The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Konoin

Kurguton Bridge

location
Kaptebengwet (in Konoin)
year first funded
2003
action
Construction
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 6,583,716
estimate
Ksh 7,300,000

Terek Girls Secondary School

location
Kiptenden (in Konoin)
year first funded
2003
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 2,850,000
estimate
Ksh 3,000,000

Koiwa Central Day Secondary School

location
Koiwa (in Konoin)
year first funded
2006
action
Construction 4 Classrooms
output
Improve Enrolment
implementation status
On-Going
total cost
Ksh 2,750,000
estimate
Ksh 3,000,000

Simoti Secondary School

location
Simoti (in Konoin)
year first funded
2003
action
Construction
output
Improve Performance
implementation status
On-Going
total cost
Ksh 2,700,000
estimate
Ksh 3,000,000

St. Monica Girls' Secondary School

location
Chebangang (in Konoin)
year first funded
2003
action
Construction of Dining Hall
output
Improve Performance
implementation status
On-Going
total cost
Ksh 2,650,000
estimate
Ksh 2,000,000

Kaptebengwet Secondary School

location
Kaptebenwget (in Konoin)
year first funded
2004
action
Construction of Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 2,500,000
estimate
Ksh 1,855,000

Chepchabas Secondary School

location
Saosa (in Konoin)
year first funded
2003
action
Construction 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 2,350,000
estimate
Ksh 3,000,000

Boito Polytechnic

location
Boito (in Konoin)
year first funded
2006
action
Construction
output
Impr. Self Reliance
implementation status
On-Going
total cost
Ksh 2,200,000
estimate
Ksh 3,000,000

Kabiangek Secondary School

location
Chemelet (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 2,170,000
estimate
Ksh 3,000,000

Kaptebengwet Water Project

location
Kaptebengwet (in Konoin)
year first funded
2003
action
Water Supply
output
Water Piping
implementation status
On-Going
total cost
Ksh 2,145,200
estimate
Ksh 9,435,000

Saseta Girls Secondary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Dormitory
output
Boarding Facility
implementation status
On-Going
total cost
Ksh 2,030,000
estimate
Ksh 3,600,000

Chepchabas Water Project

location
Saosa (in Konoin)
year first funded
2004
action
Water Supply
output
Water Piping
implementation status
On-Going
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kaptebengwet - Rerendet Road

location
Kaptebengwet (in Konoin)
year first funded
2005
action
Grading/Murraming
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Embomos Secondary School

location
Embomos (in Konoin)
year first funded
2003
action
Construction of 4 Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,950,000
estimate
Ksh 2,500,000

Divisional Headquarters

location
Cheptalal (in Konoin)
year first funded
2007
action
Div. Headquarters
output
Improve Security
implementation status
On-Going
total cost
Ksh 1,900,000
estimate
Ksh 1,546,000

Chemalal Secondary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,900,000
estimate
Ksh 3,000,000

Stbridgids Girls Secondary School

location
Chemelet (in Konoin)
year first funded
2004
action
Construction of Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,800,000
estimate
Ksh 3,000,000

Kiptenden Secondary School

location
Kiptenden (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,800,000
estimate
Ksh 2,000,000

Meswondo Secondary School

location
Cheptalal (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,800,000
estimate
Ksh 2,000,000

Ruseya Secondary School

location
Simoti (in Konoin)
year first funded
2003
action
Construction of Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,750,000
estimate
Ksh 2,000,000

Ngererit Secondary School

location
Mogogosiek (in Konoin)
year first funded
2003
action
Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,700,000
estimate
Ksh 2,500,000

Cheptabach Secondary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,650,000
estimate
Ksh 3,000,000

Ngererit Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,550,000
estimate
Ksh 1,000,000

Kaptien Secondary School

location
Kaptien (in Konoin)
year first funded
2003
action
Construction of Twin Lab
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,550,000
estimate
Ksh 2,000,000

Taboino Water Project

location
Cheptalal (in Konoin)
year first funded
2006
action
Water Supply
output
Water Piping
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 12,000,000

