The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Education Bursary
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2003
- action
- Disbursement Of Bursary To The Needy Students
- output
- Enhance Enrolment, Retention And Completion Rate In Schools
- implementation status
- On Going
- total cost
- Ksh 18,627,377
- estimate
- Ksh 6,000,000
Emergency Reserve
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2004
- action
- Funding Of Unforeseen Circumstances
- output
- Promote Pre Disaster Preparedness
- implementation status
- On Going
- total cost
- Ksh 9,990,352
- estimate
- Ksh 8,000,000
Loiyangalani Secondary School
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2003
- action
- Construction of 2 Classrooms, Admin. Block,Dormitory And Provision Of Desks
- output
- Improve Education Accessibility ,Learnimg Environment &Retention
- implementation status
- Complete And In Use
- total cost
- Ksh 5,000,000
- estimate
- Ksh 10,000,000
Office Administration
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2003
- action
- Office Administration And Supplies
- output
- Increase Efficient Service Delivery To Constituents
- implementation status
- On Going
- total cost
- Ksh 4,832,103
- estimate
- Ksh 2,000,000
Malgis Dam Construction
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2007
- action
- Excavation & Civil Work
- output
- Increase Access To Safe Water For Domestic And Livestock
- implementation status
- Complete And In Use
- total cost
- Ksh 4,500,000
- estimate
- Ksh 6,500,000
Kamotonyi Primary School Classrooms ,Staff House And School Desks
- location
-
Merille
(in Laisamis)
- year first funded
- 2003
- action
- Construction of 4 Classrooms,Administration-On Block & Teachers Quarter And Provision Of Desks
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use.
- total cost
- Ksh 4,130,000
- estimate
- Ksh 4,000,000
Ndikir Borehole And Rock Catchments &Equipment
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2004
- action
- Construction of Rock Catchments Dam And Installation Of Hand Pump
- output
- Accessibility To Water In The Rural Areas For Domestic And Livestock Use.
- implementation status
- Complete And In Use
- total cost
- Ksh 3,350,000
- estimate
- Ksh 3,800,000
New School Construction At Arge Arge Primary School Construction
- location
-
South Horr
(in Laisamis)
- year first funded
- 2003
- action
- Construction of Four Classrooms & Staff Quarter
- output
- Promote Education And Increase Enrolment
- implementation status
- Complete And In Use
- total cost
- Ksh 3,280,000
- estimate
- Ksh 4,000,000
Ballah Health Centre Construction
- location
-
Korr
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Health Centre
- output
- Improve Access To Health Care
- implementation status
- Stalled
- total cost
- Ksh 3,200,000
- estimate
- Ksh 4,500,000
Korr Water Supply
- location
-
Korr
(in Laisamis)
- year first funded
- 2006
- action
- Construction Of Water Supply Pipeline
- output
- Access To Safe & Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 3,000,000
- estimate
- Ksh 5,500,000
Monitoring & Evaluation
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2006
- action
- Supervision &Monitoring Of Cdf Projects
- output
- Ensure Proper Implementation Of Cdf Projects
- implementation status
- On Going
- total cost
- Ksh 2,925,804
- estimate
- Ksh 1,700,000
Gatab Primary School
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2005
- action
- Provision Of School Desks & Construction Of 4 Classrooms
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 2,900,000
- estimate
- Ksh 0
Lontolio Dispensary Construction And Equipping
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2005
- action
- Construction of Staff House,Dispensary, Water Tank And Provision Of Solar, Stretcher, Furniture And Drawer
- output
- Improve Access To Health Care For All
- implementation status
- Complete And In Use
- total cost
- Ksh 2,550,000
- estimate
- Ksh 2,800,000
Olturot Dispensary Construction An D Equipping
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2003
- action
- Construction of Olturot Dispensary, Water Tank & Toilets And Equipping
- output
- Improve Access To Health Care Services
- implementation status
- Complete And Not In Use
- total cost
- Ksh 2,401,000
- estimate
- Ksh 2,500,000
Gangeisa Primary School
- location
-
Kargi
(in Laisamis)
- year first funded
- 2005
- action
- Construction of 3 Classrooms & Administration Block And Provision Of Desks
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use.
