The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Kuresoi

Sirikwa Secondary School

location
(in Kuresoi)
year first funded
2003
action
Plastering Of 4 Classrooms
output
Complete 4 Classrooms
implementation status
On-Going
total cost
Ksh 2,030,000
estimate
Ksh 0

Silibwet Secondary School

location
(in Kuresoi)
year first funded
2004
action
Roofing & Plastering Of A Laboratory
output
Complete Laboratory
implementation status
OnGoing
total cost
Ksh 1,950,000
estimate
Ksh 0

Koige Secondary School

location
(in Kuresoi)
year first funded
2003
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
New
total cost
Ksh 1,560,000
estimate
Ksh 0

Tendwet Secondary School

location
(in Kuresoi)
year first funded
2003
action
Roofing & Plastering Of A Laboratory
output
Complete Laboratory
implementation status
On-Going
total cost
Ksh 1,170,000
estimate
Ksh 0

Kapkwen Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 8 Classrooms
output
8 Complete Classrooms
implementation status
Done To Skeleton Level
total cost
Ksh 1,150,000
estimate
Ksh 0

Kamwaura Secondary School

location
(in Kuresoi)
year first funded
2004
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,050,000
estimate
Ksh 0

Chorwa Kibaraa Bri

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Permanent Bridge
output
Bridge To Connect The Two Ridges
implementation status
OnGoing
total cost
Ksh 1,026,521
estimate
Ksh 0

Ndabibit Primary School

location
(in Kuresoi)
year first funded
2004
action
Purchase Of School Land,Construction Of 3 Classrooms Roofing & Plastering Of A Classroom
output
Additional School Land,3 Classrooms
implementation status
Land Purchased,Classrooms OnGoing
total cost
Ksh 1,020,000
estimate
Ksh 0

Kiptagich Secondary School

location
(in Kuresoi)
year first funded
2004
action
Completion Of 4 Classrooms And An Admin Block
output
Completion Of 4 Classrooms And An Admin Block
implementation status
OnGoing
total cost
Ksh 1,000,000
estimate
Ksh 0

KeringetTown Road

location
(in Kuresoi)
year first funded
2004
action
Filling Pothholes &Drainage
output
To Be Passable In All Weather
implementation status
Completed
total cost
Ksh 950,000
estimate
Ksh 0

Mau Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 4 Classrooms
output
Completion Of Classrooms
implementation status
OnGoing
total cost
Ksh 950,000
estimate
Ksh 0

Kiptaragon Secondary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 2 Classrooms Purchase Of 1 Acre Land
output
Complete A Classroom
implementation status
Completed
total cost
Ksh 920,000
estimate
Ksh 0

Kirandich Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of 4 New Permanent Classrooms
output
4 Complete Classrooms
implementation status
2 Classrooms Completed,2 Others Awaiting Plastering
total cost
Ksh 900,000
estimate
Ksh 0

Chemaner Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of Four Classrooms
output
Completion Of A Classroom
implementation status
Almost CompletedPlastering &Painting Outstanding
total cost
Ksh 900,000
estimate
Ksh 0

Teta Primary School

location
(in Kuresoi)
year first funded
2004
action
Contstruction Of 3 Permanent Classrooms
output
To Provide Conducive Environment For Learning
implementation status
OnGoing
total cost
Ksh 900,000
estimate
Ksh 0

SasumuaKamwaura Road

location
(in Kuresoi)
year first funded
2006
action
Grading Of A Road
output
Hastened Communication Between The Two Ridges
implementation status
OnGoing
total cost
Ksh 900,000
estimate
Ksh 0

Saptet Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of 2 New Classroom
output
2 Completion Of Classrooms
implementation status
Completed
total cost
Ksh 850,000
estimate
Ksh 0

Tuiyobei Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 2 Classrooms
output
2 Complete Classrooms
implementation status
To Skeleton Level
total cost
Ksh 850,000
estimate
Ksh 0

Mkulima Secondary School

location
(in Kuresoi)
year first funded
2003
action
n/a
output
-
implementation status
already in use
total cost
Ksh 820,000
estimate
Ksh 0

Simotwet Primary School

location
(in Kuresoi)
year first funded
2004
action
Roofing & Plastering Of 2 Classroooms
output
2 Complete Classroom
implementation status
OnGoing
total cost
Ksh 800,000
estimate
Ksh 0