Satiet - Terek Road

location
Satiet (in Konoin)
year first funded
2005
action
Grading
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kapkilaibei Primary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Sotit-Cheptingting Road

location
Koiwa (in Konoin)
year first funded
2006
action
Grading / Murraming
output
Rd.Network
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Mogogosiek T/Ship Road

location
Mogogosiek (in Konoin)
year first funded
2005
action
Rd/Construction
output
Improve Transport
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Siomo Dispensary

location
Embomos (in Konoin)
year first funded
2006
action
Construction
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 1,450,000
estimate
Ksh 1,500,000

Boito Health Centre

location
Boito (in Konoin)
year first funded
2006
action
Build Health Centre
output
Improve On Health
implementation status
On-Going
total cost
Ksh 1,400,000
estimate
Ksh 1,749,150

Kaptembwo Secondary School

location
Boito (in Konoin)
year first funded
2006
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,400,000
estimate
Ksh 2,000,000

Mogonjet Secondary School

location
Mosonik (in Konoin)
year first funded
2003
action
Construction of Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,400,000
estimate
Ksh 3,000,000

Sotit Secondary School

location
Sotit (in Konoin)
year first funded
2003
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,356,400
estimate
Ksh 2,000,000

Embomos Dispensary

location
Embomos (in Konoin)
year first funded
2004
action
Construction
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 1,350,000
estimate
Ksh 1,500,000

Taboino Primary School

location
Cheptalal (in Konoin)
year first funded
2004
action
Storey Building
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,200,000
estimate
Ksh 3,000,000

Cheptalal Secondary School

location
Cheptalal (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Mogogosiek Health Centre

location
Mogogosiek (in Konoin)
year first funded
2003
action
Theatre
output
Improve Services
implementation status
Complete & In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Boito Secondary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Dining Hall
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,050,000
estimate
Ksh 2,500,000

Nyagesu - Itare Road

location
Mogogosiek (in Konoin)
year first funded
2006
action
Grading/Culverting
output
Improve Transport
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kaptegendany Crossing

location
Simoti (in Konoin)
year first funded
2005
action
Culverting
output
Improve Transport
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kitala Primary School

location
Cheptalal (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kimulot Health Centre

location
Kimulot (in Konoin)
year first funded
2006
action
Construction
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Chemelet - Roronya Road

location
Chemelet (in Konoin)
year first funded
2005
action
Grading
output
Improve Road Network
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Morit/Chemelet Road

location
Chemelet (in Konoin)
year first funded
2007
action
Grading/Culverting
output
Improve Road Network
implementation status
Complete & In Use
total cost
Ksh 996,900
estimate
Ksh 1,000,000

Satiet Dispensary

location
Satiet (in Konoin)
year first funded
2004
action
Construction
output
Improve Health
implementation status
On-Going
total cost
Ksh 950,000
estimate
Ksh 1,500,000

Kapset Secondary School

location
Kimulot (in Konoin)
year first funded
2008
action
Contruct 2 Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 0

Kibanjalal Primary School

location
Simoti (in Konoin)
year first funded
2005
action
Construction of 8 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 850,000
estimate
Ksh 2,000,000

Kamagomon Primary School

location
Kaptebengwet (in Konoin)
year first funded
2003
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Koroitik Water Project

location
Kiptenden (in Konoin)
year first funded
2005
action
Water Piping
output
Water Supply
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 1,500,000

Siomo Youth Polytechnic

location
Embomos (in Konoin)
year first funded
2004
action
Construction
output
Create Self Reliance
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 2,000,000

Ksalaat Secondary School

location
Satiet (in Konoin)
year first funded
2003
action
Construction of Laboratory
output
Improve Performance
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 2,000,000

Simoti Water Project

location
Simoti (in Konoin)
year first funded
2003
action
Water Piping
output
Supply Water
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 2,000,000

Kabomo Primary School

location
Kiptenden (in Konoin)
year first funded
2006
action
Construction of 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Chongenwo Electricity

location
Simoti (in Konoin)
year first funded
2006
action
Electricity Supply
output
Lighting
implementation status
Complete & In Use
total cost
Ksh 781,572
estimate
Ksh 781,572

Chebunye Youth Polytechnic

location
Koiwa (in Konoin)
year first funded
2003
action
Construction
output
Create Self Reliance
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Mogogosiek Township Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 1,000,000

