The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Magombo Market And Surbubs
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 3,840,000
- estimate
- Ksh 5,400,000
Kemera Water Project
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Water Gravitation
- output
- Water
- implementation status
- Complete & In Use
- total cost
- Ksh 2,830,500
- estimate
- Ksh 2,930,500
Nyambaria Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Constructing 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,300,000
Nyachichi Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Library
- output
- Library
- implementation status
- Complete & In Use
- total cost
- Ksh 1,993,656
- estimate
- Ksh 2,000,000
Morako Polytechnic
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,893,656
- estimate
- Ksh 1,943,656
Tombe Dispensary
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructiion Of Female Ward
- output
- Ward
- implementation status
- Complete & In Use
- total cost
- Ksh 1,893,656
- estimate
- Ksh 3,920,683
Nyakongo Secondary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,850,000
- estimate
- Ksh 1,500,000
Girango Dispensary
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Complete & In Use
- total cost
- Ksh 1,737,040
- estimate
- Ksh 1,587
Nyanchonori Dispensary
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,706,452
- estimate
- Ksh 2,250,000
Esani Secondary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Ikobe Dispensary
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Complete & In Use
- total cost
- Ksh 1,693,656
- estimate
- Ksh 1,993,656
Gesure Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,200,000
Rianyarusa Bridge
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete & In Use
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,180,000
Nyagancha Dispensary
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Complete & In Use
- total cost
- Ksh 1,519,140
- estimate
- Ksh 1,319,940
Machururiati Dispensary
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,450
- estimate
- Ksh 2,500,000
Karantini Secondary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Lab Construction
- output
- Laboratory
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,700,000
Sungututa Secondary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,485,656
- estimate
- Ksh 1,500,000
Rigoma Dispensary
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Maternity Block
- output
- Maternity Block
- implementation status
- Ongoing
- total cost
- Ksh 1,451,656
- estimate
- Ksh 1,351,656
Kiobwoge/Ekerubo/Ikonge Schools
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,250,000
Rigoma Secondary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Extension Of Hall
- output
- Hall Adm. Block
- implementation status
- Ongoing
- total cost
- Ksh 1,450,000
- estimate
- Ksh 2,500,000
Omoyo Secondary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,038,000
Kiendege Dispensary
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,800,000
Rianchogu Bridge
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Bridge Construction
- output
- Bridge Construction
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,000,000
Magombo Guch Dispensary
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Extension Of Maternity Ward
- output
- Maternity Ward
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,509,500
Kenyerere Polytechnic
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Completing Classrooms/Equi
- output
- Classrooms/Equipment
- implementation status
- Ongoing
- total cost
- Ksh 1,362,800
- estimate
- Ksh 1,350,000
Nyaguku Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,354,140
- estimate
- Ksh 1,500,000
St. Don Bosco Nyabiosi
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Laboratory &
- output
- Laboratory & Power
- implementation status
- Complete & In Use
- total cost
- Ksh 1,337,312
- estimate
- Ksh 1,512,800
Riooga Secondary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Laboratory Construction
- output
- Laboratory
- implementation status
- Complete & In Use
- total cost
- Ksh 1,334,000
- estimate
- Ksh 1,600,000
St. Thomas Gekano Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Lab/Equipment/Electricity
- output
- Lab/Equipments/Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,330,400
- estimate
- Ksh 2,000,000
Nyatieko Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Extension Of Lab/Equipments
- output
- Laboratory /Equipment
- implementation status
- Ongoing
- total cost
- Ksh 1,256,456
- estimate
- Ksh 1,800,000
Miriri Secondary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Kitchen Construction &
- output
- Kitchen & Lab
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,650,000
Gesima Water Project
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Water Gravitation
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 1,243,656
- estimate
- Ksh 1,993,656
Bogwendo Dispensary
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Complete & In Use
- total cost
- Ksh 1,240,900
- estimate
- Ksh 1,250,000
St. Cyprian Biticha Secondary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Laboratory Equipments
- output
- Equipments
- implementation status
- On Going
- total cost
- Ksh 1,230,000
- estimate
- Ksh 1,580,000
Embaro Polytechnic
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Construction Of Newest Polytechnic
- output
- Newest Polytechnic
- implementation status
- Complete & In Use
- total cost
- Ksh 1,214,556
- estimate
- Ksh 1,265,456
Gesure Dispensary
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Extensiion Of Newest Room
- output
- Dispensary
- implementation status
- Complete & In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,650,000
Tinga Market And Surbubs
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,900,000
Mochenwa Secondary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Lab/Furniture/Equipments
- output
- Equiped Lab/Furniture
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,550,000
Riakworo Secondary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Completing Lab/ Equipments
- output
- Equiped Laboratory
- implementation status
- Complete & In Use
- total cost
- Ksh 1,188,000
- estimate
- Ksh 3,500,000
Esani Health Centre
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Kitchen Constructiion
- output
- Kitchen
- implementation status
- Complete & In Use
- total cost
- Ksh 1,180,000
- estimate
- Ksh 1,200,000
Riyabe Secondary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Laboratory/Equip
- output
- Laboratory Equipments
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,500,000