- total cost
- Ksh 2,280,000
- estimate
- Ksh 4,000,000
Losikiriachi Primary School Construction
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2004
- action
- Repair And Paints 2 Classroom & Construction of 2 Classrooms And Provision Of Desks
- output
- Promote Education & Improve Learning Environment
- implementation status
- Complete And In Use.
- total cost
- Ksh 2,250,000
- estimate
- Ksh 3,200,000
Kamboe Primary School
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2005
- action
- Construction of 3 Classrooms And School Dormitory
- output
- Education And Increase Enrolment And Completion Rate
- implementation status
- 3 Classrooms Are Complete And In Use.
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,300,000
Laisamis Water Supply And Tirkamo Manyatta
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2003
- action
- Construction of 2 Water Tanks And Distribution Line To Tirgamo Manyatta
- output
- Increase Accessibility To Clean &Safe Water
- implementation status
- Complete And In Use
- total cost
- Ksh 2,070,000
- estimate
- Ksh 2,500,000
Rehabilitation Of Gobborre Borehole
- location
-
Korr
(in Laisamis)
- year first funded
- 2003
- action
- Excavation And Construction Trough And Water System
- output
- Increase Access To Safe And Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,300,000
Tririm Primary School Construction
- location
-
Korr
(in Laisamis)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,500,000
Log Logo Primary School Girls Dormitory And School Desks
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2004
- action
- Construction of A Girls Dormitory And Provision Of School Desks
- output
- Improve Learning Environment And Enhance Enrolment ,Retention &Complete Rate
- implementation status
- Complete And In Use.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,800,000
Kargi Nkarkar Water Supply
- location
-
Kargi
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Water Supply
- output
- Increase Accessibility To Clean & Safe Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
Rehabilitation Of Ilaut Dispensary
- location
-
Ngurnit
(in Laisamis)
- year first funded
- 2005
- action
- Dispensary Repair & Lab Construction, Staff House, Solar Panel, Stretcher And Fencing
- output
- Improve Access To Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
Kargi Water Supply And Masonry Tank
- location
-
Kargi
(in Laisamis)
- year first funded
- 2004
- action
- Construction of Water Pipeline And Masonry Storage Tanks
- output
- Increase Accessibility To Safe And Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 1,760,000
- estimate
- Ksh 18,600,000
Rehabilitation Of Classrooms At Kargi Primary School And Construction Of Boys Dormitory
- location
-
Kargi
(in Laisamis)
- year first funded
- 2003
- action
- Repair And Paint Of Four Classrooms And Construction of A Boys Dormitory
- output
- Enhance Enrolment, ,Retention And Completion Rate
- implementation status
- Complete And In Use. Dormitory Ongoing
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,500,000
Lbaarok Primary School Classroom Construction
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use.
- total cost
- Ksh 1,580,000
- estimate
- Ksh 2,200,000
Log Logo Water Supply
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2006
- action
- Construction Of Water Supply Pipeline &Protection Of Wells And Construction Of Troughs
- output
- Improve Access To Safe And Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 1,533,792
- estimate
- Ksh 1,500,000
Merille Dispensary Improvement
- location
-
(in Laisamis)
- year first funded
- 2005
- action
- Rehabilitation Of Dispensary & Construction Of InPatient Ward
- output
- Improve Access To Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Arge Water Project
- location
-
South Horr
(in Laisamis)
- year first funded
- 2008
- action
- Construction of Water Supply Systems/Piping
- output
- Increase Access To Clean Water For Domestic And Livestock
- implementation status
- Not Yet Done
- total cost
- Ksh 1,500,000
- estimate
- Ksh 5,870,000
Laisamis Secondary School Fencing And Rehabilitation
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2006
- action
- Fencing And Reroofing Of School Dormitories.
