The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Sirikwa Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Plastering Of 4 Classrooms
- output
- Complete 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 2,030,000
- estimate
- Ksh 0
Silibwet Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Roofing & Plastering Of A Laboratory
- output
- Complete Laboratory
- implementation status
- OnGoing
- total cost
- Ksh 1,950,000
- estimate
- Ksh 0
Koige Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- New
- total cost
- Ksh 1,560,000
- estimate
- Ksh 0
Tendwet Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Roofing & Plastering Of A Laboratory
- output
- Complete Laboratory
- implementation status
- On-Going
- total cost
- Ksh 1,170,000
- estimate
- Ksh 0
Kapkwen Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 8 Classrooms
- output
- 8 Complete Classrooms
- implementation status
- Done To Skeleton Level
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Kamwaura Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Chorwa Kibaraa Bri
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Permanent Bridge
- output
- Bridge To Connect The Two Ridges
- implementation status
- OnGoing
- total cost
- Ksh 1,026,521
- estimate
- Ksh 0
Ndabibit Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Purchase Of School Land,Construction Of 3 Classrooms Roofing & Plastering Of A Classroom
- output
- Additional School Land,3 Classrooms
- implementation status
- Land Purchased,Classrooms OnGoing
- total cost
- Ksh 1,020,000
- estimate
- Ksh 0
Kiptagich Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Completion Of 4 Classrooms And An Admin Block
- output
- Completion Of 4 Classrooms And An Admin Block
- implementation status
- OnGoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
KeringetTown Road
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Filling Pothholes &Drainage
- output
- To Be Passable In All Weather
- implementation status
- Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Mau Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Completion Of Classrooms
- implementation status
- OnGoing
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kiptaragon Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms Purchase Of 1 Acre Land
- output
- Complete A Classroom
- implementation status
- Completed
- total cost
- Ksh 920,000
- estimate
- Ksh 0
Kirandich Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of 4 New Permanent Classrooms
- output
- 4 Complete Classrooms
- implementation status
- 2 Classrooms Completed,2 Others Awaiting Plastering
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Chemaner Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of Four Classrooms
- output
- Completion Of A Classroom
- implementation status
- Almost CompletedPlastering &Painting Outstanding
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Teta Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Contstruction Of 3 Permanent Classrooms
- output
- To Provide Conducive Environment For Learning
- implementation status
- OnGoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
SasumuaKamwaura Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Grading Of A Road
- output
- Hastened Communication Between The Two Ridges
- implementation status
- OnGoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Saptet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of 2 New Classroom
- output
- 2 Completion Of Classrooms
- implementation status
- Completed
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Tuiyobei Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- 2 Complete Classrooms
- implementation status
- To Skeleton Level
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Mkulima Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- already in use
- total cost
- Ksh 820,000
- estimate
- Ksh 0
Simotwet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Roofing & Plastering Of 2 Classroooms
- output
- 2 Complete Classroom
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Seanin Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Plastering, Ceiling &Painting Of 2 Classrooms
- output
- 2 Complete Classrooms
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kaplelach Primary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Construction Of A Classrooms
- output
- Completion Of A Classroom
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kiptagich Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of A New Maternity Wing
- output
- Bring Services Closer For Expectant Mothers
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Mwangate Primary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Contstruction Of 4 Permanent Classrooms
- output
- To Provide Conducive Environment For Learning
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Cheptebes Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 3 Class
- output
- 3 Complete Classrooms
- implementation status
- Partially Complete. OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Seger Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- 3 Complete A Classrooms
- implementation status
- 3 Classrooms Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kapngorot Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- New
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Ambusket Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Completion Of 2 Classrooms
- implementation status
- Completed
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Arorwet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of 3 Permanent Classrooms
- output
- 3 Permanent Classrooms
- implementation status
- OnGoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kongoi Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kaplamai Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Complete 2 Classrooms
- implementation status
- Completed
- total cost
- Ksh 720,000
- estimate
- Ksh 0
Keringet Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Complete A Classroom
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kapkores Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 2 New Classrooms & An Administration Block
- output
- Completetion Of The Same
- implementation status
- OnGoingDone To Skeleton Level
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Nyota Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Contstruction Of 4 Permanent Classrooms
- output
- Provide Ample Space For Learning
- implementation status
- OnGoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Bandiat Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of a Classroom
- output
- Complete A Classroom
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Chemaner Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Sinendet - Irongo Road
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Grading & Gravelling Of The Road
- output
- Hastene Communication Between The Two Ridges
