The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Kuria
Komotobo Secondary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 11,900,000
- estimate
- Ksh 0
Kuria Constituency Office
- location
-
Bukira East
(in Kuria)
- year first funded
- 2004
- action
- Construction Of Constituency Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 7,799,900
- estimate
- Ksh 0
Kuria East District Hq Project
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Newest District Hqs
- output
- Improved Services To The Public
- implementation status
- Complete
- total cost
- Ksh 6,800,000
- estimate
- Ksh 5,000,000
Komomange Dispensary
- location
-
Bukira Central
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Staff Houses
- output
- Improved Staff Retention
- implementation status
- On Going
- total cost
- Ksh 6,238,433
- estimate
- Ksh 1,000,000
Kehancha Mixed Secondary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Tutition Block
- output
- Increased Access To Education
- implementation status
- On Going
- total cost
- Ksh 5,650,000
- estimate
- Ksh 2,000,000
Maeta Secondary School Library
- location
-
Maeta
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Performance
- implementation status
- On Going
- total cost
- Ksh 5,575,000
- estimate
- Ksh 2,500,000
Nyankore Secondary School
- location
-
Bugumbe East
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Living Conditions
- implementation status
- On Going
- total cost
- Ksh 5,387,733
- estimate
- Ksh 3,570,000
Komotobo Health Centre
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 4,500,000
- estimate
- Ksh 2,000,000
Taranganya HighSchool
- location
-
Bukira East
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Improved Staff Retention
- implementation status
- On Going
- total cost
- Ksh 3,875,000
- estimate
- Ksh 2,000,000
Gokeharaka Secondary School
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 3,835,000
- estimate
- Ksh 2,000,000
Ikerege Secondary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 3,725,000
- estimate
- Ksh 2,000,000
Kehancha District Hospital
- location
-
Bukira East
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 3,469,400
- estimate
- Ksh 1,000,000
St. Marys Mabera Secondary School
- location
-
Tagare
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 3,275,000
- estimate
- Ksh 2,000,000
Gwitembe Secondary School
- location
-
Bwirege East
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Performance
- implementation status
- On Going
- total cost
- Ksh 3,000,000
- estimate
- Ksh 1,500,000
Nyametaburo Secondary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,905,100
- estimate
- Ksh 500,000
Kegonga Secondary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,850,000
- estimate
- Ksh 2,400,000
Nyamotambe Secondary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,595,000
- estimate
- Ksh 1,500,000
Chacha Moronge Secondary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,580,166
- estimate
- Ksh 1,500,000
Getonganya Secondary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2003
- action
- Construction
- output
- Better Living Conditions
- implementation status
- On Going
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Taranganya Girls Boarding
- location
-
Bukira East
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Staff Houses
- output
- Improved Staff Retention
- implementation status
- On Going
- total cost
- Ksh 2,475,000
- estimate
- Ksh 800,000
Kugitura Girls Secondary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,450,000
- estimate
- Ksh 1,000,000
St. Joseph Ntimaru Secondary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Performance
- implementation status
- On Going
- total cost
- Ksh 2,375,000
- estimate
- Ksh 2,000,000
Moi Nyabohanse Secondary School Laboratory
- location
-
Bugume South
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Laboratory & Staff Houses
- output
- Improved Staff Retention
- implementation status
- On Going
- total cost
- Ksh 2,375,000
- estimate
- Ksh 2,000,000
Siabai Secondary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,350,000
- estimate
- Ksh 1,000,000
Wangirabose Secondary School
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2004
- action
- Construction Of Tuition Block
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 2,350,000
- estimate
- Ksh 600,000
Moheto Secondary School
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Tuition Block
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 2,350,000
- estimate
- Ksh 1,000,000
Kebaroti Secondary School
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,000,000
Getongoroma Secondary School
- location
-
Nguruna
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,275,000
- estimate
- Ksh 1,000,000
Getambwega Dispensary
- location
-
Bukira South
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 2,250,000
- estimate
- Ksh 1,250,000
Ecd Ttc Kehancha
- location
-
Bukira East
(in Kuria)
- year first funded
- 2004
- action
- Finishing D/Hall
- output
- Better Living Conditions
- implementation status
- On Going
- total cost
- Ksh 2,188,433
- estimate
- Ksh 1,500,000
Matare Secondary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2004
- action
- Construction Of Library
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 2,125,000
- estimate
- Ksh 300,000
Gamasisi Youth Polytechnic
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Workshop
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 2,113,433
- estimate
- Ksh 500,000
Nyamaharaga Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,105,033
- estimate
- Ksh 1,900,000
Moheto Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 2,015,299
- estimate
- Ksh 200,000
Mote Morabu Secondary School
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Nyametaburo Dispensary
- location
-
Bukira West
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Nyabikaye Secondary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 500,000
Kurutiange Secondary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Karosi Primary School
- location
-
Bugumbe East
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,450,000