Seanin Primary School

location
(in Kuresoi)
year first funded
2004
action
Plastering, Ceiling &Painting Of 2 Classrooms
output
2 Complete Classrooms
implementation status
OnGoing
total cost
Ksh 800,000
estimate
Ksh 0

Kaplelach Primary School

location
(in Kuresoi)
year first funded
2003
action
Construction Of A Classrooms
output
Completion Of A Classroom
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 0

Kiptagich Dispensary

location
(in Kuresoi)
year first funded
2004
action
Building Of A New Maternity Wing
output
Bring Services Closer For Expectant Mothers
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 0

Mwangate Primary School

location
(in Kuresoi)
year first funded
2003
action
Contstruction Of 4 Permanent Classrooms
output
To Provide Conducive Environment For Learning
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 0

Cheptebes Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 3 Class
output
3 Complete Classrooms
implementation status
Partially Complete. OnGoing
total cost
Ksh 800,000
estimate
Ksh 0

Seger Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 3 Classrooms
output
3 Complete A Classrooms
implementation status
3 Classrooms Completed
total cost
Ksh 800,000
estimate
Ksh 0

Kapngorot Secondary School

location
(in Kuresoi)
year first funded
2003
action
Construction Of A Classroom
output
Complete Classroom
implementation status
New
total cost
Ksh 750,000
estimate
Ksh 0

Ambusket Secondary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 2 Classrooms
output
Completion Of 2 Classrooms
implementation status
Completed
total cost
Ksh 750,000
estimate
Ksh 0

Arorwet Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of 3 Permanent Classrooms
output
3 Permanent Classrooms
implementation status
OnGoing
total cost
Ksh 750,000
estimate
Ksh 0

Kongoi Secondary School

location
(in Kuresoi)
year first funded
2003
action
n/a
output
-
implementation status
not known
total cost
Ksh 750,000
estimate
Ksh 0

Kaplamai Secondary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 2 Classrooms
output
Complete 2 Classrooms
implementation status
Completed
total cost
Ksh 720,000
estimate
Ksh 0

Keringet Secondary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Complete A Classroom
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 0

Kapkores Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 2 New Classrooms & An Administration Block
output
Completetion Of The Same
implementation status
OnGoingDone To Skeleton Level
total cost
Ksh 700,000
estimate
Ksh 0

Nyota Primary School

location
(in Kuresoi)
year first funded
2004
action
Contstruction Of 4 Permanent Classrooms
output
Provide Ample Space For Learning
implementation status
OnGoing
total cost
Ksh 700,000
estimate
Ksh 0

Bandiat Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of a Classroom
output
Complete A Classroom
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 0

Chemaner Dispensary

location
(in Kuresoi)
year first funded
2005
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 0

Sinendet - Irongo Road

location
(in Kuresoi)
year first funded
2008
action
Grading & Gravelling Of The Road
output
Hastene Communication Between The Two Ridges
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 0

Irongo Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of Two New Classrooms
output
Completion Of Two New Classrooms
implementation status
Skeleton Structure Completed
total cost
Ksh 650,000
estimate
Ksh 0

Bondet Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of Three Classrooms
output
3 Complete Classrooms
implementation status
OnGoindNeeds Plastering,Windows,Doors And Painting
total cost
Ksh 600,000
estimate
Ksh 0

Cheptuech Primary School

location
(in Kuresoi)
year first funded
2004
action
Plastering Of 3 Classrooms
output
Clean And Conducive Rooms For Learning
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 0

Ainamoi Primary School

location
(in Kuresoi)
year first funded
2004
action
Partfunding For Completion Of Three Classrooms
output
To Provide Conducive Environment For Learning
implementation status
OnGoing
total cost
Ksh 600,000
estimate
Ksh 0

Keringet Estate Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of A New Administration Block
output
To Free Classrooms Currently Being Utilised As Staff Room
implementation status
Skeketon Building Completed
total cost
Ksh 600,000
estimate
Ksh 0

TinetKapkembu Road

location
(in Kuresoi)
year first funded
2004
action
Grading Of A New Road
output
To Hasten Communication Between Kapkembu & Keringet
implementation status
3Kms Done
total cost
Ksh 600,000
estimate
Ksh 0