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Irongo Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of Two New Classrooms
- output
- Completion Of Two New Classrooms
- implementation status
- Skeleton Structure Completed
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Bondet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of Three Classrooms
- output
- 3 Complete Classrooms
- implementation status
- OnGoindNeeds Plastering,Windows,Doors And Painting
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Cheptuech Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Plastering Of 3 Classrooms
- output
- Clean And Conducive Rooms For Learning
- implementation status
- Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ainamoi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Partfunding For Completion Of Three Classrooms
- output
- To Provide Conducive Environment For Learning
- implementation status
- OnGoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Keringet Estate Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A New Administration Block
- output
- To Free Classrooms Currently Being Utilised As Staff Room
- implementation status
- Skeketon Building Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 0
TinetKapkembu Road
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Grading Of A New Road
- output
- To Hasten Communication Between Kapkembu & Keringet
- implementation status
- 3Kms Done
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Emitik Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- 3 Complete Classrooms
- implementation status
- Partially Complete. OnGoing
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Korabariet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of 1 Permanent Classroom
- output
- 1 Classroom
- implementation status
- Work Yet To Begin
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kibaraa Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Refurbishment Of SemiPermanent Classrooms
- output
- To Provide Clean & Condusive Classrooms For Learning
- implementation status
- Successful Implemente
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Geticha Primary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Constructions Of 2 Classrooms
- output
- Complete 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Temyotta -Chemaner Road
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Grading Of A New Road
- output
- Connect Chepkinoiyo And Githiriga
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Emitik Girls Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of Dining Hall
- output
- Complete Dining Hall
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
KiptagichTimbwalo Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Grading Of A New Road
- output
- Hastened Communication Between 3 Locations
- implementation status
- Temporarily Stalled Due To Misunderstanding Between Contractor And Pmc. Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiptaragon Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- 2 Complete Classrooms
- implementation status
- Almost Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chesirikwa Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- 3 Complete Classrooms
- implementation status
- Partly Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kapkeet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of 2 New Classroom
- output
- Completion Of 2 A New Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
ChebaraaKapkeet Kiptagich Road
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chebaraa Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Equiping The Dispensary With Medical Facilities
- output
- To Access Good & Quality Medical Facilities
- implementation status
- Successfully Implemented
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ribot Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- 3 Complete Classrooms
- implementation status
- OnGoingSkeleton Structure Done
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sitoito Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Refurbishment Of An Old Building & Building Of 2 New Classromms
- output
- 2 Complete Classrooms
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Silibwet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- 3 Complete Classrooms
- implementation status
- OnGoingSkeleton Structure Done
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Set KoborMengit Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Grading Of A New Road
- output
- Hastened Communication Between The Two Areas
- implementation status
- Work Yet To Begin
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Tinet Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Plastering & Painting Of 3 Rooms
- output
- Complete The 3 Rooms
- implementation status
- OnGoing
- total cost
- Ksh 470,000
- estimate
- Ksh 0
Tulwet Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A New Dispensary
- output
- To Acess Good & Quality Medical Facilities
- implementation status
- New
- total cost
- Ksh 470,000
- estimate
- Ksh 0
Tegat Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of An Administration Block
- output
- Completed Administration Block
- implementation status
- Partly Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Silibwet Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of A Laboratory
- output
- To Access Good & Quality Medical Facilities
- implementation status
- New
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Tabain Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 New Classroom
- output
- Completion Of 1 New Classroom
- implementation status
- Partially Completed. OnGoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kitoben Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of A Library
- output
- Store For Books & Reading Room
- implementation status
- Partly Completed. OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Barao Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of New Classrooms
- output
- Completion Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Cheptagum Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Builiding Of A New Classroom
- output
- 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mukeu Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of 2 New Classrooms
- output
- 2 Complete Classrooms
- implementation status
- 1 Classroom Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Lelaitich Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kamwaura Bridge
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Lemechonik Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Sitoton Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Skeleton Structure Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mawingu Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 1 Classroom
- output
- Completion Of 1 Classroom
- implementation status
- Kshs 150000 Of Materials Have Been Bought.