- estimate
- Ksh 500,000
Biasumu Bridge
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 1,426,866
- estimate
- Ksh 300,000
Nyaigutu Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 500,000
Komosoko Dispensary
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2004
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 100,000
Ntimaru Heath Centre
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,000,000
Nyamaharaga Pag
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Taraganya Ds Residence
- location
-
Bukira East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of D.Os Residence
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 1,259,852
- estimate
- Ksh 5,000,000
St. Seglia Kegonche Primary School
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 1,225,000
- estimate
- Ksh 500,000
Kegonga Primary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,201,000
- estimate
- Ksh 521,000
Bohorera Primary School
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2006
- action
- Constuction Of 4 Dormitory
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 600,000
Nyamagagana Secondary School
- location
-
Bugumbe N
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,175,000
- estimate
- Ksh 450,000
Ds Residence Chinato
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of D.Os Residence
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 5,000,000
Nyamaranya Dispensary
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 500,000
Getongaya Secondary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nyamaharaga Secondary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Komomange Secondary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Kuria Teachers Office
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Community Hall
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kuria Teachers Sacco
- location
-
Bukira East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Masaba Health Centre
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Staff Houses
- output
- Higher Retention Of Staff
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
St. Augustines Motemorabu
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Isibania Secondary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gairore Dispensary
- location
-
Siabai
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Kugitimo Dispensary
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kubweye Secondary School
- location
-
Tagare
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
NyamAgeng'A Primary School
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 980,000
- estimate
- Ksh 500,000
Nyanchabo Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Dormitory
- output
- Better Living Conditions
- implementation status
- On Going
- total cost
- Ksh 975,000
- estimate
- Ksh 700,000
Nyametembe Dispensary
- location
-
Siabai
(in Kuria)
- year first funded
- 2005
- action
- Constructuion Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 970,000
- estimate
- Ksh 300,000
Wizara Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 970,000
- estimate
- Ksh 400,000
Kebobono Primary School
- location
-
Bukira Central
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 500,000
Gwikonge Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 500,000
Ntimaru Police Station
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of A Police Station Block
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 5,000,000
Biamiti Primary School
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Tuition Block
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 945,000
- estimate
- Ksh 500,000
Bikarabwa Culverts
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 938,433
- estimate
- Ksh 300,000
Nyabirongo Girls Boarding School
- location
-
Bugumbe E
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Staff Houses
- output
- Staff Houses
- implementation status
- On Going
- total cost
- Ksh 925,000
- estimate
- Ksh 100,000
Rebakari Bridge
- location
-
Bukira East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 922,000
- estimate
- Ksh 1,000,000
Ikerege Primary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 913,433
- estimate
- Ksh 300,000
Minyere Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 903,433
- estimate
- Ksh 500,000
Bugumbe Health Centre
- location
-
Tagare
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Tisinye Dispensary
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 500,000
Ntiyange Girls Boarding
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Dormitory
- output
- Better Living Conditions
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 800,000
Ikerege Youth Polytechnic
- location
-
Bukira North
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
Taranganya Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 875,000
- estimate
- Ksh 500,000
Itongo Primary School
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 870,000
- estimate
- Ksh 400,000
Nyamagongwi Dispensary
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 870,000
- estimate
- Ksh 200,000
Masangora Primary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 400,000
Kegonga Health Centre
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 400,000
Komomange Primary School s School
- location
-
Bukira Central
(in Kuria)
- year first funded
- 2005
- action
- Renovation
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 835,000
- estimate
- Ksh 100,000
Kombe Secondary School
- location
-
Kombe
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Tuition Block
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 825,000
- estimate
- Ksh 700,000
Nyakehomo Primary School
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2006
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 825,000
- estimate
- Ksh 300,000
Seronga Dispensary
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2006
- action
- Constructuion Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 806,405
- estimate
- Ksh 300,000
Nyansita Bridge
- location
-