Chepchabas Dispensary

location
Saosa (in Konoin)
year first funded
2003
action
Construction
output
Improve Health
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 3,000,000

Michira Primary School

location
Kaptebengwet (in Konoin)
year first funded
2004
action
Construction of 8 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Kirimose Primary School

location
Sotit (in Konoin)
year first funded
2003
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 1,000,000

Kapchepkap Water Project

location
Kimulot (in Konoin)
year first funded
2004
action
Water Supply
output
Water Piping
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Kebumbur Primary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 725,000
estimate
Ksh 1,000,000

Kapsebetet Primary School New

location
Chemelet (in Konoin)
year first funded
2006
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kapsir Water Project

location
Chemelet (in Konoin)
year first funded
2005
action
Water Piping
output
Water Supply
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kapchepkole Primary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Admin Block
output
Improve Services
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kipkelok Market Electricity

location
Mogogosiek (in Konoin)
year first funded
2006
action
Electrification
output
Lighting For Security
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 1,155,812

Kimori Aic Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Chebangang Electricity

location
Chebangang (in Konoin)
year first funded
2005
action
Electricity Supply
output
Improve Lighting
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 2,000,000

Beekab Arwet Primary School

location
Chebangang (in Konoin)
year first funded
2004
action
Construction of 8 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 2,000,000

Koiwa High School

location
Koiwa (in Konoin)
year first funded
2004
action
Renovation
output
Renew Buildings
implementation status
Complete & In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

St. Peter Busoreto Primary School

location
Kaptebengwet (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Kabiangek Primary School

location
Chemelet (in Konoin)
year first funded
2004
action
Construction of Admin Block
output
Improve Services
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Chorwet Primary School

location
Mosonik (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 1,500,000

Kirimose Secondary School

location
Sotit (in Konoin)
year first funded
2007
action
Construction/Desks
output
Basic Facility
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 0

Nyagesu Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction of 8 Classrooms
output
Improve On Literacy
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 2,000,000

Chepchabas Primary School

location
Saosa (in Konoin)
year first funded
2003
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Kaptebengwet Mrkt Electric

location
Kaptebengwet (in Konoin)
year first funded
2006
action
Electrification
output
Lighting For Security
implementation status
On-Going
total cost
Ksh 625,240
estimate
Ksh 986,102

Korotik - Kabomo Road

location
Cheptalal (in Konoin)
year first funded
2006
action
Grading /Culverting
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Kugerwet Primary School

location
Satiet (in Konoin)
year first funded
2003
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Kimaech Primary School

location
Kiptenden (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Chorwet Primary School Electricity

location
Mosonik (in Konoin)
year first funded
2007
action
Electrification
output
Lighting For Security
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 845,654

Chepkochun Secondary School

location
Mosonik (in Konoin)
year first funded
2007
action
Construction of 1 Classroom
output
Start A New School
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 4,510,740

Kaproret Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Tabaita Primary School

location
Koiwa (in Konoin)
year first funded
2006
action
Construction 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Meswondo Primary School

location
Cheptalal (in Konoin)
year first funded
2005
action
Construction of 6 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Siomo /Sugutek Road

location
Cheptalal (in Konoin)
year first funded
2006
action
Grading /Culverting
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Ndalelai Primary School

location
Cheptalal (in Konoin)
year first funded
2007
action
Construction of 6 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,022,000

Talalga Primary School

location
Embomos (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Rerendet Primary School

location
Simoti (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Koiwa Primary School

location
Koiwa (in Konoin)
year first funded
2004
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Cheptingting Primary School

location
Koiwa (in Konoin)
year first funded
2003
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Koiwa Water Project

location
Koiwa (in Konoin)
year first funded
2004
action
Water Supply
output
Water Piping
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 2,000,000

Kaboisio Nursery School

location
Saosa (in Konoin)
year first funded
2006
action
Construction 8 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 2,000,000