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mkulima Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Building Of 2 Classrooms
- output
- 2 New Classrooms
- implementation status
- One Class Finished.
- total cost
- Ksh 400,000
- estimate
- Ksh 0
CentralKamwingi Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of Foot Bridge
- output
- Hastened Communication Between The Two Areas
- implementation status
- Successfully Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Tiloa Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of 1 Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Chepnyalilo Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 3 Classroom & 1 Staffroom
- output
- Clean & Condusive Rooms For Learning & Administration.
- implementation status
- Skeleton Structure. OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Seguton Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Completion Of 2 Classrooms
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Olenguruone Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Refurbishment Of 6 Classrooms
- output
- Clean And Conducive Rooms For Learning &Administration
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kipsinendet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Completion Of 1 Classroom
- implementation status
- Partly Completed. OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kipsinendet Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A New Classroom
- output
- Completion Of A Classroom
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Chepakundi Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A New Maternity Wing
- output
- Bring Services Closer For Expectant Mothers
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Tulwet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 New Classroom
- output
- 1 Classroom
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
KeringetBararget Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Grading Of A New Road
- output
- Hastened Communication Between The 2 Locations
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Tarakwa Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kipkewa Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Payment For Bursary To Needy Students & Ophants
- output
- -
- implementation status
- not known
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Chorwa Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Upendo Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kamara Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Part Funding For A Maternity Wing
- output
- Bring Services Closer For Expectant Mothers
- implementation status
- Work
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Soymet - Chebaraa Road Culvert
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Road Grading & Installation Of Culverts
- output
- To Hasten Comminication Between The Two Ridges
- implementation status
- On - Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kio Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Plastering Of A Administration Block
- output
- Completion Of A Administration Block
- implementation status
- OnGoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
KabuchoSaino Road
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Filling Pothholes &Drainage
- output
- To Be Passable In All Weather
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Olenguruone Town - Kiptenden Bridge
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- Ease Of Communication
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
KiptagichTembwalo Bri
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A Permanent Bridge
- output
- Hastened Communication Between The Two Ridges
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kaplamai Health Centre
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Contstruction Of A Dispensary
- output
- To Access Good & Quality Medical Facilities
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Bararget Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Contstruction Of 2 Permanent Classrooms
- output
- Partly Completed
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kaplelach - Mosop Culverts
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of Culverts
- output
- To Hasten Comminication Between The Two Ridges
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Tirigoi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 2 New Classrooms
- output
- Completion Of 2 New Classrooms
- implementation status
- 2 Skeleton Structures Done
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lelaitich Kamwaura Bri
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Completion Of Bridge
- output
- Hastened Communication Between The Two Ridges
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
ChepkinoiyoGithiriga Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of A Foot Bridge
- output
- Hastened Communication Between The Two Ridges
- implementation status
- Some Materials Purchased
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Banana Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Successfully Implemented
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Boron Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Starting A New School & Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Successfully Implemented
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chepkoburot Primary School
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Construction Of 1 Permanent Classroom
- output
- Completion Of A 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ndoinet Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Plastering & Painting Of 3 Rooms
- output
- Access Good & Quality Medical Facilities
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Tangi Nursery School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Completion Of 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
GacharageUSolRoad
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Opening Of A New Road Needs Heavy Grading
- output
- Hastened Communication Between The Location
- implementation status
- Successfully Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Arimi - Chebonde Kiptenden Road
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Grading Of A New Road
- output
- Hastened Communication Between The 2 Location
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Matunda - Chemaner Road
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Grading Of A Road
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tendwet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of A New Classroom
- output
- 1 Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kapkoi Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of A New Dispensary
- output
- To Access Good & Quality Medical Facilities
- implementation status
- Starting Soon
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Sigowet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Longet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Nukiat Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Lelaitich Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kabigeriet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kaplamboi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Haraka Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 New Classroom
- output
- Completion Of 1 New Classroom
- implementation status
- Partially Completed. OnGoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tiriyta - Kures Bridge
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- To Facilitate Communication Between The Two Ridges
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Cheptuech Secondary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of Dining Hall
- output
- Complete Dining Hall
- implementation status
- New
- total cost
- Ksh 220,000
- estimate
- Ksh 0
Kongoi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Saino Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Permanent Classroom
- output
- Completion Of A 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kures Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Renovation Of 9 Temporary Classrooms
- output
- Clean &Conducive Classrooms For Learning
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chemare Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of A Permanent Admin. Block
- output
- To Enable Teachers Get Condusive Seating Place
- implementation status
- Successful Implemente
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ndoinet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 1 Wooden Classroom,1 Wooden Admin Block,Roofing &Painting Of 4 Classrooms
- output
- Clean And Conducive Rooms For Learning &Administration
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapsongop Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of SemiPermanent Staff Houses
- output
- To Provide Housing For Teachers
- implementation status
- Successful Implemente
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kipkoris Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- 2 Complete Classrooms
- implementation status
- Plastering Of Walls,Floor Remaining.
