The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kitutu Masaba

Magombo Market And Surbubs

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 3,840,000
estimate
Ksh 5,400,000

Kemera Water Project

location
Kemera (in Kitutu Masaba)
year first funded
2003
action
Water Gravitation
output
Water
implementation status
Complete & In Use
total cost
Ksh 2,830,500
estimate
Ksh 2,930,500

Nyambaria Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Constructing 2 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 2,500,000
estimate
Ksh 2,300,000

Nyachichi Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Constructing Library
output
Library
implementation status
Complete & In Use
total cost
Ksh 1,993,656
estimate
Ksh 2,000,000

Morako Polytechnic

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Constructing Classrooms
output
Classrooms
implementation status
Complete & In Use
total cost
Ksh 1,893,656
estimate
Ksh 1,943,656

Tombe Dispensary

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Constructiion Of Female Ward
output
Ward
implementation status
Complete & In Use
total cost
Ksh 1,893,656
estimate
Ksh 3,920,683

Nyakongo Secondary School

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Constructing Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,850,000
estimate
Ksh 1,500,000

Girango Dispensary

location
Gachuba (in Kitutu Masaba)
year first funded
2003
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,737,040
estimate
Ksh 1,587

Nyanchonori Dispensary

location
East Kitutu (in Kitutu Masaba)
year first funded
2003
action
Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 1,706,452
estimate
Ksh 2,250,000

Esani Secondary School

location
Gesima (in Kitutu Masaba)
year first funded
2003
action
Constructing Classrooms
output
Classrooms
implementation status
Complete & In Use
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Ikobe Dispensary

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,693,656
estimate
Ksh 1,993,656

Gesure Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Constructing Classrooms
output
Classrooms
implementation status
Complete & In Use
total cost
Ksh 1,550,000
estimate
Ksh 1,200,000

Rianyarusa Bridge

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
Complete & In Use
total cost
Ksh 1,550,000
estimate
Ksh 2,180,000

Nyagancha Dispensary

location
Gachuba (in Kitutu Masaba)
year first funded
2003
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,519,140
estimate
Ksh 1,319,940

Machururiati Dispensary

location
Mochenwa (in Kitutu Masaba)
year first funded
2003
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,500,450
estimate
Ksh 2,500,000

Karantini Secondary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Lab Construction
output
Laboratory
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,700,000

Sungututa Secondary School

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,485,656
estimate
Ksh 1,500,000

Rigoma Dispensary

location
East Kitutu (in Kitutu Masaba)
year first funded
2004
action
Constructing Maternity Block
output
Maternity Block
implementation status
Ongoing
total cost
Ksh 1,451,656
estimate
Ksh 1,351,656

Kiobwoge/Ekerubo/Ikonge Schools

location
Kemera (in Kitutu Masaba)
year first funded
2005
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 1,250,000

Rigoma Secondary School

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Extension Of Hall
output
Hall Adm. Block
implementation status
Ongoing
total cost
Ksh 1,450,000
estimate
Ksh 2,500,000

Omoyo Secondary School

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,038,000

Kiendege Dispensary

location
Kemera (in Kitutu Masaba)
year first funded
2005
action
Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,800,000

Rianchogu Bridge

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Bridge Construction
output
Bridge Construction
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,000,000

Magombo Guch Dispensary

location
Gachuba (in Kitutu Masaba)
year first funded
2004
action
Extension Of Maternity Ward
output
Maternity Ward
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 1,509,500

Kenyerere Polytechnic

location
North Kitutu (in Kitutu Masaba)
year first funded
2004
action
Completing Classrooms/Equi
output
Classrooms/Equipment
implementation status
Ongoing
total cost
Ksh 1,362,800
estimate
Ksh 1,350,000

Nyaguku Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,354,140
estimate
Ksh 1,500,000

St. Don Bosco Nyabiosi

location
Mochenwa (in Kitutu Masaba)
year first funded
2004
action
Constructing Laboratory &
output
Laboratory & Power
implementation status
Complete & In Use
total cost
Ksh 1,337,312
estimate
Ksh 1,512,800