Emitik Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 3 Classrooms
output
3 Complete Classrooms
implementation status
Partially Complete. OnGoing
total cost
Ksh 550,000
estimate
Ksh 0

Korabariet Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of 1 Permanent Classroom
output
1 Classroom
implementation status
Work Yet To Begin
total cost
Ksh 550,000
estimate
Ksh 0

Kibaraa Primary School

location
(in Kuresoi)
year first funded
2004
action
Refurbishment Of SemiPermanent Classrooms
output
To Provide Clean & Condusive Classrooms For Learning
implementation status
Successful Implemente
total cost
Ksh 500,000
estimate
Ksh 0

Geticha Primary School

location
(in Kuresoi)
year first funded
2003
action
Constructions Of 2 Classrooms
output
Complete 2 Classrooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Temyotta -Chemaner Road

location
(in Kuresoi)
year first funded
2007
action
Grading Of A New Road
output
Connect Chepkinoiyo And Githiriga
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 0

Emitik Girls Secondary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of Dining Hall
output
Complete Dining Hall
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

KiptagichTimbwalo Road

location
(in Kuresoi)
year first funded
2006
action
Grading Of A New Road
output
Hastened Communication Between 3 Locations
implementation status
Temporarily Stalled Due To Misunderstanding Between Contractor And Pmc. Stalled
total cost
Ksh 500,000
estimate
Ksh 0

Kiptaragon Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of Two Classrooms
output
2 Complete Classrooms
implementation status
Almost Completed
total cost
Ksh 500,000
estimate
Ksh 0

Chesirikwa Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 3 Classrooms
output
3 Complete Classrooms
implementation status
Partly Completed
total cost
Ksh 500,000
estimate
Ksh 0

Kapkeet Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of 2 New Classroom
output
Completion Of 2 A New Classroom
implementation status
Partly Completed
total cost
Ksh 500,000
estimate
Ksh 0

ChebaraaKapkeet Kiptagich Road

location
(in Kuresoi)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Chebaraa Dispensary

location
(in Kuresoi)
year first funded
2004
action
Equiping The Dispensary With Medical Facilities
output
To Access Good & Quality Medical Facilities
implementation status
Successfully Implemented
total cost
Ksh 500,000
estimate
Ksh 0

Ribot Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 3 Classroom
output
3 Complete Classrooms
implementation status
OnGoingSkeleton Structure Done
total cost
Ksh 500,000
estimate
Ksh 0

Sitoito Secondary School

location
(in Kuresoi)
year first funded
2005
action
Refurbishment Of An Old Building & Building Of 2 New Classromms
output
2 Complete Classrooms
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 0

Silibwet Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 3 Classroom
output
3 Complete Classrooms
implementation status
OnGoingSkeleton Structure Done
total cost
Ksh 500,000
estimate
Ksh 0

Set KoborMengit Road

location
(in Kuresoi)
year first funded
2006
action
Grading Of A New Road
output
Hastened Communication Between The Two Areas
implementation status
Work Yet To Begin
total cost
Ksh 500,000
estimate
Ksh 0

Tinet Dispensary

location
(in Kuresoi)
year first funded
2007
action
Plastering & Painting Of 3 Rooms
output
Complete The 3 Rooms
implementation status
OnGoing
total cost
Ksh 470,000
estimate
Ksh 0

Tulwet Dispensary

location
(in Kuresoi)
year first funded
2004
action
Construction Of A New Dispensary
output
To Acess Good & Quality Medical Facilities
implementation status
New
total cost
Ksh 470,000
estimate
Ksh 0

Tegat Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of An Administration Block
output
Completed Administration Block
implementation status
Partly Completed
total cost
Ksh 450,000
estimate
Ksh 0

Silibwet Dispensary

location
(in Kuresoi)
year first funded
2006
action
Construction Of A Laboratory
output
To Access Good & Quality Medical Facilities
implementation status
New
total cost
Ksh 450,000
estimate
Ksh 0

Tabain Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 New Classroom
output
Completion Of 1 New Classroom
implementation status
Partially Completed. OnGoing
total cost
Ksh 450,000
estimate
Ksh 0

Kitoben Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of A Library
output
Store For Books & Reading Room
implementation status
Partly Completed. OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Barao Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of New Classrooms
output
Completion Of A Classroom
implementation status
Partly Completed
total cost
Ksh 400,000
estimate
Ksh 0