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiplongony Primary School
- location
-
(in Kuresoi)
- year first funded
- 2003
- action
- Construction Of A Laboratory
- output
- Complete Laboratory
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Taragonik Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Starting Soon
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kio Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiptororo Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Permanent Classroom
- output
- Completion Of A 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Keringet Health Centre
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Building Of A New Maternity Wing
- output
- Bring Services Closer For Expectant Mothers
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Langwenda Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mwahe Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Molo Sdispensary
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Refurshment Of An Old Building
- output
- Access Good & Quality Medical Facilities
- implementation status
- Experience Financial Problems Due To Overlapping Of Funds
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kewamoi Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of 3 Rooms - Diagnosis, Dressing /Injection & Store
- output
- Access To Good Medical Services
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
MasaitaMwahe Road
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Road Grading & Installation Of Culverts
- output
- To Hasten Comminication Between The Two Ridges
- implementation status
- Successfully Implemented
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tinet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Plastering & Painting Of 4 Classrooms Previously Funded By Barclays Bank Of Kenya Ltd
- output
- To Provide Conducive Environment For Learning
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Cherokyet Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A New Classroom
- output
- Completion Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Timbwalo Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of New Classroom
- output
- Completed Of A Classroom
- implementation status
- Partly Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Korao Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 New Classroom
- output
- Completion Of A New Classroom
- implementation status
- Starting Soon
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapkoi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 New Classroom
- output
- Completion Of 1 New Classroom
- implementation status
- Work Yet To Begin
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kimororoch Primary School
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Construction Of 1New Classroom
- output
- Complete Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ogiek Primary School
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Construction Of 1New Classroom
- output
- Complete Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Korao Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Plastering & Painting Of 3 Rooms
- output
- Complete The 3 Rooms
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
KondametSotiki Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Grading Of A New Road
- output
- To Hasten Communication Between Sotiki & Main Road
- implementation status
- 4 Kms Graded
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sasumua Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Plastering & Painting Of A Dining Hall
- output
- Complete Dining Hall
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Githiriga Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of Two New Classrooms
- output
- 2 Complete Classrooms
- implementation status
- Done To Skeleton L;Evel
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Matunda Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of Two New Classrooms
- output
- Completion Of Two New Classrooms
- implementation status
- Skeleton Structure Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Murinduko Primary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Work Yet To Begin
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Githima Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Completion Of A Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tumoiyot Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 4 Teachers' Quarters
- output
- 4 Complete Teachers' Quarters
- implementation status
- 3 Completedwhilee Th E4Th One Needs Floor Plastering
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Murinduko Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Completion Of 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sirikwa Gacharage Road
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Grading Of A New Road
- output
- Opening Up Of A New Road
- implementation status
- 1.8 Kms Graded
- total cost
- Ksh 200,000
- estimate
- Ksh 0
SirikwaKarima Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Grading Of A New Road
- output
- Opening Up Of A New Road
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nyanda Primary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of A Classroom
- output
- Complete Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Saptet Nursery School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1New Classroom
- output
- Complete Classroom
- implementation status
- Work Yet To Begin. OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Emitik Health Centre
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Building Of A New Maternity Wing
- output
- Bring Services Closer For Expectant Mothers
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chebotoi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Partly Completed. OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Konoin Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiplemeiywo Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms Using Timber
- output
- Provide Ample Space For Learning
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sukutek Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiptagich Kiborowo Road