Aregeriot Primary School

location
Satiet (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Kobor Primary School

location
Embomos (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Sugutek Primary School

location
Embomos (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Mugenyi Primary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Kiptenden Primary School

location
Kiptenden (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Cheptabach Primary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Muramet Primary School

location
Satiet (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kapset Health Centre

location
Kimulot (in Konoin)
year first funded
2004
action
Construction
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Mogonjet Electricity

location
Mosonik (in Konoin)
year first funded
2005
action
Electricty Supply
output
Improve Lighting
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Chemelet Water Project

location
Chemelet (in Konoin)
year first funded
2005
action
Water Piping
output
Water Supply
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 700,000

Chemaan Primary School

location
Boito (in Konoin)
year first funded
2007
action
Construction of 8 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Kipraisi Primary School

location
Boito (in Konoin)
year first funded
2003
action
Construction of 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Terek Girls Road

location
Kiptenden (in Konoin)
year first funded
2005
action
Grading
output
Impr. Road Network
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Koroitik Primary School electricity

location
Kiptenden (in Konoin)
year first funded
2008
action
Electricity Supply
output
Improve Lighting
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 4,564,600

Koroitik Primary School

location
Kiptenden (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Simoti Social Hall

location
Simoti (in Konoin)
year first funded
2006
action
Construction of Social Hall
output
Recreation
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,212,000

Lebekyet Primary School

location
Simoti (in Konoin)
year first funded
2006
action
Construction of Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chongenwo Primary School

location
Simoti (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Sotit Primary School

location
Sotit (in Konoin)
year first funded
2004
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Embomos Primary School

location
Embomos (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chebugen Primary School

location
Embomos (in Konoin)
year first funded
2003
action
Adm'N Block
output
Improve Services
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 650,000

Taarut Primary School

location
Embomos (in Konoin)
year first funded
2004
action
Construction of 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kimulot Primary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Cheptalal- Tarkambei Road

location
Cheptalal (in Konoin)
year first funded
2007
action
Grading/Gravelling
output
Rd. Network
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Bosto Primary School

location
Satiet (in Konoin)
year first funded
2004
action
Construction of Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Siomo Primary School

location
Embomos (in Konoin)
year first funded
2004
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Komirmir Primary School

location
Satiet (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Cheptalal Primary School

location
Cheptalal (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Seanin Primary School

location
Koiwa (in Konoin)
year first funded
2004
action
Construction 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Koiwa Health Centre

location
Koiwa (in Konoin)
year first funded
2003
action
Renovation/Water
output
Improve Health
implementation status
Complete & In Use
total cost
Ksh 450,000
estimate
Ksh 450,000

Kenyagoro Primary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Kaptembwo Dispensary

location
Boito (in Konoin)
year first funded
2003
action
Construction
output
Impr. Health Services
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 700,000

Kapset Primary School

location
Kimulot (in Konoin)
year first funded
2005
action
Construction of 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Siomo Secondary School

location
Embomos (in Konoin)
year first funded
2009
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Chebangang Primary School

location
Chebangang (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Saseta Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Ruseya - Kibanjalal Road

location
Koiwa (in Konoin)
year first funded
2008
action
Grading/Gravelling
output
Rd.Network
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Satiet Primary School

location
Satiet (in Konoin)
year first funded
2005
action
Construction of Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Itare Dispensary

location
Kaptebenwget (in Konoin)
year first funded
2006
action
Construction
output
Improve Heath
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kapsengere Primary School

location
Chebangang (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Nyoikeno Primary School

location
Chebangang (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Koitalel Primary School

location
Kaptien (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kimulot Secondary School

location
Kimulot (in Konoin)
year first funded
2005
action
Renovation
output
Renew Buildings
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Sinendoik Primary School

location
Kiptenden (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kenyagoro Dispensary

location
Boito (in Konoin)
year first funded
2003
action
Construction
output
Impr. Health Services
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 700,000

Kapsir Primary School

location
Chemelet (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Chepkochun Primary School

location
Mosonik (in Konoin)
year first funded
2003
action
Construction of 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Chepkochun Nursery

location
Mosonik (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Sangwa Primary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Kaptebengwet Primary School

location
Kaptebenwget (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Ketik Somok Primary School

location
Simoti (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Kapsiratet Nursery School

location
Boito (in Konoin)
year first funded
2004
action
Construction of 2 Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 600,000

Sitonik Primary School

location
Kiptenden (in Konoin)
year first funded
2005
action
Construction of 3 Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Kibitgoi Primary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,000,000