Cheptagum Primary School

location
(in Kuresoi)
year first funded
2004
action
Builiding Of A New Classroom
output
1 Classroom
implementation status
OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Mukeu Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of 2 New Classrooms
output
2 Complete Classrooms
implementation status
1 Classroom Completed
total cost
Ksh 400,000
estimate
Ksh 0

Lelaitich Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of 1 Classroom
output
1 Classroom
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 0

Kamwaura Bridge

location
(in Kuresoi)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Lemechonik Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Partly Completed
total cost
Ksh 400,000
estimate
Ksh 0

Sitoton Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Skeleton Structure Completed
total cost
Ksh 400,000
estimate
Ksh 0

Mawingu Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 1 Classroom
output
Completion Of 1 Classroom
implementation status
Kshs 150000 Of Materials Have Been Bought.
total cost
Ksh 400,000
estimate
Ksh 0

Mkulima Primary School

location
(in Kuresoi)
year first funded
2004
action
Building Of 2 Classrooms
output
2 New Classrooms
implementation status
One Class Finished.
total cost
Ksh 400,000
estimate
Ksh 0

CentralKamwingi Road

location
(in Kuresoi)
year first funded
2006
action
Building Of Foot Bridge
output
Hastened Communication Between The Two Areas
implementation status
Successfully Completed
total cost
Ksh 400,000
estimate
Ksh 0

Tiloa Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of 1 Classroom
implementation status
Partly Completed
total cost
Ksh 400,000
estimate
Ksh 0

Chepnyalilo Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 3 Classroom & 1 Staffroom
output
Clean & Condusive Rooms For Learning & Administration.
implementation status
Skeleton Structure. OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Seguton Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 2 Classrooms
output
Completion Of 2 Classrooms
implementation status
OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Olenguruone Secondary School

location
(in Kuresoi)
year first funded
2006
action
Refurbishment Of 6 Classrooms
output
Clean And Conducive Rooms For Learning &Administration
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 0

Kipsinendet Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Classroom
output
Completion Of 1 Classroom
implementation status
Partly Completed. OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Kipsinendet Secondary School

location
(in Kuresoi)
year first funded
2005
action
Building Of A New Classroom
output
Completion Of A Classroom
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 0

Chepakundi Dispensary

location
(in Kuresoi)
year first funded
2005
action
Building Of A New Maternity Wing
output
Bring Services Closer For Expectant Mothers
implementation status
OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Tulwet Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 New Classroom
output
1 Classroom
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 0

KeringetBararget Road

location
(in Kuresoi)
year first funded
2006
action
Grading Of A New Road
output
Hastened Communication Between The 2 Locations
implementation status
OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Tarakwa Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 400,000
estimate
Ksh 0

Kipkewa Primary School

location
(in Kuresoi)
year first funded
2004
action
Payment For Bursary To Needy Students & Ophants
output
-
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 0

Chorwa Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Partly Completed
total cost
Ksh 350,000
estimate
Ksh 0

Upendo Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
OnGoing
total cost
Ksh 350,000
estimate
Ksh 0

Kamara Dispensary

location
(in Kuresoi)
year first funded
2007
action
Part Funding For A Maternity Wing
output
Bring Services Closer For Expectant Mothers
implementation status
Work
total cost
Ksh 350,000
estimate
Ksh 0

Soymet - Chebaraa Road Culvert

location
(in Kuresoi)
year first funded
2007
action
Road Grading & Installation Of Culverts
output
To Hasten Comminication Between The Two Ridges
implementation status
On - Going
total cost
Ksh 350,000
estimate
Ksh 0

Kio Secondary School

location
(in Kuresoi)
year first funded
2004
action
Plastering Of A Administration Block
output
Completion Of A Administration Block
implementation status
OnGoing
total cost
Ksh 350,000
estimate
Ksh 0

KabuchoSaino Road

location
(in Kuresoi)
year first funded
2007
action
Filling Pothholes &Drainage
output
To Be Passable In All Weather
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 0

Olenguruone Town - Kiptenden Bridge

location
(in Kuresoi)
year first funded
2008
action
Construction Of A Bridge
output
Ease Of Communication
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

KiptagichTembwalo Bri

location
(in Kuresoi)
year first funded
2005
action
Building Of A Permanent Bridge
output
Hastened Communication Between The Two Ridges
implementation status
OnGoing
total cost
Ksh 300,000
estimate
Ksh 0