Riooga Secondary School

location
Gesima (in Kitutu Masaba)
year first funded
2003
action
Laboratory Construction
output
Laboratory
implementation status
Complete & In Use
total cost
Ksh 1,334,000
estimate
Ksh 1,600,000

St. Thomas Gekano Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2003
action
Lab/Equipment/Electricity
output
Lab/Equipments/Electricity
implementation status
Ongoing
total cost
Ksh 1,330,400
estimate
Ksh 2,000,000

Nyatieko Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2003
action
Extension Of Lab/Equipments
output
Laboratory /Equipment
implementation status
Ongoing
total cost
Ksh 1,256,456
estimate
Ksh 1,800,000

Miriri Secondary School

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Kitchen Construction &
output
Kitchen & Lab
implementation status
Ongoing
total cost
Ksh 1,250,000
estimate
Ksh 1,650,000

Gesima Water Project

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Water Gravitation
output
Water
implementation status
Ongoing
total cost
Ksh 1,243,656
estimate
Ksh 1,993,656

Bogwendo Dispensary

location
North Kitutu (in Kitutu Masaba)
year first funded
2003
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,240,900
estimate
Ksh 1,250,000

St. Cyprian Biticha Secondary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Laboratory Equipments
output
Equipments
implementation status
On Going
total cost
Ksh 1,230,000
estimate
Ksh 1,580,000

Embaro Polytechnic

location
East Kitutu (in Kitutu Masaba)
year first funded
2003
action
Construction Of Newest Polytechnic
output
Newest Polytechnic
implementation status
Complete & In Use
total cost
Ksh 1,214,556
estimate
Ksh 1,265,456

Gesure Dispensary

location
Central Kitutu (in Kitutu Masaba)
year first funded
2003
action
Extensiion Of Newest Room
output
Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,650,000

Tinga Market And Surbubs

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,900,000

Mochenwa Secondary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Lab/Furniture/Equipments
output
Equiped Lab/Furniture
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,550,000

Riakworo Secondary School

location
Gesima (in Kitutu Masaba)
year first funded
2003
action
Completing Lab/ Equipments
output
Equiped Laboratory
implementation status
Complete & In Use
total cost
Ksh 1,188,000
estimate
Ksh 3,500,000

Esani Health Centre

location
Gesima (in Kitutu Masaba)
year first funded
2003
action
Kitchen Constructiion
output
Kitchen
implementation status
Complete & In Use
total cost
Ksh 1,180,000
estimate
Ksh 1,200,000

Riyabe Secondary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Laboratory/Equip
output
Laboratory Equipments
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 1,500,000

Tombemixed Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2003
action
Construction Of Toilets
output
Toilets & Classroom
implementation status
Ongoing
total cost
Ksh 1,106,000
estimate
Ksh 1,300,000

Kiangoso Dispensary

location
Kemera (in Kitutu Masaba)
year first funded
2003
action
Extension Of Rooms
output
Rooms
implementation status
Complete & In Use
total cost
Ksh 1,101,656
estimate
Ksh 1,500,450

Nyamanagu Polytechnic

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Extending Classrooms
output
Classrooms & Equipment
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,800,000

Rikenye Dispensary

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Gesima Elecricity

location
Gesima (in Kitutu Masaba)
year first funded
2007
action
Electricity
output
New
implementation status
Awaiting 600,000
total cost
Ksh 1,100,000
estimate
Ksh 2,600,000

Ogango Dispensary

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,543,656

Irianyi/Nyangena/Mokwerero/Kiendege

location
Kemera (in Kitutu Masaba)
year first funded
2005
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kebirichi Secondary School

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,750,000

Matutu Secondary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Lab Equipments/Admin. Block
output
Equipments/Admin Block
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,400,000

Metamaywa Secondary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Laboratory Construction
output
Laboratory
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Biticha Umoja Electricity