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,500,000
Kurungu Dispensary
- location
-
South Horr
(in Laisamis)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Improve Access To Health Cares
- implementation status
- Complete And Not In Use
- total cost
- Ksh 1,450,000
- estimate
- Ksh 2,200,000
Arapal Administration Police Post
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2007
- action
- Construction of Ap Unihuts And Installation Of Radio Call
- output
- Boosting Security And Improve Communication
- implementation status
- Complete And In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
El Molo Community Market/Curio
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2006
- action
- Construction of 2 Market Stalls/Curio Shops At Liyani & Kamote Village
- output
- Promote And Conservation Of Cultural Artifacts
- implementation status
- Complete And In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,500,000
ChurGudasSoriadi Road
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2007
- action
- Repair Of Roads I.E. Side Trenches, Bush Clearing Filling Of Potholes
- output
- Improve Transport And Accessibility
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 3,000,000
Laisamis Cultural Centre
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2006
- action
- Construction of Cultural Center With A Store
- output
- Promote Cultural Activities
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 200,000
Santur /Nawapa Water Supply
- location
-
Loiyagalani
(in Laisamis)
- year first funded
- 2007
- action
- Construction of Water Supply Pipeline From Santur To Nawapa
- output
- Improve Access To Safe Water For All And Hygiene
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,800,000
South Horr Administration Police Post
- location
-
South Horr
(in Laisamis)
- year first funded
- 2007
- action
- Construction of Ap Residential House
- output
- Boosting Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,000,000
Log Logo Health Centre
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2008
- action
- Construction of New Health Centre
- output
- Improve Access To Health Care
- implementation status
- Reallocated
- total cost
- Ksh 1,200,000
- estimate
- Ksh 6,500,000
Recurrent Expenditure
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2008
- action
- Equipment Expenses
- output
- Maintenance Of Equipment And Plants
- implementation status
- On Going
- total cost
- Ksh 1,144,354
- estimate
- Ksh 1,200,000
Gudas Gen-Set & Cattle Troughs - Changed To Log-Logo Water Supply Rehabilitation
- location
-
LogLogo
(in Laisamis)
- year first funded
- 2003
- action
- Rehabilitation 0F Water Supply
- output
- Increase Access To Safe And Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Moite A Line
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2006
- action
- Construction of A.P Residential House And Toilets
- output
- Improve Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Arapal Primary School Construction
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2003
- action
- Construction of Two Classrooms
- output
- Promote Education And Increase Enrolment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,082,191
- estimate
- Ksh 2,000,000
Kurkum Yeel Feeder Road
- location
-
Kargi
(in Laisamis)
- year first funded
- 2008
- action
- Construction of New Feeder Road. (I.E. Side Trenches, Bush Clearing).