Besiobei Primary School

location
Kaptebengwet (in Konoin)
year first funded
2005
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Bosto Tourism Camp

location
Satiet (in Konoin)
year first funded
2008
action
Fence Camp
output
Boost Tourism
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 6,000,000

Kobel Primary School

location
Cheptalal (in Konoin)
year first funded
2007
action
Purchase Land
output
Start A School
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 2,000,000

Roads And Footbridge

location
Saosa (in Konoin)
year first funded
2005
action
Construction
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Koiwa Social Hall

location
Koiwa (in Konoin)
year first funded
2005
action
Construction
output
Recreation
implementation status
Stalled
total cost
Ksh 300,000
estimate
Ksh 1,300,000

N/Chebelion Primary School

location
Koiwa (in Konoin)
year first funded
2004
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kapken Primary School

location
Koiwa (in Konoin)
year first funded
2003
action
Construction Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chief's Office - Simoti

location
Simoti (in Konoin)
year first funded
2006
action
Construction of Chief'S Office
output
Improve Security
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 870,000

Ruseya Primary School

location
Simoti (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Mogogosiek Social Hall

location
Mogogosiek (in Konoin)
year first funded
2005
action
Construction
output
Recreation
implementation status
Destroyed/ Violence
total cost
Ksh 300,000
estimate
Ksh 300,000

Kipkelok Primary School

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction of 1 Classroom
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kaptembwo Primary School

location
Boito (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Boito Primary School

location
Boito (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chemalal Primary School

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kaptien Primary School

location
Kaptien (in Konoin)
year first funded
2005
action
Construction of 3 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Cheibei Primary School

location
Kaptebenwget (in Konoin)
year first funded
2006
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Sugutek Riverside Bridge

location
Embomos (in Konoin)
year first funded
2008
action
Construt Bridge
output
Ease Transport
implementation status
Complete& In Use
total cost
Ksh 270,000
estimate
Ksh 349,000

Kimarwandi Primary School

location
Sotit (in Konoin)
year first funded
2003
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Boito Tea B/Centres

location
Boito (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 400,000

Boito Rural Electricity

location
Boito (in Konoin)
year first funded
2004
action
Electricity Supply
output
Improve Lighting
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 500,000

Chebaibai Nursery School

location
Saosa (in Konoin)
year first funded
2006
action
Construction 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 600,000

Kimugul Nursery School

location
Cheptalal (in Konoin)
year first funded
2007
action
Construction of Classrooms
output
Increase Enrolment
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 921,954

Chepkoin Nursery School

location
Mogogosiek (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Kibirir Nursery School

location
Mogogosiek (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Cheptalal Water Project

location
Cheptalal (in Konoin)
year first funded
2003
action
Water Supply
output
Water Piping
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Bosto Health Centre

location
Satiet (in Konoin)
year first funded
2006
action
Construction
output
Improve Health
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 900,000

Tuiyobei Primary School

location
Kaptebengwet (in Konoin)
year first funded
2006
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Bemiat Nursery

location
Chebangang (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Chebangang Health Centre

location
Chebangang (in Konoin)
year first funded
2004
action
Renovation
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Emmanuel Boys Primary School

location
Embomos (in Konoin)
year first funded
2005
action
Construction 4 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiptenden B/Nursery

location
Kimulot (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Kapkilaibei Seconary School

location
Kimulot (in Konoin)
year first funded
2009
action
Lockers, Books, Lab. Mat.
output
Improve Performance
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kimulot Ecd Centre

location
Kimulot (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On- Going
total cost
Ksh 200,000
estimate
Ksh 0

Terek Primary School

location
Kiptenden (in Konoin)
year first funded
2006
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiptenden Chief's Office

location
Kiptenden (in Konoin)
year first funded
2003
action
Chief'S Office
output
Improve Security
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 300,000

Kiptenden Health Centre

location
Kiptenden (in Konoin)
year first funded
2006
action
Construction
output
Impr. Health Services
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Kipraisi Water Project

location
Boito (in Konoin)
year first funded
2004
action
Water Piping
output
Water Supply
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Mogonjet Primary School

location
Mosonik (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Mosonik Dispensary

location
Mosonik (in Konoin)
year first funded
2006
action
Construction
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Chepkok Nursery

location
Chebangang (in Konoin)
year first funded
2004
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 600,000