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Mokwerero Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Construction Of Laboratory
output
Laboratory
implementation status
Complete & In Use
total cost
Ksh 999,656
estimate
Ksh 1,155,180

Riakworo Water Project

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Water Gravitation
output
Water
implementation status
On Going
total cost
Ksh 993,000
estimate
Ksh 993,656

Miriri Dispensary

location
Gachuba (in Kitutu Masaba)
year first funded
2003
action
Extension Of Staff Houses
output
Staff Houses
implementation status
Ongoing
total cost
Ksh 962,800
estimate
Ksh 962,800

Mokomoni Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Lab/Equipments
output
Equiped Laboratory
implementation status
Ongoing
total cost
Ksh 950,000
estimate
Ksh 1,500,000

Orotuba Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2005
action
Laboratory Construction
output
Laboratory
implementation status
On Going
total cost
Ksh 950,000
estimate
Ksh 1,650,000

Kiobwoge Polytechnic

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Extending Classrooms
output
Classrooms & Equipment
implementation status
On Going
total cost
Ksh 943,656
estimate
Ksh 743,656

Rionguti Disabled

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Classroom Construction
output
Classroom
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Mongoni Secondary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Administration Block
output
Administration Block
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,550,000

Machururiati Secondary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Lab Equipments
output
Equipments
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Bogwendo Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Equiped Laboratory
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 2,500,000

Motari Geke Dispensary

location
North Kitutu (in Kitutu Masaba)
year first funded
2004
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 882,140
estimate
Ksh 1,500,000

Riamoni Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Constructing Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 870,000
estimate
Ksh 800,000

Nyankoba Secondary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Classroom/Lab
output
Classrooms/Laboratory
implementation status
On Going
total cost
Ksh 850,000
estimate
Ksh 1,550,000

Bigogo Primary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 2,595,000

Nyariacho Secondary School

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Construction Of Laboratory/Equip
output
Equiped Laboratory
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 1,300,000

Ikobe Mixed Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2003
action
Laboratory
output
Laboratory
implementation status
Ongoing
total cost
Ksh 838,000
estimate
Ksh 1,800,000

Kiabira Secondary School Elect

location
Kemera (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 801,376
estimate
Ksh 2,800,000

Kianungu Dispensary

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Nyanchonori Secondary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Library Equipments
output
Library
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

St. Pauls Gekano Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Hall Construction
output
Hall
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,214,556

Rigena Rienyangau Gravity Water

location
Gesima (in Kitutu Masaba)
year first funded
2005
action
Water Gravitation
output
Water
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,550,000

Geteni Polytechnic

location
Gachuba (in Kitutu Masaba)
year first funded
2004
action
Constructing Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 770,000
estimate
Ksh 170,000

Gesima Dispensary

location
Gesima (in Kitutu Masaba)
year first funded
2005
action
Buying Refrigerator
output
Refrigerator
implementation status
Complete & In Use
total cost
Ksh 767,395
estimate
Ksh 3,500,000

Sengera Manga Primary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 765,000

Ogango/Nyaikuro/Gesure Elect

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Electricity
output
Electricity
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 5,000,000

St. Dennis Eronge

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction Of Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Sengera Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Wiring, Lab Equipments
output
Functional Lab
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 1,550,000

Kabosi Bridge

location
Gesima (in Kitutu Masaba)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
Complete & In Use
total cost
Ksh 737,312
estimate
Ksh 1,500,000

Kiabiraa Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Construction Of Classes
output
Classrooms
implementation status
Ongoing
total cost
Ksh 701,828
estimate
Ksh 2,000,000

Riakumba /Mosobeti Electricity

location
Gesima (in Kitutu Masaba)
year first funded
2005
action
Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,300,000

Ikonge Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Equipments
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 3,000,000

Kiogutwa Poly

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Extension Of Rooms
output
Rooms
implementation status
Ongoing
total cost
Ksh 693,656
estimate
Ksh 1,000,000