Tombemixed Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Construction Of Toilets
- output
- Toilets & Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,106,000
- estimate
- Ksh 1,300,000
Kiangoso Dispensary
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Extension Of Rooms
- output
- Rooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,101,656
- estimate
- Ksh 1,500,450
Nyamanagu Polytechnic
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Extending Classrooms
- output
- Classrooms & Equipment
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,800,000
Rikenye Dispensary
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Gesima Elecricity
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Electricity
- output
- New
- implementation status
- Awaiting 600,000
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,600,000
Ogango Dispensary
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,543,656
Irianyi/Nyangena/Mokwerero/Kiendege
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kebirichi Secondary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,750,000
Matutu Secondary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Lab Equipments/Admin. Block
- output
- Equipments/Admin Block
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,400,000
Metamaywa Secondary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Laboratory Construction
- output
- Laboratory
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Biticha Umoja Electricity
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Mokwerero Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Laboratory
- implementation status
- Complete & In Use
- total cost
- Ksh 999,656
- estimate
- Ksh 1,155,180
Riakworo Water Project
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Water Gravitation
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 993,000
- estimate
- Ksh 993,656
Miriri Dispensary
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Extension Of Staff Houses
- output
- Staff Houses
- implementation status
- Ongoing
- total cost
- Ksh 962,800
- estimate
- Ksh 962,800
Mokomoni Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Lab/Equipments
- output
- Equiped Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 1,500,000
Orotuba Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Laboratory Construction
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 1,650,000
Kiobwoge Polytechnic
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Extending Classrooms
- output
- Classrooms & Equipment
- implementation status
- On Going
- total cost
- Ksh 943,656
- estimate
- Ksh 743,656
Rionguti Disabled
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Mongoni Secondary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Administration Block
- output
- Administration Block
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,550,000
Machururiati Secondary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Lab Equipments
- output
- Equipments
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Bogwendo Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Equiped Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 2,500,000
Motari Geke Dispensary
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 882,140
- estimate
- Ksh 1,500,000
Riamoni Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 870,000
- estimate
- Ksh 800,000
Nyankoba Secondary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Classroom/Lab
- output
- Classrooms/Laboratory
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 1,550,000
Bigogo Primary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 2,595,000
Nyariacho Secondary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Laboratory/Equip
- output
- Equiped Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 1,300,000
Ikobe Mixed Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2003
- action
- Laboratory
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 838,000
- estimate
- Ksh 1,800,000
Kiabira Secondary School Elect
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 801,376
- estimate
- Ksh 2,800,000
Kianungu Dispensary
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Nyanchonori Secondary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Library Equipments
- output
- Library
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
St. Pauls Gekano Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Hall Construction
- output
- Hall
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,214,556
Rigena Rienyangau Gravity Water
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Water Gravitation
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,550,000
Geteni Polytechnic
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 770,000
- estimate
- Ksh 170,000
Gesima Dispensary
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Buying Refrigerator
- output
- Refrigerator
- implementation status
- Complete & In Use
- total cost
- Ksh 767,395
- estimate
- Ksh 3,500,000
Sengera Manga Primary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 765,000
Ogango/Nyaikuro/Gesure Elect
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Electricity
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 5,000,000
St. Dennis Eronge
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 2,000,000
Sengera Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Wiring, Lab Equipments
- output
- Functional Lab
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 1,550,000
Kabosi Bridge
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete & In Use
- total cost
- Ksh 737,312
- estimate
- Ksh 1,500,000
Kiabiraa Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 701,828
- estimate
- Ksh 2,000,000
Riakumba /Mosobeti Electricity
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,300,000
Ikonge Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Equipments
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 3,000,000
Kiogutwa Poly
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Extension Of Rooms
- output
- Rooms
- implementation status
- Ongoing
- total cost
- Ksh 693,656
- estimate
- Ksh 1,000,000
Kiangende Polytechnic
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Extension/Equipments
- output
- Equipments
- implementation status
- Ongoing
- total cost
- Ksh 688,000
- estimate
- Ksh 2,100,000
Nyakome Water Supply
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Water Gravitation
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 653,656
- estimate
- Ksh 653,656
Nyaiguta Dispensary
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Constructing Newest Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 1,780,000