Bukira East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Remanyaki Primary School
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 200,000
Ntiyange Primary School
- location
-
Bugumbe East
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Naora Primary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 500,000
Nyatechi Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 770,000
- estimate
- Ksh 500,000
Nyamagagana Primary School
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 762,500
- estimate
- Ksh 150,000
Iraha Dispensary
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 500,000
Kuigisingisi electrification
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Installation Of Electricity
- output
- Enhanced Rural Electrification
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
Komotobo School For Disabled
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2007
- action
- Constuction Of Labaratory
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 735,000
- estimate
- Ksh 500,000
Makararagwe Dispensary
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Ncck Community Hall
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Community Hall
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 5,000,000
Nyasese Dispensary
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Getambwega Primary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 250,000
Kemakoba Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 687,500
- estimate
- Ksh 500,000
Maeta Chiefs Office
- location
-
Maeta
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 680,000
- estimate
- Ksh 1,000,000
Isibania Mixed Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 675,000
- estimate
- Ksh 500,000
Nyamotambe Assistant Chiefs Office
- location
-
Bukira South
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 670,000
- estimate
- Ksh 200,000
Nyabikongori Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Nyamekorongoto Dispensary
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Staff Houses
- output
- Higher Retention Of Staff
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 200,000
Rokere Primary School
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2006
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 200,000
Musweto Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Gokeharaka Primary School
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Ngochoni Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Emergency/
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 637,500
- estimate
- Ksh 650,000
Nyatira Primary School
- location
-
Kombe
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 637,500
- estimate
- Ksh 250,000
Komosoko Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 632,650
- estimate
- Ksh 632,650
Mabera Ds Residence
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of D.Os Residence
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 630,000
- estimate
- Ksh 250,000
Nyabikongori Secondary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 630,000
- estimate
- Ksh 3,000,000
St. Kizito Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 625,000
- estimate
- Ksh 300,000
Gibarori Primary School
- location
-
Maeta
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Taragwiti Ds Residence
- location
-
Bukira West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of D.Os Residence
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 5,000,000
Sakuri Primary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Nyatira Primary School
- location
-
Kombe
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Nyangoge Dispensary
- location
-
Bugumbe East
(in Kuria)
- year first funded
- 2005
- action
- Construction Of Dispensary Block
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kuguyi Primary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2005
- action
- Constrution Of 3 Classes
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 100,000
Taranganya Dispensary
- location
-
Bukira East
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 577,482
- estimate
- Ksh 300,000
Bokobora Bridge
- location
-
Tagare
(in Kuria)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- Improved Access To Remote Areas
- implementation status
- Complete
- total cost
- Ksh 570,000
- estimate
- Ksh 600,000
Nyamararangere Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 400,000
Masangora Ap Lines
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Ap Lines
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 540,000
- estimate
- Ksh 1,000,000
Seronga Primary School
- location
-
Bwirege East
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 531,405
- estimate
- Ksh 100,000
Tagare Primary School
- location
-
Tagare
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 525,000
- estimate
- Ksh 300,000
Nguruna Primary School
- location
-
Nguruna
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 525,000
- estimate
- Ksh 300,000
Chacha Marwa Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 515,000
- estimate
- Ksh 1,000,000
Kwiho Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 506,405
- estimate
- Ksh 400,000
Kwigena Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 504,901
- estimate
- Ksh 273,201
Mainang'Iti Muungano Comm Water Project
- location
-
Bukira North
(in Kuria)
- year first funded
- 2009
- action
- Drilling Of Boreholes
- output
- Improved Access To Clean Water
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,200,000
Nyamekoma Dispensary
- location
-
Bukira South
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gwikonge Maranatha Polytechnic
- location
-
Bukira North
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
Kemakoba Dispensary
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kubweye Dispensary
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chinato Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Nyamwini Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gosese Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Robarisia Primary School
- location
-
Bukira Central