Kiangende Polytechnic

location
Gachuba (in Kitutu Masaba)
year first funded
2004
action
Extension/Equipments
output
Equipments
implementation status
Ongoing
total cost
Ksh 688,000
estimate
Ksh 2,100,000

Nyakome Water Supply

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Water Gravitation
output
Water
implementation status
Ongoing
total cost
Ksh 653,656
estimate
Ksh 653,656

Nyaiguta Dispensary

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Constructing Newest Dispensary
output
Dispensary
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 1,780,000

Kerongeta Secondary School

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Library/Furniture/Construction
output
Equiped Library/Lab
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 1,650,000

Riamachana Water Gravitation

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Water Gravitation
output
Water
implementation status
Ongoing
total cost
Ksh 632,400
estimate
Ksh 1,632,400

Rianyabwanga Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 609,500
estimate
Ksh 1,030,400

Springs Mochenwa Location

location
Mochenwa (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Protected Spring
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Tombe Girls Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 638,000

Miriri Borehole

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Drilling Borehole
output
Drilled Borehole
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Geke Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 3,500,000

Riamainga Bridge

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
On Going
total cost
Ksh 580,000
estimate
Ksh 3,701,181

Matutu Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2004
action
Classrooms/Toilet
output
Classrooms
implementation status
Ongoing
total cost
Ksh 570,000
estimate
Ksh 700,000

Nyariacho Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Constructing Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 1,450,000

Nyaikuro Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 706,000

St. Teresas Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Equiped Laboratory
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 3,500,000

Kerora Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 600,000

Nyakegogi Dispensary

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 550,000
estimate
Ksh 1,001,656

Kemera Springs

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
On Going
total cost
Ksh 530,000
estimate
Ksh 723,656

Kericha Market/Esani Surbubs

location
Gesima (in Kitutu Masaba)
year first funded
2005
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Sungututa Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Constructing Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Ogango Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,400,000

Kiendege Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Equipments
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 999,656

Kiangoso Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 450,000

St. Marys Ekerubo Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Laboratory
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 790,000

Rigoma Mkt & Surbubs Rural Elect

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 1,750,000

Riamakini Bridge

location
Mochenwa (in Kitutu Masaba)
year first funded
2006
action
Construction of Bridge
output
Bridge
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiendege Bridge

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 900,000

Bigogo D Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Constr. Of Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 800,000

Bogwendo Electricity

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Supply Of Electricity
output
Availability Of Electricity
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 4,800,000

Egekerio Electricity Group

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Supply Of Electricity
output
Availability Of Electricity
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 3,500,000

Mochenwa-Karantini Elec

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 1,900,000

Nyamwanga Electricity

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 780,000

Boburia - Mokomoni Bridge

location
Gesima (in Kitutu Masaba)
year first funded
2009
action
Construction Of Bridge
output
Bridge
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Manga Market And Surbubs

location
Central Kitutu (in Kitutu Masaba)
year first funded
2005
action
Electricity
output
Electricity
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 4,000,000

Nyangori Market/Rigoma

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 700,000

Manga Hall

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation Of Hall
output
Clean Hall
implementation status
Complete & In Use
total cost
Ksh 480,000
estimate
Ksh 900,000

Nyamachemange Primary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 470,000
estimate
Ksh 688,000

Risa Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Construction Of Fallen Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 450,000

Bitundugusu Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 980,000

Nyasimwamu Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 150,000

Irianyi Secondary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Equipments
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 980,000

Morako Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 1,300,000

Nyaisa Secondary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 1,310,000

Kebobora Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 250,000

Iranya Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 3,000,000

Karantini Nyamakoroto S

location
Mochenwa (in Kitutu Masaba)
year first funded
2007
action
Road Construction
output
Road Construction
implementation status
New
total cost
Ksh 450,000
estimate
Ksh 500,000

Sirate Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 425,000
estimate
Ksh 250,000

Nyaguku Gravity Water Project

location
North Kitutu (in Kitutu Masaba)
year first funded
2005
action
Water Supply
output
Water
implementation status
On Going
total cost
Ksh 411,900
estimate
Ksh 450,900