Cheptalal Hospital

location
Cheptalal (in Konoin)
year first funded
2003
action
Renovation
output
Improve Health
implementation status
Complete & In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Chemosoren Cattle Dip

location
Simoti (in Konoin)
year first funded
2004
action
Renovation
output
Increase Agr.Production
implementation status
Complete & In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Saseta Small Home

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Assist Orphans
implementation status
Complete & In Use
total cost
Ksh 150,000
estimate
Ksh 500,000

Chebwongo Nursery

location
Kimulot (in Konoin)
year first funded
2004
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 0

Kebumbur Tbc Road Works

location
Boito (in Konoin)
year first funded
2007
action
Repairs
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 144,000
estimate
Ksh 144,000

Chongenwo - Kiptemenio Bridge

location
Simoti (in Konoin)
year first funded
2008
action
Construction of Bridge
output
Improve Transport
implementation status
Ongoing
total cost
Ksh 120,000
estimate
Ksh 1,165,237

Chepkoin Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2003
action
Collection Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 115,000
estimate
Ksh 250,000

Embomos Nursery

location
Embomos (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 500,000

Boito Chief's Office

location
Boito (in Konoin)
year first funded
2007
action
Build Office
output
Improve Services
implementation status
Starting
total cost
Ksh 100,000
estimate
Ksh 0

Chorwet Nursery School

location
Mosonik (in Konoin)
year first funded
2008
action
n/a
output
-
implementation status
-
total cost
Ksh 100,000
estimate
Ksh 0

Kaptebengwo Nursery

location
Chemelet (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Kabiangek Dispensary

location
Chemelet (in Konoin)
year first funded
2007
action
Completion Of Dispensary
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Kipraisi Nursery School

location
Boito (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 404,000

Kapkinara Nursery School

location
Mosonik (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 469,160

Simotwet New Pre School

location
Kiptenden (in Konoin)
year first funded
2007
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 1,137,935

Talalga Nursery School

location
Embomos (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Kababai Nursery

location
Embomos (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Kapsinendet Dispensary

location
Kimulot (in Konoin)
year first funded
2003
action
Construction
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 1,000,000

Serombe Nursery

location
Kimulot (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 600,000

D's Office - Kimulot

location
Kimulot (in Konoin)
year first funded
2006
action
Foundation Laying
output
Improve Security
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 300,000

Chepchirik Ecd Centre

location
Kimulot (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On- Going
total cost
Ksh 100,000
estimate
Ksh 0

Kapcheptuenik Ecd

location
Kimulot (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
Starting
total cost
Ksh 100,000
estimate
Ksh 948,650

Mogogosiek Baby Home

location
Mogogosiek (in Konoin)
year first funded
2005
action
Plastering
output
Assist Orphans
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kapletyo Pre School

location
Mogogosiek (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 1,137,935

Mogogosiek T/Ship Ecd Centre

location
Mogogosiek (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 0

Ainabkoi Nursery Ecd

location
Simoti (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Transport
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 907,480

Ainab Berik Cattle Dip

location
Koiwa (in Konoin)
year first funded
2004
action
Construction
output
Imp. Agr. Production
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 300,000

Koiwa Street Lights

location
Koiwa (in Konoin)
year first funded
2004
action
Power Supply
output
Improve On Lighting
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 500,000

Soet Foot Bridge

location
Saosa (in Konoin)
year first funded
2006
action
Foot Bridge
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kitala / Kimarwandi Bridge

location
Cheptalal (in Konoin)
year first funded
2008
action
Construction
output
Ease Transport
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Kipsigirio Pre School

location
Satiet (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 1,112,070

Kipsinende Nursery School

location
Satiet (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 1,137,935

Chelolongbei Pre School

location
Satiet (in Konoin)
year first funded
2008
action
Construction
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 907,480

Chebangang Water Project

location
Chebangang (in Konoin)
year first funded
2004
action
Water Supply
output
Water Piping
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 3,000,000