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyangiti Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Komasincha Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Taragai Dispensary
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyamotambe Dispensary
- location
-
Bukira South
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyaitara Dispensary
- location
-
Maeta
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyawaintachiria Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kugisingisi Primary School
- location
-
Tagare
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Rosabare Primary School
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Igena Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kombe Primary School
- location
-
Kombe
(in Kuria)
- year first funded
- 2005
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Komasincha Primary School
- location
-
Bukira Central
(in Kuria)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kehancha Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2004
- action
- Finishing Of 3 Classrooms
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ngukumahando Primary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kohanga Korobunyige Dispensary
- location
-
Kombe
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Staff Houses
- output
- Higher Retention Of Staff
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Maeta Primary School
- location
-
Maeta
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 488,433
- estimate
- Ksh 300,000
Kemotegande Bridge
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 476,866
- estimate
- Ksh 300,000
Taragai Primary School
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 470,000
- estimate
- Ksh 300,000
Tebesi Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 462,500
- estimate
- Ksh 350,000
Wizara Special School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 5,000,000
Mainang'Iti Dispensary
- location
-
Bukira North
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Remanyanki Ap Posts
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Ap Lines
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kionyo Secondary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Nyaroha Dispensary
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Taragai Ap Post
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Ap Lines
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Makararangwe Ap Post
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Ap Lines
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Getongoroma Ap Post
- location
-
Nguruna
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Ap Lines
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kugitimo Ap Post
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Ap Lines
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Nyamotambe-Gokeharaka Secondary School Culvert
- location
-
Bukira South
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 300,000
Dcio Office
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 2,000,000
Nyamaranya Secondary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 3,000,000
Regesengo Bridge
- location
-
Bukira East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 438,433
- estimate
- Ksh 1,000,000
Gwitembe Primary School
- location
-
Bwirege East
(in Kuria)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 431,405
- estimate
- Ksh 300,000
Nyamanche Primary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 425,000
- estimate
- Ksh 300,000
Nyaitara Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 425,000
- estimate
- Ksh 300,000
Getongoroma Primary School
- location
-
Nguruna
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 425,000
- estimate
- Ksh 300,000
Getonganya Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 420,000
- estimate
- Ksh 200,000
Nyankore Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2005
- action
- Renovation
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Muchebe Dispensary
- location
-
Bugumbe East
(in Kuria)
- year first funded
- 2005
- action
- Completion Of Dispensary Block
- output
- Enhanced Health Services
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kuigoto Chiefs Office
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Simbori Primary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sirori Simba School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Matare Boarding Primary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 395,000
- estimate
- Ksh 300,000
Makararangwe Primary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 395,000
- estimate
- Ksh 300,000
Ds Residence Ntimaru
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of D.Os Residence
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 391,404
- estimate
- Ksh 2,000,000
Nyabikaye Secondary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Laboratory
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 375,000
- estimate
- Ksh 500,000
Sanchwa Primary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 375,000
- estimate
- Ksh 300,000
Nyabirongo Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Emergency
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 374,500
- estimate
- Ksh 250,000
Cacc Office
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Purchase Of Motorcycle
- output
- Improved Services To The Public
- implementation status
- Complete
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Kibuchiki Dam
- location
-
Bukira North
(in Kuria)
- year first funded
- 2009
- action
- Fencing Of Dam
- output
- Improved Access To Clean Water
- implementation status
- On Going
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Robarisia Nursery School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 360,000
- estimate
- Ksh 5,000,000
Kionyo Primary School
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
Ikerege-Robarisia
- location
-
Bukira North
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 300,000
Siabai Chiefs Office
- location
-
Siabai
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 338,433
- estimate
- Ksh 1,000,000
Korobunyige Primary School