Riakibagendi Water Gravitation

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Water Gravitation
output
Water
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Nyachichi /Kiabiraa Electricity

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 5,500,000

Nyasore-Riabore-Bondeni-Nyaigesa

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 2,500,000

Borabu Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 600,000

Kenyamware Health Centre

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Newest Wards
output
Construction Of Wards
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 4,600,000

Nyanchonoro-Nyankoba-Nyaigesa Elec

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 2,800,000

Riegechure Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2004
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 395,000
estimate
Ksh 430,000

Kiomakondo Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 370,000
estimate
Ksh 490,000

Rigoma T Constructiion

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Expansion
output
Expansion
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 450,000

Nyambaria Water Springs

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 150,000

Bogwendo Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Toilet Construction
output
Toilets
implementation status
New
total cost
Ksh 350,000
estimate
Ksh 100,000

Riabagaka Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 1,150,000

Nyamwanga Secondary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Laboratory Equipments
output
Equiped Laboratory
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 1,054,140

Rianya Youth Group

location
Gesima (in Kitutu Masaba)
year first funded
2007
action
Environmental Conservation
output
Environ. Conservation
implementation status
New
total cost
Ksh 350,000
estimate
Ksh 650,000

Riomoro primary School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 350,000
estimate
Ksh 750,000

Gachuba Culverts

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Culvert Making
output
Culverts
implementation status
On Going
total cost
Ksh 317,410
estimate
Ksh 500,000

Riondimu/Riaroni/Riasere/Rianyati Springs

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Spring Protection
output
Protected Spring
implementation status
Complete & In Use
total cost
Ksh 314,000
estimate
Ksh 314,000

Nyakongo Springs

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
On Going
total cost
Ksh 310,000
estimate
Ksh 400,000

Ritibo Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 550,000

Kewanda Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 350,000

Nyantaro Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 1,100,000

Rigena Springs

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 650,000

Metamaywa/Riabore Rural Elect

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 750,000

Mochenwa Education Office

location
Mochenwa (in Kitutu Masaba)
year first funded
2006
action
Construction of Education Office
output
Education Office
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Embaro Tea B

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction of Tea Band
output
Tea Band
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 560,000

Kambini/Sungututa/Iranya Elec

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 500,000

Girango Secondary School

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kuja Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Nyambaria primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 1,700,000

Gucha-Moturumesi-Nyagancha Ele

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 2,300,000

Nyakoba-Rigoma-Siara Elec

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 1,900,000

Gechona-Nyamwanga Bridge

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction of Bridge
output
Bridge
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 4,000,000

Karantini Nyamakoroto Bridge

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Bridge Construction
output
Road Accessibility
implementation status
New
total cost
Ksh 290,000
estimate
Ksh 6,000,000

Mochenwa Culverts

location
Mochenwa (in Kitutu Masaba)
year first funded
2006
action
Installed
output
Culverts
implementation status
Ongoing
total cost
Ksh 272,410
estimate
Ksh 500,000

Ekitutu Locculverts

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Culvet Making
output
Culverts
implementation status
On Going
total cost
Ksh 272,410
estimate
Ksh 272,410

Riamaemba Bridge

location
Gachuba (in Kitutu Masaba)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
On Going
total cost
Ksh 272,410
estimate
Ksh 272,410

Nkitutu Culverts

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Culvet Making
output
Culverts
implementation status
Complete & In Use
total cost
Ksh 272,410
estimate
Ksh 272,410

Kemera Culverts & Access

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Culverts
output
Newest Culverts
implementation status
New
total cost
Ksh 272,410
estimate
Ksh 487,312

Matangi D Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Toilet Construction
output
Toilets
implementation status
On Going
total cost
Ksh 270,000
estimate
Ksh 200,000

Kiabiraa Water Project

location
Kemera (in Kitutu Masaba)
year first funded
2004
action
Water Supply
output
Water
implementation status
Complete & In Use
total cost
Ksh 251,828
estimate
Ksh 251,828