Kaplamai Health Centre

location
(in Kuresoi)
year first funded
2005
action
Contstruction Of A Dispensary
output
To Access Good & Quality Medical Facilities
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Bararget Primary School

location
(in Kuresoi)
year first funded
2005
action
Contstruction Of 2 Permanent Classrooms
output
Partly Completed
implementation status
OnGoing
total cost
Ksh 300,000
estimate
Ksh 0

Kaplelach - Mosop Culverts

location
(in Kuresoi)
year first funded
2008
action
Construction Of Culverts
output
To Hasten Comminication Between The Two Ridges
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Tirigoi Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 2 New Classrooms
output
Completion Of 2 New Classrooms
implementation status
2 Skeleton Structures Done
total cost
Ksh 300,000
estimate
Ksh 0

Lelaitich Kamwaura Bri

location
(in Kuresoi)
year first funded
2006
action
Completion Of Bridge
output
Hastened Communication Between The Two Ridges
implementation status
OnGoing
total cost
Ksh 300,000
estimate
Ksh 0

ChepkinoiyoGithiriga Road

location
(in Kuresoi)
year first funded
2006
action
Building Of A Foot Bridge
output
Hastened Communication Between The Two Ridges
implementation status
Some Materials Purchased
total cost
Ksh 300,000
estimate
Ksh 0

Banana Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Successfully Implemented
total cost
Ksh 300,000
estimate
Ksh 0

Boron Primary School

location
(in Kuresoi)
year first funded
2004
action
Starting A New School & Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Successfully Implemented
total cost
Ksh 300,000
estimate
Ksh 0

Chepkoburot Primary School

location
(in Kuresoi)
year first funded
2007
action
Construction Of 1 Permanent Classroom
output
Completion Of A 1 Classroom
implementation status
OnGoing
total cost
Ksh 300,000
estimate
Ksh 0

Ndoinet Dispensary

location
(in Kuresoi)
year first funded
2005
action
Plastering & Painting Of 3 Rooms
output
Access Good & Quality Medical Facilities
implementation status
OnGoing
total cost
Ksh 300,000
estimate
Ksh 0

Tangi Nursery School

location
(in Kuresoi)
year first funded
2005
action
Construction Of Classroom
output
Completion Of 1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

GacharageUSolRoad

location
(in Kuresoi)
year first funded
2006
action
Opening Of A New Road Needs Heavy Grading
output
Hastened Communication Between The Location
implementation status
Successfully Completed
total cost
Ksh 300,000
estimate
Ksh 0

Arimi - Chebonde Kiptenden Road

location
(in Kuresoi)
year first funded
2008
action
Grading Of A New Road
output
Hastened Communication Between The 2 Location
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Matunda - Chemaner Road

location
(in Kuresoi)
year first funded
2008
action
Grading Of A Road
output
-
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 0

Tendwet Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of A New Classroom
output
1 Classroom
implementation status
Partly Completed
total cost
Ksh 250,000
estimate
Ksh 0

Kapkoi Dispensary

location
(in Kuresoi)
year first funded
2006
action
Building Of A New Dispensary
output
To Access Good & Quality Medical Facilities
implementation status
Starting Soon
total cost
Ksh 250,000
estimate
Ksh 0

Sigowet Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
Completed
total cost
Ksh 250,000
estimate
Ksh 0

Longet Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 250,000
estimate
Ksh 0

Nukiat Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 250,000
estimate
Ksh 0

Lelaitich Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 250,000
estimate
Ksh 0

Kabigeriet Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 250,000
estimate
Ksh 0

Kaplamboi Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 250,000
estimate
Ksh 0

Haraka Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 New Classroom
output
Completion Of 1 New Classroom
implementation status
Partially Completed. OnGoing
total cost
Ksh 250,000
estimate
Ksh 0

Tiriyta - Kures Bridge

location
(in Kuresoi)
year first funded
2008
action
Construction Of A Bridge
output
To Facilitate Communication Between The Two Ridges
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 0

Cheptuech Secondary School

location
(in Kuresoi)
year first funded
2008
action
Construction Of Dining Hall
output
Complete Dining Hall
implementation status
New
total cost
Ksh 220,000
estimate
Ksh 0