- output
- Improve Transport Accessibility And Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
El Molo Water Supply
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2004
- action
- Construction of Water Supply Pipeline
- output
- Increase Accessibility To Safe & Clean Water For All
- implementation status
- Complete And Not In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kargi Feeder School
- location
-
Kargi
(in Laisamis)
- year first funded
- 2004
- action
- Construction of Two Classrooms
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ngurnit Dispensary Construction
- location
-
(in Laisamis)
- year first funded
- 2005
- action
- Construction Dispensary Staff House
- output
- Improve Access To Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,800,000
ElMolo Water Supply
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Water Supply Pipeline
- output
- Increase Accessibility To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,300,000
Silapani Water
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2006
- action
- Construction Of Water Supply Pipeline
- output
- Access To Safe & Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
SouthHorr Water
- location
-
South Horr
(in Laisamis)
- year first funded
- 2006
- action
- Construction of Water Supply Pipeline
- output
- Access To Safe & Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Kuya Water Project
- location
-
Kargi
(in Laisamis)
- year first funded
- 2007
- action
- Protection Of 17Wells And Construction Of Troughs
- output
- Improve Access To Safe Water For All And Hygiene
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Kamboe Water Supply
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2007
- action
- Construction Of Water Supply Pipeline
- output
- Improve Access To Safe Water For All And Hygiene
- implementation status
- To Be Confirm
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Loiyangalani Moite Road
- location
-
Loiyangalni
(in Laisamis)
- year first funded
- 2007
- action
- Repair Of Roads 95Km Side Trenches, Bush Clearing Filling Of Potholes
- output
- Improve Transport And Accessibility
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,500,000
Nabey Water Supply
- location
-
Korr
(in Laisamis)
- year first funded
- 2008
- action
- Construction of Water Supply Systems
- output
- Increase Access To Clean And Safe Water For Domestic
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,300,000
SakaRoadala Borehole Construction And Equipping
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2008
- action
- Construction Work And Equipping
- output
- Accessibility To Clean Water For Domestic And Livestock Use.
- implementation status
- Complete In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 2,800,000
Loiyangalni Larachi Feeder Roads
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2008
- action
- Construction of New Feeder Road. (I.E. Bush Clearing And Filling Of Potholes).
- output
- Improve Transport And Accessibility
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 3,000,000
Nairibi Primary School Classroom Construction
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2007
- action
- Construction of 1 Classroom And Provision Of Desks
- output
- Promote Education And Improve Learning Environment
- implementation status
- 80% Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 2,500,000
Kurkum Primary School
- location
-
Kargi
(in Laisamis)
- year first funded
- 2007
- action
- Construction of 1 Classroom And Provision Of Desks
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 4,500,000
Larachi Primary School
- location
-
Mt.Kulal
(in Laisamis)
- year first funded
- 2007
- action
- Construction of 1 Classroom And Provision Of Desks
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 3,800,000
Rehabilitation Merille Water System
- location
-
Merille
(in Laisamis)
- year first funded
- 2006
- action
- Rehabilitation Of Water Supply And Water Piping
- output
- Access To Safe & Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 1,150,000
Marmar Water Supply
- location
-
Kargi
(in Laisamis)
- year first funded
- 2006
- action
- Construction Of Water Supply Pipeline
- output
- Access To Safe& Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Ballah Primary School Construction
- location
-
Korr
(in Laisamis)
- year first funded
- 2003
- action
- Construction of Staff Quarters
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Laisamis Hospital Rehabilitation
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2005
- action
- Rehabilitation Of Hospital
- output
- Improve Access To Health Care
- implementation status
- Not Started
- total cost
- Ksh 850,000
- estimate
- Ksh 500,000
Sunyuro Primary School
- location
-
Korr
(in Laisamis)
- year first funded
- 2007
- action
- Construction of 1 Classroom And Provision Of Desks
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use. Desks Not Yet Provided
- total cost
- Ksh 800,000
- estimate
- Ksh 3,500,000
Strategic Planning And Constituency Website
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2008
- action
- Planning And Designing Of Five Year Strategic Plan And Constituency Website
- output
- Enhance Proper Planning
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,650,000
Kurkum A Line
- location
-
Kargi
(in Laisamis)
- year first funded
- 2006
- action
- Construction of A.P Residential House And Toilets
- output
- Improve Security
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 1,250,000
Laisamis Constituency Environment Activities
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2008
- action
- Capacity Building And Conservation Of Environment
- output
- Promote And Conservation Of Environment
- implementation status
- On Going
- total cost
- Ksh 762,902
- estimate
- Ksh 762,902
Laisamis Constituency Sports Activities
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2008
- action
- Organizing And Conducting Sports Activities
- output
- Promote Sports Activities
- implementation status
- On Going
- total cost
- Ksh 762,902
- estimate
- Ksh 762,902
Kurungu Primary School Desks
- location
-
South Horr
(in Laisamis)
- year first funded
- 2004
- action
- Purchase And Provision Of Desks
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Ulauli Primary School Classroom Construction
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2006
- action
- Construction of 1 Classroom And Provision Of Desks
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
Losidan Primary School Classroom Construction
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2006
- action
- Construction of 1 Classroom And Provision Of Desks
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 1,400,000
Bura Aramia Primary School
- location
-
Korr
(in Laisamis)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- Promote Education
- implementation status
- Complete And In Use
- total cost
- Ksh 680,000
- estimate
- Ksh 4,500,000
Loiyagalani Government Dispensary
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Dispensary And Provision Of Furniture
- output
- Improve Access To Health Care
- implementation status
- Complete And In Use.