Mongoni/Birongo Rural Elct

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 1,250,000

Girango Coffee Society

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
n/a
output
Electricity
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 400,000

Mwamonari Rural Electricity

location
Mochenwa (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 500,000

Central Location Water Springs

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

Getacho Water Gravitation

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

Nyamacho/Kebirichi Rural Elect

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Power Installation
output
Electricity
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 1,200,000

Provincial Admi

location
Gachuba (in Kitutu Masaba)
year first funded
2009
action
Construction Of Newest Office
output
Office
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 700,000

Riamamboleo Box Culvert

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction of Bridge
output
Bridge
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 1,700,000

Nyabogoye Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 680,000

Kiamwarimu Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Classrooms Construction
output
Newest Classrooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 700,000

Machururiati Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Toilet Construction
output
Modern Toilets Constructed
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 550,000

Sirate Dispensary

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Newest Dispensary
output
Construction
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 1,200,000

Nyankoba/Amabuko Rural Elec

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 300,000

Moromba Primary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

Risa Polytechnic

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 500,000

Botana Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2004
action
Construction Of Classrooms
output
Classrooms
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Amaiga Dispensary

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Newest Dispensary
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 1,150,000

Keroka S Hospital

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction of Hospital
output
Hospital
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 1,506,456

Gesima Location Culverts

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Culvert Making
output
Culverts
implementation status
On Going
total cost
Ksh 222,410
estimate
Ksh 700,000

Central Culverts & Access

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Installation Electricity
output
Culverts
implementation status
On Going
total cost
Ksh 222,410
estimate
Ksh 250,000

Nyaigesa Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 220,000
estimate
Ksh 543,000

Sengereri primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 780,000

Miriri Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2007
action
Construction Of Clssrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 500,000

Riamoni Water Springs

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 800,000

Embaro Springs

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Mochenwa/Nyabiosi Rural Electricity

location
Mochenwa (in Kitutu Masaba)
year first funded
2005
action
Wiring For Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 250,000

Mochenwa Field

location
Mochenwa (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation Of Soccer Field
output
Soccer Field
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 300,000

Embaro Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction Of Class
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 890,000

Nyaguku Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classroom
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Bonyunyu Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classroom
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 400,000

Emanga Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 895,000

Nyangena Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 530,000

Keboba Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2007
action
Classroom Construction
output
Classrooms Construction
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 670,000

Esani Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Classroom Construction
output
Classrooms Construction
implementation status
Protection
total cost
Ksh 200,000
estimate
Ksh 700,000

Nyagechenche Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2008
action
Classroom Construction
output
Classroom Construction
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 650,000

Nyabiosi Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Classroom Construction
output
Classroom Construction
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 870,000

Nyaibasa Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Classroom Construction
output
Newest Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Nyangarora Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Classroom Construction
output
Newest Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 800,000

Metamaywa Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Classroom Construction
output
Newest Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 650,000

Mongoni Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Classroom Construction
output
Newest Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 700,000

Mochenwa Dispensary

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Constructions Of Wards
output
Construction Of Wards
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Nyabuya Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 670,000

Bocharia Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Rigoma Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 1,850,000

Karantini Primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 2,300,000

Mochenwa primary School

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 550,000

Nyamakoroto Dispensary

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
Constructions Of Wards
output
Construction Of Wards
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 1,800,000

Girango-Kerongeta Elect

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 3,500,000

Kegogi Tbc

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction of Clean Hall
output
Clean Hall
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 380,000

Gesima Poly

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Extending Classrooms
output
Classrooms & Equipment
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 3,000,000

Ritongo Polytechni

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Extending Classrooms
output
Classrooms & Equipment
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 2,500,000

Mong'Oni Poly

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Extending Classrooms
output
Classrooms & Equipment
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 2,300,000

Gesima-Nyabuya Bridge

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Construction of Bridge
output
Bridge
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 3,200,000

Nyambaria-Nyamemiso Fedder Road

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Grading,Clearing Bushes & Murraming
output
Road
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 300,000