Kongoi Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Partly Completed
total cost
Ksh 200,000
estimate
Ksh 0

Saino Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Permanent Classroom
output
Completion Of A 1 Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Kures Primary School

location
(in Kuresoi)
year first funded
2005
action
Renovation Of 9 Temporary Classrooms
output
Clean &Conducive Classrooms For Learning
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 0

Chemare Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of A Permanent Admin. Block
output
To Enable Teachers Get Condusive Seating Place
implementation status
Successful Implemente
total cost
Ksh 200,000
estimate
Ksh 0

Ndoinet Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 1 Wooden Classroom,1 Wooden Admin Block,Roofing &Painting Of 4 Classrooms
output
Clean And Conducive Rooms For Learning &Administration
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Kapsongop Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of SemiPermanent Staff Houses
output
To Provide Housing For Teachers
implementation status
Successful Implemente
total cost
Ksh 200,000
estimate
Ksh 0

Kipkoris Primary School

location
(in Kuresoi)
year first funded
2004
action
Construction Of 2 Classrooms
output
2 Complete Classrooms
implementation status
Plastering Of Walls,Floor Remaining.
total cost
Ksh 200,000
estimate
Ksh 0

Kiplongony Primary School

location
(in Kuresoi)
year first funded
2003
action
Construction Of A Laboratory
output
Complete Laboratory
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Taragonik Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Starting Soon
total cost
Ksh 200,000
estimate
Ksh 0

Kio Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
Partly Completed
total cost
Ksh 200,000
estimate
Ksh 0

Kiptororo Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Permanent Classroom
output
Completion Of A 1 Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Keringet Health Centre

location
(in Kuresoi)
year first funded
2007
action
Building Of A New Maternity Wing
output
Bring Services Closer For Expectant Mothers
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Langwenda Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Mwahe Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Molo Sdispensary

location
(in Kuresoi)
year first funded
2004
action
Refurshment Of An Old Building
output
Access Good & Quality Medical Facilities
implementation status
Experience Financial Problems Due To Overlapping Of Funds
total cost
Ksh 200,000
estimate
Ksh 0

Kewamoi Dispensary

location
(in Kuresoi)
year first funded
2008
action
Construction Of 3 Rooms - Diagnosis, Dressing /Injection & Store
output
Access To Good Medical Services
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

MasaitaMwahe Road

location
(in Kuresoi)
year first funded
2005
action
Road Grading & Installation Of Culverts
output
To Hasten Comminication Between The Two Ridges
implementation status
Successfully Implemented
total cost
Ksh 200,000
estimate
Ksh 0

Tinet Primary School

location
(in Kuresoi)
year first funded
2005
action
Plastering & Painting Of 4 Classrooms Previously Funded By Barclays Bank Of Kenya Ltd
output
To Provide Conducive Environment For Learning
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 0

Cherokyet Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of A New Classroom
output
Completion Of A Classroom
implementation status
Partly Completed
total cost
Ksh 200,000
estimate
Ksh 0

Timbwalo Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of New Classroom
output
Completed Of A Classroom
implementation status
Partly Completed
total cost
Ksh 200,000
estimate
Ksh 0

Korao Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 New Classroom
output
Completion Of A New Classroom
implementation status
Starting Soon
total cost
Ksh 200,000
estimate
Ksh 0

Kapkoi Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 New Classroom
output
Completion Of 1 New Classroom
implementation status
Work Yet To Begin
total cost
Ksh 200,000
estimate
Ksh 0

Kimororoch Primary School

location
(in Kuresoi)
year first funded
2007
action
Construction Of 1New Classroom
output
Complete Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Ogiek Primary School

location
(in Kuresoi)
year first funded
2007
action
Construction Of 1New Classroom
output
Complete Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Korao Dispensary

location
(in Kuresoi)
year first funded
2008
action
Plastering & Painting Of 3 Rooms
output
Complete The 3 Rooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

KondametSotiki Road

location
(in Kuresoi)
year first funded
2006
action
Grading Of A New Road
output
To Hasten Communication Between Sotiki & Main Road
implementation status
4 Kms Graded
total cost
Ksh 200,000
estimate
Ksh 0

Sasumua Primary School

location
(in Kuresoi)
year first funded
2004
action
Plastering & Painting Of A Dining Hall
output
Complete Dining Hall
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Githiriga Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of Two New Classrooms
output
2 Complete Classrooms
implementation status
Done To Skeleton L;Evel
total cost
Ksh 200,000
estimate
Ksh 0