- total cost
- Ksh 650,000
- estimate
- Ksh 1,500,000
Excavation Of Matarbah Water Pan
- location
-
Korr
(in Laisamis)
- year first funded
- 2003
- action
- Excavation Work
- output
- Increase Access To Safe And Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 750,000
GenSet Laisamis Secondary School
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2005
- action
- Provision Of Computer, Office Printer And School Text Books.
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Nahgan/Matarba Dam Construction
- location
-
Korr
(in Laisamis)
- year first funded
- 2007
- action
- Desilting & Fencing Of Dam
- output
- Increase Access To Safe Water In Rural Areas For Domestic And Livestock
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Kamboe Dispensary Construction
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2006
- action
- Construction of Masonry Tank & Solar Panel, Stretcher & Tables
- output
- Improve To Health Care Services
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,400,000
Arapal Water Supply
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2006
- action
- Construction Of Water Supply Pipeline.
- output
- Access To Safe & Clean Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Rehabilitation Of Kargi Dispensary
- location
-
Kargi
(in Laisamis)
- year first funded
- 2003
- action
- Repair And Paints Of Medical Lab And Provision Laboratory Equipment
- output
- Improve Access To Health Care Services
- implementation status
- Complete And In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 800,000
Gatab Hospital
- location
-
Mt.Kulal
(in Laisamis)
- year first funded
- 2007
- action
- Repair Of Inpatient Ward
- output
- Improve Access To Health Care
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Merille Dispensary Water Supply
- location
-
Merille
(in Laisamis)
- year first funded
- 2008
- action
- Extension Of Water Piping System To Dispensary
- output
- Increase Access To Clean And Safe Water For Patients
- implementation status
- Not Yet Started
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Olturot Primary School
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kargi Community Posho Mill
- location
-
Kargi
(in Laisamis)
- year first funded
- 2008
- action
- Construction of Posho Mill And Fencing
- output
- To Bring Closer Maize Grinding Services To Community
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Gatab Community Posho Mill
- location
-
Mt.Kulal
(in Laisamis)
- year first funded
- 2008
- action
- Construction And Installation Posho Mill
- output
- To Bring Closer Maize Grinding Services To Community
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Soriadi Cattle Trough And Water Tank
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2008
- action
- Construction of Cattle Trough And Masonry Tank
- output
- Increase Access To Clean And Safe Water For Both Domestic And Livestock
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Sukuroi Dam Expansion
- location
-
Korr
(in Laisamis)
- year first funded
- 2007
- action
- Desilting And Expansion
- output
- Increase Access To Clean And Safe Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Gorle Dam
- location
-
South Horr
(in Laisamis)
- year first funded
- 2007
- action
- Construction of Dam And Fencing
- output
- Increase Access To Clean And Safe Water For All
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Log Logo Radio Call
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2006
- action
- Provision And Installation Of Radio Call Sets
- output
- Boast Security And Improve Communication
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Kamotonyi Wells Protection
- location
-
Merille
(in Laisamis)
- year first funded
- 2006
- action
- Protection Of Wells And Trough
- output
- Access To Safe & Clean Water For Livestock And Domestic Use
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Trikamo Boreholes Vide
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Troughs
- output
- Increase Accessibility To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Feasibility Study For Ndikir And Namarei Rock Catchments
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2004
- action
- Carrying Out Feasibility Studies
- output
- Sustainability Of Rock Catchments
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Loiyangalani Primary School
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2005
- action
- Provision Of Solar Panels And School Desks
- output
- Improve Learning Environment
- implementation status
- Complete And In Use.