Kerongeta Secondary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Library/Furniture/Construction
- output
- Equiped Library/Lab
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 1,650,000
Riamachana Water Gravitation
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Water Gravitation
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 632,400
- estimate
- Ksh 1,632,400
Rianyabwanga Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 609,500
- estimate
- Ksh 1,030,400
Springs Mochenwa Location
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Protected Spring
- implementation status
- Complete & In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Tombe Girls Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 638,000
Miriri Borehole
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Drilling Borehole
- output
- Drilled Borehole
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Geke Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 3,500,000
Riamainga Bridge
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- On Going
- total cost
- Ksh 580,000
- estimate
- Ksh 3,701,181
Matutu Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Classrooms/Toilet
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 570,000
- estimate
- Ksh 700,000
Nyariacho Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 1,450,000
Nyaikuro Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 706,000
St. Teresas Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Equiped Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 3,500,000
Kerora Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
Nyakegogi Dispensary
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 1,001,656
Kemera Springs
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 530,000
- estimate
- Ksh 723,656
Kericha Market/Esani Surbubs
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Sungututa Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Constructing Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ogango Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,400,000
Kiendege Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Equipments
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 999,656
Kiangoso Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 450,000
St. Marys Ekerubo Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 790,000
Rigoma Mkt & Surbubs Rural Elect
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,750,000
Riamakini Bridge
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiendege Bridge
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Bigogo D Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Constr. Of Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Bogwendo Electricity
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Supply Of Electricity
- output
- Availability Of Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 4,800,000
Egekerio Electricity Group
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Supply Of Electricity
- output
- Availability Of Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 3,500,000
Mochenwa-Karantini Elec
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 1,900,000
Nyamwanga Electricity
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 780,000
Boburia - Mokomoni Bridge
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2009
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Manga Market And Surbubs
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Electricity
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 4,000,000
Nyangori Market/Rigoma
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Manga Hall
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation Of Hall
- output
- Clean Hall
- implementation status
- Complete & In Use
- total cost
- Ksh 480,000
- estimate
- Ksh 900,000
Nyamachemange Primary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 470,000
- estimate
- Ksh 688,000
Risa Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Fallen Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Bitundugusu Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 980,000
Nyasimwamu Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Irianyi Secondary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Equipments
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 980,000
Morako Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,300,000
Nyaisa Secondary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,310,000
Kebobora Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 250,000
Iranya Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 3,000,000
Karantini Nyamakoroto S
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Road Construction
- output
- Road Construction
- implementation status
- New
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Sirate Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 425,000
- estimate
- Ksh 250,000
Nyaguku Gravity Water Project
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Water Supply
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 411,900
- estimate
- Ksh 450,900
Riakibagendi Water Gravitation
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Water Gravitation
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Nyachichi /Kiabiraa Electricity
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 5,500,000
Nyasore-Riabore-Bondeni-Nyaigesa
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 2,500,000
Borabu Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kenyamware Health Centre
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Newest Wards
- output
- Construction Of Wards
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 4,600,000
Nyanchonoro-Nyankoba-Nyaigesa Elec
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 2,800,000
Riegechure Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 395,000
- estimate
- Ksh 430,000
Kiomakondo Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 370,000
- estimate
- Ksh 490,000
Rigoma T Constructiion
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Expansion
- output
- Expansion
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Nyambaria Water Springs
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 150,000
Bogwendo Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Toilet Construction
- output
- Toilets
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 100,000
Riabagaka Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 1,150,000
Nyamwanga Secondary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Laboratory Equipments
- output
- Equiped Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 1,054,140
Rianya Youth Group