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Filling Pothholes &Drainage
- output
- Create An All Weather Rd
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chepkoiyet Bridge
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Building Of A Footbridge
- output
- Ease Of Communication
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mwangate Primary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Plastering Of 4 Classrooms
- output
- Complete 4 Classroom
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tegat Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Building Of A New Maternity Wing
- output
- Bring Services Closer For Expectant Mothers
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Siwot Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of 2 New Permanent Classrooms
- output
- Conducive Learning Environment
- implementation status
- OnGoingDone To Lintel Level
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Keringet Boarding Primary School
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Purchased 2 Cooking Boilers
- output
- To Save On Fuel Costs And Time
- implementation status
- Successfully Implemented
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tuiyobei Primary School
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Partially Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kerinet - Tuiyobei Bridge
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of A Permanent Bridge
- output
- To Facilitate Communication Between The Two Ridges
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapsimbeiywo Dispensary
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Refurbishment Of Old Cattle Dip
- output
- To Access Good & Quality Medical Facilities
- implementation status
- Successfully Implemented
- total cost
- Ksh 165,000
- estimate
- Ksh 0
Githunguri Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 Classroom
- output
- 1 Classroom
- implementation status
- OnGoingDone To Lintel Level
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ikumbi Health Centre
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of Male Ward
- output
- To Access Quality Healthcare
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kamwaura Primary School
- location
-
(in Kuresoi)
- year first funded
- 2004
- action
- Plastering, Ceiling & Painting Of 2 Classrooms
- output
- Complete 2 Classrooms
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Boron Primary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- Complete Classroom
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Cheptemonok Primary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- 2 Complete Classrooms
- implementation status
- Kshs 10000 Worth Of Materals Have Been Bought
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kipsapta Saino Bridge
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- already in use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kiplongony Saino Bridge
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Building Of A Permanent Bridge
- output
- To Facilitate Communication Between The Two Ridges
- implementation status
- Work Yet To Begin
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kaplamai Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Partly Completed
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Tilindi Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of 1 New Classroom
- output
- Completion Of 1 New Classroom
- implementation status
- Partially Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kamara Primary School
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Construction Of 1New Classroom
- output
- Complete Classroom
- implementation status
- Work Yet To Begin. OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Wamkong Primary School
- location
-
(in Kuresoi)
- year first funded
- 2008
- action
- Plastering Of 2 Classrooms
- output
- Complete Classrooms
- implementation status
- New
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Nyanda Primary School
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Rehabilitation Of Old Classrooms
- output
- 5 Classrooms Plastered
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Amalo Olbosimoru Bri
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A Footbridge
- output
- Ease Of Communication
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Konoin Ararwet Bridge
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of A Foot Bridge
- output
- Hasten Communication Between The Two Ridges
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
KipsonoiTegat Bri
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Building Of A Foot Bridge
- output
- Hasten Communication Between The Two Ridges
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
KeringetTembwo Bri
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of A Permanent Bridge
- output
- To Facilitate Communication Between The Two Ridges
- implementation status
- Partially Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kirandich Road Project
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Filling Pothholes &Drainage
- output
- To Be Passable In All Weather
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Boron Bridge
- location
-
(in Kuresoi)
- year first funded
- 2007
- action
- Opening Of A New Road Needs Heavy Grading
- output
- To Hasten Communication Within The Locations
- implementation status
- Starting Soon
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ndoinet Saino Bridge
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- Building Of A Permanent Bridge
- output
- To Facilitate Communication Between The Two Ridges
- implementation status
- Work Yet To Begin
- total cost
- Ksh 100,000
- estimate
- Ksh 0
MengitMurinduko Bri
- location
-
(in Kuresoi)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- already in use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
OgilgeiKipkewa Road
- location
-
(in Kuresoi)
- year first funded
- 2006
- action
- Construction Of A Permanent Bridge
- output
- Bridge To Connect Both Nakuru & Kericho District
- implementation status
- OnGoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0