Saptet Nursery

location
Chebangang (in Konoin)
year first funded
2006
action
Construction of 2 Classes
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Kapkeronjo Nursery

location
Chebangang (in Konoin)
year first funded
2006
action
Construction of 2 Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Murguiywet Nurser

location
Chebangang (in Konoin)
year first funded
2008
action
Construction of Classrooms
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 771,500

Konoita Ecd Centre

location
Sotit (in Konoin)
year first funded
2008
action
Construction of 1 Classroom
output
Increase Enrolment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

Kiptui Bailey Bridge

location
Chebangang (in Konoin)
year first funded
2007
action
Foot Bridge
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 89,700
estimate
Ksh 116,000

Kiptenden Tea B/Centre

location
Kiptenden (in Konoin)
year first funded
2003
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 85,000
estimate
Ksh 100,000

Sotit Dispensary

location
Sotit (in Konoin)
year first funded
2009
action
Completion Of Dispensary
output
Improve Health Services
implementation status
On-Going
total cost
Ksh 70,000
estimate
Ksh 0

Tea Buying Centres

location
Sotit (in Konoin)
year first funded
2004
action
Renovation
output
Improve Tea Quality
implementation status
Complete & In Use
total cost
Ksh 60,000
estimate
Ksh 60,000

Three Tea Buying Centres

location
Saosa (in Konoin)
year first funded
2004
action
Renovation
output
Improve Tea Quality
implementation status
Complete & In Use
total cost
Ksh 60,000
estimate
Ksh 60,000

Two Tea B/Centres

location
Saosa (in Konoin)
year first funded
2005
action
Renovation
output
Improve Tea Quality
implementation status
Complete & In Use
total cost
Ksh 60,000
estimate
Ksh 60,000

Serombe Tea B/Centre

location
Kimulot (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 60,000
estimate
Ksh 1,000,000

Chemalal Tea B/Centre

location
Kimulot (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 60,000
estimate
Ksh 100,000

Kapsebetet - Kapkoros

location
Chemelet (in Konoin)
year first funded
2008
action
Construction
output
Ease Transport
implementation status
New
total cost
Ksh 56,300
estimate
Ksh 56,300

Kirimose - Kamogomon Bridge

location
Sotit (in Konoin)
year first funded
2007
action
Construction
output
Improve Transport
implementation status
On-Going
total cost
Ksh 55,000
estimate
Ksh 0

Mogonjet Tbc

location
Mosonik (in Konoin)
year first funded
2005
action
Renovation
output
Improve Tea Quality
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Mogonjet Cattle Dip

location
Mosonik (in Konoin)
year first funded
2003
action
Construction
output
Improve Agr. Production
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Aregeriot Tea B/Centre

location
Satiet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Kapsengere / Kapkeronjo Group

location
Chebangang (in Konoin)
year first funded
2008
action
Roads & Bridges
output
Ease Transport
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 0

Kabomo Tea B/Centre

location
Kiptenden (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Kombero Bridge Project

location
Boito (in Konoin)
year first funded
2007
action
Build Footbridge
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Tengecha - Koroitik Bridge

location
Simoti (in Konoin)
year first funded
2008
action
Construction of Bridge
output
Improve Transport
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Chepchabas Bridge

location
Saosa (in Konoin)
year first funded
2007
action
Foot Bridge
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 62,140

Taboino Tea B/Centre

location
Cheptalal (in Konoin)
year first funded
2003
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 200,000

Koitalel Tea B/Cente

location
Cheptalal (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 200,000

Kipsigirio Tea B/Centre

location
Satiet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Chelolongbei Tea B/ Centre

location
Satiet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Kugerwet Tea B/Centre

location
Satiet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Komirmir Tea B/Centre

location
Satiet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 100,000

Kiptemenio Tea B/Centre

location
Mosonik (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 45,000
estimate
Ksh 100,000

Sach Angwan Tbc

location
Mosonik (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 45,000
estimate
Ksh 100,000

Chepkochun Tbc

location
Mosonik (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 45,000
estimate
Ksh 100,000

Muriasi Footbridge

location
Boito (in Konoin)
year first funded
2007
action
Build Footbridge
output
Ease Transport
implementation status
Complete & In Use
total cost
Ksh 40,000
estimate
Ksh 40,000