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Environmental Conservation
- output
- Environ. Conservation
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 650,000
Riomoro primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 750,000
Gachuba Culverts
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Culvert Making
- output
- Culverts
- implementation status
- On Going
- total cost
- Ksh 317,410
- estimate
- Ksh 500,000
Riondimu/Riaroni/Riasere/Rianyati Springs
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Spring Protection
- output
- Protected Spring
- implementation status
- Complete & In Use
- total cost
- Ksh 314,000
- estimate
- Ksh 314,000
Nyakongo Springs
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 310,000
- estimate
- Ksh 400,000
Ritibo Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 550,000
Kewanda Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
Nyantaro Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,100,000
Rigena Springs
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 650,000
Metamaywa/Riabore Rural Elect
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 750,000
Mochenwa Education Office
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Education Office
- output
- Education Office
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Embaro Tea B
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction of Tea Band
- output
- Tea Band
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 560,000
Kambini/Sungututa/Iranya Elec
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Girango Secondary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kuja Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
Nyambaria primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 1,700,000
Gucha-Moturumesi-Nyagancha Ele
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 2,300,000
Nyakoba-Rigoma-Siara Elec
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 1,900,000
Gechona-Nyamwanga Bridge
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 4,000,000
Karantini Nyamakoroto Bridge
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Bridge Construction
- output
- Road Accessibility
- implementation status
- New
- total cost
- Ksh 290,000
- estimate
- Ksh 6,000,000
Mochenwa Culverts
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Installed
- output
- Culverts
- implementation status
- Ongoing
- total cost
- Ksh 272,410
- estimate
- Ksh 500,000
Ekitutu Locculverts
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Culvet Making
- output
- Culverts
- implementation status
- On Going
- total cost
- Ksh 272,410
- estimate
- Ksh 272,410
Riamaemba Bridge
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- On Going
- total cost
- Ksh 272,410
- estimate
- Ksh 272,410
Nkitutu Culverts
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Culvet Making
- output
- Culverts
- implementation status
- Complete & In Use
- total cost
- Ksh 272,410
- estimate
- Ksh 272,410
Kemera Culverts & Access
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Culverts
- output
- Newest Culverts
- implementation status
- New
- total cost
- Ksh 272,410
- estimate
- Ksh 487,312
Matangi D Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Toilet Construction
- output
- Toilets
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 200,000
Kiabiraa Water Project
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- Complete & In Use
- total cost
- Ksh 251,828
- estimate
- Ksh 251,828
Mongoni/Birongo Rural Elct
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 1,250,000
Girango Coffee Society
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- n/a
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 400,000
Mwamonari Rural Electricity
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Central Location Water Springs
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Getacho Water Gravitation
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Nyamacho/Kebirichi Rural Elect
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Provincial Admi
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2009
- action
- Construction Of Newest Office
- output
- Office
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 700,000
Riamamboleo Box Culvert
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 1,700,000
Nyabogoye Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 680,000
Kiamwarimu Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classrooms Construction
- output
- Newest Classrooms
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 700,000
Machururiati Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Toilet Construction
- output
- Modern Toilets Constructed
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 550,000
Sirate Dispensary
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Newest Dispensary
- output
- Construction
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Nyankoba/Amabuko Rural Elec
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Moromba Primary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Risa Polytechnic
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Botana Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Amaiga Dispensary
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Newest Dispensary
- output
- Newest Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,150,000
Keroka S Hospital
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction of Hospital
- output
- Hospital
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,506,456
Gesima Location Culverts
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Culvert Making
- output
- Culverts
- implementation status
- On Going
- total cost
- Ksh 222,410
- estimate
- Ksh 700,000
Central Culverts & Access
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Installation Electricity
- output
- Culverts
- implementation status
- On Going
- total cost
- Ksh 222,410
- estimate
- Ksh 250,000
Nyaigesa Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 220,000
- estimate
- Ksh 543,000
Sengereri primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 780,000
Miriri Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Clssrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Riamoni Water Springs
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Embaro Springs
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mochenwa/Nyabiosi Rural Electricity
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Wiring For Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
Mochenwa Field
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation Of Soccer Field
- output
- Soccer Field