Nitutu Loc chief's Camp

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Newest Office
output
Office
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyasore Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2004
action
Electricity/Classrooms
output
Electricity/Classrooms
implementation status
Complete & In Use
total cost
Ksh 170,000
estimate
Ksh 800,000

Mokorongosi Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2005
action
Construction Of Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 170,000
estimate
Ksh 501,828

Gachuba Nurseries

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soil Conservation
implementation status
New
total cost
Ksh 155,180
estimate
Ksh 125,000

Nkitutu Nurseries

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soil Conservation
implementation status
Ongoing
total cost
Ksh 155,180
estimate
Ksh 450,000

Kemera Tree Nursery

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Planting And Maintenance
output
Trees
implementation status
New
total cost
Ksh 155,180
estimate
Ksh 750,000

Ekitutu Nurseries

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Putting Up Tree Nursary
output
Tree Nursary
implementation status
On Going
total cost
Ksh 155,180
estimate
Ksh 790,000

Tree Nursery Gesima Location

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Putting Up Tree Nursery
output
Tree Nursery
implementation status
On Going
total cost
Ksh 155,180
estimate
Ksh 500,000

Central Kitutu Nurseries

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soil Conservation
implementation status
Complete & In Use
total cost
Ksh 155,180
estimate
Ksh 150,000

Nyangena Health Centre

location
Kemera (in Kitutu Masaba)
year first funded
2008
action
Constructions Of Wards
output
Construction Of Wards
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 2,000,000

Gucha Bridge

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction of Bridge
output
Bridge
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 1,800,000

Rigoma Ds Office

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction Of Newest Office
output
Office
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 350,000

Kebuko Buying Centre

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 500,000

Nyabuya Buying Centre

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 550,000

Riabore Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 500,000

Kierira Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 295,000

Nyambogo Primary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2004
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 300,000

Gekano Water Springs

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Bocharia Springs

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Girango Springs

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Ekonu/Bogeka/Biticha Spring Protection

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Spring Protection
output
Water
implementation status
Complete & In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyatieno Water Springs

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 530,000

Nyankoba Springs

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Protection
output
Water
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 500,000

Mochenwa Mkt/Embaro Rural

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Electricity
output
Electricity
implementation status
On Going
total cost
Ksh 140,000
estimate
Ksh 1,240,000

Gianche Tbc

location
Central Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction of Clean Hall
output
Clean Hall
implementation status
Ongoing
total cost
Ksh 140,000
estimate
Ksh 300,000

Gechona Bridge

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction of Bridge
output
Bridge
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 4,000,000

Nyamochorio Buying Centre

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 650,000

Gekano Mission Road

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Face Lifting
output
Road Accessibility
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 150,000

Riorogo Water Project

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction of A Water Spring
output
Water Accessbillity
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 550,000

Gesima Primary School

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 450,000

Nyagancha Primary School

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 2,000,000

Karantini Tbc

location
Gesima (in Kitutu Masaba)
year first funded
2008
action
Construction of Clean Hall
output
Clean Hall
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 500,000

Moitunya Tbc

location
Kemera (in Kitutu Masaba)
year first funded
2008
action
Construction of Clean Hall
output
Clean Hall
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 700,000

Bonyunyu Polytechnic

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Extending Classrooms
output
Classrooms & Equipment
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 1,500,000

Nyachichi Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 560,000

Riogoro-Geke Road

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Grading,Clearing Bushes & Murraming
output
Road
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 200,000

Rianyakeya

location
North Kitutu (in Kitutu Masaba)
year first funded
2008
action
Grading,Clearing Bushes & Murraming
output
Road
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 300,000

Moitunya Special School

location
Kemera (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 250,000

Nyamare Primary School

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction
output
Classrooms/Toilet
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Riyabe Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Toilet Construction
output
Toilet
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 200,000

Nyankoba Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Reconstruction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Chitago Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Moromba Coffee Society Elect

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 500,000

Gesonso Coffee Society Elect

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Power Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Bogwendo Water Springs