Mutereriet Tea B/Centre

location
Mogogosiek (in Konoin)
year first funded
2005
action
Construction
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Kibaraa Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Murguiywet Tea B/Centre

location
Chebangang (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Kapsengere Tea B/Centre

location
Chebangang (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Nyoikeno Tea B/Centre

location
Chebangang (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Chepkok Tea B/Cente

location
Chebangang (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Kiptui Tea B/Centre

location
Chebangang (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Kimulot Tea B/Centre

location
Kimulot (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 1,000,000

Kibitgoi Tea B/Centre

location
Kimulot (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 1,000,000

Kiptenden Tea B/Centre

location
Kimulot (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Mindaet Tea B/Centre

location
Embomos (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kapkinara Tbc

location
Mosonik (in Konoin)
year first funded
2005
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Simotwet Tea B/Centre

location
Chemelet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kabiangek Tea B/Centre

location
Chemelet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Chemelet Tea B/Centre

location
Chemelet (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kimuta Tea B/Centre

location
Kiptenden (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Mangoita Tea B/Centre

location
Kiptenden (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Cheptuiyet Tea B/Centre

location
Kiptenden (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kapkemo Tea B/Centre

location
Kiptenden (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kipreres Tea B/Centre

location
Embomos (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kobor Tea B/Centre

location
Embomos (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Sanet Tea B/Centre

location
Embomos (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Tendwet Tea B/Centre

location
Embomos (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Koiba Saram Tea B/ Centre

location
Koiwa (in Konoin)
year first funded
2004
action
Construction of Tea B/Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Kapnongo Tea B/Centre

location
Koiwa (in Konoin)
year first funded
2004
action
Construction of Tea B/Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Kiprono Koskei Tea B/Centre

location
Cheptalal (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Chebarus Tea B/Centre

location
Cheptalal (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Nyaldit Tea Buying Centre

location
Cheptalal (in Konoin)
year first funded
2005
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Etwe Tea Buying Centre

location
Cheptalal (in Konoin)
year first funded
2005
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Kimugul Tbc

location
Cheptalal (in Konoin)
year first funded
2006
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Sewerwerik Tea B/Centre

location
Embomos (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Lesie Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Lebekyet Tea Buying Centre

location
Simoti (in Konoin)
year first funded
2004
action
Collection Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kaptegendany Tea B/Centre

location
Simoti (in Konoin)
year first funded
2004
action
Collection Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Chongenwo/Saptet Tbc

location
Simoti (in Konoin)
year first funded
2004
action
Collection Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 100,000

Kelonget Tea Buying Centre

location
Koiwa (in Konoin)
year first funded
2004
action
Construction of Tea B/Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Arong Tea Buying Centre

location
Koiwa (in Konoin)
year first funded
2004
action
Construction of Tea B/Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Kapken Tea Buying Centre

location
Koiwa (in Konoin)
year first funded
2004
action
Construction of Tea B/Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 25,000
estimate
Ksh 200,000

Ngererit Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction of Toilet
output
Improve On Health
implementation status
Complete & In Use
total cost
Ksh 20,000
estimate
Ksh 20,000

Kiptunoi Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2004
action
Plastering
output
Improve Tea Quality
implementation status
Complete & In Use
total cost
Ksh 20,000
estimate
Ksh 100,000

Rerendet Tea Buying Centre

location
Simoti (in Konoin)
year first funded
2004
action
Renovation
output
Improve Tea Quality
implementation status
Complete & In Use
total cost
Ksh 20,000
estimate
Ksh 20,000

Tegat Tbc

location
Embomos (in Konoin)
year first funded
2007
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 20,000
estimate
Ksh 0

Chepkesio Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 20,000
estimate
Ksh 100,000

Kipkelok Tea Buying Centre

location
Mogogosiek (in Konoin)
year first funded
2004
action
Construction
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 20,000
estimate
Ksh 100,000

Kamugeno Tbc

location
Mosonik (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 20,000
estimate
Ksh 100,000

Kabindoto Tbc

location
Mosonik (in Konoin)
year first funded
2004
action
Buying Centre
output
Improve Tea Quality
implementation status
On-Going
total cost
Ksh 20,000
estimate
Ksh 100,000