Matunda Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of Two New Classrooms
output
Completion Of Two New Classrooms
implementation status
Skeleton Structure Completed
total cost
Ksh 200,000
estimate
Ksh 0

Murinduko Primary School

location
(in Kuresoi)
year first funded
2008
action
Building Of 1 Classroom
output
1 Classroom
implementation status
Work Yet To Begin
total cost
Ksh 200,000
estimate
Ksh 0

Githima Primary School

location
(in Kuresoi)
year first funded
2005
action
Construction Of 1 Classroom
output
Completion Of A Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Tumoiyot Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 4 Teachers' Quarters
output
4 Complete Teachers' Quarters
implementation status
3 Completedwhilee Th E4Th One Needs Floor Plastering
total cost
Ksh 200,000
estimate
Ksh 0

Murinduko Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Classroom
output
Completion Of 1 Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Sirikwa Gacharage Road

location
(in Kuresoi)
year first funded
2007
action
Grading Of A New Road
output
Opening Up Of A New Road
implementation status
1.8 Kms Graded
total cost
Ksh 200,000
estimate
Ksh 0

SirikwaKarima Road

location
(in Kuresoi)
year first funded
2006
action
Grading Of A New Road
output
Opening Up Of A New Road
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Nyanda Primary School

location
(in Kuresoi)
year first funded
2008
action
Construction Of A Classroom
output
Complete Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 0

Saptet Nursery School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1New Classroom
output
Complete Classroom
implementation status
Work Yet To Begin. OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Emitik Health Centre

location
(in Kuresoi)
year first funded
2007
action
Building Of A New Maternity Wing
output
Bring Services Closer For Expectant Mothers
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Chebotoi Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of 1 Classroom
output
1 Classroom
implementation status
Partly Completed. OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Konoin Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 Classroom
output
1 Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Kiplemeiywo Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 4 Classrooms Using Timber
output
Provide Ample Space For Learning
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 0

Sukutek Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 Classroom
output
1 Classroom
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Kiptagich Kiborowo Road

location
(in Kuresoi)
year first funded
2007
action
Filling Pothholes &Drainage
output
Create An All Weather Rd
implementation status
OnGoing
total cost
Ksh 200,000
estimate
Ksh 0

Chepkoiyet Bridge

location
(in Kuresoi)
year first funded
2007
action
Building Of A Footbridge
output
Ease Of Communication
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Mwangate Primary School

location
(in Kuresoi)
year first funded
2008
action
Plastering Of 4 Classrooms
output
Complete 4 Classroom
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Tegat Dispensary

location
(in Kuresoi)
year first funded
2007
action
Building Of A New Maternity Wing
output
Bring Services Closer For Expectant Mothers
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Siwot Primary School

location
(in Kuresoi)
year first funded
2005
action
Building Of 2 New Permanent Classrooms
output
Conducive Learning Environment
implementation status
OnGoingDone To Lintel Level
total cost
Ksh 200,000
estimate
Ksh 0

Keringet Boarding Primary School

location
(in Kuresoi)
year first funded
2005
action
Purchased 2 Cooking Boilers
output
To Save On Fuel Costs And Time
implementation status
Successfully Implemented
total cost
Ksh 200,000
estimate
Ksh 0

Tuiyobei Primary School

location
(in Kuresoi)
year first funded
2007
action
Building Of 1 Classroom
output
1 Classroom
implementation status
Partially Completed
total cost
Ksh 200,000
estimate
Ksh 0

Kerinet - Tuiyobei Bridge

location
(in Kuresoi)
year first funded
2008
action
Construction Of A Permanent Bridge
output
To Facilitate Communication Between The Two Ridges
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Kapsimbeiywo Dispensary

location
(in Kuresoi)
year first funded
2005
action
Refurbishment Of Old Cattle Dip
output
To Access Good & Quality Medical Facilities
implementation status
Successfully Implemented
total cost
Ksh 165,000
estimate
Ksh 0

Githunguri Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 Classroom
output
1 Classroom
implementation status
OnGoingDone To Lintel Level
total cost
Ksh 150,000
estimate
Ksh 0