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Sirate Water Springs

location
North Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyanchonori/Nyaigesa Spring Protection

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Biticha Spring Protection

location
East Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Geteni Rural Elec

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Electricity
output
Electricity
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Rianyakundi/Rianyambane Springs

location
East Kitutu (in Kitutu Masaba)
year first funded
2005
action
Protection
output
Water
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 150,000

Biticha Primary School

location
East Kitutu (in Kitutu Masaba)
year first funded
2008
action
Construction Of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 200,000

Rigoma Field

location
East Kitutu (in Kitutu Masaba)
year first funded
2007
action
Leveling
output
Leveling
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Entanda Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2007
action
Classroom/Toilet
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Ekerubo Primary School

location
Kemera (in Kitutu Masaba)
year first funded
2007
action
Classroom/Toilet
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 870,000

Gesima Diabetic Clinic

location
Gesima (in Kitutu Masaba)
year first funded
2007
action
Purchase Of Study Equipments
output
Purchase Of Study Equipments
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 500,000

Nyaisa Tbc

location
Central Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction of Clean Hall
output
Clean Hall
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 300,000

Kenyerere Pag Primary School

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction Of Classes
output
Classrooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 602,000

Eronge Water Gravitation

location
East Kitutu (in Kitutu Masaba)
year first funded
2004
action
Water Gravitation
output
Water
implementation status
Ongoing
total cost
Ksh 93,656
estimate
Ksh 93,656

Esani Junction Repairs

location
Gesima (in Kitutu Masaba)
year first funded
2007
action
Repairs
output
Repairs
implementation status
On Going
total cost
Ksh 70,000
estimate
Ksh 70,000

Mwabosire Springs

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
On Going
total cost
Ksh 70,000
estimate
Ksh 500,000

Matororo Buying Centre

location
Kemera (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 70,000
estimate
Ksh 400,000

Nyaikuro Buying Centre

location
Central Kitutu (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 70,000
estimate
Ksh 500,000

Ogango Tea Buying Centre

location
Central Kitutu (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 70,000
estimate
Ksh 570,000

Bondeka Buying Centre

location
Central Kitutu (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 70,000
estimate
Ksh 450,000

Nyabigege Tea Buying Centre

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 70,000
estimate
Ksh 635,000

Kiogutwa Springs

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Spring Protection
output
Water
implementation status
On Going
total cost
Ksh 60,000
estimate
Ksh 450,000

Nyaora Tbc

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction of Clean Hall
output
Clean Hall
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 550,000

Eseng'Enge Tea Buying Centre

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 450,000

Matongo Tea Buying Centre

location
Mochenwa (in Kitutu Masaba)
year first funded
2008
action
T.B.C Construction
output
Newest Tea Buying Centre
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 500,000

Bosiango Water Pump

location
Gachuba (in Kitutu Masaba)
year first funded
2008
action
Construction Of A Water Pump
output
Water Accessbillity
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 700,000

Nyamwanga Pri, School

location
North Kitutu (in Kitutu Masaba)
year first funded
2007
action
Construction Of Toilet
output
Toilets
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 700,000

Manga Field

location
Central Kitutu (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soccer Field
implementation status
Complete
total cost
Ksh 40,000
estimate
Ksh 380,000

Bonyunyu Soccer field

location
Gachuba (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soccer Field
implementation status
Complete & In Use
total cost
Ksh 40,000
estimate
Ksh 40,000

Ritongo Soccer Field

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soccer Field
implementation status
Complete
total cost
Ksh 40,000
estimate
Ksh 40,000

Riamoni Soccer Field

location
Gesima (in Kitutu Masaba)
year first funded
2006
action
Rehabilitation
output
Soccer Field
implementation status
Complete
total cost
Ksh 40,000
estimate
Ksh 100,000

Nyamakoroto Primary School

location
Mochenwa (in Kitutu Masaba)
action
Construction Of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 0
estimate
Ksh 239,000