- total cost
- Ksh 350,508
- estimate
- Ksh 230,000
Rehabilitation Of Balah Hand Pump
- location
-
Korr
(in Laisamis)
- year first funded
- 2003
- action
- Rehabilitation And Installation Of Hand Pump.
- output
- Improve Access To Safe And Clean Water
- implementation status
- Complete And Not In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Losikiriachi Roads Repair
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2007
- action
- Repair Of Roads I.E. Filling Of Potholes And Bush Clearing
- output
- Improve Transport And Accessibility
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Kargi Haiyai Dam Desilting
- location
-
Kargi
(in Laisamis)
- year first funded
- 2008
- action
- Desilting Of Dam
- output
- Increase Access To Clean Water For Domestic And Livestock
- implementation status
- Complete And In Use
- total cost
- Ksh 301,181
- estimate
- Ksh 500,000
Kijiji Nursery
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Promote Education And Improve Learning Environment
- implementation status
- Complete And In Use.
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Halisurwa Water Supply
- location
-
Korr
(in Laisamis)
- year first funded
- 2004
- action
- Construction of Water Supply Pipeline
- output
- Increase Accessibility To Safe And Clean Water
- implementation status
- Complete And Not In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Gatab Road
- location
-
Mt. Kulal
(in Laisamis)
- year first funded
- 2007
- action
- Overhaul Of 35Km Roads I.E. Filling Of Potholes And Bush Clearing
- output
- Improve Transport And Accessibility
- implementation status
- Complete And In Use
- total cost
- Ksh 249,718
- estimate
- Ksh 500,000
Buraramia Water Trough
- location
-
Korr
(in Laisamis)
- year first funded
- 2007
- action
- Construction of Cattle Trough
- output
- Improve Access To Clean And Safe Water For Livestock
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
OlLogo Irrigation
- location
-
Log Logo
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Storage Tanks/Making Irrigation Schemes
- output
- Increase Accessibility To Clean Water
- implementation status
- To Be Confirm
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Anderi Water Tank
- location
-
South Horr
(in Laisamis)
- year first funded
- 2007
- action
- Construction Of Storage Tank
- output
- Increase Access To Safe Water For All And Improve Hygiene
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Merille Primary School
- location
-
Merille
(in Laisamis)
- year first funded
- 2005
- action
- Provision Of Solar Panels
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 150,508
- estimate
- Ksh 230,000
Laisamis Primary School
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2005
- action
- Provision Of Solar Panels
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 150,508
- estimate
- Ksh 230,000
Solar Panel For Loiyangalani Secondary School
- location
-
Loiyangalani
(in Laisamis)
- year first funded
- 2005
- action
- Provision Of Solar Panels
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 150,508
- estimate
- Ksh 230,000
Supply Of Solar Panels To Lontolio Primary School
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2004
- action
- Supply Of Solar Panels
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Supply Of Solar Panels To Korr Primary School
- location
-
Korr
(in Laisamis)
- year first funded
- 2004
- action
- Supply Of Solar Panels
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Laisamis Water Supply
- location
-
Laisamis
(in Laisamis)
- year first funded
- 2005
- action
- Construction Of Water Piping Systems
- output
- Increase Accessibility To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Supply Of Solar Panels To Kargi Primary School
- location
-
Kargi
(in Laisamis)
- year first funded
- 2004
- action
- Supply Of Solar Panels
- output
- Improve Learning Environment
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000