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 337,500
- estimate
- Ksh 250,000
Muchebe Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 337,500
- estimate
- Ksh 450,000
Rongabi Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 325,000
- estimate
- Ksh 300,000
Nyamekoma Primary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 325,000
- estimate
- Ksh 300,000
Kugipimo Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kombe Chiefs Office
- location
-
Kombe
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 150,000
Bugumbe North Chiefs Office
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 150,000
Bugumbe Central Chiefs Office
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 150,000
Nyatechi Culverts
- location
-
Bukira East
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamwini Culverts
- location
-
Bukira West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Kebarisia -Nyabosongo-Nyamutiro
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Road
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Chacha Maroa-Ihore- Nguku-Getontira
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Road
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Komasimo Dispensary
- location
-
Bukira North
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Maternity
- output
- Safer Motherhood
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
St. Annes Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Masaba Primary School
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Seronga Dispensary
- location
-
Bwirege East
(in Kuria)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Makonge Dispensary
- location
-
Siabai
(in Kuria)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyankogo Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Biasumu Primary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sakuri-Kegonga Bridge
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Komorama-Maeta-NyamAgeng'A Bridge
- location
-
Maeta
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyabikongori -Komotobo Bridge
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rebirera Bridge
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Masaba-Gekamiri Bridge
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamwitanchiria-Koragati Bridge
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Getonganya -Nyamwitanchiria Bridge
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Hibwa-Kondago Bridge
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Guchisere Bridge
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kuguyi -Nyamataburo-Kugitura Road
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Road
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bosara Bridge
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Guitagito Bridge
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sorore-Kugitura Bridge
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wangira Chiefs Office
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyankore Kemwita Bridge
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Nyankongo Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Makonge Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Girigiri Primary School
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Sakuri Kamwamu Culvert
- location
-
Nguruna
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 500,000
Maeta Dispensary
- location
-
Maeta
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 1,000,000
Girigiri Dispensary
- location
-
Nguruna
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 500,000
St. Angela Girls Secondary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 3,000,000
Gosebe Dispensary
- location
-
Bukira South
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 1,000,000
Gureta Primary School
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 1,000,000
Bukira East Iritongo
- location
-
Bukira East
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 1,000,000
Isibania Health Centre
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Nyabikaye Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Nyametaburo Ass Chiefs Office
- location
-
Bukira South
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Nyangiti Assistant Chief Office
- location
-
Bukira South
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Siabai Assistant Chiefs Office
- location
-
Siabai
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
NyamAgeng'A Primary School road
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Road
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Korogati Primary School
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 200,000
Taranganya Chiefs Camp Office
- location
-
Bukira East
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Matare Primary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2007
- action
- Emergency
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 245,000
- estimate
- Ksh 100,000
NyamAgeng'A Road
- location
-
Maeta
(in Kuria)
- year first funded
- 2008
- action
- Opening Up Of A Newest Road
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 238,433
- estimate
- Ksh 500,000
Ds Office Chinato
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2009
- action
- Rehabilitation Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 1,000,000
Tongeria Primary School
- location
-
Bugumbe Central
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Sorore Primary School
- location
-
Bukira North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Siabai Primary School
- location
-
Siabai
(in Kuria)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Romangucha Primary School
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Nyaroha Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Nyamotambe Primary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Motarakwa Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Matere Mixed Primary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Increased Student Enrollment
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Maeta Primary School
- location
-
Maeta