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Embaro Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Class
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 890,000
Nyaguku Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Bonyunyu Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Emanga Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 895,000
Nyangena Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 530,000
Keboba Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Classrooms Construction
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 670,000
Esani Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Classrooms Construction
- implementation status
- Protection
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Nyagechenche Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom Construction
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 650,000
Nyabiosi Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom Construction
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 870,000
Nyaibasa Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Newest Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Nyangarora Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Newest Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Metamaywa Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Newest Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 650,000
Mongoni Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Newest Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Mochenwa Dispensary
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Constructions Of Wards
- output
- Construction Of Wards
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Nyabuya Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 670,000
Bocharia Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Rigoma Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 1,850,000
Karantini Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 2,300,000
Mochenwa primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 550,000
Nyamakoroto Dispensary
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Constructions Of Wards
- output
- Construction Of Wards
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 1,800,000
Girango-Kerongeta Elect
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 3,500,000
Kegogi Tbc
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Clean Hall
- output
- Clean Hall
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 380,000
Gesima Poly
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Extending Classrooms
- output
- Classrooms & Equipment
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 3,000,000
Ritongo Polytechni
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Extending Classrooms
- output
- Classrooms & Equipment
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 2,500,000
Mong'Oni Poly
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Extending Classrooms
- output
- Classrooms & Equipment
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 2,300,000
Gesima-Nyabuya Bridge
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 3,200,000
Nyambaria-Nyamemiso Fedder Road
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Grading,Clearing Bushes & Murraming
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Nitutu Loc chief's Camp
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Newest Office
- output
- Office
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyasore Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Electricity/Classrooms
- output
- Electricity/Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 170,000
- estimate
- Ksh 800,000
Mokorongosi Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 170,000
- estimate
- Ksh 501,828
Gachuba Nurseries
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soil Conservation
- implementation status
- New
- total cost
- Ksh 155,180
- estimate
- Ksh 125,000
Nkitutu Nurseries
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soil Conservation
- implementation status
- Ongoing
- total cost
- Ksh 155,180
- estimate
- Ksh 450,000
Kemera Tree Nursery
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Planting And Maintenance
- output
- Trees
- implementation status
- New
- total cost
- Ksh 155,180
- estimate
- Ksh 750,000
Ekitutu Nurseries
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Putting Up Tree Nursary
- output
- Tree Nursary
- implementation status
- On Going
- total cost
- Ksh 155,180
- estimate
- Ksh 790,000
Tree Nursery Gesima Location
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Putting Up Tree Nursery
- output
- Tree Nursery
- implementation status
- On Going
- total cost
- Ksh 155,180
- estimate
- Ksh 500,000
Central Kitutu Nurseries
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soil Conservation
- implementation status
- Complete & In Use
- total cost
- Ksh 155,180
- estimate
- Ksh 150,000
Nyangena Health Centre
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Constructions Of Wards
- output
- Construction Of Wards
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
Gucha Bridge
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 1,800,000
Rigoma Ds Office
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Newest Office
- output
- Office
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Kebuko Buying Centre
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Nyabuya Buying Centre
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 550,000
Riabore Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Kierira Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 295,000
Nyambogo Primary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Gekano Water Springs
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Bocharia Springs
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Girango Springs
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ekonu/Bogeka/Biticha Spring Protection
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Spring Protection
- output
- Water
- implementation status
- Complete & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nyatieno Water Springs
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 530,000
Nyankoba Springs
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Mochenwa Mkt/Embaro Rural
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 140,000
- estimate
- Ksh 1,240,000
Gianche Tbc
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction of Clean Hall
- output
- Clean Hall
- implementation status
- Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 300,000
Gechona Bridge
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 4,000,000
Nyamochorio Buying Centre