Ikumbi Health Centre

location
(in Kuresoi)
year first funded
2008
action
Construction Of Male Ward
output
To Access Quality Healthcare
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 0

Kamwaura Primary School

location
(in Kuresoi)
year first funded
2004
action
Plastering, Ceiling & Painting Of 2 Classrooms
output
Complete 2 Classrooms
implementation status
OnGoing
total cost
Ksh 150,000
estimate
Ksh 0

Boron Primary School

location
(in Kuresoi)
year first funded
2008
action
Construction Of 1 Classroom
output
Complete Classroom
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 0

Cheptemonok Primary School

location
(in Kuresoi)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Complete Classrooms
implementation status
Kshs 10000 Worth Of Materals Have Been Bought
total cost
Ksh 150,000
estimate
Ksh 0

Kipsapta Saino Bridge

location
(in Kuresoi)
year first funded
2007
action
n/a
output
-
implementation status
already in use
total cost
Ksh 150,000
estimate
Ksh 0

Kiplongony Saino Bridge

location
(in Kuresoi)
year first funded
2007
action
Building Of A Permanent Bridge
output
To Facilitate Communication Between The Two Ridges
implementation status
Work Yet To Begin
total cost
Ksh 150,000
estimate
Ksh 0

Kaplamai Primary School

location
(in Kuresoi)
year first funded
2006
action
Construction Of 1 Classroom
output
Partly Completed
implementation status
OnGoing
total cost
Ksh 150,000
estimate
Ksh 0

Tilindi Primary School

location
(in Kuresoi)
year first funded
2006
action
Building Of 1 New Classroom
output
Completion Of 1 New Classroom
implementation status
Partially Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kamara Primary School

location
(in Kuresoi)
year first funded
2007
action
Construction Of 1New Classroom
output
Complete Classroom
implementation status
Work Yet To Begin. OnGoing
total cost
Ksh 150,000
estimate
Ksh 0

Wamkong Primary School

location
(in Kuresoi)
year first funded
2008
action
Plastering Of 2 Classrooms
output
Complete Classrooms
implementation status
New
total cost
Ksh 120,000
estimate
Ksh 0

Nyanda Primary School

location
(in Kuresoi)
year first funded
2006
action
Rehabilitation Of Old Classrooms
output
5 Classrooms Plastered
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 0

Amalo Olbosimoru Bri

location
(in Kuresoi)
year first funded
2005
action
Building Of A Footbridge
output
Ease Of Communication
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 0

Konoin Ararwet Bridge

location
(in Kuresoi)
year first funded
2006
action
Building Of A Foot Bridge
output
Hasten Communication Between The Two Ridges
implementation status
OnGoing
total cost
Ksh 100,000
estimate
Ksh 0

KipsonoiTegat Bri

location
(in Kuresoi)
year first funded
2006
action
Building Of A Foot Bridge
output
Hasten Communication Between The Two Ridges
implementation status
OnGoing
total cost
Ksh 100,000
estimate
Ksh 0

KeringetTembwo Bri

location
(in Kuresoi)
year first funded
2006
action
Construction Of A Permanent Bridge
output
To Facilitate Communication Between The Two Ridges
implementation status
Partially Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kirandich Road Project

location
(in Kuresoi)
year first funded
2007
action
Filling Pothholes &Drainage
output
To Be Passable In All Weather
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 0

Boron Bridge

location
(in Kuresoi)
year first funded
2007
action
Opening Of A New Road Needs Heavy Grading
output
To Hasten Communication Within The Locations
implementation status
Starting Soon
total cost
Ksh 100,000
estimate
Ksh 0

Ndoinet Saino Bridge

location
(in Kuresoi)
year first funded
2005
action
Building Of A Permanent Bridge
output
To Facilitate Communication Between The Two Ridges
implementation status
Work Yet To Begin
total cost
Ksh 100,000
estimate
Ksh 0

MengitMurinduko Bri

location
(in Kuresoi)
year first funded
2005
action
n/a
output
-
implementation status
already in use
total cost
Ksh 100,000
estimate
Ksh 0

OgilgeiKipkewa Road

location
(in Kuresoi)
year first funded
2006
action
Construction Of A Permanent Bridge
output
Bridge To Connect Both Nakuru & Kericho District
implementation status
OnGoing
total cost
Ksh 50,000
estimate
Ksh 0