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Kugitimo Primary School
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Kubweye Primary School
- location
-
Bugumbe West
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 225,000
- estimate
- Ksh 300,000
Nyamagonwi Primary School
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2007
- action
- Renovation
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 225,000
- estimate
- Ksh 0
Bwirege East Chiefs Office
- location
-
Bwirege East
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 206,408
- estimate
- Ksh 1,000,000
Wangirabose Primary School
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kugitimo Chief's Camp
- location
-
Nyabasi North
(in Kuria)
- year first funded
- 2004
- action
- Construction
- output
- Improved Services To The Public
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Keburui Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kombe Dispensary
- location
-
Kombe
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Staff Houses
- output
- Higher Retention Of Staff
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngisiru Dispensary
- location
-
Tagare
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Treatment Rooms
- output
- Enhanced Health Services
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyarukuro Water Spring Protection
- location
-
Bukira East
(in Kuria)
- year first funded
- 2007
- action
- Protection Of Water Spring
- output
- Improved Access To Clean Water
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ds Residence Kegonga
- location
-
Nyabasi East
(in Kuria)
- year first funded
- 2007
- action
- Construction Of D.Os Residence
- output
- Increased Staff Morale
- implementation status
- Not Yet Started
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gwitembe Police Post
- location
-
Siabai
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Police Post
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ihore Assistant Chiefs Office
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Masangora Assistant Chiefs Office
- location
-
Bukira South
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Moheto Assistant Chiefs Office
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nguruna Chiefs Office
- location
-
Nguruna
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyamaranya Assistant Chiefs Office
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyabikaye Ass Chiefs Office
- location
-
Bukira West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kuria Bamboo Project
- location
-
Bukira North
(in Kuria)
- year first funded
- 2008
- action
- Provision Of Seedlings
- output
- Environmental Conservation
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mahuntutntu Coffee Factory
- location
-
Bukira North
(in Kuria)
- year first funded
- 2008
- action
- Repair Of Coffee Store
- output
- Increased Productivitry & Mkt Sharee
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Nyabohanse Ap Line
- location
-
Tagare
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Ap Lines
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Nyaitara Assistant Chiefs Office
- location
-
Maeta
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Mtiniti Primary School
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
Caanan Community Project
- location
-
Wangirabose
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Community Hall
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
Nyametamburo Primary School
- location
-
Bukira South
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Tuition Block
- output
- Better Examination Results
- implementation status
- On Going
- total cost
- Ksh 180,000
- estimate
- Ksh 1,000,000
Bwirege West Chiefs Office
- location
-
Bwirege West
(in Kuria)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- Improved Services To The Public
- implementation status
- On Going
- total cost
- Ksh 177,029
- estimate
- Ksh 1,000,000
Komotobo Primary School
- location
-
Nyabasi West
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Kebaroti Primary School
- location
-
Kebaroti
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Ngisiru Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Nyangoge Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Sagegi Primary School
- location
-
Kombe
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Kewandwi Simbori Colverts
- location
-
Bukira South
(in Kuria)
- year first funded
- 2009
- action
- Construction Of Culverts
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Nyamaranya Primary School
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2005
- action
- Construction Of 2 Classes
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyabokarange Dispensary
- location
-
Bukira North
(in Kuria)
- year first funded
- 2005
- action
- Renovation
- output
- Enhanced Health Services
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyasese Primary School
- location
-
Bukira West
(in Kuria)
- year first funded
- 2006
- action
- Construction
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
NyamAgeng'A Bridge
- location
-
Maeta
(in Kuria)
- year first funded
- 2008
- action
- Construction Of A Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Motemorabu Primary School
- location
-
Bugumbe South
(in Kuria)
- year first funded
- 2007
- action
- Rehabilitation Of Tuition Block
- output
- Better Learning Conditions
- implementation status
- On Going
- total cost
- Ksh 75,000
- estimate
- Ksh 100,000
Masaba T
- location
-
Bugumbe North
(in Kuria)
- year first funded
- 2005
- action
- Office renovation
- output
- Office
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Chacha Moaroa Tisinye Bridge
- location
-
Gokeharaka
(in Kuria)
- year first funded
- 2007
- action
- Construcrion Of Bridge
- output
- Improved Access To Remote Areas
- implementation status
- On Going
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Koromangucha Primary School sool
- location
-
Nyabasi North
(in Kuria)
- action
- Renovation
- output
- Better Learning Conditions
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 0