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 650,000
Gekano Mission Road
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Face Lifting
- output
- Road Accessibility
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Riorogo Water Project
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of A Water Spring
- output
- Water Accessbillity
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 550,000
Gesima Primary School
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
Nyagancha Primary School
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
Karantini Tbc
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Clean Hall
- output
- Clean Hall
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Moitunya Tbc
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Clean Hall
- output
- Clean Hall
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 700,000
Bonyunyu Polytechnic
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Extending Classrooms
- output
- Classrooms & Equipment
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
Nyachichi Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 560,000
Riogoro-Geke Road
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Grading,Clearing Bushes & Murraming
- output
- Road
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Rianyakeya
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Grading,Clearing Bushes & Murraming
- output
- Road
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Moitunya Special School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Nyamare Primary School
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction
- output
- Classrooms/Toilet
- implementation status
- Complete & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Riyabe Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Toilet Construction
- output
- Toilet
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Nyankoba Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Reconstruction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Chitago Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Moromba Coffee Society Elect
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Gesonso Coffee Society Elect
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bogwendo Water Springs
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Sirate Water Springs
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyanchonori/Nyaigesa Spring Protection
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Biticha Spring Protection
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Geteni Rural Elec
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Rianyakundi/Rianyambane Springs
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2005
- action
- Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Biticha Primary School
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Rigoma Field
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Leveling
- output
- Leveling
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Entanda Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Classroom/Toilet
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Ekerubo Primary School
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Classroom/Toilet
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 870,000
Gesima Diabetic Clinic
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Purchase Of Study Equipments
- output
- Purchase Of Study Equipments
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Nyaisa Tbc
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction of Clean Hall
- output
- Clean Hall
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kenyerere Pag Primary School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 602,000
Eronge Water Gravitation
- location
-
East Kitutu
(in Kitutu Masaba)
- year first funded
- 2004
- action
- Water Gravitation
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 93,656
- estimate
- Ksh 93,656
Esani Junction Repairs
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Repairs
- output
- Repairs
- implementation status
- On Going
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Mwabosire Springs
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 70,000
- estimate
- Ksh 500,000
Matororo Buying Centre
- location
-
Kemera
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 70,000
- estimate
- Ksh 400,000
Nyaikuro Buying Centre
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 70,000
- estimate
- Ksh 500,000
Ogango Tea Buying Centre
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 70,000
- estimate
- Ksh 570,000
Bondeka Buying Centre
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 70,000
- estimate
- Ksh 450,000
Nyabigege Tea Buying Centre
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 70,000
- estimate
- Ksh 635,000
Kiogutwa Springs
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 60,000
- estimate
- Ksh 450,000
Nyaora Tbc
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction of Clean Hall
- output
- Clean Hall
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 550,000
Eseng'Enge Tea Buying Centre
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 450,000
Matongo Tea Buying Centre
- location
-
Mochenwa
(in Kitutu Masaba)
- year first funded
- 2008
- action
- T.B.C Construction
- output
- Newest Tea Buying Centre
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Bosiango Water Pump
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2008
- action
- Construction Of A Water Pump
- output
- Water Accessbillity
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 700,000
Nyamwanga Pri, School
- location
-
North Kitutu
(in Kitutu Masaba)
- year first funded
- 2007
- action
- Construction Of Toilet
- output
- Toilets
- implementation status
- On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 700,000
Manga Field
- location
-
Central Kitutu
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soccer Field
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 380,000
Bonyunyu Soccer field
- location
-
Gachuba
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soccer Field
- implementation status
- Complete & In Use
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Ritongo Soccer Field
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soccer Field
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Riamoni Soccer Field
- location
-
Gesima
(in Kitutu Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Soccer Field
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 100,000
Nyamakoroto Primary School
- location
-
Mochenwa
(in Kitutu Masaba)
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 0
- estimate
- Ksh 239,000