ksh 0

Itoik/Kiboloeng Roads Project

location
Masaita (in Kipkelion)
year first funded
2006
action
To build footpath & road gravelling,drainage and foot path
output
Improvement of transport
implementation status
Initial 3 lines of culverts(6 culverts)
total cost
Ksh 100,000
estimate
Ksh 13,948,953

Talai Roads Project

location
Kapkwen (in Kipkelion)
year first funded
2006
action
To build a foot bridge
output
Improvement of transport
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 102,000

Benditai primary School

location
Masaita (in Kipkelion)
year first funded
2006
action
Completion of 2 Classrooms
output
Conducive learning environment
implementation status
1class completed
total cost
Ksh 100,000
estimate
Ksh 205,000

Lemotit Chief’s Office

location
Lemotit (in Kipkelion)
year first funded
2008
action
Construction of Chief’s office
output
Improve security
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 0

Sogobet primary School

location
Chepseon (in Kipkelion)
year first funded
2007
action
Reconstruction of sunken toilets
output
Conduceive sanitary environment
implementation status
At slab level
total cost
Ksh 100,000
estimate
Ksh 0

Subukia Security Houses

location
Subukia (in Kipkelion)
year first funded
2005
action
Construction of security houses
output
Improve security
implementation status
Project taken over by Kenya police
total cost
Ksh 100,000
estimate
Ksh 479,080

Kapchepngosos Primary School

location
Kunyak (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
More pupils will access basic education
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 706,400

Mau Tea Primary School

location
Cheboswa (in Kipkelion)
year first funded
2006
action
Fixing windows and making of lockers, tables and chairs
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 475,700

Kaisugu Primary School

location
Cheboswa (in Kipkelion)
year first funded
2006
action
Renovation of toilets
output
Conducive sanitary environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 257,390

Mugomoini Primary School

location
Tendeno (in Kipkelion)
year first funded
2006
action
Construction of 8 Classrooms
output
Conducive learning environment
implementation status
1 classroom at roofing stage
total cost
Ksh 100,000
estimate
Ksh 873,050

Kipkeremwo primary School

location
Kapseger (in Kipkelion)
year first funded
2006
action
Construction of 5 Classrooms
output
Conducive learning environment
implementation status
Constructed one classroom
total cost
Ksh 100,000
estimate
Ksh 1,692,313

Cherara Primary School

location
Kokwet (in Kipkelion)
year first funded
2006
action
Construction of one -Classroom
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 100,000
estimate
Ksh 353,200

Kamiwa Primary

location
Kokwet (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 100,000
estimate
Ksh 400,000

Kapchorwa Primary School

location
Toroton (in Kipkelion)
year first funded
2006
action
Construction of 2 Classrooms
output
Conducive learning environment
implementation status
Not yet started
total cost
Ksh 100,000
estimate
Ksh 706,400

Kipchorian primary School

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Construction of 3 Classrooms
output
Conducive learning environment
implementation status
No classrooms constructed
total cost
Ksh 100,000
estimate
Ksh 756,300

Kipchorian primary School

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Replacing sunken toilets
output
Conducive sanitary facilities
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chepseon primary School

location
Chepseon (in Kipkelion)
year first funded
2006
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
Diverted funds to renovate classroom
total cost
Ksh 100,000
estimate
Ksh 353,200

Koisagat Primary School

location
Chilchila (in Kipkelion)
year first funded
2007
action
Reconstruction of sunken toilets
output
Conducive sanitary facilities
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 217,000

Keringet Nursery School

location
Masaita (in Kipkelion)
year first funded
2005
action
Construction of 1 Classroom
output
Conducive learning environment
implementation status
At roofing stage
total cost
Ksh 100,000
estimate
Ksh 386,800

Chereres Nursery Sc

location
Lemotit (in Kipkelion)
year first funded
2007
action
Repair of 1 Classroom
output
Conduceive learning environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 127,000

Lelu Dispensary

location
Kamasian (in Kipkelion)
year first funded
2005
action
Fencing dispensary
output
Keeping off intruders/improve security
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Chepkunyuk Dispensary

location
Kapkwen (in Kipkelion)
year first funded
2006
action
Construction of staff house
output
Conducive living environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 479,560

Marusoi Water Project

location
Kipchorian (in Kipkelion)
year first funded
2005
action
Construction of a dam
output
livestock will access clean drinking water
implementation status
Funds not released
total cost
Ksh 100,000
estimate
Ksh 300,000

Chepkoiyo Water Project

location
Lemotit (in Kipkelion)
year first funded
2005
action
Construction of dam
output
Availability of water
implementation status
Escavation of dam just started
total cost
Ksh 100,000
estimate
Ksh 569,770

Siret Primary School

location
Lesirwo (in Kipkelion)
year first funded
2007
action
Reconstruction of blown off roof
output
Conduceive learning environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chesinende primary School

location
Chepseon (in Kipkelion)
year first funded
2004
action
Replacing sunken toilets
output
Conducive sanitary environment Conducive learning environment
implementation status
Complete and in use
total cost
Ksh 100,000
estimate
Ksh 199,120

Kapsenda primary School

location
Kipsirchiet (in Kipkelion)
year first funded
2008
action
Purchase of chairs&lockers desks
output
Conduceive studying environment
implementation status
Purchased 26 chairs&lockers
total cost
Ksh 100,000
estimate
Ksh 0

Chereres primary School

location
Sorget (in Kipkelion)
year first funded
2005
action
Completion of 2 Classrooms
output
Conducive learning environment
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 253,000

D.O’S Office Londiani

location
Londiani (in Kipkelion)
year first funded
2006
action
n/a
output
-
implementation status
Wiring done
total cost
Ksh 60,870
estimate
Ksh 0

DO’s Office-Kipkelion

location
Kipchorian (in Kipkelion)
year first funded
2006
action
Renovation of DO’s office
output
Conducive working environment
implementation status
Emergency
total cost
Ksh 50,000
estimate
Ksh 376,157

Kapkures Bridge

location
Kipteris (in Kipkelion)
action
Construction of a bridge
output
Improve movement of people and goods
implementation status
Work ongoing
total cost
Ksh 0
estimate
Ksh 0